CC - Item 6B - Presentation on an Energy Service Performance Project for Energy-Related Improvements to City FacilitiesROSEMEAD CITY COUNCIL
STAFF REPORT
TO: THE HONORABLE MAYOR AND CITY COUNCIL
FROM: BEN KIM, CITY MANAGER /L
DATE: MAY 13, 2025
SUBJECT: PRESENTATION ON AN ENERGY SERVICE PERFORMANCE
PROJECT FOR ENERGY-RELATED IMPROVEMENTS TO CITY
FACILITIES
f.Y1hL h� /\:YI
The purpose of this report is to provide the City Council with an overview of Energy Efficiency
Projects under California Government Code Section 4217.12 and to seek direction for an Energy
Savings Performance Contract (ESPC). Under state legislation, public agencies are authorized to
enter into agreements with Energy Service Companies (ESCOs) to design and implement energy
efficiency projects. These projects are structured so that the energy savings generated over the life
of the contract fully cover project costs, with additional savings continuing after the contract ends.
Many jurisdictions have successfully used this approach to complete essential facility upgrades
while achieving long-term operational savings. To assess the feasibility of an ESPC for the City
of Rosemead, staff engaged with three ESCOs selected from the U.S. Department of Energy's
2025 Qualified List of Energy Service Companies and the Southern California Regional Energy
Network (SOCaIREN) trade ally network. Each ESCO conducted a preliminary review of the
City's current energy usage and determined that the City holds significant potential to benefit from
an ESPC, with opportunities to reduce energy costs, improve facility performance, and support
sustainability objectives.
As a critical first step to entering into an ESPC, the City must undertake an Investment Grade
Audit (IGA). An IGA is a comprehensive, detailed analysis conducted by an ESCO to assess the
current energy usage of the City's facilities and identify potential Energy Conservation Measures
(ECMs). The audit provides precise data on projected savings, costs, and the feasibility of proposed
projects, ensuring that the measures will deliver the anticipated financial and environmental
benefits. The level of analysis reduces risk and enhances the accuracy of performance guarantees
in the ESPC.
Staff is seeking City Council direction on: 1) if to proceed with an Energy Efficiency Project per
California Government Code Section 4217.12, and 2) which Energy Service Company (ESCO) to
engage an Energy Saving Performance Contract ( ESPC) for the Investment Grade Audit (IGA)
that will be brought to the City Council at a later date for approval.
AGENDA ITEM 6.11
City Council Meeting
May 13, 2025
Page 2 of 7
A significant amount of the City's existing energy infrastructure is at or near its useful life,
resulting in deferred and/or recurring maintenance problems and inefficient operations. As a result,
the City's utility and operation and maintenance (O&M) costs have increased above their optimal
levels. Energy Savings Performance Contracting can provide a budget -neutral approach to
implementing infrastructure improvement projects without using funds from capital budgets,
providing greater flexibility in funding strategies. An ESCO develops and implements energy
conservation projects and guarantees ongoing cost savings to the City for a specified period of
time. Guaranteed cost savings from energy saving projects are designed to offset finance payments
over the useful life of the equipment.
Pursuant to Section 25008 of the Public Resources Code, it is the Legislature's intent to promote
all feasible means of energy and water conservation and all feasible uses of alternative energy and
water supply sources. As an incentive for public agencies to implement energy efficiency projects,
the State of California enacted Government Code Sections 4217.10 - 4217.18 in 1984, which
provides public agencies with the ability and flexibility to award Energy Savings Performance
Contracts without the need for a formal competitive bidding process. This exemption streamlines
procurement, reduces administrative burden, and expedites energy conservation projects. To
utilize this contracting method, the City Council must hold a noticed public hearing and determine
the following:
1) That the anticipated cost to the public agency for thermal or electrical energy or
conservation services provided by the energy conservation facility under the contract will
be less than the anticipated marginal cost to the public agency of thermal, electrical, or
other energy that would have been consumed by the public agency in the absence of those
purchases.
2) That the difference, if any, between the fair rental value for the real property subject to the
facility ground lease and the agreed rent, is anticipated to be offset by below-market energy
purchases or other benefits provided under the energy service contract.
In other words, the City must determine that the project will result in net cost savings compared to
what the City would have spent on energy without the improvements. This is typically determined
through an IGA performed by a selected ESCO. The IGA provides a detailed, engineering -based
analysis to identify specific ECMs, estimate associated costs, and project the financial savings and
operational benefits. Because of the significant time and resources involved, many ESCOs require
an IGA agreement that may include an exit fee should the City choose not to proceed with the
project following the audit.
It is important to note that the ESCO must contractually guarantee the project's financial
performance. If the guaranteed savings are not achieved, the ESCO is obligated to reimburse the
City for the shortfall, thereby mitigating financial risk and ensuring that the City will not need to
allocate capital funds for the improvements. While the project is expected to be self -funding
through savings accrued over time, an initial investment is required. Funding can come from low-
City Council Meeting
May 13, 2025
Page 3 of 7
to no -interest loans, grants, rebates, city reserves, and incentives such as the federal Investment
Tax Credit (ITC). Due to uncertainty around future federal funding, it is important to consider
securing incentives while they are available. City staff can work with the Southern California
Regional Energy Network (SoCa1REN), a no -cost service provided by Los Angeles County, and
leverage ESCO grant -writing support to maximize funding opportunities.
To assess the feasibility of an ESPC for the City of Rosemead, staff engaged with three vetted
ESCO's Ameresco, Veregy, and Schneider Electric— from the U.S. Department of Energy's
2025 Qualified List of Energy Service Companies and the SoCa1REN trade ally network. On
February 28, 2025, each ESCO submitted preliminary analyses based on a detailed review of the
City's utility bills, comprehensive inspections of municipal facilities, and interviews with City
staff. Following review of these analyses, staff directed the ESCOs to develop proposals for a
Phase 1 project aligned with the priorities outlined in Table 1. These priorities were informed by
findings from the preliminary assessments, including maintenance logs, staff input, utility and
energy costs, potential energy savings, and the remaining lifespan of current equipment.
Energy Conservation
Measure
Location
Priority Level
HVAC io Building
Automation Controls
City Hall
Hi -h
`
Garvey Community Center
Rosemead Park Playschool
Rosemead Community Recreation Center
Garvey Park Clubhouse
LED Lighting
All Facilities
High
Rosemead Park
Garvey Park
LED Traffic Signals
Citywide
High
Pool Control Systems
Rosemead Park Aquatic Center
High
Garvey Park Splash Zone
Solar PV Canopies
Rosemead Park
Moderate
Garvey Park
Table 1: Priorities for a Phase I Energy Project
Each ESCO provided a thorough proposal outlining project history, qualifications, technical
approach, management approach, cost and pricing, responsiveness, and community benefit. A
summary of each firm's proposal is provided below:
Ameresco
Ameresco has 25 years of experience and has delivered over $16 billion in energy projects,
primarily in California school districts, with more limited experience in local government. The
firm is highly qualified in infrastructure upgrades, renewable energy, and performance contracting.
City Council Meeting
May 13, 2025
Page 4 of 7
Their technical approach is comprehensive and collaborative, following a phased process that
includes detailed energy audits, lifecycle cost analysis, customized engineering solutions, and
guaranteed energy savings verified through International Performance Measurement and
Verification Protocols (IPMVP). Cost and pricing are outlined transparently, with a 10% overhead,
8% profit margin, 22% markup, 6-12% in fees, and a 3-6% contingency. They provided a
preliminary estimate of $5.2 million for a Phase 1 project, with a projected payback period of 7.7
years, and proposed a design/IGA exit fee of $16,934. Ameresco is responsive, offering ongoing
operations and maintenance services, staff training, and asset management support through its
AssetPlanner platform. The company also emphasizes community benefit by engaging local
subcontractors, supporting workforce development, and aligning project outcomes with
Rosemead's climate and sustainability goals.
VereQv
Veregy brings over 34 years of experience and has completed more than 185 energy programs for
municipalities, demonstrating deep technical expertise and strong financial capacity, including a
$325 million bonding limit and $4.75 billion in secured project financing. Their technical strategy
focuses on energy efficiency, electrification, and renewable energy, supported by advanced
modeling, thorough auditing, and a vendor -neutral approach to equipment selection. Preliminary
cost estimates for a Phase 1 project range from $3.6 million to $6.5 million, with projected net
savings of $1.5 million to $4.5 million over 20 years. Overhead, profit margin, and other fees were
not specified. Veregy offers a $0 design/IGA exit fee; however, all project documentation and
calculations would remain proprietary. The firm demonstrates high responsiveness through real-
time communication, 24/7 system monitoring, and in-house commissioning. Community benefits
are a core part of their approach, including the use of local subcontractors, support for energy
conservation education programs, and alignment with Rosemead's 2030 Strategic Plan to promote
environmental and economic resilience.
Schneider Electric
Schneider Electric proposes a highly experienced team with over 33 years in the ESCO sector and
more than $4.6 billion in completed performance contracts. Their technical approach is thorough
and tailored, combining advanced energy modeling tools with a structured design -build
methodology to deliver cost-effective and high -performing solutions. Schneider provides a
performance guarantee backed by IPMVP-compliant measurement and verification, using the
robust Option C whole -building method, and assumes full responsibility for any savings shortfalls.
They provided a preliminary estimate of $3.94 million for a Phase 1 project, with an anticipated
return on investment in under 15 years. Their proposal includes a Lighting Master Plan at no
additional cost and estimates annual telecom savings of approximately $68,000. Pricing is clearly
detailed, with a proposed $99,750 design/IGA exit fee,10-12% overhead, and 6-8% profit margin.
Schneider provides a 24/7 performance assurance hotline and remote O&M support. Community
benefits include use of local subcontractors, support for community events, partnership with the
Chamber of Commerce, and marketing for sustainability programs.
On April 1 and 2, the ESCOs presented an overview of their proposals to a panel of key City staff,
including the Finance Director/Assistant City Manager, Administrative Services Manager, Acting
Planning and Economic Development Manager, Parks and Recreation Director, Public Works
City Council Meeting
May 13, 2025
Page 5 of 7
Director, and Public Works Manager. Following the presentations, staff held a debriefing session
and assigned scores to each ESCO. Table 2 summarizes the average scores provided by the panel
members and highlights common feedback for each ESCO.
ESCO
Evaluation Criteria
Staff Comments
Qualifications
F9.25
Very experienced in industry; professional
Schneider
Electric
Technical Approach
Conservative with calculations
Cost and Pricing
Upfront costs; Reimburses for shortfalls
Responsiveness
9.50
Support for community engagement
Total Average Score
9.44
Qualifications
8.75
34 years of experience
Veregy
Technical Approach
8.25
Holistic approach; Maintenance plan
Cost and Pricing
7.75
Costs and pricing were very high level
Responsiveness
8.50
Good training plan; local office
Total Average Score
8.31
Qualifications
6.75
Not much local government experience
Ameresco
Technical Approach
7.00
Measurement & Verification for 15 years
Cost and Pricing
6.25
1 No change orders
Responsiveness
6.50
Ongoing training provided
Total Average Score
16.63
Table 2: Average Scores and Feedback Provided by Panel
All three ESCOs presented strong and competitive proposals, each with unique aspects that
informed staff's evaluation. Schneider Electric was noted for its conservative approach to project
calculations, which may help ensure performance expectations are met, and for its transparency in
outlining the Design/IGA exit fee and reimbursement process for performance shortfalls.
Ameresco's experience was primarily with school districts, with less emphasis on local
government clients, and its assertion of no change orders prompted discussion about the feasibility
of that approach. Veregy was recognized for its local presence and comprehensive methodology,
though its proposal included higher-level cost estimates with less detail on specific fees such as
overhead and profit, which staff considered when comparing the proposals.
STAFF RECOMMENDATION
It is recommended that the City Council:
1) Receive and file this report; and
2) Provide direction to staff regarding next steps for potential implementation of an Energy
Services Performance Contract.
City Council Meeting
May 13, 2025
Page 6 of 7
FISCAL IMPACT
There is no fiscal impact associated with the recommended action at this time, as staff is only
seeking City Council direction to explore an energy savings performance contract. Should the City
Council choose to proceed with a specific project or agreement in the future, a detailed fiscal
analysis and funding strategy will be provided for Council consideration prior to approval.
ENVIRONMENTAL REVIEW
The proposed action is not subject to the California Environmental Quality Act (CEQA) pursuant
to CEQA Guidelines Section 15378(b)(5), as it constitutes an administrative activity of the City
involving general policy direction and does not commit the City to a specific project or result in a
physical change to the environment at this time. As such, the action does not meet the definition
of a "project" under CEQA, and no environmental review is required at this stage. Should the City
move forward with the design or implementation of a specific energy efficiency project as a result
of this direction, the proposed project will be evaluated for potential environmental impacts in
accordance with the California Environmental Quality Act (CEQA). At that time, the City will
determine the appropriate level of environmental review, if any, prior to project approval or
commencement of physical work.
STRATEGIC PLAN IMPACT
This action aligns with the City of Rosemead's Strategic Plan Goal C — Infrastructure and
Facilities, focusing specifically on improving city facilities and promoting the adoption of
renewable energy and energy efficiency resources. It supports the modernization of public
infrastructure through sustainable energy solutions and resource -efficient facility upgrades.
PUBLIC NOTICE PROCESS
This item has been noticed through the regular agenda notification process.
Prepared by:
W" (.f•Gr�
Arlene Tieu, Administrative Analyst
City Council Meeting
May 13, 2025
Page 7 of 7
Attachment A: Schneider Electric Proposal
Attachment B: Veregy Proposal
Attachment C: Ameresco Proposal
Attachment A
Schneider Electric Proposal
sr-
,1�y�1-/—�
for
ilia
`,o ,, - r` T_ mow• '��
f(
SCA
I�
N
City of Rosemead
Energy Project Proposal
March 20, 2025
-
:1
Life Is C7n Schneider
. I 0,,Electnc
City of Rosemead
Energy Project Proposal
Life Is On Schneider
0Eleci is
Table of Contents
ExecutiveSummary ................................................................................... 3
1. Project History ....................................................................................... 7
2. Qualifications....................................................................................... 10
3. Technical Approach............................................................................. 16
4. Management Approach....................................................................... 25
5. Cost & Pricing...................................................................................... 33
6. Responsiveness.................................................................................. 42
7. Community Benefit.............................................................................. 44
This proposal, and any exhibits and attachments hereto, (collectively, this 'Proposal") and any information contained herein, is the
property of Schneider Electric Buildings Americas, Inc. (Schneider Electric) and shall constitute proprietary and confidential
information. The party to whom this Proposal is addressed (the'Recelving Party") acknowledges the confidential nature of this
Proposal and agrees to take all necessary precautions to ensure the confidential treatment of this Proposal and all information
contained herein. This Proposal is intended solely for the employees, representatives, and agents of the Receiving Party (the
"Receiving Party Representatives"); provided, however, that this Proposal is only to be disclosed to those Receiving Party
Representatives on a "need -to -know" basis. Except for the Receiving Party Representatives, the Proposal will not be used, copied,
reproduced, disclosed or otherwise made available, directly or Indirectly, to any other person, firm, corporation, governmental unit,
association or entity, for any purpose whatsoever, without the prior written consent of Schneider Electric.
March 20, 2025
Page 2
Use or disclosure of data contained on this sheet is subject to the restriction an the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Executive Summary
This proposal represents an opportunity to modernize and shape the energy
landscape of Rosemead, a community we look forward to partnering with to
ensure a sustainable and resilient future for generations to come. At
Schneider Electric, we have one goal — to be the partner who enables your
vision beyond traditional efficiency improvements. We believe that a project
as simple as saving energy is much more than that and has potential to
impact the lives of the 49,305+ residents that call Rosemead home along
with the many visitors that frequent your growing community. Your vision for
the City of Rosemead is clear - "being a safe, welcoming, connected. and
active city with thriving businesses, well-maintained infrastructure, and
quality services that support the entire community, while its mission is to
provide programs and services that build community and increase
opportunities."
Schneider Electric will enable your vision by:
Addressing your critical needs, including a turn -key solution that
improves the longevity of your infrastructure, reduces costs, and advances technology and inefficient
Life Is On Schneider
Electric
systems.
• Identifying key funding opportunities and submitting strong innovative applications that better the success
rate and award to the City of Rosemead.
• Collaborating with our marketing team to engage community outreach events that promote your
accomplishments and wins.
• Integrating with local labor to bring new jobs to your communities.
• Implementing innovative programs that meet Rosemead objectives around sustainability, environment,
economy, and community.
Solutions to Fund Your Highest Priorities
City of Rosemead's goals are within reach. In fact, you can do more than you thought possible with Schneider
Electric at your side.
We can help you capture revenue from your operations and reinvest those savings into infrastructure
improvements that support your strategic goals. Below is a summary of improvements that are key to
transforming your utility bills into assets. More information on each solution is in Section 5.
March 20, 2025
Page 3
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
m
U
C
E
E
O
U
a
ro
rn
0
Comprehensive LED Retrofit
Park Lighting
Street Lighting Master Plan
City -Owned Streetlights to LED
HVAC Unit Replacements
Full BAS Upgrade
Standardized Controls Solution
Variable Frequency Drives (VFD's)
EV Charging Stations
Capital Asset Planning
Community Engagement
Grant Strategy and Procurement
.'A
Life Is On I Schneider
Electric
0
N
L
N
N
CL
rn
Y
m
ro
Z
ra
M,
0
a
U
1'✓
We will collaborate with your team to define, design, and install solutions that are funded with a combination of
energy and utility savings. As your single point of contact, we will manage all details, right down to helping you
obtain grant funding, applying for rebate programs, implementing utility incentives, and obtaining 0% financing...
so you can concentrate on your day-to-day business.
March 20, 2025
Page 4
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
CElectrlc
Benefits to Your Community
By investing in these proposed improvements, Rosemead will be able to:
THIS PROJECT WILL PROVIDE: TO HELP YOU ACHIEVE:
City Wide HVAC Replacements
LED Solutions for Facilities, Streets and Parks
O • Reduced maintenance and operations
costs
• Enhance efficiency to hedge against
QQ rising utility costs
• Improved Safety and Security
Building Automation Controls Qj • Single platform with training and support
services built-in
Real Savings to Your Bottom Line
Your utility and infrastructure improvements will deliver real, verifiable savings to your bottom line. Based on our
initial research, we anticipate that you could save more than $6 million over a 25 -year period. More details can be
found in Section 5 of this response.
ECONOMIC BENEFITS FOR A 25 -YEAR TERM
$500,000+
rebates, incentives & 0% loans
$6.07M $82,500
annual energy savings + revenue generation
7%
total savings
over 25 years $55,000
reduction in energy spend
annual O&M savings
Partner with the Country's #1 Energy Services Company
We have an unmatched reputation in our industry. Schneider Electric has been the top-rated ESCO in the nation
since 2017, and we are honored as one of the world's most ethical companies. Our customers state that our
integrity, reliability, and the ease of working with our team members place us on a level above our competition.
You will work with certified professionals who have the proven expertise to develop innovative solutions to your
most pressing challenges—and to see them through to completion. Our extensive experience and financial
strength position us to support your project now and well into the future.
Above all, you will see the savings where they count—on your utility bills. In the unlikely event that your project
does not deliver as expected, we will write a check for the difference.
As a result, you will be able to deliver on your promises to your stakeholders—and continue to build trust in your
strategic direction. This commitment to excellence is why our customers repeatedly select us for future projects. It
has also earned us numerous recognitions in the industry, including:
March 20, 2025
Page 5
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
#1 -ranked
ESCO
in the nation
AGuidehouse
INSIGN7S
At Home in California
2024
Partner of
the Year
2024 Honoree and
ranked for 13 years
and counting
www UN15PHERC cool
Life Is On Schneider
VElectric
#1 Most Sustainable
Company on
Global 100 List in 2025
kol GLOBALIOO
Rosemead can move forward with confidence knowing that you will have a qualified team well -versed in the
unique requirements of Los Angeles County and the State of California. We bring to the table:
30+ Years in California
131 California Projects since 2007
8 California Offices $720M+ in California work
2,100 local employees $70M+ in secured state grants and incentives
Taking the Next Step—Together
Your vision is attainable, and Schneider Electric is here to help. Backed by our long track record and ironclad
guarantee, you will have the expertise you need to turn your vision into reality. With your approval, we can get
started right away on delivering positive outcomes for your community.
Let's take the next step, together.
March 20, 2025
Page 6
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
I {Electric
1. Project History
ESCO's knowledge of the city's energy policies, building codes, and sustainability goals with proven experience
with similar projects in the region.
Schneider Electric has dedicated significant effort to thoroughly understanding the condition of Rosemead
facilities and the City's strategic goals, including:
• Schneider received and reviewed the
following documents which highlight
aspects of the City's energy policy and
sustainability goals:
o Imagine Rosemead 2030
Strategic Plan
0 2012 Energy Action Plan
• Schneider analyzed 39 months utility
billing
• We met with City management and public
works staff numerous times to ascertain
Rosemead's goals, priorities, and challenges.
• Schneider held a workshop with over 20 staff members to discuss facility issues and operational
challenges.
• We conducted site walks of each facility with public works staff.
City of Rosemead's Sustainability Efforts
The City of Rosemead commissioned the development of an Energy Action Plan in 2012. However, progress in
implementing, this plan has been limited. Notable actions include upgrading LED lights in city facilities and
installing EV chargers at the Garvey Community Center and Rosemead Community Center. Despite these efforts,
the City has faced challenges in advancing its sustainability program.
RENEWED MISSION IN THE 2030 STRATEGIC PLAN
The City's 2030 Strategic Plan outlines a renewed mission to modernize facilities by addressing a significant
backlog of deferred maintenance at City Hall, community centers, parks, pools, and public yards. Key objectives
include:
• Enhancing public safety with new street, park, and facility lighting, and improved access controls.
• Supporting a healthier budget through significant reductions in utility costs.
• Upgrading public parks and athletic fields with mechanical, lighting, pool system enhancements, and
additional EV charging stations.
• Becoming a more responsive city with proactive maintenance and enhanced controls.
Strategic Partnership
Our proposed solution addresses the immediate mechanical and lighting needs identified by the Rosemead city
leadership team. It also includes the development of a city-wide lighting master plan with a roadmap to a second
March 20, 2025
Page 7
Use or disclosure of data contained on this sheet is subjed to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On i Schneider
VElectric
phase that upgrades park lighting, adds solar power to city yards and parks, as well as expanding the EV
charging infrastructure for both fleet and public use.
We can also uniquely enable the City to accurately track and report on GHG emissions and implement a Capital
Asset Planning tool that integrates with your existing work order systems and allows staff to easily manage all city
assets on one intelligent platform. This solution will prevent the accumulation of deferred maintenance by
providing a long-term strategic asset plan, ensuring that maintenance needs are proactively addressed and
managed efficiently.
CHALLENGES AND OPPORTUNITIES
Workforce fluctuations in Rosemead have led to an increase in deferred maintenance. Community residents have
also expressed concerns about room temperatures at the Garvey Community Center. While intermittent upgrades
to LED interior lights have been made, much of the mechanical equipment is nearing or past its end of life. The
lack of universal controls on these systems creates operational challenges for staff.
Proven Experience
The City of Rosemead needs a partner to address substantial deferred maintenance and empower city
operations. Schneider Electric is committed to our partners long-term success by providing ongoing support and
implementing new capabilities to ensure that assets are proactively cared for. Our approach ensures that the City
of Rosemead can maintain its facilities effectively and sustainably, with continuous improvements and support
from our team. Here are a few highlights from municipal clients that demonstrate the complex solutions we've
developed for several other prominent cities.
City of Chicago, IL Dallas County, TX Los Angeles County, CA
Audited mer 3 Milson Sq Ft IN
the 3rd wgesl cd) of the u S,
over 583M worth Of upgrades and sanngs
to date In excess of i20M
$J51d wa5lexdlei a. aCuu r
the Urges) County in the U
City of Dallas, TX City of Houston, TX City of Atlanta. GA
a prates of v spanning a 2 year retahaWnp
Owl S4 Mt w,Mlh of wok to the a* targesl CM in
Neu -s.
S16M protect with the City Rapid Trans,[Authonly
20, 2025
Page 8
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
CALIFORNIA EXPERIENCE
Our extensive experience with similar projects in the region positions us as a reliable partner for the City's
ambitious plans. For instance, at the City of Palmdale, we successfully:
• Generated a new revenue stream within the utility budget.
• Reduced CO2 emissions and carbon footprint.
• Enhanced the quality of lighting city-wide through LED solutions for both interior and exterior.
• Improved safety and security in public spaces.
• Improved indoor air quality by upgrading mechanical equipment and standardizing ALC controls.
• Implemented irrigation upgrades and controls with modern technology.
• Removed risk from the city's supply chain.
• Added marketable modernizations to sports areas to increase sports tourism and economic development.
• Optimized federal grants to fund the City's vision.
Alongside Palmdale, we have developed and installed more than $720M in California. Here is an additional
sampling of public agency projects that faced similar challenges or desired similar solutions as the City of
Rosemead. More information about California experience can be found in Section 6.
City of Palmdale -2 Phases Palmdale CA $20,700,000
City of EI Centro EI Centro CA $14,983,747
University of California San Diego San Diego CA $7,800,000
Naval Base Coronado San Diego CA $45,034,918
Marine Corps Air Station Miramar San Diego CA $19,288,354
San Diego Unified School District -4 Phases San Diego CA $45,252,299
Carlsbad Unified School District -6 Phases Carlsbad CA $11,893,301
San Marcos USD — 3 Phases San Marcos CA $6,243,576
The City of Rosemead is an innovative city with high aspirations to modernize and achieve sustainability. As
you're looking for energy experts to guide you through your efficiency journey, you need an ESCO that is equally
matched and able to develop a solution that is worthy of the Rosemead name.
March 20, 2025
Page 9
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On 1 Schneider
Electric
2. Qualifications
ESCO's background, financial capability, industry accreditations, and compliance with performance contracting
requirements.
A. ESCO Background
Schneider Electric was established in 1836 and has grown into a global specialist in energy management,
efficiency, and infrastructure. We entered the ESCO business 33 years ago with the founding of our Sustainability
Business in 1992 to bring our global expertise to serve local government.
Our operations span more than 100 countries, with
nearly 168,000 employees and $35.9 billion in
annual revenue. In short, we offer the backing and
stability of a large company, while the
Sustainability Business operates within the ESCO
space as a smaller division. Rosemead will receive
the resources and expertise you need with the
personal touch of local representatives who
understand your unique challenges.
Evidence of our commitment to long-term
partnerships, value, and performance includes
over $1,418,112,641 in repeat business from
customers who trust us to deliver time and again.
ESCO BUSINESS
Schneider Electric's ESCO business unit, our
Sustainability Business, specializes in comprehensive facility improvement projects for local and federal
government, healthcare, higher education, and K-12 markets. We've helped facilities across the country transform
energy savings into operational gains for the past 33 years, with more than 1,090 projects and $4,120,684,485 in
savings guaranteed to date.
We offer an approach that extends beyond standard performance contracting services. We'll help Rosemead
realize your vision and accomplish your highest priority goals in several key areas, including:
March 20, 2025
Page 10
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Energy
Reduce and optimize your utility
and energy usage through
infrastructure improvements.
loon
Facilities/Operations
Training to sustain optimal
equipment performance and
solutions that reduce long-term
operating and maintenance costs.
ro
CCoo
�
Technology
Modernize your facility
using the latest technology
tailored to your needs.
Community Engagement
Empower stakeholders
and educate them
regarding behaviors that
affect your budget.
Life Is On I Schneider
Electric
Funding
Leverage reallocated funds
from your energy savings to fund
improvements and explore available
energy rebates, and more.
Co -create a marketing
vision plan that will help build
awareness of your environmental
commitment through press releases,
community outreach events,
specialized signage, and more.
From the first visioning session through your guarantee period, Rosemead will have a fully integrated team of
knowledgeable and skilled experts at your side who are well -versed in the unique requirements of cities in the
region. That's because Schneider Electric staffs all projects with in-house personnel from our deep bench of
20, 2025
Page 11
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
B. Financial Capability
Rosemead requires a partner that offers financial soundness and
stability to protect your investment in your project. Schneider
Electric has the wherewithal to deliver on our promises so that
you can follow through on yours. By partnering with Schneider
Electric, you will have a dedicated financial expert at your side to
answer your questions and explain your options as you seek
financing associated with your project.
As a result, you will:
Proceed with confidence knowing you have all of the
Oinformation you need to make informed decisions about
the project and its associated financing.
Attain a package of financing options for consideration
Othat offers competitive terms and optimizes the value of
your energy savings.
3 Reduce your exposure to risk during construction and
throughout the guarantee period.
Life Is On Schneider
Electric
You will have the support and backing of
a reputable, credit -worthy ESCO partner:
ID
0
Fully Insured &
Moody's
Bonded
Rating
O
0
S&P Global
Dun & Bradstreet
Rating
Rating
Your energy savings guarantee is a direct obligation and commitment from Schneider Electric, not a "savings
assurance' guarantee provided or issued by a third party. We hold our guarantees as a liability on our financial
statements and truly bear the financial responsibility of the savings guarantee. This means we are professionally
and financially vested in making sure your savings are achieved. If your project does not deliver the savings
promised, we make up the difference.
C. Industry Accreditations
Schneider Electric is an active, accredited member of NAESCO as
an Energy Service Provider (ESP) and is certified by the U.S.
Department of Energy (DOE) as an ESCO.
This accreditation, the highest that NAESCO awards, means that we
offer all of the capabilities of a traditional ESCO, as well as additional
offerings not all firms in the energy business are able to provide. Our
projects not only include energy conservation measures, but we also
have the expertise to help our clients meet emissions reduction
targets or achieve carbon neutrality as part of their performance
outcomes. This includes solutions such as distributed energy
generation, cogeneration, combined heat and power (CHP) projects,
as well as arrangement of firm contracting of energy supply and
energy -as -a -service (EaaS).
Please see the following pages for additional industry awards.
Schneider Electric is accredited by the
National Association of Energy
Services Companies (NAESCO) as an
Energy Service Provider
March 20, 2025
Page 12
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
Certificate of Accreditation
meo m,mxp w,
Schneider Electdc
M1upaM W�eaM J,eamed,atien p2gamaMpmeW aMM1»
[nmW�re Eean.4neyleOE,vRySxN[a VaoNEs
-r;l-
Schneider Electric is accredited by the
National Association of Energy
Services Companies (NAESCO) as an
Energy Service Provider
March 20, 2025
Page 12
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
We are honored to be recognized and awarded globally in areas of innovation, sustainability, ethics, and
safety. The list below highlights some of our most recent awards, including those we are most proud of:
Commitment to Customers
Earns #1 ESCO Rank from
Guidehouse Insights
Rosemead can count on Schneider Electric to
address your needs far beyond energy. In fact,
our commitment to our customers earned us
the #1 spot on Guidehouse Insights 2023
ESCO Leaderboard Grid, our 3f° consecutive
time leading the way. The assessment ranked
10 leading ESCOs based on their strategy and
execution.
AGuidehouse
INSIGHTS
2024 World's Most
Ethical Company Designation
Ethics and responsibility are foundational to our
relationships with all customers, partners,
suppliers, and communities in which we work.
And it shows: Schneider Electric has been
recognized for 13 years as a World's Most
Ethical Company Honoree. To read more about
the designation, click HERE.
WORLD'S MOST
ETHICAL
COMPANIES
Ranked #1 World's Most Sustainable
Company in 2024
Schneider Electric earned the top spot on Time
Magazine's World's Most Sustainable
Companies list in 2024 because of our internal
emissions reductions goals and our
commitment to help reduce our customers'
carbon footprint. More information
can be found HERE.
n
2025 Ranked #1 World's Most Sustainable
Corporation
Schneider Electric has received the "World's
Most Sustainable Corporation" title by
Corporate Knights in 2025, thanks to a "hull
level of sustainable investment and revenue. "
We have been included in the Global 100 for
14 consecutive years with seven top 10
rankings, and the only company to be
awarded #1 twice (2021).
�..•` GLOBAL100
ENERGY STAR Partner of the Year
Award for more than a Decade
We have been recognized by the
Environmental Protection Agency (EPA) as
an ENERGY STAR Partner of the Year for
more than a decade, validating our expertise
in facility benchmarking and utility data
analysis. This means you have an expert
team in tracking and assessing
energy and water use across "
your buildings. nQj�
Fortune's 2024 World's Most Admired
Companies
For the seventh year in a row, Schneider
Electric has been ranked based on a survey
of U.S. and global Fortune 500 companies
that are top performers. Schneider Electric
received high ratings for innovation and
quality of products and services. SIT,
Page 13
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
More than 200 Awards for
Jobsite Safety
#1 in the Gartner Top 25
Supply Chain
Gartner.
Platinum Medal for 3rd
consecutive year in
Sustainability Rating
ecovadis
#11 out of 100 Best
Places to Work in 2025
glassdoor
Please visit this site for additional awards and recognition.
CERTIFICATIONS
Life Is On I Schneider
VEleccric
Diversity Leaders for 41h
consecutive year
FT FINANCIAL
TIMES
Terra Carta Seal Recipient
— Commitment to a
Sustainable Future
Rosemead will benefit from working with a company that is an active member of the industry's leading
organizations and initiatives, holding the following certifications and credentials:
Registered Partner &
Partner off the Year
ENE FGYS
PANiNER
Approved Performance
Contractor
U.5 DEPARTMENT OF
ENERGY
Accredited Energy
Service Provider
NAESCO
ACCREDITED
Gold Accredited Provider
of Sustainability
Consulting
Approved Performance
Contractor
141
US Army Corps
of Engineers
As an approved performance contractor for NAESCO, the DOE and the DOD, Schneider Electric has
undergone substantial vetting. In short, our credentials prove that we can do what we say we will do—
whether it be for the federal government or for a City like yours.
March 20, 2025
Page 14
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
i'
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
D. Compliance with Performance Contract Requirements
Schneider Electric's Program Proposal is in full compliance with California Government Code 4217.12a, which
states "...a public agency may enter into an energy service contract and any necessarily related facility ground
lease on terms that its governing body determines are in the best interests of the public agency ... and if the
governing body" makes the statutory findings of cost savings. These future savings are used to pay for the
project over time, reducing the need for upfront capital. By taking advantage of G.C. 4217, local governments can
reduce capital costs, streamline project delivery, and reduce financial risk while addressing deferred maintenance
and developing onsite generation, energy resiliency, and zero emission vehicle infrastructure.
Outcome Driven Project Delivery with California G.C. 4217
G.0 4217 allows public agencies to achieve superior project outcomes quicker than DBB.
FINAL COMMISSIONING
DESIGN
PRELIMINARY CONSTRUCTION TRAININUSUPPORT
DESIGN
PERMITS PERFORMANCE
Deferred Maintenance:
Most cities and districts face significant
political pressure as they struggle with
backlogs of deferred maintenance due
to funding and staffing shortages.
0902
I
Zero Emissions Mandates:
Electrical grid capacity issues and
market uncertainty hinder local
government efforts to meet California's
zero emission energy mandate timelines.
M
Future Uncertainty:
Using multiple firms for energy projects
complicates long-term planning, leading
to demand shortages and compliance
failures. Struggles to meet growing
energy demand are exacerbated by
utility lead times for new service.
END
Lack of Awareness:
Many government executives are not
familiar with G.C. 4217 and don't realize
they can bundle energy-saving projects
with improved delivery and cost -savings.
Fragmented Project Management:
Conventional design -bid -build project
delivery uses multiple consultants and
often results in a patchwork of
technologies, disparate policies, service
disruptions, and lack of accountability.
March 20, 2025
Page 15
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
VEleccric
3. Technical Approach
ESCO's approach to energy efficiency, technology selection, auditing, M&V, commissioning, operations and
maintenance, and handling of savings shortfalls.
A. Energy Efficiency
We take a pragmatic approach to energy savings in that they should be seen where they count—on your utility
bills. The City of Rosemead will save what we promise, or Schneider Electric will make up the difference. This is
covered by utilizing IPMVP Option C (utility bill) met
methodology whenever possible and practical.
Rosemead will work with a partner whose entire
process is designed to ensure your expectations are
met. You will benefit from:
• Accurate, dependable energy savings projections
that are developed by one of the industry's most
comprehensive energy engineering teams
• A transparent process for measuring results
• A team of performance assurance engineers at your
side to confirm your savings are on track for years to
come
Our energy engineering team will ensure your vision for
infrastructure improvements and savings translates into
achievable savings. You can move forward with
confidence knowing that we are financially vested in the
outcome.
B. Technology Selection
Gommissioning
oeWned
Engme.,M,
Proven Process From the moment we begin design work
through your guarantee period, every step we take is
aimed at ensuring you achieve the savings we promise.
Your goals and how you use your facilities are unique to your City. For Rosemead, we will tailor our savings and
technology approach to your situation and the needs of your project. Our team is well versed in most types of
technologies and measures currently found throughout the current landscape, and will work with Rosemead to
find the best measures based off of your needs, ROI, and practicality,
Our energy analysis and technology approach are influenced by several factors:
Page 16
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
0 Magnitude of cost savings
OImpact of savings on the meter (overall percent reduction)
(D Complexity of the measure
(D Impact the measure will have on other systems (system interaction)
O M&V plan
OImpact of other measures on shared meter or building
We do not take a one -size -fits -all approach to energy analysis, nor do we operate with the same set of
assumptions across different projects. Rather, we have
multiple tools at hand to forecast energy savings and RELIABLE DEVELOPMENT
systems, including:
• Commercially available energy modeling tools to
simulate complex buildings and campuses
• Spreadsheet calculation tools to model simple
buildings, systems, and specific ECMs
• A suite of in-house spreadsheet tools to process
and analyze utility data, simulate rate tariffs, and
manage energy model results and savings
• A catalog of current types of equipment available in
the market
Our experience spans single buildings with complex
systems, to simple buildings with a similar scope, to
facilities that have undergone multiple renovations and
additions. You can expect us to scale our analysis
methods up or down to match the needs of your
project.
C. Auditing
I -
City of St. Joseph, MO — Schneider Electric's
development team engineered multiple phases of
work with the City, resulting in $25M worth of
investment with over $30M in savings over the life of
the equipment.
INVESTMENT GRADE AUDIT— ANALYSIS, APPROACH, AND METHODOLOGY
The City of Rosemead can experience a comprehensive transformation with our Investment Grade Audit
procedures, where we align our ability to design, develop, and implement infrastructure improvements with your
long-term organizational and sustainability plans. Facility energy use, equipment costs, occupant schedules, and
supply chain timelines are just some of the complexities involved with embarking on an infrastructure
March 20, 2025
Page 17
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
improvement project. Our experience in implementing more than 1,090 of these projects gives us the expertise to
design and implement your project while keeping all of these factors in mind.
—L3
12VE] I I I I
A. PROGRAM B. CONCEPTUAL C. SCHEMATIC D. FINAL AUDIT
VISION DESIGN DESIGN PROPOSAL
MAPPING
Schneider Electric's Auditing Process. We design with the end in mind. Our collaborative auditing process
puts your needs and priorities up front, allowing our team to develop a comprehensive solution that brings
your vision to life.
A. PROGRAM VISION MAPPING
Our goal during the Program Vision Mapping phase is to understand your unique project priorities, operational
challenges, and maintenance backlog. With this insight, we can begin to develop a project scope that not only
meets your operational needs, but also aligns with your broader organizational objectives.
Vision Mapping Milestones
• Stakeholder Interviews: The Schneider Electric team is composed of in-house engineers, led by senior
licensed engineers, under the direction of the Project Development Manager (PDM). Our customer -centric
approach begins with strategic interviews of key stakeholders to capture insights that will inform our focus
areas for development. This interview process will happen throughout all milestone meetings during the
development of the project which ensures Rosemead will always have a voice at the table.
• Facility Site Visits: The development team also performs facility site visits to create a comprehensive
scope matrix that is presented for your review.
• Data Collection: Collecting data can be difficult when many departments are involved. In planning our
site visit(s), our team will collaborate with your staff to reduce any disruptions to their daily work and will
also handle the communication with utilities to gather necessary information. For our Schematic Design
process (see item C below), we'll rely on current engineering and architectural drawings for detailed
design. But for this first phase of basic data collection, simple floorplans will be sufficient.
During the audit, Schneider Electric uses a digital data collection tool called AkitaBox to gather HVAC
equipment details, electrical panel nameplates, meter information, and more. AkitaBox allows the in-
house development team to document data completely and accurately, which reduces the number of site
visits needed during the audit phase.
B. CONCEPTUAL DESIGN
During the Conceptual Design phase, we work with you to select
which ECMs presented in the scope matrix to develop further. We
engage with the relevant stakeholders in each building to ensure
each of our solutions and intended ECMs will meet your stated
goals. Once we finish the initial design, our team will collaborate
Q1 AkitaBox
Organizing your Digital Collection -We use
AkitaBox to maintain all of your pertinent
facility and equipment details
March 20, 2025
Page 18
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is on Schneider
{Electric
with you to make sure that the equipment, methods, operational guidelines, and design standards meet the
specific requirements of your buildings and your organization. To create solutions that are effective now and into
the future, we make every effort to grasp the unique needs of your organization. The insights and observations we
gain from this collaborative Conceptual Design phase are crucial for tailoring solutions that truly fit your needs.
Along with traditional ECMs, we will also discuss and propose non -construction related options to improve your
energy savings that are offered by our Client Services team. Examples include capital asset planning tools and
software, building analytics tied into your system for real-time analysis of system operations, supply-side
management and purchasing, and ongoing support to ensure sustained performance.
Concurrently, our team will examine the project's financial constraints and potential funding sources. Our in-house
finance manager will provide the project team with multiple funding options to consider. Our in-house rebate and
incentive specialists will assess potential offerings that may be applied to your project. Finally, our in-house grants
team will also research available grant funding and assist Rosemead during the application process for any
project -related grant opportunities.
This step involves considerable collaboration between your staff, Schneider Electric, partner companies, and our
subcontracting team to deliver the best possible solutions that are both innovative and align with your standards
and budget. This phase will result in the 30% ECM Report and Scoping Meeting including:
• An updated scope matrix of potential measures at a feasibility or conceptual level for input and
discussion, including projected costs tied to a financial pro forma
• Baseline and energy savings, including projected energy savings for each measure
• Preliminary drawings, and basis of design/design criteria when applicable
• A preliminary project development timeline
From this project phase, we will seek direction from the Rosemead on high priority ECMs to develop and obtain
your preferences that may influence further design and development.
C. SCHEMATIC DESIGN
During Schematic Design, Schneider Electric will
dig deeper into the major mechanical, electrical,
plumbing and technology improvements identified
for further development in the previous phase,
tailoring them to meet your requirements and
incorporating your input into the final design
documents. Preferred equipment vendors and/or
subcontractors are further vetted during this phase.
This step will result in the 60% IGA Report and
Mid -Term Planning Meeting which includes:
• Your stakeholder feedback related to the scope of work
• Detailed scope of work descriptions
• Projected energy savings
• Budgetary pricing for the project based on subcontractor input
• Proposed M&V strategies per IPMVP
• Preliminary Client Services offerings
March 20, 2025
Page 19
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On I Schneider
Electric
• Preliminary financial analysis including cash Flow, funding options, and possible grants and funding
incentives
• A draft contractual agreement with supplemental terms for your review
• A preliminary construction and phasing schedule
• Career & Technical Education Plans that are specific to Project Based Learning, when applicable
• Preliminary drawings, basis of design, design criteria, equipment lists, as applicable
D. FINAL DESIGN AND FINAL IGA PROPOSAL
This is the final stage of design prior to construction contract review, approval, and execution.
During this phase, the Schneider Electric team will conduct a series of meetings to present the final scope of work
for approval which includes Rosemead input, energy savings, an M&V plan, and final, fixed, firm project pricing.
All design will adhere to Rosemead facility standards and code compliance. We will submit a 90% IGA Report
and Design Documents that describe the proposed project scope for key stakeholder groups to review and
provide comments and feedback.
Upon receiving and incorporating feedback on the 90%
report, we will move to the Final IGA Report and Final
Planning Meeting which includes:
• Final scope of work
• Final fixed, firm pricing
• Financial pro -forma
• Guaranteed annual energy savings
M&V plan for the ECMs included in the project
• Recommended Client Services offerings
• Preliminary Construction Phasing Plan
• Commissioning Plan
• Quality Assurance/Quality Control Plan
• Marketing Vision and Student Engagement Plan
• EPC construction contract for review
I�
"From the moment I met
Schneider (Electric), the
hasn't let me down
since day 1. 1 haven't ever
DTeam
had to go without having my
issues resolved."
Deborah Hall, VP for Finance and
Operations
LaGrange College, Georgia
• Final drawings and design criteria/basis of design updates, final equipment lists, specifications as prepared
to date
Once the Final IGA Report and supporting documents are reviewed, and your comments are received, we will
incorporate all feedback resulting in an approved document. The final construction contract and referenced
documents will be developed immediately following that meeting and will then be submitted to the Rosemead's
governing body. The passing of the construction contract signifies the end of the development stage and the start
of the implementation stage -
FROM M;
tage.
Like most ESCOs, Schneider Electric follows the guidelines established by the International Performance
Measurement and Verification Protocol (IPMVP). The IPMVP offers a framework and four M&V options for
measuring, computing, and reporting savings.
March 20, 2025
Page 20
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
However, we stand apart in that we do not rely on a one-time data logging exercise of specific ECMs after
construction and declare the savings achieved. Rather, to deliver the highest value and lowest risk to our
customers, we almost always recommend Option C, the "whole -building," meter approach. By measuring
building performance against the meter, we hold ourselves accountable for actual performance as reflected in
your utility bills. This ensures that you see a reduction in energy use over the long term. There is no murky math
or vague guarantees that your savings are being met—you will see the savings reflected on your utility invoices.
In the unlikely event that your savings performance falls short, we will make up the difference. We keep our
promises to you, so you can keep your promises to your stakeholders.
In this way, Schneider Electric assumes most of the risk for energy performance. We can take on this higher level
of risk because our M&V department is second to none. We have 94 energy professionals who are dedicated to
measuring energy performance and troubleshooting issues as they arise.
Your project's needs will dictate which option is best suited for your City. In cases when Option C is not
prescribed, will recommend Options A, B, or D. We have demonstrated experience with all IPMVP options. This
expertise will ensure your savings are accurately measured and transparently verified, no matter the scope of
your project. The figure below summarizes how the different IPMVP options are typically applied based on project
scope.
B
D
C
A
Customer Risk
D New construction performance contracting,
Calibrated ECMs implemented when significant
Simulation historical data is unavailable.
Measurement and Verification Matrix When establishing an M&V plan, the cost of conducting the measurement
versus the project risk must be weighed. The table below shows typical ECMs with the most common IPMVP
option proposed for tracking savings.
March 20, 2025
Page 21
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
A
Lighting retrofits, water conservation
Partial Retrofit
measures
Isolation
B
Renewable energy generation, chiller
replacement, process improvement -related
Retrofit
ECMs, such as laundry facilities where sub -
Isolation
metering was included
C
Multiple interactive ECMs (for example, a
project that includes HVAC replacements,
Whole Meter
lighting retrofits, and building automation
Measurement
controls
D New construction performance contracting,
Calibrated ECMs implemented when significant
Simulation historical data is unavailable.
Measurement and Verification Matrix When establishing an M&V plan, the cost of conducting the measurement
versus the project risk must be weighed. The table below shows typical ECMs with the most common IPMVP
option proposed for tracking savings.
March 20, 2025
Page 21
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
VElectric
E. Commissioning
You can depend on our guaranteed savings, which start by confirming that all ECMs work as intended and that
your staff can confidently operate new equipment before project closeout.
Pre -Functional I Functional 1W, Performance
Testing (PFT) Testing (FT) Adjusting and —A ; ' IF Verification (PV)
01'r 11F Balancing (TAB) IF
Our Commissioning Approach Our approach verifies that equipment is installed correctly, functions together as a
system, and complies with design intent to ensure sustained and optimal performance over time.
Schneider Electric is a member of the Building Commissioning Association (BCA), and our commissioning
approach is based on BCA best practices. We focus on optimizing system interactions between installed,
retrofitted, and existing equipment. The process also benchmarks a number of operational.and maintenance
conditions against which performance can be checked for years to come.
A project -specific Cx Approach and Plan can be developed and carried out by our team of commissioning
engineers if required. Whatever the situation, we have the expertise to meet your commissioning requirements.
F. Operations and Maintenance (O&M) Plan Approach
Your O&M plan affects more than the performance of
new systems and equipment – it also impacts your time
and budget. Proper maintenance is essential to ensure
your systems continue to deliver your expected energy
and cost savings. Our goal is to make sure the
Rosemead team has the knowledge and confidence to
take ownership of your O&M plan.
Unlike many competitors, our goal isn't to make
operations and maintenance so complicated that your
team has to call us often. Instead, your facilities team
will have the resources to maintain all factory
warranties, ensuring operational and energy efficiency.
We will provide the documentation, on-site evaluations,
and training to equip your team with the knowledge and
tools to maintain momentum long after project
commissioning.
Your O&M processes and resources are unique to your
buildings. And because we have invested time learning
about your facilities through audits, we will establish the
most efficient operational procedures for your
infrastructure improvements. This partnership will also
have the flexibility to allow your facilities staff to decide
OFamiliarity with Your Operational Needs
We take time to learn your operations and
processes in order to anticipate both your
immediate and future needs. After project
completion, we will continue to conduct on-
site visits with your team, so we stay familiar
with any operational changes or challenges.
OLong-term Relationships
We work side-by-side with your operations
staff during implementation, and long after
project completion, to ensure they have the
skills and knowledge they need for success.
0/ Response Time
Through our 24/7 performance assurance
hotline, we provide remote O&M support
around the clock. 90% of all technical calls
to the hotline are resolved within 15
minutes of calling remote support.
March 20, 2025
Page 22
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On I Schneider
how to best implement the procedures. During the construction phase, we will work with your team to formalize a
long-term O&M plan for installed equipment and systems. Whether you choose to use your in-house staff, outside
subcontractors, or a blend of the two to maintain your new systems, we will support your choice and give you the
full range of options available.
This approach will allow Rosemead to take a more active role in maintenance responsibility, if desired, while
ensuring that the manufacturers' minimum requirements are maintained during the guarantee.
DOCUMENTATION PROVIDED
Your team will receive multiple copies of a detailed O&M plan at project completion. The O&M plan will be
organized by Energy Conservation Measure and will include maintenance schedules, drawings, and technical
specifications supplied by the equipment manufacturers.
Our O&M plans typically include the following information and documentation:
0�—
^�® EQUIPMENT
REFERENCES
• Equipment cut sheets and technical
data
• Detailed sequence of operations
• Mechanical and control system
drawings
• A detailed description of the control
system operation and features
d,,,v RELIABLE &
EFFICIENT
OPERATION
• Routine maintenance
procedures recommended by
the manufacturer and
Schneider Electric engineers
• Commissioning documentation,
including functional and check-
out sheets
• Start-up and shut -down
procedures
0 HELP &
SUPPORT
• Contact information for all
contractors and manufacturers
• Provisions for safety shutdowns,
emergency conditions, and
interfaces with building control
and life safety systems
• All warranty information and
claim procedures
The Rosemead staff can also expect the same attention to detail in your construction closeout. We clearly define
all wiring and systems with easy -to -read labels that correlate directly to the instructions and training your team
receives. For items outside the project scope, we will provide additional notes for your consideration, including an
Equipment Deficiency List for items you may want to review or repair for best system performance.
You'll also receive the best available equipment warranties. During the competitive bidding process, we often
negotiate on your behalf to add in provisions for warranty, or include options for an extended warranty, to support
critical response needs. All new equipment warranties will be transferred directly to City of Rosemead upon
completion of the project.
G. Savings Shortfalls
Savings reconciliations happen on an annual basis, at the end of each year's guarantee term. Our Client Services
team consistently analyzes a client's energy usage during the guarantee period so you can rest assured if any
energy challenges were identified before year's end our team would have been working with Rosemead long
before any potential reconciliation.
March 20, 2025
Page 23
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
If Schneider Electric should fail to meet your guaranteed energy savings, we will write a check in the amount of
the savings shortfall to the City of Rosemead. Schneider Electric will first try to understand why the shortfall has
occurred. Because Schneider Electric is continuously monitoring usage, a lot of this research is done before the
end of the anniversary of the savings guarantee commencement date. If it is determined that the shortfall has
occurred because of a deviation from the original contract, i.e. — not using the schedules outlined in the contract,
adding square footage to a meter being monitored without notifying Schneider Electric, not using the set -points
set forth in the contract, etc. — then adjustments to the savings figure are made. If a shortfall remains after
adjustment, Schneider Electric will write a check for the adjusted amount. If it is determined that the shortfall is
through no deviation of the original contract, then a check will be cut for the full difference. Payments for any
savings shortfall will be made by Schneider Electric to the City within 30 days of that year's annual guaranteed
savings reconciliation.
To date we have completed more than $4.6 Billion worth of performance contracting projects and met 99.73% of
the guaranteed dollars we've promised. The following is a list of clients that we have written shortfall checks in the
past 5 years.
Buena Vista City Public Schools 2016-2023 $125,813
Carteret County Schools 2017, 2020 $28,195
City of Covington Aquatic Center 2009-2020 $59,180
City of Greenville 2016, 2020-2021 $37,379
Commerce ISD 2021 $4,278
Morgan County 2021 $14,104
Roanoke Citv Schools Phase 2 2020 $11,530
Silver Valley USD 2021-2022 $62,112
Stone County Schools 2019-2022 $34,407
20, 2025
Page 24
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
4. Management Approach
ESCO's project management, coordination, local staffing, subcontractors, construction management, Owner
interaction, and long-term servicing.
A. Project Management
Financing an infrastructure project is often only half the challenge for City. Most procurement methods would
require the City of Rosemead to oversee project details while also taking care of day-to-day operations and
stakeholder expectations.
With Schneider Electric, Rosemead will gain a knowledgeable partner that provides innovative solutions and will
take on the roles and risks of project management. You'll have a single, integrated team that works side-by-side
with you and your stakeholders to:
0 Define your goals
OPrioritize your needs
ODevelop and implement
innovative solutions
OEnsure long-term facility performance
You have our commitment that trust,
collaboration, and communication will remain
consistent in your project, so that you know what to expect at every step.
APPROACH TO PROJECT MANAGEMENT
Infrastructure projects are complex undertakings with many moving parts. Rosemead can proceed with
confidence knowing that our project management approach will account for every detail while also minimizing
disruption to your daily activities.
From development to the guarantee period, your project will be managed by seasoned experts using tools and
processes that foster collaboration and communication. Schneider Electric's project management process
includes:
• Single -source accountability, including coordination and management of subcontractors, to reduce your risk
• A fully integrated team that works hand-in-hand with your stakeholders to design and deliver solutions that
advance your strategic goals
• The use of PROCORE, an industry leading Project Management Information System (PMIS) software to keep
your project organized and on track
Regular, frequent project updates to eliminate surprises and minimize occupant disruption
March 20, 2025
Page 25
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
VElectric
Well-defined processes that keep your vision, goals, expectations, and priorities at the forefront
Consistency is the backbone of our project management approach. Built on PMP® and ISO standards, our
processes are robust and proven, while also flexible and scalable. This enables us to plan with great detail,
execute with excellence, and make fast, precise decisions when necessary so that we design and implement your
project right the first time.
The outcome: you can deliver on
your commitments to your
stakeholders because our team is
vested in your success. Your
Project will be delivered on time, on
budget, and will produce the
savings we promised.
B. Coordination
Schneider Electric received more than
200 safety awards since 2016, demonstrating our
commitment to hazard -free work environments with
zero lost -time accidents.
We currently utilize PROCORE, a 3rd party project management tool to streamline all information and
communication between internal team members, including all our in-house sub -disciplines. Because infrastructure
upgrades involve a lot of moving parts and people, we specifically designed our PMIS to capture, manage, and
track the details for each project. PROCORE:
• Plans, tracks, and monitors activities to ensure they are on time and on budget
• Provides real-time project information reports from your ��o � Q ��
Project Manager to your stakeholders •
• Ensures we meet and exceed safety and performance A Streamlined Process: We use PROCORE,
expectations an all -in -one 3rd party project management
All members of the core team use this tool to maintain all project tool
information in one place. This ensures that transitions between phases are seamless and provides your team with
a single source for project details. Any time Rosemead needs information, our PMIS allows our Project Managers
to access real-time information and documents, including meeting minutes, the risk register, and installation
timelines
C. Staffing
As a leader within your community, we know that the City of Rosemead is looking for the best partner and
strongest team possible to implement your project. Here at Schneider Electric, we've assembled a team of
experts that are not only the best in their field; we also love what we do.
We believe our great people make us a great company. Based on employee feedback, we are proud to share that
in 2023, Schneider Electric was certified as a Great Place to Worke for the 51" year in a row. Additionally, 86% of
our in-house engineers have advanced degrees or specialized certification. This means you will partner with
a passionate, productive team with a commitment to excellence. We listen to you, and your project is in good
hands. The core team responsible for leading this project includes the following essential roles:
March 20, 2025
Page 26
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Y
Program
Manager
Serves as your point of
contact throughout the entire
project
Site
Superintendent
Provides daily oversight of
construction, subcontractors,
and all health, safety, and quality -
related performance
Project Development
Manager
Collaborates with your team
to define the scope, and oversees
development, design and engineering
Client Services
Representative
Manages monitoring, M&V, and
ongoing support and training to
ensure that your project delivers
guaranteed savings
Life Is On Schneider
Electric
8
Project
Manager
Provides regular
communications to project
stakeholders and oversees
schedule and budget
II0I
Financing
Specialist
Assists in determining funding
opportunities and optimal
financing options
Project Core Team
Your dedicated core team consists of representatives from each discipline who collaborate and pool their expertise throughout
the project lifecycle, resulting in first-time quality and lower risk of change orders and schedule impacts.
KEY PERSONNEL AND RESPONSIBILITIES
Rosemead will collaborate with a core project team from the initial development phase of your project to post-
installation support. Below are the roles and responsibilities of the key personnel on your core team. Each role will
have varying levels of involvement and responsibility throughout the project lifecycle, but all will be involved from
start to finish with a collaborative voice that advocates for your project goals.
March 20, 2025
Page 27
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
Development
Construction &
Customer Support
Commissioning
& Guarantee Period
Program Manager
- 'l
Marc Starkey
25 Years in the industry
Your point of contact throughout the project.
Involved with communicating to you and your key stakeholders.
Public Partnership Leader
Sam Hall
20 Years in the industry
Your point of contact throughout the project.
Involved with communicating to you and your key stakeholders.
March 20, 2025
Page 27
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
Project Development Manager
Raquel Treichel, CEM, PMP
Site auditing,
Design intent
Consultation
9 Years in the industry
project development
consultation
as needed
and design
as needed
Project Engineer
P, n
David Hodson, PE
Site auditing,
Design intent
Consultation
12 Years in the industry
project development
consultation
as needed
and design
as needed
Project Manager�6?&
Arash Nadershahi
Schedule
Cost and schedule
Consultation as needed
7 Years in the industry
development,
monitoring,
subcontractor
communication to
selection
stakeholders
Site Superintendent Manager"=EE
'E-�---
Fred McCandless, CEM,
Constructability
Daily oversight of
Consultation as needed
CMVP, CDSM
assessment
construction and
43 Years in the industry
commissioning
Client Services Manager
-
Dave Horton, CEM, CMVP,
Measurement & verification
plan development
Measurement and
LEED AP
verification,
15 Years in the industry
performance assurance
Project Team Life Cycle
While the core team is involved in varying degrees throughout the project lifecycle, they maintain involvement throughout all
three project phases to ensure the highest level of collaboration, communication, and quality.
D. Subcontractors
Rosemead will work with one team: Schneider Electric. We eliminate the hassle of managing a patchwork of
subcontractors by taking sole responsibility for all construction activities. This streamlined approach is more
responsive to the sensitive scheduling and logistical needs of your City.
To ensure that subcontractors on your site are professional and qualified, we:
0 Thoroughly screen every subcontractor's performance, safety record, financial statements, and backlog
OContact customer and vendor references to confirm a track -record of reliability and work completion
according to specifications
March 20. 2025
Page 28
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
CElec tr is
Using Avetta, a leading provider of supply chain management
solutions, we can ensure your project utilizes subcontractors that ,Avetta
can meet minimum vetting and governance criteria including
operational verification, insurance checks, and compliance.
Moreover, all of our subcontractors are required to sign a
Subcontractor Master Agreement, which defines all terms and Managing Supply Chain Safety: We use
conditions under which they must operate. As a result, Avetta to maintain our subcontractor database
Rosemead will have no additional workload associated with
supervising and managing fieldwork. Your Schneider Electric Project Manager will handle all paperwork,
invoicing, and accounting with subcontractors. Your Schneider Electric Site Superintendent will manage all day-
to-day communications, scheduling, and safety audits.
We collaborate with you to develop a list of potential partners that can provide both a local presence and a quality
product. From the following chart of potential contractors, we will conduct a competitive bidding process to select
the subcontractor providing not only the most competitive price but also the best value to the City. We use an
objective scoring methodology to evaluate each subcontractor bid using weighted ranking criteria. Best value is
determined by factors such as qualifications, safety record, small or disadvantaged business status, experience,
local presence, ability to perform the work, service capabilities, and price reasonableness. Our policy is to use
local businesses as much as possible, while maintaining quality and best value.
March 20, 2025
Page 29
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
{Electric
E. Construction Management
Rosemead will have a professional team at your side who takes full responsibility for ensuring your operations
stay up and running with minimal disruption to your building occupants.
Regularly scheduled communications will provide plenty of time to prepare your stakeholders for what to expect
during each phase of construction. In addition, the project schedule will account for the dynamic environment of
your organization. Much of our work can be performed during second shift, evenings, weekends, and holidays.
At the outset of construction, the Project Manager will work with your team to:
Finalize the estimated project timeline
Z,) Schedule regular project updates
Determine logistics that best accommodate your operational needs
0 Review and finalize your Quality Control Plan and Health and Safety Plan
These items will be captured, tracked, and communicated throughout the project via your project manager. Any
potential for scope or schedule creep will be identified and immediately addressed to keep your project on target.
We use a design -build approach, meaning we take sole responsibility for all aspects of project implementation.
This provides you with:
• A more streamlined implementation schedule, with much of the engineering work already completed
• No risk of change orders; if we find an issue in the field relating to our scope of work, we will correct it and take
full responsibility for fixing it
• Better quality equipment without "low -bid" requirements often seen in design -bid -build projects
Another unique Schneider feature is our core team approach that includes disciplinary experts that give their
guidance throughout project implementation. Our in-house design engineers will inspect systems during, and after
implementation, to make sure they are installed per design. It is typical for our design engineers to visit the site
multiple times to ensure everything is in working in concert.
F. Owner Interaction
Rosemead will work with a partner that designs solutions with you, not for you. Bringing everyone to the table at
the outset is key to transforming your vision into reality. Our approach is inclusive of your key stakeholders and
receptive to their ideas and opinions from start to finish.
March 20, 2025
Page 30
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
OElectiis
Your Schneider Electric Program Manager, Marc Starkey, will be your primary point of contact throughout the
project, and other members of our
core team will meet with your SCHEDULED COMMUNICATIONS BY I _
stakeholders at key points. _ _ _ -11, _
Rosemead can rely on the frequent,
regularly scheduled communication
Summarizes daily accomplishments, safety
outlined below that eliminates
Daily Report
briefings, equipment used, staff involved, and any
uncertainty of what is coming next.
events that occurred causing impact to schedule
We will collaborate with you and your
team on logistics and schedule at
Weekly Four-
Consists of the past week, the present week, and
every step. The Project Manager will
Week Rolling
the next two weeks to come, providing a detailed
schedule regular project update
Schedule
picture of historical and current work progress
meetings to cover process and
Monthly
Provides an evaluation of the project schedule
schedules and address any concerns.
compared against baseline target and the
Progress
percentage complete for each activity
We also collaborate with your team
Meeting
on innovative ways to keep your
Summarizes the work performed to date, risks,
stakeholders informed. This could be
Monthly
issues, and financial performance; includes a
a combination of press releases,
Progress
recovery plan if a milestone is predicted to slip by
information kiosks, or interactive
Report
more than one week
websites
G. Long-term Servicing
CLIENT SERVICES
During the guarantee period, Rosemead will have the full support of our Client Services program, which provides
ongoing performance assurance and support services through the contract term.
Unlike traditional M&V programs, which offer a one-time confirmation of savings, our Client Services program
offers ongoing monitoring of your facilities throughout the guarantee period. This ensures that your energy
savings are protected, and even improved, over time. You will receive:
• A dedicated Client Services representative. Your Client Services consultant will provide technical
assistance during business hours and with most after-hours needs. If your consultant is unavailable, one of our
other consultants will be available 24 hours a day, 7 days a week through a toll-free Client Services Hotline.
• Training and preventive maintenance. Your facilities team will have the support they need to ensure that
your equipment is properly operated and kept in top condition.
• Secure remote monitoring. Your utility data will be monitored down to individual meters to ensure that you
are benefitting from the savings we promised. Regular reviews of your building automated systems will also
provide leading indicators of performance and flag areas that may need to be addressed.
Onsite services. We offer onsite support that is annually tailored to your needs, whether it is finding ways to
improve your energy savings, helping you cross items off your list of priorities, offering hands-on training, or
even evaluating your operating strategy. These services are highly customized to assist you and your team
with meeting your energy performance expectations.
March 20, 2025
Page 31
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
VEleccric
• Resource Advisor. You will have access to Resource Advisor, our secure, cloud -based software platform for
tracking and managing energy, water, and other resource usage. You can even use Resource Advisor for
managing your utility bills. All information is provided in real time and available at your fingertips.
Client Services Deliverables Schneider Electric's unparalleled support services are designed to optimize your
system performance and energy use.
n.
tMOnline
Access to Live
Training
Data
Prevent1
MaintenaHands-on
System Training
��¢
and Building Analysis
Resource -
Software Back-up and
kndSavings
Advisor'
Database Protection
ClienServicEnergy
Star
Access toConsulting
Technical Rep
Ongoing System
& 24-7 Hotline
5M
Recalibration
* - Unique ro Schneider Electric
ENERGY SAVINGS
O MAXIMIZED
O VERIFIED
O SUSTAINED
Your Client Services team will pay attention to energy performance details so that you don't need to. This also
enables us to identify potential concerns before they become problems. If any performance issues emerge, we
will:
• Investigate the issue
• Pay you the difference between the guaranteed and actual savings
• Work to resolve the issue to avoid future shortfalls
March 20, 2025
Page 32
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
5. Cost & Pricing
ESCO's markups, overhead, profit margins, fees, contingency, and how best value is achieved.
Estimated Project Value
$3.94 Million
In Self -funding City modernizations
Annual Savings Potential
$137,500
Includes energy, revenue generation, streetlights,
and O&M savings
Year 3 Telecom Savings
-$68,000 annually
ROI
Less than 15 years
Lifecycle Savings
$6.07 Million
Savings Impact over life of equipment
$6.1 M
Project Lifecycle
Cost Savings
Project Benefits
• Modernize City Facilities
• Tackle Deferred Maintenance Needs
• Significantly reduce electricity, gas,
and telecom expenditures
• Implement innovative solutions to
maximize City resources
• Provide staff with the systems, tools,
and resources needed to be as
efficient and effective as possible
• Address $3.9M in infrastructure
improvements
• Generate $6.1 M in lifecycle savings
• Explore applicable grants for all
recommended modernizations
Costs are estimated based on initial site audit and historical pricing of similar energy conservation measures for
municipalities in the Los Angeles area. Final Investment Grade Audit will include full design, competitive bid
process of vetted and trusted subcontractors and finalized turnkey pricing and savings numbers. Preliminary costs
typically assume 10-12% overhead costs and 6-8% profit margin.
Costs also include community engagement activities, marketing and branding, and post -project support (M&V,
Client Services, etc.) which can be tailored to client -specific needs during the Investment Grade Audit stage.
Schneider Electric will work with the City of Rosemead throughout the Investment Grade Audit to co-author a final
scope of work for a Phase 1 project that addresses the city's major priorities and mission.
Investment Grade Audit Design/Exit Fee: $99,750
- Includes all development and engineering for associated projects into a turnkey shovel -ready program.
- Includes Street Lighting Master Plan
- Fee will be included in final cost of construction, or payable upon decision to forego construction with
Schneider.
March 20, 2025
Page 33
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
VElectrjc
To reduce costs and ensure a holistic approach to designing both project phases, this Fee will also include full
development of the Phase 2 project as follows:
Energy Conservation
Location
Priority Level
Measure
HVAC & Building
River Yard
High
Automation Controls
LED Lighting
Citywide Parks
High
Rosemead Community
Solar PV Canopies
Recreation Center
Moderate
Citv Hall
Solar PV Canopies Rosemead Park Moderate
Garvev Park
#1 Energy Service
Company (ESCO)
AGuidehouse
INSIGHTS
Smart City Solution of the
Year
IoT
1 QT
-t VIII i'
Highest -ranked ESCO on #1 Intelligent Building
the Global 100 List Software
ti OLOBAL100 AGuidehouse
INSIGHTS
diiurld s Ethical
Cnn�l,tini�,c 11.E+ yt�ar-.l
ETHISPHERE
® rr
2023 Partner of the Year
l�
Page 34
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On 1 Schneider
OElectric
A. Preliminary Costs
Preliminary Costs: Provide a breakdown of costs for each individual facility, including all identified
improvements, equipment, labor, and any associated costs. Clearly identify any areas where cost estimates are
based on initial assessments or assumptions, and explain the methodology used to arrive at the provided values.
0
$0
3,940,000
$0
$0
$0
$0
-$2,940,000
Amount
Esc. Rate
Total Project Cost
$
Est ITC Solar Credit
$
-
Utility Savings
$
75,000
4.0%
CIP Funding
$
1,000,000
Solar Savings
$
-
4.0%
Final Project Cost
$
20940,000
O&M Savings
$
55,000
4.0%
$220,179
$84,365
$61,868
Revenue Gen
$
7,500
4.0%
-
$220,179
Interest Estimate
$64,342
4.20%
$8,774
$228,856
-$1,991,256
6
Number of Years
$91,249
20
Telecom Savings
$
68,000
-$1,755,966
Estimated Payment
$220,179
$220,179
$69,593
$68,000
$9,490
$241,981
0
$0
$0
$0
$0
$0
$0
-$2,940,000
1
$220,179
$75,000
$55,000
$0
$7,500
$137,500
-$2,802,500
2
$220,179
$78,000
$57,200
$0
$7,800
$143,000
-$2,659,500
3
$220,179
$81,120
$59,488
$68,000
$8,112
$216,720
-$2,442,780
4
$220,179
$84,365
$61,868
$68,000
$8,436
$222,669
-$2,220,111
5
$220,179
$87,739
$64,342
$68,000
$8,774
$228,856
-$1,991,256
6
$220,179
$91,249
$66,916
$68,000
$9,125
$235,290
-$1,755,966
7
$220,179
$94,899
$69,593
$68,000
$9,490
$241,981
-$1,513,985
8
$220,179
$98,695
$72,376
$9,869
$180,941
-$1,333,044
9
$220,179
$102,643
$75,271
$10,264
$188,178
-$1,144,866
10
$220,179
$106,748
$78,282
$10,675
$195,705
-$949,160
11
$220,179
$111,018
$81,413
$11,102
$203,534
-$745,627
12
$220,179
$115,459
$84,670
$11,546
$211,675
-$533,952
13
$220,179
$120,077
$88,057
$12,008
$220,142
-$313,810
14
$220,179
$124,881
$91,579
$12,488
$228,948
-$84,862
15
$220,179
$129,876
$95,242
$12,988
$238,106
$153,243
16
$220,179
$135,071
$99,052
$13,507
$247,630
$400,873
17
$220,179
$140,474
$103,014
$14,047
$257,535
$658,408
18
$220,179
$146,093
$107,135
$14,609
$267,836
$926,244
19
$220,179
$151,936
$111,420
$15,194
$278,550
$1,204,794
20
$220,179
$158,014
$115,877
$15,801
$289,692
$1,494,486
21
$164,334
$120,512
$16,433
5301,279
$1,795,765
22
$170,908
$125,332
$17,091
$313,331
$2,109,096
23
$177,744
$130,346
$17,774
$325,864
$2,434,960
24
$184,854
$135,559
$18,485
$338,898
$2,773,858
25
$192,248
$140,982
$19,225
$352,454
$3,126,312
Please see the previous item in this section for our costing methodology.
March 20, 2025
Page 35
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is cin Schneider
OEleccric
B. Energy Savings
Energy Savings: Provide a clear outline of projected energy savings, including how these savings were
calculated. Specify the expected return on investment (ROI) and payback period.
SAVINGS METHODOLOGY
Rosemead's ability to fund
priorities by using energy
savings is dependent on your
facilities performing as
promised. Establishing an
accurate estimate of savings
on the front end is key to
ensuring you can achieve your goals.
JOSE CARRASCO will be the Energy Engineering Lead for
your project. He will be responsible for establishing the overall
energy baseline, energy modelling, weatherization, and
determining scope feasibility.
When it comes to estimating savings, many ESCOs simply take a snapshot of energy use at a specific time and
place. A prescribed set of assumptions are applied to the data to land on a set of savings projections. These
calculations may or may not account for interactions with other building systems, the magnitude of savings
relative to the baseline, and changes to how spaces are used seasonally, on holidays, or even on weekends.
When you partner with Schneider Electric, you can count on accurate energy savings. Schneider Electric does not
delegate the critical task of energy analysis to a project manager. Instead, we have a dedicated team of energy
engineers within our larger engineering group who are charged with developing precise utility and energy
baselines and determining reliable savings projections.
Our energy engineers will walk your buildings, review as-builts and design drawings, study your equipment, talk
with your staff, and dig into your utility data. We develop an in-depth understanding of how your facilities were
designed and how they are being operated. All of this information is used to establish the energy baseline and is
critical for determining the potential savings that can be achieved in the future.
Once we have established your baseline, we will use a combination of modeling tools and calculations to
determine energy and utility savings. Our energy engineers will calibrate these models and calculations against
actual utility bills to develop an accurate representation of how your building is designed and operated.
March 20, 2025
Page 36
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
VElectric
Steps to Establish Projected Savings There are four important steps in determining energy savings.
• Our analysis starts with a building and systems survey, including lighting,
• Schneider Electric collects two years of actual utility bills for analysis.
• We perform year-to-year utility data comparisons to identify trends and
STEP Establish anomalies.
2 Utility The baseline normalization process involves a linear regression
Baseline analysis comparing energy usage and weather. The most
representative 12 -month utility baseline is established for the project.
STEP Perform
3 Utility Rate
Analysis
HVAC, controls systems, building operating characteristics, building
STEP Survey construction, and other miscellaneous energy -consuming equipment.
1 Facilities We also review site data, drawings, specifications, codes, and standards
related to the project scope, and collaborate with site personnel to fully
understand existing conditions.
• We develop a thorough understanding of each utility meter and
rate structure to fully analyze energy costs and savings potential.
• We create rate simulations based on actual utility tariffs.
• The rate simulations are calibrated to the actual utility billing data
to verify rates and formulas match the utility provider.
• Energy models are developed using baseline data collected
and calibrated to the utility baseline established.
STEP Calculate • Energy savings are determined through the difference
4 Savings between baseline and post project energy consumption.
• Cost savings are calculated using the utility rates
�J established.
C. Funding Options / Financing Approach
Funding Options / Financing Approach: Provide a clear breakdown of how costs can be funded utilizing
financing and grant opportunities. The City is interested in pursuing loans with low interest rates (0-1%). Any
portion of the project that is unable to be funded through loans will be funded by the City's reserves.
As you anticipate the value of your energy savings, Rosemead must address the costs associated with any
financing to pay for the up -front investment. With Schneider Electric's excellent reputation in the financial market,
and our transparent and proactive approach to arranging financing, we can help you secure a competitive
financing package with favorable terms.
March 20, 2025
Page 37
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On I Schneider
Electric
By partnering with us, you will also have the advantage of a dedicated resource whose sole purpose is to help
you obtain the best financing for your project. Our national Finance Director offers more than 30 years of relevant
experience and will work with your team to arrange financing. We have supported funding efforts for hundreds of
successful projects across the country, ranging from less than $1
million to more than $40 million, using a variety of debt instruments AdWaL
and funding sources.
Our team will be at your side to bid out the financing and review
the results. While we will not make a recommendation, we can
assist you by explaining all terms and conditions. You will have all
of the information you need to weigh the advantages and
disadvantages of each response against your end goals. We will
coordinate with all parties throughout the documentation and
funding process so that you have the support you need through
closing.
MORE OPTIONS FOR FINANCING YOUR GOALS
With Schneider Electric, there is no
one -size -fits -all approach to
arranging financing. We will work
with the lending community to
provide debt structures that are
The larger the pool of lenders at your disposal, the better yourI most advantageous to you.
opportunity for finding the right package to fund your goals. With
Schneider Electric, Rosemead will have access to a national network of lenders that are motivated to finance
energy projects for Municipality customers. These lenders understand the benefits of performance contracting
and can offer long-term interest rate locks, competitively low interest rates, and flexible prepayment provisions.
In addition to bringing competitive pricing to the table, this network provides Rosemead with alternatives in terms
of both lenders as well as structure options. We have vetted these institutions and fostered relationships of trust
to secure the best results for our customers.
One of the unique benefits of our collaborative approach is we will develop your project and arrange financing
hand in hand. This means you will have a defined scope and an assessment of anticipated costs that is based on
actual data, including cash flow assumptions. Our Finance Director will provide real-time interest rate
assumptions that are reflected in the cash flow models.
Rather than approaching potential lenders with a ballpark figure, you will have a more complete plan against
h; h t t d
KIM ALBERTSON is Schneider Electric's in-house project
finance director. With over 30 years of experience, she will
work with you to seek out the best possible financing
arrangements.
w Ic o compare ra es an
terms. As a result, there will be
no surprises for you when it is
time to lock in costs for our
contract and lender financing.
Schneider Electric will not
charge you for—or make any profit from—the financing of your project, nor do we serve as a financial or
municipal advisor. All financing for Schneider Electric projects comes from independent third -parry lender/investor
sources, such as Bank of America Public Capital Corp, Pinnacle Bank, US Bank, Signature Bank, Sterling
National Bank, First Security Finance, Stifel, and D.A. Davidson. Our only interest is to help you find the capital
you need with the best terms possible to support your vision for mission -critical improvements for your City.
March 20, 2025
Page 38
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
CAPTURING AVAILABLE REBATES, INCENTIVES, AND GRANTS
Accessing federal relief packages and the thousands of incentive and grant programs available nationwide is not
always simple. Schneider Electric's team of funding experts can help you tap into these grants, rebates, and
incentives to stretch your dollars further, reduce the cost of your project, and bridge the funding gap you may be
facing. Our in-house Energy Incentives Team actively monitors over 52,000 rebate and incentive programs across
North America. We can assist you by researching and identifying the right funding opportunities to maximize the
capital available for your project, including:
• Utility rebates and incentives
• State and federal grants
• Stimulus funds such as the Elementary and Secondary School Emergency Relief Fund (ESSER) and the
Governor's Emergency Education Relief Fund (GEER)
Our experienced team can also guide you through the grant application process to ensure you secure the
maximum amount of incentives available. Over the past 15 years, we have helped our clients secure more than
$630M in rebates, incentives, grants, and zero -interest financing to fund their infrastructure improvement projects.
$1.5M grant
for electric vehicle charging
$600,000 rebates
for battery storage
$12M+ of energy
improvements
funded by grants and
rebates
We helped Stockton USD
secure funding for advanced
and innovative energy
solutions to help pay for the
District's multi-year Energy
Expenditure Plan
GRANT AND REBATE SERVICES
$1.6M grant
covered half the cost of new
turbo blowers for the City
44% reduction
in energy usage which saved
$80,000 annually
The City of EI Centro utilized
funding from grants and
guaranteed savings to tackle
backlogged capital projects
which helped reduce utility
costs and the City's carbon
footprint.
$6.5M grant
for renewable energy
3 Megawatts
Solar PV production
Renewable Energy
Services Agreement
(PPA)
within an ESPC
By leveraging Federal funding
and third -party ownership, our
team helped the US Coast
Guard increase energy
security and add resiliency to
their existing electrical grid
Schneider Electric has an established Grants and Rebates team which provides federal and state funding
reporting, consulting, and project management services.
March 20, 2025
Page 39
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schwieider
Electric
Service Model
State and Federal grant applications have evolved. Instead of requiring a single writer with little oversight, today a
grant program requires several steps including discovery and evaluation, the application writing process, and
post -submission documentation to ensure an award is secured. Schneider Electric offers a comprehensive
program that maximizes your ability to secure funding for your projects. We work with our clients from kick-off
through the post -submission period to ensure your grants for project funding will get the attention and support
they deserve.
After years of experience, we understand key barriers you
face:
• Awareness: You may know your facility needs, but you
may not be aware of all the funding available.
• Time and Resources: You may be aware of the grant
funding that could further your project, but you may not
have the time or resources to apply.
Competition: Or, you may even have someone willing to tackle
your grant response, but you might not have the latest information
to create a competitive application.
Schneider Electric is here to help. We have cultivated knowledge around
grant funding cycles, project management, and program management
over the last two decades, and have honed a comprehensive method that
helps our clients develop a long-term funding strategy.
OUR TEAM WILL PROVIDE:
Reporting and Program Management
Project Management and Grant Submission
Support
Post -Award Guidance and Assistance
In the past year,
we secured for
clients:
$43.2M in clean
school bus grants
$13.8M in school-
based mental health
$8M in School
Violence Prevention
Program (SVPP)
TO HELP YOU ACHIEVE:
To ensure your grant applications are submitted on time
and follow all stated government guidelines
To make sure you have the most competitive grant/rebate
proposal possible
To ensure you receive the funding you've been awarded
in a timely manner
Many federal grants allow a short time period of 45-60 days to learn the submission criteria and turn around an
application. Some applications can even take an estimated 400 hours (fifty, B -hour days) to complete.
Additionally, approximately 30-40%a of applications in a grant program will be rejected prior to scoring because
they omit required details, documentation; or, inadequately explain a problem or solution. With a keen eye for
detail, that 30AO% rejection rate can be significantly reduced.
The City of Rosemead can save countless hours of time and develop your applications prior to federal funding
guidance being released by utilizing our proprietary materials and methodology. These materials are comprised of
a series of guides, templates and spreadsheets that directly mimic what the applicant will see in application
portals, allowing the applicant to have a head start on gathering content and creating your narrative.
March 20, 2025
Page 40
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
,Electric
Local, State and Federal Grant Programs Available to Rosemead
Based on initial research, we have identified several opportunities that Rosemead may be able to leverage for
your project. Upon selection, Schneider Electric can assist you with these options by providing oversight
throughout the application process. Our grant team can identify the grant programs that best relate to your
project's overall scope of work. Below are several grant opportunities that Schneider has secured for clients in the
past. As the federal funding landscape changes, Schneider will work with Rosemead to identify state and local
fund programs (eg SCAQMD Climate Pollution Reduction Grants, CEC Prop 4 Climate Bond) to support the
project.
.>
Environmental Protection Agency _
Total available:
4W j
Clean Heavy Duty Vehicle
For Class 6/7 fleet vehicles
$1,250,000,0000
V,
Program
Max award: TBD
Rebuilding American Infrastructure
ac OF TRqros
E A
with Sustainability and Equity
(RAISE) / Infrastructure for
For major roadway infrastructure (can
Max award: $25M -
Rebuilding America
include "dig once" for fiber installation)
$75M
(INFRA)
iFor
fa
projects that improve pedestrian
and cyclist safety, including lighting
ATEa OF P�
Safe Streets and Roads for All
projects and traffic signals — can
Max award: $25M
include smart grid (traffic) technology,
or even building new pathways for
pedestrians, etc.
Dept. of Transportation / Dept. of
Community and corridor roadway
Max award: $15M, to
Energy Electric Vehicle
charging
g
fund 80% of total project
Infrastructure Program
cost
Dept. of Energy Grid Resilience
To ensure the reliability of the power
Max award for smart
Grid: $30M
and Innovative Partnerships
sector's infrastructure
Max award for Grid
S
Program
Innovation: $250M
National Telecommunications and
For broadband adoption activities
��
Information Administration Digital
(education, healthcare, workforce
Max award: $3M
BroadbandUSA
Equity (NTIA)
development, etc.)
Incentivizes investments in energy
30%-60%of solar
Inflation Reduction Act /Energy Efficiency and
efficiency retrofit projects (lighting,
project cost AND
rogram (EECBG)
Conservation Block Granntt Program
envelope, mechanical)
_$1M - $3M of entire
EPC protect discounted
Based on square footage and desired
Formulas:
25%, Deduction:
scope, the IRA has bolstered EPC
$2.50Istift X SQ FT.. X
Inflation Reduction Act (IRA) & EPAct Credit (179D)
scope cost deduction through the
25% deduction
EPAct of 2005.
50% Deduction:
$2.50Isq.ft. X SQ. FT.. X
50% deduction
Southern California Edison - On Bill Financing measures 0% interest loans on energy efficiency Max award: up to $5M
March 20, 2025
Page 41
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
Electric
6. Responsiveness
ESCO's track record of collaboration and ability to address inquiries, requests, and concerns proactively and
effectively.
Our foundational philosophy rests on the following three tenets: Integration of innovative ideas, Communication
during the execution of a well-designed plan, and Local collaboration that maximizes community, economic, and
social impact. With these supporting principles at the core of our philosophy, we will be able to help the City of
Rosemead maximize the success of our partnership.
Our vast experience in successfully
completing over 1,090 guaranteed savings
projects throughout the country speaks to
our overall ability to fulfil this philosophy.
No doubt inquiries and concerns arise
throughout the development and
construction of a project, but we have time
and time again worked and collaborated
with clients to ultimately further their goals
through these projects.
Municipal Experience
We have helped counties and
municipalities of all sizes accomplish their
climate action and financial goals. Our work across more than 160 municipal projects includes major US
cities such as Dallas, Chicago, Atlanta, Los Angeles, Houston, Kansas City, and more.
Schneider Electric ESPC Work — Over $1.4B Nationwide.
Our municipal clients state that our integrity, reliability, and the ease of working with our team members place us
on a level above our competition. You will work with certified professionals who have the proven expertise to
develop and construct innovative solutions to your most pressing challenges. Our extensive experience and
financial strength position us to support your project now and well into the future.
Schneider Electric can develop traditional ECMs such as the ones listed in the phased measure list (HVAC, LED
Lighting, etc.) along with unique ECMs that require more technical creativity while assisting with grant
securement. We can also support bond campaigns and co -develop programs to ensure staff and community
members are engaged with the overall vision of Rosemead's efficiency and economic development goals.
Experience in Similar Facility Types
With such a broad range of experience in cities and counties all over the country, our team has ample experience
in facility types similar to those in Rosemead. We have performed ESPC projects in public sector facilities such
as:
• Battery storage, City -street and sports field lighting (City of Palmdale)
• Microgrid (Ojai USD)
March 20, 2025
Page 42
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On I Schneider
VEleccric
• Solar, EV infrastructure, and lighting (City of Auburn)
• Aquatic centers (Berkeley High School Natatorium)
• EV Infrastructure and fleet plans (Stockton USD, Modesto USD, Sierra USD)
• Controls and Mechanical replacements (Kings Canyon USD)
• Sustainable Outdoor Community Centers (Modesto USD, Thousand Oaks USD, Berkeley USD)
• Solar (City of La Porte, Ojai USD, Pleasant Ridge USD, Moraga USD, Modesto USD)
• Wastewater treatment plants (LA County Sanitation, Simi Valley)
• Sports fields, Parks, Sports Tourism (City of Sierra Vista)
• City halls (City of Palmdale, City of Auburn, City of Lomita)
• Water wells (Virginia National Guard)
• Fire stations (Dallas County)
• Police stations (City of Smyrna)
• Recreation buildings (University of Maryland)
• Airports (Valley International Airport, City of Auburn)
The City of Rosemead is an innovative city with high aspirations of efficiency and sustainability. As you're looking
for energy experts to guide you through your efficiency journey, you need an ESCO that is equally matched and
able to develop a solution that is worthy of the Rosemead name.
Our Experience in California
We have a long history of providing energy work in the State of California since 1995. Schneider Electric employs
over 2,100 professionals across the state. We have developed and implemented over $720M worth of work
for cities, counties, school districts, and special districts across the state.
We are registered as a California Professional Engineering firm and function as a general contractor on energy
savings performance contracts. Our registration number is 708952.
i
I
CALIFORNIA PRESENCE
8 offices located in
California with 2,100
local employees
delivering Schneider
Electric solutions
Over 130 projects
totaling over $720M in
work.
March 20, 2025
Page 43
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On Schneider
'Electric
7. Community Benefit
Beneficial Scope. The scope of this project inherently benefits the Rosemead community by upgrading all city
facility lighting to LED and parkwide lighting at Rosemead Park and Aquatic Center, along with modernizing
HVAC units in key facilities with universal controls. These improvements align with Rosemead's Strategic 2030
goals to significantly enhance safety, security, and comfort for residents and staff; save substantial energy;
reduce maintenance costs; and lower greenhouse gas emissions. The new systems will enable proactive
maintenance, ensuring reliable and efficient operations, freeing up staff to focus on constituent services and
improving the overall quality of life in Rosemead. This project will create a healthier, more attractive, and more
vibrant community, fostering pride and engagement among residents.
Global Foundation. The Schneider Electric Foundation is dedicated to creating positive change worldwide by
promoting sustainability, with clean energy solutions, enhancing community resilience through emergency relief,
empowering youth through vocational training, and fostering volunteerism among employees. Celebrating 25
years of impact, the Foundation donates over $2 million annually to non -profits, supports health, education, and
cultural initiatives, and collaborates on innovative projects to reduce CO2 emissions and improve energy
efficiency, demonstrating Schneider Electric's commitment to being a responsible corporate citizen and a positive
force in client communities.
The Schneider Foundation recently donated hundreds of portable power supply units to the Footprint
Project, which distributed these units to areas impacted by the LA Wildfires, including Emergency
Operations Centers and residents with power needs for at-home medical devices.
Committed to Engaging
Community Engagement is central to Schneider's culture, and we
engage our partner communities in a variety of ways.
Supporting our Partners' Community Events
• Palmdale Kaleidoscope Festival
o Hosted a solar -powered smoothie station, and a
o Kids station, painting drawstring backpacks
Schneider Employee Volunteering Events
Schneider Electric is committed to fulfilling its role as a responsible
corporate citizen by supporting and adding value to the communities
in which our employees live and work. The Company has a global
policy that allows our employees to volunteer up to 20 hours during
company paid time. The new Volunteer Policy aligns with
Schneider's local practices, allowing employees to volunteer 20
hours annually to activities that benefit the community.
Recent activities in the area include:
• Los Angeles Regional Food Bank, January 2025 (three
Fridays)
75 employees assembled 5,413 food kits and 16,050
pounds of produce for families impacted by the LA Wildfires
20,2025
Page 44
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
Life Is On I Schneider
Electric
• Long Beach Rainbow Harbor Marina, Debris removal, October 2024
• Long Beach Pier, trash pickup, July 2024
Schneider will commit to engaging the Rosemead Community:
1. Conducting a Rosemead Community education campaign
a. Multi -channel communication to Rosemead residents; may include:
i. Public presentations
ii. Direct mail campaign
iii. Permanent interactive kiosk in Civic Center or Community Center
iv. Bus -stop & billboard campaign
Supporting Rosemead Community Events
a. Sponsoring a State of the City event, provide progress report
b. Hosting a table at National Night Out
3. Joining the Rosemead Chamber of Commerce
4. Organize volunteer events and encourage Schneider Employees to volunteer in Rosemead, for
Rosemead non-profit organizations or events
Marketing and Public Relations: Get Your Message Out
Generate excitement and foster trust in your strategic direction with a marketing and communications plan that is
tailored to your goals and audience. Schneider Electric's public relations and marketing experts can help you do
more with less by becoming an extension of your team. We take the complex task of generating positive publicity
and community engagement off your shoulders by putting our resources to work for you:
OEngage: We identify groups or stakeholders who may want to get involved to make the most of your
energy initiatives.
OPromote: We work with you to develop high -impact messages for local, statewide, and even national
audiences.
3 B Influence: We determine the best distribution channels to share your story to reach the biggest network.
March 20, 2025
Page 45
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
City of Rosemead
Energy Project Proposal
COMMUNITY AWARENESS
Our marketing team will work with you to identify and
reach key audiences in both the digital and physical
worlds. We will then devise a multi -faceted plan to
engage your stakeholders, generate excitement for
your efforts, and promote your success. Your
marketing plan will be customized for your organization
and could include:
• Public relations outreach to local and national
media
• Community and media events to celebrate key
project milestones
• Special events like Earth Day, Arbor Day, and
community fairs
• Grant or rebate check presentations
• Social media campaigns and communication
templates
BRANDING AND POSITIONING
Life Is On I Schneider
{Electric
A PARTNER OF SUSTAINABILITY
FOR YOUR COMMUNITY
Monument, CO — Schneider Electric has helped
clients across country, like Lewis -Palmer SD 38 in
Colorado, put on community outreach events to
promote engagement and sustainability.
Branding ensures your message is consistent and your position is clear.
Schneider Electric will help you create dynamic messaging and visuals to instill
confidence in your stakeholders and get your message across.
• Custom signage to inform and educate your community about your
projects benefits
• A clear and concise visual identity to boost visibility and provide a
consistent image for awareness
• Targeted branding to influence critical stakeholders in advance of
bond votes, board meetings, Environmental Protection Agency
reviews, and more
NATIONAL RECOGNITION
PALM DALE
A PLACE TO CALL HOME
Our custom logo for the City of
Palmdale
You are a leader in energy conservation and environmental responsibility. Schneider Electric can help you
showcase the breadth of your commitment to energy conservation and fiscal stewardship through:
• Promotional videos that celebrate your position and success with sustainability, initiatives
• Fresh website content or a new website to showcase improvements
• Case studies and white papers that bring your initiative to the national stage
To see videos, case studies, and white papers from our previous customers, visit
hub resourceadvisor.com/performance-contracting. Your marketing and communications plan will be tailored for
you. Tell us what you need, and we will craft a plan that is aimed at your audience and your success.
Page 46
Use or disclosure of data contained on this sheet is subject to the restriction on the table of contents of this proposal
DREAMING BIG IN CALIFORNIA
0 30+ Years in California (D 131 California Projects since 2007
8 California Offices $720M+ in California work
2,100 local employees
D
$70M+ in secured state grants D
and incentives
"if you're looking for a firm that provides quality work and exhibits integrity throughout all
aspects of operations, Schneider is your team member. "
-Adele Nikkel, CFO - Kings Canyon USD
Kathleen Pratt
323203.6479
Kathleen. Pratt@se.com
1660 Scenic Ave.
Costa Mesa, CA 92626
Life Is On Schneider
Electric
Attachment B
Veregy Proposal
OSEMEAD
kk 1 i—L,% ". fill I. -r.0 l:u, ii, i
Department of Public Works
8838 E. Valley Blvd.
Rosemead, CA 91770
Veregy Contact Information:
Ryan Gunstream
E: rgunstream@veregy.com
P: 949-531-1979
Address:
3090 Bristol Street, Suite 400
Costa Mesa, CA 92626
.Y
SEMEAp 1�
seas
VAllil
r
A Contractor's License: #1023083 p {
• r
CA Dept Industrial Relations: #1000053722
Veregy, LLC, is not a legal, tax, investment, or financial advisor, nor does Veregy directly rice any projects. V
rmational purposes only, any content readers should not construe any such inform n or other material as I
ice. Regardless of only, to the contrary, nothing available on or through Vera g LLC's business practices
IN /emendation that an individual or organization should not consult with a legal, tax, investment, or financi
m7pilicular circumstances.
e
LLCe ccntentis
ial
Ulfteddrea a
Veregy's Response to City of Rosemead Request for Proposal
Table of Contents
4^4'VEREGY
TABLE OF CONTENTS...........................................................................................2
COVERLETTER......................................................................................................3
PROJECT HISTORY................................................................................................4
QUALIFICATIONS..................................................................................................5
TECHNICAL APPROACH........................................................................................8
MANAGEMENT APPROACH................................................................................11
COST AND PRICING.............................................................................................18
RESPONSIVENESS..............................................................................................23
Veregy's Response to City of Rosemead Request for Proposal
Cover Letter
March 20, 2025
Arlene Tieu
City of Rosemead, California.
Department of Public Works
Dear, Arlene
The City of Rosemead "City" will achieve long term energy savings for its
taxpayers, gain strategic progress towards the City's sustainability goals, and
minimize its financial risk to perform the services outlined in this RFP by selecting
Veregy as its energy services "ESCO" partner. We applaud the City for taking this
proactive approach to solving their infrastructure needs through this process.
Our team is excited for this opportunity to build on these accomplishments and is
committed to helping the City meet the challenges and stated project goals
including: Funding and Financing Solutions, Energy Efficiency,
Technological Modernization, Public and Environmental Benefits,
Budgetary Risk Management.
Veregy excels in identifying, designing, and constructing diverse energy and
water improvements with proven technical and financial expertise. We manage
design -build projects from start to finish using a unique process that delivers
highly accurate, quantifiable energy savings, surpassing industry standards. Our
exceptional qualifications are well-suited to support the City of Rosemead.
I
Local to Rosemead: We are committed to being your long-term partner,
demonstrated by our investment in a dedicated Southern California office at 3090 Bristol Street, Costa Mesa,
CA. With multiple local offices in California, all on-site work will utilize local resources, enhancing response
times and lowering project costs.
Customized Solutions: As vendor- and product -independent engineers, we are duty-bound to select
products that best serve our clients. This independence leads.to unbiased recommendations and
comprehensive life -cycle cost analysis that guarantees the lowest long-term cost.
Unmatched municipal and funding expertise: Veregy offers in-house financial experts to maximize
funding, investigate and optimize federal, state and local grants, minimize capital costs, and ensure optimal
long-term financial performance of projects, in line with the City's fiscal responsibility.
Our unique approach delivers maximum value: Veregy's in-house engineers create comprehensive,
vendor -neutral solutions and detailed implementation plans, ensuring projects are designed and
I competitively bid with no change orders and strong energy savings guarantees before any construction
contract is signed.
We appreciate your consideration and look forward to partnering with the City of Rosemead on your initiatives.
Together, we welcome the opportunity to build on our long-term, successful partnership with the City of
Rosemead.
Please contact during this review process: Ryan Gunstream, Sr. Account Executive P: 949.531.1979 E:
rgunstream@veregy.com
Page 3 of 26
iAr VEREGY
grir
Veregy's Response to City of Rosemead Request for Proposal OSE AD
Project History
Veregy has extensive experience in the municipal markets across the country have done over 100 EPC
projects with municipalities covering many hundreds of facilities with a broad range of functions
including:
Airports
Parks
Government
..m"
Stadiums
Police Stations Libraries Museums
M.q,. A.Y,r Clfa y
�wr^ar+ V
Wastewater Fire Stations Streets
VEREGY CALIFORNIA LOCATIONS
Central Califomia
1600 Truxtun Ave, 2n0 Floor
Bakersfield, CA 93301
Southern California
3090 Bristol Street, Suite 400
Costa Mesa, CA 92614
Northern California
1111 Broadway, Floor 3
Oakland, CA 94607
Page 4 of 26
�^r
VEREGY
Sample City and Nearby Clients
County of Santa Barbara
City of Hawaiian Gardens
City of Lake Forest
County of San Luis Obispo
City of Huntington Beach
City of Maywood
City of San Luis Obispo
City of La Mirada
City of Moorpark
City of Whittier
City of Seal Beach
City of Redondo Beach
Kern Community College
Bakersfield College)
Ventura Unified School District
Lamont Elementary School District
Oxnard Union High School District
Los Olivos School District
Butionwillow Elementary School
District
Page 4 of 26
�^r
VEREGY
OR
Veregy's Response to City of Rosemead Request for Proposal ROSE EAD
VEREGY'S VAST KNOWLEDGE AND EXPERTISE
Veregy has extensive experience working within the City's energy policies, building codes, and
sustainability goals, ensuring compliance while delivering high-performance, cost-effective energy
solutions. As a DOE -qualified Energy Services Company (ESCO) and NAESCO-accredited provider,
Veregy is well -versed in local energy efficiency regulations, Title 24 compliance, California Green
Building Standards (CALGreen), and municipal sustainability initiatives aimed at reducing carbon
emissions and operational costs.
Our expertise includes building automation, HVAC optimization, solar and battery storage, LED lighting
retrofits, electrification projects including fleet electrification through electric vehicle (EV) charging and
public facing EV and Water/Wastewater treatment efficiency, all designed to align with the City's long-
term energy and environmental objectives. Veregy has successfully executed similar energy
performance and commissioning projects across the region, partnering with public agencies, school
districts, and municipalities to implement turnkey solutions that reduce energy consumption and
enhance system performance. Our ability to self -perform key aspects of project implementation ensures
compliance with all regulatory requirements while maximizing financial and environmental benefits for
the City.
We design our projects in full compliance with state and local building and energy codes. Our team has
successfully designed and implemented projects approved by DSA, OSHPD, and local municipal plan
check authorities. For instance, California Title 24 mandates that all new packaged units include
outside air economizers. Also, our lighting designs include Design Light Consortium (DLC), approved
lamps and fixtures to qualify for applicable rebates and loan programs. We are committed to
collaborating closely with City engineers to develop solutions that meet or exceed the minimum code
requirements.
We are grateful for the cooperation and input we have received from City staff throughout this initial
stage of our preliminary assessment. As we have already presented, we estimate the City has the
potential to capture over $22 million in energy savings over the next 20 years -and has the potential to
reduce its greenhouse gas emissions (GHG) by almost 2.8 million pounds of carbon dioxide. In
addition, this project would make strategic gains towards the City's 2030 Sustainability Plan including:
Safety, Infrastructure and Facilities, Parks and Programs, Finance, and Activation and Economy.
All Measure Upgrades.
$9.9M
LED Lighting
$1.6M
HVAC/Controls Upgrades
$3.6M
PV Solar
Pool/Irrigation Upgrades
$4.3M
$250k
Implementation Savings
20yr Total Savings
(5%e aWon+MC)
$22M
4A"' VEREGY
SOX 'G' N0.
V DIO%IDI SOlNR OXIDES IfiROCilI G xIUkS
3,572 70 02
er year 16speryear r
Page 5 of 26
Veregy's Response to City of Rosemead Request for Proposal
Qualifications
VEREGY'S BACKGROUND
Over the past 34 years, Veregy has implemented more than 185 individual
comprehensive energy conservation programs for municipalities across the
country with over a billion dollars in avoided energy costs and secured over
$4.75 billion in project financing solutions. Veregy has earned a reputation as a
leader in the energy services industry. Our funding team has secured over $1
billion in funding and provides a depth of expertise that is unmatched by any
other firm, with an 87.6% funding rate. The City of Rosemead will receive
dedicated support from our local Costa Mesa office, and supporting offices
including Oakland, CA and Phoenix, AZ. We employ over 500 full-time staff
dedicated to engineering, design, construction management, installation,
operations, finance, and guarantee of energy projects. Among these personnel
are more than 30 project developers, 115 project managers, and 130 engineers,
including 55 registered professional engineers.
FINANCIAL CAPABILITY OF VEREGY
Veregy also maintains robust financial capacity, with no bankruptcies, pending
litigation, or other financial issues that could impede our ability to complete the
contract. Our stability and financial strength, coupled with our deep expertise,
commitment to quality, and proven success in securing utility incentives, make
Veregy a reliable partner for delivering comprehensive energy solutions in
California. Veregy has a bonding capability of $325M for public works projects.
STRONG CASH FLOW & FISCAL MANAGEMENT
Veregy maintains robust cash flow and financial reserves, allowing us to fund
upfront costs, procure long -lead equipment, and support projects through all
phases without financial strain. Our company's proven financial discipline ensures
that every project is delivered on time and within budget, without unexpected cost
overruns. Veregy's financial team adheres to strict Generally Accepted
Accounting Principles (GAAP) and utilizes state-of-the-art accounting systems to
track project costs, manage invoicing, and maintain full transparency with clients.
ACCREDITATIONS
Veregy is an approved provider of energy services through the U.S. Department
of Energy's Federal Energy Management Program (FEMP) and an accredited
member of the National Association of Energy Service Companies (NAESCO).
Veregy has earned NAESCO's highest level of accreditation as an Energy Service Provider (ESP). We
have been fully accredited by NAESCO since 2009. Companies seeking NAESCO-accredited status
must apply to a committee of industry experts unaffiliated with any Energy Services Company (ESCO)
or any other company under consideration for a thorough examination of core competencies and
business practices each year.
Jig-,
OSE _ AD
Page 6 of 26
4w" VEREGY'
�0
Veregy's Response to City of Rosemead Request for Proposal 0SE,mME'AD
10 ..,_...
Through this process, Veregy has met the rigorous standards to become an accredited Energy
Services Provider (ESP) through NAESCO. Through our membership, Veregy attends workshops,
webinars, and conferences featuring industry innovation and business development. This gives us
valuable insight into new and emerging energy conservation measures, market trends, and policy
updates, adding value to our projects.
VEREGY'S COMPLIANCE WITH PERFORMANCE CONTRACTING REQUIREMENTS
Veregy is a DOE -qualified Energy Services Company (ESCO) and a NAESCO-accredited Energy
Service Provider (ESP), ensuring full compliance with performance contracting requirements at the
federal, state, and local levels. Our approach adheres to all statutory and regulatory guidelines, including
California Government Code Sections 4217.10-4217.18, which govern energy service performance
contracting (ESPC) for public agencies.
Guaranteed Performance and Cost Savings
Veregy operates under Energy Savings Performance Contracts (ESPCs), where project costs are repaid
through guaranteed energy savings. We conduct comprehensive energy audits, life cycle cost analyses,
and financial modeling to demonstrate that projected savings will fully cover the cost of improvements. If
actual energy savings do not meet the guaranteed thresholds, Veregy is financially responsible for
covering the shortfall, protecting clients from financial risk.
Comprehensive Measurement & Verification (M&V)
To ensure compliance with performance contracting requirements, Veregy implements rigorous
Measurement & Verification (M&V) protocols following IPMVP (International Performance Measurement
and Verification Protocol) standards. We track and report actual energy savings over the contract term,
providing clients with detailed performance reports and ensuring transparency in all financial
calculations.
Page 7 of 26
4Ar VEREGY
f
Veregy's Response to City of Rosemead Request for Proposal OSE EAD
Procurement and Competitive Bidding Compliance
Veregy follows strict procurement guidelines, utilizing competitive bidding processes to secure qualified
subcontractors, cost-effective materials, and high -efficiency equipment that comply with project
specifications. We adhere to public works contracting requirements, including prevailing wage laws,
certified payroll reporting, and Department of Industrial Relations (DIR) registration.
As vendor- and product -independent engineers, we are duty-bound to select products that best serve
our clients. This independence leads to unbiased recommendations and comprehensive life -cycle cost
analysis that guarantees the lowest long-term cost.
No Change Order Guarantee
A fundamental component of Veregy's performance contracting compliance is our fixed -cost, no -
change -order guarantee, unless requested by our client. This ensures that once a project is contracted,
there are no unexpected costs or budget overruns. All project scope and financial commitments are
clearly outlined upfront, providing clients with financial certainty and risk-free execution.
Alignment with Public Agency Requirements
Veregy works closely with school districts, municipalities, and higher education institutions, ensuring all
performance contracting requirements are met, including regulatory approvals, reporting, and
stakeholder engagement. Our extensive experience with state funding mechanisms, utility rebates, and.
federal incentive programs allows us to structure projects for maximum financial benefit while remaining
fully compliant with government codes and performance contracting best practices.
Experience and Accountability
With a track record of successfully executing performance-based energy projects across hundreds of
public facilities, Veregy has built a reputation for delivering measurable savings, long-term operational
benefits, and compliance with all performance contracting standards. Our transparency, financial
accountability, and adherence to contractual obligations make us a trusted partner for clients seeking to
improve energy efficiency while maintaining strict financial and operational oversight.
Technical Approach
ENERGY EFFICIENCY
Our process begins with gaining a thorough understanding of the current utility consumption and costs
at each City site and building. Establishing an accurate overall energy and end-use baseline ensures
that the projected savings for each measure are realistic and achievable. For example, if a building
audit has determined that lighting use accounts for 40% of the total electric energy, then our approach
ensures that overall lighting efficiency and controls savings for this building remain bounded by the
lighting end-use portion of the baseline. This end-use energy approach is applied to other building
measures such as HVAC efficiency, HVAC control strategies, plug loads, natural gas equipment
efficiency, etc.
To further strengthen confidence in our savings estimates, our team has developed eQuest whole -
building energy models (which is typically reserved for the IGA stage) of Rosemead's major facilities
during the PEA, providing a head start in evaluating the savings from proposed ECMs. As noted earlier,
these models are calibrated to the actual utility baseline for each facility and will be further refined
during the IGA with detailed audited and metered data. See below for whole -building model renderings
of City Hall, Community Center, and Garvey Center buildings:
Page 8 of 26
4^" VEREGY
Veregy's Response to City of Rosemead Request for Proposal R0SE1y kAD
�J
Figure 1 - Rosemead City Hall Model
Figure 2 - Rosemead Community Center Model
Figure 3 - Rosemead Garvey Center Model
TECHNOLOGY SELECTION
As vendor- and product -independent engineers, we are duty-bound to select products that best serve
our clients. This independence leads to unbiased recommendations and comprehensive life -cycle cost
analysis that guarantees the lowest long-term cost. We take a utility meter -focused approach to energy
projects when evaluating the order of various measures. This means we first evaluate the energy
efficiency measures, such as lighting upgrades and HVAC improvements, to reduce the load at the
meter. Only after optimizing energy use do, we evaluate renewable generation options to prevent over
generation and the potential loss of value from sending excess energy back to the grid at a lower rate.
AUDITING
Veregy performs thorough walk-throughs of site-specific buildings to review and document existing
conditions to identify real measures. This could account for safety, building conditions, occupancy
levels, locations of equipment, lighting, electrical gear, HVAC/Controls, parking lots, roofs, and more.
In addition to what we can identify, we discuss the wants, needs, and goals of individual key personnel
(building coordinators, maintenance technicians, etc). This provides us detailed insight of the day-to-
day operations of the City.
During the IGA, we will audit all the measures listed in Phase 1 and Phase 2 simultaneously. This
streamlined approach minimizes the number of site visits required for the same measures and reduces
Rosemead's staff escort time needed for these visits.
Page 9 of 26
'4^r VEREGY
d
Veregy's Response to City of Rosemead Request for Proposal RE1vTE%k
e..u.
MEASUREMENT AND VERIFICATION
Depending on what ongoing services are requested by the customer, Veregy may continue to this
phase. During this phase we will actively monitor the actual savings and provide regular reports on
those savings. Any problem in the systems that affect energy savings will be caught quickly so
corrective measures can be taken.
What sets Veregy apart from our competitors is our 24/7 central energy plant that monitors our energy
projects. Veregy has arrays across the country and our central energy plant operates 24/7/365 for the
sole purpose of ensuring each system performs as expected. If a problem should arise, our team has
the resources, knowledge, and equipment to know where the problem is and how to fix it promptly. We
use state-of-the-art hardware to gather, transmit, and make available timely system performance data
to you and to our dedicated team of performance engineers and expert service technicians, thereby
ensuring fast, reliable, and effective response to any field issues. With our monitoring services, your
downtime will be limited should any problems arise.
COMMISSIONING
Our commissioning team ensures that each project step is completed properly and aligns the function
of the building systems with the client's project requirements. The Commissioning Plan is developed
and executed under the supervision of a qualified Commissioning Agent — never by the installing
subcontractor who has a vested interest in overlooking challenges. Our dedicated in-house staff are
heavily involved in the entirety of the commissioning process. Veregy uses a systematic commissioning
process that creates cohesiveness between the City's project requirements, Veregy's engineering and
design, subcontractor installation, and operation of each building system. If desired by the
City, commissioning can also be completed by a third -party Commissioning Agent.
OPERATIONS AND MAINTENANCE
Veregy's construction management team coordinates contracting efforts with both City staff and Veregy
project development engineers. This coordination ensures the project is completed with minimal
disruption to operations, installed in a timely manner, delivered on budget, and performs as the
engineer intended. By acting as the sole source of accountability for each project, our construction
team provides the highest -quality, most cost-effective project installations.
Veregy provides ongoing training and support for our clients' staff for as long as the client desires. As
part of this ongoing support, our on-site staff evaluate the need for formal refresher training and
conduct informal on -the -spot training as needed. We offer maintenance training as needed to ensure
that systems and equipment continue to operate properly and to support verification of persistent
savings. Training also covers the procedures and protocols necessary at the end of the project term to
turn the systems, operations, maintenance, repairs, and replacement responsibility over to City staff.
HANDLING OF SAVINGS SHORTFALLS
Veregy's Energy Savings Guarantee is the most robust guarantee in the industry because we leave
nothing to chance when we design and engineer a project. Due to the level of upfront development
and engineering we perform, we can utilize IPMVP M&V Option C, which yields the most accurate
guaranteed utility savings for our clients. Unlike our competition, who typically guarantees at most 90-
95% of energy savings, we guarantee 100% of our savings. Additionally, Veregy guarantees no change
orders on our projects, unless requested by our customer. We can provide these guarantees because
of our extensive in-house expertise and our unique engineering -centric approach providing enhanced
upfront engineering and full solution design before contract. Our robust energy savings
guarantees are a result of our full project development and implementation process, which is detailed in
the Scope of Work section. M&V Management: The M&V approach employed by Veregy is consistent
Page 10 of 26
4A4' VEREGY
Veregy's Response to City of Rosemead Request for Proposal
I
OSE . EAD
with the U.S. Department of Energy Federal Energy Management Program publication, M&V
Guidelines: Measurement and Verification for Federal other approved methods. Veregy works
collaboratively with clients to establish our M&V approach for each energy conservation measure
implemented, and weigh factors such as facility type, metering and submetering capabilities, utility
incentive requirements, etc. Veregy recognizes that each facility is different and that every implemented
measure is unique. Veregy's approach is designed to provide a clear path to measurable energy
savings and reliable incentive maximization.
Management Approach
ORGANIZATIONAL CHART
tV41%
k SE]VTE'1.AD
.
VEREGY PACIFIC
Ryan Gunstream
Account Manager
VEREGY PACIFICI I VEREGY PACIFIC
Staffen Akerstrom Paul Benson
Principal in Charge Director of Safety
P.E. #M-31150
VEREGY PACIFIC
Virak Dee VEREGY PACIFIC
SENIOR PROJECT Adam Kline
DEVELOPER. PE I Construction Manager
VEREGY PACIFIC VEREGY PACIFIC
Jaime Casal AIIA Nauhna
PROJECT DEVELOPER III. PE Project Manager
VEREGY PACIFIC
VEREGY PACIFIC
Sean Murphy
Mike McNulty
Senior Engineer
I
Site Superintendent
I
P.E. ,M-3882& LEED AP BD.0
510934&27 CEM #23823
VEREGY PACIFIC
Amends Maki
Project Engineer
E4 9171478; CA
LEED AP BDaC r 99711253431
4A" VEREGY
Page 11 of 26
VAN
Veregy's Response to City of Rosemead Request for Proposal OSE EAD
PROJECT MANAGEMENT
Veregy Project Managers (PM) are active in the project from its conception. They work with project
developers through the audit and design phase, and then after the project is approved, they take control
through the implementation and the entire warranty period. Veregy project managers are field-tested
professionals with engineering and business backgrounds with the industry knowledge to be involved in
every project phase. Veregy promotes an interactive working relationship with our clients. We will work
with the City to integrate our staff of professionals with the Rosemead team of personnel and
subcontractors so that every aspect of the project is successfully coordinated.
PROFESSIONAL ENGINEERING LICENSURE AND CERTIFICATIONS
Veregy licensed professionals maintain an array of certificafions and licenses, including Certified Energy
Manager (CEM) certifications, LEED professional designations, PMP, and licensed professional
Engineers (P.E.). Veregy currently has over 450+ employees nationwide, allowing us to self -perform
a vast majority of the deliverables associated with a comprehensive project. This includes:
PROFESSIONAL ENGINEERING SAFETY
Scope Definition
As facility and energy conservation opportunities are identified and quantified by the engineering team,
the project manager evaluates the practicality of the installation, the parameters for the implementation,
the risks involved, and the economics related to the client's overall project goals. The first step in the PM
process is a complete and thorough definition of the project scope. A project kick-off meeting between
the City and the Veregy project team will seek to define installation standards and procedures that will
be included as part of the scope of work for each facility improvement measure (FIM) and energy
conservation measure (ECM). The project scope is the design criteria from the engineering
recommendations of the detailed audit. The scope definition includes identifying operating information on
each FIM and ECM, for example, air and water flow data, motor speed, entering and leaving
Page 12 of 26
4Ar VEREGY
16
30
1
AIL
AAL
AAL
AAL
us&""
04
Professional
Engineers
UED AP
Professionals
Certified
Energy Managers
Certified
Energy Auditor
OSHA 30
OSHA 500
OSHA
Excavation
OSHA 10
Scope Definition
As facility and energy conservation opportunities are identified and quantified by the engineering team,
the project manager evaluates the practicality of the installation, the parameters for the implementation,
the risks involved, and the economics related to the client's overall project goals. The first step in the PM
process is a complete and thorough definition of the project scope. A project kick-off meeting between
the City and the Veregy project team will seek to define installation standards and procedures that will
be included as part of the scope of work for each facility improvement measure (FIM) and energy
conservation measure (ECM). The project scope is the design criteria from the engineering
recommendations of the detailed audit. The scope definition includes identifying operating information on
each FIM and ECM, for example, air and water flow data, motor speed, entering and leaving
Page 12 of 26
4Ar VEREGY
Veregy's Response to City of Rosemead Request for Proposal
OSEE,AD
.
,,.,,._.,....
temperatures, etc. Specific equipment and installation guidelines and applicable building and installation
codes will be defined during this exercise.
Scope Review
Constructability Review Procurement, Bidding
and Estimating
Permitting and Code
Review
Preliminary Schedule
Review
Subcontractor
Selection
Equipment Selection
Schedule Review
Final Schedule Review
Establish Formal
Communication Lines
Subcontractor
Procurement and
Scheduling
Material Ordering
Staging
Communication
Superintendent &
Safety On Site
Utilize PM Software
O&M and Training
The Veregy business development manager, projectmanager, and the Gients internal project manager will be involved
througlwat the entire process.
PROJECT GOALS AND OPERATING PARAMETERS
Defining the project's operating parameters is also part of the kick-off meeting. These parameters include
data that will allow the PM to plan the successful implementation of the improvements effectively.
The definition of the client's goals for this project will be discussed with the team. Veregy expects to
manage this project on time, on budget without change orders, and to the satisfaction of the City.
Therefore, it is critically important that we are aware upfront what the expectations are from the City as
they relate to:
Disruptions
Scheduling
Internal / External City Processes
Badging and Security
4^4 VEREGY
Clean -Up
Facility Policies
Subcontractor/Staff Communication
Page 13 of 26
Veregy's Response to City of Rosemead Request for Proposal OSE AD
Team Development
Developing a team capable of executing the designed work according to the established operating
parameters and project plan is critical to a project's success and client satisfaction. Veregy follows a
project -tested subcontractor and supplier evaluation and selection process. The evaluation determines
a subcontractor candidate's strengths and weaknesses and the development of a plan to manage the
relationship. Constant evaluation of all subcontractors and suppliers throughout a project enables Veregy
to monitor their performance and further assess their capabilities. Maintaining the expertise of the entire
Veregy team at a level necessary to meet the client's cost, schedule, and quality expectations is critical
on every project.
We have always enjoyed working with Veregy because, like Henson Robinson, the "client first"
concept permeates throughout the entire organization. Our shared projects found the right
blend of energy efficiency, first cost, quality, and long-term reliability for our customers.
-Joe Kulek, President, and Dan Hoselton, Executive VP
Henson Robinson
Subcontractor Selection
Veregy is committed to strengthening local economies and communities with every project by utilizing
qualified local contractors and suppliers as part of our project team. Veregy values our long-standing
relationships with our partners and is pleased to include them on the City project team. The most
important aspect of managing and coordinating an implementation team is ensuring that the best possible
team members are in the appropriate positions.
Target local and national subcontractors
I Target subcontractors who have a relationship with the client
I Target subcontractors based on experience, expertise, and abilities
I Invite contractors that have provided City exceptional service over the years
I Evaluate the use of in-house employees interested in working on the project
Prospective contractors complete a Contractor Qualification Statement
I Evaluate strengths and weaknesses of contractors and suppliers
I Review contractors' experience, ability, and company stability
I Confirm availability and capacity for the project
I Evaluate safety records and legal history
I Consider proximity to the project and similar values as our client and Veregy
I Establish clear goals and objectives for the project with each subcontractor and supplier
I Identify a single point of contact with each subcontractor that has the authority to make
commitments
I Identify the contractual/administrative point of contact with each subcontractor
Page 14 of 26
4^" VEREGY
Veregy's Response to City of Rosemead Request for ProposalD
ROM -
Project
Planning
During the technical audit phase of the project, the PM will develop a detailed project plan. A clear and
dynamic project plan is imperative to completing an ESPC project. This project plan will include the
engineering design criteria, equipment -specific information such as lead times, and the project definition
criteria established during the pre -project meetings.
The preliminary plan developed on an ECM -by -ECM or FIM -by -FIM basis will be modified to include
information available during the audit and the facility operating schedules. The detailed installation plan
will accommodate the operations schedule to the maximum extent possible.
Where disruptions in operations are inevitable, the project manager will document the expected
interruption and its impact on the facilities and communicate this interruption to the client's
representatives and facility operator. The project manager must confirm the plan and all expected
disruptions before the installation of the ECMs begins. The plan will also show the critical project path
so that the project manager will know where the resources should be concentrated to finish on time at
every point during the implementation.
The project plan will be updated monthly, posted in Veregy's on-site office, and communicated to
stakeholders as necessary. All installing parties involved with a particular ECM must accept and adhere
to the detailed installation plan. The plan will be made available to every subcontractor and supplier in
both hard copy and electronic form, and plan adherence will be built into every subcontract issued. We
will also make the project schedule available to each facility operator affected by the installation, along
with complete documentation of the work involved, expected downtime, and delays scheduled before
starting work.
On-site Office
During the technical audit, Veregy will seek to establish an on-site project management office for Veregy's
use and all subcontractors involved. If space is unavailable in the facilities, we will rent a mobile office
and position it in collaboration with the client's preference on location. This office allows the project
manager to spend more productive time on-site and be available for questions and conflict, and problem -
solving. It also functions as a verbal communications and information hub, making on-site employees
more efficient by giving them a place to take care of their non -installation business.
Project Management Tools and Communication
At Veregy, we utilize project management software to manage the project and will offer system access
to the City and all subcontractors. This software houses the entire PM process data, including drawing
management, meetings, emails, photos, RFIs, specifications, schedules, submittals, daily logs,
inspections, budgets, final punch lists, meeting minutes, and change management. The City and the
entire construction team will benefit by providing this high-quality project management, producing a
premium result.
Page 15 of 26
'O^4' VEREGY
Veregy's Response to City of Rosemead Request for Proposal
This software is designed to:
I Boost project accountability and efficiency by
mobilizing and streamlining documentation from
project inception to project completion.
I Reduce expensive delays and risks.
I Facilitate unlimited collaboration enabling
Veregy to work with anyone, from anywhere, in
real time.
I Create a central database for project documents,
including drawings, submittals, meeting minutes,
daily job logs, project schedules, and job
progress reports.
I Save time by organizing and locating pertinent
project information faster.
��(rz ,
0SEME'AD
.o.
In addition to the project management software, Veregy will utilize the following tools to keep the project
on track:
I Microsoft Project Schedule - Establishes a blueprint for the project action items with dates and
durations to ensure key project activities are completed within the allotted timeline.
I Project Scope of Work Matrix - Provides a quick view of the scope of work items and which
buildings each activity will occur within. This is a one-page, quick reference to visualize the overall
project scope.
I Project Work Plan - A 2-3 week look ahead for onsite activities broken down from the MS Project
Schedule. It includes work location, personnel on site, impact to the site, work hours, safety and
precautions check, emergency contacts, deliveries to the site, and attachments, as needed. Once
approved by the project team, usually a week before the start of activities, the client can hand this to
the staff, so they clearly understand the activities taking place at their facility.
I Project Summary Custom Excel - based spreadsheet that details all activities from the project
scope of work and converts the number of activities to a percentage complete for the project. This
document is the "where are we aV in the project by percentage complete and is updated every
progress meeting.
Overall, the project management tools provide updates on future activity, confirm current on-site activity,
and generate current project completion percentages so the Client can always remain informed of the
status of the project.
Page 16 of 26
4^4' VEREGY
Veregy's Response to City of Rosemead Request for ProposalOSAD
., .,,.e.. --
Communication Lines and Project Meetings
Mandatory project progress meetings will be held regularly throughout the project. Progress meetings
are essential in identifying and solving problems and conflicts and are imperative to keeping the project
plan current. Meeting minutes will be drafted and circulated after each meeting to ensure all stakeholders
are informed of project progress and issues.
While Veregy would never seek to restrict communications between subcontractors or the City
stakeholders, we establish formal lines of communication. Such a formality assists everyone on the
project in knowing his or her communication obligations. This will also minimize needless paperwork and
senseless information transfer. The graphic below illustrates our typical project communication.
i ,r V ER EGY
Page 17 of 26
Veregy's Response to City of Rosemead Request for Proposal
Rosemead Baseline Energy Use and Costs
OSEIV�E'AD
The City of Rosemead receives electric energy from Southern California Edison (SCE) and natural gas
from SoCalGas. The electric and natural gas utility summaries below are based on data provided by the
utilities via the City.
ELECTRIC UTILITY
From July 2023 to June 2024, Rosemead purchased electricity from SCE totaled $974,400. The
breakdown for the annual cost of electricity by City usage type is shown in the figure below.
City Traffic Lights (TC -1),
$38,659,4%
City -Owned &
Maintained Outdoor
Lights LS -2 LS -3),
$48,020,, 5%
CE -Owned Maintained Street &
Outdoor Lights (LS -1 & OL -1),
$319,839, 33%
Garvey Park Main,
$112,907,12% City Hall, $75,694, 8%
TOU, $567,891,58%
Aquatic Center,
$167,395,17%
$7,9,276, 2%
Garvey Center 2, $8,131,
Public Service - Rive
Yard, $10,073,1%
Garvey
6%
C munity&Rec
/ e eerT$59,429,6%
erman Sports
Co px, $28,783,3%
Garrey Park Clubhouse,
$14,854,1%
Public Safety, $11,322,1%
Figure 4 - City of Rosemead - Annual Electric Cost Breakdown ($)
The largest portion of the electricity total electric costs are for the various city buildings and facilities
with time -of -use (TOU) meters (shown in the figure above in the large pie). After the TOU meters which
accounts for 58% of total electric spend, SCE -owned street and outdoor lighting accounts for 33%, City -
owned and maintained lighting accounts for 5%, and City traffic lights account for 4%. Also in the figure
above, the small pie breaks down the facilities electric spend further with the Aquatic Center, Garvey
Park, City Hall, Garvey Center, and Community Center as the top 5.
NATURAL GAS
From May 2023 to April 2024, Rosemead purchased natural gas at 10 sites from SoCalGas totaling
$82,319. The single largest user of natural gas is the Rosemead Aquatic center which accounts for
75% of the total natural gas spend, or $62,447. This is followed by Garvey Park (Splash Zone), City
Hall, Rosemead Community & Recreation Center, Garvey Center with annual gas spend of $10,165,
Page 18 of 26
-o^" VEREGY`
�/II:
Veregy's Response to City of Rosemead Request for Proposal OSEME�AD
$3,059, $2,325, and $2,208, respectively shown in the table below. The remaining 5 smaller sites
combine for a total of $2,115.
Table 1— City of Rosemead Facility Natural Gas Use and Costs
Facility
Aquatic Center
Use(Therm)
51,545
Cost
$62,447
Garvey Park- Splash Zone
6,935
$10,165
City Hall
1,720
$3,059
Community & Rec Center
1,240
$2,325
Garvey Center
1186
$2,208.92
Energy Conservation Measures
The identified ECMs shown in the matrix table (below) align with the City's priorities for Phase 1 and
Phase 2. These measures showcase the City's commitment to the environment through a mix of energy
efficiency and renewable energy. Also, these measures will help Rosemead decarbonize through
replacement of fossil fuel heating with electric heat pumps. Moreover, the new efficient heat pumps will
have low global warming potential refrigerant further benefiting the environment and community. These
measures will help them save energy, utility and maintenance costs, and improve their infrastructure
throughout Rosemead.
Page 19 of 26
1^t VEREGY
Veregy's Response to City of Rosemead Request for Proposal OSE EAD
Table 2 - ECM Matrix at City of Rosemead
• Lighting Measures
• HVAC & Cantrds Measures
• P,:vII3935ufe5
• Sdar PVMeasures
PRELIMINARY SCOPE AND ASSUMPTIONS
Phase 1 — High Priority
Indoor Light & Controls
o Upgrade non -LED lighting lamps and fixture with LED lighting
o Install occupancy -based lighting controls
o Upgrades to be performed in building listed in ECM Matrix
o Pricing assumptions were based on historical Veregy projects, building sq/ft, and existing fixture
conditions noted during site walks.
o Considerations were taken to account for LED fixtures the City has already upgraded. Outdoor
Sports Lighting
o Upgrade existing HID sports lighting fixtures with LED at Rosemead Park and Garvey Park
o Pricing assumptions were based on number of fixture heads, locations and light cutoff needs
(darksky compliant), and condition of existing metal poles noted during site walks.
Page 20 of 26
4^4 VEREGY
0�:
Veregy's Response to City of Rosemead Request for Proposal ROOM
AD
30 City Traffic Lighting
o Replace all existing city -owned inefficient traffic signal lamps with new LED traffic signal lamps at
37 intersections based on information received from Rosemead
o Pricing assumptions were based on number of intersections and general access requirements
such as lifts.
HVAC & Control Upgrades
o (Pricing assumptions were based on unit tonnages, locations, adapter curbs, and required items
under Title 24 such as economizers)
o City Hall
• Replace existing 40 -ton chiller with high efficiency outdoor unit
• Replace existing 10 -ton gas pack with new high efficiency heat pump
• Replace old small split unit in basement server room
• Retro -commission the existing multi -zone AHU unit
• Install DDC controls to replace existing pneumatic controls on AHU
o Community Center
• Replace nine (9) existing gas HVAC rooftop units totaling 68 tons with new rooftop heat
pumps with economizers
• Install updated DDC controls system
o Garvey Center
• Replace twelve (12) existing split heat pumps and four (4) existing gas HVAC rooftop
units totaling 90 tons with new efficient electric heat pumps with economizers
• Install updated DDC controls system
o Rosemead Park Playschool & Garvey Park Clubhouse
• Replace existing gas HVAC rooftop units totaling 10 tons with new rooftop electric heat
pumps with economizers
• Install updated DDC controls system
o Pool Upgrades
• Retro -commission of Rosemead Aquatic Center control system to modulate flow to the
required pool turnover rates
• Install controls and VFD to modulate flow at Splash Zone
• Install sensors and controls to lockout existing solar thermal systems during low to no
solar irradiance periods at Aquatic Center
• Pricing assumptions were based on current pump conditions and HP sizing.
Phase 1 — Moderate Priority
PV Solar
o Install 212.4 kWp carport shade structure at Rosemead Park lot
o Install 60kW / 258 kWh Battery Storage System at Rosemead Park lot
o Install 168.2 kWp carport shade structure at Garvey Park lot
o Pricing assumptions were based on array wattage size, carport style structures, expected
geotechnical soil condition in the area, tree locations, and switchgear conditions
Page 21 of 26
i^6- VEREGY
Veregy's Response to City of Rosemead Request for Proposal
OSEME'AD
Phase 2—AII Priority
City Park Lighting
o Replace (151) inefficient HID lamps in park lighting fixtures (single to 3 lamps per fixture) with
high -efficient longer -life LED lamps
o Pricing assumptions were based on decorative style, quantity, and existing wiring conditions
PV Solar
o Install 94.4 kWp carport shade structure serving City Hall
o Install 76.7 kWp carport shade structure serving Community Center
o Utilize SCE solar aggregation program to interconnect at a single meter and serve both buildings
o Pricing assumptions were based on array wattage size, carport style structures, expected
geotechnical soil condition in the area, tree locations, and switchgear conditions
ECM Table of Project Costs
Table 3 - ECM Cost Breakdown - City of Rosemead
Phase 1 - Hiah Priority
Measure Name
Measure
Cost
Lighting Efficiency & Controls
$
225,000
HVAC Upgrades
$
2,535,000
Controls Upgrades
$
425,000
Pool Upgrades
$
115,000
Sports
• •
$
$
390,000
3,690,000
Phase 1 - Hioh & Moderate Priority
-
_.-Measure
Cost
Lighting Efficiency & Controls
$
225,000
HVAC Upgrades
$
2,535,000
Controls _Upgrades
$
425,000
PV Solar
$
2,750,000
Pool Upgrades
_ $
115,000
Sports
• -
$
$
390,000
6,440,000
hase 2 - All P
Controls Upgrades $ 22,000
PV Solar $ 942,000
City Owned Street /Traffic Lighting $ 243,000
S 1,207,000
Page 22 of 26
9^t VEREGY
�Irk
Veregy's Response to City of Rosemead Request for Proposal OSE�E'AD
Summary Tables of Financial Projections
Phase 1 ECM's I Phase 2 ECM's
TOTAL• $BM4'15.7M
TOTAL$1.5-$4.5M TOTAL GROSS$4.1.4.3M
'Cost/savings variation due to the option to include Ph1 Solar TOTAL NET SAVINGS $1.8421111111
Responsiveness
VEREGY'S PROVEN TRACK RECORD OF COLLABORATION & COMMUNITY IMPACT IN
ROSEMEAD
The hallmark of Veregy's approach is our collaboration with you, our customer, and the ongoing
integration of our team members with City staff. That is why our team has taken the time to speak with
City staff, walk all City facilities, and attend City Council meetings. We understand the goal of this project
is to reduce the energy consumption of the City and offset the coming increases in electric costs over the
next several years. Understanding that this is a complex process that will require staff time and resources
to ensure a successful outcome, we have modeled our innovative integration of work teams to respect
your existing processes and maximize efficiencies to bring forward downstream interests who work in
tandem. This approach will streamline the comprehensive design -build services, improve safety and
communication during project management, and limit handing -off tasks from one group to another.
Ultimately, selecting Veregy will reduce risk and deliver the best value with superior accuracy for the City.
Veregy has a long-standing reputation for collaborative partnerships, ensuring all inquiries, requests, and
concerns are addressed proactively and effectively throughout every phase of a project. Our dedicated
Project Managers (PMs) serve as a single point of accountability, maintaining open communication with
stakeholders and providing timely updates, solutions, and support to keep projects on track. Through
regular coordination meetings, stakeholder engagement sessions, and real-time progress reporting,
Veregy ensures that projects align with client goals while minimizing disruptions to daily operations.
With extensive experience in California public sector energy projects, Veregy works seamlessly with
school districts, municipalities, and state agencies to navigate funding mechanisms, compliance
requirements, and operational needs. Our ability to self -perform key aspects of energy projects, including
HVAC, electrical, lighting, and controls, allows for greater efficiency, cost savings, and quality assurance.
Veregy's no -change -order guarantee ensures that once a project is contracted, there are no unexpected
costs, providing financial certainty for our clients, unless a change is requested by our client.
Page 23 of 26
4^" VEREGY
Veregy's Response to City of Rosemead Request for Proposal O E1uTE'AD
B. COMMUNITY BENEFITS FOR THE CITY OF ROSEMEAD
Veregy's energy solutions will provide long-term economic, environmental, and educational benefits for
the Rosemead community by reducing energy costs, improving local infrastructure, and creating a
healthier environment. Our energy efficiency and electrification projects lower operational costs for public
buildings, allowing funds to be redirected toward municipal programs, community services, and
community enrichment opportunities.
Additionally, Veregy is committed to local workforce development, prioritizing the hiring of local
subcontractors and suppliers, creating job opportunities, and supporting economic growth within
Rosemead. Our projects focus on enhancing indoor air quality, lighting, and thermal comfort, ensuring
that community buildings provide a safe, healthy, and productive environment for visitors, staff, and
residents.
Through sustainability initiatives such as solar energy, battery storage, and water conservation, Veregy
helps the Rosemead community reduce its carbon footprint, enhance climate resilience, and achieve
long-term environmental goals. By implementing clean energy and high -efficiency systems, Veregy
ensures that Rosemead remains a forward -thinking, energy -conscious community while promoting a
healthier. more sustainable future for all residents.
Veregy's energy services align seamlessly with the City of Rosemead's strategic objectives, offering
substantial community benefits that support the city's vision for a sustainable and vibrant future.
Economic Revitalization and Energy Efficiency
The City's 2023-24 Annual Action Plan emphasizes the importance of creating attractive and energy-
efficient storefronts as a priority need. Veregy's expertise in energy efficiency can assist local
businesses in upgrading their facilities, reducing operational costs, and enhancing the aesthetic appeal
of commercial areas, thereby stimulating economic growth.
Sustainable Housing Initiatives
Rosemead's Housing Element Update (2021-2029) outlines the city's commitment to accommodating
projected housing needs while promoting sustainability. Veregy can support these efforts by integrating
renewable energy solutions and energy-efficient technologies into new housing developments, ensuring
that growth aligns with environmental stewardship.
Alignment with the 2030 Strategic Plan
The Imagine Rosemead — 2030 Strategic Plan serves as a roadmap for the city's future, focusing on
continuous improvement and service excellence. Veregy's services can contribute to this vision by
implementing energy projects that not only reduce the city's carbon footprint but also enhance the
quality of life for residents through improved public facilities and infrastructure.
Community Engagement and Education
By collaborating with local schools and organizations, Veregy can facilitate educational programs on
energy conservation and sustainability, fostering a culture of environmental responsibility among
residents.
In summary, Veregy's energy services can play a pivotal role in advancing Rosemead's strategic goals,
leading to economic revitalization, sustainable development, and an enhanced quality of life for the
community.
Page 24 of 26
14^" VEREGY
Veregy's Response to City of Rosemead Request for ProposalO E Ef\D
C. DETAILED COST BREAKDOWN BASED UPON THE CITY'S $3.5 - $4 MILLION BUDGET
REQUIREMENTS.
Preliminary Costs: Provide a breakdown of costs for each individual facility, including all identified
improvements, equipment, labor, and any associated costs. Clearly identify any areas where cost
estimates are based on initial assessments or assumptions, and explain the methodology used to
arrive at the provided values.
Please see our detailed response beginning on page 17 of this document, Energy Conversation
Measures.
Energy Savings: Provide a clear outline of projected energy savings, including how these savings
were calculated. Specify the expected return on investment (ROI) and payback period.
o Please see our detailed response to this question beginning on page 17 of this document, Energy
Conversation Measures.
Funding Options / Financing Approach: Provide a clear breakdown of how costs can be funded
utilizing financing and grant opportunities. The City is interested in pursuing loans with low interest
rates (0-1 %). Any portion of the project that is unable to be funded through loans will be funded by
the City's reserves.
o Veregy has worked with hundreds of cities, special districts, and other agencies to address a
wide range of financial challenges. For over 34 years, we have helped public and private entities
with funding projects. To date, Veregy has secured over $1.8 billion in project financing for our
clients. All project funding options will be evaluated and presented to the City for consideration
during the IGA Phase. Please note that Veregy is not a municipal advisor and will not make
decisions on financial products or solutions on behalf of the City. We encourage the City to
consult with a municipal advisor during this process.
We have substantial experience in helping our customers identify, apply for, and successfully secure
available utility incentives in California. Our in-house team tracks guidelines, eligibility, and deadlines
for available energy, water, and transportation grants and investment tax credits. Our grant writing team
then helps secure all eligible funding opportunities. Over the last 15 years, we have secured more than
$10 million in utility incentives for our customers, significantly enhancing the financial viability of their
energy projects. This track record demonstrates our deep understanding of utility incentive programs
and our ability to navigate the application process effectively. We explore all viable investment tax
credits, such as the 179D Tax Deduction and federal grant programs, including the Infrastructure
Investment and Jobs Act (IIJA) and Inflation Reduction Act (IRA).
Page 25 of 26
t^4 VEREGY
Ire:
Veregy's Response to City of Rosemead Request for Proposal 0SEME'%�D
D. APPROACH TO ADDRESSING THE CITY'S PRIORITIES FOR THE PHASE 1 PROJECT.
Building on the strong collaboration that we have already demonstrated with City staff, we will develop a
project with a carefully optimized package of measures designed to deliver a strong return on investment
through energy savings across various City sites and buildings. To align with the City's budget
requirements, we will leverage the California Energy Commission's (CEC) Energy Conservation
Assistance Act Low Interest Loan Program (CEC Loan) to finance the majority of the Phase 1 project.
The CEC Loan provides public entities like the City of Rosemead with low-interest financing at 1% and
up to 20 -year term for energy efficiency, renewable energy and storage, and EV charging projects.
Additionaly, we will assist the City in utilizing any available ITC funding to direclty offset the cost of the
PV Solar which could range from 30-50% of the costs.
Our team has extensive experience with grant and loan programs, including the CEC Loan and utility on -
bill financing programs. During the IGA phase, we will create an optimized project bundle tailored for the
loan programs and support the City in completing the application and necessary attachments to secure
the loan. After successful completion of a Phase 1 project, we will similarly package a renewable and
energy storage Phase 2 project to maximize financing through the CEC loan and other loan program.
Furthermore, we will pursue all applicable ufility energy efficiency incentive programs for funding to help
improve the return on investment of the overall project.
E. YOU MAY INCLUDE YOUR APPROACH FOR THE PHASE 2 PROJECT IN THE PROPOSAL.
We have provided additional information on both the first and second phase beginning on page 17 of this
document: Energy Conservation Measures.
Page 26 of 26
4^'* VEREGY
Statement of Qualifications: Next Steps
Comprehensive Citywide
Energy Program
Prepared for Prepared by
City of Rosemead
Attn: Sam Gutierrez, Director of Public Works
8838 E. Valley Boulevard
Rosemead, CA 91770
March 20, 2025
Ameresco, Inc.
222 North Pacific Coast Highway
Suite 2000
EI Segundo, CA 90245
AMERESCO�
Green • Clean • Sustainable
March 20, 2025
City of Rosemead
Attn: Sam Gutierrez, Director of Public Works
8838 E. Valley Boulevard
Rosemead, CA 91770
Dear Mr. Gutierrez:
222 North Pacific Coast Highway, Suite 2000
EI Segundo, CA 90245
Y•IUCI(kYK�][H•li11
On behalf of the Ameresco team, thank you for the opportunity to submit this Statement of
Qualifications for a Comprehensive Citywide Energy Program. We appreciate the chance to
demonstrate our expertise and strong reputation in delivering these services and are grateful to the City
for consideration of our firm.
As a leading, full-service energy provider, Ameresco's comprehensive portfolio includes energy and
utility resource efficiency, infrastructure upgrades, asset sustainability, and renewable energy solutions
delivered to customers throughout North America. We understand the financial and administrative
constraints Rosemead faces and is committed to providing innovative solutions that optimize building
performance, reduce operational costs, and support the City's long-term goals.
One of the key goals outlined in the City of Rosemead's 2030 Strategic Plan is to maintain
infrastructure and facilities that support a safe, active, and climate -conscious community. This
includes continuous improvements to infrastructure and the promotion of renewable energy. However,
like many cities, Rosemead faces challenges with aging infrastructure and rising energy costs driven by
high escalation utility rates. By taking a strategic approach to preventative maintenance, infrastructure
upgrades, and energy efficiency, Ameresco can assist the City in achieving long-term cost savings
while enhancing sustainability.
Founded in 2000, Ameresco has engineered, constructed, and/or provided guaranteed services for
over $16 billion in energy projects, with an average annual energy cost savings ranging from 20% to
over 40% of the total utility expense for our municipal customers. We have successfully analyzed,
recommended, and installed energy conservation projects ranging in size from a single building to more
than 160 buildings and ranging in value from $1 million to $795 million, with financing terms of 7 to 30
years. Our in-house team of engineers, construction managers, technicians, and measurement and
verification specialists reduce facility energy intensity and revitalize aging infrastructure with long-term
operations and maintenance benefits, maximizing returns on investment. In fact, the U.S. DOE has
recognized Ameresco as providing more energy savings per dollar invested than any other ESCO and
awarded Ameresco the single largest ESPC (Energy Savings Performance Contract) in its history.
Factors that have guided Ameresco's success include:
• Agnostic & Comprehensive: We area one-stop, technology independent provider with the
ability to develop, design, construct, operate, and maintain complex multi -faceted projects.
• Experienced: We offer 25 years of experience implementing comprehensive solutions across
local and national markets and contracting methods. Ameresco is also on top of innovative
funding opportunities such as renewable energy certificates, grants, utility rebates, and tax
City of Rosemead Statement of Qualifications
Comprehensive Citywide Energy Program
Page 2 of 2
credits continuously in development at the federal and state levels.
Global Perspective, Local Presence: We leverage best -in -class technology with a focus on the
impacts to your community.
Thought Leaders: Ameresco has paved the way from performance contracts to battery storage
to the latest in Smart City initiatives. Our team of experts leads thought-provoking industry
conversations, trends, and associations across our markets and technology application use
cases.
• Market Position: Ranked as the 2024 North American Energy Services Company of the Year
and the 2024 #1 ranked provider of Energy -as -a -Service (EaaS), Ameresco is uniquely
positioned to serve as the City of Rosemead's long-term strategic partner for all of its energy-
related initiatives by combining our manufacturer -agnostic approach, suite of contracting and
financing options, and industry -recognized technical expertise.
Ameresco has performed energy efficiency, renewable energy, and utility infrastructure renewal projects
for many neighboring government customers. Not only do we have a firm understanding of the local
energy market, but we also have strong relationships with premier vendors and subcontractors. Our
team has a vested interest in the success of any resultant project and is committed to working, as a
preferred ESCO, to improve the City's energy efficiency, as well as renewable generation, while
supporting stakeholder engagement and community relations. Ameresco will leverage its history and
expertise, lessons learned, and breadth of resources to efficiently identify and develop effective
improvement measures for the City.
Should you have any questions or wish to discuss elements of this Statement of Qualifications further,
please do not hesitate to contact me directly at 626.390.4487 or at ernestkim(a)-ameresco.com.
Respectfully Submitted,
(5n, AIi 9(12 2
Ernest Kim
Senior Account Executive
Ameresco, Inc.
Attachment C
Ameresco Proposal
AMERESCO4
This Proposal contains data and information that has been submitted in response to a request for proposal or similar
solicitation and is provided in confidence. The contents include proprietary information and trade secrets that belong
to Ameresco, Inc., ("Confidential Information") and is disclosed to the recipient only for purposes of evaluation. In the
event Ameresco is awarded a contract or purchase order as a result of or in connection with the submission of this
proposal, Customer shall have a limited right as set forth in the governing contract or purchase order to disclose the
data herein, but only to the extent expressly allowed.
AMERESCO4
Table of Contents
Project History
1
Knowledge of the City's Energy Policies, Building Codes, and Sustainability Goals........................1
Proven Experience with Similar Projects in the Region....................................................................1
Qualifications
7
Ameresco's Background..................................................................................................................7
Full -Service Energy Partner.............................................................................................................8
FinancingCapability.......................................................................................................................10
IndustryAccreditations...................................................................................................................12
Compliance with Performance Contracting Requirements.............................................................13
Technical Approach
15
Management Approach
25
Project/Construction Management, Coordination and Local Staffing.............................................25
KeyPersonnel................................................................................................................................26
Subcontractors...............................................................................................................................27
OwnerInteraction...........................................................................................................................27
Cost and Pricing
29
Responsiveness
31
Long -Term Servicing......................................................................................................................31
Community Benefit
32
Phase 1 Project Priorities
33
Description of Measures, Existing Conditions, Proposed Improvements.......................................33
Phase 1 Project Cost Breakdown
51
Phase 2 Project Priorities
56
Description of Measures, Existing Conditions, Proposed Improvements.......................................56
Phase 2 Project Cost Breakdown
61
City of Rosemead, California Table of Contents
Comprehensive Citywide Energy Program
City of Rosemead, California
Statement of Qualifications
Comprehensive Citywide Energy Program
Evaluation Criteria
ROSEMEAD
8838 E.
-`y �"�.:
r 1
C I T Y
VALLEY
H ALL
BLVD.
Ka
AMERESCO4
Project History
Knowledge of the City's Energy Policies, Building Codes, and
Sustainability Goals
One of the critical goals outlined in the City's 2030 Strategic Plan is improving infrastructure and
promoting renewable energy. Ameresco is fully aligned with these objectives.
With extensive experience in California building codes and compliance, including Title 24 Building
Energy Efficiency Standards and CEQA (California Environmental Quality Act), Ameresco ensures that
all projects adhere to both City and State regulations. Additionally, Title 15 of the City of Rosemead's
building code encourages green building practices based on the U.S. Green Building Council's
Leadership in Energy and Environmental Design (LEED) standard, which awards points based on
building performance.
Wherever possible, Ameresco will identify opportunities to improve building performance and
advance sustainability, energy efficiency and renewable energy in alignment with the City's goals.
Proven Experience with Similar Projects in the Region
Ameresco will leverage best practices from our vast Municipal
experience to ensure successful delivery of these complex projects. In
our over twenty years operating in California, Ameresco has developed
a strong presence for both energy conservation and renewable energy.
In fact, Ameresco has experience with over $1 billion in energy
conservation, renewable energy, and energy storage projects
throughout the State. Additionally, Ameresco has implemented over
1,900 projects totaling over $2.5 billion for state and local governments
including over 500 -MW of solar photovoltaic systems. The work
accomplished demonstrates the range of Ameresco capabilities from
management to financing, including the following:
• Facility Building Audits
• Investment Grade Audits (IGA)
• Identification of all Feasible
Technologies
• Specification Development
• Equipment Installation
• Customer -Coordinated Implementation
• Operations and Maintenance
• Measurement and Verification
• Monitoring of Project Performance
• Development of Energy Conservation
Measures (ECMs)
• Life Cycle Cost Analysis
City of Rosemead, California
Comprehensive Citywide Energy Program
• Low -Cost Financing
• Design and Engineering
• Modeling of Energy and Cost Savings
• Equipment Selection
• Construction Management
• Training of Facility O&M Personnel
• Project Documentation
• Monitoring of Energy Consumption
• Analyzing Utility Invoicing
• Fuel Procurement
• Evaluation of Emissions
• Permitting
• 24 -Hour Emergency Service
Evaluation Criteria 1 1
AMERESCO4
The following represents a sampling of Ameresco's project experience with cities and counties, large
and small.
City of Rosemead, California Evaluation Cileria 1 2
Comprehensive Citywide Energy Program
City of Dallas, TX - Love Field
Representative Municipal Experience: City/ County
Alpena County, MI
Bee County, TX
City of Dallas, TX Water Utilities
Cass County, ND
City of Englewood, CO
Campbell County Government, WY
City of Englewood, CO Solar
Carson City, NV
City of Edmonds, WA
Chaffee County, CO
City of Fall River, MA
Charlotte -Mecklenburg County, NC
City of Fairfax, VA
Christian County, MO
City of Flagstaff, AZ
City of Aberdeen, WA
City of Florence, OR
City of Anadarko, OK
City of Gallipolis, OH
City of Apple Valley, MN
City of Glendale, AZ
City of Austin, TX —Thermal Energy Storage
City of Greenville, SC
City of Austin, TX — Town Lake Center
City of Hattiesburg, MS
City of Avondale, AZ
City of Henderson, NV
City of Battle Creek, MI
City of Houston, TX
City of Battle Creek, MI / Kellogg Arena
City of Kelso, WA
City of Bellevue, WA
City of Kent, WA
City of Bellevue, WA - Fire Department
City of Kirkland, WA
City of Belpre, OH
City of Knoxville, TN
City of Bend, OR
City of Lawrence, KS
City of Blue Ash, OH
City of Longview, WA
City of Bowie, MD
City of Lowell, MA
City of Casa Grande, AZ
City of Lowell, MA Solar
City of Chicago, IL Infrastructure Trust
City of Methuen, MA
City of Chicago, IL Park District
City of Miami Beach, FL
City of Chicopee, MA
City of Milwaukie, OR
City of Cincinnati, OH
City of Medford, OR
City of Columbia, SC
City of Montrose, CO
City of Columbus, OH
City of Newton, MA Solar
City of Coos Bay, OR
City of Olympia, WA
City of Pendleton, OR
Lane County, OR
City of Peoria, AZ
La Plata County, CO
City of Philadelphia, PA Water Department
Lake County, IL
City of Phoenix, AZ
Las Animas County, CO
City of Portland, ME
Lawrence County, PA
City of Portsmouth, NH
Lewis and Clark County, MT
City of Rosemead, California Evaluation Cileria 1 2
Comprehensive Citywide Energy Program
AMERESCO4
City of Rosemead, California Evaluation Criteria 1 3
Comprehensive Citywide Energy Program
Lorain County JVS, OH
Representative Municipal Experience: City/ County
City of Redmond, OR
City of Reno, NV
Madison County Government, MT
City of Renton, WA
Manatee County, FL
City of Revere, MA
Maricopa County, AZ
City of Richmond, VA
Melrose, MA Metropolitan Area Planning
City of Rifle, CO
Milwaukee County, WI
City of Rockport, TX
Moffat County, CO
City of San Antonio, TX
Monroe County, NY
City of Santa Clara, CA
Montezuma County, CO
City of Salida, CO
Montgomery County, MD
City of Shelbyville, TN
Multnomah County, OR
City of Show Low, AZ
National City, CA
City of Smithville. MO
New Castle County, DE
City of Tarpon Springs, FL
Okanogan County, WA
City of Tempe, AZ
Ouray County, CO
City of Tucson, AZ
Pinal County, AZ
City of Tukwila, WA
Pima County, AZ
City of West Melbourne, FL
Rio Blanco County, CO
City of Wichita Falls, TX
San Patricio County, TX
Clark County Water Reclamation District, NV
Sangamon County, IL
Columbia County, OR
Santa Clara County, CA
Eagle County, CO
Scioto County Board of Commissioners, OH
Franklin County, OH
Spencer County, IN
Franklin Township, NJ
Spokane County, WA
Fremont County, CO
Springfield Airport Authority, IL
Garfield County, CO
Suffolk County, ME
Gilpin County, CO
Town of Ashland, MA
Gunnison County, CO
Town of Camillus, NY
Hamilton County, OH
Town of Carbondale, CO
Henry County Government, GA
Town of Farmington, CT
Kittitas County, WA
Town of Oro Valley, AZ
Kenton County Government, KY
I Town of Scituate, MA
Town of Steilacoom, WA
Vigo County, IN
Town of Windsor, CA
City of Rosemead, California Evaluation Criteria 1 3
Comprehensive Citywide Energy Program
AMERESCO4
Ameresco will oversee, manage, and coordinate all audit, design, construction, and ongoing service
and maintenance activity of all City projects, in a manner designed to minimize your internal project
management requirements. Our team shares a common goal of working hard to provide the best
solution for the City of Rosemead's infrastructure and energy needs, focusing on energy efficiency
and renewable energy installations that provide the best value. Our in-house team of engineers,
construction managers, technicians, and measurement and verification specialists reduce facility
energy intensity and revitalize aging infrastructure with long-term operations and maintenance benefits,
maximizing returns on investment. A brief sampling of project highlights follows.
National City' National City, CA
National City and Ameresco partnered on an energy and water
conservation program for critical city facilities, transitioning to a
more sustainable infrastructure and asset portfolio that provides for
more efficient and cost-effective operations. Ameresco and the City
worked collaboratively to identify measures that replaced
antiquated and failing equipment to enhance operations and
address underfunded critical deferred maintenance needs.
The ESPC project with the City installed energy improvements, including comprehensive interior and
exterior LED lighting retrofits, 277 kW DC solar photovoltaic (PV) installations, HVAC mechanical and
controls, duct cleaning, as well as domestic water and irrigation control retrofits.
County and City of Santa Clara San Jose, CA
The County of Santa Clara and Ameresco partnered on the
development of an LED lighting retrofit including lighting controls.
The $4.2 Million project consisted of 28 buildings for a total of
1,008,000 square feet. In total, Ameresco retrofit 9,755 interior and
exterior lights across the County. Construction was completed in
the spring of 2021. The County's annual savings in the first year
totaled 1.5 Million kWh, or $329,137.
The City of Santa Clara and Ameresco partnered to construct a clean energy project that captures and
puts to use gas created naturally at the city's closed municipal landfill. Ameresco designed, built and
owns the innovative system, which generates 750 kW of green electricity per hour. The energy comes
from gas created at the landfill through the decomposition of organic materials. The electric output from
the plant is sold to Silicon Valley Power (SVP), the municipal electric utility for the city. The project
produces enough electricity to power more than 477 homes, while reducing emissions equivalent to the
planting of nearly 996 acres of pine or fir forest and will save approximately half a million gallons of gas
annually.
Additionally, Ameresco is in the process of constructing a 50 MW battery energy storage system to
provide SVP in the City of Santa Clara with additional local area capacity for electrical system
reliability and flexibility. The Ameresco owned asset will mark the beginning of a 25 -year lease and
Energy Storage Agreement with the City of Santa Clara. Ameresco developed and will own and operate
the BESS, while SVP will supply the charging energy. With a maximum energy capacity of up to 200
megawatt -hours (MWh), the BESS will efficiently acquire surplus renewable electricity and provide a
clean and reliable resource to integrate renewables, decrease reliance on gas-fired generation, and
mitigate greenhouse gas (GHG) and criteria air pollutant emissions.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 4
Metropolitan Detention Center Los Angeles Los Angeles, CA
In 2018, Ameresco was selected to implement a $17.8 million
ESPC comprised of ten ECMs at the Metropolitan Detention Center
(MDC) Los Angeles. MDC Los Angeles is a single ten -story high
rise facility of 272,258 gross ftz. In addition to multi -story inmate
housing areas, the MDC houses administrative, kitchen,
maintenance, physical plant, storage, clinic, and a segregated
housing unit. Implemented measures included the installation of
new boilers and boiler controls; chilled water system optimization;
BAS optimization; new HVAC upgrades; installation of interior and exterior LED lighting fixtures and
controls; piping insulation; water conservation measures; refrigeration system improvements; and
replacement of food carts.
AMERESCO4
Completed in 2020, MDC Los Angeles realized a savings of 2.3 million kWh and $659,410 in the first
year alone — translating to a total energy use reduction of 18,662 MMBtu and a 46 percent total water
reduction for the selected fixture upgrade. The project is expected to save over $28.6 million during
the performance period term.
McKinleyville Wastewater Treatment Plant McKinleyville,
In 2020, McKinleyville Community Services District selected
Ameresco to design and build an integrated microgrid at the
community's Hiller Park Wastewater Treatment Plant. The
microgrid incorporated existing diesel generation along with new
683 kW -DC ground mount solar PV array and 250 kW 1712 kWh
battery energy storage system (BESS) to optimize electrical grid
resiliency while delivering both financial and environmental benefits
to the community.
CA
U.S. Coast Guard Training Center, Petaluma I Petaluma, CA
Phase I: Ameresco and Pacific Gas & Electric (PG&E) entered into
a Master Services Agreement under a Utility Energy Services
Contract to provide energy efficiency services to federal agencies
within the PG&E Northern California service territory. Ameresco
was selected by PG&E and the USCG Petaluma to complete a site -
wide comprehensive UESC at the Petaluma site across 39
buildings, comprising 574,000 square feet.
r4 KIIYpLtYVILLt
COM11 1UNITY SERVICES DISTRICT
MASTEYATER MANAGEMENT
FACILITY
Completed in 2016, the $4.4 million guaranteed energy savings project included HVAC, furnace, and
boiler plant improvements; lighting upgrades; demand ventilation control; DDC control upgrades;
building envelope improvements; water conservation; refrigeration and appliance upgrades; and solar
thermal energy systems.
Phase II: Facing a range of energy security and resiliency challenges endemic to the climate and
regional power infrastructure in northern California, the U.S. Coast Guard (USCG) competitively
selected Ameresco in February 2021 to fast-track development of a comprehensive ESPC at USCG
Training Center Petaluma, the service's largest west coast training facility, to enhance the site's electric
infrastructure and resiliency posture.
In October 2021, the USCG awarded Ameresco a $43 million DOE ESPC project that features the
USCG's first BESS project and the Department of Homeland Security's (DHS) largest solar PV
City of Rosemead, California — Evaluation Criteria 5
Comprehensive Citywide Energy Program
AMERESCO4
renewable energy project integrated within the USCG's first fully functional, renewable energy -powered
microgrid. The project installed 5 MW of onsite solar electric generation assets, 11.6 MW BESS, and a
microgrid control system that ensures uninterrupted power to mission -critical loads during a loss of
utility event. By implementing the solar through an ESA instead of as a traditional energy conservation
measure, Ameresco enabled the installation to benefit from the Federal Investment Tax Credit for
onsite generation and storage assets. Ameresco will retain title to these assets for 20 years and deliver
renewable energy to the installation at a cost lower than the serving electric utility's rate.
Ameresco also designed and installed additional energy saving opportunities to reduce the site's
electric load, minimize energy costs, enhance comfort, and improve reliability. Improvements featured
the deployment of new power distribution transformers, smart DDC building controls, LED lighting
improvements for over 8,000 fixtures, installation of new EV charging infrastructure, and HVAC
recommissioning and upgrades.
The project's first year cost savings are $1.2 million and the ECMs will reduce the site's annual
electricity by 8.7 million kWh and propane consumption by 50.8 kcal.
In addition to those highlighted herein, additional sample projects include:
• Biogas Cogeneration Project in Sacramento. California
• Battery Energy Storage System Contract with Silicon Valley Power
• Joint Forces Training Base Los Alamitos Microgrid
• Lynwood Unified School District Multi -Phased Energy Efficiency Project
• University of California. Irvine and UCI Health
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 6
Qualifications
Ameresco's Background
Founded in 2000, Ameresco (NYSE:AMRC) is a leading full-service
energy solutions provider. Ameresco's only business is energy, and
the execution of performance-based energy solutions is the core
function supported by our dedicated company of professionals.
As a full-service provider, we develop, design, arrange financing,
construct, and install solutions that deliver measurable cost and
energy savings while enhancing the operations, energy security,
infrastructure, and resiliency of a facility on a site-specific, regional,
and nationwide basis. We offer an extensive and diverse portfolio that
spans lighting, water, heating, ventilation, cooling, building envelope,
lab efficiency, smart meters and controls; central plant upgrades and
rehabilitation; and renewable solutions including solar PV, CHP and
cogeneration plants, geothermal, green gas, and wind — all of which
can all be paired with microgrid and battery storage technologies. Our
new construction and renovation project experience covers the full
range of technologies related to building systems and facility
infrastructure, often in occupied facilities and with minimal laydown
space.
AMERESCO4
About Ameresco
Founded ii I 1u
$16+ Billion in energy solutions
v
delivered since company inception
4+ GWe of renewable energy
resources contracted or managed
(solar, BESS, wind, binges, RNG,
operations & maintenance, etc.)
A
0A
1,500+ Employees throughout
A
North America and Europe
Offices providing local
Z60+
expertise in markets served
Embracing innovation through
ILn��
tailored projects aligned to
customers goals
Committed to reduce our customers'
,V_l
carbon footprints by a cumulative
Technical independence coupled with our advanced technology 500 million metric tons by 2050
portfolio allows us to integrate best -in -class solutions for the unique
needs of each City, paired with practical financial solutions. Whether focused on securing infrastructure
upgrades, meeting sustainability goals, or creating resiliency, our customers benefit from a single
provider of comprehensive clean technology solutions.
Drawing from 25 years of experience, Ameresco has successfully completed energy saving,
environmentally responsible projects with state, cities and counties, the federal government, higher
education institutions, K-12 public and private schools, commercial and industrial clients, healthcare
facilities and non-profit organizations throughout North America. Ameresco has more than 1,500
employees providing local expertise in the United States, Canada, and Europe.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 7
AMERESCO4
Full -Service Energy Partner
We are a one-stop provider with the ability to develop, design, construct, guarantee, operate and
maintain complex multi -faceted projects. At the core, customers choose Ameresco because we are
uniquely positioned as...
• Innovative: Ameresco is an innovative technology integrator with a comprehensive portfolio of
energy and utility resource conservation and renewable energy solutions. Our creative staff with
specialized technical knowledge drive state-of-the-art design and engineering. We believe in
excellence and innovation in every project.
• Experts: We deliver a broad and deep solution portfolio within a single energy and utility
resource partner. From design and development to financing and construction, our in-house
technical expertise sets us apart. Energy and utility resource efficiency along with distributed
energy generation is at the core of our business. It is who we are, and it is what we do.
• Independent: Our objective approach enables us to implement the most advanced technologies
and solutions with no technical or vendor bias.
Carbon Reporting &
At the City's direction, Ameresco can assist in the Energy Software
identification and implementation of both demand- and �.d (SaaS)
supply-side energy and utility resource solutions.
Our projects incorporate innovative technology and
techniques, customized to improve the efficiency of major *00
building systems. Energy Efficiency measures and upgrades
often include lighting, water, heating, ventilation, cooling, Operations Energy
g g & Maintenance to finance any Efficiency
building envelope, smart meters, and controls. We first ', opiportunrly
implement efficiency gains in order to establish a strong
baseline for renewable energy generation needs. d
We promote resiliency and sustainability by developing and
building Distributed Energy Generation, Storage Systems, Supply Management��� Generation, Storage & Distributed Energy
and Microgrids. Examples of these distributed energy MicrogdOs
generation resources include solar photovoltaic (PV) and Infrastructure
thermal, CHP and cogeneration plants, geothermal, green
gas, and wind — all of which can all be paired with microgrid and battery storage technologies. We can
build, operate, and maintain these plants for our customers, or can build plants under our ownership to
mitigate customer risk while providing the localized benefit of onsite energy generation.
Ameresco's experience in building modernization, retrofits, and work with utility distribution systems
and non -energy -focused design -build new construction falls into the Infrastructure expertise bucket. In
addition, Ameresco can work with customers to monetize existing energy assets and take ownership
and operation off of the customers' balance sheet.
Data drives our Energy Analytics & Supply solutions ranging from our proprietary asset management
software, AssetPlanner®, to energy procurement services for negotiating contracts and stabilizing
customers' energy budgets.
Our holistic approach to energy solutions ensures end-to-end technical guidance, from project inception
to continued Operations & Maintenance (0&M) of systems. Ameresco understands that a well-
designed and properly executed O&M program is a crucial element in the equipment performance and
maintenance required to realize all possible energy savings.
City of Rosemead, California
Comprehensive Cityvnde Energy Program
Evaluation Criteria 8
AMERESCO4
Additional Government Expertise
1 Ameresco has a wealth of experience in planning, designing, and implementing energy
cost reduction and programs for both large and small governments throughout North
America. We have proven field experience in the retrofit and replacement of all types of
energy -consuming systems, as well as renewable energy technologies. Our role is
always to collaborate with each customer to optimize system performance, while
managing implementation costs and ensuring efficient, high-quality installation.
Further, because our projects can have a particularly significant impact on local economies, Ameresco
strives to enhance workforce opportunities, partner with local subcontractors, and utilize local vendors
whenever possible to maximize the true impact on the communities in which we are invited to work.
Notable Municipal Examples
As the largest independent provider of energy services to the government sector, we have completed
projects for some of the largest cities in the United States (as ranked by the World Population Review).
• Some of the most significant renewable energy projects New York City (1) has ever undertaken.
Based on the Ameresco teams' performance and partnership, the portfolio was expanded from
an initial four sites to include 60 additional locations within various City Departments.
• A partnership with the City of Chicago IL 0 that includes the largest smart LED streetlighting
retrofit project in the U.S. that created job opportunities for local Chicago residents with
barriers to employment, multi -phased energy efficiency projects with the Public Building
Commission and Chicago Park District, and a recent solar project. Additionally, Ameresco
provides energy supply management services for the City and Chicago Housing Authority.
• Energy conservation, a complete streetlighting retrofit of over 100,000 fixtures to LED, a 20 -year
biogas and site lease agreement, and solar PV installations with the City of Phoenix, AZ (5).
• An innovative WWTP biogas-to-energy facility and an LED retrofit of approximately 130.000
streetlights with lighting controls the City of Philadelphia, PA (6).
• The first sustainable project of its kind in the nation, innovative biogas project with the City San
Antonio, TX (7) Water Systems under an EaaS Power Purchase Agreement.
• A solar, battery storage, and microgrid project on the future City of San Diego (S) Oak Park
Library. This pilot project will inform process on two subsequent projects and will offer
emergency shelter or cooling center capabilities to residents in the event of outages or disaster.
Federal Government
Ameresco has been trusted with some of the largest guaranteed Energy Savings Performance
Contracts in our federal government's history with the U.S. Department of Energy, as well as billions of
dollars in energy performance contracts with other federal entities including the U.S. Department of
Defense (all four branches of the U.S. Military), NASA, and utility providers nationwide.
Per Department of Energy data, Ameresco has guaranteed more
savings to the federal government per dollar invested than any other
energy service company (ESCO). We have successfully analyzed,
recommended, and installed utility cost reduction measures, from a
single building to more than 900 buildings, ranging in value from $1
million to $195 million, with financing terms of 7 to 23 years.
City of Rosemead, California Evaluation Criteria 1 9
Comprehensive Citywide Energy Program
AMERESCO4
Financing Capability
Ameresco has sourced and raised more than $6.4 billion of project financing assistance from various
lending sources including Crews and Associates, John Hancock, Bayerische Landesbank, Bank of
America, Capital One, Chase Bank, Union Bank, and several other financial institutions. Using existing
cash resources, cash flows from Ameresco's operating activities and access to credit through multiple
lending relationships, Ameresco has the resources necessary to develop, implement, and finance our
customer's projects. Based on the City's needs, Ameresco's finance team responsibilities may include:
• Assisting in the development of an RFP in conjunction with the City to select a financing
institution who will be responsible for providing the financing.
• Leveraging lender relationships to encourage responses in financing renewable energy.
• Utilizing market knowledge and experience to review and analyze bidder responses.
• Preparing a summary of bid results, highlighting distinguishing factors of the proposals for the
City's review and consideration.
• Reviewing RFP results with the customer to assist in the selection process.
• Introducing staff to selected lender in the financing process.
• Determining timetable for closing of escrow and initiation of project construction.
• Finalizing project financial model and contract to reflect final financing terms and conditions.
• Assisting with or Drafting Grant proposals
Ameresco works with each customer to structure a business plan that aligns with its unique goals and
needs. Financing vehicles may include one or a combination of the following methods:
• Tax-exempt lease purchase (TELP)
• Energy -as -a -Service (EaaS)
• Municipal Bond Issuance
• Loans from Energy Efficient State Property Revolving Fund
• Public -Private Partnership (P3)
• Government sponsored energy efficient funding programs
• State agency funding
• Financing provided through Ameresco
• Capital lease financing
• Installation payment financing
Through Ameresco's strong banking relationships, the team can provide an independent and
transparent bidding process to determine the right financing partner on all types of projects. We work
with lenders that provide interest rate locks, have low interest rates, and have a high level of
understanding of utility savings and demand reduction projects. Based on the City's needs and
objectives, a selection will be made from a variety of financing options that will be supported by
Ameresco's savings guarantee, ensuring that payments will be made from the savings of the project.
Financial Strength
Ameresco recognizes that it is paramount to have an energy partner that is not only technically
qualified, but also financially strong, with a stable and solid track record of performance in the capital
markets. With 2024 revenues of $1.77 billion, total assets of $4.2 billion, cash in excess of $108
million and a $325 million credit facility and term loan, Ameresco is a leading independent energy
services companies in the US. In addition, we maintain a $2 billion surety credit facility through a
corporate provider with an AM Best Rating of "A Excellent."
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 10
AMERESCO4
Proven Success Securing Incentives and Grants
Ameresco has secured nearly $110 million in grant funded projects in the last five years alone. We
work proactively with public utilities and other programs to keep abreast of the latest incentive and grant
program offerings and guidelines to help maximize the amount of additional funding customers can
receive in support of their projects. In coordination with our dedicated funding and grant writing
experts, Ameresco engineers research and evaluate utility incentives and available grants for all
projects that we develop. Ameresco's incentive and grant management services include assisting our
customers in preparation of applications, facilitation and assistance with award negotiation, and full
management of incentive/grant compliance, reporting, and close out documentation.
Table 1. Select Examples of Ameresco's Grant, Rebate, and Incentive Experience
Opportunities for the City of Rosemead
There are several opportunities that Ameresco can pursue on behalf of the City if selected for this
project. Southern California Regional Energy Network (SoCaIREN) offers rebates on select ECMs. All
available state incentives will be pursued in collaboration with the regional state liaison. The City would
likely qualify for evolving loan funds that provide zero -interest rate financing for energy projects through
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 11
Rebates and Grants Obtained
Arizona State University
Procured a total of $52,000,000 in utility rebates since 1999 which has supported a total
project value in excess of $258.9 million.
City of Chicago
$35 Million lighting improvement incentive through ComEd.
City of Dallas
Secured $233,500 in utility incentives for three site solar project.
City of Reno
Funded through federal grants and bonds and utility rebates, this project was the first
instance in the nation where a major municipality successfully integrated American
Recovery and Reinvestment Act funds with rebates to create a fully self-funded project.
Energy and operational savings of $1.1M+/yr. will be used to pay off the bonds, with no
impact on Reno's general fund.
City of Santa Barbara
$501,790 in Self -Generation Incentive Program funds for a solar and BESS project atop
the Granada Garage.
Klickitat Valley Health Microgrid
$9.8 million awarded from the FEMA Building Resilient Infrastructure and Communities
(BRIG) program for a resilient microgrid for Klickitat Valley Health and the Goldendale
School District.
Matchbook Learning Centers,
Three Renew America's Schools grants that will invest over $22 million in energy
efficiency retrofits, renewable energy generation systems, indoor air quality
Greenup Co. Schools, & Charlo
School District
improvements, and adaptive reuse for three school districts serving historically
disadvantaged populations.
Naples Community Hospital
Ameresco manages all energy project rebates.
New Mexico State University
Obtained rebates from 77 separate project items in the amount of $1,459,216.
Northwestern University
Leveraged $1,018,846 in utility incentives.
Philadelphia Streetlightino
$9.6 Million of Act 129 utility rebates anticipated at project completion.
Philadelphia Water Department
$17 Million of grant funding from the American Recovery and Reinvestment Act.
University Medical Center of
Received $60,041 from the NV Energy SureBet and $50,000 from Southwest Gas to fund
the Financial Grade Operational Audit.
Southern Nevada
Texas A&M University
Secured $21.4 Million in Qualified Energy Conservation Bonds.
Opportunities for the City of Rosemead
There are several opportunities that Ameresco can pursue on behalf of the City if selected for this
project. Southern California Regional Energy Network (SoCaIREN) offers rebates on select ECMs. All
available state incentives will be pursued in collaboration with the regional state liaison. The City would
likely qualify for evolving loan funds that provide zero -interest rate financing for energy projects through
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 11
AMERESCO4
SoCalRen and the California Energy Commission (CEC).
Self -Generation Incentive Programs (SGIP) are available through Southern California Edison (SCE)
and other entities, and the City may qualify for other credits or incentives related to energy storage, grid
load reduction, or excess generation. Ameresco is equally optimistic about various opportunities for
funding electric vehicle (EV) charging station infrastructure and equipment that are offered through
CEC and SCE.
In addition, Ameresco and our customers have secured Investment Tax Credits (ITC) on our extensive
portfolio of solar installations since the inception of the ITC in 2006. We closely follow releases of tax
credit guidance to ensure our projects receive the maximum possible tax credit benefits. Throughout
the course of the project, Ameresco will take advantage of every available rebate and incentive
opportunity on behalf of the City.
Industry Accreditations
NAESCO Accreditation
Ameresco is a National Association of Energy Service Companies (NAESCO) accredited energy
services provider. Ameresco's CEO, George Sakellaris, was one of the founding members of NAESCO,
and served as its president for several years. As the first energy service provider accredited by
NAESCO, Ameresco is a recognized leader in the performance contracting industry. With experience
in every corner of North America, we understand the unique regulatory requirements of each locality
and market in which we work. Encompassing energy conservation and procurement services, the
NAESCO accreditation validates Ameresco's whole system approach to providing services and gives
clients access to a greater array of energy services from which to choose.
The NAESCO accreditation is a rigorous examination of a company's core competencies and business
practices. The examination includes an evaluation of the precise nature of the applicant's business; the
range of measures and services offered to customers; the availability of a performance-based project
approach; ethical business practice commitment; project engineering and design, financing, project
management, operations, and maintenance capabilities; and the capability to verify and monitor energy
cost savings. Ameresco met, and embodies, all these criteria and will leverage these core
competencies for resultant projects with the State.
For additional information, including Ameresco's accredited status, please visit:
hftps:Hmembers. naesco.org/accredited-comoan ies/Details/ameresco-2257322
Federal Qualifications
Ameresco is recognized by both the U.S. Department of Defense (DOD) and Department of Energy
(DOE) as a federal qualified ESCO, a designation that Ameresco has held each year that these federal
agencies have pre -qualified candidate firms. Like the NAESCO accreditation process, these federal
qualifications are based on independent evaluations of Ameresco's capabilities and ability to
successfully develop, finance, implement, and perform long-term performance services on behalf of its
clients.
Ameresco holds multiple Super ESPC indefinite delivery/indefinite quantity (ID/IQ) contracts under
both the DOD and DOE programs. In the latest ID/IQ contract award, Ameresco was selected as part of
a $600 million shared capacity contract for the design and construction of supply- and demand-side
utility conservation projects by the U.S. Army Corp of Engineers.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 12
AMERESCO4
Affiliations, Certifications and Partnerships
In addition to our NAESCO, DOE, and DOD certifications, Ameresco is accredited in all states and
territories that prequalify energy service companies. These prequalification's are based on an
independent evaluation of our experience and demonstrated technical capabilities.
Energy Services Coalition
Ameresco is an active member and supporter of the Energy Services Coalition (ESC) both on a
national level, as well as through state chapters across the United States. In fact, one of Ameresco's
Executive Vice Presidents recently completed his term serving on the Board of Directors of the national
ESC as Vice -President Private Sector and other members of the company have recently held or
currently hold chapter Board positions.
Energy Star Partner
As an ENERGY STAR Partner, Ameresco is committed to working with clients to develop and
implement a plan to improve energy performance, adopting the ENERGY STAR strategy.
Memberships and Partnerships
In addition to those listed above, Ameresco maintains memberships and partnerships with numerous
industry organizations. While there is no specific "advantage" offered as part of these affiliations,
Ameresco's countless education and development opportunities, as well as access to industry research
materials and data, allows us to provide clients with the most up-to-date understanding of the market,
issues facing individual market segments, emerging technologies, funding and incentive opportunities,
etc. By maintaining a vigilant presence in organizations that affect the energy industry, as well as those
that focus on the clients we serve, Ameresco is best position to understand and tailor a solution to best
meet the unique needs of each customer.
Compliance with Performance Contracting Requirements
Ameresco's approach to delivering a comprehensive performance contract is centered upon working
closely with all project stakeholders to collaboratively develop solutions that meet the client's unique
operational and financial goals and complying with CA Code 4217 performance contracting
requirements.
Ameresco's knowledge of CA Code 4217 and comprehensive approach to energy conservation
projects are designed to ensure that we deliver the maximum value for the lowest possible cost while
complying with all applicable requirements. Our approach ensures that the City will be able to identify
and prioritize the full list of potential utility conservation measures and existing necessary building and
systems improvements; and that the City will have access to information that will demonstrate future
infrastructure renewal and budget requirements. By leveraging CA Code 4217, the City of Rosemead
can reduce the administrative burden. In turn, this process ensures that Ameresco delivers a targeted
and cost-effective project.
Compliance with performance contracting requirements involves adhering to specific standards and
regulations set forth in the contract to ensure that obligations are met effectively and truthfully. This
includes maintaining accurate records, meeting performance and guarantee requirements, and
regularly reporting progress. It is essential to communicate regularly and effectively with project
stakeholders to develop, recommend, and implement improvements that comply with all requirements
both long term and short term. Our detailed approach to Performance Contracting results in a high
City of Rosemead, Califomia Evaluation Criteria 113
Comprehensive Citywide Energy Program
AMERESCO<4
value project that achieves the stated results, along with regular verification to ensure compliance. In
the event discrepancies are found, it is imperative any issues are addressed promptly, accurately, and
in a way to eliminate future reoccurrence. Effective communication and collaboration among all parties
are crucial to achieving the desired outcomes and maintaining a transparent and accountable process.
City of Rosemead, California Evaluafion Criteria 114
Comprehensive Citywide Energy Program
AMERESCO4
Technical Approach
While the basic concept of an energy efficiency and conservation program is the same from one
company to another, an individual approach to the evaluation, engineering, equipment selection,
installation, and many other factorsdiffer markedly and can have a major impact on the returns on
investment. Ameresco's approach to developing a project can be summed up in three words:
comprehensive, collaborative, and customized.
We work collaboratively with our customers to determine the best methodology to upgrading their
infrastructure, ensuring the consideration of all solutions, and keeping each customer's unique
operational and financial goals at the forefront. This typically begins with energy analyses to identify
areas of deferred maintenance and opportunities for infrastructure upgrades. Projects incorporate
innovative technology and techniques, customized to improve the efficiency of major building systems,
water and wastewater treatment plants, or other infrastructure. Efficiency measures and upgrades often
include lighting, water, heating, ventilation, cooling, building envelope, smart meters, and controls. If
desired by the customer, we right -fit distributed generation solutions to balance or offset reliance on the
grid and increase benefits of renewable energy and advanced energy management.
Project
Development
Project Proposal/Preliminary
Comprehensive Audit
Investment Grade Audit
Financing
Contract Execution
Final Design &
Engineering
Design documents and
specifications development
Equipment selection
Submittals, construction
schedule, and customer
approval
Phase I: Project Development
Step 1: Needs Identification
Implementation &
Commissioning
Implementation of
approved scope
Construction
management
Commissioning, testing,
and customer acceptance
Performance
Period
Site Personnel training
Optional operations
and maintenance
services
Measurement and
verification
At project inception, Ameresco will partner with the City's staff to understand the specific goals and
objectives of the program, including fiscal, operational, sustainability, and social purposes that are most
fundamentally driving the program. The final project will then be developed with the specific goals and
priorities as the forefront of the design and implementation processes. In this way, the mutually agreed
upon solution will most effectively maximize value to ensure that the greatest reduction of utility,
operating, and maintenance costs are achieved in the long-term.
Step 2: Field Data Acquisition and Auditing
Once project goals are thoroughly understood, Ameresco engineers gather data on utility rates,
historical consumption, and facilities and infrastructure. Engineers review all information and begin to
document our assumptions and understanding of building condition, operations, and performance.
Further, we leverage our proprietary tools to model lifecycles for building systems and liaise with key
facility stakeholders to validate our assumptions and identify any knowledge gaps, resulting in bespoke
reports and dashboards for analysis. This unique data development process allows Ameresco to
quickly gain insights as to which buildings present opportunities to adapt and modernize through
various facility improvements and ECMs and provides insight into the greatest energy and cost savings
opportunities. Engineers contributing to the Preliminary Energy Assessment will also be assigned to
complete the Investment Grade Audit (IGA).
City of Rosemead, California Evaluation Criteria 15
Comprehensive Citywide Energy Program
AMERESCO4
To gain an accurate picture of existing conditions, Ameresco will:
• Perform onsite surveys with in-house project designers and engineer(s). Our staff members hold
all the appropriate industry credentials, including PEs, CEMs, CEAs, CLEPs, among others.
• Interview facility/maintenance director and staff, administration, and any other stakeholders.
• Understand commitment to the ENERGY STAR program and other environmental metrics, so
that these efforts can be included in the final project (if applicable).
• Analyze recent utility billing and interval data to evaluate operation schedules, utility demand
and usage, rate structures, and areas of excessive energy use.
• Review recent operational and capital expenditures to determine areas that may require further
investigation.
• Understand the City's perspective on current carbon footprint and the potential value of reducing
and tracking of its current and future carbon emissions.
• Update and/or review any previous utility audits or feasibility studies recently conducted by/for
the City.
• Review as -built drawings for existing buildings.
• Analyze any available submeter data.
Step 3: Energy Analysis Costing and ECM Definition
At the end of this task, Ameresco will have identified which sites have the largest opportunity for energy
efficiency based on benchmarking across multiple performance metrics. We will have synthesized all
data and information gathered through field data acquisition and individual ECMs are specified. The
savings potential of each ECM is determined, and preliminary energy baselines are established.
In a parallel effort, the cost estimating for all the identified ECMs is begun using a combination of
contractor quotes and pricing databases. The ECMs are then subjected to further analysis, resulting in
conceptual design, firm savings, and implementation price. The individuals involved in the data
gathering and evaluations perform most of the analyses. Ameresco's in-house Senior Project Managers
(SPMs) are also heavily involved in the cost estimating. The task of verifying and approving project
implementation costs at this project development stage will typically be the responsibility of Ameresco's
Director of Construction.
Step 4: Financial Modeling
The financial analysis will incorporate the cost and savings developed in the third step into the
appropriate financial model(s) for the project. These models incorporate requests from the City and
applicable interest rates and terms to produce a financial scenario that supports the required
investment and debt service.
Step 5: Investment Grade Audit
While the goal of the Preliminary Energy Assessment is to identify the potential opportunity, the IGA
serves to more firmly define the scope of work and final cost. After the Preliminary Energy Assessment
is presented, Ameresco works with the City to identify and select measures to move forward into the
IGA process. The IGA is equivalent to an ASHRAE Level 3 Audit and is a much deeper dive into the
costs and savings associated with the project to ensure that Ameresco has an accurate and complete
understanding of all the impacts associated with the project.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 116
AMERESCO4
The IGA will include firm -fixed pricing, guaranteed savings, annual costs, and other values necessary to
present a final, contractable project.
Step 6: Permanent Financing
Ameresco does not make money on financing — our financing approach is agnostic (like our
technical/engineering approach), and the cost of financing services is included in our overhead.
Ameresco's finance team works throughout the IGA process to facilitate an easy transition from audit to
construction with minimal lag time and disruption. Based on the City's needs and objectives, a selection
will be made from a variety of financing options that will be supported by Ameresco's savings
guarantee, ensuring that payments will be made from the savings of the project.
Step 7: Contract Execution
During this step, the final IGA report is presented to the City. This report will include a detailed
description of the scope of work, energy calculations, measurement and verification (M&V) protocols,
financing terms and conditions, and areas to be upgraded. The resultant Energy Services Agreement
will ensure that the systems will be upgraded, and sustainability goals advanced. The guaranteed
energy savings will pay for the project, reduce operating costs, and allow the City to allocate more of its
finite resources towards other priorities.
Customer
Kickoff
Meeting
• Outline Process
• Points of Contact/
Communications Flow
• M&V Methodology
• Contract Requirements
• Engineering
Specifications
• Safety Requirements
• Drawing Requirements/
Format
• Subcontractor
Preference(s)
Establish Baseline
Measurement
Requirements
• Subcontractor
Selection
- Data Required
Formal
Timespan
- Metering Methodology
• Baseline Measurements
Conducted
Conceptual
Design
General Scope
Documentation
Customer Confirmation
of Scope
Construction Manager
Assigned
- Site Evaluation
- Submittal Requirements
(schedule. cost
breakdown, design
requirement, equipment
performance
parameters, etc)
Site
Customer
Survey
Baseline
ofWork &Costs
Meeting
• Analysis Methodology
Report Generation
- System Drawings
Baseline Data Reviewed
- Nameplate Information
CuslomerApprovalon
- Fxisfirg Equipment
Baseline Information
Permrmance submittals
(existing parameters)
- Update BillslRate
M&V Methodology
Schedules
Finalized
- Operational Data
_ Sfipulated,OreTime at
• Existing Metered Data
Accepixnce.Ongolag
Obtained(flow,
Savings Acceptance
temperature, load, and
Procedures
demand)
M&V Methodology
City of Rosemead, California
Comprehensive Citywide Energy Program
Project
Financial
Analysis
• Finalizeand
Communicate
Implementation of
Cost/Savingst
Construction Schedule
Presentation
tothe
Customer
• Baseline Data Reviewed
• CustommApprovalon
Baseline Information
(existing parameters)
• M&V Methodology
Finalized
- Snpul.W.One Tlme at
Acceptance. Ongoing
Developmentof
Investment Grade
Final Project Scope
Audit Report
ofWork &Costs
Compilation
• Construction Management
Report Generation
Review/ Field Audi
Savings Projections
• Submittals Evaluated
Submittals
• Cost/Scope Negotiations
- Scope Definition
• Validate Equipment
- Implementauon
Performance v. Savings
Schedule
Performance
- Warmness
- Pertormanca Guarantees
- Equipment Cutsheets
- Warranties
- 0 MSpecifications
• Implementation Schedule
Savings Acceptance
• Fixed Fee
Procedures
• Risk Analysis
M&V Methodology
- ReportRequirements
• Operations Manager Input
and Review
Figure 1. Investment Grade Audit Report Delivery Process
Evaluation Criteria 117
AMERESCO4
Phase II: Final Design and Engineering
Step 1: Detailed ECM Design
At this step, Ameresco's experienced project developers and engineers will complete the ECM designs.
Ameresco's engineering team will be in charge of the design and engineering work and will ensure that
any intermediate design submittals are prepared for the City's review in a timely fashion.
Step 2: Equipment and Technology Specification
The final equipment and technology selections, subject to the City's approval, will ensure that the
guaranteed equipment performance and savings/revenue will be achieved and sustained for the full
contract term. Ameresco is unique in the fact that we are product and technology agnostic and we do
not manufacture any products, which allows us to select products and technology that is best for
the City, not internal stakeholders. Companies such as Schneider, Siemens, Trane, Honeywell,
and numerous others all manufacture equipment, products, and software, and are pressured to be
included in projects like these to meet Company goals and mandates. Often times these equipment,
products, and software are not the right fit for the project and come with multiple layers of markup,
resulting in a more expensive project with less value and incompatibility issues.
Step 3: Submittals, Construction Schedule, City Approval
Following the City's final review and approval of submittals, the submittals will become formal project
documents. The equipment and materials will be installed in accordance with these plans, drawings,
schedules, and specifications. All submittals are prepared by Ameresco's professional engineering staff
or reviewed if consultants supplemented the firm's in-house resources. A construction schedule will
also be included in the submittals.
Phase III: Implementation and Commissioning
Step 1: Implementation, City Coordination, Pre -Construction Meetings
Once the City has reviewed and approved all the final submittals and issued a Notice to Proceed, pre -
construction meetings can be held. At these meetings, site personnel and Ameresco's SPM will confirm
all the details needed to ensure smooth implementation of the improvements at each facility including
all site safety, security, background checks, and badging requirements.
The SPM is responsible for the successful construction of the project, on schedule and within budget.
Two critical roles that Ameresco's SPM fulfills are customer service and quality assurance. This staff
member will ensure a smooth and well -coordinated implementation that minimizes any impact on the
City's personnel, operating mission, and building constituents.
As is standard practice in all Ameresco's construction efforts, the SPM reports directly to Ameresco's
Director of Construction, who retains ultimate responsibility for all implementation period activities.
These activities include, but are not limited to, oversight of procurement and subcontracting,
construction budgets and cost control, installation progress, completion, training, commissioning,
project close, and ensuring a smooth transition into the long-term performance period.
Step 2: Equipment Procurement
The procurement process begins as soon as Ameresco has received the Notice to Proceed. Any
equipment and materials that Ameresco will furnish for installation will be purchased in a timely manner
to be available for the coordinated construction efforts. The SPM will be responsible for procurement
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 18
AMERESCO4
logistics to ensure that all the equipment and materials meet contract specifications and that
procurement is accomplished in the most cost-effective manner possible. Ameresco is not bound by
low -bid requirements; therefore, equipment can be acquired that provides the best value while meeting
guaranteed performance levels. Competitive procurement solicitations are the favored and typical
means of ensuring cost-effectiveness while maintaining best value.
Ameresco casts a wide net to national and local suppliers and contractors for all goods and services
and works directly with several major manufacturers. Ameresco will confer with the City, and pricing will
be compared with what the City is accustomed to paying for all similar goods and services.
Step 3: Subcontract Solicitations/Executions
The primary focus is on the proven track record and capabilities of the firms hired to perform work
throughout a City's facilities, whether it is installation labor only or complete turnkey service. Ameresco
facilitates a competitive process by issuing detailed scopes of work as Request for Proposals (RFPs)
for each ECM. Low bid is not necessarily the deciding factor in Ameresco's selection and award
process, as subcontractors are chosen based on a holistic evaluation of their ability to add value and
enhance the service provided to the City. That said, Ameresco will ensure that everything is fairly bid
and seek feedback from the City on their preferences based on the bid results and respondent
reputations. All subcontractors must be able to accomplish the specified work on time within the budget,
while meeting all established utilization goals and while maintaining appropriate state licenses.
Ameresco's success depends upon timely, professional quality workmanship performed by qualified
subcontractors who are proficient in the specific technology. In addition to price and technical proficiency,
a premium is placed on the ability of the contractor to work cooperatively in a non -disruptive fashion within
occupied City facilities and sites. To this end, it is generally beneficial to engage local subcontractors who
have a proven track record of success in similar facilities, and an established relationship with the facility
personnel. Ameresco looks favorably to contractors that have had positive experience with the City.
During the design phase, Ameresco will establish a prequalified list of local subcontractors and vendors in
collaboration with the City's staff and in accordance with predetermined criteria.
Local Involvement
Ameresco believes that community -wide, comprehensive energy conservation projects provide the
greatest benefit in terms of cost and utility savings, as well as sustainability, greenhouse gas reduction,
and social responsibility. Our projects most often encompass numerous facilities with diverse
stakeholder groups requiring multi -jurisdictional support, approval, and collaboration.
Our projects are structured to benefit the broader communities which our customer's service. We are
committed to utilizing the maximum amount of local labor and vendors to bring the greatest value to
the wider community. Local contractors and vendors have a vested interest in the success of the
project, relationships that can be leveraged in its support, and an intimate knowledge of the context in
which they are working.
Step 4: ECM Construction
Two critical responsibilities that the Senior Project Manager assumes are quality assurance and
customer satisfaction. To fulfill the quality assurance responsibilities, Ameresco's SPM must ensure
that equipment and materials meet the contract specifications, and all work is accomplished in a timely
and professional manner. To fulfill the service responsibilities, Ameresco's SPM will oversee all
subcontractor and supply vendor activities to ensure minimal disruption. He will also serve as the
primary point of contact throughout the implementation phase. All issues or concerns that arise will be
addressed immediately and resolved to the City's satisfaction. Any support that Ameresco's SPM
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 19
AMERESCO4
requires to accomplish this level of service will be readily available, and efforts can be supplemented as
needed from the reservoir of nationwide talent on Ameresco's staff.
Commitment to Project Safety
Ameresco's SPM also serves as the project safety officer and is responsible for a safe environment for
all tradesmen and facility occupants. This staff member will oversee construction -related activities to
ensure compliance with all applicable OSHA, state and local codes and regulations.
All phases of project design, implementation, and long-term performance monitoring and O&M services
are achieved with safety as our number one focus. No financial goal, work task, customer deliverable,
or schedule demand is worth an injury or environmental compromise. It is the responsibility of every
Ameresco employee, supplier, contractor, partner, and vendor to always strive and on every work
assignment to work safely and in an environmentally responsible fashion. In fact, Ameresco considers
good health, safety, and environmental performance as a fundamental element of providing industry-
leading comprehensive energy solutions on behalf of our customers.
To these ends, Ameresco is committed to meeting or exceeding 100 percent compliance to all
established safety and health regulations, zero accidents, and maintaining a safe and healthy work
environment. We currently have implemented policies, procedures, training, and self -assessments to
ensure compliance with the following federal regulations, in addition to any site-, City-, and/or
jurisdictional -specific requirements.
Design/Build
Contracts Execution
• Performance Partner Meeting/
Construction Review
• Subcontractor Budgets
Submitted
Final
• Implementation Plan
Design
Agreement • Final Design Schedule
Construction Drawings Issued
Signed • Implementation Schedule
Site Mobilization
Commissioning
and Project
Close -Out
Customer
Kick -Off
Meeting
Final Design/Construction
Budgets Submitted
• Design/Build Contracts Finalized
- Terms
- Insurance
- Site Safety and Health Plan
- Scope
- Rxetl Fee
- legal Review
City of Rosemead, California
Comprehensive Citywide Energy Program
Pre -Construction
Kick -Off with
Customer
• Site -Speck Review
• Customer's Requirements/Guidelines
• Final Design Milestones
- Equipment Review
- Drawingftvoi Schedule
- Progress Meetings
• Project Schedule
Construction
Period
• Onsite Progress Meetings
(meeting minutes issued
• Quality AssurancelQuality Control
• Contract Milestones
• Invoice Review/Approval
• Change Order Documentation
• Project Cost Management
• Safe Work Practices
• Dedicated Construction Management
Figure 2. Construction Implementation Process
Evaluation Criteria j 20
AMERESCO4
Step 5: Commissioning, Testing, City Acceptance
When the installation of an ECM, a whole facility, or logical grouping of ECMs is completed
satisfactorily, Ameresco's staff and the installation contractor will commission and test the systems in
accordance with the detailed plan described in the ECM write-ups in the detailed IGA. The development
and design engineering staff responsible for the conception and finalization of these measures will also
assist in the commissioning phase. The City's facilities and maintenance staff will be invited to the
commissioning events to ensure their complete understanding of the new equipment and recently
installed systems. Ameresco's operations manager will also be intimately involved in this process as
part of his responsibility for long-term M&V activities.
A significant amount of responsibility is placed upon Ameresco's SPM. For that reason, the individuals
who perform these services for Ameresco are extremely experienced and selected for projects based
upon their unique skillsets and bases of operations. They are appropriately vested with a corresponding
level of authority to control the project's progress and all related activities and provided with all the
support that is required to successfully accomplish their tasks.
Equipmend O&M
System Manuals Project
Startup Operation Criteria Closeout
• Start -Up and Testing Maintenance Close -Out Activities Performance
Procedures Requirements/ All Punch List Items Period
• Mechanicat Electrical Training Responsibility Finalized Process
Completion and Testing Training Schedule Warranty Information Project Reconciliation Final Turnoverto
• Cleaning and Flushing - operation Contact Information As-Buills Operationsand
• Test and Balance - Maintenance Commissioning Data Demobilize Maintenance
Punch EquipmenVSystem Substantial Final
List Functional Completion Acceptance
• Completion of Critical/ Performance Testing Customer Review/ Customer Review/
Major Punch List Items Functional Performance Acceptance Acceptance
Testing Warranty Invoicing Begins (back to
• Adherencete Design Measurementand start date at Substantial
Intent and Contractual Verification Completion)
Requirements Contract Stan Date
• Measurementand
Verification Commissioning
- One -Time Acceptance
- Ongoing
> Data OdledioN
Communication Systems
> Repaningrinvoice
Protocol Completion
Figure 3. Commissioning and Project Close -Out Process
Phase IV. Performance Period
Long-term M&V services and annual reconciliation of performance and savings will be carried out in
accordance with the site-specific M&V plan. The M&V plan presented in the IGA will be written in
accordance with the International Performance Measurement & Verification Protocol (IPMVP).
All specific protocols must be explained to and accepted by the City before project construction can
begin. The M&V plan will be developed mutually with the City during the IGA and will be fully
documented prior to the start of construction.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 21
AMERESCO4
Measurement and Verification
Ameresco's M&V methodology is incorporated throughout each phase of our Comprehensive Project
Approach. During project development, Ameresco will assign an M&V specialist who will be responsible
for ensuring the correct data has been collected and mutually agreed upon to develop the baseline
energy and operational costs. The M&V specialist will also be involved in the implementation and
commissioning stages of the project to ensure that the post -retrofit measurements and metering are
installed properly, and that the data is collected in a thorough and efficient manner. Ameresco's direct
employees will perform this service in its entirety.
Ameresco will coauthor the development of a detailed and comprehensive M&V plan with the City,
including ongoing monitoring, to ensure actual savings are attained. This is a critical element of the
performance contract because it provides the basis for the energy savings guarantee and debt -service
payment. The specific M&V Plan will be submitted with the final IGA and will be included as a schedule
in the Energy Services Agreement. All specific protocols must be explained to, and accepted by, the
City before project construction can begin.
M&V involves two essential components:
1. Verifying the ability of the project to generate all the projected and/or guaranteed savings
2. Measuring actual, periodic performance of the project against established baseline(s)
While there are a variety of ways to accomplish the two primary M&V tasks, a critical prerequisite is to
establish the baseline(s). These baselines are developed from a rigorously derived end-use analyses,
onsite measurements, and historical energy consumption data. Techniques range from stipulating all
factors affecting ECM performance to installing extensive, highly accurate metering systems. When
deciding the appropriate level of sophistication for a plan, factors such as complexity of the measure,
expected magnitude of savings from the measure, and the City's aversion to risk all affect the decision.
The general approach to determining energy savings in these plans involves comparing the energy use
associated with a facility or certain energy consuming systems within a facility before installation of the
ECM (baseline) and after installation of the ECM (post -installation).
Energy Savings = (Baseline Energy Use) – (Post Installation Energy Use)
Although the specific algorithms vary from measure to measure, they can all be broken down into
usage before and after the installation of the energy savings measure. Sometimes the baseline usage
is fixed, while in other cases the baseline is calculated based on the post -installation usage; it depends
on the specific plan used to verify the performance of the measure. To aid agencies in gaining an
understanding of M&V, the IPMVP was established. The IPMVP has four options (A, B, C, and D)
which meet the needs of a wide range of ECMs and provide industry -approved procedures for baseline
development and post -retrofit M&V. These options are flexible and reflect the considerations previously
mentioned.
Ameresco's M&V plan will be written in accordance with the IPMVP. With responsibility for satisfactory
long-term M&V and project performance, the Manager of Measurement and Verification will oversee the
M&V of this project in conjunction with local personnel.
Long-term M&V services and annual reconciliation of performance and savings will be carried out in
accordance with the site-specific M&V Plan. The frequency of M&V reporting—quarterly, biannually, or
annually—will be at the option of the City. The savings guarantee is reconciled on an annual basis.
At any time during the contract term, should there be a shortfall in energy cost savings identified during
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 22
AMERESCO4
the annual reconciliation and correction process; Ameresco will make a payment to the City in the full
amount of the shortfall. Payments can be in the form of a check or a credit against future billings from
Ameresco, at the City's option. Ameresco will repair the defect that created the shortfall at Ameresco's
expense to ensure that the savings are achieved in the following years. If the cause of the shortfall
cannot be repaired, Ameresco will have the option to install additional conservation measures at
Ameresco's expense in order to achieve the savings.
City Training
Training of the City's staff who will be involved in the long-term operation of the new equipment and
systems is of paramount importance. A strong focus on energy savings strategies and maintenance
schedules will be provided to those individuals. Because the SPM will be familiar with the newly
installed equipment and systems, as well as the site's facilities and personnel, this staff member is the
most appropriate candidate to supervise training efforts. By providing training in the proper O&M of the
newly installed ECMs, both Ameresco and the City are assured of sustained performance of the
equipment and persistence of energy savings.
Training typically commences during the commissioning phase when staff will first become acquainted
with the new equipment and systems. Training will be conducted in a classroom setting and
documented on video to train new staff or provide refresher courses for existing employees. The basic
format includes an introduction to the overall installation, so that all staff members understand the
benefits of the equipment and systems. Each ECM will be explained in detail, including how to operate,
maintain and troubleshoot, as well as any possible interactions with existing equipment. Documentation
will include review of O&M manuals, drawings, and equipment specification literature. A hands-on
approach will be encouraged to facilitate understanding of all presented material. The training will
emphasize the essential role that equipment users and operators play in energy conservation, as poorly
maintained equipment will not perform as efficiently as possible, as well as experience more frequent
breakdowns and a shortened useful service life.
Ameresco will make provisions with the City to conduct training sessions at remote sites if needed.
Informal training can also be provided throughout the contract term and may be accomplished in
conjunction with an O&M contract.
Non -Technical Training
Everyone who works for or within a facility can have an impact on the level of success of an energy
conservation program. Therefore, training should be offered to the broadest possible range of facility
groups and building occupants to the fullest extent possible. The following describes some of the types
of non-technical training programs typically considered:
• Energy Policy Development: Ameresco works with its customers to evaluate the need for a
facility -wide energy policy. A well-defined and effective energy policy provides goals, objectives,
and management direction and leadership for all energy or sustainability -related activities and
initiatives.
Occupant Awareness Program: Ameresco can work with the City to implement an outreach and
awareness program to educate employees and citizens about the energy and utility resource
projects being conducted. Messaging will highlight the importance of conservation, as well as
how building users and members of the public (as applicable) can contribute to the success of
the project.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 23
AMERESCO4
Operation & Maintenance Services / Long -Term Servicing
The City will retain full and complete authority over its equipment and facilities during the contract term.
Therefore, the City may choose to perform the O&M internally and/or have the O&M performed by
others at their discretion, provided all maintenance procedures meet or exceed the standards set forth
in the contract. These standards will be clear,
concise, and thoroughly documented as part of the
training. O&M manuals will be submitted to the City
facility(ies) upon commencement of the
performance period services. If the City deems it
appropriate to accomplish the required O&M
through a third party, these standards will serve as
a minimum level of service.
At the City's discretion, Ameresco can offer a
comprehensive O&M service plan in the final
contract. This O&M plan will help to ensure that energy savings are maintained over the term of the
contract and extend the useful life of installed equipment. Responsibility for managing this ongoing
service will be assigned to Ameresco's Manager of Measurement and Verification supported by local
management and qualified service providers to assure responsiveness. These firms will be mutually
selected with the City based on reputation, qualifications, and ability to respond to scheduled and
emergency service calls within required time periods.
J Ongoing Planning and Asset Management
Ameresco's AssetPlannerO is an industry leading and powerful Asset
AssetPlanner Management Software Solution designed by infrastructure managers for
\,►/ infrastructure managers, with the result being a straightforward and easy
to use platform that provides robust reporting and analytical tools for
innovative decision support. Our software solution provides customers the capability to organize their
risk management criteria associated with their infrastructure and to identify the most important renewal
and replacement projects.
AssetPlanner® is a relational database that seamlessly integrates information from three key work
areas that aides in decision development:
• Capital Planning: Data Development, Needs Assessment, Capital Plan and Budgeting, Project
Scheduling, and Implementation
• Maintenance Management: Workflow Process, Preventive Maintenance, Demand Maintenance
Service Request, Execute Work
• Energy Management: Data Development, Analyze and Benchmark, Energy Management Plan,
Project Scheduling, and Implementation
Our internal asset management experts help customers develop strategies to manage the funding gaps
associated with aging infrastructure by reviewing key risk management criteria to identify and prioritize
the most important renewal and replacement projects. The program provides valuable data to help
decision -makers define long-term capital planning strategies that leverage available funds to maximize
project value by incorporating state-of-the-art business processes designed to manage current capital
costs and predict the future capital needs.
City of Rosemead, California Evaluation Criteria 24
Comprehensive Citywide Energy Program
AMERESCO4
Management Approach
Project/Construction Management, Coordination and Local Staffing
As a company whose core business is solely focused on developing and implementing comprehensive
energy conservation and renewable energy generation projects, Ameresco has the in-house personnel
to develop innovative energy projects of nearly any size or scope. Every Ameresco team member is
experienced and dedicated to these projects.
As necessary and/or required, the team will draw upon the experience and expertise of the over 1,500
Ameresco energy professionals located throughout approximately 60 offices, with the City's approval.
• Regional Leadership
• Business Development/Account Management
• Energy and Renewable Energy Engineers
• Pre -Construction and Construction Project Management
• Renewable Energy Operations
• Post -Construction Energy Management and M&V Specialists
• Marketing and Communications
• Administrative Support and Contract Management
Ameresco staff manages and conducts its audits, project development, project/construction
management, and measurement and verification using in-house resources. In a collaborative
approach with the City, Ameresco will establish subcontractor alliances on a case-by-case basis. This
process keeps us vendor neutral and ensures that we can meet the financial, operational, utilization,
and other goals identified by the City. At all stages of the project, a direct Ameresco employee will be
responsible for management and oversight of:
• Proposal and/or Preliminary Energy • Finance
Assessment • Training and commissioning
• Investment Grade Audit • Measurement and verification
• Engineering and design • Operations and maintenance
• Project and construction management
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 25
AMERESCO4
Key Personnel
We have assembled an experienced and local team of in-house engineers and project managers to
develop a high quality, comprehensive Citywide Energy Program for the City of Rosemead.
Subcontractors will be selected in accordance with Ameresco's subcontractor prequalification process,
with the City's approval, and with a focus on maximizing local labor utilization.
City of Rosemead, California Evaluation Criteria 26
Comprehensive Citywide Energy Program
Academic/Name Professional Qualifications
Business Development, .Management,
12
Ernest Kim
BA, Finance, University of Southern California
Senior Account Executive
Series 7, 63, & 65 General Securities Representative (expired), CFS Institute of
Local CA Employee
Business & Finance
Ron Haxton, PE
MS, Engineering Management; BS, Mechanical Engineering, University of
30
SVP - Business Development
Idaho, Professional Engineer (PE)
Project Development,Design .
Engineering; . . . Equipment Sourcing and Logistics
Warren Van Ryzin, PE, CEM
BS, Mechanical Engineering, California State Polytechnic University, Pomona
14
Director - Engineering
Licensed PE (CA -37294), Certified Energy Manager (CEM)
Local CA Employee
Wyeth Crawford, PE
BS, Mechanical Engineering, Oregon State University
13
Engineering Team Lead
Licensed PE
Dan Feld, PE, CEM
BS, Mechanical Engineering, California State Polytechnic University, Pomona
25
Engineering Team Lead
Licensed PE (CA -M30565) CEM, LEED AP
Local CA Employee
Sean Maher, PE, CEM
BS, Mechanical Engineering, San Diego State University
12
Sr. Project Development
Licensed PE (CA -42406), CEM
Engineer
Local CA Employee
Will Morris, CEM
BS, Mechanical Engineering, Western Michigan University
18
Sr. Project Development
Graduate Certificate, Advanced Energy Storage, Michigan Technological
Engineer
University
CEM
Michael Pacella, EIT
BS, Renewable Energy Engineering, Oregon Institute of Technology
12
Sr. Project Development
Certified Measurement and Verification Professional (CMVP), EIT, OSHA 10
Engineer
Local CA Employee
Stella Shmushkina
MS, Electrical Engineering, Odessa Polytechnic Institute, Ukraine
20
Sr. Project Development
Engineer
Local CA Employee
Leo Murillo, EIT
BS, Mechanical Engineering, California State University of Long Beach
8
Project Development Engineer
EIT, OSHA 10
Local CA Employee
Rhonniel Caringal, CEM
BS, Electrical Engineering, University of Santo Tomas, Philippines
32
Project Development Engineer
Sustainability Certificate Program, UCLA Extension (ongoing)
Local CA Employee
LEED Green Associate; OSHA 10,, Registered Electrical Engineer, Philippines;
CEM
Project Management, Installation,
Commissioning, Training, Project Safety and System Integration
Goran Matesic
Marketing and International Business Certificate, University of Western Sydney,
25
SVP - Construction Services
AUS
Local CA Employee
City of Rosemead, California Evaluation Criteria 26
Comprehensive Citywide Energy Program
AMERESCO4
Ferdinand Diwa, CPM, CEM Information Technology Network and Security, University of Maryland 15
Sr. Project Manager University College (UMUCC); US Navy Construction Electrician
Local CA Employee CEM, Construction Project Management (CPM) Fiber Optic Installer Level I —
NAVFAC, Construction Manager
PeriodPerformance Services
Jared Hughes, CMVP, CEM, MS, Data Analytics, Northern Illinois University; BS, Construction Management, 17
CEA, LEED AP Missouri State University
Manager — Performance Certified Measurement and Verification Professional (CMVP), CEM, Certified
Assurance Enerav Auditor (CEA). LEEP AP
Subcontractors
Ameresco will establish subcontractor alliances on a case-by-case basis. This process keeps us vendor
neutral and ensures that we are able to meet the City's financial and operational goals. The primary
focus is on the proven track record and capabilities of the firms hired to perform work throughout the
City's facilities, whether it is installation labor only or complete turnkey service. Ameresco looks
favorably to contractors that have had positive experience with the City.
During the design phase, Ameresco will establish a prequalified list of local subcontractors and vendors
in collaboration with the City's staff and in accordance with predetermined criteria.
Additional information can be found here: Phase III: Implementation and Commissioning, Step 3:
Subcontractor Solicitation/Execution.
Owner Interaction
Ameresco has extensive experience in managing project implementation in occupied facilities, including
in K-12 schools, hospitals, city and county agencies, and high -security government facilities. We will
coordinate all construction efforts with the City's building administration and facilities personnel. To
avoid conflict with building operations, Ameresco will propose a detailed construction schedule at the
Pre -Construction kick-off meeting. All shutdowns of existing equipment and testing will be coordinated
through building administration and facilities. Regular progress meetings will facilitate ongoing
communication regarding City resources.
A key project management goal is to ensure expectations are met and any resources the City will need
to provide are identified, discussed, and incorporated in a timely manner. Below are examples of areas
that may require the City's resource coordination:
• Work scheduling
• Security, escort, or access issues
• Disruptions to normal facility operation
• Shutdown or interruption of utilities, equipment, or systems
• Housekeeping issues throughout construction
• Construction safety issues relating to subcontractors, hazardous materials, traffic, construction
areas, etc.
City of Rosemead, California Evaluation Criteria i 27
Comprehensive Citywide Energy Program
AMERESCO4
• Location of equipment, tools, temporary workspace, etc.
• Permits, rules, and regulations
City Resources during Project Development and Design & Engineering
• The design phase is an iterative process with frequent communications with the City, requiring the
availability of appropriate City staff for design review and feedback.
• Ameresco will develop a detailed work plan and review with the City. We use checklists for
preparation of construction sub -tasks, for developing detailed scope of work documents, and for
tracking completion of the work.
• For specific work which has potential for disruption of a major system, contingency plans will be
included as part of the work plan.
City Resources during Implementation and Performance Period
• Our senior project manager will be onsite and in communication with the project engineers,
subcontractors, and City staff daily during the construction phases of this project and to ensure
building access and appropriate times.
• The proposed project can be completed all at the same time or be split into phases if needed.
Ameresco teams can work behind the scenes to ensure there is minimal disruption to daily activities
and staff.
• Each week we will conduct a "look -ahead" review to properly anticipate upcoming activities and
provide adequate notice to other resources that will be required. Ameresco emphasizes effective
planning and project control on multi -phase projects to ensure the demands on resources are
managed properly. The top priority is to ensure coordination with City staff to eliminate potential
scheduling and project coordination conflicts.
City of Rosemead, California
Comprehensive Ci"de Energy Program
Evaluation Cdteda 1 28
AMERESCO4
Cost and Pricing
The following table details the project markup, fee, and contingency structure for a proposed project:
Achieving Best Value
Ameresco is the highest value "independent" ESCO in the marketplace. We do not have a parent
company, nor are we a subsidiary of any other corporation. This makes Ameresco uniquely positioned
to provide our clients with maximum flexibility in our approach, which is valuable to cities like
Rosemead, where unknown or unforeseen challenges can delay or derail a project. The municipal
space is dynamic and influenced by many outside factors, from unfunded State mandates to changes in
political leadership, and Ameresco's flat organizational structure combined with a depth of technical
and financial solutions makes responding to these ever-changing dynamics a relatively simple
process. Ameresco's company decision makers are one level removed from the team implementing our
projects, which facilitates decisive action and responsiveness over burdensome and time-consuming
internal processes required by corporate ESCOs.
A key benefit of Ameresco's independent position in this marketplace as a vendor -neutral, technology
agnostic ESCO, is that we have no pull-through product or service goals. Our only product is energy
services — we have no larger manufacturing or service -providing corporation influencing our offering.
Technology and products are recommended based on their ability to best meet the needs of our clients
for the lowest possible cost. Ameresco casts a wide net to national and local suppliers and contractors
for all goods and services and works directly with several major manufacturers. Our position as a
nationally recognized ESCO results in preferred pricing relationships with leading equipment
manufacturers providing LED lighting solutions, water meters, HVAC systems, solar modules, local
distributors, and other energy efficiency/renewable energy technologies. Our clients receive the
benefit of these relationships as it relates to our ability to leverage bulk pricing and priority delivery of
equipment to minimize any lead time and prevent project delays. Further, this independence provides
significant leverage to our clients when it comes to negotiating with vendors on warranties and
commissioning issues.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 29
Notes
Category
Value
Ameresco Overhead
10%
Ameresco Profit Margin
8%
Total Project Markup
22%
Combined Markup for Overhead & Profit
Fees are comprised of Ameresco Indirect Costs such as Project
Development and Engineering, Construction Management,
Measurement and Verification, Administrative, Closeout,
Commissioning, and Travel. Ameresco internal labor rates are
Fees
6% to 12%
applied to the projected hours, and the Total Project Markup is
applied to these costs.
A range is provided because the fee percentage can vary based
on the overall project size and scope.
Contingency is applied per improvement measure based on its
Contingency
3% to 6%
complexity and risk.
Achieving Best Value
Ameresco is the highest value "independent" ESCO in the marketplace. We do not have a parent
company, nor are we a subsidiary of any other corporation. This makes Ameresco uniquely positioned
to provide our clients with maximum flexibility in our approach, which is valuable to cities like
Rosemead, where unknown or unforeseen challenges can delay or derail a project. The municipal
space is dynamic and influenced by many outside factors, from unfunded State mandates to changes in
political leadership, and Ameresco's flat organizational structure combined with a depth of technical
and financial solutions makes responding to these ever-changing dynamics a relatively simple
process. Ameresco's company decision makers are one level removed from the team implementing our
projects, which facilitates decisive action and responsiveness over burdensome and time-consuming
internal processes required by corporate ESCOs.
A key benefit of Ameresco's independent position in this marketplace as a vendor -neutral, technology
agnostic ESCO, is that we have no pull-through product or service goals. Our only product is energy
services — we have no larger manufacturing or service -providing corporation influencing our offering.
Technology and products are recommended based on their ability to best meet the needs of our clients
for the lowest possible cost. Ameresco casts a wide net to national and local suppliers and contractors
for all goods and services and works directly with several major manufacturers. Our position as a
nationally recognized ESCO results in preferred pricing relationships with leading equipment
manufacturers providing LED lighting solutions, water meters, HVAC systems, solar modules, local
distributors, and other energy efficiency/renewable energy technologies. Our clients receive the
benefit of these relationships as it relates to our ability to leverage bulk pricing and priority delivery of
equipment to minimize any lead time and prevent project delays. Further, this independence provides
significant leverage to our clients when it comes to negotiating with vendors on warranties and
commissioning issues.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 29
AMERESCO4
As a company with its core business solely focused on developing and implementing comprehensive
turnkey energy projects, Ameresco is structured regionally with a broad bench of experts in the
industry. Not only have we attracted the best talent from the marketplace, we have also incorporated
the preeminent experts in solar and energy storage, street lighting and smart cities, renewable natural
gas (waste to energy), P3, Power Purchase Agreements, microgrids, decarbonization and other areas
of innovation. This allows us to bring the best experts into the project in the most streamlined and cost-
effective structure.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 30
AMERESCO4
Responsiveness
Ameresco's projects are specifically designed from inception through the term of the contract to
mitigate client risk. In fact, with established performance assurances backed by long-term financial
solvency and longevity, clients are inherently sheltered from the risks that are often associated with
capital improvement projects.
Our quality assurance policy states that, "Ameresco will
attain 100 percent client satisfaction by providing
value-added innovative solutions that perform to their
requirements every time." Thus, quality is a core goal
to be addressed in an ongoing manner instead of simply #, , A
addressed at the completion of a project. - _ _
Clients who select Ameresco as their energy partner can
be certain that they are dealing with a company that recognizes the importance of delivering high-
quality products, systems and services. Our experience has taught us that the long-term success of any
project or relationship requires adherence to the quality process as a number one priority and must be
recognized as such at all levels in the organization. All Ameresco projects, regardless of size or scope,
receive the same level quality and dedication.
Long -Term Servicing
Local Ameresco staff will be involved with the project from inception, through completion, and
throughout the performance period. Many of our staff members have been with Ameresco for over a
decade, allowing our customers access to familiar names and historical information about their projects.
Our engineering, development, construction, and service staff will have knowledge of this project and
will be able to instantly answer concerns, respond to requests, and address any inquiries the City has
or will have years into the future. We are dedicated to our goal of being a long-term partner to help the
City achieve their goals, needs, and wants.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 31
AMERESCO4
Community Benefit
Ameresco has assisted clients with the organization of project dedications, groundbreaking
ceremonies, and ribbon cuttings; creation and/or dissemination of press releases and case studies;
educational presentations; tours and award submissions and presentations.
Throughout the project's different phases, Ameresco's diverse team members — account managers,
engineers, project managers, and subcontractors — are happy to be examples of individuals working in
the clean energy economy by participating in events around the community, such as Earth Day
activities, local energy expositions, and school and community events.
Ameresco Solar Wagon at a Costa Mesa, CA 316 of July Event
Ameresco also provides a comprehensive marketing program
to showcase the vision, leadership, and environmental
stewardship of our customers. Outreach activities, at the City's
discretion, can include:
• Marketing: Promote the City's efforts via various media
outlets; dedication and press events; and tradeshows.
• Media Relations: Generate positive press and goodwill
in local, regional, and national media through articles,
interviews, and press releases.
• Community Affairs: Engage the community for support
and communicate the City's overall project objectives.
• Awards: Submit relevant projects for high profile awards.
e
community at a City of Phoenix Earth Day Event
• Case Studies: Draft case studies and project fact sheets that
communicate the City's commitment and promote their
environmental achievements.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 32
AMERESCO4
Phase 1 Project Priorities
Description of Measures, Existing Conditions, Proposed
Improvements
Approach to Addressing the City's Priorities for Phase 1
Ameresco has documented most of the existing conditions for the facilities identified for this Phase 1
project. We have developed costs and savings using actual vendor pricing and internal pricing
estimating tools to closely estimate the costs and savings associated with the various measures
proposed for the facilities. During the detailed IGA phase, Ameresco will refine these numbers by
obtaining additional subcontractor bids, firm equipment and material pricing, and calculate energy
savings using advanced modeling and simulation tools.
Existing Building Automation Controls and Findings
(City Hall, Garvey Community Center, Rosemead Park Playschool, Rosemead Community
Recreation Center, Garvey Park Clubhouse / Recreation Office)
Much of the City's HVAC equipment is in need of
replacement, and all building systems could greatly benefit
from an advanced Building Automation System (BAS). In
general, City of Rosemead HVAC systems are controlled
using individual thermostats to monitor temperature at the
given space, as well as timers for certain areas which
indicates there is a significant opportunity to reduce energy
consumption through the installation of a modern BAS.
Thermostats with Timers as Observed
After processing and analyzing building interval data, several in Four (4) Facilities
observations were made that are likely due to the lack of a building controls system. For example, at
City Hall the HVAC systems appear to run well before and after normal operating hours (Figure 4). Per
the "heat map" in Figure 4, the white and orange coloring shows increased electricity consumption
through the evening, in some instances up until 11:OOPM. A BAS system will be able to turn down or
turn off these HVAC systems when occupants are not present, but allow for short override abilities to
allow for a predetermined run time if there are occupants working late and in need of conditioning.
This increased, potentially unnecessary, usage is happening during periods of the day that have the
highest cost of electricity. Developing and implementing a BAS could greatly reduce this undue usage,
saving the City a substantial amount of money.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 33
Potential
Savings
Opportunitlesfi
AA;�T.%?AxA• A3S
Potential
Savings
Opportunities
AMERESCO4
Figure 4. City Hall Heat Map (by day)
ru•
unP
YOY
24]P
P19P
•Ifr•
.nae
.P.,r
.PI -01
.PNr
City Hall also appears to have higher electrical consumption outside summer months, which is unusual
given that heating was observed to be supplied by a gas furnace. An investigation of what is
contributing to the high consumption during these periods could lead to an opportunity for significant
savings (Figure 5). An advanced BAS can mitigate unintended usage and waste.
ROSEMEAD CITY HALL, 8002496643
kwhr heat reap
Figure 5. City Hall Heat Map (by month)
Additionally, the Garvey Community Center has a substantial amount of run hours from midnight to
approximately 3:00 AM on many days (Figure 6), which are outside of operating hours.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 134
v>r
!�1213AM
1 WAM
2""
.MAM
S 15AM
1 AM
A$ AM
M AM
O13AM
1XAM
IL
2-0SMI
MMI
15V
W I`U
ASPM
MMA
A.IspM
i
vwaM
iosru
Figure 4. City Hall Heat Map (by day)
ru•
unP
YOY
24]P
P19P
•Ifr•
.nae
.P.,r
.PI -01
.PNr
City Hall also appears to have higher electrical consumption outside summer months, which is unusual
given that heating was observed to be supplied by a gas furnace. An investigation of what is
contributing to the high consumption during these periods could lead to an opportunity for significant
savings (Figure 5). An advanced BAS can mitigate unintended usage and waste.
ROSEMEAD CITY HALL, 8002496643
kwhr heat reap
Figure 5. City Hall Heat Map (by month)
Additionally, the Garvey Community Center has a substantial amount of run hours from midnight to
approximately 3:00 AM on many days (Figure 6), which are outside of operating hours.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 134
AMERESCO4
Weekdays Weekends
cx z tnvestigata
iY
Investigate Y. n+m �' w 1Z SAM
I$15AM .1419 150AM
1.50 AM .uq9 7ASAM
215 AM 4.00 AM
400AM sm
5.15AS1 a-11 595AM
5:00AM
630AM ]ASAM
T:15AM u.0 9A0AM
900AM lore 1015 AM
101SAM y,u I430AM
nMAM �y -+21S PM
Advertised 0 1z.soM .
,@ 200 PM^• 310 PM
Hours j 15 PM 315M
e
.WPM 00PM
SASPM
545 PM ••a 790M
rw PM •i-1 &ASPM
6FM .nr 10M
9M
PM 191545PM
t04S PM I150 PM
15i PM
Figure 6. Garvey Community Center Heat Map (by day)
This happens not only in the summer but is observed to occur throughout the entire year (Figure 7).
GARVEY COMMUNITY CENTER, 8002280752
kwhr heal Inap
I . 1, - i
Figure 7. Garvey Community Center Heat Map (by month)
Commissioning the controls and enhancing control sequences will allow the HVAC system to better
respond to occupant needs and save energy at the same time. Since Ameresco does not manufacture
any equipment and is therefore not beholden to internal pressures to utilize one product, we can
identify and implement improvements using the best products on the market, offering significant value
to the City. We suggest products based on their cost, maintainability, features, and ability to integrate
with existing systems. This will allow the City to make informed decisions and select the best products.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 35
AMERESCO4
HVAC Systems
Heating, ventilation and air-conditioning (HVAC) equipment consumes 40% to 50% of a building's total
energy consumption on average. To maximize a building's energy efficiency, HVAC system
optimization should be prioritized over other end -uses. Utility bill and interval data analysis and a walk-
through audit provided the information necessary to determine the magnitude of potential savings
achievable. Based on specific information gathered for the identified buildings and an analysis
completed on the utility data, the following energy conservation measures (ECMs) were developed.
These ECMs represent HVAC equipment replacement and controls optimization measures. The
primary intent is to replace equipment that is currently failing or near the end of service life, including
equipment such as chillers, pneumatic controls, pumps, split systems, and outdoor package units.
City Hall Existing Conditions
City Hall uses a chiller system to cool during the hot seasons and a packaged unit to heat during the
cold seasons. These units are well beyond their end of life and need to be replaced. The chiller system
utilizes a refrigerant that is no longer available, and the age of this chiller could lead to imminent failure,
with refrigerant and parts being scarce or no longer available.
Numerous options exist for the revitalization of City Hall's HVAC system. Equipment can be replaced in
a like -for -like fashion, or a consolidated central plant system can be designed and installed to service
the building instead of the multitude of systems currently utilized. Substantial savings can be realized
due to efficiency increases and lower maintenance costs, alongside improved occupant comfort.
Table 3. City Hall Equipment List
r � r
rr r
Make Model No. Serial No.
Carrier 30HWBG40 781897
Chiller 40
Ton
1998
Air Handler Unit
10
HP
2000
AirDyne RMG-45 1258
Cooling Tower
40
Ton
1999
RSD RSD 040 9887
Packaged Unit
10
Ton
2000
Carrier 48HCDD12 2512G50229
180,000 1410
BTU/Hr
Figure 8. City Hall Equipment
The existing pneumatic air handling unit (AHU) will be upgraded to direct digital control (DDC), allowing
for improved function and elimination of the existing air compressor. Unlike pneumatic systems that rely
on compressed air to control HVAC equipment, DDC systems use digital microcontrollers for precise
and reliable control. This upgrade offers several advantages, including enhanced energy efficiency,
reduced maintenance costs, and the ability to remotely monitor and adjust system parameters.
Additionally, DDC systems provide better occupant comfort through more accurate temperature and
humidity control, and they enable early fault detection, which can prevent costly downtime.
City of Rosemead, California
Comprehensive Ci"de Energy Program
Evaluation Criteria 36
AMERESCO4
Figure 9 Existing Pneumatic Controls at City Hall
PnT!'
�urnallc .........
�
can - -
_ a - -
Figure 10 Conversion of Pneumatic Controls to DDC
Garvey Community Center Existing Conditions
Garvey Community Center has twelve (12) heat pumps and four rooftop package units that are
approximately 24 -years old, with local thermostats around the facility and timers. It is probable that a
like -for -like replacement option is the best -case scenario for this facility and is the option reflected in the
provided pricing, though other options will be investigated to identify the best solution. A variable
refrigerant flow (VRF) unit could take the place of the condenser units scattered throughout the roof,
reducing the number of units that require maintenance while improving overall building efficiency.
Table 4. Garvey Community Center HVAC Equipment List
Heat Pump
3
Ton
2001
Carrier
38YCC036
0701E23124
Heat Pump
3
Ton
2001
Carrier
38YCC036
2101E04670
Heat Pump
5
Ton
2001
Carrier
38YCC060
500lE05244
Heat Pump
5
Ton
2001
Carrier
38YCC060
500lE05279
Heat Pump
3
Ton
2002
Carrier
38YCC036
1002E30987
Heat Pump
4
Ton
2001
Carrier
38YCC048
4601E00953
Heat Pump
3
Ton
2002
Carrier
38YCC036
1002E31001
Heat Pump
5
Ton
2001
Carrier
38YCC060
500lE05305
Heat Pump
5
Ton
2001
Carrier
38YCC060
500lE05236
Heat Pump
3
Ton
2001
Carrier
38YCC036
2101E04678
Heat Pump
3
Ton
2002
Carrier
38YCC036
1002E30978
Heat Pump
3
Ton
2002
Carrier
38YCC036
1002E30992
Packaged Unit
12.5
224,000 180,000
Ton
BTU/Hr
2001
Carrier
48TFD014
2401634115
Packaged Unit
275,000 222,0750
BTon
2001
Carrier
48HJD025
4501F22352
Packaged Unit
1.5
Ton 1
2002
Carrier
48GSH0180
0802(330512
City of Rosemead, California Evaluation Criteria 37
Comprehensive Citywide Energy Program
AMERESCO4
Table 4. Garvey Community Center HVAC Equipment List
Figure 11 Garvey Community Center RTU and Heat Pumps
Rosemead Community Recreation Center Existing Conditions
The Rosemead Community Recreation Center has nine (9) rooftop packaged units that are
approximately 14 -years old and are close to their end of life, with local thermostats around the facility
and timers controlling operating hours of the units. It is probable that a like -for -like replacement option
is the best -case scenario for this facility and is the option reflected in the provided pricing, though other
options will be investigated to identify the best solution.
Tahip 5. Rnsemead Community Recreational Center HVAC Equipment List
Packaged Unit
40,0011 32,600 BTU/Hr
Ton 2012 Carrier
BTU/Hr
48HCDD08
1712610133
125,000 103,000
Packaged Unit
3 Ton
2002
Carrier
48GSN0360
1202631004
60000 48,000 BTU/Hr
Figure 11 Garvey Community Center RTU and Heat Pumps
Rosemead Community Recreation Center Existing Conditions
The Rosemead Community Recreation Center has nine (9) rooftop packaged units that are
approximately 14 -years old and are close to their end of life, with local thermostats around the facility
and timers controlling operating hours of the units. It is probable that a like -for -like replacement option
is the best -case scenario for this facility and is the option reflected in the provided pricing, though other
options will be investigated to identify the best solution.
Tahip 5. Rnsemead Community Recreational Center HVAC Equipment List
Packaged Unit
7.5
Ton 2012 Carrier
BTU/Hr
48HCDD08
1712610133
125,000 103,000
Packaged Unit
4
Ton
2012
Carrier
48HCLA05
1612080412
60,000 50,000
BTU/Hr
Packaged Unit
4
Ton
2012
Carrier
48HCLA05
1612080411
60,000 50,000
BTU/Hr
Packaged Unit
10
Ton
2012
Carrier
48HCDD12
1712G10183
180,000 148,000
BTU/Hr
Packaged Unit
7.5 Ton
2012
Carrier
48HCDD08
1712610134
125,000 103,000 BTU/Hr
Packaged Unit
10 Ton
2012
Carrier
48HCDD12
1712G10184
180,000 148,000 BTU/Hr
Packaged Unit
5 Ton
2012
Carrier
48HCL06
1612080422
60,000 50,000 BTU/Hr
Packaged Unit
5 Ton
2012
Carrier
48HCL06
1612080421
60,000 50,000 BTU/Hr
Packaged Unit
15 Ton
2012
Carrier
48HCDD17
2912U32338
220,000 178,000 i B
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 38
AMERESCO4
Jti
Figure 12 Rosemead Community Recreational Center RTUs
Garvey Park Existing Conditions
This facility has three (3) rooftop package units that are approximately 26 -years old, with local
thermostats around the facility. It is probable a like -for -like replacement option is the best -case scenario
for this facility and is the option reflected in the provided pricing, though other options will be
investigated to identify the best solution.
Tahla s- Garvev Park HVAC Eauioment List
Figure 13 Garvey Park RTU's
Rosemead Park Playschool Existing Conditions
This facility is a small single -story building in the middle of Encinita Elementary School and the
Rosemead Park Playground. Activities around arts and crafts, music stories, numbers, shapes, and the
alphabet are being held here for young children. Ameresco was not able to accurately obtain information on
the existing conditions of this facility. Due to this, we have not proposed any cost and savings estimates for
this facility to avoid inaccuracies. Lighting and HVAC retrofits are a likely opportunity, but the accurate
potential will be assessed during the IGA and priced and modeled accurately at that time.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 39
Packaged Unit
2.5
Ton
1998
Carrier
48SX-030
4798611343
40,000
32,400
BTU/Hr
Packaged Unit
1.5
Ton
1999
Carrier
8GS-018
1099610331
40,000
32,600
BTU/Hr
Packaged Unit
8.5
Ton
1999
Carrier
48HJD009
1199630366
125,000
102,500
1 BTU/Hr
Figure 13 Garvey Park RTU's
Rosemead Park Playschool Existing Conditions
This facility is a small single -story building in the middle of Encinita Elementary School and the
Rosemead Park Playground. Activities around arts and crafts, music stories, numbers, shapes, and the
alphabet are being held here for young children. Ameresco was not able to accurately obtain information on
the existing conditions of this facility. Due to this, we have not proposed any cost and savings estimates for
this facility to avoid inaccuracies. Lighting and HVAC retrofits are a likely opportunity, but the accurate
potential will be assessed during the IGA and priced and modeled accurately at that time.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 39
AMERESCO4
Figure 14 Rosemead Park Playschool
LED Lighting Existing Conditions - All Facilities, Rosemead Park, Garvey Park
After reviewing the City's Capital Improvement Project, we learned that several programs were
identified to address the lighting facility of the City. Below are a few of these items that we have
assessed and will further be studied and evaluated.
Building Interior/Exterior
Second to HVAC, lighting consumes energy at the next highest level — at around 10% to 15% of total
consumption in buildings. Although most of the interior and building exterior lamps are already
upgraded to LED technologies, a few more CFL units were seen left inside and outside office buildings,
recreational centers and park offices and its restrooms. Lighting consumption can further be reduced
by applying the appropriate controls to turn the units off when not in use.
City of Rosemead, California Evaluation Criteria 40
Comprehensive Citywide Energy Program
AMERESCO4
Figure 15 Rosemead Community Recreation Center Exterior Lighting
Figure 16 Pool Restroom Lighting
Figure 17 Garvey Community Center Restroom
City of Rosemead, California Evaluation Criteria 1 41
Comprehensive Citywide Energy Program
AMERESCO<4
Rosemead Park and Garvey Park
Going around the parks, it was observed that lamps used at the tennis courts, baseball and football
fields are still the high wattage and inefficient metal halide. Replacing these units with LED lamps or
fixtures can significantly reduce electricity consumption and costs since these lights are being used
during times of peak rates. Please see Figure 22 below from SCE bill showing the Time of Use rates
applicable to exterior lighting.
Garvey Park Tennis/Pickle Ball Court
iV J Y..
1 O&M
MIL
An0
a MW
J!. aft
Figure 18 Garvey Park Tennis/Pickle Ball Court Proposed Lighting Retrofit
City of Rosemead, California Evaluation Criteria 42
Comprehensive Citywide Energy Program
AMERESCO40
Garvey Park Baseball Field
Garvey Park Field
Figure 19 Garvey Park Baseball Field
Figure 20 Garvey Park Open Field
City of Rosemead, California
Comprehensive Citywide Energy Program
7.
Evaluation Criteria 1 43
AMERESCO4
Figure 21 Garvey Park Lighting Retrofit
Your cost varies by time of day
OWinter cost perlods (Oc101-May 31)
Wxkdays WeeksMs 6 Itolldays
4pm-9p,
Off peak 12am -8am 12am-Sam
go. -12am Spin -12.
Supwofl peak 8am-4pm Bum-4pm
ON Usage
®Avg. cost
kwh
Md peak x $0.20286
Off peak
M
x $0.13416
Supef off peak
x $6.09654
Your cost varies by time of day
JO Summer cost perlods(Jun 01 -Sep 30)
Workdays Weekaks B aolMsys
Mdpeak sure -Spm
OO peak 12am-4pm 12am-4pm
9pm - 12am 9pm - 12am
/T Usage
Wyk
® Avg. cost
x
Meklpsake""r
. $0.33176
orpmk
• $0.20266
Figure 22 Southern California Edison Peak and Off -Peak Time and Rate
Rosemead Park Walkway Lighting
The City's largest park, Rosemead Park and Aquatic Center, includes a 1/2 -mile trail. This park
walkway provides pathway lighting fixtures for walkers to use after sunset. The pathway lighting
includes more than 50 units. We propose to replace the existing lamps with LED equivalent.
Figure 23 Rosemead Park Walkway
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 44
AMERESCO40
LED Traffic Signals — Citywide
Ameresco drove through the City to identify the presence of non -LED traffic signals. Most of the
existing traffic signal lamps have already been converted to LED, though there was one instance where
a non -LED traffic signal is present (Mission Dr. and Encinita).
To further validate our findings, Ameresco contacted a representative from Republic Electric, the
company who maintains the City's traffic signals. They stated that all lamps have already been
converted to LED. Though this contradicts our finding of one non -LED traffic signal, we believe that
most traffic signals have already been upgraded, thus a very small opportunity exists for conversion.
A sampling of the City's traffic signal lights (included below) show that a number of the 42 intersections
already employ the more efficient LED bulbs. Ameresco has not proposed costs and savings for this
measure due to the unknown quantity of existing non -LED fixtures remaining but will identify savings
and costs during the IGA.
City of Rosemead, California Evaluation Criteria 45
Comprehensive Citywide Energy Program
AMERESCO4
cuy or Ro9amn9a
"."I sg,ul lnvenwry Summary spM
l ra.l ImY.,.slrenxurR YmNA94We RNn 99WWw �We_.rs• _ npa4 eR.m sNl a.=RX - — c�
Figure 25 Rosemead Traffic Signal Inventory Summary Sheet
City of Rosemead, California
Comprehensive Citywide Energy Program
Rosemead City Traffic Signal
Evaluation Criteria 146
1YNAVp,Y(!.i Y <3 ^JIH •4.
ISM
Y S
( AR
Y
VNAVFNII
' Dfy W. A E\tE .J' Ism n.�R6�F19-
G Ai S_LIAAL'eRtR=�
_ Ii63
A'i
]JI]
F
Y4
\`
Y 5
Y S
C0.'R�
R
ACNE
CLAR
YY
s W L VWfibl
_
A ATYAiN NF
_
]YA-
V'F
6
E
CURV
Gt A]L41YiYCpIYYN?f 4[]
a AV
'V]
YEF
Moo
M'E9b
SE,
SE,a
5"
Y
s 4MWYA - r nv a
+'1__
ws
FOIE>P1VY
p C AT J°f1Ri AVfILF
YES
YE4
LACVR
._
_
+[ 69RVNA 4Y 9B.tiADHA(FIRIVLR AVEXYE
-rvl]
Y-9
3
1' G•1YEYAVN:E•13VIO.NRLL BdAEVMN _ _
YF6
'E6
to
•5Y _,
.
1] GA A ATW MIIWOY6 '
IXA Ar x • SW AVEMI
1�
3
YE
r3
OAIt_
Se!MV
99x.�
gwrY.-u
14 XA A J•CR6 AV['
11
„ 1_.
W
_
AA
YES
a
_C
S
1 W6lW
Y
_L�r1Y
g
1] LXbSrCX DPVF •l WA' �tVENF
V:b
L• O•.
_fy'A_R_Y
ie 45X)Y Dzw x. x ._wil.
Y S=
-
WP MYE VEV
YES
-ES Y6Z
_
VE4
U[OtR
CL
gL
NQSEL3WL6VAINLAIXLWOERNA\'61R,fET
WN_
b
YESS YES
L1C61R
-
1j'
[jjYX0.lNARn -
TY.
YlOni _
149]
—
s
1'EYESUC6x
s
.Y 6OD =VM Al lAA-S
+
LKOIE
CLAXV
a
y •1 iA
eYEE
_
APr
A Vlll d =VARJ Ai rVA9 AVFIAIE
x v ! L
_
11
—
E
C0.e
RY
H Vfl B YAVON NRSIdIW VEI WG XdIMI AV9IDE
]]04
WE
Y6S
1EYES
CLMY
»It
MY
b
i3CO_AE�
fl RX
y -•n AVEUE
..
Y•S
M
J1C5
If RVr•I�Q.�TWf1..WiCXOVE
RI
YE'
N Idl • IWLiWEE AT =LMC W 1 FlldbiR�=
YES
_ NQ41
H
J]rW NIOX Al UA V
+S
5
__
_
____
IIII WO •\ •TX TOTI 1991 3f
W.ftl
1
-
YE5
IYTIH
... -
.
WXIi S-Rffi
•T
Ala
K_R
IS
SOJAI
�MOPY4 SW OA9R{L9W.FVn901 WIp6Yl_ LNIC
1
YE6
{AR
q W0.A3116ROh Ptl= kAJ�I WAIY— X�
MK
ES
Pari_
Y
11MM411W
Figure 25 Rosemead Traffic Signal Inventory Summary Sheet
City of Rosemead, California
Comprehensive Citywide Energy Program
Rosemead City Traffic Signal
Evaluation Criteria 146
AMERESCO40
Pool Control Systems
Rosemead Park Aquatic Center - Existing Conditions
Ameresco identified that the City has already installed a Smart Pump Control System, making the pool
control system itself efficient. Given this, Ameresco is not proposing any controls improvements at this
time. For heating, the boiler utilizes a non -condensing boiler which appears to still be in good condition.
`SI'CS
Figure 27. Existing Solar circulating pump and Smart Pump Control System
C7
Ameresco noticed an existing solar pool heating system (about 13 years of age) that does not seem to
be operating. Solar pool heating is an excellent opportunity to utilize the sun's energy. Upgrading to a
newer solar pool heating system will help save on energy costs and reduce the reliance on natural
gas. Ameresco has provided pricing and savings for this improvement, included in the Pricing Section.
Current solar pool heating systems use evacuated tube collectors to heat the pool. These systems
operate well regardless of outdoor temperature or even during low insolation periods such as cloudy
days or during the early morning or late evening hours. The systems are closed loop and require
approximately ten times less pumping energy than a traditional system, significantly reducing the cost
of the system and reducing CO2 emissions from natural gas heating and electricity.
Figure 28. Existing Solar Pool Heating System
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 47
AMERESCO4
If solar pool heating is not desired, the existing seating area shade structures could be repurposed for
solar photovoltaic (PV) panels to offset the electricity consumption. Both options will be investigated
and compared. The solar circulating pump appears to be leaking and in bad condition, repairs will be
recommended to save on water usage.
Garvey Park Splash Zone — Existing Conditions
At Splash Zone, the pool system was found to be in excellent condition. Regular maintenance and
timely upgrades have ensured the longevity and efficiency of the system. The water quality was
consistently maintained, and the filtration system was operating optimally. All pumps were already
equipped with Variable Frequency Drives (VFDs) which help in optimizing energy usage by adjusting
the motor speed to match the required load. The current boiler system is adequate for the pool's
heating needs, and no immediate replacements or upgrades are necessary. However, upgrading to a
higher efficiency boiler would help save energy. Given the current state of the pool system, the potential
for additional energy savings is minimal. The existing VFDs on the pumps and the well-maintained
boilers already contribute significantly to energy efficiency. Ameresco has not proposed controls
improvements at this time, but opportunities will be uncovered during the IGA phase.
Figure 30. Existing Pump Condition
City of Rosemead, California Evaluation Criteria 1 48
Comprehensive Citywide Energy Program
AMERESCO4
Solar PV Canopies — Rosemead Park, Garvey Park
This renewable energy measure would install new carport canopy solar photovoltaic (PV) systems at
Garvey and Rosemead parking lots. This measure would provide onsite renewable energy to serve the
loads and offset the amount of electricity purchased from the grid. An indirect benefit of this measure is
the shade provided for the vehicles that park under the canopy, helping to keep the vehicles cooler,
especially during the summer months.
Numerous financing methods exist to provide additional benefit for the City. Ameresco can present
ownership options to assist with the selection of the best option to meet the City's needs.
Figure 31. Proposed 72 kW Solar PV Carport System at Rosemead Park
City of Rosemead, California Evaluation Criteria 49
Comprehensive Citywide Energy Program
O?- r
® M -3l
on am
I0i1:::)
AMERESCO4
Figure 32. Proposed 72 kW Solar PV Carport System at Garvey Park
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 150
AMERESCO40
Phase 1 Project Cost Breakdown
Below is a summary of the improvements identified for the Phase 1 project.
Table 7. Phase 1 Energy Conservation and Carbon Reduction Measure Matrix
HVAC and Building
Building Automation Controls
x x x x x
Cooling Tower Replacement
x
Chiller Replacement
x
Replace Package and Split Type Units
x x x x x
Lighting
Field/Sports Lighting
x x
Tennis Court Lighting
x
Park Walkway Lighting
x
Pool Control
Solar Hot Water Pool Heatinq
x
Solar PV
Solar PV Carports
x x
Table B. Phase 1 Energy Conservation and Carbon Reduction Measure Cost and Savings
City of Rosemead, California Evaluation Criteria 51
Comprehensive Citywide Energy Program
Energy
O&M
Energy
Energy Conservation
Measures (ECMs)
Costs
Savings
Savings
savings
Annual
Savings
PaybackECM
City Hall
$530,967
16,924
31
$8,534
$14,927
36
Garvey
Community
$614,775
43,180
213
$9,881
$24,812
25
Center
Rosemead Park
TBD
TBD
TBD
TBD
TBD
TBD
Playschool
HVAC a, Building
Automation
Rosemead
Community
$390,938
14,987
189
$6,283
$13,230
30
Controls
Recreation Center
Garvey Park
Clubhouse /
$128,728
6,817
164
$2,072
$5,726
22
Recreation Office
All Facilities
N/A
N/A
N/A
N/A
N/A
N/A
LED Lighting
Rosemead Park
$1,584,133
70,519
N/A
N/A
$29,688
53
Garvey Park
$763,522
30,890
N/A
N/A
$18,866
40
City of Rosemead, California Evaluation Criteria 51
Comprehensive Citywide Energy Program
AMERESCO4
cnncanrefinn and r.nrhnn Reduction Measure Cost and Savings
LED Traffic Signals
Citywide
TBD
TBD
TBD
TBD
TBD
TBD
Rosemead Park
$254,380
N/A 10,403
N/A
$13,575
19
Pool Control
Aquatic Center
Systems
Garvey Park
TBD
TBD TBD
TBD
TBD
TBD
Splash Zone
Rosemead Park
$449,203
104,649 N/A
N/A
$12,575
36
Solar PV Canopies
Garvey Park
$449,203
106,592 N/A
N/A
$17,722
25
Total $5,165,849 394,559 11,000 $26,770 $751,121
Preliminary Costs, Energy Savings, Funding Options/Financing Approach
The costs and savings for the improvement measures were priced using actual material and labor
costs, providing the City of Rosemead with high -confidence estimates.
For all measures identified for Phase 1 and 2, Ameresco will work with SoCaIREN, CEC, and Utility
programs to identify rebates, incentives, and no/low-cost financing options. Please reference the
Financing Capability section for a list of opportunities and financing options. We will also deploy our
Grant Proposal Team to identify and apply for available or custom grant funding opportunities to help
pay for or partially fund these improvements.
Outside of the financing, funding, and other opportunities, we can offer alternative financing solutions
for some or all of the proposed measures including but not limited to: Power Purchase Agreement
(PPA), Energy as a Service (EaaS), Tax Exempt Lease Purchase (TELP), and others.
HVAC & Building Automation Controls
Ameresco conducted engineering calculations utilizing typical weather data to align the metered data
with average weather conditions. This process involved using existing equipment SEER, EER, and
COP values, applying EER degradation calculations, and comparing these with new equipment SEER
values to ascertain post -retrofit electrical usage. Pricing was developed using a quotation for replacing
the identified systems, giving the City highly reliable cost estimates.
LED Lighting
Computation of savings from lighting system retrofit were computed by calculating the difference in the
wattage of the previous technology versus new, multiplied by the number of hours the system is being
used. Ameresco developed the pricing for this measure by requesting and utilizing an actual quotation
for the proposed improvements. Again, providing the City with costs that are of a high level of
confidence.
LED Traffic Signals
Per our discussion of existing conditions earlier, our in-person findings show that most of the traffic
signals have been converted to LED. Only one instance of a non -LED traffic signal was identified. Due
to the unknown quantity of non -LED traffic signals, Ameresco has not included costs or savings for this
City of Rosemead, California Evaluation Criteria 1 52
Comprehensive Citywide Energy Program
AMERESCO4
measure. During the IGA, Ameresco will perform a detailed audit of all existing traffic signals and
identify opportunities to convert any non -LED signals to LED.
A Project Data sheet was found that details the needs for the Traffic Signal Controllers. Ameresco can
implement this scope along with the larger project, if desired.
Pool Control Systems
Ameresco estimated savings calculations given existing boiler information, square footage of the pool
and location for the Solar Hot Water pool system. Since existing controls were in place, no additional
controls were deemed necessary at this time and have not been priced. We did not receive bills for
natural gas usage to determine usage so average $/therm and boiler nameplate information were used
to calculate savings.
Solar PV Canopies
Ameresco performed engineering calculations using Helioscope and Energy Toolbase modeling
software to simulate the solar PV system production and model the energy and costs savings, taking
into account historic usage and weather data, system performance, and electric Time of Use (TOU)
profile.
Costs were developed using internal pricing estimating tools and accurate product pricing, providing a
high level of confidence.
City of Rosemead, California Evaluation Criteria 1 53
Comprehensive Citywide Energy Program
AMERESCO4
Phase 1 Project
City Hall
Table 9. City Hall ECM Cost and Savings
*Interior LED lighting retrofit has alreaay Deen perrormea at erns racnny.
Garvey Community Center
Table 10. Garvev Communitv Center ECM Cost and Savings
Payback
(years)
Energy
Conservation
ECM Costs ($)
Energy
Savings (kWh)
Energy
Savings
0&M Savings
($)
Total Annual
Savings (5)
Measure
Energy
Savings (kWh)
Energy
Savings
I
(therms)
Total Annual
Savings ($)
Payback
(years)
Measure
HVAC & Building
$530,967
16,924
31
$8,534
$14,927
36
Automation
43,180
213
$9,881
$24,812
25
Controls
Controls
Automation
TBD
TO
TBD
TBD
*Interior LED lighting retrofit has alreaay Deen perrormea at erns racnny.
Garvey Community Center
Table 10. Garvev Communitv Center ECM Cost and Savings
*Interior LED Lighting retrofit has already been performed at this tacnity.
Rosemead Park Playschool
Table 11. Rosemead Park Playschool ECM Cost and Savings
Rosemead Park Playschool
Garvey Community
Energy
Energy
Conservation
ECM Costs ($)
Energy
Savings (kWh)
Energy
Savings
I
0&M Savings
(5)
Total Annual
Savings ($)
Payback
(years)
Measure
Savings
($)
(therms)
Measure
$390,938 14,987
189
HVAC & Building
Automation
$614,775
43,180
213
$9,881
$24,812
25
Controls
Automation
TBD
TO
TBD
*Interior LED Lighting retrofit has already been performed at this tacnity.
Rosemead Park Playschool
Table 11. Rosemead Park Playschool ECM Cost and Savings
*Ameresco was notable to visit this facility; nowever, from me sateuae view, one ruin wp Ulul was UUsei vcu anu
over 10 years old. During the IGA phase, Ameresco can conduct a further review of the facility
Rosemead Community Recreation Center
Table 12. Rosemead Community Recreation Center ECM Cost and Savings
Rosemead Park Playschool
Recreation Center
Energy
ECM Costs IS)
Energy
Energy
0&M Savings
Total Annual Payback
Conservation
Savings (kWh)
Savings
($)
Savings (5) (years)
Measure
$390,938 14,987
189
(therms)
$13,230
30
HVAC & Building
Automation
TBD
TO
TBD
TBD
TBD
TBD
Controls*
LED Interior
TBD
TBD
TBD
TBD
TBD
TBD
Li hfin
*Ameresco was notable to visit this facility; nowever, from me sateuae view, one ruin wp Ulul was UUsei vcu anu
over 10 years old. During the IGA phase, Ameresco can conduct a further review of the facility
Rosemead Community Recreation Center
Table 12. Rosemead Community Recreation Center ECM Cost and Savings
*Interior LED lighting retrofit has already been performed at this facility.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 54
Rosemead Community
Recreation Center
Energy
Conservation
ECM Costs ($) Energy
Savings (kWh)
Energy
Savings
0&M savings
(5)
Total Annual
Savings($)
Payback
(years)
Measure
(therms)
HVAC & Building
Automation
$390,938 14,987
189
$6,283
$13,230
30
Controls
*Interior LED lighting retrofit has already been performed at this facility.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 54
AMERESCOc
Garvey Park Clubhouse / Recreation Office
Table 13. Garvey Park Clubhouse / Recreation Office ECM Cost and Savings
*Interior LED lighting retrofit has already been performed at this facility.
Rosemead Park and Rosemead Park Aquatic Center
Table 14. Rosemead Park/Aquatic Center ECM Cost and Savings
Garvey Park ' Office
Rosemead Park/Aquatic
Energy ECM Costs ($) Energy Energy
Conservation Savings (kWh) Savings
0&M Savings
($)
Total Annual
Savings (E)
Payback
(years)
Measure (therms)
ECM Costs (E)
Energy
Savings
(kWh)
Energy
Savings
(therms)
RVAG & Building $128,726 6,817
164
$2,072
$5,726
22
Automation
N/A
$29,688
53
Pool Control
Controls
N/A
10,403
N/A
$13,575
*Interior LED lighting retrofit has already been performed at this facility.
Rosemead Park and Rosemead Park Aquatic Center
Table 14. Rosemead Park/Aquatic Center ECM Cost and Savings
*Ameresco identified that the existing pool system already has a Smart Pump Control System (SPCS). solar not Water Healing
has been proposed and priced here.
Garvey Park and Garvey Park Splash Zone
Table 15. Garvey Park/Splash Zone ECM Cost and Savings
Rosemead Park/Aquatic
Center
Zone
Energy
Conservation
Measure
ECM Costs (E)
Energy
Savings
(kWh)
Energy
Savings
(therms)
0&M Savings
(E)
Total Annual Payback
Savings (E) (years)
LED Lighting
$1,584,133
70,519
N/A
N/A
$29,688
53
Pool Control
$254,380
N/A
10,403
N/A
$13,575
19
Systems*
40
Pool Control
TBD
TBD
TBD
TBD
Solar PV
$449,203
104,649
WA
N/A
$12,575
36
Canopies
Solar PV
$449,203
106,592
N/A
N/A
*Ameresco identified that the existing pool system already has a Smart Pump Control System (SPCS). solar not Water Healing
has been proposed and priced here.
Garvey Park and Garvey Park Splash Zone
Table 15. Garvey Park/Splash Zone ECM Cost and Savings
*Ameresco identified that the existing pool has VFDs already installed at this tacdny. runner tCms were not ioenoneu at uns
moment.
Citywide
Table 16. City Wide LED Traffic Signal Cost and Savings
City Wide
Garvey Park/Splash
Zone
Energy
Conservation
Energy
Conservation
ECM Costs($)
Energy
Savings
Energy
Savings
0&M Savings
($)
Total Annual
Savings ($)
Pay ac
(years)
Measure
(kWh)
(therms)
LED Traffic
TBD
TBD
LED Lighting
$763,522
30,890
N/A
N/A
$18,866
40
Pool Control
TBD
TBD
TBD
TBD
TBD
TBD
Systems*
Solar PV
$449,203
106,592
N/A
N/A
$17,722
25
Canopies
*Ameresco identified that the existing pool has VFDs already installed at this tacdny. runner tCms were not ioenoneu at uns
moment.
Citywide
Table 16. City Wide LED Traffic Signal Cost and Savings
*Ameresco was not able to identify how many traffic signals lights still neeo to oe retronneo at tnts time. uwmg me iuN Pndac,
Ameresco can make the necessary evaluation and come up with the potential savings and cost of the LED conversion for this
measure.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 55
City Wide
Energy
Conservation
ECM Costs ($) Energy
Savings (kWh)
Energy
Savings
0&M Savings
(S)
Total Annual
Savings ($)
Payback
(years)
Measure
therms
LED Traffic
TBD
TBD
TBD
TBD
TBD
TBD
Signals*
*Ameresco was not able to identify how many traffic signals lights still neeo to oe retronneo at tnts time. uwmg me iuN Pndac,
Ameresco can make the necessary evaluation and come up with the potential savings and cost of the LED conversion for this
measure.
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 55
AMERESCO4
Phase 2 Project Priorities
Description of Measures, Existing Conditions, Proposed
Improvements
Approach to Addressing the City's Priorities for Phase 2
The new ECMs and locations identified in Phase 2 Project Priorities will allow Ameresco an opportunity
to further investigate potential savings for the City. Some of the measures proposed can be priced and
developed by Ameresco at this time, but others will require a further investigation during the IGA phase.
As in Phase 1, Ameresco will conduct a bill and interval data analysis, gather relevant data from
maintenance personnel and perform a detailed audit of the facilities. Results of the study will then be
presented including equipment and material pricing and projected savings using modeling and
simulation tools.
HVAC & Building Automation Controls - River Yard
Ameresco did not have the opportunity to visit this facility. According to the City's Capital Improvement
Program, this site is expected to go through a major roof replacement. Therefore, at this time, it is
difficult to assess the condition of the equipment. During the IGA we can look at the facility and properly
select higher -efficiency equipment to be installed along with the new roof.
prolact TNM
Ne.
Roof Replacement at Public Works Office & Warehouse Building
31031
Category- rACI11TIFS Roqumtmg Dept PARKS& RICRFATION
Project Description
Justification
The project scope includes the replacement of existing metal
roof at the Public Works office & warehouse building.
The existing metal roof at the Public Works Office &
Warehouse Building has never been replaced since
the City purchased the propel ty 20 years ago . Leaks
have occurred over the years and the existing metal
roof are brittle and starting to fall apart. The
condition of the roof Is not sale to get on to make
necessary repalrs,
Location I Visual
I
Ir
a ]I
a •e V '
■
Figure 33. Public Works Office & Warehouse Building Roof Replacement CIP
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 56
AMERESCO4
LED Lighting - Citywide Parks
The City of Rosemead has numerous neighborhood parks for its constituents to use, namely: Sally
Tanner Park, Guess Park, Klingerman Park, Zapopan Park and Jay Imperial Park. Ameresco did not
generate pricing and savings as part of this proposal; however, we realize a few of these parks can
benefit from an upgrade to LED lighting. During the IGA, these parks will be audited in detail and
energy saving opportunities like park lighting retrofit and water conservation measures for the
restrooms will be identified and quantified.
Sally Tanner Park
Figure 34. Sally Tanner Park
Guess Park
Figure 35. Guess Park
City of Rosemead, California
Comprehensive Cityvnde Energy Program
Evaluation Criteria 1 57
AMERESCO40
Klingerman Park
Figure 36. Klingerman Park
Zapopan Park
zw
Figure 37. Zapopan Park
City of Rosemead, California Evaluation Criteria 1 58
Comprehensive Citywide Energy Program
AMERESCO4
Jay Imperial Park
Figure 38. Jay Imperial Park
Solar PV Canopies
This renewable energy measure would install a new carport canopy solar photovoltaic (PV) system at
the parking lot between City Hall and the Community Center. This measure would provide onsite
renewable energy to serve the building loads and offset the amount of electricity purchased from the
grid.
Sizing of the capacity of the solar carport will depend on the annual energy consumption of the two
buildings. Excess energy output of the system can be exported to the grid and will be compensated
based on the rate followed by the electric utility. This setup will enable each building to independently
manage its energy needs while contributing to the overall reduction of grid dependency.
An indirect benefit of this measure is the shade provided for the vehicles that park under the canopy,
helping to keep the vehicles cooler, especially during the summer months.
The solar PV carport systems proposed at the City Hall and Rosemead Community Recreational
Center could offset 98 percent of the facilities' electricity usage. Numerous financing methods exist to
provide additional benefit for the City. Ameresco can present ownership options to assist with the
selection of the best option to meet the City's needs.
City of Rosemead, California Evaluation Criteria 59
Comprehensive Citywide Energy Program
w7wr"Ar IL
NSP
AMERESCO4
Figure 39. Proposed Solar PV Carport Systems for City Hall and Rosemead Community Recreational Center
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria ! 60
Phase 2 Project Cost Breakdown
Below is a summary of the improvements identified for the Phase 2 project.
Table 17. Phase 2 Enerav Conservation and Carbon Reduction Measure Matrix
TBD
and SulitTvoe Units
Field/Sports Lighting TBD
Park Walkway Lighting TBD
Indoor/Outdoor Lighting from CFL to LED TBD
Lighting with Photosensor TBD
Solar PV
Solar PV Caroorts I x I x I Ph1
Table 18. Phase 2 Energy Conservation and Carbon Reduction Measure Cost and
HVAC 8 Building
Automation
River Yard
Controls
TBD
TBD
TBD
LED Lighting
Citywide Parks
TBD
TBD
TBD
Rosemead Park
Solar PV Canopies
164,983
N/A
Garvey Park
Total
City of Rosemead, California
Comprehensive Citywide Energy Program
AMERESCO4
TBD
TO
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TO
$929,203
164,983
N/A
N/A
$17,350
54
$608,831
108,632
N/A
N/A
$13,267
46
$1,538,034
273,615
0
$0
$30,617
Evaluation Criteria 1 61
AMERESCO4
Preliminary Costs, Energy Savings, Funding Options/Financing Approach
The costs and savings for the improvement measures were priced using actual material and labor
costs, providing the City of Rosemead with high confidence estimates.
As discussed previously, Ameresco will work with SoCaIREN, CEC, and Utility programs to identify
rebates, incentives, no/low-cost financing options. We will also deploy our Grant Proposal Team to
identify and apply for available or custom grant funding opportunities to help pay for or partially fund
these improvements.
Outside of the financing, funding, and other opportunities, we can offer alternative financing solutions
for some or all of the proposed measures, including but not limited to: Power Purchase Agreement
(PPA), Energy as a Service (EBBS), Tax Exempt Lease Purchase (TELP), and others.
River Yard
Table 19. River Yard ECM Cost and
*Outdoor lighting does not appear to be LED, further evaluation of the interior would be required to provide an ECM cost and
savings.
**Based on the satellite image, HVAC appears to be old and should need to be replaced. During the IGA Ameresco can provide a
cost and savings to this measure.
Citywide Parks
Table 20. Citywide Parks ECM Cost and Savings
ECM Costs
Energy
Energy
0&M
Total
Payback
Energy Conservation Measure
($)
Savings
Savings
Savings ($)
Annual
(Years)
(kWh)
(therms)
(kWh)
(therms)
LED Lighting*
Savings ($)
TBD
HVAC & Building Automation
TBD
TBD
TBD
TBD
TBD
TBD
Controls**
LED Lighting*
TBD
TBD
TBD
I TBD
I TBD
TBD
*Outdoor lighting does not appear to be LED, further evaluation of the interior would be required to provide an ECM cost and
savings.
**Based on the satellite image, HVAC appears to be old and should need to be replaced. During the IGA Ameresco can provide a
cost and savings to this measure.
Citywide Parks
Table 20. Citywide Parks ECM Cost and Savings
*Not all the parks were visited during the initial site walk. Ameresco has previously included costs and savings values for
exterior lighting replacements at Rosemead and Garvey parks in the Phase 1 project section of this proposal. The remaining
parks will be audited during the IGA and ECM cost and savings will be provided at that time based on opportunity.
Rosemead Community Recreation Center
Table 21. Rosemead Community Recreation Center ECM Cost and
ECM Costs.
Energy
Energy
08M
Total
Payback
Energy Conservation Measure
($)
Savings
Savings
Savings ($)
Annual
(Years)
Savings
Payback (years)
(kWh)
(therms)
(kWh)
Savings ($)
LED Lighting*
TBD
TBD
TBD
TBD
TBD I TBD
*Not all the parks were visited during the initial site walk. Ameresco has previously included costs and savings values for
exterior lighting replacements at Rosemead and Garvey parks in the Phase 1 project section of this proposal. The remaining
parks will be audited during the IGA and ECM cost and savings will be provided at that time based on opportunity.
Rosemead Community Recreation Center
Table 21. Rosemead Community Recreation Center ECM Cost and
*Interval data for this site was not provided. Interval data from Garvey Community Center was used for the analysis
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 62
ECM
Energy
Energy
0&M
Total
Annual
Energy Conservation Measure
Costs ($)
Savings
Savings
Savings
Savings
Payback (years)
(kWh)
(therms)
($)
$
Solar PV Canooies*
$929,203
1 164,983
N/A
N/A
$17,350
54
*Interval data for this site was not provided. Interval data from Garvey Community Center was used for the analysis
City of Rosemead, California
Comprehensive Citywide Energy Program
Evaluation Criteria 1 62
AMERESCO4
City Hall
Table 22. City Hall ECM Cost and Savings
City Hall
Energy Conservation Measure
ECM Costs
(E)
Savings
(kWh)
Savi gs
(therms)
0&M
Savings (E)
Annual
Savings (E)
Payback
(years)
Solar PV Canopies
$608,831
108,632
N/A
N/A
$13,267
46
City of Rosemead, California Evaluation Criteria 63
Comprehensive Citywide Energy Program
pomasai s1g6u py aoige
; Jewapeil pue µialed s aq) ui paJais OW aie „ algeuiejsnS veals vaalg„ aug6el
all pue logLuAs qio agl'o6oI oosaJawy aqJ pue ossaiauiy auI 'o2sa]aWV SZOZ
woo-oosojewe wplasouja :3
SK[ Z6£ OLS:i
anl}noox3 aun000y jowas
WN asaua3
13e}uoO 10 lulOd AIEWIad peawaso�l 10 43
SVZ06 VO `opun6as 13
000Z aps
ReMg6lH Iseoo 04loed PON ZZZ
'Out '00SE)Jewv