Loading...
RRA - Item 3 - Acceptance of work for storm drain improvements in Kelburn and Delta Ave - Internal Files Box 069IG3~ J Ll TO: HONORABLE CHAIRMAN AND MEMBERS tn ROSEMEAD REDEVELOPMENT AGENCY FROM: I' NK TRIPEPI, EXECUTIVE DIRECTO DATE: FEBRUARY 15, 2000 RE: ACCEPTANCE OF WORK FOR STORM DRAIN IMPROVEMENTS IN KELBURN AND DELTA AVENUES The referenced project has been constructed in conformance with the approved plans and specifications. Attached are the final report of project cost, copies of all change orders, and a location map. The original contract amount was $315,295.00. The total amount to be paid to the contractor including quantity adjustments, change orders and the 10 percent retention is $330,031.75. RECOMMENDATION 1. Accept the above referenced project. 2. Authorize the recordation of the Notice of Completion by the Agency Secretary. 3. Authorize the release of the 10 percent retention payment 35 days after the recorded date of the Notice of Completion. CA Attachments ROSEMEAD REDEVELOPMENT AGENCY 8838 VALLEY BLVD., ROSEMEAD, CA 917709(818)288-6671 • Telecopier 8183079218 FEB 2 2 r CITY OF ROSEMEAD Description: STORM DRAIN IMPROVEMENTS' DELTA AVENUE AND KELBURN AVENUE Contractor: GCI Construction, Inc. Address: 245 Fischer Avenue, Unit B-3 Cncu mno CA 97626 From: 2117100 To: 02/17/00 Contract No. 10310 Job No. 9941 CONTRACT PROGRESS REPORT Report Number: FINAL Start Date: July 6, 1999 Complabe Date: February 17, 2000 ContractPrice: $315,295.00 ITEM DESCRIPTION UNIT CONTRACT QUANTITY QUANTITY THIS EST. PREVIOUS ESTIMATE QUANTITY TO DATE UNIT PRICE TOTAL CONTRACT TO DATE DELTA AVENUE ST ORM DRAIN 1 18-INCH RCP, 1250-D L.F. 175 0.00 155.00 155.00 $75.00 $11,625.00 2 24-INCH RCP, 1250-D L.F. 195 0.00 196.00 196.00 $105.00 $20,580.00 3 30-INCH RCP, 1000-D L.F. 1125 0.00 1134.00 1134.00 $94.00 $106,596.00 4A CATCH BASIN PER APWA 300-2, W = 7 FT EACH 2 0.00 2.00 2.00 52,700.00 $5,400.00 4B CATCH BASIN PER APWA 300-2, W = 10 FT EACH 2 0.00 2.00 2.00 $3,200.00 $6,400.00 5 CATCH BASIN PER APWA 314-2, W = 7 FT EACH 2 0 00 2.00 2.00 53000.00 $6,000.00 6 MANHOLE PER APWA 321-1 EACH 6 0.00 600 6.00 52,700,00 $16,200.00 7 CONCRETE COLLAR PER APWA 380.2 EACH 4 0.00 3.00 3.00 $30000 $900.00 8 PLUG END OF PIPE W/8' BRICK/MORTOR EACH 2 000 200 200 $800.00 $1600.00 9 CNSTR BLANKET PROTECTION FOR PIPE EACH 4 0.00 1.00 1.00 5530.00 $530.00 10 CNSTR HOUSE CONNECTION PER APWA 223-1 EACH 3 0 00 10 00 10.00 52000.00 $20,000.00 11 CNSTR SUPPORTS FOR CONDUITS APWA 224-1 EACH 2 0.00 3.00 3.00 $350.00 $1,050.00 12 REMOVE EXIST BRICK AND MORTAR PLUG EACH 1 0.00 1.00 1.00 5300.00 $300.00 13 SHORING AND BRACING L.S. 1 0.00 1.00 1.00 $7,800.00 $7,800.00 14 PULBIC IMPROVEMENT SIGNS EACH 2 0.00 2.00 2.00 $620.00 $1,240.00 CHANGE ORDER NO. 1 L.S. 1 0.00 1.00 1.00 $2,645.00 $2,645.00 Subtotal: $208,866.00 KELBURN AVENUE STORM DRAIN 1 18-INCH RCP, 1250-0 L.F. 130 0.00 133.00 133.00 $100,00 $13,300.00 2 24-INCH RCP, 1250-D L.F. 155 0.00 156.00 156,00 $95.00 $14,820.00 3 30-INCH RCP. 1250-D L.F. 580 0.00 570.00 570.00 $96.00 $54,720.00 4A CATCH BASIN PER APWA 300-2, W = 3.5 FT EACH 1 0.00 1.00 1.00 $2,100.00 $2,100.00 4B CATCH BASIN PER APWA 300-2, W = 7.0 FT EACH 1 0.00 1.00 1,00 $2,700.00 $2,700.00 4C CATCH BASIN PER APWA 300-2, W = 10.0 FT EACH 1 0.00 1.00 1.00 $3,200.00 $3,200.00 40 CATCH BASIN PER APWA 300-2, W = 14.0 FT EACH 1 0.00 1.00 1.00 53,800.00 $3,800.00 5 MANHOLE PER APWA 321-1 EACH 3 0.00 3.00 3.00 $2,700.00 $8,100.00 6 CONCRETE COLLAR EACH 2 000 0.00 0.00 $300.00 $0.00 7 PLUG END OF PIPE W18- SRICK/MORTOR EACH 2 0.00 2.00 2.00 $300.00 $600.00 8 CNSTR BLANKET PROTECTION FOR PIPE EACH 2 000 0.00 0.00 $360.00 $0.00 9 RMV EXIST CB, CNSTR NEW CURB OPENING EACH 1 0.00 1.00 1.00 $3,900.00 $3,900.00 10 CNSTR HOUSE CONNECTION, APWA 223-1 EACH 2 0.00 0.00 0.00 $800.00 $0.00 11 MANHOLE PER APWA 321-1, INCL MH SHAFT EACH 1 0.00 1.00 1.00 $3,800.00 $3,800.00 12 REMOVE EXIST BRICK AND MORTAR PLUG EACH 1 0.00 2.00 2.00 $300.00 $600.00 13 ABANDON EXIST CURB PKWY DRAIN, CNST CUR L.F. 20 0.00 0.00 0.00 $18.00 $0.00 14 SHORING AND BRACING L.S. 1 0.00 1.00 1.00 $4600.00 $4,600.00 15 PUBLIC IMPROVEMENTS SIGNS EACH 2 0.00 4.00 4.00 $600.00 $2,400.00 CHANGE ORDER NO. 2 L.S. 1 0.00 1.00 1.00 $1840.00 $1,840.00 CHANGE ORDER NO. 3 L.S. 1 0.00 1.00 T001 $665 ]5 $685.75 4 Subtotal: S121,165.75 Fret Che APP App Date' 2-~ 7~ Y7r% :L~ Date Date' 2- l7 -ZDaI/ Approved By:- ity of Ro me Total Construction To Date $330,031. 75 Less 10% Retention $0. 00 Total Due To Date $330,031. 75 Previous Payment $297,028. 58 Balance Due $33,003. 18 City Engineer - CITY OF ROSEMEAD w PUBLIC WORKS DIVI510N CONTRACT CHANGE ORDER NO. 1 REV. NO. 0 SUPPL. NO. 0 AGENCY: CITY OF ROSEMEAD JOB NUMBER: 10310 PROJECT TITLE: DELTA KELBURN STORM DRAIN SHEET 1 OF 1 SHEETS CONTRACT NO.: 99-01 SPECIAL AGENCY NO.: 0 TO: GCI CONSTRUCTION CONTRACTOR You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the Agency. Description of work done, estimate of quantities and prices to be paid. Segregate between additional work at contract price, agreed price and time and materials. CONSTRUCT TRANSITION STRUCTION AT STATION 9+04.5 (DELTA) PER APWA STANDARD PLAN 340-1 C (OVER) CONTRACT CHANGE ORDER NO.: 1 REV. NO.: 0 SUPPL. NO.: 0 AGENCY: CITY OF ROSEMEAD JOB NUMBER: 10310 C continued.... ESTIMATED COST: Decrease $ or Increase $ $2,645.00 By reason of this order the time of completion will be adjusted as follows: NONE Prepared By: ~rh eolLdC✓ -7` 'Z' 5 " Signature Title ` Date . Recommended By: L~ 119 BG✓ 7-2-7- S~J ' at itle Date City/Agency: i Sr v Signature Title D to We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted. Date Contractor By: Title: ( Signa"tnfre- If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. 7/22/99 G\1999RSMD\PROJECTS\Kel-DelSD\Contract Change Order Number 1 (10310).wpd CITY OF ROSEMEAD f UBLIC WORKS DIVI510N .CONTRACT CHANGE ORDER NO. 2 REV. NO. 0 SUPPL. NO. 0 AGENCY: CITY OF ROSEMEAD JOB NUMBER: 10310 PROJECT TITLE: DELTA KELBURN STORM DRAIN SHEET 1 OF 1 SHEETS CONTRACT NO.: 99-01 SPECIAL AGENCY NO.: 0 TO: GCI CONSTRUCTION CONTRACTOR You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the Agency Description of work done, estimate of quantities and prices to be paid. Segregate between additional work at contract price, agreed price and time and materials. CONSTRUCT TRANSITION STRUCTURE AT STATION 10+39.8 (KELBURN) PER APWA STANDARD PLAN 340-1 r C (OVER) CONTRACT CHANGE ORDER NO.: 2 REV. NO.: 0 SUPPL. NO.: 0 C AGENCY: CITY OF ROSEMEAD JOB NUMBER: 10310 continued.... ESTIMATED COST: Decrease $ or Increase $ $1,840.00 By reason of this order the time of u completion will be adjusted as follows: NONE Prepared By: Sign ture Title l DateLi Recommended By: p tur Title 61 Date City/Agency: 041 Y 151 ?I Signature Title D to We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. 7- Accepted, fate Contractor BY Title: Signature If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. bi4199 CA1999RS%IMPROJECTS1Ke1-De1-SMCcntract Change Order Number 2 (10310).wpd r' ` WILLDAN ASSOCIATES T47 ENGINEERS AND PLANNERS PUBLIC WOKK5 DIV1510N CONTRACT CHANGE ORDER NO. 3 REV. NO. SUPPL. NO. AGENCY ROSEMEAD REDEVELOPMENT AGENCY JOB NUMBER 10310 PROJECT TITLE DELTA/KELBURN STORM DRAIN SHEET 1 OF 1 SHEETS CONTRACT NO. 99-01 SPECIAL AGENCY NO. TO GCI CONSTRUCTION COMPANY CONTRACTOR You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the Agency. Description of work done, estimate of quantities and prices to be paid. Segregate between additional work at contract price, agreed price and time and materials. A. REMOVE TWO (2) ABANDONED STEEL CONDUITS WITHIN STORM DRAIN TRENCH THAT WERE NOT SHOWN ON PLANS. T&M COST - $243.70 B. REPLACE 56 S.F. OF WHEELCHAIR RAMP AND 5 L.F. OF CURB AND GUTTER, AT NORTHEAST CORNER OF KELBURN AND EMERSON. T&M COST - $442.08 CONTRACT CHANGE ORDER NO. 3 REV. NO. SUPPL. NO. AGENCY ROSEMEAD REDEVELOPMENT AGENCY JOB NUMBER 10310 continued.... FOR THIS WORK THE CONTRACTOR WILL BE PAID THE SUM OF $685.78 FOR THE ABOVE DESCRIBED WORK. THIS SUM CONSTITUTES FULL COMPENSATION, INCLUDING ALL MARK-UPS OF THE WORK OF THIS CHANGE ORDER. ~..';i _.t-. ESTIMATED COST: Decrease or Increase $ 685.78 By reason of this order the time of completion will be adjusted as folk Prepared By: Recommended By: City/Agency: k 0i-S'e'1r'4J a-' -~-974 Title Title Date F-{- 99 Date ,17,M Date We, the undersigned contMctor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. / X1_ Accepted, Date 2-17- pD Contrac or By: Signature -0- Title If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. i u0.<I;p 'u RV ICI f`. GRAND AV A_ ' .rl c_ t> I~ i ~ pR e q;~ o .I~•}I'ei'E uCR RZS:SR 4 1~ ~ 1 °I 5 A 1I= uk O irW Y N T vEL:s Sr N Is Sf` EV D °l oa ~O 'pJZM;AD ° 11E[}I ` 1 Change Order #1 JF S'O~ Sf-0iT~ Sl lV rl`.. g La ! YS S = ``s ,avn IMI ` N:119Y 3,d b/)G Change Order #2 BLVD rs .EY „ J BLVD S VALL FO va" Change Order #3 % = "UL P CE'i 4 > By 9 .rte, L^,KS _ ga a 43M 3, alvr 1i LL•5~ P ~I GlM S{ Si 03 Q SC ~u . o. ' _ u IaA°'Ml' LI I Si - ~ v ✓1 yP 4Y., a i , W 3: I J~ O SL r_`n ~ ~ . _ ' = Glt_N5N ~ yl G[mx B a e 1 ~S §.I I( \ET Ali NCLL'UN "AY t a, 51- RW AY .IEa uI Q I°F~EY ~ 3 a ~ aPV13l].n i:~.~ IL,'iy,EL'ESi.0. I TTTxI A\ al 1~ a mmEw E\ ~ o $a ma; N'" n~ ° eunlc r+em .i..~I I gI`" AV a : F.?.;t _ VI [h[rL xl zo L„r\yvx ~ V l,Ylp~ ` I r:-~3+-~_ • -wl~aF¢- iT ~ =1>r ~ SXlnao~ .:w 3 4 =a~ gl L N G4RVE7 I~c~ ~~V~.,, ~Ils AV SY ~1 .I xCiYAAK AY a I O ~~j _ NE>•"APC YY 1 n ' J I n GAR w 1Y T¢ ~I w;rnuF Aval C ~ ~ f.IV f$ I6X1 ° vif xlranvr si s E ~ ~ i x C I . _ _ ~EIL . x Y.[SGSE ~ ' y ~ N g AV WIGf RUSK ST u nyl n `am~us£ Ru A~rr!£A .rALO'S 1 ~.J ~ G~ =Ear FN POM FRWY I/ ' / SIR t" I ROSEMEAD REDEVELOPMENT AGENCY 1 8838 VALLEY BLVD.. ROSEMEAD, CA 91770 • (818) 288-6671 • Telecopier 8183079218 3 TO: FRANK G. TRIPEPI, EXECUTIVE DIRECTOR FROM: KEN RUKAVINA, CITY ENGINEER DATE: May 6, 1999 RE: ACCEPTANCE OF BIDS AND AWARD OF CONTRACT FOR STORM DRAIN IMPROVEMENTS IN KELBURN AND DELTA AVENUES The following bids were received for the subject project on Wednesday, April 21, 1999: 1. Mohag Construction Co. $189,655.00 C22 GCI Construction, Inc. $315,295.00 3. Los Angeles Engineering, Inc. $322,090.00 4. Gentry Brothers, Inc. $329,350.00 5. Grbavac Construction, Inc. $331,250.00 6. David T. Wasden, Inc. $348,100.00 7. W.A. Rasic Construction Company, Inc. $348,840.00 8. 4-Con Engineering $353,650.00 9. Fleming Engineering, Inc. $382,825.00 10. Mladen Grbavac Construction $416,100.00 Mohag Construction Company has requested that their bid be withdrawn due to clerical errors they made in calculating the costs of various items of work. This seems reasonable based on the large difference between their bid and those of the other contractors, as well as the engineer's estimate. Their letter and bid are attached for your reference. Excluding the bid of Mohag Construction Company, the lowest bid was submitted by GCI Construction, Inc., a responsible contractor, in the amount of $315,295.00, which is approximately 15.9 percent below the Engineer's estimate of $375,000.00. The average bid was a $349,722.00. Attached are copies of the three lowest bids, a bid analysis, and Dun and Bradstreet reports Award of Contract Kelburn and Delta Storm Drain Improvements May 6, 1999 Page 2 There were irregularities in the bids submitted by Los Angeles Engineering, GCI Construction, and Grbavac Construction. Incorrect total bids were submitted due to addition and extension errors. The correct bid amounts are listed above. RECOMMENDATION 1. Waive the irregularities in the bids submitted by Los Angeles Engineering, CGI Construction, and Grbavac Construction. 2. Authorize Mohag Construction Company to withdraw their bid in the amount of $189,655.00, and authorize staff to release the bid bond, accordingly. 3. Accept all remaining bids and award the project to GCI Construction, Inc., in the amount of $315,295.00. 4. Authorize the Chairman to sign the contract on behalf of the Redevelopment Agency. Attachments