RRA Annual Budget 1989-1990 I•
Rosemead Redeveiopment Agency
Rosemead, California
1•
1•
I.
1989-90 ANNUAL BUCIGET
MMMOMEMMS
■ @UPWIEK ■
ImMMMMMMff
IMINIMME OF
I•
I•
ROSEMEAD REDEVELOPMENT AGENCY
ANNUAL BUDGET
FISCAL YEAR 1989 - 1990
10
10
1•
1•
10
I•
1•
DENNIS McDONALD
CHAIRMAN
JAY T. IMPERIAL
VICE CHAIRMAN
ROBERT W. BRUESCH
AGENCY MEMBER
GARY A. TAYLOR
AGENCY MEMBER
ROBERT DeCOCKER
AGENCY MEMBER
10
I•
I•
1•
1•
I•
1•
1•
19
1•
I•
I•
I*
1 0
I*
10
19
10
1•
19
10
I*
May 26, 1989
ROSEMEAD REDEVELOPMENT AGENCY
8838 VALLEY BLVD., ROSEMEAD, CA 91770 • (818) 288-6671 • Telecopier 8183079218
HONORABLE CHAIRMAN
AND MEMBERS
ROSEMEAD REDEVELOPMENT AGENCY
RE: ANNUAL BUDGET
FISCAL YEAR 1989-90
SIRS:
Submitted for your review and consideration is the 1989-90 Annual
Budget for the Rosemead Redevelopment Agency. This document presents
actual revenues and expenditures for fiscal year 1987-88, projected
reveunes and expenditures for fiscal year 1988-89, and budgeted
revenues and expenditures for fiscal year 1989-90.
The fiscal year 1989-90 budgeted expenditures total $19,348,570.00
with 1.6% allocated for administrative overhead. Five traffic signal
projects are scheduled for completion during 1989-90 including two
modifications for left turn phasing, installation of two traffic
signals, and the upgrading of one signal to improve vehicular
capacity. These traffic signal projects represent 1.3% of the
budgeted expenditures. The special projects for 1989-90 account for
11.5% of the budget. Special projects encompasses such items as the
installation of three storm drains, a master storm drain plan,
completion of the Garvey Park restrooms along with the addition of a
concession stand, revamping of the play area, and landscaping. A
transfer to the Debt Service Fund is scheduled during 1989-90 (13.5%
of budgeted expenditures) to fund that year's interest and principal
payments of the 1987 Tax Allocation Notes. At 72.1%, the street
projects represent the largest portion of the 1989-90 budgeted
10
I*
19
Re: Annual Budget Fiscal Year 1989-90
May 26, 1989
Page 2
I•
1•
1•
expenditures. The Garvey Avenue reconstruction, including raised
landscaped medians and concrete intersections, is scheduled for
completion and is expected to improve both the vehicular riding
characteristics and safety, minimize maintenance, and improve
aesthetics.
The estimated revenues for 1989-90 are derived from tax increment
receipts and the interest income earned on investments. Combined with
a beginning fund balance of $15,659,430.00, the total resources
available for 1989-90 are $20,160,930.00.
1•
1•
10
10
I*
Fiscal Year 1989-90 includes approximately fourteen million dollars of
budgeted expenditures applicable to the requirements necessary to
qualify for a deferral of the current year's estimated Low & Moderate
Income Housing Set Aside. In order to qualify for deferment of the
housing set aside, the Agency must spend approximately four million
dollars during the 1989-90 fiscal year on the pre-existing projects
approved via Resolution 86-36. Staff is in the process of developing
both a Low & Moderate Income Housing Plan and the calculations
necessary to determine the 1986 through 1996 cummulative deferral
amount.
It is recommended that the Agency review and
approve the Budget for Fiscal Year 1989-90.
Respectfully submitted,
MANR G. TRIPEPI
EXECUTIVE DIRECTOR
FGT:smn
following any amendments,
10
ROSEMEAD REDEVELOPMENT AGENCY
•
ANNUAL BUDGET
FISCAL YEAR 1989 - 90
•
TABLE OF CONTENTS
Page
I. SUMMARY OF FUND BALANCES
Debt Service Funds . . . . . . . . . . . . . . . . . 1
Redevelopment Funds . . . . . . . . . . . . . . . . . 2
II. SUMMARY OF EXPENDITURES BY CATEGORY
Debt Service Funds . . . . . . . . . . . . . . . . . 3
Redevelopment Funds . . . . . . . . . . . . . . . . . 4 - 7
III. CHART OF ACCOUNTS
Revenue . . . . . . . . . . . . . . . . . . . . . . 8
Expenditures . . . . . . . . . . . . . . . . . . . . 8 - 10
IV. 1989 - 90 EXPENDITURE DETAIL
Administration (4210) . . . . . . . . . . . . . . . . . 11 - 12
• Special Projects (4215) . . . . . . . . . . . . . . . . 13 - 15
Street Projects (4500) . . . . . . . . . . . . . . . . 16 - 20
Traffic Signals (4530) . . . . . . . . . . . . . . . . 21 - 22
•
0
0
I•
[j
1•
1•
1•
1•
10
10
1•
xV-
4f r
w
C
N
40
~ J
O
OD Q
wz ~ Q
CO)
w L
z
n
c ~wt o LL
w~
CL I w
to jLl.-
w
O A
6L
W r
40
y~
G~ ~ A
W
OD
0)
w
In
cr 4
C ~
U.
U. N
OD
C
Q
b
to
10
i•
I•
I*
is
i•
I•
I•
1•
is
i•
19
•
ROSEMEAD REDEVELOPMENT AGENCY
•
SUMMARY OF FUND BALANCE
*Debt Service Funds
•
1988 - 89 1989 - 90
Projected Budgeted
Total
• RESOURCES
Funds Available At July 1 $3,176,700 $3,372,700
Transfers From Redevelopment Fund:
Tax Increment 2,638,140 2,616,760
•
Interest Earnings On Fiscal Agent Holdings 196,000 210,000
TOTAL FUNDS AVAILABLE $ 6,010,840 $6,199,460
•
EXPENDITURES
Debt Service Expenditures:
•
Principal $ 1,420,000 $1,515,000
Interest 1,218,140 1,101,760
• TOTAL EXPENDITURES & TRANSFERS: $ 2,638,140 $2,616,760
FUND BALANCE AT JUNE 30: $ 3,372,700 $3,582,700
•
* These funds are held by fiscal agents and are not available for use by the
Redevelopment Agency.
•
•
-1-
I•
ROSEMEAD REDEVELOPMENT AGENCY
•
SUMMARY OF FUND BALANCE
Redevelopment Funds
RESOURCES
Funds Available At July 1
Tax Increment
Interest Earnings
Miscellaneous Revenue
TOTAL FUNDS AVAILABLE:
0
Administrative Expenditures
Special Project Expenditures
Street Project Expenditures
Traffic Signal Expenditures
Transfers To Debt Service Fund:
Tax Increment
TOTAL EXPENDITURES AND TRANSFERS:
0
FUND BALANCE AT JUNE 30:
40
1988 - 89 1989 - 90
Projected Budgeted
Total
$20,353,290 $15,659,430
3,310,500 3,750,000
1,347,000 750,000
1,500 1,500
$25,012,290 $20,160,930
$ 318,300
$ 303,410
2,701,990
2,224,900
3,671,930
13,953,500
22,500
250,000
2,638,140
2,616,760
$ 9,352,860
$19,348,570
$15,659,430 $ 812,360
-2-
1•
1•
1•
1•
If
I•
1•
1•
10
Z
Cc o
U')
W
a
o
o
U
IL
~
Q
F-
OD
LLJ
Z
m
CO
~
~
W
w
a:
D
a
Cl) CL
'
W
o
z
ui
_
E
o
M
o
o
aL
x
W
cr
w
a
N
N
W
W
c
•
o
-
I
ao
W
m
0
W
cr
0
0 0
0
0
0 0
69
0
0 0
LJO
r-
LO
V- f39
Ee
b3
I!
I*
I*
i•
I•
I*
I•
I•
10
i•
10
1•
[l
I•
1•
1•
[7
1•
I•
1•
1•
0
z
m
m
W
0
N
Q
o
O
O
m
CO)
ww
cr.
LO
Z
o)
D
w
Z
a
U
z
w
w
a
C
a
x
w
M
w
w
V )
U)
a
d.
V
ir
0
0
e
9
`o
m
m
W
m
Q,
~
w
o
N
63
W
O
O
O
O
~
i
LU
~n
Q
C
U
I•
0
ROSEMEAD REDEVELOPMENT AGENCY
SUMMARY OF EXPENDITURES BY CATEGORY
0
DEBT SERVICES FUNDS
1987 - 88
ACTUAL
1987 TAX ALLOCATION NOTES
Principal
Interest
DEBT SERVICE FUND TOTALS
ID
Principal
Interest
10
0
0
0
$1,000,000
902,170
$1,902,170
$1,000,000
902,170
$1,902,170
1988 - 89
PROJECTED
$1,420,000
1,218,140
$2,638,140
$1,420,000
1,218,140
$2,638,140
1989 - 90
BUDGETED
$1,515,000
1,101,760
$2,616,760
$1,515,000
1,101,760
$2,616,760
-3-
I•
I•
1•
1•
I•
1•
1•
I•
I•
I•
•
•
•
0
•
•
9
0
0
0
U
Z
W
~ Q
Q F z
w
W z =
~ w ~
~ Q°
~ Jw
Wa
>m
W
D
w
e
C
O
• V
m m
MMM p
v+ ~
a
V
ao
~a
m
r
m
•
C
02
m C
0
r
H
r
C
N
N
Q
m
C6
OD
A
T
0
r
r
M
h
m
r
N
O
Q
j o
OD
W
T
■
1•
ROSEMEAD REDEVELOPMENT AGENCY
1•
I*
I•
I•
I*
I•
I•
I•
1•
1•
SUMMARY OF EXPENDITURES BY CATEGORY
Redevelopment Funds
ADMINISTRATIVE
(Cost Center 4210)
Agency Salaries
*Fringe Benefits
Auditing Fees
Legal Fees
*Administrative Services
*Financial Services
*Planning Services
Professional Services
*Vehicle Maintenance
Office Supplies
Office Equipment Maintenance
Travel and Meeting
Personnel Training
Membership/Subscriptions
Office Equipment
Vehicle
TOTAL ADMINISTRATIVE:
1987 - 88
1988 - 89
1989 - 90
Actual
Projected
Budgeted
$ 14,025
$ 16,600
$ 16,600
1,440
1,400
1,600
8,073
10,000
10,000
25,335
30,000
35,000
87,699
96,180
99,200
35,026
42,160
43,420
51,875
66,690
70,550
14,981
9,000
9,000
3,033
2,680
3,350
1,676
1,500
.1,700
1,651
1,600
1,700
2,856
3,500
3,500
-0-
5,000
3,000
965
1,100
1,100
40,575
15,630
3,690
11,221
15,260
-0-
$ 300,431
$ 318,300
$ 303,410
* Reimbursement of City incurred costs.
SPECIAL PROJECTS
(Cost Center 4215)
Zapopan Center
Commercial Rehabilitation
Garvey Park Parking Facility
Garvey Park
Fern School Sports Complex
Rio Hondo Park
Fire Station
Garvey Park Improvements Program
Zapopan Park Improvement Program
Rosemead Library Improvement
Ramona Sewer
Klingerman Drain Extension
Fern Drain Extension
Master Storm Drain Plan
Zapopan Park Drain
Zapopan Parking Lot Improvements
$ -0-
$ 20,000
$ -0-
-0-
-0-
100,000
3,615
-0-
-0-
16,315
-0-
-0-
421,977
651,000
-0-
-0-
5,900
-0-
1,284
800,000
-0-
66,877
-0-
-0-
929
-0-
-0-
114,885
135,100
-0-
77,335
13,770
-0-
(32,696)
-0-
-0-
435
33,870
-0-
-0-
-0-
20,000
1,096
21,000
279,000
-0-
3,500
46,500
-4-
1•
ROSEMEAD REDEVELOPMENT AGENCY
I•
10
I*
19
I•
I•
19
10
16
19
SUMMARY OF EXPENDITURES BY CATEGORY
Redevelopment Funds (continued)
1987 - 88 1988 - 89
Actual Projected
SPECIAL PROJECTS (cont.)
(Cost Center 4215)
Slurry Seal Project
Concrete Repair Project
Newmark (San Gabriel/Falling Leaf) &
Ivar (Garvey/1200' North) Storm Drain
City Hall Space Analysis
Earthquake/DSR 50953/Garvey Park Gym
Garvey Gym Remodel
Walnut Grove Slope - East
Fern School Sports Complex/Equipment
Garvey Park Project Building/Sandblast
Zapopan Park Projects
Garvey Park Landscaping
Walnut Grove Slope - West
Jackson Drain
San Gabriel Drain
Garvey Park Gym Graphics
TOTAL SPECIAL PROJECTS
STREET PROJECTS
(Cost Center 4500)
Supportive Engineering
Paveouts
Gladys (Garvey/Cul De Sac)
San Gabriel Overpass Widening
Graves (City Limit/Limit)
Columbia (Del Mar/New)
Falling Leaf (Garvey/Graves)
Evelyn (Hellman/Garvey)
Isabel (Hellman/Garvey)
Stevens (Hellman/Emerson)
Prospect (Hellman/Emerson)
La Madrina (Walnut Grove/WE)
Falling Leaf (Emerson/N End)
Alley Improvements
Garvey Improvements - Phase I
S Gab/Wal Grv/Landis View Project
Hellman Ave. (Ingleside Beacon)
184
-0-
39,972
12,054
16,229
9,168
-0-
-0-
-0-
-0-
-0-
-0-
-0-
-0-
-0-
$ 749,659
-5-
66,750
5,538
44,147
10,541
2,898
492,601
56,745
494,312
388,662
15,308
37,418
973
14,535
27,030
3,546
2,982
21,853
60,000
2,600
560,000
-0-
71,000
224,000
-0-
70,750
2,400
5,100
-0-
-0-
22,000
-0-
-0-
$ 2,701,990
50,000
-0-
-0-
122,000
10,000
350
465,000
-0-
-0-
278,400
235,000
320
103,000
180,000
10,000
30,000
-0-
1989 - 90
Budgeted
60,000
127,400
-0-
-0-
-0-
-0-
13,000
-0-
450,000
25,000
225,000
150,000
368,000
350,000
11,000
$ 2,224,900
50,000
30,000
-0-
750,000
1,000,000
-0-
-0-
-0-
-0-
-0-
-0-
50,000
-0-
168,600
3,800,000
69,000
-0-
I•
ROSEMEAD REDEVELOPMENT AGENCY
1•
I•
Is
1•
1•
I•
is
1•
is
10
SUMMARY OF EXPENDITURES BY CATEGORY
Redevelopment Funds (continued)
STREET PROJECTS (cont.)
(Cost Center 4500)
Kelburn (Garvey/Newmark)
La Presa (Garvey/Fern)
Emerson (Del Mar/Evelyn)
Willard (Garvey/Fern)
Delta (Fern/Klingerman)
Walnut Grove (Fwy 10/Klingerman)
San Gabriel (Garvey/Rush)
Resurfacing Project (Infrastructure -
Priority A)
Walnut Grove (King/S City Limit)
Greensdale (Earlswood/Hershey)
Hershey (Greensdale/Earlswood)
Stevens (Garvalia/Graves)
Kelburn (Newmark/Graves)
Bartlett (Garvey/Klingerman)
Gladys (Hellman/Garvey)
Dubonnet (Muscatel/Fern)
Pal Jay (Fern/Klingerman)
La Presa (Fern/Klingerman)
Charlotte (Garvey/South End)
Resurfacing Project (Infrastructure -
Priority B)
Whitmore Alley (Wilson/Eckhart)
Walnut Grove Beautification
Infrastructure Management Plan Annual
Update
Newmark (Pine/Falling Leaf)
Fern (San Gabriel/Falling Leaf)
Mobil/Carrow's Access Modification
Whitmore (San Gabriel/West End)
Eckhart Alley (Whitmore/North End)
Resurfacing Project
Fern (River/Stingle)
Rosemead Place (Garvey/Ramona)
Fern (Walnut Grove/Muscatel)
Melrose (Jackson/West End)
Muscatel (Klingerman/Garvey)
Del Mar (Hellman/Highcliff)
1987 - 88
1988 - 89
1989 - 90
Actual
Projected
Budgeted
$ 3,934
$ 10,000
$ 232,600
342
194,000
-0-
11,140
6,000
120,000
24,496
10,000
200,000
513
40,000
210,000
-0-
20,000
280,000
513
30,000
285,000
52,402
300,000
-0-
32,806
180,100
-0-
-0-
17,000
133,000
-0-
9,000
91,000
-0-
34,000
250,000
72,412
90,000
641,300
2,392
388,000
-0-
15,276
155,000
-0-
342
11,000
139,000
-0-
25,000
235,000
537
47,000
575,000
-0-
20,000
280,000
513
60,000
240,000
17,483
130,000
145,000
1,155
800
150,000
-0-
-0-
20,000
-0-
20,000
269,000
-0-
10,000
185,000
-0-
5,500
-0-
-0-
-0-
150,000
-0-
-0-
50,000
-0-
-0-
400,000
-0-
-0-
400,000
-0-
-0-
970,000
-0-
-0-
210,000
-0-
-0-
100,000
-0-
-0-
600,000
(639)
19,400
-0-
-6-
1•
ROSEMEAD REDEVELOPMENT AGENCY
I•
C7
I*
10
I*
1•
is
10
is
10
SUMMARY OF EXPENDITURES BY CATEGORY
Redevelopment Funds (continued)
1987 - 88
1988 - 89
1989 - 90
Actual
Projected
Budgeted
STREET PROJECTS (cont.)
(Cost Center 4500)
Arston (Charlotte/Gaydon)
$ -0-
$ -0-
$ 100,000
Emerson (W. City Limit/Evelyn)
-0-
-0-
325,000
Del Mar (Fwy 10/11ellman)
-0-
-0-
50,000
Fern/Walnut Grove/Klingerman Drain
(1,734)
-0-
-0-
Garvey Undergrounding
16,308
-0-
-0-
Charlotte (Garvey/480 N Park)
7,825
-0-
-0-
Pine (Graves/Newmark)
27,545
56,000
-0-
Infrastructure Mgmt Plan
15,240
-0-
-0-
Hellman (Del Mar/New)
495
60
-0-
De Quine (Garvey/Egley)
139,805
-0-
.-0-
Lindy (Garvey/Egley)
133,522
-0-
-0-
Prospect (Garvey/Egley)
135,833
-0-
-0-
Egley (New/Jackson)
2,954
-0-
-0-
Angelus (Fern/Klingerman)
146,828
300,000
-0-
TOTAL STREET PROJECTS:
$ 2,546,077
$ 3,671,930
$13,953,500
TRAFFIC SIGNALS
(Cost Center 4530)
Valley @ Walnut Grove
$ (64)
$ -0-
$ -0-
Graves @ San Gabriel
2,500
500
109,500
Walnut Grove @ San Gabriel
1,905
500
40,500
Walnut Grove @ Landis View
-0-
-0-
70,000
San Gabriel @ Delta
138,774
-0-
-0-
San Gabriel @ Emerson
47,817
15,500
-0-
San Gabriel @ Hellman
19,300
6,000
-0-
Garvey @ Walnut Grove
-0-
-0-
20,000
Garvey @ Del Mar
-0-
-0-
10,000
TOTAL TRAFFIC SIGNALS:
$ 210,232
$ 22,500
$ 250,000
REDEVELOPMENT FUND TOTALS:
$ 3,806,399
$ 6,714,720
$16,731,810
-7-
1•
ROSEMEAD REDEVELOPMENT AGENCY
10
10
CHART OF ACCOUNTS
REVENUE
-3900-000 Interest Income
-3945-000 Tax Increment
-3999-000 Miscellaneous
10
1*
EXPENDITURES
Bonds/Notes
-4050-000 Retirement of Principal
-4060-000 Interest Expense
10
10
KI
is
I•
10
Administration
-4210-010
Agency Salaries
-4210-100
Fringe Benefits
-4210-130
Auditing Fees
-4210-131
Legal Fees
-4210-132
Administrative Services
-4210-133
Financial Services
-4210-134
Planning Services
-4210-150
Professional Services
-4210-230
Vehicle Maintenance
-4210-410
Office Supplies
-4210-440
Office Equipment Maintenance
-4210-510
Travel and Meeting
-4210-520
Personnel Training
-4210-730
Membership/Subscriptions
-4210-910
Office Equipment
Special Projects
-4215-241
Commercial Rehabilitation
-4215-260
Master Storm Drain Plan
-4215-261
Zapopan Park Drain
-4215-262
Zapopan Parking Lot Improvements
-4215-263
Slurry Seal Project
-4215-264
Concrete Repair Project
-4215-269
Walnut Grove Slope - East
-8-
I*
ROSEMEAD REDEVELOPMENT AGENCY
I•
10
10
C7
10
19
I*
I*
19
CHART OF ACCOUNTS
EXPENDITURES
Special Projects (continued)
-4215-271
Garvey Park Project Building/Sandblast
-4215-272
Zapopan Park Projects
-4215-273
Garvey Park Landscaping
-4215-274
Walnut Grove Slope - West
-4215-275
Jackson Drain
-4215-281
San Gabriel Drain
-4215-282
Garvey Park Gym Graphics
Street Projects
-4500-800
Supportive Engineering
-4500-820
Paveouts
-4500-902
San Gabriel Overpass Widening
-4500-903
Graves (City Limit/Limit)
-4500-911
La Madrina (Walnut Grove/WE)
-4500-914
Alley Improvements
-4500-918
Garvey Improvements - Phase I
-4500-919
San Gab/Wal Grv/Landis View Project
-4500-921
Kelburn (Garvey/Newmark)
-4500-923
Emerson (Del Mar/Evelyn)
-4500-924
Willard (Garvey/Fern)
-4500-925
Delta (Fern/Klingerman)
-4500-926
Walnut Grove (Fwy 10/Klingerman)
-4500-927
San Gabriel (Garvey/Rush)
-4500-930
Greensdale (Earlswood/Hershey)
-4500-931
Hershey (Greensdale/Earlswood)
-4500-932
Stevens (Garvalia/Graves)
-4500-933
Kelburn (Newmark/Graves)
-4500-936
Dubonnet (Muscatel/Fern)
-4500-937
Pal Jay (Fern/Klingerman)
-4500-938
La Presa (Fern/Klingerman)
-4500-939
Charlotte (Garvey/South End)
Resurfacing Project (Infrastructure -
-4500-940
Priority B)
-4500-941
Whitmore Alley (Wilson/Eckhart)
-4500-942
Walnut Grove Beautification
Infrastructure Management Plan Annual
-4500-943
Update
-4500-944
Newmark (Pine/Falling Leaf)
-4500-949
Fern (San Gabriel/Falling Leaf)
-9-
f•
ROSEMEAD REDEVELOPMENT AGENCY
10
I*
r
I*
10
1•
I•
I•
I*
19
CHART OF ACCOUNTS
EXPENDITURES
Street Proiects (continued)
-4500-951
-4500-952
-4500-953
-4500-954
-4500-956
-4500-957
-4500-959
-4500-961
-4500-966
-4500-969
-4500-979
Traffic Signals
-4530-909
-4530-934
-4530-937
-4530-941
-4530-942
Whitmore (San Gabriel/West End)
Eckhart Alley (Whitmore/North End)
Resurfacing Project
Fern (River/Stingle)
Rosemead Place (Garvey/Ramona)
Fern (Walnut Grove/Muscatel)
Melrose (Jackson/West End)
Muscatel (Klingerman/Garvey)
Arston (Charlotte/Gaydon)
Emerson (W. City Limit/Evelyn)
Del Mar Median (Fwy 10/Hellman)
Graves @ San Gabriel
Walnut Grove @ San Gabriel
Walnut Grove @ Landis View
Garvey @ Walnut Grove
Garvey @ Del Mar
-10-
10
I•
I•
I•
I•
1•
1•
1•
10
1•
is
r%o%o%r-a •r- A r% r1r-r%r-IIf-I ^M& AE7\IT A f%-CAI
rlVaGMr-AW ri CVCVCI_vrIVII_In I
ANNUAL BUDGET
1989-90
Function: REDEVELOPMENT Activity: ADMINISTRATION Account: 4210
APPROPRIATION DETAIL
Account 1987-88 1988-89 1989-90
No. Activity Actual
Fd Object Expense Budget 11 Estimated Budget
Personnel
12 010
Agency Salaries
14,025
17,900
16,600
16,600
12 100
Fringe Benefits
1,440
1,500
1,400
1,600
Total Personnel
15,465
19,400
F78,00
F 18,200
11
Operations
12 130
Auditing Fees
8,073
9,350
10,000
10,000
12 131
Legal Fees
25,335
35,000
30,000
.35,000
12 132
Administrative Services
87,699
94,600
96,180
99,200
12 133
Financial Services
35,026
44,000
42,160
43,420
12 134
Planning Services
51,875
67,000
66,690
70,550
12 150
Professional Services
14,981
9,000
9,000
9,000
12 230
Vehicle Maintenance
3,033
29500
2,680
3,350
12 410
Office Supplies
1,676
1,500
1,500
1,700
12 440
Office Equipment Maintenance
1,651
1,600
1,600
1,700
12 510
Travel and Meeting
2,856
3,500
3,500
3,500
12 520
Personnel Training
-0-
5,000
5,000
3,000
12 730
Membership/Subscriptions
965
1,100
1,100
1,100
Total Operations
233,170
274,150
269,410]
1 281,520
Capital Outlay
12 910
Office Equipment
40,575
15,630
15,630
3,690
12 920
Vehicle
11,221
15,260
15,260
-0
Total Capital Outlay
51,796
30,890
30,890
3,690
Department Total
F 300,431
324,440
318,300
303,410
-11-
ROSEMEAD REDEVELOPMENT AGENCY
BUDGET DETAIL
ADMINISTRATION
Cost
Center 4210
010
AGENCY SALARIES - Provides funds for salaries for Agency Members,
Agency Executive Director, Assistant City Manager, Agency Treasurer,
Agency Secretary, and clerical functions performed directly for the
Agency.
100
FRINGE BENEFITS - Provides funds for the proportionate cost of in-
surance for the Agency's Treasurer, Executive Director, and Assis-
tant City Manager. These costs are incurred by the City of Rosemead
and partially reimbursed by the Agency.
. 130
AUDITING - Provides funds for an independent C.P.A. firm to perform
an annual audit, complete any necessary reports, and provide re-
quested professional information.
131
LEGAL FEES - Provides funds to retain legal services as needed and
or requested by the Agency.
132
ADMINISTRATIVE SERVICES - Provides funds to reimburse the City of
.
Rosemead for services the Aggency requires of the Administration
nt of the costs
-fi
(25)
b
perce
ve
e twenty
Department. (Estimated to
incurred by the City.)
133
FINANCIAL SERVICES - Provides funds to reimburse the City of Rosemead
for services the Agency requires of the finance Department. (Esti-
mated to be twenty (20) percent of the costs incurred by the City and
)
l
oyee.
one hundred (100) percent of one part-time emp
134
PLANNING SERVICES - Provides funds to reimburse the City of Rosemead
for services the Agency requires of the Planning Department. (Esti-
mated to be twenty (20) percent of the costs incurred by the City and
)
t Offi
f
cer.
orcemen
one hundred (100) percent of one full time Code En
150
PROFESSIONAL SERVICES - Provides funds for the Agency's Fiscal
Agents in their administration of the notes.
230
VEHICLE MAINTENANCE - Provides funds to reimburse the City of
Rosemead for vehicle maintenance costs incurred in maintaining the
vehicles of the Executive Director and the Assistant City Manager.
410
OFFICE SUPPLIES - Provides funds for such supplies as paper, check
printing, postage, binders, and any other office supplies as needed.
440
OFFICE EQUIPMENT MAINTENANCE - Provides funds for maintenance ser-
vices for the computer.
510
TRAVEL & MEETING - Provides funds for any Agency related traveling
and/or meetings as approved by the Agency Members.
520
PERSONNEL TRAINING - Provides funds for the continued training of
staff.
730
MEMBERSHIP/SUBSCRIPTIONS - Provides funds for the Agency's member-
ship in the Community Redevelopment Agencies Association and sub-
ls
di
d
i
f
l
l
.
o
ca
journa
s an
per
essiona
scriptions to selected pro
910
OFFICE EQUIPMENT - Provides funds to Vurchase a new copier, paper
cutter and stand, includes first year s maintenance cost. Cost to
690) and
01-4720-910 $3
h
Ci
(
t
5
/50 b
,
ty
. no.
etween t
e
acc
be share
0
i
l
h
) f
purc
ase pr
ce
or a tota
the Agency (acct. no. 12-4210-910 $ 3,690
of $7,380.
-12-
1•
1•
1•
1•
1•
I•
10
1•
1•
I*
11^C%CLACAn MCMC110I nDhAGAIT ArZ;=Mr.
ANNUAL BUDGET
1989-90
Function: REDEVELOPMENT Activity: SPECIAL PROJECTS Account: 4215
APPROPRIATION DETAIL
1987-88
1988-89
1989-90
Account
No.
Activity
Actual
Fd Object
Expense
Budget
Expense
Budget
Capital Outlay
13 240
Zapopan Center
-0-
-0-
20,000
-0-
13 241
Commercial Rehabilitation
-0-
100,000
-0-
100,000
13 242
Garvey Park Parking Facility
3,615
-0-
-0-
-0-
13 246
Garvey Park
16,315
-0-
-0-
-0-
13 247
Fern School Sports Complex
421,977
755,000
651,000
-0-
13 248
Rio Hondo Park
-0-
160,000
5,900
-0-'
13 249
Fire Station
1,284
800,000
800,000
-0-
13 251
Garvey Park Improvements Prog
66,877
-0-
-0-
-0-
13 252
Zapopan Park Improve. Program
929
-0-
-0-
-0-
13 254
Library Replacement Facility
-0-
1,300,000
-0-
-0-
13 255
Rsmd City Library Improvement
114,885
135,100
135,100
-0-
13 257
Ramona Sewer
77,335
-0-
13,770
-0-
13 258
Klingerman Drain Extension
(32,696)
-0-
~ -0-
-0-
13 259
Fern Drain Extension
435
-0-
33,870
-0-
13 260
Master Storm Drain Plan
-0-
20,000
-0-
20,000
13 261
Zapopan Park Drain
1,096
300,000
21,000
279,000
13 262
Zapopan Pkg Lot Improvements
-0-
50,000
3,500
46,500
13 263
Slurry Seal Project
184
60,000
60,000
60,000
13 264
Concrete Repair Project
-0-
130,000
2,600
127,400
13 265
Newmark (San Gab/Falling Lf)
& Ivar (Gary/1200'N)Storm Dr
39,972
533,700
5601,000
-0-
13 266
City Hall Space Analysis
12,054
-0-
-0-
-0-
13 267
Earthqke/DSR 50953/GPG
16,229
70,948
71,000
-0-
13 268
Garvey Gym Remodel
9,168
13,000
224,000
-0-
13 269
Walnut Grove Slope - East
-0-
13,000
-0-
13,000
13 270
Fern School Sports Complex
/Equipment
-0-
70,750
70,750
-0-
13 271
Garvey Park Project Building
/Sandblast
-0-
439,430
2,400
450,000
13 272
Zapopan Park Projects
-0-
18,100
5,100
25,000
13 273
Garvey Park Landscaping
-0-
200,000
-0-
225,000
13 274
Walnut Grove Slope - West
-0-
150,000
-0-
150,000
13 275
Jackson Drain
-0-
390,000
22,000
368,000
13 277
Kelburn Drain
-0-
330,000
-0-
-0-
13 279
City Hall Expansion
-0-
1,300,000
-0-
-0-
13 280
Rosemead/Del Mar County Libr.
-0-
11,000
-0-
-0-
13 281
San Gabriel Drain
-0-
-0-
-0-
350,000
-13-
I*
10
10
10
1•
I•
1•
I•
1•
I•
I•
e%0%e+r1LAr w n r1~f1c\/CI r%0LACkIT An_`Ck1 V
R%J0V-IVIGP%I.J nGUC V GLVr nnL.I's 1 1-1Va L- I'm V I
ANNUAL BUDGET
1989-90
Function: REDEVELOPMENT Activity: SPECIAL PROJECTS (cont.) Account: 4215
APPROPRIATION DETAIL
Account
1987-88
1988-89 '
9-90
L
No.
Fd Object
Activity
Actual
Expense
Budget
Estimated
get
Bud
Capital Outlay
13 282
Garvey Park Gym Graphics
-0-
-0-
-0-
11,000
Total Capital Outlay
749,659
7,350,028
2,701,990
1
2,224,900
1 ]
Department Total
749,659
7,350,028
2,701,990j
['2 ,224,900
-14-
1•
ROSEMEAD REDEVELOPMENT AGENCY
BUDGET DETAIL
1•
10
1•
1•
I•
1•
I*
1•
10
1•
SPECIAL PROJECTS
Cost Center 4215
241 COMMERCIAL REHABILITATION - Provides funds to subsidize low interest
commercial rehabilitation loans and supplement existing CDBG Commer-
cial Rehabilitation Program.
260 MASTER STORM DRAIN PLAN - Provides funds for detailed master plan with
specific backup hydrology studies to assist in obtaining funding from
Los Angeles County for storm drains.
261 ZAPOPAN PARK DRAIN - Provides funds for storm drain at Park, Angelus,
and Whitmore Cul de Sacs.
262 ZAPOPAN PARK PARKING LOT IMPROVEMENTS - Provides funds for patching and
repaving Zapopan Park Parking Lot.
263 SLURRY SEAL PROJECT - Provides funds to slurry seal streets at various
locations.
264 CONCRETE REPAIR PROJECT - Provides funds to replace damaged curb,
gutter, sidewalk and paving at various locations.
269 WALNUT GROVE SLOPE-EAST - Provides funds for replantin$ the area adja-
cent to the walk-ways on the east Slope with frost resistant material.
This is a carry over item from 1988/89.
271 GARVEY PARK PROJ. BLDG/SANDBLAST - RESTROOMS & CONCESSION STANDS
Provides funds for replacing the res rooms s orage area between the
ballfields along with adding a concession stand and revamping the p1a
area and landscape. This is a carry over item from Fiscal Year 1988/89.
272 ZAPOPAN PARK PROJECTS - SECURITY LIGHTS
Provides funds for secure y ig s around parking lot at Park. This is
a carry over project.
273 GARVEY PARK LANDSCAPING - Provides funds for revamping the picnic and
play areas between Emerson and Dorothy, west of the Pool. It is pro-
posed to develop this area in phases. The proposal consists of
providing funds for Architect and Engineering services as well as con-
struction. This is a carry over item.
274 WALNUT GROVE SLOPE-WEST - Provides funds for Architect, Engineering
services and construction cost to re-landscape the West Slope of the
Walnut Grove underpass.
275 JACKSON DRAIN - Provides funds to install a storm drain to collect
drainage on Jackson Avenue between Newmark Avenue and Garvey Avenue and
convey it to LACFCD SD No. 1109.
281 SAN GABRIEL DRAIN - Provides funds to install a storm drain to collect
drainage on San Gabriel Boulevard between Hellman Avenue and Emerson
Place and convey it along Emerson Place to Alhambra Wash.
282 GARVEY PARK GYM GRAPHICS - Provides funds for establishing graphics/
signage on the exterior and interior of Garvey Park Gymnasium.
-15-
1•
1•
[7
1•
1•
I*
is
I *
1•
is
I*
_ 1nneChAC An QcnG\/FI nPMF=NT AC-'iFNCY
nVVL1Y1Vr1v Iit LV.. . -
ANNUAL BUDGET
1989-90
Function: REDEVELOPMENT Activity: STREET PROJECTS Account: 4500
APPROPRIATION DETAIL
1987-88
1988-89
1989-90
Account
No.
Activity
Actual
Fd Object
Expense
Budget
Estimated
Budget
Capital Outlay
13 800
Supportive Engineering
66,750
50,000
50,000
50,000
13 820
Paveouts
5,538
50,000
-0-
30,000
13 901
Gladys (Garvey/Cul De Sac)
44,147
-0-
-0-
-0-
13 902
San Gabriel Overpass Widening
10,541
1,115,000
122,000
750,000
13 903
Graves (City Limit/Limit)
2,898
1,000,000
10,000
1,000,000
13 905
Columbia (Del Mar/New)
492,601
-0-
350
-0-
13 906
Falling Leaf (Garvey/Graves)
56,745
782,620
465,000
-0-
13 907
Evelyn (Hellman/Garvey)
494,312
-0-
-0-
-0-
13 908
Isabel (Hellman/Garvey)
388,662
-0-
-0-
-0-
13 909
Stevens (Hellman/Emerson)
15,308
278,400
278,400
-0-
13 910
Prospect (Hellman/Emerson)
37,418
279,700
235,000
-0-
13 911
La Madrina (Walnut Grove/WE)
973
50,000
320
.50,000
13 912
Falling Leaf (Emerson/N End)
14,535
143,470
103,000
-0-
13 914
Alley Improvements
27,030
348,600
180,000
168,600
13 915
Cameta/Muscatel Extension
-0-
400,000
-0-
-0-
13 916
Concrete Inter.(Garv/Wal Grv)
-0-
700,000
-0-
-0-
13 917
Concrete Inter(Wal Grv/S Gab)
-0-
95,000
-0-
-0-
13 918
Garvey Improvements - PhaseI
3,546
3,430,000
10,000
3,800,000
13 919
S Gab/Wal Grv/Landis View Pr.
2,982
90,000
30,000
69,000
13 920
Hellman Ave.(Ingle. Beacon)
21,853
-0-
-0-
-0-
13 921
Kelburn (Garvey/Newmark)
3,934
242,600
10,000
232,600
13 922
La Presa (Garvey/Fern)
342
150,000
194,000
-0-
13 923
Emerson (Del Mar/Evelyn)
11,140
103,800
6,000
120,000
13 924
Willard (Garvey/Fern)
24,496
180,000
10,000
200,000
13 925
Delta (Fern/Klingerman)
513
240,000'
40,000
210,000
13 926
Walnut Grove (10 Fwy/Klinger.
) -0-
300,000
20,000•
280,000
13 927
San Gabriel (Garvey/Rush)
513
400,000
30,000
285,000
13 928
Resurfacing Project (Infra-
structure - Priority A)
52,402
300,000
300,000
-0-
13 929
Walnut Grove (King/S C Limit)
32,806
640,000
180,100
-0-
13 930
Greensdale(Earlswood/Hershey)
-0-
150,000
17,000
133,000
13 931
Hershey(Greensdale/Earlswood)
-0-
100,000
9,000
91,000
13 932
Stevens (Garvalia/Graves)
-0-
200,000
34,000
S 250,000
13 933
Kelburn (Newmark/Graves)
72,412
696,300
90,000
4 641,300
13 9,34
Bartlett (Garvey/Klingerman)
2,392
150,000
388,000
-0-
,
13 935.
Gladys (Hellman/Gervey)
15,276
300,000
155,000
-0-
13 936
Dubonnet (Muscatel/Fern)
342
150,000
11,000
139,000
13 937
Pal Jay (Fern/Klingerman)
-6-
260,000
25,000
235,000
13 938
La Presa (Fern/Klingerman)
537
200,000
470000
575,000
1•
Is
16
1•
I*
I*
1•
1*
1•
10
I *
r' ,O%P%rI •r w r% nrr%r!!!!'%It-1 ^MkACw1-r A I-- CAIr`V
n%jor-MC/`1V 1"1000 v GL_Wr_ tvt`tr t
ANNUAL BUDGET
Function: REDEVELOPMENT Activity: STREET PROJECTS (cont.) Account: 4500
APPROPRIATION DETAIL
1988-89
1989-90
Account
1987-88
No.
Activity
Actual
Fd Object
Expenses
Budget
Estimated
Budget
Capital Outlay
13 939
Charlotte (Garvey/South End) -0-
300,000
20,000
280,000
13 940
Resurfacing Project (Infra-
structure -Priority B) 513
300,000
60,000
240,000
13 941
Whitmore Alley (Wilson/Eckhart) 17,483
275,000
130,000
145,000
13 942
Walnut Grove Beautification 1,155
150,000
800
150,000
13 943
Infrastructure Management
Plan Annual Update -0-
20,000
-0-
20,000
13 944
Newmark (Pine/Falling Leaf) -0-
195,000
20,000
269,000
13 949
Fern (San Gab/Fall. Leaf) -0-
195,000
10,000
185,000
13 950
Mobil/Carrow's Access Modif. -0-
5,000
5,500
-0-
13 951
Whitmore (San Gab./W. End) -0-
-0-
-0-
150,000
13 952
Eckhart Alley (Whitmore/N. E.) -0-
-0-
-0-
50,000
13 953
-0-
Resurfacing Project
-0-
-0-
400,000
13 954
II
Fern (River/Stingle)' -0-
-0-
-0-
400,000
13 956
Rosemead Place (Garvey/Ramona) -0-
-0-
-0-
970,000
13 957
Fern (Walnut Grove/Muscatel) -0-
-0-
-0-
210,000
13 959
Melrose (Jackson/W. End) -0-
-0-
-0-
100,000
13 961
Muscatel (Klingerman/Garvey) -0-
-0-
-0-
600,000
13 962
Del Mar (Hellman/Highcliff) (639)
-0-
19,400
-0-
13 966
Artson (Charlotte/Gaydon) -0-
-0-
-0-
100,000
13 969
Emerson (W. City Limit/Evelyn) -0-
-0-
-0-
325,000
13 979
Del Mar (Fwy 10/Hellman) -0-
-0-
-0-
50,000
13 988
Fern/Walnut Grove/King Drain (1,734)
-0-
-0-
-0-
13 989
Garvey Undergrounding 16,308
-0-
-0-
-0-
13 990
Charlotte (Garvey/480 N Pk.) 7,825
-0-
-0-
-0-
13 991
Pine (Graves/Newmark) 27,545
-0-
56,000
-0-
13 992
Infrastructure Mgmt Plan 15,240
-0-
-0-
-0-
13 994
Hellman (Del Mar/New) 495
-0-
60
-0-
13 995
De Quine (Garvey/Egley) 139,805
-0-
-0-
-0-
13 996
Lindy (Garvey/Egley) 133,522
-0-
-0-
-0-
13 997
Prospect (Garvey/Egley) 135,833
-0-
-0-
-0-
13 998
Egley (New/Jackson) 2,954
-0-
-0-
-0-
13 999
Angelus (Fern/Klingerman) 146,828
525,000
300,000
-0-
Total Capital Outlay
2,546,077
15,540,490
3,671,930
13,953,500
Department Total
2,546,077
15,540,490
3,671,930
F13,953,500
-17-
ROSEMEAD REDEVELOPMENT AGENCY
BUDGET DETAIL
STREET PROJECTS
Cost Center 4500
800 SUPPORTIVE ENGINEERING - Provides funds, at the request of the Agency
Members or Executive Director for the Agency Engineer to perform
special project review or analysis not identifiable to a specific public
works project.
820 PAVEOUTS - Provides funds for paveouts and related local street en-
ineering. It also includes some funds for miscellaneous construc-
ion items such as, necessary removal and construction of existing
curb and gutter due to street widening and for construction of
cross-gutters.
902 SAN GABRIEL OVERPASS WIDENING - Provides funds for the widening of
the existing overpass. This project will include approximately a
thirty (30) foot widenin of the east side of the overpass and the
addition of a traffic median. The City is to be the lead agency on
the engineering of this project with the Agency reimbursing the City
an estimated $122,000 dur ng 1988-89 and $40,000 during 1989-90.
City Account 01-4500-965) 1989-90 Construction and inspection costs
estimated at $710,000) are budgeted and to be paid directly by the
Agency only.
903 GRAVES (CITY LIMIT/LIMIT) - Provides funds for half the cost of
the construction and acquisition of right-of-way with the County
of Los Angeles paying the balance.
911 LA MADRINA (WALNUT GROVE/WEST END) - Provides funds for the acquisi-.
tion of right-of-way for the reconstruction of the street and in-
stallation of curb and gutter. This is to fund the street recon-
struction costs for the city residents in this County administered
assessment district. This is presently a private street.
914 ALLEY IMPROVEMENTS - Provides funds for reconstructing Wilson Way and
drainage improvements.
918 GARVEY IMPROVEMENTS - PHASE I - Provides funds for the reconstruction
of Garvey Avenue from City limit to limit to upgrade the street, minimize
deterioration, improve vehicular ridin$ characteristics and safety,
provide raised landscaped medians, minimize maintenance and improve
aesthetics. Included are concrete intersections at Del Mar Avenue, San
Gabriel Boulevard and Walnut Grove Avenue. 50% of the construction
will be budgeted in 1989-90 with the remainder to be budgeted in 1990-91.
919 SAN GABRIEL/WALNUT GROVE/LANDIS VIEW PROJECT - Provides funds to widen
San Gabriel Boulevard between Walnut Grove and the 60 Freeway westbound
off-ramp and improve intersection. (Also see 4530-934, 937).
921 KELBURN (GARVEY/NEWMARK) - Provides funds for widening and reconstructing
existinthirty (30) foot roadway to thirty-six (36) feet in existing
fifty (go ) foot right-of-way.
923 EMERSON (DEL MAR/EVELYN) - Provides funds for reconstruction and widen-
ing existing thirty (30 foot roadway to thirty-six (36) feet in existing
sixty (60) foot right-of-way.
924 WILLARD (GARVEY/FERN) - Provides funds for reconstructing and widening
existingg thirty (30) foot roadway to thirty-six (36) feet in existing
fifty (50) foot right-of-way. Provides for new pavement, curb, gutter
and sidewalk.
• 925 DELTA (FERN/KLINGERMAN) - Provides funds for reconstructin$ and widening
existingg thirty (30) foot roadway to thirty-six (36) feet in existing
fifty (50) foot right-of-way. Provides for new pavement, curb, gutter
and sidewalk.
-18-
•
ROSEMEAD REDEVELOPMENT AGENCY
BUDGET DETAIL
STREET
PROJECTS (continued)
Cost Center 4500 (continued)
926
WALNUT GROVE (FWY 10/KLINGERMAN) - Provides funds for resurfacing over
a rubberized interlayer and repairing concrete.
927
SAN GABRIEL (GARVEY/RUSH) - Provides funds for resurfacing existing
paving and repairing concrete.
930
GREENDALE (EARLSWOOD/HERHSEY~ - Provides funds for reconstructing and
t in
(36) f
-
ee
six
widening existing thirty (30) foot roadway to thirty
t
d
er an
existing fifty-four (54) foot right-of-way including curb, gut
sidewalk.
931
HERSHEY (GREENDALE/EARLSWOOD) - Provides funds for reconstructing exist-
ing paving, installing curb, gutter, and sidewalk.
932
STEVENS (GARVALIA/GRAVES) - Provides funds for reconstructing existing
thirty-six (36) foot roadway including curb, gutter, and sidewalk in
f-
-
way.
o
existing sixty (60) foot right
933
funds for reconstructing and widen-
KELBURN (NEWMARK/GRAVES) -
ing existing thirty (30 foot roadway to thirty-six (36) feet and
foot
ht-of-w
t
i
f
f
ay.
g
ee
o
r
acquiring an additional eight (8)
936
DUBONNET (MUSCATEL/FERN) - Provides funds for reconstructin$ existing
-four (54) foot right-of-way.
fift
ti
i
ng
y
s
thirty (30) foot roadway in ex
tt
d
b
er.
gu
an
Provides for new pavement, cur
• 937
PAL JAY (FERN/KLINGERMAN) - Provides funds for widening existing thirty
-four (54)
fift
tin
t i
i
(36) f
i
-
y
g
n ex
s
ee
s
x
(30) foot roadway to thirty
foot right-of-way. Provides for new pavement, curb, gutter and sidewalk.
938
LA PRESA (FERN/KLINGERMAN) - Provides funds for widenin$ existin$
(36) feet in the existing
i
thi
t
-
d
)
s
x
way to
r
y
foot roa
twenty-ei ht (28
utter
ent
urb
f
~
,
, c
, g
or new pavem
foot right-of-way. Provides
fifty (50
sidewalk and drainage improvements.
939
CHARLOTTE (GARVEY/SOUTH END) - Provides funds for reconstruction and
t in
(36) f
i
-
i
ee
x
rty
s
widening existingg thirty (30) foot roadway to th
existing fifty (50) foot right-of-way. Provides for new pavement, curb,
gutter and sidewalk.
940
RESURFACING PROJECT (INFRASTRUCTURE -PRIORITY B) - Provides funds for
heating, scarifying, resurfacing existing paving, and repairing con-
t
R
epor
.
crete on streets according to Infrastructure Management
941
WHITMORE ALLEY (WILSON WAY/ECKHART) - Provides funds for removing exist-
ing fences, installing new single boundary fence, and provide drainage.
942
WALNUT GROVE BEAUTIFICATION - Provides funds for professional landscape
services and reconstruction of medians north and south of I-10 freeway
similar to those on Rosemead Boulevard.
943
INFRASTRUCTURE MANAGEMENT PLAN ANNUAL UPDATE - Provides funds for an
annual update of the Infrastructure Management Plan.
944
NEWMARK (PINE/FALLING LEAF) - Provides funds for reconstruction and
widening existin$ twenty (20) foot roadway to thirty-six (36) feet and
acquiring an additional eight (8) feet of right-of-way. Provides for
new pavement, curb, gutter, sidewalk and sewer upgrade.
949
FERN (SAN GABRIEL/FALLING LEAF) - Provides funds for reconstruction and
-
i
(36) f
t
d
hi
ee
an
rty
s
x
widening existing twenty (20) foot roadway to t
vides for
ht-
f-
P
(8) f
f
i
ro
o
way.
eet o
r
g
acquiring and additional eight
new pavement, curb, gutter and sidewalk.
•
-19-
ROSEMEAD REDEVELOPMENT AGENCY
BUDGET DETAIL
STREET PROJECTS (continued)
Cost Center 4500 (continued)
951 WHITMORE (SAN GABRIEL/WES~ E - Provides funds for reconstructing and
TD)
(36) f
t in
hi
-
i
ee
x
rty
s
foot roadway to t
widening existing thirty 30
avement
Provides for new
f-
ht-
)
i
,
p
o
way.
foot r
g
existing fifty (50
ts are re
uired
ner
lk
T
d
q
wo cor
cu
ewa
.
cul-de-sac, curb, gutter and si
at San Gabriel.
952 ECKHART ALLEY (WHITMORE/NORTH END) - Provides funds for reconstructing
ll
t
(20) f
ey.
a
oo
existing twenty
953 RESURFACING PROJECT - Provides funds for heating, scarifying, resufac-
t
th
di
'
e
ng
o
ing existing paving and repairing concrete on streets accor
t
t R
.
epor
Infrastructure Managemen
954 FERN (RIVER/STINGLE) - Provides funds for constructing the extension of
Fern Avenue between River Avenue and Stingle Avenue and drainage
improvements.
956 ROSEMEAD PLACE (GARVEY(RAMONA) - Provides funds for reconstructing the
ti
t
-
i
i
i
even (67)
ng s
y
s
n the ex
s
x
existing fifty-six (5611 foot roadway
foot right-of -way. Provides for new pavement, curb, g
and drainage improvements to LACFCD No. 529.
957 FERN (WALNUT GROVE( MUSCATEL) - Provides funds for resurfacing the exist-
f
i
ht-
50
oot r
g
)
ing thirty-six (361 foot roadway in the existing fifty (
of-way. Provides for new curb, gutter and sidewalk.
959 MELROSE (JACKSON/WEST END) - Provides funds for reconstructing the ex-
t in the existin
(36) f
i
-
h
g
ee
irty
s
x
isting thirty (30) foot roadway to t
fifty (50) foot right-of-way on the south side only. Developer is con-
avement
cul-
id
f
P
,
es
or new p
rov
structing the north side improvements.
de-sac, curb, gutter and sidewalk.
961 MUSCATEL (KLINGERMAN/GARVEY) - Provides funds for reconstructing the ex-
(60) f
t
i
oo
xty
isting thirty-six (36) foot roadway in the existing s
id
lk
d
a
ewa
.
s
right-of-way. Provides for new pavement, curb, gutter an
966 ARSTON (CHARLOTTE(GAYDON) - Provides funds for reconstructing the ex-
t ri
ht-
(50) f
i
fift
h
i
oo
g
y
e ex
st
ng
isting thirty (30)1 foot roadway in t
of-way. Provides for new pavement, curb, gutter and sidewalk.
969 EMERSON (WEST CITY LIMIV EVELYN) - Provides funds for resurfacing the
160)1
sixt
ithin the existin
(36 f
t
d
y
way w
g
oo
roa
existing thirty-six
id
lk
d
b
ewa
.
, gutter an
s
foot right of-wa Provides for new cur
/
~
modific n of the existing 4-foot median to con-
und~s r
979 Trov`ides
struct a left turn pocket onto Hellman. Provides funds for traffic
striping modifications.
-20-
1•
I•
1•
1•
1•
I•
I•
1•
10
16
16
r%O%r%r&Ar• A r% r%0LACA17 At'`-CA1r V
r%%J0CI4I1- /1LJ 11CVGrLLVr wIL-I'l I r\\A16- 1•v
ANNUAL BUDGET
II
1989-90
L unction: REDEVELOPMENT Activity: TRAFFIC SIGNALS Account: 4530
F
APPROPRIATION DETAIL
Account
1987-88
1988-89
1989-90
No.
Activity
Actual
Fd Object
Expense
Budget
Estimated
Budget
Capital Outlay
13 902
Valley @ Walnut Grove
(64)
-0-
-0-
-0-
13 909
Graves @ San Gabriel
2,500
110,000
500
109,500
13 934
Walnut Grove @ San Gabriel
1,905
41,000
500
40,500
13 937
Walnut Grove @ Landis View
-0-
70,000
-0-
70,000
13 938
San Gabriel @ Delta
138,774
-0-
-0-
-0-
13 939
San Gabriel @ Emerson
47,817
19,200
15,500
-0-
13 940
San C-abriel @ Hellman
19,300
12,000
6,000
-0-
13 941
Garvey @ Walnut Grove
-0-
-0-
-0-
20,000
13 942
Garvey @ Del Mar
-0-
-0-
-0-
10,000
/3 9I3
Wa1,..vtC-rc ,-e- [_!`?o_rs/,QIr
Total Capital Outlay
210,232
252,200
22,500
250,000
Department Total
210,232
252,200
22,500
250,000
-21-
,i
•
ROSEMEAD REDEVELOPMENT AGENCY
BUDGET DETAIL
•
TRAFFIC
SIGNALS
Cost Center 4530
909
GRAVES AT SAN GABRIEL - Provides funds for the installation of a
traffic signal in conjunction with the reconstruction of Graves.
4500-903)
(S
l
.
ee
ingerman.
Includes relocating the signal at K
934
WALNUT GROVE AT SAN GABRIEL - Provides funds for the upgrading of this
signalized intersection to improve vehicular capacity. This is a co-
will
t A
d
l
gency
opmen
eve
operative pro ect with Cal-Trans. (Rosemead Re
ith 4500-919
)
d
~
.
w
) percent of the project to be constructe
fund fifty (5
937
WALNUT GROVE AT LANDIS VIEW - Provides funds for a traffic signal to
be interconnected with the existing traffic signal at the intersec-
tion of Walnut Grove and San Gabriel to be constructed with 4500-919.
This will increase the vehicular capacity of San Gabriel and Walnut
Grove intersection.
941
GARVEY AT WALNUT GROVE - Provides funds for modifying the existing
traffic signal to include North-South left turn phasing.
•
942
GARVEY @ DEL MAR - Provides funds for modifying the existing traffic
signal to include East-West left turn phasing.
•
•
•
•
•
•
-22-