Loading...
RRA Annual Budget 1988-1989 1• 1• 1. I• 1. 1• I• 1• G. jT Y aIN E, i cnf\( Rosemead Redevelopment Agency Rosemead, California 1988-89 ANNUAL BUDGET 1 MMMMMEMMS ■@~WIgn ■ ■■■M■■■■■ I■■■■■■■r I%t■■■N► 10 • • • • • • I• ROSEMEAD REDEVELOPMENT AGENCY ANNUAL BUDGET FISCAL YEAR 1988 - 1989 ROBERT W. BRUESCH CHAIRMAN DENNIS McDONALD VICE CHAIRMAN GARY A. TAYLOR AGENCY MEMBER JAY T. IMPERIAL AGENCY MEMBER ROBERT DeCOCKER AGENCY MEMBER I• 1` If 1♦ I* I* is 1• I• Is 1• If I• is IQ is May 27, 1988 ROSEMEAD REDEVELOPMENT AGENCY 8838 VALLEY BLVD.. ROSEMEAD. CA 91770 • (818) 288-6671 • Telecopier 8183079218 HONORABLE CHAIRMAN AND MEMBERS ROSEMEAD REDEVELOPMENT AGENCY RE: ANNUAL BUDGET FISCAL YEAR 1988-89 SIRS: Ir Is is Submitted for your review and consideration is the 1988-89 Annual Budget for the Rosemead Redevelopment Agency. This budget continues a very aggressive public improvements program, which includes capital outlay for forty-four (44) street and traffic signal projects totaling $15,787,690. New projects include the reconstruction and widening of both Newmark from Pine to Falling Leaf and Fern from Pine to Falling Leaf. The 1988-89 Budget proposes spending $7,329,080 on special projects which include the completion of the Fern School Sports Complex, reconstruction of Fire Station No. 4 on San Gabriel Boulevard, expansion of the City Hall facilities, construction of a storm drain on Newmark and Ivar, and a project at Garvey Park including the demolition of existing and constsruction of new restroom facilities along with the addition of a concession stand and relandscaping the area North of the existing facility. The budget also includes reimbursement by the Agency to the City for staff time provided to the Agency. Administrative overhead for the approximately twenty-six million dollar Redevelopment Agency Budget amounts to 1.2%. It is recommended that the Agency review and, following any amendments, approve the Budget for Fiscal Year 1988-89. 10 10 Respectfully submitted, ~x 6'.06 FRANK G. TRIPEPI EXECUTIVE DIRECTOR FGT:smn 19 If ROSEMEAD REDEVELOPMENT AGENCY If ANNUAL BUDGET FISCAL YEAR 1988 - 89 IA Iw 10 is I* if I* 10 TABLE OF CONTENTS Page I. SUMMARY OF FUND BALANCES Debt Service Funds . . . . . . . . . . . . . . . . . 1 Redevelopment Funds . . . . . . . . . . . . . . . . . 2 II. SUMMARY OF EXPENDITURES BY CATEGORY Debt Service Funds . . . . . . . . . . . . . . . . . 3 Redevelopment Funds . . . . . . . . . . . . . . . . . 4 - 7 III. CHART OF ACCOUNTS Revenue . . . . . . . . . . . . . . . . . . . . . . 8 Expenditures . . . . . . . . . . . . . . . . . . 8 - 10 IV. 1988 - 89 EXPENDITURE DETAIL Administration (4210) . . . . . . . . . . . . . . . . . 11 - 13 Special Projects (4215) . . . . . . . . . . . . . . . . 14 - 20 Street Projects (4500) . . . . . . . . . . . . . . . . 21 - 27 Traffic Signals (4530) . . . . . . . . . . . . . . . . 28 - 29 if 1! 10 I* 1• 1• I• I• 1• 10 10 D Q uj 2 ui 0) O >0 U Z LLJ C7 Q F- z w 2 am O J W W D W c E00 U m0 O U ~ co ~0 C~ 060 X ~ w N I- m~ W 0 C ti :3 CC) LL OC) C CV _C 63 0) CD m W J J Z O :3 1 W R G~ W O U C~V W0 O ac CL 0 co aD V- 10 ie I• I• I& 10 i• I• i• i• i• i* s ROSEMEAD REDEVELOPMENT AGENCY • SUMARY OF FUND BALANCE *Debt Service Funds 40 1987 - 88 1988 - 89 Projected Budgeted Total RESOURCES Funds Available At July 1 $ 972,330 $ 212,130 Transfers From Redevelopment Fund: A Tax Increment 1,729,200 2,638,140 Defeasement of 1983 Notes 2,622,200 -0- Interest Earnings On Fiscal Agent Holdings 175,000 50,000 TOTAL FUNDS AVAILABLE $ 5,498,730 $2,900,270 EXPENDITURES Debt Service Expenditures: Principal $ 1,000,000 $1,420,000 Interest 736,600 1,218,140 Defeasement Of 1983 Notes 3,550,000 -0- TOTAL EXPENDITURES & TRANSFERS: $ 5,286,600 $2,638,140 FUND BALANCE AT JUNE 30: $ 212,130 $ 262,130 These funds are held by fiscal agents and are not available for use by the Redevelopment Agency. 0 -1- 0 ROSEMEAD REDEVELOPMENT AGENCY SUMMARY OF FUND BALANCE Redevelopment Funds 1987 - 88 1988 - 89 Projected Budgeted Total RESOURCES Funds Available At July 1 $12,731,390 $22,178,670 Tax Increment 3,100,000 3,415,000 Interest Earnings 1,533,000 1,425,000 Miscellaneous Revenue 1,000 1,000 Transfer From Debt Service: Proceeds From 1987 Notes Before Defeasements 13,977,150 -0- TOTAL FUNDS AVAILABLE: $31,342,540 $27,019,670 EXPENDITURES Administrative Expenditures $ 316,050 $ 324,440 Special Project Expenditures 1,222,440 7,329,080 Street Project Expenditures 2,965,180 15,535,490 Traffic Signal Expenditures 308,800 252,200 Transfers To Debt Service Fund: Tax Increment 1,729,200 2,638,140 . Defeasement Of 1983 Notes 2,622,200 -0- TOTAL, EXPENDITURES AND TRANSFERS: $ 9,163,870 $26,079,350 FUND BALANCE AT JUNE 30: $22,178,670 $ 940,320 -2- I• 1• 1• 1• 1• 1• 1• 1• 1• 1• CC) C\j > 4- LO C/D 4- z U m U r^ CO L- LU CD Q a- ~ m C C C _m ~ C L E CD Q W U N Q Z uj W Xe L W co Q m uj O uj~ WR W N 0 Go 0) LLI r U uj 0 O LLJ N crm v) J I• I• 1• I• 1• 1• is 1• I• 1• 10 1• 1• it 1• 1• 1• I, 1• 1♦ 1• Z w 0 o N \ ` \ W Z m ' a X W C - O W et v~ 3 v W N O Q N il! o 0 O w Q ~ U C LLI U_ 0 w cr 10 • ROSEMEAD REDEVELOPMENT AGENCY SUMMARY OF EXPENDITURES BY CATEGORY • DEBT SERVICES FUNDS • 1986 - 87 1987 - 88 1988 - 89 ACTUAL PROJECTED BUDGETED 1983 TAX ALLOCATION NOTES • Principal $ 950,000 $1,000,000 $ -0- Interest 369,860 100,000 -0- $1,319,860 $1,100,000 $ -0- 1987 TAX ALLOCATION NOTES Principal $ -0- $ -0- $1,420,000 Interest -0- 636,600 1,218,140 $ -0= $ 636,600 $2,638,140 • DEBT SERVICE FUND TOTALS Principal $ 950,000 $1,000,000 $1,420,000 Interest 369,860 736,600 1,218,140 • $1,319,860 $1,736,600 $2,638,140 0 • 0 -3- I* n i• I• i• I• I* I• I• I• 10 I• I• 1• 1• I• I. I• 1• I• L z . •o w Q CV) •L CL m X w z W w •U a m N w CO) ° ~ a~ a OL It N 0 CM m~ 0 Q p O m J ' ui E a 0 > Q ui cm 03 c N ~ uj C O to O •c- 1• 10 ROSEMEAD REDEVELOPMENT AGENCY I• SUMMARY OF EXPENDITURES BY CATEGORY I* 10 10 I* I* 16 I* 19 10 Redevelopment Funds ADMINISTRATIVE (Cost Center 4210) Agency Salaries *Fringe Benefits Auditing Fees Legal Fees *Administrative Services *Financial Services *Planning Services Professional Services *Vehicle Maintenance Office Supplies Office Equipment Maintenance Travel and Meeting Personnel Training Membership/Subscriptions Office Equipment Vehicle TOTAL ADMINISTRATIVE: 1986 - 87 1987 - 88 1988 - 89 Actual Projected Budgeted $ 13,990 $ 14,300 $ 17,900 1,320 1,400 1,500 8,350 8,500 9,350 29,880 30,000 35,000 55,080 88,100 94,600 31,000 38,700 44,000 33,060 61,000 67,000 8,400 14,750 9,000 2,230 2,500 2,500 1,010 1,200 1,500 710 1,500 1,600 5,520 3,000 3,500 -0- -0- 5,000 950 1,100 1,100 380 38,000 15,630 -0- 12,000 15,260 $ 191,880 $ 316,050 $ 324,440 Reimbursement of City incurred costs. SPECIAL PROJECTS (Cost Center 4215) Zapopan Center Commercial Rehabilitation Garvey Park Parking Facility Garvey Water Main - Phase I Garvey Park Fern School Sports Complex Rio Hondo Park Fire Station Garvey/San Gabriel Irrig. System Garvey Park Improvements Program Zapopan Park Improvement Program Garvey Water Main - Phase II Library Replacement Facility Rosemead Library Improvement Bus Route Improvements Ramona Sewer Klingerman Drain Extension $ 330 $ -0- $ -0- -0- -0- 100,000 15,810 -0- -0- 338,550 -0- -0- 36,730 16,320 -0- 23,180 400,000 755,000 10,700 -0- 160,000 73,070 -0- 800,000 2,200 -0- -0- 63,690 62,120 -0- 8,350 1,000 -0- 167,610 -0- -0- -0- -0- 1,300,000 -0- -0- 135,100 238,510 -0- -0- -0- 75,000 -0- -0- 375,000 -0- i• ROSEMEAD REDEVELOPMENT AGENCY C 10 10 10 10 10 I* I* 19 SUMMARY OF EXPENDITURES BY CATEGORY Redevelopment Funds (continued) SPECIAL PROJECTS (Cost Center 4215) Master Storm Drain Plan Zapopan Park Drain Zapopan Parking Lot Improvements Slurry Seal Project Concrete Repair Project Newmark (San Gabriel/Falling Leaf) & Ivar (Garvey/1200' North) Storm Drain City Hall Space Analysis Earthquake/DSR 50953/Garvey Park Gym Garvey Gym Remodel Walnut Grove Slope - East Fern School Sports Complex/Equipment Garvey Park Project Building/Sandblast Zapopan Park Projects Garvey Park Landscaping Walnut Grove Slope - West Jackson Drain Kelburn Drain City Hall Expansion Rosemead/Del Mar County Libr. Improv. TOTAL SPECIAL PROJECTS STREET PROJECTS (Cost Center 4500) Supportive Engineering Paveouts Gladys (Garvey/Cul De Sac) San Gabriel Overpass Widening Graves (City Limit/Limit) Rush Street Extension Columbia (Del Mar/New) Falling Leaf (Garvey/Graves) Evelyn (Hellman/Garvey) Isabel (Hellman/Garvey) Stevens (Hellman/Emerson) Prospect (Hellman/Emerson) La Madrina (Walnut Grove/WE) Falling Leaf (Emerson/N End) 1986 - 87 1987 - 88 1988 - 89 Actual Projected Budgeted -0- -0- 20,000 -0- 1,000 300,000 -0- -0- 50,000 -0- -0- 60,000 -0- 70,000 130,000 -0- 50,000 533,700 -0- 12,000 -0- -0- 60,000 50,000 -0- 100,000 13,000 -0- -0- 13,000 -0- -0- 70,750 -0- -0- 439,430 -0- -0- 18,100 -0- -0- 200,000 -0- -0- 150,000 -0- -0- 390,000 -0- -0- 330,000 -0- -0- 1,300,000 -0- -0- 11,000 $ 978,730 $ 1,222,440 $ 7,329,080 1,040 $ 53,000 $ 50,000 -0- -0- 50,000 4,250 44,150 -0- 5,600 -0- 1,115,000 -0- -0- 1,000,000 284,730 -0- -0- 63,350 449,900 -0- 15,370 49,380 782,620 63,390 485,500 -0- 40,600 365,100 -0- 45,910 78,600 278,400 42,570 85,300 279,700 -0- 1,000 50,000 70 11,530 143,470 1 -5- 1* ROSEMEAD REDEVELOPMENT AGENCY F, 10 I* 19 10 10 1• 10 10 SUMMARY OF EXPENDITURES BY CATEGORY Redevelopment Funds (continued) STREET PROJECTS (Cost Center 4500) Handicap Ramps Alley Improvements Cameta/Muscatel Extension Concrete Inter. (Garvey/Walnut Grove) Concrete Inter. (Wal Grv/San Gabriel) Garvey Improvements - Phase I S Gab/Wal Grv/Landis View Project Hellman Ave. (Ingleside Beacon) Kelburn (Garvey/Newmark) La Presa (Garvey/Fern) Emerson (Del Mar/Evelyn) Willard (Garvey/Fern) Delta (Fern/Klingerman) Walnut Grove (Fwy 10/Garvey) San Gabriel (Garvey/Rush) Resurfacing Project (Infrastructure - Priority A) Walnut Grove (King/S City Limit) Greensdale (Earlswood/Hershey) Hershey (Greensdale/Earlswood) Stevens (Garvalia/Graves) Kelburn (Newmark/Graves) Bartlett (Garvey/Klingerman) Gladys (Hellman/Garvey) Dubonnet (Muscatel/Fern) Pal Jay (Fern/Klingerman) La Presa (Fern/Klingerman) Charlotte (Garvey/South End) Resurfacing Project (Infrastructure - Priority B) Whitmore Alley (Wilson/Eckhart) Walnut Grove Beautification Infrastructure Management Plan Annual Update Newmark (Pine/Falling Leaf) Fern (Pine/Falling Leaf) Del Mar (Hellman/Highcliff) Kelburn (Dorothy/Emerson) Fern/Walnut Grove/King Drain 1986 - 87 1987 - 88 1988 - 89 Actual Projected Budgeted -0- $ 1,000 $ -0- -0- 26,400 348,600 -0- -0- 400,000 -0- -0- 700,000 -0- 5,000 95,000 13,770 -0- 3,430,000 -0- 10,000 90,000 4,860 -0- -0- -0- 17,400 242,600 -0- -0- 150,000 -0- 6,200 103,800 -0- 50,000 180,000 -0- -0- 240,000 -0- -0- 300,000 -0- -0- 400,000 -0- 10,000 300,000 -0- 10,000 640,000 -0- -0- 150,000 -0- -0- 100,000 -0- -0- 200,000 -0- 73,700 696,300 -0- -0- 150,000 -0- -0- 300,000 -0-. -0- 150,000 -0- -0- 260,000 -0- -0- 200,000 -0- -0- 300,000 -0- -0- 300,000 40 21,000 275,000- -0- -0- 150,000 -0- -0- 20,000 -0- -0- 195,000 -0- -0- 195,000 44,760 -0- -0- 220 -0- -0- 413,960 -0- -0- 1* -6- I• ROSEMEAD REDEVELOPMENT AGENCY I• 1• 1* 10 10 10 10 I* 10 SUMMARY OF EXPENDITURES BY CATEGORY Redevelopment Funds (continued) STREET PROJECTS (Cost Center 4500) Garvey Undergrounding Charlotte (Garvey/480 N Park) Pine (Graves/Newmark) Infrastructure Mgmt Plan Hellman (Del Mar/New) De Quine (Garvey/Egley) Lindy (Garvey/Egley) Prospect (Garvey/Egley) Egley (New/Jackson) Angelus (Fern/Klingerman) TOTAL STREET PROJECTS: 1986 - 87 Actual $ 780,530 190 258,190 44,760 563,520 13,610 12,010 12,010 352,860 256,920 $ 3,339,090 1987 - 88 Projected 1988 - 89 Budgeted $ -0- -0- -0- -0- -0- -0- -0- -0- -0- 525,000 $15,535,490 TRAFFIC SIGNALS (Cost Center 4530) Valley @ Walnut Grove Graves @ San Gabriel Walnut Grove @ San Gabriel Walnut Grove @ Landis View San Gabriel @ Delta San Gabriel @ Emerson San Gabriel @ Hellman TOTAL TRAFFIC SIGNALS: REDEVELOPMENT FUND TOTALS: $ -0- -0- -0- 15,300 563,520 132,400 132,400 132,400 -0- 135,000 $ 2,965,180 $ 60 $ -0- $ -0- -0- 10,000 110,000 -0- 9,000 41,000 -0- 15,000 70,000 4,520 150,000 -0- 4,000 76,800 19,200 -0- 48,000 12,000 $ 8,580 $ 308,800 $ 252,200 $ 4,518,280 $ 4,812,470 $23,441,210 10 -7- I* ROSEMEAD REDEVELOPMENT AGENCY 19 19 1s 10 Is I• if 10 is CHART OF ACCOUNTS RE.VENICE -3940-000 -3945-000 -3999-000 EXPENDITURES Bonds/Notes -4050-000 -4060-000 Administration -4210-010 -4210-100 -4210-130 -4210-131 -4210-132 -4210-133 -4210-134 -4210-150 -4210-230 -4210-410 -4210-440 -4210-510 -4210-730 -4210-910 -4210-920 Special Projects -4215-241 -4215-247 -4215-248 -4215-249 -4215-254 -4215-255 Interest Income Tax Increment Miscellaneous Retirement Of Principal Interest Expense Agency Salaries Fringe Benefits Auditing Fees Legal Fees Administrative Services Financial Services Planning Services Professional Services Vehicle Maintenance Office Supplies Office Equipment Maintenance Travel and.Meeting Membership/Subscriptions Office Equipment Vehicle Commerical Rehabilitation Fern School Sports Complex Rio Hondo Park Fire Station Library Replacement Facility Rosemead City Library Improvements I* -8- If ROSEMEAD REDEVELOPMENT AGENCY If 10 Is Is 10 Is I* I* 10 If CHART OF ACCOUNTS Special Projects (continued) -4215-260 Master Storm Drain Plan -4215-261 Zapopan Park Drain -4215-262 Zapopan Parking Lot Improvements -4215-263 Slurry Seal Project -4215-264 Concrete Repair Project -4215-265 Newmark (San Gabriel/Falling Leaf) & Ivar (Garvey/1200' North) Storm Drain -4215-267 Earthquake/DSR 50953/Garvey Park Gym -4215-268 Garvey Gym Remodel -4215-269 Walnut Grove Slope - East -4215-270 Fern School Sports Complex/Equipment -4215-271 Garvey Park Project Building/Sandblast -4215-272 Zapopan Park Projects -4215-273 Garvey Park Landscaping -4215-274 Walnut Grove Slope - West -4215-275 Jackson Drain -4215-277 Kelburn Drain -4215-279 City Hall Expansion -4215-280 Rosemead/Del Mar County Library Improv. Street Projects -4500-800 Supportive Engineering -4500-820 Paveouts -4500-902 San Gabriel Overpass Widening -4500-903 Graves (City Limit/Limit) -4500-906 Falling Leaf (Garvey/Graves) -4500-909 Stevens (Hellman/Emerson) -4500-910 Prospect (Hellman/Emerson) -4500-911 La Madrina (Walnut Grove/West End) -4500-912 Falling Leaf (Emerson/North End) -4500-914 Alley Improvements -4500-915 Cameta/Muscatel Extension -4500-916 Concrete Intersection (Garvey/ Walnut Grove) -4500-917 Concrete Intersection (Walnut Grove/ San Gabriel) -4500-918 Garvey Improvements - Phase I -4500-919 San Gabriel/Walnut Grove/Landis View Project -9- It ROSEMEAD REDEVELOPMENT AGENCY 10 10 10 Ir is I* If I* CHART OF ACCOUNTS Street Projects (continued) -4500-921 Kelburn (Garvey/Newmark) -4500-922 La Presa (Garvey/Fern) -4500-923 Emerson (Del Mar/Evelyn) -4500-924 Willard (Garvey/Fern) -4500-925 Delta (Fern/Klingerman) -4500-926 Walnut Grove (Fwy 10/Garvey) -4500-927 San Gabriel (Garvey/Rush) -4500-928 Resurfacing project (Infrastructure - Priority A) -4500-929 Walnut Grove (Klingerman/South City Limit) -4500-930 Greensdale (Earlswood/Hershey) -4500-931 Hershey (Greensdale/Earlswood) -4500-932 Stevens (Garvalia/Graves) -4500-933 Kelburn (Newmark/Graves) -4500-934 Bartlett (Garvey/Klingerman) -4500-935 Gladys (Hellman/Garvey) -4500-936 Dubonnet (Muscatel/Fern) -4500-937 Pal Jay (Fern/Klingerman) -4500-938 La Presa (Fern/Klingerman) -4500-939 Charlotte (Garvey/South End) -4500-940 Resurfacing Project (Infrastructure - Priority B) -4500-941 Whitmore alley (Wilson/Eckhart) -4500-942 Walnut Grove Beautification -4500-943 Infrastructure Management Plan Annual Update -4500-944 Newmark (Pine/Falling Leaf) -4500-949 Fern (Pine/Falling Leaf) -4500-999 Angelus (Fern/Klingerman) Traffic Signals -4530-909 Graves @ San Gabriel -4530-934 Walnut Grove @ San Gabriel -4530-937 Walnut Grove @ Landis Veiw -4530-939 San Gabriel @ Emerson -4530-940 San Gabriel @ Hellman Is -lo- U r 1• Is If If I# I• is 19 10 Dr%Q= 1AC A n p=nC\/CI nDMFAIT A ......~V...`.-... 160-. r . rr... - - - - ANNUAL BUDGET 1988-89 Function: REDEVELOPMENT Activity: ADMINISTRATION Account: 4210 APPROPRIATION DETAIL Account 1986-87 1987-88 1988-89 No. Activity Actual Fd Object Expense Budget Estimated Budget Personnel 12 010 Agency Salaries 13,990 14,800 14,300 17,900 12 100 Fringe Benefits 1,320 1,800 1,400 1,500 Total Personnel 15,310 T 16,600 15,700 19,400 Operations 12 130 Auditing Fees 8,350 9,500 8,500 9,350 12 131 Legal Fees 29,880 40,000 30,000 35,000 12 132 Administrative Services 55,080 82,000 88,100 94,600 12 133 Financial Services 31,000 32,000 38,700 44,000 12 134 Planning Services 33,060 37,000 61,000 67,000 12 150 Professional Services 8,400 6,000 14,750 9,000 12 230 Vehicle Maintenance 2,230 1,000 2,500 2,500 12 410 Office Supplies 1,010 1,500 1,200 1,500 12 440 Office Equipment Maintenance 710 800 1,500 1,600 12 510 Travel and Meeting 5,520 3,500 3,000 3,500 12 520 Personnel Training -0- -0- -0- 5,000 12 730 Membership/Subscriptions 950 1,100 1,100 1,100 Total Operations 176,190 214,400] 1 250,350 274,150 Capital Outlay 12 910 Office Equipment 380 30,000 38,000 15,630 12 920 Vehicle -0- -0- 12,000 15,260 Total Capital Outlay 380] 1 30,000 50,000 30,890 Department Total J 191,880J - j I 261,000 J 316,050 1 1 I 1 324,440 -11- ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL ADMINISTRATION Cost Center 4210 010 AGENCY SALARIES - Provides funds for salaries for Agency Members, * Agency Executive Director, Assistant City Manager, Agency Treasurer, Agency Secretary, and clerical functions performed directly for the Agency. 100 FRINGE BENEFITS - Provides funds for the proportionate cost of in- surance for the Agency's Treasurer, Executive Director, and Assis- i tant City Manager. These costs are incurred by the City of Rosemead and partially reimbursed by the Agency. 130 AUDITING - Provides funds for an independent C.P.A. firm to perform an annual audit, complete any necessary reports, and provide re- quested professional information. • 131 LEGAL FEES - Provides funds to retain legal services as needed and or requested by the Agency. 132 ADMINISTRATIVE SERVICES - Provides funds to reimburse the City of Rosemead for services the Agency requires of the Administration Department. (Estimated to be twenty-five (25) percent of the costs incurred by the City.) 133 FINANCIAL SERVICES - Provides funds to reimburse the City of Rosemead for services the Agency requires of the finance Department. (Esti- mated to be twenty (20) percent of the costs incurred by the City and one hundred (100) percent of one part-time employee.) 134 PLANNING SERVICES - Provides funds to reimburse the City of Rosemead for services the Agency requires of the Planning Department. (Esti- mated to be twenty (20) percent of the costs incurred by the City and one hundred (100) percent of one full time-Code Enforcement Officer.) ' 150 PROFESSIONAL SERVICES - Provides funds for the Agency s Fiscal Agents in their administration of the notes. 230 VEHICLE MAINTENANCE - Provides funds to reimburse the City of Rosemead for vehicle maintenance costs incurred in maintaining the vehicles of the Executive Director and the Assistant City Manager. 410 OFFICE SUPPLIES - Provides funds for such supplies as paper, check printing, postage, binders, and any other office supplies as needed. 440 OFFICE EQUIPMENT MAINTENANCE - Provides funds for maintenance ser- vices for the computer. ~ -12- ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL ADMINISTRATION Cost Center 4210 (continued) 510 TRAVEL & MEETING - Provides funds for any Agency related traveling * and/or meetings as approved by the Agency Members. 520 PERSONNEL TRAINING - Provides funds for the continued training of staff. 730 MEMBERSHIP/SUBSCRIPTIONS - Provides funds for the Agency's member- ship in the Community Redevelopment Agencies Association and sub- scriptions to selected professional journals and periodicals. 910 OFFICE EQUIPMENT - Provides funds to purchase a new copier for City Hall. Cost to be share 50/50 with the City. (Refer to City's account code 01-4110-910 B for City's fifty (50) percent share). 920 VEHICLE A. Provides funds for thirty (30) percent of cost for re- placement Parking Control Vehicle. Additional seventy (70) percent to be paid by City (Refer to City's account code . 01-4310-920). ($4,660) B. Provides funds for fifty (50) percent of the cost of a 1985 Buick. (City to share 50% of the cost. See City's account code 01-4240-920 B). ($10,600) -13- 1• 1• 1• Is 1• 1• 1• 10 1• 19 10 OnCCRAC A n Qcncv=i f10RAI=MT Af.F ■■VVVOWN1./1V ■■i.vr.0-0-~. r.. - ANNUAL BUDGET 1988-89 Function: REDEVELOPMENT Activity: SPECIAL PROJECTS Account: 4215 APPROPRIATION DETAIL Account 1986-87 1987-88 1988-89 No. Activity Actual Fd Object Expense Budget Expense Budget Capital Outlay 13 240 Zapopan Center 330 -0- -O- -0- 13 241 Commercial Rehabilitation -0- 100,000 -0- 100,000 13 242 Garvey Park Parking Facility 15,810 -0- -0- -0- 13 243 Garvey Water Main - Phase I 338,550 -0- -0- -0- 13 246 Garvey Park 36,730 -0- 16,320 -0- 13 247 Fern School Sports Complex 23,180 1,155,000 400,000 755,000 13 248 Rio Hondo Park 10,700 150,000 -0- 160,000 13 249 Fire Station 73,070 727,000 -0- 800,000 13 250 Garvey/San Gabriel Irrig. Sys 2,200 -0- -0- -0- 13 251 Garvey Park Improvements Prog 63,690 609120 62,120 -0- 13 252 Zapopan Park Improve. Program 8,350 1,000 1,000 -0- 13 253 Garvey Water Main - Phase II 167,610 -0- -0- -0- 13 254 Library Replacement Facility -0- 1,300,000 -0- 1,300,000 13 255 Rsmd City Library Improvement -0- 135,100 -0- 135,100 13 256 Bus Route Improvements 238,510 -0- -0- -0- 13 257 Ramona Sewer -0- 95,000 75,000 -0- 13 258 Klingerman Drain Extension -0- 529,100 375,000 -0- 13 259 Fern Drain Extension -0- 600,000 -0- -0- 13 260 Master Storm Drain Plan -0- 20,000 -0- 20,000 13 261 Zapopan Park Drain -0- 300,000 1,000 300,000 13 262 Zapopan Pkg Lot Improvements -0- 50,000 -0- 50,000- 13 263 Slurry Seal Project -0- 30,000 -0- 60,000 13 264 Concrete Repair Project -0- 100,000 70,000 130,000 13 265 Newmark (San Gab/Falling Lf) & Ivar (Gary/1200'N)Storm Dr -0- -0- 50,000 533,700 13 266 City Hall Space Analysis -0- -0- 12,000 -0- 13 267 Earthqke/DSR 50953/GPG -0- -0- 60,000 50,000 13 268 Garvey Gym Remodel -0- -0- 100,000 13,000 13 269 Walnut Grove Slope - East -0- -0- -0- 13,000 13 270 Fern School Sports Complex /Equipment -0- -0- -0- 70,750 13 271 Garvey Park Project Building /Sandblast -0- -0- -0- 439,430 13 272 Zapopan Park Projects -0- -0- -0- 18,100 13 273 Garvey Park Landscaping -0- -0- -0- 200,000 13 274 Walnut Grove Slope - West -0- -0- -0- 150,000 13 275 Jackson Drain -0- -0- -0- 390,000 13 277 Kelburn Drain -0- -0- -0- 330,000 I F-- 1 1 - -14- V, I I F1 1• 1+ Is I• I• 1• 10 1• 10 1• RncPMFAn RFnFvFi nPMENT AGENCY ANNUAL BUDGET 1988-89 Function: REDEVELOPMENT Activity: SPECIAL PROJECTS (cont.) Account: 4215 APPROPRIATION DETAIL 1986-87 1987-88 1988-89 Account No. Activity Actual Fd Object Expense Budget I Estimated F I Budget Capital Outlay 13 279 City Hall Expansion -0- -0- -0- 1,300,000 13 280 Rosemead/Del Mar County Library Improvements -0- -0- -0- 1 1 11,000 Total Capital Outlay 978,730J I 5,352,320 1,222,440 7,329,080 Department Total 978,730 5,352,320 1,222,440 7,329,080 -15- ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL SPECIAL PROJECTS Cost Center 4215 241 COMMERCIAL REHABILITATION - Provides funds to subsidize low interest commercial rehabilitation loans and supplement existing CDBG Commer- cial Rehabilitation Program. 247 FERN SCHOOL SPORTS COMPLEX - The Fern School Sports Complex project consist of soccer, football and baseball fields all under lights along with a restroom facility. 1988-89 budget Provides funds to complete the Sports Complex construction as well as payment of the retention. 248 RIO HONDO PARK - Provides funds for the Development of the Motor Bike Park. 249 FIRE STATION - Provides funds for a 4,200 square foot double bay fire station to replace the existing 2,480 square foot single bay Station Number 4 on San Gabriel Boulevard. In exchange, the Agency will not need to reimburse the Fire Protection District for the Montebello Hills annexation under fifteen (15) acres in size. (NOTE: During 1986-87, $73,070 was paid to Los Angeles County for architect fees.) 254 LIBRARY REPLACEMENT FACILITY - Provides funds for the construction of a 7,500 square foot facility to replace an existing 2,100 square foot library on Del Mar Avenue. Cost includes $1,125,000 for the building and fixtures ($140 per square foot), and $375,000 for land acquisition ($12.50 per square foot). The County Library will acquire the land and construct the facility. 255 ROSEMEAD COUNTY LIBRARY IMPROVEMENTS - Provides funds for interior improvements, refurbish library with new furniture and equipment, painting the building exterior, an outdoor, lighted sign, wall tile in two (2) public restrooms, the purchase of a Telefax Machine, and connect the Del Mar Library to the Rosemead Library and other li- braries in Los Angeles County for instant transmission of information and other needed data. A Telefax Machince will improve the informa- tion delivery capability at the library. Interior Improvements $ 75,000 New Furniture and Equipment 30,000 Painting Building Exterior 15,800 Outdoor Lighted Sign 6,000 Wall Tile for Public Restrooms 4,000 Telefax Machine 2,700 Emergency Lighting System 1,600 $135,100 -16- • ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL • SPECIAL PROJECTS (continued) Cost Center 4215 (continued) 260 MASTER STORM DRAIN PLAN - Provides funds for detailed master plan with • specific backup hydrology studies to assist in obtaining funding from Los Angeles County for storm drains. 261 ZAPOPAN PARK DRAIN - Provides funds for storm drain at Park, Angelus, and Whitmore Cul de Sacs, and parking lot at Zapopan Park. • 262 ZAPOPAN PARK PARKING LOT IMPROVEMENTS - Provides funds to patching and repaving Zapopan Park Parking Lot. 263 SLURRY SEAL PROJECT - Provides funds to slurry seal streets at various locations. • 264 CONCRETE REPAIR PROJECT - Provides funds to replace damaged curb, gutter, sidewalk and paving at various locations. 265 NEWMARK (SAN GABRIEW FALLING LEAF) & IVAR (GARVEY/1200' NORTH) STORM DRAINS - Provides funds to install storm drains to collect drainage on Newmark Avenue and Ivar Avenue and convey it to RDD314 and LACFCD SD No. 529, respectively. 267 EARTHQUAKE/DSR 50953/GARVEY PARK GYM - Provides funds for Architect and Engineering services and construction cost to repair structural damage to Garvey Park Gym as a result of October 1, 1987 Earthquake. • 268 GARVEY PARK GYM REMODEL - Provides funds for Architect, Engineering fees and construction cost to remodel Garvey Park Gym. 269 WALNUT GROVE SLOPE-EAST - Provides funds for replanting the area adja- cent to the walk-ways on the east Slope with frost resistant material. Approved by Rosemead Redevelopment Agency in February 1988. • 270 (A) FERN SCHOOL SPORTS COMPLEX/EQUIPMENT- 3 GANG ROTARY LAWN MOWER ($40,000) Provides funds for the purchase of a Three Gang Rotary lawn mower for use at Fern School Sports Complex, Zapopan Park, Garvey Park, and other park areas in the southern area of Rosemead. • 270 (B) FERN SCHOOL SPORTS COMPLEX/EQUIPMENT - CUSHMAN VEHICLE ($9,000) Provides funds for the purchase of a cushman utility vehicle to be used at Fern School Sports Complex for ballfield maintenance and landscape maintenance at the park site. 270 (C) FERN SCHOOL SPORTS COMPLEX/EQUIPMENT - BACK PACK BLOWER ($375) • Provides funds for the purchase of a back pack blower to be used at Fern School Sports Complex by maintenance staff to clean off all concrete and asphalt, surfaces of debris and litter. -17- I* ROSEMEAD REDEVELOPMENT AGENCY [7 I* 1• I• 10 10 1• 1! 16 SPECIAL PROJECTS (continued) Cost Center 4215 (continued) BUDGET DETAIL 270 (D) FERN SCHOOL SPORTS COMPLEX/EQUIPMENT - EDGER ($275) Provides funds for the purchase of a power edger for use at Fern School Sports Complex by maintenance staff to edge all walkway areas. 270 (E) FERN SCHOOL SPORTS COMPLEX/EQUIPMENT - LINE MARKER & SIGNS ($800) Provides funds for the acquisition of a line marker and signs for Fern School Sports Complex. Line Marker - $200 Signs (4) - 600 $800 270 (F) FERN SCHOOL SPORTS COMPLEX/EQUIPMENT - FOOTBALL GOALS ($2,000) Provides funds for the purchase of two (2) football goal posts for Fern School Sports Complex. 270 (G) FERN SCHOOL SPORTS COMPLEX/EQUIPMENT - BLEACHERS (PERMANENT) ($14,000) Provides funds for the purchase of two (2) permanent bleachers sections with seating capacity for three hundred fifty (350) spectators for Fern School School Sports Complex. 270 (H) FERN SCHOOL SPORTS COMPLEX/EQUIPMENT - BLEACHERS (PORTABLE) ($4,300) Provides funds for the purchase of two (2) portable bleachers for spec- tator seating at the baseball or football area at Fern School Sports Complex. RECAP OF OBJECT 270: Riding Lawn Mower Cushman Vehicle Back Pack Blower Edger Line Marker & Signs Football Goals Bleachers (Permanent) Bleachers (Portable) $40,000 9,000 375 275 800 2,000 14,000 4,300 Subtotal $70,750 271 (A) GARVEY PARK PROJECT BUILDING/SANDBLAST - BLOCK WALL ($2,430) Provides funds for the sandblasting of the block retaining wall at Garvey Park to remove layers of old paint. 10 -18- ROSEMEAD REDEVELOPMENT AGENCY 1• 10 I• SPECIAL PROJECTS (continued) Cost Center 4215 (continued) BUDGET DETAIL 271 (B) GARVEY PARK PROJ. BLDG/SANDBLAST - RESTROOMS & CONCESSION STANDS ($437,000 Provides funds for demolishing the existing restroom facility and to re- place it with a more modern facility. Includes adding a concession stand and re-landscaping the area North of the existing facility. RECAP OF OBJECT 271: Block Wall Restrooms & Concession Stand $ 2,430 437,000 Subtotal $439,430 19 16 10 I• 19 I* I* 272 (A) ZAPOPAN PARK PROJECTS - SPRING ANIMALS ($950) Provides funds for three (3) Spring animals to be placed in the North end of Zapopan Park. 272 (B) ZAPOPAN PARK PROJECTS - SWING PARTS ($320) Provides funds for safe and durable playground apparatus for the Zapopan playground area at North end of Zapopan Park. 272 (C) ZAPOPAN PARK PROJECTS - SECURITY LIGHTS ($13,800) Provides funds for the installation of four (4) security light poles at Zapopan Park parking lot. 272 (D) ZAPOPAN PARK PROJECT - SANDBLASTING ($3,040) Provides funds for he sandblasting of all metal surfaces of the Zapopan Park restroom and Maintenance Shed. RECAP OF OBJECT 272: Spring Animals $ 950 Swing Parts 320 Security Lights 13,800 Sandblasting 3,040 Subtotal $18,110 273 GARVEY PARK LANDSCAPING - Provides funds for Architect and Engineering services along with construction cost to redevelop the area. 274 WALNUT GROVE SLOPE-WEST - Provides funds for Architect, Engineering servic and construction cost to re-landscape the West Slope of the Walnut Grove underpass. 275 JACKSON DRAIN - Provide funds to install a storm drain to collect drain- age on Jackson Avenue between Newmark Avenue and Garvey Avenue and convey it to LACFCD SD No. 1109. -19- • ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL • SPECIAL PROJECTS (continued) Cost Center 4215 (continued) 277 KELBURN DRAIN - Provides funds to install a storm drain to collect drain- age on Kelburn Avenue between Emerson Place and Hershey Street and convey it to LACFCD SD No. 5. 279 CITY HALL EXPANSION - Provides funds for the addition of approximately 10,000 - 12,000 square feet of space to City Hall remodel portions of • the existing City Hall; and upgrade the parking lot facility for adjacent City Hall, County Library and Community Center buildings. 280 ROSEMEAD/DEL MAR COUNTY LIBRARY IMPROVEMENTS - Provides funds for an information desk with bookshelves for the Rosemead Library and a Panasonic • monitor/VHS player with carrying case for the Del Mar Library. RECAP OF OBJECT 280: Information desk $ 9,620 Monitor/VHS Player 1,300 • Subtotal $10,920 • • • -20- I• 1• 1• 19 1* 1* 19 1• 1• 10 1• ['fA@CwAC A r% MCM011M r%ORACA1T ANNUAL BUDGET 1988-89 Function: REDEVELOPMENT Activity: STREET PROJECTS Account: 4500 APPOPRIATION DETAIL Account 1986-87 1987-88 1988-89 No. Activity Actual - 11 Fd Object Expense Budget Estimated Budget Capital Outlay 13 800 Supportive Engineering 1,040 35,000 53,000 50,000 13 820 Paveouts -0- 50,000 -0- 50,000 13 901 Gladys (Garvey/Cul De Sac) 4,250 47,500 44,150 -0- 13 902 San Gabriel Overpass Widening 5,600 1,115,000 -0- 1,115,000 13 903 Graves (City Limit/Limit) -0- 1,000,000 -0- 1,000,000 13 904 Rush Street Extension 284,730 -0- -0- -0- 13 905 Columbia (Del Mar/New) 63,350 75,000 449,900 -0- 13 906 Falling Leaf (Garvey/Graves) 15,370 832,000 49,380 782,620 13 907 Evelyn (Hellman/Garvey) 63,390 583,000 485,500 -0- 13 908 Isabel (Hellman/Garvey) 40,600 509,000 365,100 -0- 13 909 Stevens (Hellman/Emerson) 45,910 357,000 78,600 278,400 13 910 Prospect (Hellman/Emerson) 42,570 365,000 85,300 279,700 13 911 La Madrina (Walnut Grove/WE) -0- 50,000 1,000 50,000 13 912 Falling Leaf (Emerson/N End) 70 155,000 11,530 143,470 13 913 Handicap Ramps -0- 1,000 1,000 -0- 13 914 Alley Improvements -0- 375,000 26,400 348,600 13 915 Cameta/Muscatel Extension -0- 400,000 -0- 400,000 13 916 Concrete Inter.(Garv/Wal Grv) -0- 100,000 -0- 700,000 13 917 Concrete Inter(Wal Grv/S Gab) -0- 100,000 5,000 95,000 13 918 Garvey Improvements - PhaseI 13,770 2,930,000 -0- 3,430,000 13 919 S Gab/Wal Grv/Landis View Pr. -0- 100,000 10,000 90,000 13 920 Hellman Ave.(Ingle. Beacon) 4,860 -0- -0- -0- 13 921 Kelburn (Garvey/Newmark) -0- 260,000 17,400 242,600 13 922 La Presa (Garvey/Fern) -0- 150,000 -0- 150,000 13 923 Emerson (Del Mar/Evelyn) -0- 110,000 6,200 103,800 13 924 Willard (Garvey/Fern) -0- 230,000 50,000 180,000 13 925 Delta (Fern/Klingerman) -0- 240,000 -0- 240,000 13 926 Walnut Grove (Fwy 10/Garvey) -0- 300,000 -0- 300,000 13 927 San Gabriel (Garvey/Rush) -0- 400,000 -0- 400,000 13 928 Resurfacing Project (Infra- structure - Priority A) -0- 310,000 10,000 300,000 13 929 Walnut Grove (King/S C Limit) -0- 650,000 10,000 640,000 13 930 Greensdale(Earlswood/Hershey) -0- 150,000 -0- 150,000 13 931 Hershey(Greensdale/Earlswood) -0- 100,000 -0- 100,000 13 932 Stevens (Garvalia/Graves) -0- 200,000 -0- 200,000 13 933 Kelburn (Newmark/Graves) -0- 600,000 73,700 696,300 13 934 Bartlett (Garvey/Klingerman) -0- 150,000 -0- 150,000 13 935 Gladys (Hellman/Garvey) -0- 300,000 -0- 300,000 13 936 Dubonnet (Muscatel/Fern) -0- 150,000 -0- 150,000 J_ IF 1 -21- 1 11 - ]I K x X I 1• 1• 10 I• I* 10 1• is 1• 19 10 ROSEMEAD REDEVELOPMENT AGENCY ANNUAL BUDGET 1988-89 Function: REDEVELOPMENT Activity: STREET PROJECTS (cont.) Account: 4500 APPROPRIATION DETAIL Account 1986-87 1987-88 1988-89 No. Activity Actual Fd Object Expenses Budget Estimated Budget Capital Outlay 13 937 Pal Jay (Fern/Klingerman) -0- 260,000 -0- 260,000 13 938 La Presa (Fern/Klingerman) -0- 200,000 -0- 200,000 13 939 Charlotte (Garvey/South End) -0- 300,000 -0- 300,000 13 940 Resurfacing Project (Infra- structure - Priority B) -0- 300,000 -0- 300,000 13 941 Whitmore Alley(Wilson/Eckhart ) 40 400,000 21,000 275,000 13 942 Walnut Grove Beautification -0- 150,000 -0- 150,000 13 943 Infrastructure Management Plan Annual Update -0- -0- -0- 20,000 13 944 Newmark (Pine/Falling Leaf) -0- -0- -0- 195,000 13 949 Fern (Pine/Falling Leaf) -0- -0- -0- 195,000 13 962 Del Mar (Hellman/Highcliff) 44,760 -0- -0- -0- 13 987 Kelburn (Dorothy/Emerson) 220 -0- -0- -0- 13 988 Fern/Walnut Grove/King Drain 413,960 -0- -0- -0- 13 989 Garvey Undergrounding 780,530 -0- -0- -0- 13 990 Charlotte (Garvey/480 N Park) 190 -0- -0- -0- 13, 991 Pine (Graves/Newmark) 258,190 -0- -0- -0- 13 992 Infrastructure Mgmt Plan 44,760 -0- 15,300 -0- 13 994 Hellman (Del Mar/New) 563,520 -0- 563,520 -0- 13 995 De Quine (Garvey/Egley) 13,610 142,500 132,400 -0- 13 996 Lindy (Garvey/Egley) 12,010 142,500 132,400 -0- 13 997 Prospect (Garvey/Egley) 12,010 142,500 132,400 -0- 13 998 Egley (New/Jackson) 352,860 -0- -0- -0- 13 999 Angelus (Fern/Klingerman) 256,920 660,000 135,000 525,000 Total Capital Outlay 3,339,090 16,177,000 2,965,180 15,535,490 L 1 1 _J - Department Total 3,339,090 16,177,000 2,965,180 15,535,490 -22- I ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL STREET PROJECTS Cost Center 4500 800 SUPPORTIVE ENGINEERING - Provides funds, at the request of the Agency Members or Executive Director, for the Agency Engineer to perform special project review or analysis not identifiable to a specific public works project. 820 PAVEOUTS - Provides funds for paveouts and related local street en- gineering. It also includes some funds for miscellaneous construc- tion items such as, necessary removal and construction of existing curb and gutter due to street widening and for construction of cross-gutters. 902 SAN GABRIEL OVERPASS WIDENING - Provides funds for the widening of the existing overpass. This project will include approximately a thirty (30) foot widening of the east side of the overpass and the addition of a traffic median. The City is to be the lead agency on this project with the Agency reimbursing the City. (City Account 01-4500-965) 903 GRAVES (CITY LIMIT/LIMIT) - Provides funds for half the cost of the construction and acquisition of right-of-way with the County of Los Angeles paying the balance. 906 FALLING LEAF (GARVEY/GRAVES) - Provides funds for widening, recon- struction, and acquisition of the right-of-way. 909 STEVENS (HELLAMN/EMERSON) - Provides funds for widening, reconstruc- tion, and acquisition of right-of-way. 910 PROSPECT (HELLMAN/EMERSON) - Provides funds for widening, reconstruc- tion, and acquisition of right-of-way. 911 LA MADRINA (WALNUT GROVE/WEST END) - Provides funds for the acquisi- tion of right-of-way for the reconstruction of the street and in- stallation of curb and gutter. This is to fund the street recon- struction costs for the city residents in this County administered assessment district. This is presently a"private street. 912 FALLING LEAF (EMERSON/NORTH END) - Provides funds for reconstruc- tion and acquisition of right-of-way for widening. 914 ALLEY IMPROVEMENTS - Provides funds for reconstructing existing alleys south of Interstate 10. This includes repaving, a center concrete gutter, and approaches. Included are alleys east of Walnut Grove between Klingerman and Fern, east of Del Mar south of Hellman to Duff School, and east of San Gabriel south of Hellman to Dorothy. -23- • ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL • STREET PROJECTS Cost Center 4500 915 CAMETA/MUSCATEL EXTENSION - Provides funds for extending a road from • Cameta to Muscatel along the perimeter of the golf course for a second access to the affected residential area. 916 CONCRETE INTERSECTION GARVEY/WALNUT GROVE - Provides funds for the installation of a concrete intersection to minimize deterioration and maintenance, and improve vehicular riding characteristics. • 917 CONCRETE INTERSECTION WALNUT GROVE/SAN GABRIEL - Provides funds for the installation of a concrete intersection to minimize deteriora- tion and maintenance, and improve vehicular riding characteristics. 918 GARVEY IMPROVEMENTS - PHASE I - Provides funds for the improvement and/or reconstruction of Garvey Avenue from city limit to limit. This is to upgrade the street, minimize deterioration, improve vehicular riding characteristics and safety, minimize maintenance, and improve aesthetics. Included is a concrete intersection at Del Mar Avenue, and at San Gabriel Boulevard. During 1987-88, this project also include the Garvey/San Gabriel Irrigation System pre- viously budgeted under 4215-250. (Garvey/San Gabriel Irrigation pro- project provides funds for the replacement of a battery operated irri- gation system.) 919 SAN GABRIEL/WALNUT GROVE/LANDIS VIEW PROJECT - Provides funds to widen San Gabriel Boulevard between Walnut Grove and the 60 Freeway • westbound off-ramp. 921 KELBURN (GARVEY/NEWMARK) - Provides funds for widening and reconstructing existing thirty (30) foot roadway to thirty-six (36) foot in existing fifty (50) foot right-of-way. • 922 LA PRESA (GARVEY/FERN) - Provides funds for installation of a curb and gutter. Provides for heating, scarifying, resurfacing existing paving, and repairing sidewalk. 923 EMERSON (DEL MAR/EVELYN) - Provides funds'for reconstruction and widen- ing existing thirty (30) foot roadway to thirty-six (36) foot in existing sixty (60) foot right-of-way. 924 WILLARD (GARVEY/FERN) - Provides funds for widening existing thirty (30) foot roadway to thirty-six (36) foot in existing fifty (50) foot right- of-way. Provides for heating, scarifying, resurfacing existing paving, and repairing concrete. • 925 DELTA (FERN/KLINGERMAN - Provides funds for widening existing thirty (30) foot roadway to thirty-six (36) foot in existing fifty (50) foot right-of-way. Provides for heating, scarifying, resurfacing existing paving, and repairing concrete. • -24- ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL STREET PROJECTS (continued) Cost Center 4500 (continued) 926 WALNUT GROVE (FWY 10/GARVEY) - Provides funds for resurfacing over a rubberized interlayer and repairing concrete. 927 SAN GABRIEL (GARVEY/RUSH) - Provides funds for resurfacing existing paving and repairing concrete. 928 RESURFACING PROJECT (INFRASTRUCTURE -PRIORITY A) - Provides funds for heating, scarifying and resurfacing of streets according to Infrastruc- ture Management Plan - Priority A: Emerson (Western City Limits/Evelyn) $ 55,000 Del Mar (Highcliff/Graves) 35,000 Earlswood (Ivar/Glendale) 10,000 *Earle (Fern/Klingerman 20,000 Whitmore (Driggs/Heglis) 15,000 Whitmore (Sullivan/Heglis 10,000 Angelus (Hellman/Park) 55,000 Benton (Garvey/Graves) 75,000 Dorothy (San Gabriel/Charlotte) 20,000 Dorothy (Delta/Rockhold) 15,000 $310,000 Water line needed in street. 929 WALNUT GROVE (KLINGERMAN/SOUTH CITY LIMITS) - Provides funds for re- constructing existing pavement, repairing concrete, and eliminating irrigation problem. 930 GREENDALE (EARLSWOOD/HERSEY) - Provides funds for reconstructing and widening existing thirty (30) foot roadway to thirty-six (36) foot in existing fifty-four (54) foot right-of-way. 931 HERSHEY (GREENDALE/EARLSWOOD - Provides funds for reconstructing exist- ing paving, installing a curb, gutter, and sid walk. x % s-- 36 n 6,0 ~P1u0 932 STEVENS (GARVALIA/GRAVES) - Provides funds for reconstructing and widen- ing existing twenty (20) foot wide paving to a thirty-six (36) foot road- way including curb, gutter, and sidewalk in existing sixty (60) foot right-of-way. 933 KELBURN (NEWMARK/GRAVES) - Provides funds for reconstructing and widen- ing existing thirty (30) foot roadway to thirty-six (36) foot and acquir- ing an additional eight (8) feet of right-of-way. 934 BARTLETT (GARVEY/KLINGERMAN) - Provides funds for construction of a new curb, gutter, and sidewalk. Heat, scarify, and resurface existing thirty- six (36) foot wide roadway paving. -25- ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL STREET PROJECTS (continued) Cost Center 4500 (continued) 935 GLADYS (HELLMAN/GARVEY) - Provides funds for reconstructing existing pave- ment in existing thirty-six (36) foot roadway and repairing concrete. 936 DUBONNET (MUSCATEL/FERN) - Provides funds for widening existing thirty (30) foot roadway to thirty-six (36) foot in existing fifty-four (54) foot right-of-way. Provides for replacing curb, gutter, and sidewalk. Provides for heating, scarifying, and resurfacing existing paving. • 937 PAL JAY (FERN/KLINGERMAN - Provides funds for widening existing thirty (30) foot roadway to thirty-six (36) foot in existing fifty-four (54) foot right-of way. Provides for replacing existing paving over existing base anc constructing widened paving. 938 LA PRESA (FERN/KLINGERMAN) - Provides funds for widening existing twenty- eight (28) foot roadway to thirty-six (36) foot in the existing fifty (50) foot right-of-way. Provides for heating, scarifying, and resurfacing exist- ing paving. 939 CHARLOTTE (GARVEY/SOUTH END) - Provides funds for reconstruction and widening existing thirty (30) foot roadway to thirty-six (36) foot in existing fifty (50) foot right-of-way. 940 RESURFACING PROJECT (INFRASTRUCTURE -PRIORITY B) - Provides funds for heating, scarifying, resurfacing existing paving, and repairing concrete of streets according to Infrastructure management Plan - Priority B: • Delta (Dorothy/Delta Place) $ 38,000 Delta (Dorothy/Hellman) 30,000 Artson (Twin/Rockhold 30,000 *Brighton (Garvey/Garvalia) 55,000 Charlotte (Park/Hellman) 55,000 0 C. 'VArfg.J -e+atr4-&t+e (Arston/Hellman) 38,000 Charlotte (Arston/Hellman) 9,000 Gaydon (Arston/Hellman) 9,000 Twin (Arston/Hellman) 9,000 Earle (Arston/Hellman) 9,000 Rockhold (Arston/Hellman) 9,000 Angelus (Arston/Hellman) 9,000 $300,000 s< Water line needed in street. 0 941 WHITMORE ALLEY (WILSON WAY/ECKHART) - Provides funds for removing exist- ing fences, installing new single boundary fence, and provide drainage. 0 -26- ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL STREET PROJECTS (continued) Cost Center 4500 (continued) 942 WALNUT GROVE BEAUTIFICATION - Provides funds for professional landscape services and reconstruction of medians north and south of I-10 freeway similar to those on Rosemead Boulevard. 943 INFRASTRUCTURE MANAGEMENT PLAN ANNUAL UPDATE - Provides funds for an annua_ update of the Infrastructure Management Plan. 944 NEWMARK (PINE/FALLING LEAF) - Provides funds for reconstruction and widen- ing existing twenty (20) foot roadway to thirty-six (36) foot and acquir- ing an additional eight (8) feet of right-of-way. 949 FERN (PINE/FALLING LEAF) - Provides funds for reconstruction and widening existing twenty (20) foot roadway to thirty-six (36) foot and acquiring and additional eight (8) feet of right-of-way. 999 ANGELUS (FERN/KLINGERMAN - Provides funds for the acquisition of right- of-way and constructing a street extension from Klingerman and Delta to Angelus and northerly on Angelus half way to Fern. Provides for widening and reconstruction of Angelus from Fern and Delta west on Fern to Angelus and south on Angelus halfway to Klingerman. -27- 1• I• 1• I• 1• 1• 1• I• I• 10 1• Rnc=RAcAn L2cncxmi noMFNT AC.FN['_Y .M . . ■V V`r~`AV 1 ■m-V` r `VV■ . r ANNUAL BUDGET 1988-89 Function: REDEVELOPMENT Activity: TRAFFIC SIGNALS Account: 4530 APPROPRIATION DETAIL Account 1986-87 1987-88 1988-89 No. Activity Actual Fd Object Expense Budget Estimated Budget Capital Outlay 13 902 Valley @ Walnut Grove 60 -0- -0- -0- 13 909 Graves @ San Gabriel -0- 120,000 10,000 110,000 13 934 Walnut Grove @ San Gabriel -0- 50,000 9,000 41,000 13 937 Walnut Grove @ Landis View -0- 85,000 15,000 70,000 13 938 San Gabriel @ Delta 4,520 150,000 150,000 -0- 13 939 San Gabriel @ Emerson 4,000 96,000 76,800 19,200 13 940 San Gabriel @ Hellman -0- 60,000 48,000 12,000 Total Capital Outlay 8,580 561,000 308,800 252,200 Department Total 8,580 561,000 308,800 L 252,200 - -28- y X VI ROSEMEAD REDEVELOPMENT AGENCY BUDGET DETAIL TRAFFIC SIGNALS Cost Center 4530 909 GRAVES AT SAN GABRIEL - Provides funds for the installation of a traffic signal in conjunction with the reconstruction of Graves. Includes relocating the signal at Klingerman. 934 WALNUT GROVE AT SAN GABRIEL - Provides funds for the upgrading of this signalized intersection to improve vehicular capacity. This is a co-operative project with Cal-Trans. (Rosemead Redevelopment Agency will fund fifty (50) percent of the project.) 937 WALNUT GROVE AT LANDIS VIEW - Provides funds for a traffic signal to be interconnected with the existing traffic signal at the inter- section of Walnut Grove and San Gabriel. This will increase the vehicular capacity of San Gabriel and Walnut Grove intersection. 939 SAN GABRIEL AT EMERSON - Provides funds for construction of a traffic signal at this intersection. 940 SAN GABRIEL AT HELLMAN - Provides funds for upgrading the traffic signal at this intersection to include a left turn phasing. 0 0 0 -29- is i• I• I• i• I• I• l• i• I• 10