CC - Item 5C - Council Chambers Audiovisual Upgrade Project No. 31030 - Award of Construction Contract to Studio Spectrum, Inc.ROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: BEN KIM, CITY MANAGER T DATE: AUGUST 12, 2025 SUBJECT: CITY COUNCIL CHAMBERS AUDIOVISUAL UPGRADE PROJECT NO. 31030— AWARD OF CONSTRUCTION CONTRACT SUMMARY As part of the City's Fiscal Year 2025-2026 Capital Improvement Program (CIP), the City Council allocated funds for the City Council Chambers Audiovisual Upgrades Project to update the existing audiovisual system in the Council Chambers with modern, state-of-the-art equipment. On June 23, 2025, staff sent out a Notice Inviting Informal Bids to the vendors listed on the City's Qualified Contractor's List and various industry trades. The City received two informal bids and after a comprehensive review of the proposals, staff recommends awarding a construction contract to Studio Spectrum, Inc. for the work, at an estimated cost of $189,907.88. BACKGROUND The Council Chambers serves as the central hub for City Council and Committee meetings, where effective communication is key to productive discussions by ensuring that council members, committee participants, and the public can clearly hear discussions and see presentations. However, certain audiovisual components in the Council Chambers are outdated and in need of replacement. The proposed upgrades will address these issues by improving equipment, enhancing presentation quality, and integrating modern technology to support more effective meetings. Planned enhancements include: • New display systems on both sides of the dais for improved visibility • Upgraded audio systems for clearer sound • Advanced wireless connectivity • New cameras equipped for web conferencing These improvements will ensure a more efficient, professional, and enhanced meeting environment for all participants. AGENDA ITEM 5.0 City Council Meeting August 12, 2025 Page 2 of 3 DISCUSSION On June 23, 2025, staff issued a Notice Inviting Informal Bids (NIIB) to the construction trade journals as specified in Section 22036 of the Uniform Public Construction Cost Accounting Act. Staff also sent the NIIB to the respective vendors listed on the City's Qualified Contractors' List for the Council Chambers Audiovisual Upgrades Project. The City received a total of two (2) proposals on July 2, 2025, with the following results: Firm Location Proposal Amount EIDIM Group Inc. Los Angeles, CA $202,311.22 Studio Spectrum, Inc. Burbank, CA $189,907.88 Staff performed a comprehensive bid analysis, which included verifying the contractor's state licensing, Department of Industrial Relations (DIR) registration, checking both state and federal debarment lists, and reviewing the references provided. During this analysis, staff identified mathematical errors in the bid submitted by EIDIM Group, Inc. The total base bid, when calculated based on the unit prices, amounted to $183,504.48. However, the total base bid amount written in words in the submitted documents was $202,311.22. According to the Contract Bid Forms (CBF -4), in cases where discrepancies exist within the bid amounts, the following rules apply: • Unit prices take precedence over extended amounts; and • Written -out takes precedence over numerical figures. Staff determined that the amount written out should prevail. Accordingly, the base bid amount considered is $202,311.22. The bid from Studio Spectrum, Inc. was then confirmed as the lowest responsive bid. Staff recommends awarding the construction contract to Studio Spectrum, Inc. for $189,907.88, with an additional 5% contingency of $9,495.40, totaling $199,403.28. Additionally, the project will require minor electrical work involving the installation of outlets to power the new displays. This electrical and other incidental work is not included in Studio Spectrum's bid and will be sourced to a third -party provider. The estimated amount for this work will not exceed $15,000. Therefore, the total estimated construction budget, inclusive of the electrical scope, is $214,403.28. STAFF RECOMMENDATION It is recommended that the City Council: Authorize the City Manager to execute a construction contract with Studio Spectrum, Inc. for the City Council Chamber Audiovisual Upgrades Project, in the amount of $189,907.88. In addition, authorize an amount of $9,495.40 (5%) as a contingency to cover the cost of unforeseen construction expenses, for a total of $199,403.28. City Council Meeting August 12, 2025 Page 3 of 3 FINANCIAL IMPACT The Project was included in the Fiscal Year 2025-2026 Capital Improvement Program (CIP) Budget and consists of an approved $230,000 in Public Facilities funds. The following is the breakdown of the construction phase budget: Construction Contract $189,907.88 Construction Contingency 5% $9,495.40 Total Construction Budget $199,403.28 ENVIRONMENTAL REVIEW The proposed work involves upgrades of an existing public facility; therefore, the project is exempt from the California Environmental Quality Act (CEQA) pursuant to a Class 1 (Section 15301, Existing Facilities), subsection (d) exemption. STRATEGIC PLAN IMPACT None PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Prepared by: 25-r-'X� Mm—any Basilyous, City Engineer Attachment B: Studio Spectrum, Inc. Proposal Attachment C: EIDIM Group Inc. Proposal Attachment D: Construction Contract with Studio Spectrum, Inc. Attachment A Bid Package CITY OF ROSEMEAD CALIFORNIA CONTRACT DOCUMENTS FOR COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 FISCAL YEAR 2024-2025 IN THE CITY OF ROSEMEAD PUBLIC WORKS DEPARTMENT, ENGINEERING DIVISION 8838 E. VALLEY BOULEVARD ROSEMEAD, CA 91770 TELEPHONE: (626) 569-2150 FAX: (626) 307-9218 BIDS DUE: JULY 2ND, 2025 AT 2:OOPM CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 TABLE OF CONTENTS BIDDING DOCUMENTS Notice Inviting Informal Bids ...................................................NIB -1 - NIB -2 2. Instructions to Bidders.............................................................. ITB- I - ITB -10 3. Contract Bid Forms............................................................ CBF- 1 - CBF -13 CONTRACT AGREEMENT Contract Agreement and Insurance Requirements 2. Performance Bond 3. Payment Bond CONTRACT APPENDIX Part "A" General Provisions ......................................... GP- 1 — GP -34 Part "B" Supplemental General Conditions ......................GC -1 — GC -10 Part "C" Technical Provisions......................................TP-1 — TP -1 Part "D" Appendix Appendix A — Council Chamber Signal Flow & Proposed Equipment List City of Rosemead, California Council Chamber Audiovisual Upgrades Project No. 31031 CITY OF ROSEMEAD NOTICE INVITING INFORMAL BIDS NIB No. 2025-14 COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 SUBMITTALS: Electronic proposal submittal via email Proposal shall be submitted via the following email rbasilyous(i citvofrosemead.org no later than Wednesday. July 2.2025, at 02:00 am CONTACT PERSON Romany Basilyous, City Engineer City of Rosemead 8838 E. Valley Boulevard Rosemead, California 91770 (626) 569-2154, rbasilyousna cityofrosemead.org The project consists of furnishing and installing audiovisual components to upgrade the existing audiovisual components at the City of Rosemead Council Chamber, as listed per bid schedule. Project includes upgrades to the existing microphones and camera system located in the Council Chamber, installation of a 109 -inch video wall display, including other incidental and appurtenant work necessary for the proper completion of the project and other related work as described in the specifications. The engineer's estimate for this project is in the range of $190,000. The successful bidder shall have THIRTY (30) working days to complete the work. Liquidated damages shall be $500.00 per calendar day. Copies of the Bidding and Contract Documents, Plans and Specifications can be obtained from contacting rbasilyousgcityofrosemead.org. Hard copy of the bid package will not be mailed. Questions for the Council Chamber Audiovisual upgrades shall be submitted to rbasilyous(a).citvofrosemead.org no later than June 26th, 2025, by 5:00 pm. NIB -1 City of Rosemead, California Council Chamber Audiovisual Upgrades Project No. 31031 SB 854 Requirements: This project is subject to the requirements of SB 854. No prime contractor or subcontractor may be listed on a bid proposal for a public works project unless registered and qualified with the Department of Industrial Relations pursuant to Labor Code section 1725.5. No prime contractor or subcontractor may be awarded a contract for public work on a public works project unless registered and qualified with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The bid proposal must include a print out from the DIR registration website showing that the prime contractor and each subcontractor is currently registered and qualified. No bid proposals will be accepted, nor any contract entered into with a prime contractor without proof of registration as required above. [Unless within the limited exceptions from this requirement for bid proposals only under Labor Code Section 1771.1(a)] Each bid must be accompanied by a bidder's security in an amount not less than 10% of the amount of the bid, as a guarantee that the bidder will, if awarded the Contract, enter into a satisfactory agreement and provide a Performance Bond and a Payment Bond, each not less than 100% of the total amount of the bid price. No bidder may withdraw his bid for a period of sixty-one (61) days after the above bid opening date. The CITY OF ROSEMEAD will affirmatively ensure the disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, disability, sex or national origin in the consideration for an award. Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wage and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Bidders shall be licensed in accordance with the provision of Chapter 9, Division 111 of the Business and Professions Code of the State of California. Bidder shall have a Class "C-7" or Class "B" license in good standing at the time Bids are received. The Council reserves the right to reject any and all bids and to waive any informality, technical defect, or minor irregularity in any bid submitted. An award of service shall not be final until the bids have been reviewed and a Contract Agreement with the City has been signed by the lowest responsible bidder and by the City. Award of Contract Agreement is proposed for August 12", 2025. Dated this June 23`d, 2025 Ericka Hernandez City Clerk CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 INSTRUCTION TO BIDDERS INSTRUCTIONS TO BIDDERS All Bids must be made in accordance with these Instructions to Bidders ("ITB"). Unless specifically noted, capitalized terms are used as defined in the General Conditions, found in Part "B" of the Contract Appendix. All terms defined in the General Conditions which occur in the Bid Documents and Contract shall have meanings as defined therein. 1. AVAILABILITY OF BID DOCUMENTS Bids must be submitted to the Owner on the Contract Bid Forms which are a part of the Bid Package for the Project. Prospective bidders may obtain one (1) complete set of Bid Documents. Bid Documents may be obtained from emailing rbasilyouscicityofrosemead.ore 2. EXAMINATION OF BID DOCUMENTS The Owner has made copies of the Bid Documents available, as indicated above. Bidders shall be solely responsible for examining the Project Site and the Bid Documents, including any Addenda issued during the bidding period, and for informing itself with respect to local labor availability, means of transportation, necessity for security, laws and codes, local permit requirements, wage scales, local tax structure, contractors' licensing requirements, availability of required insurance, and other factors that could affect the Work. Bidders are responsible for consulting the standards referenced in the Contract titled Specifications. Failure of Bidder to so examine and inform itself shall be at its sole risk, and no relief for error or omission will be given except as required under State law. 3. INTERPRETATION OF BID DOCUMENTS Any request for an interpretation or clarification of the Bid Documents must be submitted in writing by Bidder via email or facsimile to the Owner's Project Engineer. Any response that the Owner may choose to make for purposes of interpretation or clarification, will be in writing and made available to all the listed holders of the Bid Documents. The Owner will respond to all written/faxed/email Bidder's inquiries received at least seventy two (72) hours before the scheduled bid opening date for which, in its sole judgment, a response is in the best interest of the Owner. Where such interpretation or clarification requires a change in the Bid Documents, the Owner will prepare and issue an Addendum to the Bid Documents. The Owner shall not be bound by, and Bidder shall not rely upon, any oral interpretation or clarification of the Bid Documents. The bidding process and terms and conditions will be in strict accordance with the following Bid Documents: a. Notice Inviting Bids b. Instructions to Bidders C. Contract Bid Forms d. Contract e. Contract Appendix Part "A" - General Conditions Part "B" - Supplementary General Conditions Part "C" - Technical Provisions Part "D" - Appendix f. Any Addenda Issued by the Owner 4. INSPECTION OF SITE; PRE-BID CONFERENCE AND SITE WALK ITB - 1 Each prospective bidder is responsible for fully acquainting himself with the conditions of the Project Site (which may include more than one site), as well as those relating to the construction and labor of the Project, to fully understand the facilities, difficulties and restrictions which may impact the total and adequate completion of the Project. 5. ADDENDA The Owner reserves the right to revise the Bid Documents prior to the bid opening date. Revisions, if any, shall be made by written Addenda. Pursuant to Public Contract Code Section 4104.5, if the Owner issues an Addendum later than 72 hours prior to the deadline for submission of bids, and the Addendum requires material changes, additions or deletions to the description of the work to be performed or the content, form or manner of submission of bids, the Owner will extend the deadline for submission of bids by at least 72 hours. Otherwise, the Owner may determine, in its sole discretion, whether an Addendum requires that the date set for opening bids be postponed. The announcement of the new date, if any, shall be made by Addenda. Each prospective bidder shall provide Owner a name, address and facsimile number to which Bid Document Addenda may be sent, as well as a telephone number by which the Owner can contact the Bidder. Copies of Addenda will be furnished by email, facsimile, first class mail, express mail or other proper means of delivery without charge to all parties who have obtained a copy of the Bid Documents and provided such current information. Please Note: Bidders are primarily and ultimately responsible for ensuring that they have received any and all Addenda. To this end, each Bidder should contact the Development Services Department to verify that he has received all Addenda issued, if any. Bidders must acknowledge receipt of all Addenda, if any, in its Bid Letter. Failure to acknowledge receipt of all Addenda may cause its Bid to be deemed incomplete and nonresponsive. 6. PREPARATION OF BIDS Bids shall be prepared only using copies of the Contract Bid Forms provided with the Bid Documents. The use of substitute bid forms other than clear and correct photocopies of those provided by the Owner will not be permitted and may result in the Bid being declared nonresponsive. Bid Letters shall be executed by an authorized signatory as described in these Instructions to Bidders. In addition, Bidders shall fill in all blank spaces (including inserting "N/A" where applicable) and initial all interlineations, alterations, or erasures to the Contract Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter on the Contract Bid Forms nor make substitutions thereon. USE OF INK, INDELIBLE PENCIL OR A TYPEWRITER IS REQUIRED. 7. ALTERNATE BIDS The award of Contract shall be based on the TOTAL BASE BID AMOUNT only. The ADDITIVE ALTERNATE BID ITEMS shown per the ADDITIVE ALTERNATE BID SCHEDULE above will not be taken into account in determining the lowest responsible bidder. City may add bid items from the ADDITIVE ALTERNATE BID SCHEDULE at the sole and complete discretion of the City as part of the performance of the contract. S. MODIFICATIONS OF BIDS Each Bidder shall submit its Bid in strict conformity with the requirements of the Bid Documents. Each Bid prepared by Bidder shall be complete in itself and shall be submitted within a sealed envelope in accordance with the instructions herein. Unauthorized conditions, limitations, exclusions or provisions attached to a Bid will render it nonresponsive and may cause its rejection. Bidders shall neither delete, modify, nor supplement the printed matter on the ITB - 2 Contract Bid Forms, nor make substitutions thereon. ORAL, TELEPHONIC AND FACSIMILE BIDS OR MODIFICATIONS WILL NOT BE CONSIDERED. 9. SIGNING OF BIDS All Bids submitted shall be executed by the Bidder or its authorized representative. Bidders will be asked to provide evidence in the form of an authenticated resolution of its Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom. If a Bidder is a joint venture or partnership, it will be asked to submit an authenticated Power of Attorney executed by each joint venture or partner appointing and designating one of the joint ventures or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that joint venture or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that particular joint venture or partner to act for and bind Bidder in all matters relating to the Bid; and (2) provide that each venture or partner shall bei ointly and severally liable for any and all of the duties and obligations of Bidder assumed under the Bid and under any Contract arising therefrom. The Bid shall be executed by the designated joint venture or partner on behalf of the joint venture or partnership in its legal name. 10. BID GUARANTEE (BOND) Each bid proposal shall be accompanied by a certified or cashier's check, bid bond (the bid bond must be submitted on the form included in these Bid Documents) or equivalent substitution in lieu of a bond, as authorized by Code of Civil Procedure Section 995.710, in an amount not less than 10% of the Total Bid Price. Any check, bond, or other substitute must be made payable to the Owner, and shall be given as a guarantee that the Bidder will enter into the Contract described in the Bid Documents if awarded the work and will provide a satisfactory Performance Bond, Payment Bond, the required insurance certificates and endorsements, and any other certifications as may be required by the Contract. By submitting a proposal, each bidder agrees that its failure to enter the Contract if awarded the work or to provide the Bonds and other information or documentation described above would result in damage to the Owner, and that it would be impracticable or extremely difficult to ascertain the actual amount of that damage. For this reason, each bidder agrees that the Owner may retain the bid proposal guarantee as liquidated damages if the bidder is awarded the work but fails or refuses to timely enter into the Contract or to provide the Bonds and other information or documentation described above, except as may otherwise be required by California law. If electing to provide a Bid Bond, as set forth above, each Bidder must obtain such a bond from an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the Owner. In addition, the Bid Bond must be submitted on the form furnished by the Owner, or one substantially in conformance with the Owner's form if previously approved in writing by the Owner. Certified or cashiers checks must be drawn on a solvent state bank or a California branch of a solvent national bank. After the Owner has made an award to the successful Bidder, and the Bidder has signed a Contract, submitted the necessary bonds, original insurance certificates and endorsements, and any other certifications as may be required by the Contract, the remaining Bid guarantees shall be returned to each particular bidder if requested by that bidder. If the Owner rejects all Bids, it will promptly return to all Bidders their Bid guarantees Il. SUBMISSION OF SEALED BIDS ITB - 3 Once the Bid and supporting documents herein have been completed and signed as set forth above, they shall be placed, along with the Bid Guarantee and any proposed sketches and brochures or other materials required by these instructions, in an envelope, sealed, addressed and delivered or mailed, postage prepaid to the Owner at the place and to the attention of the person indicated in the Notice Inviting Bids. NO ORAL, TELEPHONIC OR FACSIMILE FORMS WILL BE CONSIDERED. The envelope shall also contain the following in the lower left-hand comer thereof: Bid of (Insert Name of the Companvl for COUNCIL CHAMBER AUDIOVISUAL UPGRADES Alternatively, bids can be submitted electronically through to rbasilvousnn,citvofrosemead.or No consideration shall be given by the Owner to bid proposals received after the date and time set for the opening of bids as provided in the Notice Inviting Bids. 12. DELIVERY AND OPENING OF BIDS Bids will be received by the Owner at the address shown in the Notice Inviting Bids or electronically through emailing rbasilyous2cityofrosemead.ore up to the date and time shown therein. The Owner will leave unopened any Bid received after the specified date and time, and any such unopened Bid will be returned to the Bidder. It is the Bidder's sole responsibility to ensure that its Bid is received as stipulated. Bids may be submitted earlier than the dates(s) and time(s) indicated. Bids will be opened at the date and time stated in the Notice Inviting Bids and the amount of each Bid will be read aloud and recorded. All Bidders may, if they desire, attend the opening of Bids. Owner reserves the right to reject any or all Bids, to waive any informality or irregularity in any Bid received where such waiver is in the best interests of the Owner, and to be the sole judge of the merits of the respective Bids received. In the event of a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govem. 13. WITHDRAWAL OF BID Prior to the bid opening date, a Bid may be withdrawn by the Bidder by means of a written request signed by the Bidder or its properly authorized representative. If a Bidder to whom the award is made fails or refuses to sign a Contract, or to furnish the bonds, certificates and endorsements required below within the time specified in these Instructions to Bidders below, the funds represented by the Bid Guarantee (cash, cashiers check or Bid bond described above) shall be forfeited and become and remain the property of the Owner; the amount thereof being previously agreed to by the Bidder and the surety to be due the Owner because of the damage resulting from the delay in the execution of the Contract and in the performance of Work thereunder. 14. AWARD PROCESS Once all Bids are opened and reviewed to determine the lowest responsive and responsible bidder, the City Council will make all necessary decisions and awards. The apparent successful bidder should at this point begin to prepare the following documents: (1) the Performance Bond; (2) the Payment Bond; and (3) the required insurance certificates and endorsements. Once the Owner issues a Notice of Award, the successful bidder will have seven (7) Working Days from the date of this letter to supply the Owner with all of the required documents and certifications. Regardless of whether the successful bidder supplies the required documents and certifications in a timely manner, the Contract Time will begin to run ten (10) Working Days from the date of the Notice of Proceed. Once the Owner receives all of the properly drafted and executed documents and certifications from the successful bidder, the Owner shall issue a Notice to Proceed ITB - 4 to that successful bidder 15. DESIGNATION OF SUBCONTRACTORS Pursuant to state law, the Bidders must designate the name and location of each subcontractor who will perform work or render services for the prime Bidder in an amount that exceeds one-half of one percent (0.5%) of the Bidder's Total Bid Price, as well as the portion of work each such subcontractor will perform. Bidders must make these designations, as well as any others requested by the Owner, on the document titled "List of Proposed Subcontractors" which has been included with the Contract Bid Forms. Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow Bidders twenty- four (24) additional hours after the deadline for submission of bids to submit the information requested by the Owner about each subcontractor, other than the name and location of each subcontractor. 16. LICENSING AND REGISTRATION REQUIREMENTS Pursuant to Section 7028.15 of the Business and Professions Code and Section 3300 of the Public Contract Code, all bidders must possess proper licenses for performance of this Contract. Pursuant to Section 1725.5 of the Labor Code, all bidders must be registered with the Department of Industrial Relations to be qualified to bid on this Contract. Subcontractors must possess the appropriate licenses for each specialty subcontracted and be registered with the Department of Industrial Relations. Pursuant to Section 7028.5 of the Business and Professions Code, the Owner shall consider any bid submitted by a contractor not currently licensed in accordance with state law and pursuant to the requirements found in the Bid Documents to be nonresponsive, and the Owner shall reject the Bid. The Owner shall have the right to request, and the Bidders shall provide within five (5) Calendar Days, evidence satisfactory to the Owner of all valid license(s) currently held by that Bidder and each of the Bidder's subcontractors, before awarding the Contract. 17. DISQUALIFICATION OF BIDDERS; INTEREST IN MORE THAN ONE BID No bidder shall be allowed to make, submit or be interested in more than one bid. However, a person, firm, corporation or other entity that has submitted a subpro osal to a bidder, or that has quoted prices of materials to a bidder, is not thereby disqualified from submitting a subproposal or quoting prices to other bidders submitting a bid to the Owner. 18. INSURANCE REQUIREMENTS Within the time specified in these Instructions to Bidders above, Bidder shall provide the Owner with four identical counterparts of all required insurance certificates and endorsements as specified in the Bid Documents. Failure to do so may, in the sole discretion of Owner, result in the forfeiture of the Bid Guarantee. All insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VIII, licensed to do business in California, and satisfactory to the Owner. 19. REQUIRED BIDDER CERTIFICATIONS Bidders must comply with the following: A. CONTRACT BID FORMS: Within the Contract Bid Documents the bidder must certify to various information, including but not limited to, the accuracy of the representations made in the Contract Bid Forms. B. NON -COLLUSION AFFIDAVIT: Pursuant to Public Contract Code Section 7106, each Bidder must execute and submit with its bid the statutorily mandated non -collusion affidavit included in the Bid Documents. Him" 20. BASIS OF AWARD; BALANCED BIDS The Owner shall award Contracts to only the lowest responsible Bidders submitting responsive Bids, as required by law. The Owner reserves the right to reject any or all Bids. The Owner may reject any Bid which, in its opinion when compared to other bids received or to the Owner's internal estimates, does not accurately reflect the cost to perform the Work. In addition, because the Owner may elect to include or exclude any of the bid items and alternate bid items at its sole and absolute discretion, each Bidder must ensure that each bid item contains a proportionate share of profit, overhead and other costs or expenses which will be incurred by the Bidder. The Owner may reject as non-responsive any bid which unevenly weights or allocates overhead and profit to one or more particular bid items. 21. FILING OF BID PROTESTS Bidders may file a "protest" of a contract award with the Owner's Project Manager. In order for a Bidder's protest to be considered valid, the protest must: A. Be filed in writing within five (5) Working Days after the bid opening date. B. Clearly identify the specific accusation involved. C. Clearly identify the specific Owner Staff/Board recommendation being protested. D. Specify, in detail, the grounds of the protest and the facts supporting the protest. E. Include all relevant, supporting documentation with the protest at time of filing. If the protest does not comply with each and every one of these requirements, it will be rejected as invalid If the protest is valid, the Owner's Project Manager, or other designated Owner staff member, shall review the basis of the protest and all relevant information. The Project Manager will deny or concur with the protest and provide a written decision to the protestor. The protestor may then appeal the decision of the Project Manager to the City Engineer then the appeal at the City Council. That way, the Council can deny the protest and approve the project at the same hearing. 22. PERFORMANCE BOND AND PAYMENT BOND REQUIREMENTS Within the time specified in these Instructions to Bidders above, the Bidder to whom a Contract is awarded shall deliver to the Owner four identical counterparts of the Performance Bond and Payment Bond in the form supplied by the Owner and included in the Bid Documents. Failure to do so may, in the sole discretion of Owner, result in the forfeiture of the Bid Guarantee. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the Owner. The Performance Bond shall be for one hundred percent (100%) of the Total Bid Price, and the Payment Bond shall also be for one hundred percent (100%) of the Total Bid Price. Contractor shall require, pursuant to Public Contract Code article 4108, all subcontractors providing labor and materials in excess of the dollar amount indicated in the Notice Inviting Bids to supply Payment and Performance Bonds in the amounts and manner required of the Contractor. The Contractor shall specify this requirement for subcontractor bonds in his written or published request for subcontractor bids 23. EXPERIENCE AND TECHNICAL REQUIREMENTS Bidders are required to provide the experience and qualification information required as part of the Contract Bid Forms. The purpose of this data is to provide the information necessary for the Owner to determine whether Bidders have the necessary experience in order to responsibly carry out the Work. Each Bidder shall answer all questions and provide information requested by the Contract Bid Forms. 24. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES Contractor and its subcontractors performing work under this Contract will be required to pay California sales and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the work will be located, unless otherwise expressly provided by the Bid Documents. 25. EXECUTION OF CONTRACT The Bidder to whom an award is made shall execute the Contract in the amount of its Total Bid Price and furnish the required insurance certificates and endorsements, as well as Performance and Payment Bonds, in a timely manner. The Owner may require appropriate evidence that the persons executing the Contract and the bonds for both the Bidder and its surety or sureties are duly empowered to do so. 26. OWNER RIGHTS The Owner may investigate the qualifications of any Bidder under consideration, require confirmation of information furnished by a Bidder, and require additional evidence of qualifications to perform the work described in these Bid Documents. The Owner reserves the right to: A. Reject any or all of the Bids if such action is in the best interest of the Owner. B. Issue subsequent Notices Inviting Bids. C. Cancel this entire Notice Inviting Bids. D. Appoint evaluation committees to review any or all Bids. E. Seek the assistance of outside technical experts to validate the Bid(s). F. Approve or disapprove the use of particular subcontractors. G. Waive informalities and irregularities in Bids. The Notice Inviting Bids does not commit the Owner to enter into a contract, nor does it obligate the Owner to pay any costs incurred in preparation and submission of Bids or in anticipation of a contract. 27. BIDDER'S RESPONSIVENESS The Owner will evaluate Bids for responsiveness at the time of Bid opening and before award is made. A Bid must be in strict compliance with the commercial and technical specifications, without exception. Only Bids which conform in all material respects to the Bid Documents can be eligible for award. A Bid not meeting the requirements of the responsiveness checklist may be rejected immediately upon opening, and returned to the Bidder's representative. 28. BIDDER'S RESPONSIVENESS CHECKLIST The Owner's initial responsiveness evaluation will consider the following A. Completed and properly executed Bid Letter (Including a completed Total Bid Price, completed Bid Bond amount, acknowledged addenda, completed state of incorporation or partner/joint venturer information (if applicable), completed license number, and signature by authorized company officer); B. Completed Bid Data Forms (including valid and properly executed Bid Bond for 10% of the Total Bid Price and a completed List of Proposed Subcontractors); ITB - 7 C. Properly executed Non -Collusion Affidavit; and D. Completed and properly executed Bidder Information Forms. If the Bidder is a joint venture, each joint venturer shall prepare and submit a separate form. Extra forms, if needed, can be obtained from the Owner, or photocopied by the Bidder, if necessary. 29. CONTRACT BID FORMS; LISTS OF SUBCONTRACTORS A. Contract Bid Forms. The Bid Letter and Forms must be completed as set forth below. (1) The Contract Bid Forms and Letter must be prepared using ink, indelible pencil or a typewriter. (2) The Bid Letter must be signed by the Bidder or on its behalf by the person or persons having the authority to do so. Proof of the authority to act on behalf of the firm must be submitted when requested. The proof shall be in the form of a certified copy of an appropriate corporate resolution, certificate of partnership or joint venture, or other appropriate document. If Bidder is an entity made up of multiple parties and no person or persons are designated to act on its behalf, all parties shall execute the Bid. (3) Addenda - Receipt of addenda must be acknowledged in the space provided in the Bid Letter. (4) The Bidder shall not delete, modify, supplement or make substitutions thereof, on the printed matter of the Contract Bid Forms or Bid Letter. (5) Corrections shall be initialed by the person who signs the Bid Letter. (6) Exceptions or qualifications to the Bid Documents are strictly forbidden. Any comment by the Bidder which the Owner determines can be construed as altering the requirements of the specifications or the terms and conditions of the Contract will render the Bid nonresponsive and disqualify the Bidder from consideration for award. B. List of Proposed Subcontractors (Forms). State law prohibits substitution of subcontractors listed in the original Bid except as otherwise provided in Sections 4107 and 4107.5 of the California Public Contract Code. Bidders are required to list all Subcontractors whose participation in the Contract will exceed one-half of one percent (0.5%) of the Total Bid Price. The List of Proposed Subcontractors Forms must be completed as set forth below. (1) Name. List the name of Subcontractors who will perform work in excess of one half of one percent (0.5%) of the Total Bid Price. (2) Location. For listed Subcontractors, identify the location of its place of business (City and State). (3) Work. For listed Subcontractors, identify the type/portion of work to be performed in the Contract. NMI (4) Contractor License Number. For listed Subcontractors, list the contractor license number issued to the Subcontractor by the California Contractors State License Board. (5) Registration with Department of Industrial Relations. For listed Subcontractors, include evidence of registration with the Department of Industrial Relations as required by Section 1725.5 of the Labor Code. Pursuant to Public Contract Code Section 4104, the Owner has determined that it will not allow Bidders twenty-four (24) additional hours after the deadline for submission of bids to submit the information requested by the Owner about each subcontractor, other than the name and location of each subcontractor. 30. RESPONSIBILITY CRITERIA Responsibility is the apparent ability of the Bidder to meet and complete successfully the requirements of the Contract. The Owner reserves the right to consider the financial responsibility and general competency of each bidder, as well as its reputation within the industry. Owner may request, and apparent low bidder shall provide, a financial statement, audited if necessary, including the Bidder's latest balance sheet and income statement. Owner expects that each Bidder will fully and truthfully disclose all information required of the Bidder by the Bid Documents. The prospective contractor, in order to be evaluated by the Owner as being a responsible contractor, must complete Section 4 of the Contract Bid Forms to determine that it: A. Has or can secure adequate financial resources to perform the contract; B. Is able to meet the performance or delivery schedule of the contract, taking into consideration other business commitments; and C. Has a satisfactory record of performance. A contractor seriously deficient in current contract performance, considering the number of contracts and extent of the deficiencies, is presumed not to meet this requirement unless the deficiencies are beyond its control or there is evidence to establish its responsibility notwithstanding the deficiencies. Evidence of such satisfactory performance record should show that the contractor: (1) Has a satisfactory record of integrity in its dealings with government agencies and with subcontractors, and is otherwise qualified to receive an award under applicable laws and regulations; (2) Has the necessary organization, experience, satisfactory safety record, accounting and operational controls and technical skills or the ability to obtain them; and (3) Has the necessary production, construction, and technical equipment and facilities or the ability to obtain them. END OF INSTRUCTIONS TO BIDDERS BIDDER: CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 SECTION I - BID SCHEDULE CONTRACT BID FORMS CBF -1 BID SCHEDULE SCHEDULE OF PRICES FOR COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 Audio System Upgrades NO. ITEM DESCRIPTION UNIT EST. UNIT ITEM QTY. PRICE COST 1 Gooseneck Microphone (Cardoid mic Eq 12 $ $ capsule with mute switch and LED indicator) 2 BSS BLU -BIB Expansion Box for existing EA 1 $ $ DSP Handheld Wireless Microphones with Receivers (Provides (3) New Handheld 3 Wireless Mics for Room PA & Provides (3) EA 6 $ $ Dedicated Wireless Mics for Language Translation Application) Assisted Listening System (WIFI 4 channel 4 Wi-Fe Audio Server (for hearing impaired / EA 1 $ $ translation applications) 5 Professional Speaker Amplifier EA 1 $ $ Video Routing and Control System Equipment EST. UNIT ITEM NO. ITEM DESCRIPTION UNIT QTY. PRICE COST 6 Extron DTP Crosspoint 108 4K Video Router EA 1 $ $ 7 Extron IPCP Pro 350 A Control Processor EA 1 $ $ 8 Extron DTP T HWP 4K 230 D HDMI Tx Wall EA 3 plate g Extron 15' Tabletop Control Screen with EA 1 $ $ video preview ability 10 Extron HDMI 230 DTP Receiver EA 1 $ $ CBF -2 BIDDER: CBF -3 Multiview Processor (4 HDMI inputs, support 11 for flexible PIP window placement to a single EA 1 $ $ broadcast switcher input, full RS232/LAN control from Extron touchpanel) 12 16 Port Gigabit PoE Switch 16 PoE + Ports at EA 1 $ $ 25OW 13 AppleTV 4K with Ethernet 31d Generation EA 1 $ $ (128 GB) 14 Signal Converter (HMDI to SDI 12G with EA 1 $ $ PSU) 15 Signal Converter (SDI to HDMI 12G with EA 4 $ $ PSU) PTZ Camera (with 30x Optical Zoom with 16 SDI/HDMI/USB/IP, full RS232/LAN control EA 3 $ $ from Extron touch panel (Gray) 17 Ceiling Mount Kit for PTZ Optics Camera EA 3 $ $ 18 Sequencing Power Conditioner EA 1 $ $ 19 Misc. Installation Cables and Fittings LS 1 $ $ (Budgetary Line Item) Display System Equipment EST. UNIT ITEM NO. ITEM DESCRIPTION UNIT Qom. PRICE COST Planar Video Wall 109" Diagonal, FHD, 20 1.2mm pitch, 800 nit brightness, HDR, 247 EA 2 $ $ reliability, multi -source viewing, speakers, landscape. Multiview Processor (4 HDMI inputs, support for 4 simultaneous video windows with flexible windows placement, background 21 video window support, supports output to 2 EA 1 $ $ mirrored video walls with one signal extended via Extron DTP, full RS232 / LAN control from Extron touchpanel 22 Extron =DMI 230 DTP Receiver EA 1 $ $ CBF -3 23 Extron 1x2 4K HDMI Distribution Amplifier EA 1 $ $ 24 Dell Optiplex Small Form Factor PC with 27" EA 1 $ $ Monitor 25 Misc. Installation Cables and Fittings LS 1 $ $ (budgetary line item) Labor and Associated Installation of Audiovisual Equipment & Components EST. UNIT ITEM NO. ITEM DESCRIPTION UNIT QTY. PRICE COST Planar: Install Assist for 2 Video Wall 26 Systems (Pro serv, assisted install with EA 1 $ $ training) 28 Uninstallation and removal of existing LS 1 $ $ equipment that is no longer necessary 29 Video Systems Wiring, Installation, Video LS 1 $ $ Routing Configurations 30 Audio System Tuning, Audo System DSP LS 1 $ $ Programming 31 Extron Touchscreen Control System LS 1 $ $ Programming Labor 32 Project Management/DIR Filings and CPR LS 1 $ $ Admin Costs TOTAL BASE BID AMOUNT IN NUMBERS $ TOTAL BASE BID AMOUNT IN WORDS: The award of Contract shall be based on the TOTAL BASE BID AMOUNT. In the case of discrepancies in the amount of bid, unit prices shall govern over extended amounts, and words shall govem over fi ures. Full compensation for the items listed to the right as Items A, B, C, D and B are consideredn as inclusive in each Bid Item listed above in the Bid Schedule as applicable, and no A. Mobilization / Demobilization T....0 v—rrm P C ntrrol 'D� C.r � " and Best Management C. *" I Practices (BMPs), Public Convenience and CBF -4 BIDDER: additional and/or separate compensation will Safety be allowed. The bid prices shall include any and all costs, including labor, materials, appurtenant expenses, taxes, royalties and any and all other incidental costs to complete the project, in compliance with the Bid and Contract Documents and all applicable codes and standards. The City reserves the right to add, delete, increase or decrease the amount of any quantity shown and to delete any item from the contract and pay the contractor at the bid unit prices so long as the total amount of change does not exceed 25% (plus or minus) of the total bid amount for the entire project. If the change exceeds 25%, a change order may be negotiated to adjust unit bid prices. All other work items not specifically listed in the bid schedule, but necessary to complete the work per bid and contract documents and all applicable codes and standards are assumed to be included in the bid prices. A bid is required for the entire work, that the quantities set forth in the Bid Schedule are to calculate total bid amount, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in the schedule of bid items above, within the limits define in Section 3-2.2.1 of the Standard Specifications, to stay within the budgeted amount of this project. The award of Contract shall be based on the TOTAL BASE BID AMOUNT only. If the Bid lists any Additive Alternate bids, the ADDITIVE ALTERNATE BID ITEMS shown per the ADDITIVE ALTERNATE BID SCHEDULE above will not be taken into account in determining the lowest responsible bidder. City may add bid items from the ADDITIVE ALTERNATE BID SCHEDULE at the sole and complete discretion of the City as part of the performance of the contract. The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern. Attached hereto is a certified check, a cashier's check or a bid bond in the amount of Dollars ($ ) said amount being not less than ten percent (10%) of the Total Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award, we fail or refuse to execute the Contract and furnish the required bonds, certificates and endorsements of insurance and other certifications within the time provided. If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be prepared by the Owner for execution, within five (5) Calendar Days following the Letter of Award CBF -5 1:3U1U� 71 for the Contract, and will deliver to the Owner within that same period the necessary original Certificates of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other documentation and certification required by the Contract. The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the Business and Professional Code), arising from purchases of goods, materials or services by the Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to he Contractor. Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence satisfactory to the Owner of Bidder's California contractor's license(s) in good standing; (2) evidence that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting therefrom; and (3) any other information and documentation, financial or otherwise, needed by Owner to award a Contract to the lowest responsible and responsive bidder. Bidder understands and agrees that liquidated damages shall apply to this Contract in the amounts of five hundred dollars ($500.00) per calendar day if project is not completed within the working days specified on the Notice Inviting Bids. The Contract Time will begin to run ten (10) Working Days from the date of the Notice of Proceed and subject to the terms and conditions described in the Contract Form and the Contract Documents. Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data submitted herewith into a contract arising out of this Bid. The undersigned acknowledges receipt, understanding and full consideration of the following addenda to the Contract Documents. Addenda Nos. The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and equipment or supplies necessary to complete the Work as described in the Bid Documents. If this bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the necessary bonds and accept the Total Bid Price as compensation in full for all Work under the contract. CBF -6 BIDDER: EXAMINATION OF SPECIFICATIONS AND SITE OF WORK The Bidder declares that he/she has carefully read and examined the project plans, specifications, bid documents, and he/she has made a personal examination of the site (indicate name of the person, representing the bidder, who inspected the site and date below) and that he/she understands the exact scope of the Project. Name of Person who inspected the site: Date of Inspection: ADDENDA ACKNOWLEDGMENT The Bidder acknowledges receipt of the following Addenda and has included their provisions in this Proposal: Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated CBF -7 BIDDER: PUBLIC CONTRACT CODE STATEMENT AND QUESTIONAIRE PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has _ , has not _ been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. Note: The bidder must place a checkmark after "has" or "has not" in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE In conformance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes _ No If the answer is yes, explain the circumstances in the following space. CBF -8 BIDDER: PUBLIC CONTRACT CODE 10232 STATEMENT In conformance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two-year period because of the Contractors failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. CBF -9 I am Signature Business Street Address Type or Print Name City, State and Zip Code Title Bidder's/Contractor's State of Incorporation: Partners or Joint Venturers: Bidder's License Number(s): Department Industrial Relations Registered No. NOTES: Telephone Number 1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the representations made on the Contract Bid Forms. 2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address 3) If Bidder is a partnership or joint venture, give full names of all partners or joint venturers. As further discussed in the Instructions to Bidders, Bidder will be required to provide evidence that the person signing on behalf of the corporation, partnership or joint venture has the authority to do so. CBF - 10 :.. : SECTION 2 BID DATA FORMS CBF- 11 BIDDER: Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide the information required. Bidder shall ensure that every page of its Bid Data Forms are properly identified with the Bidder's name and page number. 2.A BID BOND KNOW ALL MEN BY THESE PRESENTS: THAT as Principal, and , as Surety, are held firmly bound unto the CITY OF ROSEMEAD (hereinafter called the OWNER) in the sum of DOLLARS ($ ), being not less than ten percent (10%) of the Total Bid Price; for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work required for the COUNCIL CHAMBER AUDIOVISUAL UPGRADES—as set forth in the Notice Inviting Bids and accompanying Bid Documents, dated NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the OWNER and, within the time and in the manner required by the above- referenced Bid Documents, enters into the written form of Contract bound with said Bid Documents, furnishes the required bonds (one to guarantee faithful performance and the other to guarantee payment for labor and materials) furnishes the required insurance certificates and endorsements, and furnishes any other certifications as may be required by the Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by the OWNER and judgment is recovered, said Surety shall pay all costs incurred by the OWNER in such suit, including reasonable attorneys' fees to be fixed by the court. SIGNED AND SEALED, this day of , 20 Principal Signature Surety By: Signature CBF -12 11-1101111:10 2.B LIST OF PROPOSED SUBCONTRACTORS In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100 through 4114 of the California Public Contract Code, and any amendments thereto, each Bidder shall provide the information requested below for each subcontractor who will perform work, labor or render service to Bidder in or about the construction of the Work in an amount in excess of one-half of one percent (greater than 0.5 %) of the Bidder's Total Bid Price, or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work which will be done by each subcontractor. Bidder shall list only one subcontractor for any one portion of the Work. Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow Bidders twenty-four (24) additional hours after the deadline for submission of bids to submit the information requested by the Owner about each subcontractor, other than the name and location of each subcontractor. If the Bidder fails to specify a subcontractor for any portion of the Work to be performed under the Contract, it shall be deemed to have agreed to perform such portion itself, and shall not be permitted to subcontract that portion of the Work except under the conditions hereinafter set forth below. Subletting or subcontracting of any portion of the Work in excess of one half of one percent (greater than 0.5%) of the Total Bid Price or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, for which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after Owner approval. CBF - 13 2.13 LIST OF PROPOSED SUBCONTRACTORS (continued) ["Duplicate Next 2 Pages if needed for listing additional subcontractors."] Name and Location Description of Work of Subcontractor to be Subcontracted License No.: Department of Industrial Relation Registration Name and Location of Subcontractor Name:_ Address: License No.: Description of Work to be Subcontracted Department of Industrial Relation Registration No. Name and Location of Subcontractor License No.: Description of Work to be Subcontracted Department of Industrial Relation Registration No. Name and Location of Subcontractor Name: Address: License No.: Description of Work to be Subcontracted Department of Industrial Relation Registration No. Name and Location of Subcontractor Description of Work to be Subcontracted Name: Address: License No.: Department of Industrial Relation Registration CBF -14 BIDDER: 2.0 The following are the names, addresses and telephone numbers for three public agencies for which BIDDER has performed similar work within the past two (2) years: 2. Name and Address of Owner Name and telephone number of person familiar with project Contract amount Type of Work Date Completed Name and Address of Owner Name and telephone number of person familiar with project Contract amount Type of Work Date Completed 3. Name and Address of Owner Name and telephone number of person familiar with project Contract amount Type of Work Date CBF -15 EJ Name and Address of Owner Name and telephone number of person familiar with project Contract amount Type of Work Date Completed CBF -16 SECTION 3 NON-COLL USION AFFIDAVIT CBF -17 BIDDER: NON -COLLUSION AFFIDAVIT In accordance with Public Contract Code Section 7106, the undersigned, being first duly sworn, deposes and says that he or she holds the position listed below with the bidder, the party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Signature Typed or Printed Name Title Bidder Subscribed and sworn before me This _ day of 20 Notary Public in and for the State of California My Commission Expires: CBF -18 (Seal) CONSTRUCTION CONTRACT COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT (COMPANY NAME) 1. PARTIES AND DATE This Contract is made and entered into this day of 20 (Effective Date) by and between the City of Rosemead, a municipal corporation of the State of California, located at 8838 E. Valley Blvd., Rosemead, California 91770, ("City") and COMPANY NAME with its principal place of business at COMPANY ADDRESS (hereinafter referred to as "Contractor"). City and Contractor are sometimes individually referred to as "Party" and collectively as "Parties" in this Contract. 2. RECITALS 2.1 Contractor Contractor desires to perform and assume responsibility for the COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT by the City on the terms and conditions set forth in this Contract. Contractor represents that it is experienced in providing such work services to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the Services in the State of California, and that is familiar with the plans of City. 2.2 Project City desires to engage Contractor to render such services described herein as Project ("Project") as set forth in this Contract. 3. TERMS 3.1 Scope of Services and Term 3.1.1 General Scope of Services. Contractor promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional construction services necessary for the Project ("Services"). The Services are more particularly described in Exhibit "A" attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Contract, the exhibits attached Company Name Page 2 of 11 hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations. 3.1.2 Term. The term of this Contract shall be from Effective Date shown above to Month, Date and Year unless earlier terminated as provided herein. Contractor shall complete the Services within the term of this Contract, and shall meet any other established schedules and deadlines. The Parties may, by mutual, written consent, extend the term of this Contract if necessary to complete the Services. 3.2 Responsibilities of Contractor. 3.2.1 Control and Payment of Subordinates; Independent Contractor. The Services shall be performed by Contractor or under its supervision. Contractor will determine the means, methods and details of performing the Services subject to the requirements of this Contract. City retains Contractor on an independent contractor basis and not as an employee. Contractor retains the right to perform similar or different services for others during the term of this Contract. Any additional personnel performing the Services under this Contract on behalf of Contractor shall also not be employees of City and shall at all times be under Contractor's exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance. 3.2.2 Schedule of Services: Contractor shall perform the Services expeditiously, within the term of this Contract, and within the schedules timeline. Contractor represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions. In order to facilitate Contractor's conformance with the Schedule, City shall respond to Contractor's submittals in a timely manner. Upon request of City, Contractor shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services. 3.2.3 Conformance to Applicable Requirements. All work prepared by Contractor shall be subject to the approval of City. 3.2.4 City's Representative. The City hereby designates the City Manager, Ben Kim, or his designee, to act as its representative for the performance of this Contract ("City's Representative'). City's Representative shall have the power to act on behalf of the City for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the City's Representative or his or her designee. 3.2.5 Contractor's Representative. Contractor hereby designates Project Manager, or his designee, to act as its representative for the performance of this Contract ("Contractor's Representative"). Contractor's Representative shall have full authority to represent and act on behalf of the Contractor for all purposes under this Contract. The Contractor's Representative shall supervise and direct the Services, using his/her best skill and attention, and shall be responsible for all means, methods, techniques, sequences and Company Name Page 3 of 11 procedures and for the satisfactory coordination of all portions of the Services under this Contract. 3.2.6 Coordination of Services. Contractor agrees to work closely with City staff in the performance of Services and shall be available to City's staff, consultants and other staff at all reasonable times. 3.2.7 Standard of Care; Performance of Employees. Contractor shall perform all Services under this Contract in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Services. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License if applicable, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Contractor's failure to comply with the standard of care provided for herein. Any employee of the Contractor or its sub -contractors who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Contractor and shall not be re-employed to perform any of the Services or to work on the Project. 3.2.8 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state aind federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA, AQMD requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with Services. If the Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations. 3.2.9 Insurance: Contractor shall maintain, prior to the beginning of and for the duration of this Contract, insurance coverage as specified in Exhibit B attached to and part of this Contract. 3.2.10 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees Company Name Page 4 of 11 appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and life saving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures. 3.2.11 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 1600, et seq., ("Prevailing Wage Laws'), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance' projects. If the Services are being performed as part of an applicable "public works' or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. 3.2.12 Bonds. 3.2.12.1 Performance Bond: If specifically requested by City, Contractor shall execute and provide to City concurrently with this Contract a Performance Bond in the amount of the total, not -to -exceed compensation indicated in this Contract, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by the City. 3.2.12.2 Payment Bond. If required by law or otherwise specifically requested by City, Contractor shall execute and provide to City concurrently with this Contract a Payment Bond in the amount of the total, not -to -exceed compensation indicated in this Contract, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by the City. 3.2.12.3 Bond Provisions. Should, in City's sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the affected bond within 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the total Company Name Page 5 of 11 compensation is increased in accordance with the Contract, the Contractor shall, upon request of the City, cause the amount of the bonds to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. To the extent available, the bonds shall further provide that no change or alteration of the Contract (including, without limitation, an increase in the total compensation, as referred to above), extensions of time, or modifications of the time, terms, or conditions of payment to the Contractor, will release the surety. If the Contractor fails to furnish any required bond, the City may terminate this Contract for cause. 3.2.12.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted. The surety must be a California -admitted surety with a current A.M. Best's rating no less than A:VIII and satisfactory to the City. If a California -admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City. 3.3 Fees and Payments. 3.3.1 Compensation. The total compensation shall not exceed Dollar Amount in Word Format Dollars (Numerical) without advance written approval of City's project manager. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Contract. 3.3.2 Payment of Compensation. Contractor shall submit to City a monthly itemized statement that indicates work completed and hours of Services rendered by Contractor. The statement shall describe the amount of Services and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within 45 days after receiving such statement, review the statement and pay all approved charges. The payments will be subject to a 5% retention amount, which would be released and paid after all work under the Contract has been satisfactorily completed, and 35 days after a Notice of Completion is filed with the County of Los Angeles. 3.3.3 Reimbursement for Expenses. Contractor shall not be reimbursed for any expenses unless authorized in writing by City. 3.3.4 Extra Work. At any time during the term of this Contract, City may request that Contractor perform Extra Work. As used herein, "Extra Work" means any work that is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Contract. Contractor shall not perform, nor be compensated for, Extra Work without written authorization from City's Representative. 3.4 Accounting Records. 3.4.1 Maintenance and Inspection. Contractor shall maintain complete and accurate records with respect to all costs and expenses incurred under this Contract. All Company Name Page 6 of 11 such records shall be clearly identifiable. Contractor shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Contract. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to the Contract for a period of three (3) years from the date of final payment under this Contract. 3.5 General Provisions. 3.5.1 Termination of Contract. 3.5.1.1 Grounds for Termination. City may, by written notice to Contractor, terminate the whole or any part of this Contract at any time and without cause by giving written notice to Contractor of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Contractor shall be compensated only for those services that have been adequately rendered to City, and Contractor shall be entitled to no further compensation. Contractor may not terminate this Contract except for cause. 3.5.1.2 Effect of Termination. If this Contract is terminated as provided herein, City may require Contractor to provide all finished or unfinished Documents and Data and other information of any kind prepared by Contractor in connection with the performance of Services under this Contract. Contractor shall be required to provide such document and other information within fifteen (15) days of the request. 3.5.1.3 Additional Services. In the event this Contract is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. 3.5.2 Delivery of Notices. All notices permitted or required under this Contract shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose: rel CITY: Company Name Address City, State, Zip Code Attn: Project Manager's Name Tel: (000) 000-0000 City of Rosemead 8838 E. Valley Boulevard Rosemead, CA 91770 Attn: Ben Kim, City Manager Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the Company Name Page 7 of 11 party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service. 3.5.3 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Contract. 3.5.4 Attorney's Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Contract, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorney's fees and all other costs of such action. 3.5.5 Indemnification. Contractor shall defend, indemnify and hold the City, its officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Services, the Project or this Contract, including without limitation the payment of all consequential damages and attorneys fees and other related costs and expenses. Contractor shall defend, at Contractor's own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its directors, officials, officers, employees, agents or volunteers. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its directors, officials, officers, employees, agents or volunteers, in any such suit, action or other legal proceeding. Contractor shall reimburse City and its directors, officials, officers, employees, agents and/or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, officials, officers, employees, agents or volunteers. 3.5.6 Entire Contract. This Contract contains the entire Contract of the parties with respect to the subject matter hereof, and supersedes all prior negotiations and understandings. This Contract may only be modified by a writing signed by both parties. 3.5.7 Governing Law. This Contract shall be governed by the laws of the State of California. Venue shall be in Los Angeles County. 3.5.8 Time of Essence. Time is of the essence for each and every provision of this Contract. 3.5.9 City's Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project. 3.5.10 Successors and Assigns. This Contract shall be binding on the successors and assigns of the parties. Company Name Page 8 of 11 3.5.11 Assignment or Transfer. Contractor shall not assign, hypothecate, or transfer, either directly or by operation of law, this Contract or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer. 3.5.12 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Contract, the language of this Contract shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not workdays. All references to Contractor include all personnel, employees, agents, and subcontractors of Contractor, except as otherwise specified in this Contract. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Contract. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Contract. 3.5.13 Amendment; Modification. No supplement, modification, or amendment of this Contract shall be binding unless executed in writing and signed by both Parties. 3.5.14 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppels, or otherwise. 3.5.15 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties. 3.5.16 Invalidity; Severability. If any portion of this Contract is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect. 3.5.17 Prohibited Interests. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to rescind this Contract without liability. For the term of this Contract, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. 3.5.18 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, Company Name Page 9 of 11 handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Contractor shall also comply with all relevant provisions of City's Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted. 3.5.19 Labor Certification. By its signature hereunder, Contractor certifies that it is aware of the provisions of Section 3700 of the California Labor Code that require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services. 3.5.20 Authority to Enter Contract. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Contract. Each Party warrants that the individuals who have signed this Contract have the legal power, right, and authority to make this Contract and bind each respective Party. 3.5.21 Counterparts. This Contract may be signed in counterparts, each of which shall constitute an original. 3.6 Subcontracting. 3.6.1 Prior Approval Required. Contractor shall not subcontract any portion of the work required by this Contract, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Contract. [SIGNATURES ON NEXT PAGE] Company Name Page 10 of 11 CITY OF ROSEMEAD Ben Kim, City Manager Date Attest: Ericka Hernandez, City Clerk Approved as to Form: Date COMPANY NAME By: _ Signature Date Na Print [If Corporation, TWO SIGNATURES, President OR Vice President AND Secretary, AND CORPORATE SEAL OF CONTRACTOR REQUIRED] By: Rachel Richman, City Attorney Date Name: Company Name EXHIBIT A SCOPE OF CONTRACT SERVICES SEE ATTACHED BID SCHEDULE/PROPOSAL Company Name EXHIBIT B INSURANCE REQUIREMENTS Prior to the beginning of and throughout the duration of the Work, Contractor will maintain insurance in conformance with the requirements set forth below. Contractor will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth here, Contractor agrees to amend, supplement or endorse the existing coverage to do so. Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to City in excess of the limits and coverage required in this Contract and which is applicable to a given loss, will be available to City. Contractor shall provide the following types and amounts of insurance: Commercial General Liability Insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO "insured contract' language will not be accepted. Automobile liability insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident. Workers' compensation insurance. Contractor shall maintain Workers' Compensation Insurance (Statutory Limits) and Employer's Liability Insurance (with limits of at least $1,000,000) for Contractor 's employees in accordance with the laws of the State of California, Section 3700 of the Labor Code In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor's employees. Excess or Umbrella Liability Insurance. (Over Primary) Contractor shall obtain and maintain an umbrella or excess liability insurance policy that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability, automobile liability, and employer's liability. Such policy or policies shall include the following terms and conditions: Contractor shall obtain and maintain an umbrella or excess liability insurance policy thatwill provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability, automobile liability, and employer's liability. Such policy or policies shall include Company Name the following terms and conditions: • A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason; • Pay on behalf of wording as opposed to reimbursement; • Concurrency of effective dates with primary policies; and • Policies shall "follow form" to the underlying primary policies. • Insureds under primary policies shall also be insureds under the umbrella or excess policies. Builder's risk insurance. Upon commencement of construction and with approval of Agency, Contractor shall obtain and maintain builder's risk insurance for the entire duration of the Project until only the Agency has an insurable interest. The Builder's Risk coverage shall include the coverages as specified below. The named insureds shall be Contractor and Agency, including its officers, officials, employees, and agents. All Subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear. Contractor shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to Agency. The policy shall contain a provision that all proceeds from the builder's risk policy shall be made payable to the Agency. The Agency will act as a fiduciary for all other interests in the Project. Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub -limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub -limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to Agency to ensure adequacy of terms and sublimits and shall be submitted to the Agency prior to commencement of construction. Insurance procured pursuant to these requirements shall be written by insurers that are admitted carriers in the state of California and with an A.M. Bests rating of A- or better and a minimum financial size VII. General conditions pertaining to provision of insurance coverage by Contractor. Contractor and City agree to the following with respect to insurance provided by Contractor: Contractor agrees to have its insurer endorse the third party General liability policies shall provide or be endorsed to provide that Agency and its officers, Company Name officials, employees, agents, and volunteers shall be additional insurer under such policies using standard ISO endorsement No. CG 2010. Contractor also agrees to require all contractors, and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Contract shall prohibit Contractor, or Contractor's employees, or agents, from waiving the right of subrogation prior to a loss. Contractor agrees to waive subrogation rights against City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 3. All insurance coverage and limits provided by Contractor and available or applicable to this Contract are intended to apply to the full extent of the policies. Nothing contained in this Contract or any other Contract relating to the City or its operations limits the application of such insurance coverage. 4. None of the coverage required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called "third party action over" claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification and additional requirements by the City, as the need arises. Contractor shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect City's protection without City's prior written consent. 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all of the coverage required and an additional insured endorsement to Contractor's general liability policy, shall be delivered to City at or prior to the execution of this Contract. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled at any time and no replacement coverage is provided, City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other Contract and to pay the premium. Any premium so paid by City shall be charged to and promptly paid by Contractor or deducted from sums due Contractor, at City option. Certificate(s) are to reflect that the insurer will provide 30 days notice to City of any cancellation of coverage. Contractor agrees to require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, or that any party will "endeavor" (as opposed to being required) to comply with the requirements of the certificate. Company Name It is acknowledged by the parties of this Contract that all insurance coverage required to be provided by Contractor or any subcontractor, is intended to apply first and on a primary, noncontributing basis in relation to any other insurance or self insurance available to City. 10. Contractor agrees to ensure that subcontractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all Contracts with subcontractors and others engaged in the project will be submitted to City for review. 11.Contractor agrees not to self -insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it will not allow any contractor, subcontractor, Architect, Engineer or other entity or person in any way involved in the performance of work on the project contemplated by this Contract to self -insure its obligations to City. If Contractor's existing coverage includes a deductible or self-insured retention, the deductible or self- insured retention must be declared to the City. At that time the City shall review options with the Contractor, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 12. The City reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City will negotiate additional compensation proportional to the increased benefit to City. 13. For purposes of applying insurance coverage only, this Contract will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Contract. 14. Contractor acknowledges and agrees that any actual or alleged failure on the part of City to inform Contractor of non-compliance with any insurance requirement in no way imposes any additional obligations on City nor does it waive any rights hereunder in this or any other regard. 15.Contractor will renew the required coverage annually as long as City, or its employees or agents face an exposure from operations of any type pursuant to this Contract. This obligation applies whether or not the Contract is canceled or terminated for any reason. Termination of this obligation is not effective until City executes a written statement to that effect. 16. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Contract have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered Company Name shall be submitted prior to expiration. A coverage binder or letter from Contractor's insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these specifications applicable to the renewing or new coverage must be provided to City within five days of the expiration of the coverage. 17.The provisions of any workers' compensation or similar act will not limit the obligations of Contractor under this Contract. Contractor expressly agrees not to use any statutory immunity defenses under such laws with respect to City, its employees, officials and agents. 18. Requirements of specific coverage features or limits contained in this section are not intended as limitations on coverage, limits or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be limiting or all- inclusive. 19.These insurance requirements are intended to be separate and distinct from any other provision in this Contract and are intended by the parties here to be interpreted as such. 20.The requirements in this Section supersede all other sections and provisions of this Contract to the extent that any other section or provision conflicts with or impairs the provisions of this Section. 21. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Contractor for the cost of additional insurance coverage required by this Contract. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto. Contractor agrees to provide immediate notice to City of any claim or loss against Contractor arising out of the work performed under this Contract. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 PERFORMANCE BOND PERFORMANCE BOND WHEREAS the CITY OF ROSEMEAD (also herein "Obligee") has awarded to (hereinafter "Contractor"), a contract for work consisting of but not limited to, furnishing all labor, materials, tools, equipment, services, and incidentals for the COUNCIL CHAMBER AUDIOVISUAL UPGRADES and all other required structures and facilities within the rights-of-way, easements and permits; WHEREAS, the Work to be performed by the forth in that certain contract for the said Public Work dated _ the "Public Work Contract"); and Contractor is more particularly set (hereinafter WHEREAS, the Contractor is required by said Public Work Contract to perform the terms thereof and to provide a bond both for the performance and guaranty thereof, NOW, THEREFORE, we the undersigned Contractor, as Principal, and , a corporation organized and existing under the laws of the State of , and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto the CITY OF ROSEMEAD in the sum of dollars, ($ ), said sum being not less than 100% of the total amount payable by the said Obligee under the terms of the said Public Work Contract, for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the said Public Work Contract and any alteration thereof made as therein provided, on his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill the one-year guarantee of all materials and workmanship; and indemnify and save harmless the Obligee, its officers and agents, as stipulated in the said Public Work Contract, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect. In the event legal action is required to enforce the provisions of this agreement, the prevailing party shall be entitled to recover reasonable attorneys' fees in addition to court costs, necessary disbursements, and other damages. In case legal action is required to enforce the provisions of this bond, the prevailing parry shall be entitled to recover reasonable attorneys' fees in addition to court costs, necessary disbursements and other consequential damages. The said Surety, for value received, hereby stipulates and agrees that no change, extensions of time, alteration or addition to the terms of the Public Work Contract or to the Work PERFORMANCE BOND - 1 to be performed thereunder, or the specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work or to Specifications. IN WITNESS WHEREOF, we have hereto set our hands and seals this _ day on , 20 Principal/Contractor By: President Surety By: Attorney -in -Fact The rate of premium on this bond is per thousand. The total amount of premium charged, (The above must be filled in by corporate surety.) PERFORMANCE BOND -2 STATE OF CALIFORNIA ) ss. COUNTY OF On this _ day of , in the year , before me, a Notary Public in and for said state, personally appeared , ]mown to me (or proved to be on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument as the Attorney -in -Fact of the (surety) and acknowledged to me that he subscribed the name of the (surety) thereto and his own name as Attorney -in -Fact. (SEAL) My Commission expires Notary Public in and for said State PERFORMANCE BOND -3 CERTIFICATE AS TO CORPORATE PRINCIPAL I, , certify that I am the Secretary of the corporation named as principal to the within bond; that who signed the said bond on behalf of the principal was then of said corporation; that I know his signature, and his signature thereto is genuine; and that said bond was duly signed, sealed and attested for and in behalf of said corporation by authority of its governing Board. (Corporate Seal) Signature Date NOTE: A copy of the power of attorney to local representatives of the bonding company may be attached hereto. PERFORMANCE BOND -4 CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 PAYMENT BOND PAYMENT (MATERIAL & LABOR) BOND WHEREAS the CITY OF ROSEMEAD (hereinafter "Obligee") has awarded to (hereinafter "Contractor"), a contract for work consisting of but not limited to, furnishing all labor, materials, tools, equipment, services, and incidentals for the COUNCIL CHAMBER AUDIOVISUAL UPGRADES and all other required structures and facilities within the rights-of-way, easements and permits; WHEREAS, the Work to be performed by the Contractor is more particularly set forth in that certain contract for the said Public Work dated (hereinafter the "Public Work Contract"); and WHEREAS, said Contractor is required to furnish a bond in connection with said Public Work Contract providing that if said Contractor or any of his or its subcontractors shall fail to pay for any materials, provisions, or other supplies, or terms used in, upon, for or about the performance of the Work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the provisions of 3248 of the California Civil Code, with respect to such work or labor, that the Surety on this bond will pay the same together with a reasonable attorney's fee in case suit is brought on the bond. NOW, THEREFORE, we the undersigned Contractor, as Principal and , a corporation organized and existing under the laws of the State of and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto the CITY OF ROSEMEAD and to any and all material men, persons, companies or corporations furnishing materials, provisions, and other supplies used in, upon, for or about the performance of the said Public Work, and all persons, companies or corporations renting or hiring teams, or implements or machinery, for or contributing to said Public Work to be done, and all persons performing work or labor upon the same and all persons supplying both work and materials as aforesaid excepting the said Contractor, the sum of dollars, ($ ), said sum being not less than 100% of the total amount payable by said Obligee under the terms of the said Public Work Contract, for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH that if the Principal, his or its subcontractors, heirs, executors, administrators, successors, or assigns, shall fail to pay for any materials, provisions, or other supplies or machinery used in, upon, for or about the performance of the Work contracted to be done, or for work or labor thereon of any kind, or fail to pay any of the persons named in California Civil Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such claimant, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the contractor and his subcontractors pursuant to PAYMENT BOND -1 Section 13020 of the Unemployment Insurance Code with respect to such work and labor, and all other applicable laws of the State of California and rules and regulations of its agencies, then said Surety will pay the same in or to an amount not exceeding the sum specified herein. In case legal action is required to enforce the provisions of this bond, the prevailing party shall be entitled to recover reasonable attorneys' fees in addition to court costs, necessary disbursements and other consequential damages. In addition to the provisions hereinabove, it is agreed that this bond will inure to the benefit of any and all persons, companies and corporations entitled to make claims under Sections 3110, 3111, 3112 and 3181 of the California Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond. The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or additions to the terms of the said Public Work Contract or to the Work to be performed thereunder or the specification accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the Work or to the Specifications. IN WITNESS WHEREOF, we have hereto set our hands and seals this _ day on 20 Principal/Contractor By: President Surety By: Attomey-in-Fact PAYMENT BOND -2 STATE OF CALIFORNIA ) COUNTY OF ) ss. On this day of , in the year , before me, a Notary Public in and for said state, personally appeared , known to me (or proved to be on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument as the Attorney -in -Fact of the (surety) and acknowledged to me that he subscribed the name of the (surety) thereto and his own name as Attorney -in -Fact. (SEAL) My Commission Expires Notary Public in and for said State PAYMENT BOND -3 CERTIFICATE AS TO CORPORATE PRINCIPAL Secretary of the corporation named was then certify that I am the as principal in the attached bond, that who signed the said bond on behalf of the principal of said corporation; that I know his signature, and his signature thereto is genuine; and that said bond was duly signed, sealed and attested for and in behalf of said corporation by authority of its governing Board. (Corporate Seal) Signature Date NOTE: A copy of the power of attorney to local representatives of the bonding company may be attached hereto. PAYMENTBOND-4 CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 PART "A" GENERAL PROVISIONS Standard Specifications. The Work hereunder shall be done in accordance with the Standard Specifications for Public Works Construction ("Greenbook"), 2021 Edition, including all current supplements, addenda, and revisions thereof (hereinafter referred to as "Standard Specifications"), these General Conditions and the Specifications and Drawings identified in the Contract Documents. The Standard Specifications are referred to and by this reference made a part hereof as though set forth at length. In the case of conflict between the Standard Specifications and these General Conditions, these General Conditions shall take precedence over, and shall be used in lieu of, such conflicting provisions. The section headings in these General Conditions correspond to the section headings of the Standard Specifications. In the event a section heading contained in the Standard Specifications is not referenced in these General Conditions that section shall read exactly as stated in the Standard Specifications. Supplemental Reference Specifications. Insofar as references may be made in these Special Provisions to the Caltrans Standard Specifications, such work shall conform to the referenced portions of the technical provisions Caltrans Standard Specifications, 2023 edition, only of said reference specifications, provided, that wherever the term "Standard Specifications" is used without the prefix "Caltrans", it shall mean the Standard Specifications for Public Works Construction ("Green Book"), 2021 Edition, as previously specified in the above paragraph. GENERAL PROVISIONS - 1 PART 1 - GENERAL PROVISIONS SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-2 TERMS AND DEFINITIONS Wherever in the Standard Specifications or other Contract Documents the following terms are used, they shall mean the following: Agency - The CITY OF ROSEMEAD Bid Guaranty - As defined in the Standard Specifications. Also referred to as the "Bid Security" in the Contract Documents. Bid Security - The Bid Guaranty, as defined herein. Board - The City Council of the CITY OF ROSEMEAD. City - The CITY OF ROSEMEAD City's Representative - The Engineer, as defined herein. Contract - The written agreement (Contract form) between the City and the Contractor for the complete and adequate completion of the Work for the Project. The Contract consists of the Contract Documents. The documents comprising the Contract are complementary, and each obligation of the Contractor, Subcontractors and material or equipment suppliers in any one document shall be binding as if specified in all. The Contract is intended to include all items required for the proper execution and completion of the Work. Contract Documents - In addition to the documents noted in the definition of Contract Documents in the Standard Specifications, all documents incorporated by reference into the Contract form. Contract Price - The amount stated in the Contract form, including authorized adjustments pursuant to Change Orders, which is the total amount payable by the City to the Contractor for performance of the Work under the Contract. It is also sometimes referred to as the "Total Bid Price" in the Contract Documents. Contractor's Representative— Contractor's executive representative who shall be present on the Project Site at all times that any Work is in progress and who shall have the authority to act on behalf of the Contractor for all purposes under the Contract. The Contractor shall designate such representative in writing to the City. The Contractor's Representative shall be available to the City and its agent's at all reasonable times. GENERAL PROVISIONS - 2 Engineer - The Director of Public Works of the CITY OF ROSEMEAD, acting either directly or through properly authorized agents, such as agents acting within the scope of the particular duties entrusted to them. Also sometimes referred to as the "City's Representative" in the Contract Documents. Liquidated Damages - the amount prescribed in the Contract form, pursuant to the authority of Government Code Section 53069.85, to be paid to the City or to be deducted from any payments due, or to become due, the Contractor for each day's delay in completing the whole or any specified portion of the Work beyond the time allowed in the Contract Documents. Notice to Contractors - Notice Inviting Bids. Project - The total and satisfactory completion of the project noted in the Contract Documents, as well as all related work performed in accordance with the Contract, including but not limited to, any alternates selected by the City. Project Site - All of the property and/or facilities of the City where the Work will be performed pursuant to the Contract, as well as such adjacent lands as may be directly affected by the performance of the Work. Recyclable Waste Materials - Materials removed from the Project site which is required to be diverted to a recycling center rather than an area landfill. Recyclable Waste Materials include asphalt, concrete, brick, concrete block, and rock. Special Provisions - Any provisions which supplement or modify the Standard Specifications, including these General Conditions (Part "A"), the Supplementary General Conditions (Part `B") and the Technical Provisions (Part "C"). Total Bid Price - The amount stated in the Contract form, including authorized adjustments pursuant to Change Orders, which is the total amount payable by the City to the Contractor for performance of the Work under the Contract. Also sometimes referred to as the "Contract Price" in the Standard Specifications and other Contract Documents. - END OF SECTION - GENERAL PROVISIONS - 3 SECTION 2 SCOPE OF THE WORK The project consists of furnishing and installing audiovisual components to upgrade the existing audiovisual components at the City of Rosemead Council Chamber, as listed per bid schedule. Project includes upgrades to the existing microphones located in the Council Chamber, installation of a 109 -inch video wall display, including other incidental and appurtenant work necessary for the proper completion of the project and other related work as described in the specifications. 3-3 SUBCONTRACTS Section 3-3 of the Standard Specifications shall be amended to include the following provisions: "By appropriate written agreement, Contractor shall require each Subcontractor to be bound by all obligations of this Contract. Each subcontract agreement shall preserve and protect the rights of the City. Should any subcontractor fail to perform the Work undertaken by him to the satisfaction of the City, said subcontractor shall be removed immediately from the Project upon request by the City's Representative and shall not again be employed on the Work. The Contractor shall be held liable for the all deficient Subcontractor Work." 1-7.2 CONTRACT BONDS The following shall be added at the end of Section 2-4 of the Standard Specifications: "The Contractor shall ensure that its Bonding Company is familiar with all of the terms and conditions of the contract Documents, and shall obtain a written acknowledgment by the Bonding Company that said Bonding Company thereby waives the right of special notification of any changes or modifications of the Contract, or of extensions of time, or of decreased or increased Work, or of cancellation of the Contract, or of any other act or acts by the Owner or any of its authorized representatives. If the Contract Price is increased in accordance with the Contract, the Contractor shall, upon request of the City, cause the amount of the bonds to be increased accordingly and promptly deliver satisfactory evidence of such increase to the City." "Pursuant to Public Contract Code Section 4108, Contractor shall require all Subcontractors providing labor and materials in excess of the amount indicated in the Notice Inviting Bids to supply Payment and Performance Bonds in accordance with the same bond requirements applicable to the Contractor, except that the bond amounts shall equal the total amount of their subcontract. The Contractor shall specify this requirement for Subcontractor bonds in his written or published request for Subcontractor bids. Failure to comply with this requirement shall not preclude Contractor from complying with the Subcontractor bonding requirements. The practice of issuing separate purchase orders and/or subcontracts for the purpose of circumventing the Subcontractor bonding requirements shall not serve to exempt the Contractor from these requirements. No payments, except for a reimbursement payment to the Contractor for the cost of the Contractor's own Faithful Performance and Payment bonds, shall be made to the Contractor until the Contractor provides the aforementioned Subcontractor bonds to the Contractor." 3-7 CONTRACT DOCUMENTS GENERAL PROVISIONS - 4 3-7.1 General. The second full paragraph of Section 3-7.1 of the Standard Specifications shall be amended to include the following at the end of that paragraph: "All Contract Documents are essential parts of the Contract for a given project. Any requirement included in one Contract Document shall be as binding as though included in all, as they are intended to be cooperative and to provide a description of the Work to be done." 3-7.2 Precedence of Contract Documents. The provisions of Section 3-7.2 of the Standard Specifications shall be revised to read as follows: "In resolving disputes resulting from conflicts, errors, or discrepancies in any of the Contract Documents, the document highest in precedence shall control. The order of precedence shall be as listed below: 1. Change Orders or Work Change Directives 2. Agreement 3. Addenda 4. Contractor's Bid (Bid Forms) 5. Special Provisions 6. General Conditions 7. Standard Specifications 8. Notice Inviting Bids 9. Instructions to Bidders 10. Specifications 11. Plans (Contract Drawings) 12. Standard Plans 13. Reference Documents" "With reference to the Drawings, the order of precedence shall be as follows: I. Figures govern over scaled dimensions 2. Detail drawings govern over general drawings 3. Addenda or Change Order drawings govern over Contract Drawings 4. Contract Drawings govern over Standard Drawings 5. Contract Drawings govern over Shop Drawings" 3-4 Authority of the Board and the Engineer. Section 3-4 shall be added to the Standard Specifications to read as follows: "Should it appear that the Work to be done, or any matter relative thereto, is not sufficiently detailed or explained on the Plans or in the Specifications, the Contractor shall request the City's Representative for such further explanation as may be necessary, and shall conform to such explanation or interpretation as part of the Contract, so far as may be consistent with the intent of the original Specifications. In the event of doubt or questions relative to the true meaning of the Specifications, reference shall be made to the Engineer, whose decision thereon shall be final." GENERAL PROVISIONS - 5 3-4 AUTHORITY OF BOARD AND ENGINEER. The provisions of Section 3-4 of the Standard Specifications shall be revised to read as follows: "Whenever the Contract Documents refer to the Engineer or City's Representative, or provide the Engineer or City's Representative with power to act on behalf of the City, such reference shall necessarily include the City's Representative, or his or her authorized designee." "The City Council shall have the power to award the Contract, and shall generally have the final authority to act in all matters affecting the Project. The City's Representative shall have the authority to enforce compliance with the Contract Documents. The Contractor shall promptly comply with the instructions of the City's Representative. The decisions of the City's Representative shall be final and binding on all questions as to: (1) the quantity, quality and acceptability of materials and equipment furnished and Work performed; (2) the manner of performance and rate of progress of the Work; (3) any and all questions which may arise as to the interpretation of the Plans, Specifications, General Conditions, and Special Provisions; (4) the acceptable fulfillment of the Contract on the part of the Contractor; (5) any claims and compensation issues; and (6) his authority to enforce and make effective such decisions and actions as the Contractor fails to carry out promptly." 3-5 INSPECTION. The provisions of Section 3-5 shall be amended to include the following at the end of that Section: "The Engineer shall have complete and safe access to the Work at all times during construction, and shall be furnished with every reasonable facility for ascertaining that the materials and the workmanship are in accordance with the Specifications, the Special Provisions, and the Plans. All labor, materials, and equipment furnished shall be subject to the Engineer's inspection." "When the Work is substantially completed, the Engineer or a representative of the Engineer will make the final inspection." "Whenever the Contractor varies the period during which Work is carried on any day, he shall give adequate notice to the City's Representative so that proper inspection may be provided. Defective Work shall be made good, and unsuitable materials may be rejected, notwithstanding the fact that such defective work and unsuitable materials have previously been inspected, accepted or estimated for payment." "The Contractor shall prosecute work on any State highway or within any railroad right-of-way only in the presence of an inspector representing the State Division of Highways or the railroad company, and any Work done in the absence of such inspectors will be subject to rejection. The Contractor shall make the appropriate notification according to the instructions given on the State Encroachment Permit or railroad permit for all inspections, and shall post all bonds and certificates required by the permit. The permit shall be acquired by the Contractor at the GENERAL PROVISIONS - 6 Contractor's expense. The Contractor shall pay for all testing and inspections required by a State Encroachment Permit or railroad permit." 2-12 SITE EXAMINATION Section 2-12 shall be added to the Standard Specifications as follows: "The Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the Work, and the general and location conditions, such as, but not limited to, all other matters which could in any way affect the Work or the costs thereof. The failure of the Contractor to acquaint itself with all available information regarding any applicable existing or future conditions shall not relieve it from the responsibility for properly estimating either the difficulties, responsibilities, or costs of successfully performing the Work according to the Contract Documents." 7-4 PROHIBITION AGAINST SUBCONTRACTING OR ASSIGNMENT. Section 2-14 shall be added to the Standard Specifications as follows: "The Contractor shall give his personal attention to the fulfillment of the Contract and shall keep the Work under his control. The Contractor shall not contract with any other entity to perform in whole or in part the services required hereunder except in strict compliance with Section 2-3 of the Standard Specifications and state law. In addition, neither this Contract nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered, either voluntarily or by force of law, except as otherwise provided in Section 7103.5 of the State of California Public Contract Code, without the prior written approval of the City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of the Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, this Contract shall be void. No approved transfer shall release the Contractor or any surety of the Contractor of any liability hereunder without the expressed written consent of the City." - END OF SECTION - GENERAL PROVISIONS - 7 SECTION 3 CHANGES IN WORK 2-7 CHANGES INITIATED BY THE AGENCY. 2-7.1 General. The provisions of Section 2-7.1of the Standard Specifications shall be amended to include the following at the end of that Section: "Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions and provisions of the original Contract." 7-3 Payment. The provisions of Section 7-3 of the Standard Specifications shall be revised to read as follows: "7-3.5 Contract Unit Prices. Section 7-3.5 shall be amended in its entirety to read as follows:" "In the event of an increase or decrease in a bid item quantity of a unit price contract, the total amount of work actually done or materials or equipment furnished shall be paid for according to the unit price established for such work under the Contract Documents, wherever such unit price has been established; provided, that an adjustment in the Contract Unit Price may be made for changes which result in an increase or decrease in the quantity of any unit price bid item of the Work in excess of 25 percent, or for eliminated items of work." "7-3.5.2 Increases of More Than 25 Percent on Unit Price Contracts. On a unit price contract, should the total quantity of any item of work required under the Contract exceed the Engineer's Estimate therefor by more than 25 percent, the work in excess of 125 percent of such estimate and not covered by an executed contract Change Order specifying the compensation to be paid therefor will be paid for by adjusting the Contract Unit Price, as hereinafter provided, or at the option of the Owner, payment for the work involved in such excess will be made as provided in Paragraph 7-3.5.2, as amended in these Special Provisions." "Such adjustment of the Contract Unit Price will be the difference between the Contract Unit Price and the actual unit cost, which will be determined as hereinafter provided, of the total pay quantity of the item. If the costs applicable to such item of work include fixed costs, such fixed costs shall be deemed to have been recovered by the Contractor by the payments made for 125 percent of the Engineer's Estimate of the quantity for such item, and in computing the actual unit costs, such fixed costs will be excluded. Subject to the above provisions, such actual unit cost will be determined by the engineer in the same manner as if the work were to be paid for as extra work as provided in Paragraph 7-3.5.2, as amended in these Special Provisions, or such adjustment as will be as agreed to by the Contractor and the Owner." "When the compensation payable for the number of units of an item of work performed in excess of 125 percent of the Engineer's Estimate is less than $5,000 at the applicable Contract Unit GENERAL PROVISIONS - 8 Price, the Engineer reserves the right to make no adjustment in said price if he so elects, except that an adjustment will be made if requested in writing by the Contractor." "7-3.5.3 Decreases of More Than 25 Percent on Unit Price Contracts. On unit price contracts, should the total pay quantity of any item of work required under the contract be less than 75 percent of the Engineer's Estimate therefor, an adjustment in compensation pursuant to this Section will not be made unless the Contractor so requests in writing. If the Contractor so requests, the quantity of said item performed, unless covered by an executed contract change order specifying the compensation payable therefor, will be paid for by adjusting the Contract Unit Price as hereinafter provided, or at the option of the engineer, payment for the quantity of the work of such item performed will be made as if the work were to paid for as extra work as provided in Paragraph 7-3.5.3, as amended in these Special Provisions, or such adjustment as will be as agreed to by the Contractor and the Owner; provided, however, that in no case shall the payment for such work be less than that which would be made at the Contract Unit Price." "Such adjustment of the contract unit price will be the difference between the contract unit price and the actual unit cost, which will be determined as hereinafter provided, of the total pay quantity of the item, including fixed costs. Such actual unit cost will be determined by the Engineer in the same manner as if the work were to be paid for as extra work as provided in Paragraph 7-3.5.3, as amended in these Special Provisions, or such adjustment as will be as agreed to by the Contractor and the Owner." "The payment for the total pay quantity of such item of work will in no case exceed the payment which would be made for the performance of 75 percent of the Engineer's Estimate of the quantity for such item at the original Contract Unit Price." "7-3.8 Eliminated Items on Unit Price Contracts. On unit price contracts, should any contract item of the work be eliminated in its entirety, in the absence of an executed contract Change Order covering such elimination, payment will be made to the Contractor for actual costs incurred in connection with such eliminated contract item if incurred prior to the date of notification in writing by the Engineer of such elimination." "If acceptable material is ordered by the Contractor for the eliminated item prior to the date of notification of such elimination by the Engineer, and if orders for such material cannot be canceled, it will be paid for at the actual cost to the Contractor. In such case, the material paid for shall become the property of the Owner and the actual cost of any further handling will be paid for by the Owner. If the material is returnable to the vendor and if the Engineer so directs the Contractor, the material shall be returned and the Contractor will be paid for the actual cost of charges made by the vendor for returning the material. The actual cost of handling returned material will be paid for." "The actual costs or charges to be paid by the Owner to the Contractor as provided in this Section 3-2 will be computed in the same manner as if the work were to be paid for as extra work as provided in Paragraph 7-3.8, as amended in these General Conditions, or such adjustment as will be as agreed to by the Contractor and the Owner." 7-4 PAYMENT FOR EXTRA WORK GENERAL PROVISIONS - 9 7-4.1 General. The provisions of Section 7-4.1 of the Standard Specifications shall be amended to include the following at the end of that Section: "Extra work shall be paid for under written work order in accordance with the terms therein provided. Generally, payment for extra work will be made at the unit price or lump sum previously agreed upon between the Contractor and the City." 7-4.2 Basis for Establishing Costs. The provisions of Section 7-4.2 of the Standard Specifications shall be amended as follows: 7-4.2.1 General. Section 7-4.2.1 shall be amended to include the following at the beginning of that Section: "Extra work shall be paid for under written work order in accordance with the terms therein provided. Generally, payment for extra work will be made at the unit price or lump sum previously agreed upon between the Contractor and the City." 7-4.3 Markup. Paragraph (a) of Section 7-4.3.1 (Work by Contractor) shall be amended in its entirety to read as follows: "(a) Work by Contractor. The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profit. a. LABOR COSTS 1. Labor markup for employer taxes standard federal/state rates: 10% 2. Labor markup for fringe benefits (if fringe benefits are not included in the labor cost: 15% 3. Labor overhead markup: 10% 4. Profit markup: 10% b. MATERIAL, EQUIPMENT, SUBCONTRACTOR COSTS Only 5% markup by prime contractor will be allowed on materials, equipment and subcontractor costs. No other additional markups (overhead, profit, etc.) will be allowed. c. After the total amount is established by adding the above items, an additional 2% markup for INSURANCE AND BONDING COSTS will be allowed. The markups mentioned hereinafter shall include, but are not limited to, all costs for the services of superintendents, project managers, timekeepers and other personnel not working directly on the change order, and pickup or yard trucks used by the above personnel, and other vehicles and/or equipment present at the job site but not directly used in actual construction activities. Incidental movements of labor, materials, supplies or equipment shall not be considered as use in actual construction activities. These costs shall not be reported as labor or equipment elsewhere, except when actually performing work directly on the change order and then shall only be reported at the labor classification of the work performed. GENERAL PROVISIONS - 10 2-5 EXISTING CONDITIONS. Section 2-5 shall be added to the Standard Specifications as follows: "Contractor shall have the sole responsibility for satisfying itself concerning the conditions, nature and location of the Project and the Work to be performed, as well as the general and local conditions. Such conditions shall include, but shall not be limited to, local labor availability, means of transportation, necessity for security, laws and codes, local permit requirements, wage scales, local tax structure, contractors' licensing requirements, availability of required insurance, and other factors that could in any way affect the Work or the costs thereof. The Contractor is solely responsible for understanding the facilities, difficulties and restrictions which may impact the total and adequate completion of the Project. The failure of the Contractor to acquaint himself with all available information regarding any applicable existing or future conditions shall not relieve him from the responsibility for properly estimating either the difficulties, responsibilities, or costs of fully and adequately performing the Work according to the Contract Documents." - END OF SECTION - GENERAL PROVISIONS - 11 SECTION 4 CONTROL OF MATERIALS 4-1 MATERIALS AND WORKMANSHIP 4-1.1 General. Section 4-1.1 of the Standard Specifications shall be amended in its entirety to read as follows: "It is the intent of the City in drafting the Contract Documents to accept only first-class work, materials, parts, equipment and workmanship. All materials, parts and equipment furnished by Contractor for the Work shall be new, high grade, free from defects, of specified kind and fully equal to samples when such samples are required. Used or secondhand materials, parts and equipment may be used only if permitted by the Specifications. When the quality or kind of material or articles required under the Contract are not particularly specified, the Contractor shall provide those representing the best of their class or kind. Quality of Work shall be in strict accordance with generally accepted standards. Material, parts, equipment and Work quality shall be subject to the approval of the City's Representative. All materials, parts and equipment used and installed, and all details of the Work done, shall at all times be subject to the supervision, test and approval of the City's Representative. The City's Representative shall have access to the Work at all times during construction, and shall be furnished with every reasonable facility for securing full knowledge with regard to the progress, workmanship and character of the materials, parts and equipment used or employed in the Work. Materials, parts and equipment shall be furnished in such quantities, kinds and at such times as to ensure uninterrupted progress of the Work." "All materials, parts, equipment or Work which are defective in their construction or deficient in any of the requirements of the Contract Documents, whether in place or not, shall be remedied or removed and replaced by the Contractor in an acceptable manner, and no compensation will be allowed for such correction work. Any Work done beyond the lines shown on the Plans or established by the City's Representative, or any extra work done without written authority, will be considered unauthorized and will not be paid for by the City. Upon Contractor's failure to comply promptly with any order of the City's Representative made under the provisions of this Section, the City's Representative shall have authority to cause such defective or unauthorized Work to be remedied or removed and replaced, and to deduct the costs thereof from any moneys due or to become due the Contractor. If the Work is found to be in compliance with these specifications, the City's Representative will furnish the Contractor with a certificate to that effect." 4-2 Protection of Work and Materials. The provisions of Section 4-2 of the Standard Specifications shall be amended to add the following at the end of that Section: "Contractor shall fully and adequately store and protect all materials, parts and equipment, as required herein. Contractor shall be solely responsible for any and all damages or loss by weather or any other cause to such materials, parts and equipment. The Contractor shall make good any and all damages or loss to materials, parts and equipment." "Until the final written acceptance of the Work by the City, the Contractor shall have the charge and care thereof and shall bear the risk of injury or damage to any part of the Work by the action of the elements or any other cause. The Contractor shall rebuild, repair, restore and make good all injuries or damages to any portion of the Work occasioned by any cause before its GENERAL PROVISIONS - 12 completion and acceptance, and shall bear the expense thereof, except for such injuries or damages arising from the sole negligence or willful misconduct of the City, its officers, agents or employees. In the case of suspension of Work from any cause whatsoever, the Contractor shall be responsible for all materials and the protection of Work already completed, and shall properly store and protect them, if necessary. Contractor shall provide suitable drainage and erect temporary structures where necessary. Nothing in this Contract shall be considered as vesting in the Contractor any right of property in materials used after they have been attached or affixed to the Work or the soil upon City real property. All such materials shall, upon being so attached or so affixed, become the property of the City." "Notwithstanding the foregoing, Contractor shall not be responsible for restoring damage valued in excess of five percent (5%) of the Contract Price if such damage was caused by an earthquake measuring over 3.5 on the Richter scale or by a tidal wave, as provided for in Public Contract Code Section 7105. If provided for in the Contract Bid Forms, however, Contractor shall provide insurance to protect against such damages." 4-4 Test of Materials. The provisions of Section 4-4 of the Standard Specifications shall be amended to add the following at the end of that Section: "Contractor shall immediately remove all rejected material from the Work or Site, and shall not again return such material to the Site." 4-6 Trade Names or Equals. The second and third paragraphs of Section 4-6 of the Standard Specifications shall be amended in their entirety to read as follows: "Whenever any particular material, process, or equipment is indicated by a patent, proprietary, or brand name, or by the name of the manufacturer, such product shall be followed by the words "or equal". A Contractor may offer any material, process, or equipment considered as equivalent to that indicated, unless a sole source is specified. Failure of the Contractor to submit requests for substitution promptly after award shall be deemed to signify that the Contractor intends to furnish one of the brands named in the Special Provisions, and the Contractor does hereby waive all rights to offer or use substitute materials, products, or equipment for that which was originally specified. Unless otherwise authorized by the Engineer, the time for submission of data substantiating a request for substitution of an "or equal" item shall be not less than 35 nor more than 40 calendar days after award of Contract." "The burden of proof as to the comparative quality and suitability of alternative equipment or materials shall be on the Contractor. The Contractor shall, at its expense, furnish data concerning items offered by it as equivalent to those specified. Such data shall include complete calculations, technical specifications, samples, or published documents relating to the performance and physical characteristics of the proposed substitute. The Contractor shall have the material tested as required by the City's Representative to determine that the quality, strength, physical, chemical or other characteristics, including durability, finish, efficiency, dimensions, service and suitability are such that the item will completely and adequately fulfill its intended function." 4-1.9 Placing Orders. Section 4-1.9 shall be added to the Standard Specifications as follows: GENERAL PROVISIONS - 13 "The Contractor shall place the order(s) for all long -lead supplies, materials, and equipment, for any traffic signing, striping, legends and traffic control facilities within 3 working days after the award of Contract by the Owner. The Contractor shall furnish the Engineer with a statement from the vendor(s) that the order(s) for said supplies, materials, and equipment has been received and accepted by said vendor(s) within 15 working days from the date of said award of Contract." 4-1.10 Removal of Interfering Obstructions. Section 4-1.10 shall be added to the Standard Specifications to read as follows: "The Contractor shall remove and dispose of all debris, abandoned structures, tree roots and obstructions of any character met during the process of excavation, it being understood that the cost of said removals are made a part of the unit price bid by the Contractor under the item for excavation or removal of existing Work." - END OF SECTION - GENERAL PROVISIONS - 14 SECTION 5 UTILITIES 402-1 LOCATION The provisions of Section 402-1 of the Standard Specifications shall be amended to add the following at the end of that Section: "Locations of existing utilities shown on the Plans are approximate and may not be complete. Therefore, the Contractor shall notify Underground Service Alert at 1-800-227-2600 a minimum of 2 working days prior to any excavation in the vicinity of any potentially existing underground facilities in order to verify the location of all utilities prior to the commencement of the Work." "The Contractor shall be responsible for coordinating its work with all utility companies during the construction of the Work." "The Plans identify the approximate locations of existing utilities that parallel or cross the Work. These locations are based on the best information available to the Owner. The Contractor shall verify these locations." 402-2 PROTECTION The provisions of Section 402-2 of the Standard Specifications shall be amended to add the following at the end of that Section: "All water meters, water valves, fire hydrants, electrical utility vaults, telephone vaults, gas utility valves, and other subsurface structures shall be relocated or adjusted to grade by the Contractor. The Contractor shall notify each utility owner a minimum of 2 working days before commencing the Work." "If the Contractor, while performing the Contract, discovers utility facilities not identified by the public agency in the Contract Plans or Specifications, he or she shall immediately notify the public agency and utility in writing." "The public utility, where they are the owner, shall have the sole discretion to perform repairs or relocation work, or permit the Contractor to do such repairs or relocation work at a reasonable price." "During construction of the Work, some of the existing utilities may fall within the prism of trenches. if the existing utility does fall within the contractor=s trenches, the utility involved shall be supported properly by the Contractor to the satisfaction of the utility owner. The method of support of the utility, precautions to be taken during trench backfill and compaction, etc., shall be per the utility owner's requirements. The Contractor shall contact the utility owner should it anticipate such exposure of any of the existing utilities." 402-5 DELAYS GENERAL PROVISIONS - 15 The provisions of Section 402-5 of the Standard Specifications shall be amended to add the following at the end of that Section: "Notwithstanding anything to the contrary, the provisions of Articles 1 and 2 of the California Government Code (Sections 4215 and 4216) are incorporated by reference as if fully set forth herein. In the event of any conflict between the Standard Specifications and Government Code Sections 4215 and 4216, the provisions of Government Code Section 4215 and 4216 shall prevail. Contractor should pay particular attention to the provisions of Section 4215 with regards to the relocation of utilities, the costs thereof, delays caused thereby and the indication of service laterals and appurtenances." "The right is reserved to the owners of public utilities or franchises to enter upon the streets for the purpose of making repairs or changes in their property which may be necessary as a result of the Work. Employees of the City shall likewise have the privilege of entering upon the street for the purpose of making any necessary repairs or replacements." "Contractor shall employ and use only qualified persons, as hereinafter defined, to work in proximity to Southern California Edison's secondary, primary and transition facilities. The term "qualified person" shall mean one who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved, as more specifically defined in Section 2700 of Title 8 of the California Administrative Code. The Contractor shall take such steps as are necessary to assure compliance by all Subcontractors." - END OF SECTION - GENERAL PROVISIONS - 16 SECTION 6 PROSECUTION, PROGRESS, AND ACCEPTANCE OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK The second paragraph of Section 6-1.1 of the Standard Specifications shall be amended in its entirety to read as follows: "After the Contract has been approved by the Owner, and a written Notice to Proceed has been issued to the Contractor, the Contractor shall start the Work within 10 working days after the date specified in said Notice to Proceed. The Work shall be diligently prosecuted to completion before the expiration of the time indicated in the Bid Documents and Contract Form, plus any duly authorized extensions thereof." The provisions of Section 6-1 of the Standard Specifications shall be amended to add the following at the end of that Section: "Notwithstanding anything to the contrary herein, the Contractor's proposed construction schedule shall include the expected start and completion dates for all portions of the contract Work. During a scheduling conference between the Contractor and the City's Representative, the work schedule will be discussed and modified, if necessary, by mutual agreement. Should it become necessary for the City to delay temporarily the construction schedule agreed upon during the scheduling conference, every effort will be made to permit a new construction schedule at the time most convenient to the Contractor, thus permitting the Project to proceed with the shortest intramural movement of the equipment. The Contractor shall notify the City's Representative in all such cases in order to arrive at a mutually satisfactory schedule." "Contractor's construction schedule shall be in a form provided for in the Specifications. Contractor shall continuously update its construction schedule. Contractor shall submit an updated and accurate construction schedule to the Owner whenever specifically requested to do so by Owner and with each periodic payment request. Failure to submit an updated and accurate construction schedule shall render Contractor in breach of the Contract and shall entitle Owner to withhold money therefor." 6-6 SUSPENSION OF WORK. 6-6.1 General. The provisions of Section 6-6.1 of the Standard Specifications shall be amended to add the following at the end of that Section: "The situations which will be deemed to be in the City's interest to suspend the Work shall include, but shall not be limited to, the following: (1) unsuitable weather or such other conditions that render the proper prosecution of the Work impracticable or inefficient; or (2) when the Contractor or his workmen fail or refuse to carry out orders or to perform any or all of the requirements of the Contract; (3) when the Contractor fails or refuses to supply an adequate working force for any reason whatsoever (including, but not limited to, strikes, labor unrest or labor shortages of any kind); (4) when the Contractor fails or refuses to begin delivery of any materials, manufactured articles, supplies or equipment for any reason whatsoever (including, but not limited to, transportation problems, strikes, labor unrest or labor shortages of any kind); (5) when the GENERAL PROVISIONS - 17 Contractor fails or refuses to commence Work within the time specified for any reason whatsoever (including, but not limited to, transportation problems, labor strikes, labor unrest or labor shortages of any kind); (6) when the Contractor fails or refuses to maintain an adequate rate of delivery of materials, manufactured articles, supplies or equipment for any reason whatsoever (including, but not limited to transportation problems, strikes, labor unrest or labor shortages of any kind); (7) when the Contractor fails or refuses to execute the Work in a manner and at such locations as specified in the Contract Documents; (8) when the Contractor fails or refuses to maintain a Work program which will insure the Agency's interest; (9) when the Contractor fails or refuses to carry out the intent of the Contract; or (10) when the Contractor fails or refuses in any other respect to prosecute the Work with the diligence, speed or force specified or intended by the terms of the Contract. The Contractor shall immediately comply with any written order from the City's Representative and shall not resume operations until so ordered in writing." 6-7 DEFAULT BY CONTRACTOR. The first, second and third full paragraphs of Section 6-7 of the Standard Specifications shall be amended to read as follows: "If the Contractor should be in violation of the Contract, then the City may, without prejudice to any other right or remedy and after giving notice as specified herein, terminate the Contract and take all actions provided for herein and elsewhere in the Contract Documents. By way of example and not as a limitation upon its right to terminate the Contract as provided herein, the City may terminate the Contract if, in its sole opinion, the Contractor fails or refuses to: (1) begin delivery of any materials, manufactured articles, supplies or equipment for any reason whatsoever (including, but not limited to transportation problems, strikes, labor unrest or labor shortages of any kind); (2) commence Work within the time specified for any reason whatsoever (including, but not limited to, transportation problems, labor strikes, labor unrest or labor shortages of any kind); (3) maintain an adequate rate of delivery of materials, manufactured articles, supplies or equipment for any reason whatsoever (including, but not limited to, transportation problems, strikes, labor unrest or labor shortages of any kind); (4) execute the Work in a manner and at such locations as specified in the Contract Documents; (5) maintain a Work program which will insure the Agency's interest; (6) cavy out the intent of the Contract; (7) supply an adequate working force for any reason whatsoever (including, but not limited to, strikes, labor unrest, labor shortages of any kind), or (8) in any other respect prosecute the Work with the diligence, speed or force specified or intended by the terms of the Contact." "If the City determines that sufficient grounds exist to terminate the Contract as provided herein, the City's Representative shall provide written notice to the Contractor and its surety on its performance bond. If the Contractor or its surety does not fully comply with such notice within five (5) days after receiving it, or fails to continue after starting to comply in good faith, the City may exclude the Contractor and its employees and Subcontractors from the Work, or any portion thereof, and take possession of and use, or cause to be used, all materials, tools and equipment of every description as may be found at the place of such Work. Thereupon, the Contractor and its employees and Subcontractors shall discontinue such Work or such part thereof as the City may designate, and the City may thereupon, by Contract or otherwise, as it may determine, complete the Work or any part thereof. All expenses charged under this paragraph shall be deducted and paid for by the City out of any moneys then due or to become due the Contractor under the Contract. In such accounting, GENERAL PROVISIONS - 18 the City shall not be held to obtain the lowest figure for the Work for completing the Contract, or any part thereof, or for insuring its proper completion, but all sums paid therefore shall be charged to the Contractor. In case the expenses so charged are less than a sum which would have been payable under the Contract if the same had been completed by the Contractor, the Contractor shall be entitled to receive the difference. In case such expense shall exceed the amount payable under the Contract, then the Contractor shall pay the amount of the excess to the City upon completion of the Work without further demand being made therefore. In the determination of the question as to whether or not there has been any such noncompliance with the Contract as to warrant the suspension or annulment thereof, the decision of the City Council shall be binding on all parties to the Contract." 3-13 COMPLETION AND ACCEPTANCE. Section 3-13 of the Standard Specifications shall be amended in its entirety as follows: "The Work will be inspected for acceptance by the City's Representative upon receipt of the Contractor's written assertion that the Work has been completed. If, in the sole discretion of the City's Representative, the Work has been completed and is ready for acceptance, the City's Representative will notify the City Clerk that the Contract has been completed in its entirety. The City's Representative shall request that the City accept the Work and that the City Clerk be authorized to file on behalf of the City in the office of the Los Angeles County Recorder, allotice of Completion of the Work. The date of completion shall be the date the Contractor is relieved from responsibility to protect the Work." "The Contractor hereby guarantees that the entire Work constructed by him under the Contract will meet fully all requirements as to quality of workmanship and materials. The Contractor hereby agrees to make, at his own expense, any repairs or replacements made necessary by defects in materials or workmanship that become evident within one (1) year after the date of the final payment, and to restore to full compliance with the requirements of these Contract Documents, including any test requirements set forth herein for any part of the Work constructed hereunder, which during said one (1) year period is found to be deficient with respect to any provisions of the Contract Documents. The Contractor shall make all repairs and replacements promptly upon receipt of written orders for the same from the City's Representative. If the Contractor fails to make the repairs and replacements promptly, the City may do the work and the Contractor and his sureties shall be liable to the City for the cost thereof." "The guarantees and agreements set forth herein shall be secured by a surety bond which shall be delivered by the Contractor to the City before the Notice of Completion and acceptance of the Work by the City. Said bond shall be in the form approved by the City Attorney and executed by a surety company or companies satisfactory to the City in the amount of One Hundred Percent (100%) of the Contract. Said bond shall remain in force for a period of one (1) year after the date of Notice of Completion and acceptance. Alternatively, the Contractor may provide for the Faithful Performance Bond furnished under the Contract to remain in force and effect for said amount until the expiration of said one (1) year period." "The parties agree that no certificate given, with the exception of the certificate of final payment, shall be conclusive evidence of the faithful performance of the Contract, either in whole or in part, and that no payment shall be construed to be in acceptance of any defective work or GENERAL PROVISIONS - 19 improper materials. Further, the certificate of final payment shall not terminate the Contractor's obligations under his warranty herein above. The Contractor agrees that payment of the amount due under the Contract and the adjustments and payments due for any Work done in accordance with any alterations of the same, shall release the City, the City Council and its officials, officers and employees from any and all claims or liability on account of work performed under the Contract or any alteration thereof." 6-9 LIQUIDATED DAMAGES. Section 6-9 of the Standard Specifications shall be amended in its entirety to read as follows: "Contractor agrees that if the Work is not completed within the Contract Time and/or pursuant to any completion schedule, construction schedule or project milestones developed pursuant to provisions of the Contract, it is understood, acknowledged and agreed that the District will suffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the District as fixed and liquidated damages the sum specified in the Contract form for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule, construction schedule or Project milestones established pursuant to the Contract. Liquidated damages may be deducted from any payments or other funds owing to Contractor, including progress payments, the final payment and retentions." 2-4 TIMES OF OPERATION Section 2-4 shall be added to the Standard Specifications to read as follows: "It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following, other than between the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, with no work allowed on Owner -observed holidays, unless otherwise approved by the Engineer: Powered Vehicles 2. Construction Equipment 3. Loading and Unloading Vehicles 4. Domestic Power Tools" -END OF SECTION - GENERAL PROVISIONS - 20 SECTION 5 LEGAL RELATIONS AND RESPONSIBILITIES OF THE CONTRACTOR 5-3 LABOR. 5-3.1 General. "The Contractor, its agents and employees shall be bound by and comply with applicable provisions of the Labor Code and Federal, State and local laws related to labor. Notwithstanding anything to the contrary contained in the Contract Documents, Contractor shall comply with the following:" "5-3.2 Social Security Requirements. Contractor shall furnish to the City satisfactory evidence that he and all of his Subcontractors are complying with all laws, rules and regulations with respect to Social Security. The Contractor, at any time upon request, shall satisfy the City that all necessary Social Security and other taxes are being properly reported and paid." "5-3.4 Hours of Labor. Contractor and all Subcontractors shall be required to comply with the provisions of California Labor Code Section 1810 et SeMc . According to those sections, eight (8) hours of labor shall constitute a legal day's work. Contractor shall pay to the City a penalty of Twenty-five Dollars ($25.00) for each worker employed in the execution of this Contract by the Contractor, or by any Subcontractor, for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any calendar day or forty (40) hours in any one (1) calendar week, except when payment for overtime is made at not less than one and one-half (1 -1 /2) times the basic rate for that worker." "5-3.2.4 Licensing Requirements. Pursuant to Section 7028.15 of the Business and Professions Code and Section 3300 of the Public Contract Code, all bidders must possess proper licenses for performance of this Contract. Contractors shall meet the California Contractor's license requirements set forth in the Notice Inviting Bids. Subcontractors must possess the appropriate licenses for each specialty subcontracted. Pursuant to Section 7028.5 of the Business and Professions Code, the City shall consider any bid submitted by a contractor not currently licensed in accordance with state law and pursuant to the requirements found in the Contract Documents to be nonresponsive, and the City shall reject the Bid. The City shall have the right to request, and the Bidders shall provide within five (5) Calendar Days, evidence satisfactory to the City of all valid license(s) currently held by that Bidder and each of the Bidder's subcontractors, before awarding the Contract." "5-3.2.5 Non -Discrimination. Contractor shall not discriminate in the employment of persons upon the Contract because of the race, creed, color, national origin, ancestry, non - disqualifying disability, age, medical condition, marital status, sex or other classifications of such persons protected by federal, state and local laws, rules and regulations. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Contractor shall cause an identical clause to be included in every subcontract for the contract work." "7-5.3.6 Travel and Subsistence Payments. As required by Section 1773.8 of the GENERAL PROVISIONS - 21 California Labor Code, the Contractor shall pay travel and subsistence payments to each worker needed to execute the Work, as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with law. To establish such travel and subsistence payments, the representative of any craft, classification, or type of worker needed to execute the Contract shall file with the Department of Industrial Relations fully executed copies of collective bargaining agreements for the particular craft, classification or type of work involved. Such agreements shall be filed within 10 days after their execution and thereafter shall establish such travel and subsistence payments whenever filed 30 days prior to the call for Bids." 2-2 PERMITS. Section 2-2 of the Standard Specifications shall be amended in its entirety to read as follows: "Unless indicated to the contrary in the Contract Documents, including the Special Provisions, Contractor shall procure all permits and licenses (including a City business license), pay all charges and fees, and give all notices necessary and incidental to the due and lawful prosecution of the Work." 3-12 WORK SITE MAINTENANCE. 3-12.2 Air Pollution Control. The provisions of Section 3-12.2 of the Standard Specifications shall be amended to add the following at the end of that Section: "In addition, Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes. All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements." A. Maintenance The Contractor shall ensure the proper implementation and functioning of BMP control measures and shall regularly inspect and maintain the construction site for the BMPs identified in the SWPPP. The Contractor shall identify corrective actions and time frames in order to properly address any damaged measure, or reinitiate any BMPs that have been discontinued. If the City identifies a deficiency in the deployment or functioning of identified control measures, the deficiency shall be corrected by the Contractor immediately or by a later date and time if requested in writing, but not later than the onset of the subsequent precipitation events. The correction of deficiencies shall be at no additional cost to the City. B. Payment All costs involved in the implementation of the SWPPP, including furnishing all labor, materials, tools, equipment and all incidentals; and for doing all the work involved in installing, constructing, maintaining, removing, and disposing of control measures, except those that were installed as a part of another structure, shall be included in the unit prices bid for the various related items of work and no additional compensation will be made therefore. 7-8.8 Sound and Vibration Control Requirements. Section 7-8.8 shall be added to the GENERAL PROVISIONS - 22 Standard Specifications to read as follows: "The Contractor shall comply with all local sound control and noise level rules, regulations and ordinances, including hours of operation requirements. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage, the Contractor shall promptly remove the equipment and shall not return said equipment to the job until the device is repaired or replaced. Said noise and vibration level requirements shall apply to all equipment on the job or related to the job, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor." 5-7 PUBLIC CONVENIENCE AND SAFETY. 5-7.1 Work Site Safety. 5-7.2 Safety Orders. Section 5-7.2 shall be amended to add the following to the beginning of the first full paragraph: "In accordance with generally accepted construction practices, the Contractor shall be solely and completely responsible for conditions of the job site, including the safety of all persons and property in performance of the Work. This requirement shall apply continuously and shall not be limited to normal working hours. The Contractor's duty to preserve safety shall include, but shall not be limited to, the erection and maintenance of temporary fences, bridges, railings and barriers; the placement of guards; maintenance and operation of sufficient lights and signals; and all other precautions necessary to maintain safety in the vicinity of the Work. Any duty on the part of the City's Representative or other City employee or agent to give general engineering supervision of the Contractor's performance is not intended to include the review of the adequacy of the Contractor's safety measures. Nothing herein shall relieve Contractor of his sole and complete responsibility for safety conditions on the Site." Section 5-7.2 shall be amended also to add the following to the beginning of the second full paragraph: "Pursuant to Labor Code Section 6705, if the Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the Labor Code, including Section 6705, regarding sheeting, shoring and bracing." 5-7.4 Special Hazardous Substances and Processes. Section 5-7.4 shall be amended to add the following to the end of that Section: "As required by Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify City of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by City; and (3) unknown physical conditions of an unusual M0011IC7:\A9M61TA`l[al► IMI? nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, City shall promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract, but shall retain all rights provided by the Contract or by law for making protests and resolving the dispute." 5-6 PATENT FEES OR ROYALTIES. Section 5-6 of the Standard Specifications shall be amended in its entirety to read as follows: "The Contractor shall include in its bid amount the patent fees or royalties on any patented article or process furnished or used in the Work. Contractor shall assume all liability and responsibility arising from the use of any patented, or allegedly patented, materials, equipment, devices or processes used in or incorporated with the work, and shall defend, indemnify and hold harmless the City, its officials, officers, agents and employees from and against any and all liabilities, demands, claims, damages, losses, costs and expenses, of whatsoever kind or nature, arising from such use." 5-1 LAWS AND REGULATIONS. Section 5-1 of the Standard Specifications shall be revised in its entirety to read as follows: "The Contractor shall keep itself fully informed of all existing and future State, Federal and local laws, rules and regulations, which in any manner affect those engaged or employed in the Work, or the materials used in the Work, or which in any affect the conduct of the Work, and of all such orders and decrees of bodies or tribunals having any jurisdiction or authority over the same. The Contractor shall at all times observe and comply with all such existing and future laws, rules, ordinances, regulations, orders, and decrees of bodies or tribunals having any or all authority over the Work, and shall defend, indemnify and hold harmless, at least to the extent of the indemnification provisions of this Agreement, the Owner and its officials, officers, employees, volunteers and agents, including, but not limited to, the Director of Public Works and the Owner Engineer, against any claim or liability arising from, or based on, the violation or alleged violation of any such law, rule, ordinance, regulation, order, or decree, whether by itself or its employees. The Contractor shall particularly observe all laws, rules and regulations relating to the obstruction of streets or the conduct of the Work, keeping open passageways and protecting the same where they are exposed or dangerous to traffic. The Contractor shall at all times comply with such laws, rules and regulations. If any discrepancy or inconsistency is discovered in the Plans, Drawings, Special Provisions, or Contract for the Work in relation to any such law, rule, ordinance, regulation, order, or decree, the Contractor shall forthwith report the same to the Engineer in writing." 5-4 INDEMNIFICATION. Section 5-4.1 shall be added to the Standard Specifications as follows: "Contractor shall defend (with counsel of City's choosing), indemnify and hold the City, its officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liabilities, losses, damages or injuries, in law or equity, GENERAL PROVISIONS - 24 to property or persons, including wrongful death, to the extent arising out of or incident to any acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Work or this Contract, including without limitation the payment of all consequential damages and attorneys fees and other related costs and expenses. Contractor shall defend, at Contractor's own cost, expense and risk, with Counsel of City's choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its officials, officers, employees, volunteers or agents. To the extent of its liability, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City, its officials, officers, employees, volunteers or agents, in any such suit, action or other legal proceeding. Contractor shall reimburse City, its officials, officers, employees, volunteers or agents for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code Section 2782." 5-7.2.2 CONCRETE FORMS, FALSEWORK AND SHORING. Section 5-7.22 shall be added to the Standard Specifications as follows: "Contractor shall comply fully with the requirements of Section 1717 of the Construction Safety Orders, State of California, Department of Industrial Relations, regarding the design of concrete forms, falsework, and shoring, and the inspection of same prior to the placement of concrete. Where Section 1717 requires the services of a civil engineer registered in the State of California to approve design calculations and working drawings of the falsework or shoring system, or to inspect such system prior to the placement of concrete, Contractor shall employ a registered civil engineer for these purposes, and all costs therefor shall be included in the Bid item price named in the Contract for completion of the Work as set forth in the Contract Documents." - END OF SECTION - GENERAL PROVISIONS - 25 SECTION 7 MEASUREMENT AND PAYMENT 7-2 LUMP SUM WORK. Section 7-2 of the Standard Specifications shall be amended to add the following at the end of that Section: "On lump sum contracts, the Contractor shall submit, for approval by the Engineer, a Schedule of Values, or lump sum price breakdown, which will serve as the basis for progress payments and which shall be incorporated into a form of Application for Payment acceptable to the Engineer. Such Schedule of Values shall be submitted for approval at the Pre -construction Conference and must meet the approval of the Engineer before any payments can be made to the Contractor." 7-3 PAYMENT. 7-3.1 Payment. The last paragraph of Section 7-3.1 of the Standard Specifications shall be deleted and replaced with the following two paragraphs: "Contractor shall submit, with each of its billing invoices, a corrected list of quantities, verified by the Engineer, for unit price items listed in the Bid Schedule. Following the City's acceptance of the Work as fully complete, the Contractor shall submit to the City for approval a written statement of the final quantities of Contract items for inclusion in the final invoice. Upon receipt of such statement, the City's Representative shall check the quantities included therein and shall authorize the Contractor to submit an invoice which, in the City Representative's opinion, shall be just and fair, covering the amount and value of the total amount of Work done by the Contractor, less previous payments, applicable withholdings and retentions." "All retention proceeds shall be released and paid in strict accordance with Public Contract Sections 7107 and 7201." Section 7-3.1 of the Standard Specifications shall be amended to also add the following at the end of that Section: "Payment for the various items on the Contract Bid Forms, as further specified in the Contract, shall include all compensation to be received by the Contractor for furnishing all tools, equipment, supplies, and manufactured articles, and for all labor, operations, and incidentals appurtenant to the items of Work being described, as necessary to complete the various items of Work, all in accordance with the provisions for Measurement and Payment in the Standard Specifications and these General Conditions, and as shown on the Drawings, including all appurtenances thereto. Compensation shall include all costs of compliance with the regulations of public agencies having jurisdiction over the Work, including the Safety and Health Requirements of the California Division of Industrial Safety and the Occupational Safety and Health Administration of the U.S. Department of Labor (OSHA)." "No separate payment will be made for any item that is not specifically set forth in the Contract Bid Forms, and all costs therefor shall be included in the prices named in the Contract Bid IN00Ii1:7_\rl9:Z4]rIL]rGIM]W1 Forms for the various appurtenant items of work." 7-3.2 Partial and Final Payments. Section 7-3.2 of the Standard Specifications shall be amended to add the following at the end of that Section: "For purposes of this Section, the monthly payment date shall be the last calendar day of each month. In order for the City to consider and prepare for each monthly payment, the Contractor shall submit a detailed measurement of Work performed and a progress estimate of the value thereof before the tenth (10th) day of the following month. The City shall review and make payment on all approved charges within the time required by Public Contract Code Sections 20104.5 et seq." "Acceptance of any progress payment accompanying any estimate without written protest shall be an acknowledgment by the Contractor that the number of accumulated contract days shown on the associated statement of working days is correct. Progress payments made by the Owner to the Contractor or its sureties after the completion date of the Contract shall not constitute a waiver of liquidated damages." "Subject to the provisions of Section 22300 of the California Public Contract Code, a 5 percent retention will be withheld from each payment. All invoices and detailed pay requests shall be approved by the Engineer before submittal to the Owner for payment. All billings shall be directed to the Engineer." "Pursuant to Section 22300 of the California Public Contract Code, In accordance with California Public Contract Code Section 22300, the City will permit the substitution of securities for any monies withheld by the City to ensure performance under the Contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the City, or with a state or federally chartered bank in California as the escrow agent, and thereafter the City shall then pay such monies to the Contractor as they come due. Upon satisfactory completion of the Contract, the securities shall be returned to the Contractor. The Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. The escrow agreement used for the purposes of this Section shall be in the form provided by the City." "The Contractor shall submit with each invoice the Contractor's conditional waiver of lien for the entire amount covered by such invoice, as well as a valid unconditional waiver of lien from the Contractor and all subcontractors and materialmen for all work and materials included in any prior invoices. Waivers of lien shall be in the forms prescribed by California Civil Code Section 3262. Prior to final payment by the Owner, the Contractor shall submit a final waiver of lien for the Contractor's work, together with releases of lien from any subcontractor or materialmen." - END OF SECTION GENERAL PROVISIONS - 27 CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 PART "B" SUPPLEMENTAL GENERAL CONDITIONS COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 3031 SUPPLEMENTARY GENERAL CONDITIONS 10-1 GENERAL 10-1.1 Description of Work The project consists of furnishing and installing audiovisual components to upgrade the existing audiovisual components at the City of Rosemead Council Chamber, as listed per bid schedule. Project includes upgrades to the existing microphones located in the Council Chamber, installation of a 109 -inch video wall display, including other incidental and appurtenant work necessary for the proper completion of the project and other related work as described in the specifications. 10-1.2 Quantities - The estimate of quantities of work is approximate only, being given as basis for the compilation of bids, and the City of Rosemead does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work that may be deemed necessary or expedient by the Engineer. In such case the contract unit price shall prevail subject to the requirements of Subsection 3-2.2.1 of the Standard Specifications. All work incidental to this project, as described on the drawings and/or this specification shall be considered as included within the scope of the work. The bid prices submitted by the contractor shall include the cost of said incidentals, even though such incidentals are not specifically mentioned in the preceding description of work to be done or in the proposal form. 10-1.3 Equals - Whenever the names of specific products are designated in the details appearing on the drawings or in the specifications, the intent is to state the general type and quality of the products desired, without the intention of ruling out the use of other products of equal type and quality. If the successful contractor wishes to make substitutions of the products specified, he must make an application in writing to the Engineer prior to the acceptance and installation into the project with a complete description of the alternate products and a statement with regard to the saving to the owner, if any, in case the substitution would be permitted. The Engineer will have the right to make the final decision in these cases and to insist on use of particular brands of products shown on the drawings or in the specifications, if, in his opinion, such brands will be preferable to the Engineer, in lieu of the requested substitutions. 10-1.4 Installation of Equipment - All materials and workmanship shall be in accordance with the manufacturer's specifications and instructions. SUPPLEMENTARY GCs -1 10-2 PROSECUTION, PROGRESS, AND ACCEPTANCE OF WORK Prosecution, progress, and acceptance of work shall conform to Section 6 of the Standard Specifications with the following special conditions: a. Beginning and Completion of Work: The contract time allowed for completion of the project is THIRTY (30) working days including material procurement. Work on this project shall commence no later than ten (10) days from the date of Notice to Proceed. b. The contractor shall submit to the Engineer a time schedule of work for the various sequences of the major operations. Said schedule shall be submitted at least 5 working days prior to the beginning of work and shall be subject to the approval of the Engineer. C. Working hours on this project shall be limited to 7:00 a.m. to 5:00 p.m. with no work on Saturdays, Sundays, Holidays, and alternate Fridays in which City Hall is closed. Except when authorized by the Director of Public Works or City Engineer. d. Inspection: The City shall provide inspection for an 8 -hour day for normal working days. The City will deduct from the contractor's invoice an amount equal to $120 per hour for inspection in excess of the foregoing, including legal holidays, City Hall closed Fridays, and weekends. e. Contractor shall notify all property owners within the project limits of all activities; written notification shall be delivered to properties at least seventy-two (72) hours in advance of any activity. f The contractor and all subcontractors shall attend a pre -construction meeting at the time, date, and place determined by the City. g. The contractor and all subcontractors shall obtain a Rosemead Business License prior to the start of work. 10-3 STANDARD SPECIFICATIONS The work embraced herein shall be done in accordance with the "Standard Specifications for Public Works Construction (Greenbook)," latest edition, including all supplements, and applicable provisions of Caltrans Standard Specifications, latest edition. In case of conflict between the Standard Specifications and the Special Provisions, the Special Provisions shall take precedence over and be used in lieu of such conflicting portions. 10-5 UTILITIES SUPPLEMENTARY GCs -2 The contractor will obtain the locations of underground facilities from the utility companies at least twenty-four (24) hours prior to commencing construction in such areas. At all time the contractor shall be responsible for the protection of such facilities and shall be held liable for damage to utilities during construction. The contractor is responsible to call Underground Service Alert at 811 at least 72 hours prior to commencing any work. 10-7 AIR AND WATER POLLUTION The Contractor shall be required to conform to all current regulations of the South Coast Air Quality Management District. The Contractor shall also conform to Section 402(p) of the 1972 Clean Water Act which establishes a framework for the regulation of municipal, industrial and construction stormwater discharges under the National Pollutant Discharge Elimination System (NPDES) program. 10-8 HAZARDOUS MATERIAL NOTIFICATION A material Safety Data Sheet (MSDS) is required by the City of Rosemead for all hazardous materials which are brought on site by the Contractor. A MSDS is required for any product which may contain hazardous materials. The contractor must alert the City Engineer of the quantity and type of hazardous material which will be brought on site. The MSDS sheets must be submitted to the City Engineer at least two (2) business days prior to starting work. The City Engineer may require the City Safety Officer or his designee to review the MSDS for approval of use. The contractor shall be responsible for notifying Underground Service Alert (800) 422-4133 and all utility companies having substructures within the limits of the job. This shall be done at least 72 hours prior to commencing construction. 10-10 PAYMENT Payment shall be made in accordance with Section 7 of the Standard Specifications. Payment will be made at the lump sum prices or unit prices as stipulated in the Bid Proposal and will include full compensation for furnishing all labor materials, tools and equipment and doing all the work involved in completion of the bid items. 5 % retention will be paid 35 days after Notice of Completion was recorded. 10-12 CLEAN-UP Upon completion of the work and before the final estimate is submitted, the Contractor shall, at his own expense, remove from the vicinity of the work all plant, buildings, rubbish, unused materials, concrete forms and other materials or equipment belonging to or used by him or any subcontractor on the work. In the event of failure to SUPPLEMENTARY GCs -3 so remove, the same may be removed and disposed of by the City at the Contractor's expense. 10-13 GUARANTEE The contractor hereby guarantees for a period of one year that the entire work constructed by him under this contract will meet fully all requirements thereof as to quality of workmanship and of materials furnished by him. The contractor hereby agrees to make at his own expense any repairs or replacements made necessary by defects in materials or workmanship supplied by him that becomes evident within the time specified after filing of the Notice of Completion of the work by the Engineer, and to restore to full compliance with the requirements of these specifications, including the test requirements set forth herein for any part of the work constructed hereunder, which during said period is found to be deficient with respect to any provision of the specifications. The contractor also agrees to defend, indemnify and hold the Owner, its officers and employees, harmless from claims of any kind arising from damage due to said defects. The contractor shall make all repairs and replacements promptly upon receipt of written orders for same from the Engineer. If the contractor fails to make the repairs and replacements promptly, the owner may do the work and the contractor and his surety shall be liable to the owner for the cost thereof. Upon termination of the Contractor's guarantee any manufacturers' guarantees held by him shall be delivered to the owner. The guarantees and agreements set forth in this section shall be secured by a surety bond which shall be delivered by the Contractor to the Owner before the notice of completion shall be filed by the Public Works Director. Said bond shall be in an approved form and executed by a surety company or companies satisfactory to the owner, in the amount of ten percent (10%) of the contract price. Said bond shall remain in force for a period of one year from the date of filing of the Notice of Completion. Instead of providing a surety bond, the contractor may, at his option, provide for the Faithful Performance Bond furnished under the contract to remain in force for said amount until the expiration of the required period. 10-14 SANITATION All portions of the work shall be maintained at all times in sanitary condition. The contractor shall provide adequate toilet facilities for all workmen and representatives of the owner employed on the work. Such facilities shall be subject to the acceptance of the owner as to location and type. The contractor shall maintain the same in sanitary condition from the beginning of the work until completion and then shall remove the facilities and disinfect the premises if necessary. The contractor shall be responsible for alleviating all dust and nuisance conditions occasioned by his work. Each day, at the completion of the day's work, the entire trench area and adjacent streets shall be swept and cleaned to the satisfaction of the City Engineer or his appointed SUPPLEMENTARY GCs -4 representative. The contractor shall cover all storm drain catch basins during excavation and sweeping operations to prevent excavated materials from entering the catch basins. 10-15 SITE MAINTENANCE 1.01 General. The Contractor shall maintain the construction site in a neat and orderly condition, free from trash and waste construction materials at all times. Unattended construction materials, equipment, and trash shall be left in a manner to not constitute a fire hazard nor become a nuisance or danger due to rain, wind, or other forces of nature. The Contractor shall provide and maintain enclosed toilets for the use of employees engaged in the work. These accommodations shall be maintained in a neat and sanitary condition. They shall also comply with all applicable laws, ordinances, and regulations pertaining to public health and sanitation of dwellings and camps. The Contractor shall provide proper barricades with flashing lights properly working and temporary fencing to insure a safe construction site. The Contractor shall maintain the work site in a manner that assures adequate access to workers and other authorized personnel. The Contractor shall provide proper traffic control in all construction areas. 1.02 Dust Control. The Contractor shall exercise all reasonable and necessary means to abate undue dust. Application of water for dust control shall be under the control of the Engineer and shall be applied in the amounts and at locations designated by the Engineer or other City Representatives. 1.04 Protection of Existing Improvements. Construction operations shall be conducted in a manner that assures all permanent facilities and improvements, as well as temporary improvements which remain during the life of this contract, are not subject to vertical settlement or horizontal movement. The Contractor shall work around all existing utility facilities. During construction the Contractor shall cooperate with the owners of any utility that has manholes, vaults, valve covers or any other facilities within the construction area. These facilities shall be completely protected by the Contractor. The Contractor shall exercise care to prevent asphalt material from being deposited on concrete surfaces. Unless otherwise specified, all costs for protection of existing improvements shall be absorbed in the various items of work and no separate payment shall be made for them. 1.05 Restoration of Existing Improvements. All existing improvements removed or damaged during construction shall be reconstructed in accordance with the applicable provisions of the Standard Specifications for Public Works Construction, 2021 Edition, (hereinafter referred to as the Standard Specifications). The Contractor shall replace or restore existing improvements to their original condition to the satisfaction of the Engineer at no expense to the City. SUPPLEMENTARY GCs -5 1.06 Disposal of Removed, Cleared, and Waste Material. All removed, cleared, and waste material shall become the property of the Contractor and shall be disposed of by the Contractor outside the limits of work in accordance with the applicable ordinances and regulations of governmental agencies having jurisdiction. 1.07 Final Clean Up. After completion of all other work required under the contract, the Contractor shall, at no expense to the City, clean up the work site including any and all properties used by the Contractor during construction to the satisfaction of the Engineer. The Contractor shall remove and dispose of all excess materials. The Contractor shall repair, replace, or restore, to the satisfaction of the Engineer, all property of any type or nature which has been moved, damaged or altered in any way by the Contractor's operations. The Contractor shall return all roadway and adjoining surfaces to their original condition and appearance. The Contractor shall provide all necessary means to avoid tracking asphalt oil on existing asphalt pavement or concrete pavement during paving operations. The Contractor shall slurry (quick set emulsion aggregate slurry, Type II (cationic) with 2-1/2% latex additive) all asphalt pavement area where asphalt oil was accidentally tracked. If tracking is left on the concrete pavement, Contractor shall sand blast the affected area to its original condition and to the satisfaction of the Engineer or City Representatives at no additional cost. Any and all of these requirements shall be at the Contractor's expense. 1.08 Payment. No separate payment will be made for Site Maintenance. All costs for furnishing all labor, materials, tools, dump fees, and incidentals and doing all the work involved, as specified herein and as directed by the Engineer, shall be included in the prices bid for the various contract items of work. 10-17 CONTRACTOR'S RESPONSIBILITIES BEFORE COMMENCEMENT OF THE PROJECT 3.01 General. Due to the nature of this project involving some inconveniences, the Contractor shall respond to all complaints associated with the project that include any alleged damage to private property and/or vehicles, within 24 hours of notification. Failure to comply with this provision will result in an additional penalty of $50.00 per occurrence. The City reserves the right, after 24 hours of notification, to respond to the complaint and repair the alleged damage. The Contractor shall reimburse the City for all costs involved in addressing the complaint, including any administrative costs incurred by the City. 3.02 Notification of Affected Owners or Businesses. The Contractor shall distribute notices informing those affected that construction will be performed in proximity to their property. The notice shall be distributed not less than 48 hours before commencement of work. The Contractor shall provide a sample notification to the Engineer for approval. SUPPLEMENTARY GCs -6 3.04 Payment. No separate payment will be made for Contractor's Responsibilities Before Commencement of the Project. All costs for furnishing all labor, materials, tools, and incidentals and doing all the work involved, as specified herein and as directed by the Engineer, shall be included in the prices bid for the various contract items of work. SUPPLEMENTARY GCs -7 CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 PART "C" TECHNICAL PROVISIONS COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 TECHNICAL PROVISIONS The Proposed Signal Flow list and Equipment list shown as Appendix A shall be utilized for the Council Chamber Audiovisual Upgrades project. All items as listed on Bid schedule shall be furnished, delivered, and installed in accordance with the respective Manufacturer Specifications. TECHNICAL PROVISIONS TP -I CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 PART "D" APPENDIX APPENDIX A - PROPOSED EQUIPMENT LIST AND SIGNAL FLOW Rosemead Council Chambers AV Upgrades ITM O Description List Price Extension Display System Equipment 1 2 Planar Video Wall 109" diagonal, FHD, 1.2mm pitch, 800 nit brightness, HDR, 24x7 reliability, multi -source viewing, speakers, landscape 2 1 MultiView Processor 4 HDMI inputs, support for 4 simultaneous video windows with flexible windows placement, background video window support, supports output to 2 mirrored video walls with one signal extended As Extron DTP, full RS232 / LAN control from Extron touchpanel 3 1 lExtron HDMI 230 DTP Receiver 4 1 Extron 1x2 4K HDMI Distribution Amplifier 5 1 Dell Optiplex Small Form Factor PC with 27' Monitor 6 1 Misc Installation Cables and Fittings Budget 7 Display System Subtotal $0.00 8 9 Video Routing and Control System Equipment 10 1 Extron DTP CrossPoint 108 4K Video Router 111 1 1 Extron IPCP Pro 350 A Control Processor 12 3 Extron DTP T HWP 4K 230 D HDMI Tx Wall late 13 1 lExtron 15' Tabletop Touch Screen with video preview ability 14 1 lExtron HDMI 230 DTP Receiver 15 1 IMultiView Processor 4 HDMI Inputs, support for flexible PIP window placement to a single broadcast switcher input, full RS232/LAN control from Extron touchpanel 16 1 16 Port Gigabit PoE Switch 16 PoE+ Ports @250W 17 1 AppleTV 4K with Ethernet 3rd Generation (128GB) 18 1 Signal Converter - HDMI to SDI 12G with PSU 19 4 Signal Converter - SDI to HDMI 12G with PSU 20 3 PTZ Camera PTZ Camera with 30x Optical Zoom, with SDI/HDMI/USB/IP, full RS232/LAN control from Extron touchpanel (Gray) 21 3 Ceiling Mount Kit for PTZ Optics Camera 22 1 ISequencing Power Conditioner 23 1 IMisc Installation Cables and Fittings Budget 24 Video System Subtotal $0.00 25 26 Audio System Upgrades 27 12 Gooseneck Microphone Cardoid mic capsule, with mute switch and LED indicator 28 1 BSS BLU -BIB Input Expansion Box for existing DSP 29 6 Handheld Wireless Microphones with Receivers Provides (3) New Handheld Wireless Mics for Room PA Provides (3) Dedicated Wireless Mics for Language Translation Application 30 1 Assisted Listening System WIN 4 Channel Wk!'i Audio Server (for hearing impaired / translation applications) 31 1 ISpeaker Amplifier 32 Audio System Subtotal $0.00 33 34 35 Labor 36 1 Planar: Install Assist for 2 Video Wall Systems Pro-Serv, Assisted Install, URL Service, Assisted Install with Training, 38 1 Uninstallation and Removal of existing equipment that is no longer needed 39 1 Video Systems Wiring, Installation, Video Routing Configurations 40 1 Audio System Tuning, Audio System DSP Programming: 41 1 Extron Touchscreen Control System Programming Labor 42 43 Labor/Programming Subtotal F441-1 k Q CITY OF ROSEMEAD CALIFORNIA ADDENDUM #1 FOR COUNCIL CHAMBER AUDIOVISUAL UPGRADES No. 31030 Date Issued: July 2, 2025 Addendum for: Council Chamber Audiovisual Upgrades Project No. 31030 Addendum No.: 1 Addendum Date: July 2, 2025 Issued by: City of Rosemead Reminder 1: Bid due date/time has been extended. Proposals are now due by 2:00 p.m. on Monday, July Th, 2024. Reminder 2: Please sign Addenda Acknowledgement on page CBF -7 of Bid Package Section Titled "Contract Bid Forms". Reminder 3: Please carefully review Bidder's Responsiveness Checklist on page ITB -8 for a list of documents that need to be combined as one file and submitted as "Contract Bid Forms" to rbasilyousa cityofrosemead org NOTE: This Addendum #1 does not change or revise any material or project scope. This Addendum 1 does issue responses to questions received by question submittal deadline, please see Attachment A. Attachments: Attachment A: Responses to Questions Received by 5:00 p.m., June 26'h, 2025. Issued by City of Rosemead Addendum 1, Page 1 of 1 Attachment B Studio Spectrum Proposal, Inc. 1056 North Lake Street • Burbank, California 91502 818. 843.1610 • (Fax) 818.843.1145 www.studiospectrum.com CA Contractor's License # 996920 COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 City of Rosemead Attn: Romany Basilyous, City Engineer 8838 E Valley Blvd. Rosemead, CA 91770 Mr. Basilyous Please find the enclosed bid in response to the City of Rosemead's request for proposal. Studio Spectrum, Inc. is a California S -Corporation, based in Burbank for 40 years. During that time, we have served the City of Rosemead on several different audio/video service and installation projects. A few of our municipal clients in your locality include the City of Arcadia, Arcadia Unified School District, the City of Alhambra, the City of South Pasadena, and the City of South EI Monte. We are proud to continue our working relationship with Rosemead. Our familiarity with the video systems, as well as our proximity to your facilities, have contributed to our ability to deliver fast service and support to your staff. I believe our experience with Rosemead gives us a unique advantage in understanding the needs of the council chambers, not only as a broadcasting facility, but also as a venue for reliable and easy to use presentation systems. Perhaps most importantly, we know how to maximize your budget with reliable, quality components. Thank you for the opportunity to submit a bid to the City of Rosemead once again Sincerely, John Buckowski President, Studio Spectrum, Inc. BIDDER: Studio Spectrum, Inc. CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 SECTION I - BID SCHEDULE CONTRACT BID FORMS CBF -1 BIDDER: BID SCHEDULE Studio Spectrum, Inc. SCHEDULE OF PRICES FOR COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 Audio System Upgrades NO. ITEM DESCRIPTION UNIT EST. UNIT ITEM QTY. PRICE COST 1 Gooseneck Microphone (Cardoid mic EA 12 $-31729 $ 3,927.44 capsule with mute switch and LED indicator) 2 BSS BLU -BIB Expansion Box for existing EA 1 $ 987,55 $ 987.55 DSP Handheld Wireless Microphones with Receivers (Provides (3) New Handheld 3 Wireless Mics for Room PA & Provides (3) EA 6 $__±37 99 $ 5,027.92 Dedicated Wireless Mics for Language Translation Application) Assisted Listening System (WIFI 4 channel 4 Wi-Fe Audio Server (for hearing impaired I EA 1 $ 2,520.37 $ 2,520.37 translation applications) 5 Professional Speaker Amplifier EA 1 $__'2,264 90 $ 2,264.90 Video Routing and Control System Equipment EST. UNIT ITEM NO. ITEM DESCRIPTION UNIT QTY. PRICE COST 6 Extron DTP Crosspoint 108 4K Video Router EA 1 $ 15,085.93 $ 15,085.93 7 Extron IPCP Pro 350 A Control Processor EA 1 $ 1.906.73 $ 1.906.73 8 Extron DTP T HWP 4K 230 D HDMI Tx Wall EA 3 $581.41 $1,744.23 plate 9 Extron 15" Tabletop Control Screen with EA 1 $ 4,964.31 $ 4,964.31 video preview ability 10 Extron HDMI 230 DTP Receiver EA 1 $ 500.97 $ 500.97 CBF -2 BIDDER: Studio Spectrum, Inc. CBF -3 Multiview Processor (4 HDMI inputs, support 11 for flexible PIP window placement to a single EA 1 $ 470.53 470.53 broadcast switcher input, full RS2321LAN $ control from Extron touchpanel) 12 16 Port Gigabit PoE Switch 16 PoE + Ports at 250W EA 1 $ 234.01 $ 234.01 13 AppleTV 4K with Ethernet 3b Generation (128 GB) EA 1 $--Lo 116 $ 201.16 14 SignConverter (HMDI to SDI 12G with 1 $ 207.73 207.73 PSUa $ 15 Signal Converter (SDI to HDMI 12G withEA 4 $ 206.51 $ 822.02 FSU) PTZ Camera (with 30x Optical Zoom with 16 SDI/HDMI/USB/IP, full RS232/LAN control EA 3 $ 1,654.07 $____±,962 22 from Extron touch panel (Gray) 17 Ceiling Mount Kit for PTZ Optics Camera EA 3 $ 209.77 $ 629.30 18 Sequencing Power Conditioner EA 1 $ 389.90 $ 389.90 19 Misc. Installation Cables and Fittings LS 1 $ 941.36 $ 941.38 (Budgetary Line Item) Display System Equipment EST. UNIT ITEM NO. ITEM DESCRIPTION UNIT QTY. PRICE COST Planar Video Wall 109" Diagonal, FHD, 20 1.2mm pitch, 800 nit brightness, HDR, 24x7 EA 2 S -3.3±0.07 $ 76680.15 reliability, multi -source viewing, speakers, landscape. Multiview Processor (4 HDMI inputs, support for 4 simultaneous video windows with flexible windows placement, background 21 video window support, supports output to 2 EA 1 $ 9,413.71 $ 9,413.71 mirrored video walls with one signal extended via Extron DTP, full RS232 / LAN control from Extron touch panel 22 Extron HDMI 230 DTP Receiver EA 1 $ 500.97 $ 500.97 CBF -3 BIDDER: Studio Spectrum, Inc. 23 Extron 1x2 4K HDMI Distribution Amplifier EA 1 $--L50-81 $ 750.85 24 Dell Optiplex Small Form Factor PC with 27" EA 1 $ 3,739.10 $ 3,739.10 Monitor 25 Misc. Installation Cables and Fittings LS 1 $ 407.56 $ ao7.56 (budgetary line item) Labor and Associated Installation of Audiovisual Equipment & Components EST. UNIT ITEM NO. ITEM DESCRIPTION UNIT QTY. PRICE COST Planar: Install Assist for 2 Video Wall 26 Systems (Pro sere, assisted install With EA 1 $ 13,413.00 $ 13,413.00 training) 28 Uninstallation and removal of existing LS 1 $ 2,267.00 $____L267 00 equipment that is no longer necessary 29 Video Systems Wiring, Installation, Video LS 1 $_L1,250 00 $ 11,250.00 Routing Configurations 30 Audio System Tuning, Audo System DSP LS 1 $ 1,900.00 $ 1,900.00 Programming 31 Extron Touchscreen Control System LS 1 $ 10,800.00 $ 10,800.00 Programming Labor 32 Project Management/DIR Filings and CPR LS 1 $ 10,997.00 $ 10,997.00 Admin Costs TOTAL BASE BID AMOUNT IN NUMBERS $ 189,907.88 TOTAL BASE BID AMOUNT IN WORDS: One -Hundred Eighty -Nine Thousand, Nine -Hundred Seven Dollars, and Eighty -Eight Cents The award of Contract shall be based on the TOTAL BASE BID AMOUNT. In the case of discrepancies in the amount of bid, unit prices shall govern over extended amounts, and words shall govem over fi es. Full compensation for the items listed to the right as Items A, B, C, D and B are considered as inclusive in each Bid Item listed above in the Bid Schedule as applicable, and no A. Mobilization / Demobilization C. NPPES, 3APMEGP; and Best Management Practices MPs , Public Convenience and CBF -4 BIDDER: Studio Spectrum. Inc. additional and/or separate compensation will Safety -Wkifig by Land sun;eyer be allowed. The bid prices shall include any and all costs, including labor, materials, appurtenant expenses, taxes, royalties and any and all other incidental costs to complete the project, in compliance with the Bid and Contract Documents and all applicable codes and standards. The City reserves the right to add, delete, increase or decrease the amount of any quantity shown and to delete any item from the contract and pay the contractor at the bid unit prices so long as the total amount of change does not exceed 25% (plus or minus) of the total bid amount for the entire project. If the change exceeds 25%, a change order may be negotiated to adjust unit bid prices. All other work items not specifically listed in the bid schedule, but necessary to complete the work per bid and contract documents and all applicable codes and standards are assumed to be included in the bid prices. A bid is required for the entire work, that the quantities set forth in the Bid Schedule are to calculate total bid amount, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in the schedule of bid items above, within the limits define in Section 3-2.2.1 of the Standard Specifications, to stay within the budgeted amount of this project. The award of Contract shall be based on the TOTAL BASE BID AMOUNT only. If the Bid lists any Additive Alternate bids, the ADDITIVE ALTERNATE BID ITEMS shown per the ADDITIVE ALTERNATE BID SCHEDULE above will not be taken into account in determining the lowest responsible bidder. City may add bid items from the ADDITIVE ALTERNATE BID SCHEDULE at the sole and complete discretion of the City as part of the performance of the contract. The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern. Attached hereto is a certified check, a cashier's check or a bid bond in the amount of Nineteen -Thousand Dollars ($ 19.000.00 ) said amount being not less than ten percent (101/o) of the Total Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award, we fail or refuse to execute the Contract and furnish the required bonds, certificates and endorsements of insurance and other certifications within the time provided. If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be prepared by the Owner for execution, within five (5) Calendar Days following the Letter of Award CBF -5 BIDDER: Studio Spectrum. Inc. for the Contract, and will deliver to the Owner within that same period the necessary original Certificates of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other documentation and certification required by the Contract. The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the Business and Professional Code), arising from purchases of goods, materials or services by the Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to he Contractor. Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence satisfactory to the Owner of Bidder's California contractor's license(s) in good standing; (2) evidence that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting therefrom; and (3) any other information and documentation, financial or otherwise, needed by Owner to award a Contract to the lowest responsible and responsive bidder. Bidder understands and agrees that liquidated damages shall apply to this Contract in the amounts of five hundred dollars ($500.00) per calendar day if proiect is not completed within the working days specified on the Notice Inviting Bids. The Contract Time will begin to run ten (10) Working Days from the date of the Notice of Proceed and subiect to the terms and conditions described in the Contract Form and the Contract Documents. Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data submitted herewith into a contract arising out of this Bid. The undersigned acknowledges receipt, understanding and full consideration of the following addenda to the Contract Documents. Addenda Nos. We The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and equipment or supplies necessary to complete the Work as described in the Bid Documents. If this bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the necessary bonds and accept the Total Bid Price as compensation in full for all Work under the contract. Ce] BIDDER: Studio Spectrum. Inc. EXAMINATION OF SPECIFICATIONS AND SITE OF WORK The Bidder declares that he/she has carefully read and examined the project plans, specifications, bid documents, and he/she has made a personal examination of the site (indicate name of the person, representing the bidder, who inspected the site and date below) and that he/she understands the exact scope of the Project. Name of Person who inspected the site: Date of Inspection: John Buckowski 6/24/2025 ADDENDA ACKNOWLEDGMENT The Bidder acknowledges receipt of the following Addenda and has included their provisions in this Proposal: Addendum No. 1 Dated 7/2/2025 Addendum No. n/a Dated Addendum No. n/a Dated Addendum No. n/a Dated. CBF -7 BIDDER: Studio Spectrum, Inc. PUBLIC CONTRACT CODE STATEMENT AND QUESTIONAIRE PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has _ , has not x been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. Note: The bidder must place a checkmark after "has" or "has not" in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE In conformance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No X If the answer is yes, explain the circumstances in the following space. CBF -8 BIDDER: Studio Spectrum, Inc. PUBLIC CONTRACT CODE 10232 STATEMENT In conformance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two-year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. CBF -9 By:X-3-7,0f' gnature John Buckowski Type or Print Name President Title Bidder's/Contractor's State of Incorporation: Partners or Joint Venturers: Bidder's License Number(s): 996920 (C-7) Department Industrial Relations BIDDER: Studio Spectrum, Inc. 1056 N. Lake St. Business Street Address Burbank, CA 91502 City, State and Zip Code 818-843-1610 Telephone Number California Registered No. 1000032435 NOTES: 1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the representations made on the Contract Bid Forms. 2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address 3) If Bidder is a partnership or joint venture, give full names of all partners or joint venturers. As further discussed in the Instructions to Bidders, Bidder will be required to provide evidence that the person signing on behalf of the corporation, partnership or joint venture has the authority to do so CBF - 10 BIDDER: Studio Spectrum, Inc. SECTION 2 BID DATA FORMS CBF -11 BIDDER: Studio Spectrum, Inc. Bond No. BB2025792 Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide the information required. Bidder shall ensure that every page of its Bid Data Forms are properly identified with the Bidder's name and page number. 2.A BID BOND KNOW ALL MEN BY THESE PRESENTS: THAT Studio Spectrum, Inc. as Principal, and American Contractors Indemnity Company as Surety, are held firmly bound unto the CITY OF ROSEMEAD (hereinafter called the OWNER) in the sum of Ten Percent of Total Bid Amount DOLLARS ($10% ), being not less than ten percent (10%) of the Total Bid Price; for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work required for the COUNCIL CHAMBER AUDIOVISUAL UPGRADES -as set forth in the Notice Inviting Bids and accompanying Bid Documents, dated July 2nd, 2025 NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the OWNER and, within the time and in the manner required by the above- referenced Bid Documents, enters into the written form of Contract bound with said Bid Documents, furnishes the required bonds (one to guarantee faithful performance and the other to guarantee payment for labor and materials) furnishes the required insurance certificates and endorsements, and furnishes any other certifications as may be required by the Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. In the event suit is brought.0pop this bond by the OWNER and judgment is recovered, said Surety shall pay all -costs incurred by the OWNER in such suit, including reasonable attorneys' fees to'be fixed by the court. SIGNED AND SEALED, this 30th day of June 2025 Studio Spectrum, Inc. (SEAL) Principal By:' n - By: Sa re CBF - 12 American Contractors Indemnity Company(SEAL) Surety gu Vincent An, Attomey-in-Fact ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On JUN 3 0 2025 before me, Natalie Landa, Notary Public (insert name and title of the officer) personally appeared Vincent An who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/herttheir signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of Califomia that the foregoing paragraph is true and correct. NpiAUE tnNOn WITNESS my hand and official seal. Nobrypubbc-aarc.-re Orwie Co�nq VCommission: 2496t1± Ovkmy Comm. Expires a.5 5. 2C2 Signature (Seal) TOKIOMARIIYE a*+ HCC POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That American Contractors Indemnity Company of the State of California, a California corporation, does hereby appoint, VINCENT AN its true and lawful Attomey4n-Fact, with full authority to execute on its behalf bond number BB2025792 issued in the course of its business and to bind the Company thereby, in an amount not to exceed Two hundred thousand and 00/100 ( $200.000.00 ). This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following resolutions adopted by the Board of Directors of AMERICAN CONTRACTORS INDEMNITY COMPANY at a meeting duly called and held on the 1" day of September, 2011. "Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fad to represent and ad for and on behalf of the Company subject to the following provisions: Affomey-in-Fact may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any and all notices and documents canceling orterminating the Company's liability thereunder, and any such instruments so executed by any such Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." The Attomey-in-Fact named above may be an agent or a broker of the Company. The granting of this Power of Attorney is specific to this bond and does not indicate whether the Attorney4n-Fact is or is not an appointed agent of the Company. IN WITNESS WHEREOF, American Contractors President on this 20tl1 day of November, 2024. State of California County of Los Angeles oJ� mpony has caused its seal to be affixed hereto and executed by its AS�, wow* AMERICAN CONTF�CTORS INDEMNITY COMPANY By: Jjl}tAG,Ss�vt On Z Adarh S. Pessin, President ,�4UrnaMT,,r`' to"Wfifies only the identity of the individual who signed the document to which On this 20' day of November, 2024, before me, D. Littlefield, a notary public, personally appeared Adam S. Pessin, President ofAmerican Contractors Indemnity Company, who proved to me on the basis of satisfactory evidence, to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument I certify under PENALTY OF PERJURY under the laws of the State of CALIFORNIA that the foregoing paragraph is true and correct. WITNESS my hand and official seal. = a ra.rrn n".rm Signature (seal) rata... apvw Aa n.xm` I, Kio Lo, Assistant Secretary ofA encan Contractors Indemnity Company, do hereby certify that the PowerofAttomey and the resolution adopted by the Board of Directors of said Company as set forth above, are true and correct transcripts thereof and that neither the said Power of Attorney nor the resolution have been revoked and they are now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seals of said Companies at Los Angeles, California this 30th day of June 2025 P croq' O 3yq I Bond No. BB2025792 om`3 Agency No. 4203m z°s'is;c Z ` ry ." , Kio Lo. Assist to Visit tmhcc.wnVsurety for more infonnatiori"+.; 1,!',„^,,;;.•^'” HccsozzMAACm+2rz024 BIDDER: Studio Spectrum, Inc. In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100 through 4114 of the California Public Contract Code, and any amendments thereto, each Bidder shall provide the information requested below for each subcontractor who will perform work, labor or render service to Bidder in or about the construction of the Work in an amount in excess of one-half of one percent (greater than 0.5 %) of the Bidder's Total Bid Price, or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work which will be done by each subcontractor. Bidder shall list only one subcontractor for any one portion of the Work. Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow Bidders twenty-four (24) additional hours after the deadline for submission of bids to submit the information requested by the Owner about each subcontractor, other than the name and location of each subcontractor. If the Bidder fails to specify a subcontractor for any portion of the Work to be performed under the Contract, it shall be deemed to have agreed to perform such portion itself, and shall not be permitted to subcontract that portion of the Work except under the conditions hereinafter set forth below. Subletting or subcontracting of any portion of the Work in excess of one half of one percent (greater than 0.5%) of the Total Bid Price or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, for which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after Owner approval. CBF - 13 BIDDER: Studio Spectrum, Inc. 2.11 LIST OF PROPOSED SUBCONTRACTORS (continued) ["Duplicate Next 2 Pages if needed for listing additional subcontractors."] Name and Location Description of Work of Subcontractor to be Subcontracted Name: n/a License No.: Department of Industrial Relation Registration No. Name and Location of Subcontractor Name: Address: License No.: Description of Work to be Subcontracted Department of Industrial Relation Registration Name and Location of Subcontractor Name: Description of Work to be Subcontracted License No.: Department of Industrial Relation Registration Name and Location of Subcontractor Name: Address: License No.: Description of Work to be Subcontracted Department of Industrial Relation Registration Name and Location of Subcontractor Name: Address: Description of Work to be Subcontracted License No.: Department of Industrial Relation Registration CBF -14 BIDDER: Studio Spectrum, Inc. 2.0 REFERENCES The following are the names, addresses and telephone numbers for three public agencies for which BIDDER has performed similar work within the past two (2) years: I. CITY OF SIGNAL HILL - 2175 Cherry Ave. Signal Hill CA 90755 Name and Address of Owner Tina Knapp, Assistant City Clerk - 562-989-7305 (tknapp@cityofsignalhill.org) Name and telephone number of person familiar with project Comprehensive AV Presentation and Broadcast $198,088.70 Equipment Upgrade at the council chambers 2/15/2024 Contract amount Type of Work Date Completed 2. CAL STATE UNIVERSITY LONG BEACH - 1250 Bellflower Blvd. Long Beach, CA 90840 Name and Address of Owner Jose Aguilar, CHHS IT Supervisor- 562-985-2390 (Jose.Aguilar@csulb.edu) Name and telephone number of person familiar with project AV Presentation and Hyflex Conferencing $140,055.83 System upgrade for Kinesiology Classrooms 5/23/2025 Contract amount Type of Work Date Completed 3. ST. BEDE THE VENERABLE CHURCH - 215 Foothill Blvd. La Canada, CA 91011 Name and Address of Owner Lisa Orlandini, Business Manager (lisa@bede.org) Name and telephone number of person familiar with project AV Presentation Systems Installations 819.28 during construction of the new parish center 6/13/2025 Contract amount Type of Work Date CBF -15 BIDDER: Studio Spectrum, Inc. 4. GLENDALE COMMUNITY COLLEGE - 1500 North Verdugo Road Glendale, California 91208 Name and Address of Owner Mark Ragonig, IT Services Supervisor - 818-240-1000 Name and telephone number of person familiar with project AV Presentation System upgrade for $56,434.02 San Gabriel Building Classrooms Contract amount Type of Work CBF - 16 4m2025 Date Completed BIDDER: Studio Spectrum, Inc. SECTION 3 NON- COLL USION AFFIDAVIT CBF -17 BIDDER: Studio Spectrum, Inc. NON -COLLUSION AFFIDAVIT In occordance with Public Contract Code Section 7106, the undersigned, being first duly sworn, deposes and says that he or she holds the position listed below with the bidder, the party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, Mid will not pay, any fee to any corporation, partnership, company association, organ ivat ion, bid depository, or to any member or agent thereof to effectuate a collusive or sham bill. G13�/zo2s jgnAhtre John Buckowski Typed or Printed Name President Title Studio Spectrum, Inc. Bidder Subscribedand sworn before me of This t qday of J* 'Suomi 2-. 20 25 3-n — Ne -v 51 J e Notary Public in and for the State of California My Commission Expires: I' 021 I 2v2g- MMIMU (Seal) 3qTa+ i e�z.}t1AccJi -- A notary public or other officer completing this certificate verifies only the identity of the Individual who signed the document to which this certificate Is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of? ) VtWs ) rJ e Subscribed and sworn to (or affirmed) before me on this 30 day of :�Sv v12 , 20.5 , by Tr In vl proved to me on the basis of satisfactory evidence to be the person(s) who appeareEdd before me. �li 7 sbv WO9l NOipRYTMIBIIC-CAIUDRNU KT ORANGE COUNTY MY Comm Efires Des. 21,1028 (Seal) Signature U' - 3 , (M4 Attachment C EIDIM Group Inc. Proposal City of Rosemead Council Chamber Audiovisual Upgrades (Project No. 31031) EIDIM Group Inc., dba EIDIM AV Technology is 562-777-1009 www.eidim.com July 7, 2025 Prepared by: Jerome Del Castillo Estimator/Technical Writer estimatena,eidim.com 0 2 3 5 6 6 6 6 7 Executive Summary Company Overview Scope of Work I9 l Close out Documentations Assumptions Exclusions 0 Customer Requirements Insurance Requirements VProject Schedule/Milestones 4* /O RENO l' 0 2 3 5 6 6 6 6 7 Cover Letter To whom it may concern, O EIc71M ROUP EIDIM Group, Inc. is honored to submit our proposal in response to the Request for Proposal (RFP) issued by the esteemed City of Rosemead. EIDIM fully understands and complies with all elements outlined in (Project No. 31031). The city seeks a qualified AV contractor to provide a complete turnkey solution for procuring, installing, and integrating efficiently designed AV system for the Council Chamber of the City of Rosemead. This project involves upgrading the entire system and implementing advanced control programming to enhance meeting capabilities while maintaining the aesthetic integrity of the room. With over 25 years of experience in the AV industry—particularly in serving local and government institutions—EIDIM is confident in its ability to meet the City's requirements effectively and efficiently. By partnering with EIDIM, the City will benefit from our expertise in delivering seamless integration solutions_, supported by our centralized project management tools and proven methodologies. 0 Complete Turn -key Solutions/Services With the accumulation of our firm's experience, we have devised a seamless line of services and solutions that guarantee project accomplishment from start to post -service support. Diversified AV Supply Chain We have diversified our supply chain, reducing dependency on any single source and mitigating the risk of supply interruptions, while keeping prices affordable. Experienced AV Experts Our team is composed of highly trained and certified AV experts, experienced in handling the types of rooms and equipment of City. Throughout the process, we upheld the highest standards of professionalism to guarantee the best possible outcome for our government clients. We encourage you to reach out to us without hesitation regarding any questions or concerns. Our team is always available and eager to assist you in any way possible. Sincerely, Andrew W. Bang, CTS -D, CTS -I President/CEO 576-777-1009 estimate(a),eidim.com City of Rosemead I Council Chamber Audio Visial Upgrade (Project #31031) ®EI�71M GROUP Executive Summary The City of Rosemead faces a growing challenge in its Council Chamber due to outdated and inadequate audiovisual infrastructure that no longer meets the demands of contemporary municipal operations. Currently, the Chamber's AV system is constrained by aging equipment and limited capabilities, including underperforming microphones, outdated camera systems, and a lack of a unified control interface. These limitations impair the quality and reliability of public meetings, community events, and citywide broadcasts. As the primary venue for legislative sessions, public hearings, and civic presentations, the Council Chamber demands a modern AV solution that ensures clarity, accessibility, and ease of use, while also addressing the city's long-term technological goals and compliance with state accessibility mandates. Our proposed turnkey solution introduces a high-performance AV system anchored by a 109 -inch Planar video wall, delivering crisp, vibrant visuals for all attendees. The design includes comprehensive upgrades: 12 gooseneck microphones with mute switches and LED indicators to enhance vocal clarity, a new suite of wireless handheld microphones, a Wi-Fi based assisted listening system for ADA compliance, and advanced audio amplification. Visual improvements are powered by Extron video routing components, PTZ cameras with 30x zoom for multi -angle live streaming, and an Extron touchscreen control system enabling centralized management. This intelligent AV ecosystem integrates seamlessly into the chamber's operations, offering scalable, user-friendly, and energy-efficient performance that elevates communication, public transparency, and operational reliability. Why EIDIM? With over 25 years of experience in the AV industry, EIDIM has successfully completed numerous projects aligned with the City's expectations. We maintain a local office in the Northern and Southern California, staffed with skilled AV practitioners ready to provide on-site services and prompt responses to service requests through our efficient ticketing system. Our team includes certified AV designers and project managers holding AVIXA CTS, CTS -1, and CTS -D certifications, demonstrating their expertise in proposing and implementing effective modifications. Relevant Licenses We hold B, C7, C10, and C- 33 licenses, covering low - and high-voltage projects, as well as building, painting, and patching work. Dealerships Most of the equipment brands in the City's current system are part of our dealerships and partner network. City of Rosemead I Council Chamber Audio Visial Upgrade (Project #31031) HIGHLIGHTS: • 25 years of Experience • Completed projects similar with the present bid • Diverse Suppliers • Local presence • Certified AV Experts • Agile and Faster Implementation AVIXA Certifications Holding AVIXA certifications demonstrates the team's ability to implement the highest standards in the AV industry. O EIDIM GROUP 1M Company Overview EIDIM Group, Inc., short for "Everything is Done in the Maker," stands out in the audiovisual industry by offering comprehensive solutions that integrate cutting-edge technology with a deep commitment to quality and customer satisfaction. Our philosophy is rooted in a blend of spirituality and competency, encapsulated in our motto "Spirituality & Competency Combined." Since our founding in 1999, we have focused on delivering Complete All -In -One Turnkey Solutions and Services that cover all aspects of AV projects. 25 96% 560+ Years of Of Customer Repeat Completed Experience Business Projects We are a licensed General B, C-7, C-10, and C-33 certified CA contractor, with extensive experience working on local and public sector projects, as well as federal, educational institutions, houses of worship, and private projects across the nation and state. With these licenses, we deliver comprehensive, all -in -one solutions, offering a full range of services needed for any phase of AV system implementation. EIDIM is in a stable financial position, with no bankruptcy, pending litigation, planned office closures, or mergers that could impact our ability to complete the project. Moreover, we are holders of the AVLXA CTS, CTS -D, and CTS -I certifications—world-renowned credentials in the Audio -Visual industry. These certifications are awarded only to certified designers, installers, engineers, and project managers who adhere to the highest standards of AV implementation. They stand as a testament to EIDIM Group Inc.'s commitment to delivering the highest level of service. For this project we are highly capable of performing the work as the sole primary contractor. CTS ` CTS -D' CTS -1 AV Services: A. Equipment Procurement B. Design and Consultation C. Design Build D. Integration E. AV/ IT Programming F. Installation G. Warranty/ Ongoing Support Services H. Preventive Maintenance Services Company Designation: Type of Organization: Corporation CA License: 824410 Company Tax ID: 95-4837991 DIR:1000010711 DUNS: 00-661-704 Cage Code: 33EMO GSA Schedule #: GS-03F- 105AA CMAS#: 3-14-58-0247A SAM UEI#: RY5JGX8KWHV5 CSBE: 3864 City of Rosemead I Council Chamber Audio Visial Upgrade (Project #31031) ®EI131M GROUP 1M Scope of Work The City of Rosemead seeks the assistance of a certified and qualified audio-visual contractor to provide all necessary labor required to complete the objectives specified in the project. The scope of services for this project includes the procurement, installation, integration and programming, of the Council Chamber room of the city. This section of the proposal outlines EIDIM's approach and initial plans to address the needs and preferences of the City of Rosemead, based on service requirements specified in the RFP. The proposed plans and approach remain adaptable and can be modified according to City's preferences regarding service delivery. All the professional services will be implemented in compliance with the preferences of the city. A complete amount breakdown of the all included fees are provided in the attached excel file with the proposal package Place of Performance: Rosemead City Hall, 8838 E Valley Blvd, Rosemead, CA 91770, USA Consultation and Design Services Desienated AV Designer: A certified and experienced AV designer will be assigned to provide expert guidance and system design tailored to the specific needs of the room. Our designers have extensive experience with a wide range of AV systems, including those from brands specified in the solicitation—such as (Extron, Shure, Planar, Listen Technologies, QSC, Luxul and etc.,). We can offer multiple design options that meet functional requirements, with flexible pricing based on our dealership access to equivalent solutions from other reputable brands. Senior AV consultant guidance: Our Senior AV Consultant, bringing over 30 years of experience in system design and project implementation, will support the design process. His expertise provides valuable guidance and contributes significantly to mitigating key project risks. Dedicated CAD Team: Our experienced team produces detailed AV schematics—including functional diagrams, floor plans, and elevations—illustrating all component connections within the system. To streamline the process, our CAD team will initially request any existing floor plans or AV schematics, if available. Preparation of Proiect Timeline and Materials ETA: Our designated and experienced Project Manager will develop a detailed project timeline and deliverables, aligned with the City's preferences and the availability of resources. In addition, our Purchasing Team will provide the estimated time of arrival (ETA) for all required materials to accurately define key milestones and phases for project implementation, including equipment delivery and installation. City of Rosemead I Council Chamber Audio Visial Upgrade (Project #31031) EH -31M GROUP 1M ))) Equipment Procurement We maintain ongoing communication with a wide network of suppliers, manufacturers, and distributors. Upon the City's approval of the design and quote, we will promptly proceed with the procurement of equipment. If any equipment requires configuration, it will first be delivered to our office and warehouse for setup and testing. Once all components are properly configured and verified, we will proceed with transporting the equipment to the project site for installation. ))) Installation and Configuration Dedicated Project Manager: Our team includes certified and highly experienced project managers who have successfully completed hundreds of projects across California. We utilize advanced project management tools to ensure continuous oversight, proactive risk mitigation, and rigorous quality assurance—delivering each project with the highest standards of efficiency and excellence. Our structured project management hierarchy is a key factor in our ability to deliver on schedule. This hierarchy includes three levels ofproject management: • Junior Project Manager: Focuses on the meticulous tracking and execution of day-to- day tasks, ensuring every detail is attended to and documented. • Proiect Manager: Oversees the broader aspects of project planning and execution, coordinating between teams, monitoring schedules, and addressing any emerging challenges. • Senior Proiect Manager: Provides high-level oversight, strategic decision-making, and ensures alignment with project goals and client expectations Experienced AV Installers and Engineers: EIDIM comprises certified AV engineers, technicians, and specialists with extensive experience in the installation, integration, programming, and troubleshooting of AV systems. Our team includes technicians with advanced proficiency in Crestron systems. This expertise underpins our confidence in delivering high- quality installation and configuration services for City. City of Rosemead J Council Chamber Audio Visial Upgrade (Project #31031) ®EI�71M GROUP In our AV integration projects, we leverage a hybrid approach that combines the strengths of both Agile and Waterfall methodologies to ensure efficient project delivery and exceptional outcomes. PlanvlR6 ]eiWl Regeiremwn Itentloa Plwiq �"®' Rn�S 0.'o�Liag � _ I opa.m P<Pkm suaana�n Iamte.aJKl R.a�w6 i n.etlRi..a n.�. � i Pur111n and Pl.P IIMtlm B.diD{ See An'irn'Pmcess i �1r.l.l.f f MaNRgs Ark Sp,i- li'marfall Phase The Waterfall methodology will guide the early stages, such as requirements gathering, design, and hardware setup, where a linear and structured process ensures that foundational aspects are well-documented and executed systematically. Once these fixed elements are in place, we will incorporate Agile principles during the equipment installation, programming, testing, and user feedback phases. This allows for iterative cycles of planning, development, testing, and refinement, enabling us to adapt quickly to any changes in requirements or unforeseen challenges. A detailed schedule of values and project timeline will be provided by our project management team upon award. Close Out Documentations Upon project completion, EIDIM will provide comprehensive documentation tailored to the City -approved designs. Deliverables will include detailed AN line diagrams showing connectivity, components, and placements, along with the latest AN custom programs, configuration codes, links, and modules for future reconfigurations. All digital files will be securely transmitted via email, accessible only to authorized vendors and certified partners to ensure data security and integrity. • AV As -built shop drawings (digital copy) • Software Programming/Configuration codes (digital copy) • Manufacturer's product data sheets and specifications (digital copy) • AV Solution Product List (digital copy) • Equipment warranty information for newly installed (digital copy) • User Operations & Maintenance Manuals (digital copy) Note: Hard copy can be provided upon request City of Rosemead I Council Chamber Audio Visial Upgrade (Project #31031) EIDIM GROUP The items listed above may be updated or modified based on client requests or issues identified during integration. For additional deliverables or AV professional services, please contact our assigned estimator. Assumptions The following assumptions are based on the RFP document and Q&A responses provided by the client. Any clarifications can be addressed during the review and evaluation of the quote: • The City acknowledges that EIDIM does not fabricate or manufacture the products recommended in the quotation. • Items designated for reuse or repurposing must be in proper working condition. The City shall be responsible for any necessary repairs to these items. • Existing conduits intended for low -voltage applications will be reused, and the City shall provide additional power outlets as required. • The City shall be responsible for all electrical work necessary for project completion. • The City shall undertake all demolition, drywall repairs, and wall patching as may be required by the project. • The City acknowledges that the required contractor licenses for this project are (B,C-7,C- 10, and C-33). Exclusions No additional items, professional services, products, or system functions will be provided beyond the stipulated information. No electrical works are identified and are excluded on our scope. No demolition, drywall work and wall patching are identified and are excluded on our scope. Customer Requirements • Coordinate the preparation of any hardware and/or software that is not included for this project. Ensure that existing hardware is fully functional and software/firmware is updated • Assure that the environment is 100% ready. If the environment is not 100% ready the scheduling of the implementation will not be finalized until it is. • Assign a designated person from the Customer's staff who, on behalf of the Customer will grant all approvals, provide information, and otherwise be available to assist EIDIM to facilitate the delivery of this service. • Provide one point -of -contact that will finalize decisions during the installation of the project modifications. Provide necessary documentations, paperwork, schematics, line drawings, and information for EIDIM to complete the project. Any delays in providing the necessary project documentation will delay the project. • Provide a suitable work area for delivery of the service, including access to an outside telephone line, power, any network connections, etc. that is required. Insurance Requirements 1. Builder Risk Insurance requirements are not included in the proposal. City of Rosemead I Council Chamber Audio Visial Upgrade (Project #31031) ®EE -101M GROUP 2. Excess or Umbrella Liability Insurance (over primary) coverage in our proposal includes only General Liability Insurance with a limit of $5,000,000. Auto Insurance and Workers' Compensation coverage are excluded 3. All insurance requirements listed in the bid document (Exhibit B) are included in the proposal, except for the exclusions noted in items 1 and 2. Project Schedule/Milestones We have developed an estimated project timeline to ensure the timely and efficient implementation of the AV system for the city. EIDIM will complete the project within the City's expected timeframe. Upon receiving the notice to proceed, we will immediately initiate all necessary actions to ensure the project is completed on time. Milestones: Phase 1: Administration Contract Award This milestone marks the official start of the project with the contract signing and issuance of the Notice to Proceed (NTP). The NTP authorizes the proj ect team to begin work per the agreed scope, schedule, and budget. It also involves verifying contract terms, setting up communication channels, and preparing necessary documentation for a smooth transition to project execution. Site Survey/Kick of Meeting The site survey and kick-off meeting bring together the project team, stakeholders, and relevant personnel to align on project objectives, expectations, and schedules. During the site survey, team members assess the project location, gather critical data, and identify any potential obstacles. The kick-off meeting covers the project timeline, roles and responsibilities, communication protocols, and safety considerations, ensuring a unified approach from the start. Shop Drawing/Plan Check During this phase, detailed shop drawings are created, reviewed, and approved. These technical documents outline specifications, measurements, and construction details, providing a visual representation of the project. The plan check process involves reviewing the drawings for compliance with design requirements, safety standards, and regulatory codes. Any necessary revisions are made to ensure accuracy and feasibility. Order Material With approved shop drawings, the project team places orders for all required materials. This milestone involves coordinating with suppliers, verifying material specifications, and ensuring that purchase orders align with project needs. Material ETA The expected time of arrival (ETA) for the ordered materials is tracked over this 30 -day period. During this phase, the project team monitors the supply chain, manages vendor communications, and prepares for the receipt of materials. City of Rosemead I Council Chamber Audio Visial Upgrade (Project #31031) 7 EE -101M GROUP Phase 2: Installation Rough -In During the rough -in phase, the project team installs the basic infrastructure required for the equipment and systems. This involves running cables, setting up conduits, mounting brackets, and preparing connection points. Shop Staging All equipment and materials are prepared and pre -configured off-site to streamline the on-site installation process. This includes assembling components, performing preliminary testing, and ensuring that all equipment is fully operational and ready for deployment. Shop staging helps identify and resolve potential issues early, enhancing efficiency and reducing downtime during the installation phase. Equipment Installation The equipment installation phase involves physically placing and securing all project -specific equipment at the site. This includes mounting hardware, connecting systems, and integrating components as outlined in the project design and shop drawings. The installation team works closely with project managers and the assigned designer from the City to ensure that all equipment is installed correctly, aligned properly, and meets both functional and safety requirements. Termination/Configuration Once the equipment is installed, technicians perform termination and configuration tasks to connect all systems and make them fully operational. This involves wiring connections, software configuration, system integration, and conducting initial setup procedures. At this stage, technicians also conduct preliminary tests to verify that all configurations meet the specified operational parameters and project goals. Commissioning/Validation The commissioning and validation phase ensures that all installed systems and equipment are functioning as intended. This includes conducting performance tests, troubleshooting issues, and validating that the system meets all contractual and regulatory requirements. The project team works with stakeholders to complete final inspections, obtain necessary approvals, and ensure the project is ready for handover. Successful commissioning confirms that the project is complete and all systems are operational and fully compliant. Phase 3: System Programming Programming Involves comprehensive development of the audiovisual (AV) system, including audio QSC DSP programming, control system programming, network switch programming, and GUI designs for both control systems and user panels. Key milestones include: City of Rosemead I Council Chamber Audio Visial Upgrade (Project 431031) 8 E671M GROUP o Initial AV Programming Meeting: All stakeholders, including the AV Contractor, owner's representatives, system users, will meet to discuss control system functions and overall GUI design. Vendors will implement minimal changes as needed. o Initial GUI Design Development: Vendors will create a preliminary GUI design based on meeting discussions. They may request City -provided graphics, such as logos or images. o GUI Review Meeting: The initial GUI design will be reviewed, and feedback will be collected to guide further modifications. o Design Modifications: The AV contractor will adjust the GUI design to incorporate the City's feedback. o Final Code Review: After system installation and programming, a final review meeting will be conducted to ensure the system meets all requirements. This meeting will focus on code validation, not training. Debugging The debugging phase focuses on identifying and resolving software issues through thorough testing and troubleshooting. The team refines the code, optimizes performance, and conducts final tests to ensure the system operates reliably and meets all project standards. Phase 4: Substantial Completion Client Walkthrough After the system has been thoroughly tested, the client is invited for a walkthrough. During this session, the team demonstrates the system's capabilities, explains how to use the various features, and answers any questions the client may have. Punchlist Following the client walkthrough, any issues or adjustments identified are addressed during the punch list completion phase. The team works to resolve any outstanding items, ensuring that the system is fully compliant with the project requirements. This phase is critical for ensuring that the client is fully satisfied with the final installation. Training EIDIM will provide a basic training session lasting up to 8 hours for end users and IT staff. This session will cover essential system functionality and operations, including demonstrations of features and settings. The training will be conducted by a technician or engineer familiar with the system. Sign -off In this part of the project, EIDIM will provide and submit all the closeout documents and deliverables to the City. We will also request for a letter of completion in order to fully closeout the project. City of Rosemead I Council Chamber Audio Visial Upgrade (Project #31031) BIDDER: EIDIM Group Inc. CITY OF ROSEMEAD COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 SECTION I -BID SCHEDULE CONTRACT BID FORMS CBF -1 BIDDER: EIDIM Group Inc. BID SCHEDULE SCHEDULE OF PRICES FOR COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31031 Audio System Upgrades NO. ITEM DESCRIPTION UNIT EST. UNIT ITEM QTY. PRICE COST 1 Gooseneck Microphone (Cardoid mic EA 12 $2_1 7.30 $ 2,607.58 capsule with mute switch and LED indicator) 2 BSS BLU -BIB Expansion Box for existing EA 1 $639 39 $ 639.39 DSP Handheld Wireless Microphones with Receivers (Provides (3) New Handheld 3 Wireless Mics for Room PA & Provides (3) EA 6 $ 667.64 $ 4,005.84 Dedicated Wireless Mics for Language Translation Application) Assisted Listening System (WIFI 4 channel 4 Wi-Fe Audio Server (for hearing impaired / EA 1 $ 2,350.34 $_2,350 34 translation applications) 5 Professional Speaker Amplifier EA 1 $ 613.28 $ 613.28 Video Routing and Control System Equipment EST. UNIT ITEM NO. ITEM DESCRIPTION UNIT Qom, PRICE COST 6 Extron DTP Crosspoint 108 4K Video Router EA 1 $12,895.00 $ 12,895.00 7 Extron IPCP Pro 350 xi Control Processor EA 1 $_L604 46 $ 1,604.46 8 Extron DTP T HWP 41K 230 D HDMI Tx Wall EA 3 $490.62 $1,471.86 plate 9 Extron 15" Tabletop Control Screen with EA 1 $ 4.017.78 $ 4,017.78 video preview ability 10 Extron HDMI 230 DTP Receiver EA 1 $ 397.80 $ 397.80 CBF -2 CBF -3 Multiview Processor (4 HDMI inputs, support 11 for flexible PIP window placement to a single EA 1 $__1,651 02 $ 7,651.02 broadcast switcher input, full RS232/LAN control from Extron touchpanel) 12 16 Port Gigabit PoE Switch 16 PoE + Ports at EA 1 $_1,056.19 $ 1,056.19 250W 13 AppleTV 4K with Ethernet 31d Generation EA 1 $160.21 $ 160.21 (128 GB) 14 Converter (HMDI to SDI 12G with EA 1 $ 136.31 $_136 31 PSU)I 15 SignaI Converter (SDI to HDMI 12G with EA 4 $_L36.31 $ 545.25 PS PTZ Camera (with 30x Optical Zoom with 16 SDI/HDMI/USB/IP, full RS232/LAN control EA 3 $ 1,288.43 $ 3,865.29 from Extron touch panel (Gray) 17 Ceiling Mount Kit for PTZ Optics Camera EA 3 $65.20 $ 195.59 18 Sequencing Power Conditioner EA 1 $ 73.58 $_L3 58 t9 Misc. Installation Cables and Fittings LS 1 $ 2,375.75 $__2,375 75 (Budgetary Line Item) Display System Equipment EST. UNIT ITEM NO. ITEM DESCRIPTION UNIT Qom, PRICE COST Planar Video Wall 109" Diagonal, FHD, 20 1.2mm pitch, 800 nit brightness, HDR, 247 EA 2 $_'31,906.88 $68,813.75 reliability, multi -source viewing, speakers, landscape. Multiview Processor (4 HDMI inputs, support for 4 simultaneous video windows with flexible windows placement, background 21 video window support, supports output to 2 EA 1 $L,651 .02 $ 7,651.02 mirrored video walls with one signal extended via Extron DTP, full RS232 / LAN control from touch panel r22Extron Extron HDMI 230 DTP Receiver EA 1 $_197 80 $397.80 CBF -3 BIDDER: EIDIM Group Inc. 23 Extron 1x2 4K HDMI Distribution Amplifier EA 1 $ 541.45 $ 541.45 24 Dell Optiplex Small Form Factor PC with 27" EA 1 $ 1,694.36 $ 1,694.36 Monitor 25 Misc. Installation Cables and Fittings LS 1 $Z,375.75 $ 2,375.75 (budgetary line item) Labor and Associated Installation of Audiovisual Equipment & Components EST. UNIT ITEM NO. ITEM DESCRIPTION UNIT CITY PRICE COST Planar: Install Assist for 2 Video Wall 26 Systems (Pro serv, assisted install with EA 1 $5,536.05 $ 5,536.05 training) 28 Uninstallation and removal of existing LS 1 $_L672-00 $ 5,833.35 equipment that is no longer necessary 29 Video Systems Wiring, Installation, Video LS 1 $27,710 25 $ 29,871.60 Routing Configurations 30 Audio System Tuning, Audo System DSP LS 1 $_4,104.00 $ 6,265.35 Programming 31 Extron Touchscreen Control System LS 1 $6,156.00 $ 8,317.35 Programming Labor 32 Project ManagemenUDIR Filings and CPR LS 1 $_13,189-50 $ 18,350.85 Admin Costs TOTAL BASE BID AMOUNT IN NUMBERS $ 202,311.22 TOTAL BASE BID AMOUNT IN WORDS: Two Hundred two thousand, three hundred eleven dollars and twenty two cents The award of Contract shall be based on the TOTAL BASE BID AMOUNT. In the case of discrepancies in the amount of bid, unit prices shall govern over extended amounts, and words shall govern over figures. Full compensation for the items listed to the right as Items A, B, C, D and € are consideredas inclusive in each Bid Item listed above in the Bid Schedule as a licable, and no Mobilization / Demobilization rA. . �T'�-.- � 3A'):E� and Best Management actices (BMPs), Public Convenience and CBF -4 BIDDER: EIDIM Group Inc. additional and/or separate compensation will Safety be allowed. E. Glearing The bid prices shall include any and all costs, including labor, materials, appurtenant expenses, taxes, royalties and any and all other incidental costs to complete the project, in compliance with the Bid and Contract Documents and all applicable codes and standards. The City reserves the right to add, delete, increase or decrease the amount of any quantity shown and to delete any item from the contract and pay the contractor at the bid unit prices so long as the total amount of change does not exceed 25% (plus or minus) of the total bid amount for the entire project. If the change exceeds 25%, a change order may be negotiated to adjust unit bid prices. All other work items not specifically listed in the bid schedule, but necessary to complete the work per bid and contract documents and all applicable codes and standards are assumed to be included in the bid prices. A bid is required for the entire work, that the quantities set forth in the Bid Schedule are to calculate total bid amount, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in the schedule of bid items above, within the limits define in Section 3-2.2.1 of the Standard Specifications, to stay within the budgeted amount of this project. The award of Contract shall be based on the TOTAL BASE BID AMOUNT only. If the Bid lists any Additive Alternate bids, the ADDITIVE ALTERNATE BID ITEMS shown per the ADDITIVE ALTERNATE BID SCHEDULE above will not be taken into account in determining the lowest responsible bidder. City may add bid items from the ADDITIVE ALTERNATE BID SCHEDULE at the sole and complete discretion of the City as part of the performance of the contract. The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern. Attached hereto is a certified check, a cashier's check or a bid bond in the amount of Dollars ($ 190,000 ) said amount being not less than ten percent (10%) of the Total Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award, we fail or refuse to execute the Contract and furnish the required bonds, certificates and endorsements of insurance and other certifications within the time provided. If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be prepared by the Owner for execution, within five (5) Calendar Days following the Letter of Award CBF -5 BIDDER: EIDIM Group Inc. for the Contract, and will deliver to the Owner within that same period the necessary original Certificates of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other documentation and certification required by the Contract. The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the Business and Professional Code), arising from purchases of goods, materials or services by the Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to he Contractor. Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence satisfactory to the Owner of Bidder's California contractor's license(s) in good standing; (2) evidence that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting therefrom; and (3) any other information and documentation, financial or otherwise, needed by Owner to award a Contract to the lowest responsible and responsive bidder. Bidder understands and agrees that liquidated damages shall apply to this Contract in the amounts of five hundred dollars ($500.00) per calendar day if project is not completed within the working days specified on the Notice Inviting Bids. The Contract Time will begin to run ten (10) Working Days from the date of the Notice of Proceed and subject to the terms and conditions described in the Contract Form and the Contract Documents. Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data submitted herewith into a contract arising out of this Bid. The undersigned acknowledges receipt, understanding and full consideration of the following addenda to the Contract Documents. Addenda Nos. 1 The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and equipment or supplies necessary to complete the Work as described in the Bid Documents. If this bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the necessary bonds and accept the Total Bid Price as compensation in full for all Work under the contract. CBF -6 BIDDER: EIDIM Group Inc. EXAMINATION OF SPECIFICATIONS AND SITE OF WORK The Bidder declares that he/she has carefully read and examined the project plans, specifications, bid documents, and he/she has made a personal examination of the site (indicate name of the person, representing the bidder, who inspected the site and date below) and that he/she understands the exact scope of the Project. Name of Person who inspected the site Date of Inspection: uel Solis June 26, 2025 (4pm-5pm) ADDENDA ACKNOWLEDGMENT The Bidder acknowledges receipt of the following Addenda and has included their provisions in this Proposal: Addendum No. 1 Dated July 2, 2025 Addendum No. Dated Addendum No. Dated Addendum No. Dated CBF -7 BIDDER: EIDIM Group Inc. PUBLIC CONTRACT CODE STATEMENT AND QUESTIONAIRE PUBLIC CONTRACT CODE SECTION 10265.1 STATEMENT In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has _ , has not X been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. Note: The bidder must place a checkmark after "has" or "has not" in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE In conformance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No x If the answer is yes, explain the circumstances in the following space. NEW BIDDER: EIDIM Group Inc. PUBLIC CONTRACT CODE 10232 STATEMENT In conformance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two-year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. CBF -9 By: 97,aslere Signature Andrew W. Bang Type or Print Name President/CEO Title BIDDER: EIDIM Group Inc. 1015 South Placentia Ave., Business Street Address Fullerton, CA 92831 City, State and Zip Code 562-777-1009 Telephone Number Bidder's/Contractor's State of Incorporation: California Partners or Joint Venturers: Bidder's License Number(s): 824410 Department Industrial Relations Registered No. 1000010711 NOTES: None 1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the representations made on the Contract Bid Forms. 2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address 3) If Bidder is a partnership or joint venture, give full names of all partners or joint venturers. As further discussed in the Instructions to Bidders, Bidder will be required to provide evidence that the person signing on behalf of the corporation, partnership or joint venture has the authority to do so. CBF - 10 BIDDER: EIDIM Group Inc. SECTION 2 BID DATA FORMS CBF - 11 BIDDER: EIDIM Group, Inc. dba EIDIM AV Technology Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide the information required. Bidder shall ensure that every page of its Bid Data Forms are properly identified with the Bidder's name and page number. 2.A BID BOND KNOW ALL MEN BY THESE PRESENTS: THAT EIDIM as Principal, and _ Inc. dba EIDIM AV T The Gray Casualty & as Surety, are held firmly bound unto the CITY OF ROSEDIEAD (hereinafter called the OWNER) in the sum of Ten Percent of the Total Amount Bid -- — -- ---- ---- — DOLLARS ($ -- 10%-- `), being not less than ten percent (10%) of the Total Bid Price; for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work required for the COUNCIL. CHAMBER AUDIOVISUAL UPGRADES–as set forth in the Notice Inviting Bids and accompanying Bid Documents, dated July 2nd, 2025 NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the OWNER and, within the time and in the manner required by the above- referenced Bid Documents, enters into the written form of Contract bound with said Bid Documents, furnishes the required bonds (one to guarantee faithful performance and the other to guarantee payment for labor and materials) furnishes the required insurance certificates and endorsements, and furnishes any other certifications as may be required by the Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by the OWNER and judgment is recovered, said Surety shall pay all costs incurred by the OWNER in such suit, including reasonable attorneys' fees to be fixed by the court. SIGNED AND SEALED, this 27th day of June , 2025 EIDIM Group, Inc. dba EIDIM AV Technology (SEAL) The Gray Casualty & Surety Company (SEAL) Principal Surety J Signature SknyHremdez - SEAL ZAttomey-in-Fact "'y}.• — CBF - 12 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of 13rGnGP_ ) On -N -me v" T25 before me, a\—ary �o�-',c. U I�L�i nk xl 2 (insert name and title of the officer) personally appeared r (tzu � An who proved to me on the basis of satisfactory evidence to be the personal whose name(s) ism subscribed to the within instrument and acknowledged to me that helshe/ti ey executed the same in his/h it authorized capacity(ies), and that by his/hf eir signaturej."n the instrument the person(s); or the entity upon behalf of which the person(sjacted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. OELANY SOFIA COLLANA FERNANDEZ WITNESS my hand and official seal. Ur" Nome PUBLIC? CA LFORNIA� ORANGE COUNTY O COWA. EXPIRES DEC. 9, 2026 Signature (Seal) CALIFORNIA ALL-PURPOSE ACKNOWLEDGEMENT A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On JUN 2 % 1025 before me, Christina Rogers Notary Public personally appeared Zyanya Hernandez who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of State of California that the foregoing paragraph is true and correct. CNRKTINA ROGERS *10jr-my Notary Public - Catitornia Orange CountyCommission * 24!7205 Comm. Expires Sep 14. 2027 PLACE NOTARY SEAL ABOVE WITNESS my hand and official seal. Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of attached document document: Document Date: Number Signer(s) Other than Named Above: Performance Bonding 12/20202410:50 507180(157262 THE GRAY INSURANCE COMPANY THE GRAY CASUALTY & SURETY COMPANY GENERAL POWER OF ATTORNEY Bond Number: N/A - Bid Bond Principal: EIDIM Group, Inc. dba EIDIM AV Technology Project: COUNCIL CHAMBER AUDIOVISUAL UPGRADES, PROJECT No. 31031 KNOW ALL BY THESE PRESENTS, THAT The Gray Insurance Company and The Gray Casualty & Surety Company, corporations duly organized and existing under the laws of Louisiana, and having their principal offices in Metairie. Louisiana, do hereby make, constitute, and appoint: Melissa Lopez, Vanessa Ramirez, Jonathan Batin, Zynnya Hernandez, Jennifer Anaya, Joaquin Perez, .Albert Melendez, Cbrisina Rogers, Frederic M. Archerd, Jr., Mary Martha Langley, Martha Barreras, Yu Cheng Chiang, and Erik Johansson of Tustin, California jointly and severally on behalf of each of the Companies named above its We and lawful Attomey(s)-in-Fact, to nuke, execute, seal and deliver, for and on its behalf and as its deed, bonds, or other writings obligatory in the nature of a bond, as surety, contracts of suretyship as am or may be required or permitted by law, regulation, contract or otherwise, provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed the amount of $25,000,000.00. This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of both The bray Insurance Company and The Gray Casualty & Surety Company at meetings duly called and held on the 261h day of June. 2003. 'RESOLVED, that the President, Executive Vice President, any Vice President, or the Secretary be and each or any of them hereby is authorized to execute a power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company bonds, undertakings, and all contracts of surety, and that each or any of them is hereby authorized to attest to the execution of such Power of Attorney, and to attach the seal of Company; and it is FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be binding upon the Company now and in the future when so affixed with regard to any bond, undertaking or contract of surety to which it is attached. IN WITNESS WHEREOF. The Gray Insurance Company and The Gray Casualty & Surety Company have caused their official seals to be hereinto affixed and these presents to be signed by their authorized officers this 4'h day of November, 2022. SEHL By: SEEL -- Michael T. Gray Cullen S. Piske r President President The Gray Insurance Company State of Louisiana The Gray Casualty & Surety Company 55: Parish of Jefferson On this 4'h day of November, 2022, before me, a Notary Public, personally appeared Michael T. Gray, President of The Gray Insurance Company, and Cullen S. Piske, President of The Gray Casualty & Surety Company, personally known to me, being duly sworn, acknowledged that they signed the above Power of Attorney and aliixed the seals of the companies as officers of, and acknowledged said instrument to be the voluntary act and decd, of their companies. Notary Pubi,C' U U Notary ID No. 92653 Leigh Anne Hcnican Orleans Parish, Louisiana Notary Public. Parish of Orleans Slate of Louisiana My Commission is for Life I, Mark S. Manguno, Secretary of The Gray Insurance Company, do hereby certify that the above and forgoing is a We and correct copy ora Power of Attorney given by the companies, which is still in full force and effect. IN WITNESS WHEREOF. 1 have set my hand and affixed the seals of the Company this 27th day of June 2025 Y' P sp si 16 1. Leigh Anne Hcnican, Secretary of The Gray Casualty & Surety Company, do hereby certify that the above and forgoing is a true and correct copy of a Power of Attorney given by the companies, which is still in full force and effect. IN WITNESS WHEREOF, 1 have set my hand and affixed the seals of the Company this 27th day of June . 2025 . 1��Vilr-;b3A"t*-Q h4tAAA 'ot' -_ @(9 THE CeHIRAY SURETY The Gray Insurance Company The Gray Casualty & Surety Company Telephone: 504-780-7440 P.O. Box 6202 info@graysurety.com Metairie, LA 70009 Surety Bond Seal Addendum In response to the logistical issues associated with the Covid-19 pandemic, The Gray Insurance Company and The Gray Casualty & Surety Company, (individually, the "Company" and collectively, the "Companies") have authorized the Attorneys -in -Fad named on the Power of Attorney attached hereto and incorporated herein by reference to affix the Companies, seal to any bond executed on behalf of the Companies by any such Attorney -in -Fad by attaching this Addendum to said bond. To the extent this Addendum is attached to a bond that is executed on behalf of any of the Companies by such Attorney -in -Fad, each Company hereby agrees that the seal below shall be deemed affixed to said bond to the same extent as if its raised corporate seal was physically affixed to the face of the bond. Dated this V Day of January 2021 Ad By. Cullen S. Piske President, The Gray Casualty & Surety Company Attorney -in -Fad The Gray Insurance Company 'I SEAL s SEAL ,'2 Y♦i Ad By. Cullen S. Piske President, The Gray Casualty & Surety Company Attorney -in -Fad The Gray Insurance Company THE 141E.11RAY SURETY The Gray Insurance Company The Gray Casualty & Surety Company Telephone: 504-780-7440 P.O. Box 6202 info@graysurety.com Metairie, LA 70009 Surety Bond Seal Addendum In response to the logistical issues associated with the Covid-19 pandemic, The Gray Insurance Company and The Gray Casualty & Surety Company, (individually, the "Company" and collectively, the "Companies") have authorized the Attorneys -in -Fact named on the Power of Attorney attached hereto and incorporated herein by reference to affix the Companies' seal to any bond executed on behalf of the Companies by any such Attorney -in -Fact by attaching this Addendum to said bond. To the extent this Addendum is attached to a bond that is executed on behalf of any of the Companies by such Attorney -in -Fact, each Company hereby agrees that the seal below shall be deemed affixed to said bond to the same extent as if its raised corporate seal was physically affixed to the face of the bond. Dated this 1'r Day of January 2021 gUP.1q �JY�6L --fit ;= SEAL `._ SEAL u� By: Cullen S. Piske President. The Gray Casualty & Surety Company Attorney -in -Fact. The Gray Insurance Company BIDDER: EIDIM Group Inc. 2.13 LIST OF PROPOSED SUBCONTRACTORS In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100 through 4114 of the California Public Contract Code, and any amendments thereto, each Bidder shall provide the information requested below for each subcontractor who will perform work, labor or render service to Bidder in or about the construction of the Work in an amount in excess of one-half of one percent (greater than 0.5 %) of the Bidder's Total Bid Price, or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work which will be done by each subcontractor. Bidder shall list only one subcontractor for any one portion of the Work. Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow Bidders twenty-four (24) additional hours after the deadline for submission of bids to submit the information requested by the Owner about each subcontractor, other than the name and location of each subcontractor. If the Bidder fails to specify a subcontractor for any portion of the Work to be performed under the Contract, it shall be deemed to have agreed to perform such portion itself, and shall not be permitted to subcontract that portion of the Work except under the conditions hereinafter set forth below. Subletting or subcontracting of any portion of the Work in excess of one half of one percent (greater than 0.5%) of the Total Bid Price or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of I percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, for which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after Owner approval. CBF -13 2.11 LIST OF PROPOSED SUBCONTRACTORS (continued) [**Duplicate Next 2 Pages if needed for listing additional subcontractors.**] Name and Location of Subcontractor Description of Work to be Subcontracted Name: None Address: License No.: Department of Industrial Relation Registration No. Name and Location of Subcontractor Name: None Description of Work to be Subcontracted License No.: Department of Industrial Relation Registration Name and Location of Subcontractor Name: None Address: Description of Work to be Subcontracted License No.: Department of Industrial Relation Registration No. Name and Location of Subcontractor Name: None Description of Work to be Subcontracted Address: License No.: Department of Industrial Relation Registration Name and Location of Subcontractor None Description of Work to be Subcontracted License No.: Department of Industrial Relation Registration No CBF - 14 BIDDER: EIDIM Group Inc. 2.0 The following are the names, addresses and telephone numbers for three public agencies for which BIDDER has performed similar work within the past two (2) years: 1. City of EI Cajon 1200 Civic Center Way, EI Cajon, CA 92020 Name and Address of Owner Sara Diaz 1 (619) 579-4242 1 sdiaz@elcajon.gov Name and telephone number of person familiar with project AV design, installation, programming, $299,97.04 as needed support services February 3, 2025 Contract amount Type of Work Date Completed 2• City of Pasadena I Pasadena City Hall, 1000 North Garfield Avenue, City Council Chamber, Pasadena CA 91109 Name and Address of Owner Serjik Arzoumanians 1626-744-7698 1 SArzoumanians@CityofPasadena.net Name and telephone number of person familiar with project AV design, installation, programming, $243, 371.81 warranty, and maintenance March 17, 2025 Contract amount Type of Work Date Completed 3. City of San Jose 1200 East Santa Clara Street, 6th Floor, San Jose, CA 95113 Name and Address of Owner Keith Chow 1450-535-81011 keith.chow@sanjoseca.gov Name and telephone number of person familiar with project AV design, installation, programming, $1,027,967.56 warranty, and maintenance September 11, 2023 Contract amount Type of Work CBF -15 Date Completed BIDDER: EIDIM Group Inc. 4. North County Transit District I North County Transit District, 810 Mission Avenue Oceanside, CA 92054 Name and Address of Owner Suzie Tovar 1760-966-6606 1 stovar@nctd.org Name and telephone number of person familiar with project AV design, installation, programming, $225,894.04 warranty, and maintenance September 9, 2024 Contract amount Type of Work Date Completed CBF -16 SECTION 3 NON-COLL USION AFFIDA VIT CBF -17 CITY HALL COUNCIL CHAMBERS AUDIO-VISUAL UPGRADES NONCOLLUSION AFFIDAVIT (TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID) STATE OF CALIFORNIA i COUNTY OF 4tn �1iin� being first duly sworn, deposes and says thahe or she is 4 ne y:;i 4 of the party making the foregoing Bid that the Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the Bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid price, or of that of any other Bidder, or to secure any advantage against the public body awarding the Contract of anyone interested in the proposed Contract; that all statements contained in the Bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his or her Bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, Bid depository, or to any member or agent thereof to effectuate a collusive or sham Bid. -V_-i"-,H '- „]t'- =2i_ Name of Contractor Bidder (Affiant) Subscribed and sworn to before me this ist day of 20 25 My COmmISSlOn expires:{ DELANY SOFIA COLLANA FERNANDEZ 1 , _ -.R -1R COW M. LI 2429520 NOTARY PUBLIC - CAEIFORNIA c Notary Public . _ � OI.i . EXPIRES n END OF SECTION DEC. 9, 7026 AFFIDAVIT OF NONCOLLUSION 00480- 1 Attachment D Construction Contract with Studio Spectrum, Inc. CONSTRUCTION CONTRACT COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT No. 31030 (STUDIO SPECTRUM, INC.) PARTIES AND DATE This Contract is made and entered into this 12th day of August, 2025 (Effective Date) by and between the City of Rosemead, a municipal corporation of the State of California, located at 8838 E. Valley Blvd., Rosemead, California 91770, ("City") and STUDIO SPECTRUM, INC. with its principal place of business at ,1056 North Lake Street, Burbank, CA 91502 (hereinafter referred to as "Contractor'). City and Contractor are sometimes individually referred to as "Party' and collectively as "Parties" in this Contract. 2. RECITALS 2.1 Contractor Contractor desires to perform and assume responsibility for the COUNCIL CHAMBER AUDIOVISUAL UPGRADES PROJECT by the City on the terms and conditions set forth in this Contract. Contractor represents that it is experienced in providing such work services to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the Services in the State of California, and that is familiarwith the plans of City. 2.2 Project City desires to engage Contractor to render such services described herein as Project ("Project") as set forth in this Contract. 3. TERMS 3.1 Scope of Services and Term 3.1.1 General Scope of Services. Contractor promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional construction services necessary for the Project ("Services"). The Services are more particularly described in Exhibit "A" attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Contract, the exhibits attached hereto and incorporated STUDIO SPECTRUM, INC. Page 2 of 11 herein by reference, and all applicable local, state and federal laws, rules and regulations. 3.1.2 Term. The term of this Contract shall be from Effective Date shown above to August 12th, 2026 unless earlier terminated as provided herein. Contractor shall complete the Services within the term of this Contract, and shall meet any other established schedules and deadlines. The Parties may, by mutual, written consent, extend the term of this Contract if necessary to complete the Services. 3.2 Responsibilities of Contractor. 3.2.1 Control and Payment of Subordinates; Independent Contractor. The Services shall be performed by Contractor or under its supervision. Contractor will determine the means, methods and details of performing the Services subject to the requirements of this Contract. City retains Contractor on an independent contractor basis and not as an employee. Contractor retains the right to perform similar or different services for others during the term of this Contract. Any additional personnel performing the Services under this Contract on behalf of Contractor shall also not be employees of City and shall at all times be under Contractor's exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance. 3.2.2 Schedule of Services: Contractor shall perform the Services expeditiously, within the term of this Contract, and within the schedules timeline. Contractor represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions. In order to facilitate Contractor's conformance with the Schedule, City shall respond to Contractor's submittals in a timely manner. Upon request of City, Contractor shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services. 3.2.3 Conformance to Applicable Requirements. All work prepared by Contractor shall be subject to the approval of City. 3.2.4 City's Representative. The City hereby designates the City Manager, Ben Kim, or his designee, to act as its representative for the performance of this Contract ("City's Representative"). City's Representative shall have the power to act on behalf of the City for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the City's Representative or his or her designee. 3.2.5 Contractor's Representative. Contractor hereby designates John Buckowski, or designee, to act as its representative for the performance of this Contract ("Contractor's Representative"). Contractor's Representative shall have full authority to represent and act on behalf of the Contractor for all purposes under this Contract. The Contractor's Representative shall supervise and direct the Services, using his/her best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Services under this STUDIO SPECTRUM, INC. Page 3 of 11 Contract 3.2.6 Coordination of Services. Contractor agrees to work closely with City staff in the performance of Services and shall be available to City's staff, consultants and other staff at all reasonable times. 3.2.7 Standard of Care; Performance of Employees. Contractor shall perform all Services under this Contract in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Services. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License if applicable, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Contractor's failure to comply with the standard of care provided for herein. Any employee of the Contractor or its sub -contractors who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Contractor and shall not be re-employed to perform any of the Services or to work on the Project. 3.2.8 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state aind federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA, AQMD requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with Services. If the Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations. 3.2.9 Insurance: Contractor shall maintain, prior to the beginning of and for the duration of this Contract, insurance coverage as specified in Exhibit B attached to and part of this Contract. 3.2.10 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be STUDIO SPECTRUM, INC. Page 4 of 11 performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and life saving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures. 3.2.11 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 1600, et seq., ("Prevailing Wage Laws'), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the Services are being performed as part of an applicable "public works' or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. 3.2.12 Bonds. 3.2.12.1 Performance Bond: If specifically requested by City, Contractor shall execute and provide to City concurrently with this Contract a Performance Bond in the amount of the total, not -to -exceed compensation indicated in this Contract, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by the City. 3.2.12.2 Payment Bond. If required by law or otherwise specifically requested by City, Contractor shall execute and provide to City concurrently with this Contract a Payment Bond in the amount of the total, not -to -exceed compensation indicated in this Contract, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by the City. 3.2.12.3 Bond Provisions. Should, in City's sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the affected bond within 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the total compensation is increased in accordance with the Contract, the Contractor shall, upon request of the City, cause the amount of the bonds to be increased accordingly and shall STUDIO SPECTRUM, INC. Page 5 of 11 promptly deliver satisfactory evidence of such increase to the City. To the extent available, the bonds shall further provide that no change or alteration of the Contract (including, without limitation, an increase in the total compensation, as referred to above), extensions of time, or modifications of the time, terms, or conditions of payment to the Contractor, will release the surety. If the Contractor fails to furnish any required bond, the City may terminate this Contract for cause. 3.2.12.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted. The surety must be a California -admitted surety with a current A.M. Best's rating no less than A:VIII and satisfactory to the City. If a California -admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City. 3.3 Fees and Payments. 3.3.1 Compensation. The total compensation shall not exceed One Hundred Eighty -Nine Thousand, Nine Hundred Seven Dollars, and Eighty -Eight Cents ($189,907.88) without advance written approval of City's project manager. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Contract. 3.3.2 Payment of Compensation. Contractor shall submit to City a monthly itemized statement that indicates work completed and hours of Services rendered by Contractor. The statement shall describe the amount of Services and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within 45 days after receiving such statement, review the statement and pay all approved charges. The payments will be subject to a 5% retention amount, which would be released and paid after all work under the Contract has been satisfactorily completed, and 35 days after a Notice of Completion is filed with the County of Los Angeles. 3.3.3 Reimbursement for Expenses. Contractor shall not be reimbursed for any expenses unless authorized in writing by City. 3.3.4 Extra Work. At any time during the term of this Contract, City may request that Contractor perform Extra Work. As used herein, "Extra Work" means any work that is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Contract. Contractor shall not perform, nor be compensated for, Extra Work without written authorization from City's Representative. 3.4 Accounting Records. 3.4.1 Maintenance and Inspection. Contractor shall maintain complete and accurate records with respect to all costs and expenses incurred under this Contract. All such records shall be clearly identifiable. Contractor shall allow a representative of City STUDIO SPECTRUM, INC. Page 6 of 11 during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Contract. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to the Contract for a period of three (3) years from the date of final payment under this Contract. 3.5 General Provisions. 3.5.1 Termination of Contract. 3.5.1.1 Grounds for Termination. City may, by written notice to Contractor, terminate the whole or any part of this Contract at any time and without cause by giving written notice to Contractor of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Contractor shall be compensated only for those services that have been adequately rendered to City, and Contractor shall be entitled to no further compensation. Contractor may not terminate this Contract except for cause. 3.5.1.2 Effect of Termination. If this Contract is terminated as provided herein, City may require Contractor to provide all finished or unfinished Documents and Data and other information of any kind prepared by Contractor in connection with the performance of Services under this Contract. Contractor shall be required to provide such document and other information within fifteen (15) days of the request. 3.5.1.3 Additional Services. In the event this Contract is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. 3.5.2 Delivery of Notices. All notices permitted or required under this Contract shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose: CONTRACTOR CITY: STUDIO SPECTRUM, INC. 1056 NORTH LAKE STREET BURBANK, CA 91520 Attn: JOHN BUCKOWSKI Tel: (818) 843-1610 City of Rosemead 8838 E. Valley Boulevard Rosemead, CA 91770 Attn: Ben Kim, City Manager Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service. STUDIO SPECTRUM, INC. Page 7 of 11 3.5.3 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Contract. 3.5.4 Attorney's Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Contract, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorney's fees and all other costs of such action. 3.5.5 Indemnification. Contractor shall defend, indemnify and hold the City, its officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Services, the Project or this Contract, including without limitation the payment of all consequential damages and attorneys fees and other related costs and expenses. Contractor shall defend, at Contractor's own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its directors, officials, officers, employees, agents or volunteers. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its directors, officials, officers, employees, agents or volunteers, in any such suit, action or other legal proceeding. Contractor shall reimburse City and its directors, officials, officers, employees, agents and/or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, officials, officers, employees, agents or volunteers. 3.5.6 Entire Contract. This Contract contains the entire Contract of the parties with respect to the subject matter hereof, and supersedes all prior negotiations and understandings. This Contract may only be modified by a writing signed by both parties. 3.5.7 Governing Law. This Contract shall be governed by the laws of the State of California. Venue shall be in Los Angeles County. 3.5.8 Time of Essence. Time is of the essence for each and every provision of this Contract. 3.5.9 City's Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project. 3.5.10 Successors and Assigns. This Contract shall be binding on the successors and assigns of the parties. 3.5.11 Assignment or Transfer. Contractor shall not assign, hypothecate, or transfer, either directly or by operation of law, this Contract or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such STUDIO SPECTRUM, INC. Page 8 of 11 attempted assignment, hypothecation or transfer. 3.5.12 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Contract, the language of this Contract shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not workdays. All references to Contractor include all personnel, employees, agents, and subcontractors of Contractor, except as otherwise specified in this Contract. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Contract. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Contract. 3.5.13 Amendment; Modification. No supplement, modification, or amendment of this Contract shall be binding unless executed in writing and signed by both Parties. 3.5.14 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Parry shall give the other Party any contractual rights by custom, estoppels, or otherwise. 3.5.15 No Third Parry Beneficiaries. There are no intended third parry beneficiaries of any right or obligation assumed by the Parties. 3.5.16 Invalidity; Severability. If any portion of this Contract is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect. 3.5.17 Prohibited Interests. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to rescind this Contract without liability. For the term of this Contract, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. 3.5.18 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Contractor shall also comply with all relevant provisions of City's Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted. 3.5.19 Labor Certification. By its signature hereunder, Contractor certifies that STUDIO SPECTRUM, INC. Page 9 of 11 it is aware of the provisions of Section 3700 of the California Labor Code that require every employer to be insured against liability for Worker's Compensation or to undertake self- insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services. 3.5.20 Authority to Enter Contract. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Contract. Each Party warrants that the individuals who have signed this Contract have the legal power, right, and authority to make this Contract and bind each respective Party. 3.5.21 Counterparts. This Contract may be signed in counterparts, each of which shall constitute an original. 3.6 Subcontracting. 3.6.1 Prior Approval Required. Contractor shall not subcontract any portion of the work required by this Contract, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Contract. [SIGNATURES ON NEXT PAGE] STUDIO SPECTRUM, INC. Page 10 of 11 CITY OF ROSEMEAD STUDIO SPECTRUM, INC. By. Kim, City Manager Date Signat re Da e Attest: Ericka Hernandez, City Clerk Date Approved as to Form: Rachel Richman, City Attorney Date Name: Jb,^ KUC L WS Print Title: fees f C61-vt [If Corporation, TWO SIGNATURES, President OR Vice President AND Secretary, AND CORPORATE SEAL OF CONTRACTOR REQUIRED] Name: A cTI'1, W g . Title: Q hi-t.'em fl tj STUDIO SPECTRUM, INC. EXHIBIT A SCOPE OF CONTRACT SERVICES STUDIO SPECTRUM, INC. EXHIBIT B INSURANCE REQUIREMENTS Prior to the beginning of and throughout the duration of the Work, Contractor will maintain insurance in conformance with the requirements set forth below. Contractor will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth here, Contractor agrees to amend, supplement or endorse the existing coverage to do so. Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to City in excess of the limits and coverage required in this Contract and which is applicable to a given loss, will be available to City. Contractor shall provide the following types and amounts of insurance: Commercial General Liability Insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO "insured contract" language will not be accepted. Automobile liability insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident. Workers' compensation insurance. Contractor shall maintain Workers' Compensation Insurance (Statutory Limits) and Employer's Liability Insurance (with limits of at least $1,000,000) for Contractor 's employees in accordance with the laws of the State of California, Section 3700 of the Labor Code In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor's employees. Excess or Umbrella Liability Insurance. (Over Primary) Contractor shall obtain and maintain an umbrella or excess liability insurance policy that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability, automobile liability, and employer's liability. Such policy or policies shall include the following terms and conditions: Contractor shall obtain and maintain an umbrella or excess liability insurance policy that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability, automobile liability, and employer's liability. Such policy or policies shall include the following terms and conditions: STUDIO SPECTRUM, INC. • A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason; • Pay on behalf of wording as opposed to reimbursement; • Concurrency of effective dates with primary policies; and • Policies shall "follow form" to the underlying primary policies. • Insureds under primary policies shall also be insureds under the umbrella or excess policies. Builder's risk insurance. Upon commencement of construction and with approval of Agency, Contractor shall obtain and maintain builder's risk insurance for the entire duration of the Project until only the Agency has an insurable interest. The Builder's Risk coverage shall include the coverages as specified below. The named insureds shall be Contractor and Agency, including its officers, officials, employees, and agents. All Subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear. Contractor shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to Agency. The policy shall contain a provision that all proceeds from the builder's risk policy shall be made payable to the Agency. The Agency will act as a fiduciary for all other interests in the Project. Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub -limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub -limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to Agency to ensure adequacy of terms and sublimits and shall be submitted to the Agency prior to commencement of construction. Insurance procured pursuant to these requirements shall be written by insurers that are admitted carriers in the state of California and with an A.M. Bests rating of A- or better and a minimum financial size VII. General conditions pertaining to provision of insurance coverage by Contractor. Contractor and City agree to the following with respect to insurance provided by Contractor: 1. Contractor agrees to have its insurer endorse the third party General liability policies shall provide or be endorsed to provide that Agency and its officers, officials, employees, agents, and volunteers shall be additional insurer under such policies STUDIO SPECTRUM, INC. using standard ISO endorsement No. CG 2010.. Contractor also agrees to require all contractors, and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Contract shall prohibit Contractor, or Contractor's employees, or agents, from waiving the right of subrogation prior to a loss. Contractor agrees to waive subrogation rights against City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 3. All insurance coverage and limits provided by Contractor and available or applicable to this Contract are intended to apply to the full extent of the policies. Nothing contained in this Contract or any other Contract relating to the City or its operations limits the application of such insurance coverage. 4. None of the coverage required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called "third party action over" claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification and additional requirements by the City, as the need arises. Contractor shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect City's protection without City's prior written consent. 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all of the coverage required and an additional insured endorsement to Contractor's general liability policy, shall be delivered to City at or prior to the execution of this Contract. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled at any time and no replacement coverage is provided, City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other Contract and to pay the premium. Any premium so paid by City shall be charged to and promptly paid by Contractor or deducted from sums due Contractor, at City option. 8. Certificate(s) are to reflect that the insurer will provide 30 days notice to City of any cancellation of coverage. Contractor agrees to require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, or that any party will "endeavor" (as opposed to being required) to comply with the requirements of the certificate. STUDIO SPECTRUM, INC. 9. It is acknowledged by the parties of this Contract that all insurance coverage required to be provided by Contractor or any subcontractor, is intended to apply first and on a primary, noncontributing basis in relation to any other insurance or self insurance available to City. 10. Contractor agrees to ensure that subcontractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all Contracts with subcontractors and others engaged in the project will be submitted to City for review. 11.Contractor agrees not to self -insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it will not allow any contractor, subcontractor, Architect, Engineer or other entity or person in any way involved in the performance of work on the project contemplated by this Contract to self -insure its obligations to City. If Contractor's existing coverage includes a deductible or self-insured retention, the deductible or self- insured retention must be declared to the City. At that time the City shall review options with the Contractor, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 12. The City reserves the right at anytime during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City will negotiate additional compensation proportional to the increased benefit to City. 13. For purposes of applying insurance coverage only, this Contract will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Contract. 14. Contractor acknowledges and agrees that any actual or alleged failure on the part of City to inform Contractor of non-compliance with any insurance requirement in no way imposes any additional obligations on City nor does it waive any rights hereunder in this or any other regard. 15.Contractor will renew the required coverage annually as long as City, or its employees or agents face an exposure from operations of any type pursuant to this Contract. This obligation applies whether or not the Contract is canceled or terminated for any reason. Termination of this obligation is not effective until City executes a written statement to that effect. 16. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Contract have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered STUDIO SPECTRUM, INC. shall be submitted prior to expiration. A coverage binder or letter from Contractor's insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these specifications applicable to the renewing or new coverage must be provided to City within five days of the expiration of the coverage. 17.The provisions of any workers' compensation or similar act will not limit the obligations of Contractor under this Contract. Contractor expressly agrees not to use any statutory immunity defenses under such laws with respect to City, its employees, officials and agents. 18. Requirements of specific coverage features or limits contained in this section are not intended as limitations on coverage, limits or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be limiting or all-inclusive. 19. These insurance requirements are intended to be separate and distinct from any other provision in this Contract and are intended by the parties here to be interpreted as such. 20. The requirements in this Section supersede all other sections and provisions of this Contract to the extent that any other section or provision conflicts with or impairs the provisions of this Section. 21. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Contractor for the cost of additional insurance coverage required by this Contract. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto. Contractor agrees to provide immediate notice to City of any claim or loss against Contractor arising out of the work performed under this Contract. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City.