CC - Item 9A - Design Development of Aquatic Facilities at Rosemead and Garvey Parkss E A4
ROSEMEAD CITY COUNCIL &
i` COMMISSION STAFF REPORT
TO: THE HONORABLE MAYOR AND CHAIRMAN AND MEMBERS OF THE
CITY COUNCIL AND COMMUNITY DEVELOPMENT COMMISSION
FROM: JEFF ALLRED, CITY MANAGER/EXECUTIVE DIRECTOI1.
DATE: MAY 11, 2010
SUBJECT: DESIGN DEVELOPMENT OF AQUATIC FACILITIES AT ROSEMEAD
AND GARVEY PARKS
SUMMARY
At its regular meeting on February 23, the City Council authorized Aquatic Design
Group to develop schematic designs for the complete renovation of Garvey and
Rosemead Pools. The drawings are the first step toward a detailed and three-
dimensional view of the projects which better enable the City to determine a realistic
project scope and cost estimate. Schematic designs have been completed as attached.
Representatives from Aquatics Design Group, along with staff, will provide City Council
with a presentation of the completed drawings. With completion of schematic designs,
the project is ready to proceed with the full design and construction specifications
phase.
Staff Recommendation
Staff recommends the following:
1. That the City Council authorize the City Manager to enter into a professional
services agreement with Aquatic Design Group in the amount of $522,450
($350,041.50 from existing 2006A Bond proceeds and $172,408.50 from funds
that will be available through the Redevelopment Agency's repayment of a City
loan) to complete design development, construction documents and permit
drawings, and to perform construction observation for the renovation of aquatics
facilities at Rosemead and Garvey Pools; and
2. That the Community Development Commission and City Council adopt
Resolutions No. 2010-31 and CDC No. 2010-17 appropriating $350,041.50 from
the existing 2006A Bond proceeds.
As has been previously reported to City Council, because Garvey Park is located
outside of Rosemead's redevelopment project areas, it is not eligible for funding through
redevelopment bonds. Thus, an additional resolution will be brought before City Council
for authorization of the balance of costs ($172,408.50) associated with design
ITEM NO.
City Council Meeting
May 11, 2010
Page 2 of 3
.
development once the RDA repays its debt to the City from the Community
Development Commission's proposed 2010 bond proceeds.
ANALYSIS
Given the significant state of disrepair at both Rosemead and Garvey Pools, City
Council authorized staff to complete schematic drawings as a first phase in design
development of replacement facilities. Schematic design resulted in a few changes as
compared with conceptual design. Changes include the following:
Rosemead Aquatic Center
• The addition of park restrooms at southeast corner of bath house (will replace
existing portable restroom east of existing pool facilities), and
• The addition of office restroom to serve staff and sick/injured patrons
Garvey Aquatic Center
The addition of concession and storage facilities on southern end of proposed
bath house, and
• The addition of office restroom to serve staff and sick/injured patrons, and
• An increased number of shade structures on deck
Even with the additions, the estimated cost for Rosemead Aquatic Center has been
reduced to $6.52 million, while Garvey Aquatic Center has increased slightly to $3.32
million.
With completion of this phase, consideration should now be given to full-scale design,
creation of construction documents, and construction oversight. With Council
authorization, staff has been working with Aquatics Design Group through the project's
earliest stages.
Representatives from Willdan Engineering and the City's Engineering division affirm that
ADG's proposed design fees, less than 6% of total project cost, are consistent with
industry and market standards for a project of this scope.
Aquatic Design Group has proposed fees for design development in the amount of
$522,450. The portion of these fees (67% of total project) attributable to Rosemead
Aquatic Center are eligible for existing and future bond proceeds. Thus, $350,041.50 of
design costs can be charged to existing 2006A Bond proceeds. Because the Garvey
Aquatic Center falls outside either project area, it is not eligible for RDA bond funding.
Therefore, with City Council approval, it will be funded through the RDA loan repayment
to the general fund. That funding will include the design development phase of the
project at $172,408.50, payable upon receipt of the proposed 2010 bond proceeds.
PUBLIC NOTICE PROCESS
This item has been noticed through the regular agenda notification process.
City Council Meeting
May 11, 2010
Page 3 of 3
FISCAL IMPACT:
A request to appropriate $350,041.50 from the existing 2006A bond proceeds is
included in order to complete design develop of the proposed Rosemead Aquatic
Center. It is anticipated that the proposed Garvey Aquatic Center, including design
development, will be paid for through an RDA loan repayment to the General Fund in
conjunction with the proposed 2010 Tax Allocation Bonds. Thus, an additional
appropriations request will be forthcoming.
DAV1WWlONIlY~G'' OMERY-SCOTT
Parks r~ R~reation Director
Attachment A: Schematic Drawings of Garvey Aquatic Center and Estimated Cost
Attachment B: Schematic Drawings of Rosemead Aquatic Center and Estimated Cost
Attachment C: Aquatic Design Group Proposal for Consultant Services
Attachment D: CDC Resolution No. 2010-17
EMER50N PLACE
i~
F Y-
m ~ ~Y t
m Y
9
hG `
L9
D
Az so ~ ~ ~ } Y
~ m
z
Y
i -
iz
o
DOROTHT 5TREET
~V
IL I
t AQUATIC
GN GROUP
DES
ib
I
a
' rr.a~m r.. riwvmr
1Mi flICYR1 A.
_
IIOIEEIO. a ~OIO
VIF GCTgY
AQUATIC
4~wrET Pwc ~oiunCa caOB
DESIGN G R O U P
N ~
'r
i
J
uu ucm~ •vE.
,n....m ~n..,~.
xox~r.~n. c~ awro
fJRYEY fI.M NOL YlDY1C RCOII YYY
~
'
► AQUATIC
a
N
cameY ruu ~auYCa cwrtY
sY
_
SIGN GROUP
.4
A
C
N
T
T
{y~
Ih
A
O
y
L
O
1
Pm
s
a
O
A
M
y
x
M
a
m
0
0
A
.
P
M
m
j
y
D
y
-
nd
A
'n
y
d
y
a
mo
m
p
® 11LY
P
O
I
y
9
E
~
B
S
P
om .
-
;
AQUATIC
L
_
_
nn
u.ooox Euvnpp
IGN GROUP
O E
~
no.E,r.o.u wm
I/ I I ~
II I I I
r,5
- ~TYT-. / O
H
~ I s r, l~
p ^ I I
z
4
?SR
- - - - - - - - - - -
e-
T
She
~U
W!. q/.. I~.OY: r11R
/
A Q U A T I C
`
~
cuzr
run .au~zr
cwrtx
-
DESIGN GROUP
i fi
' +
m rnu.w ru rnwiol
IIME
k C1
YOIO
®
o
o
s
o
4~
~7
s
l
o
n
l
i~
i~
53
i3
iS
iS
iS
iS
33
SS
iS
SS
iS
3
5
S
?
i
e,`
a
i
5
T
g
s
S
m
i
A
w
m
f
Paz
b R
m
O
m
"
3
g S
C
n
S
1
D
_
A
_
Rd
F
O
C
44
b
$
a
9] E g
$ E S E
E
~f ee
~
i
~ 36
L
E
,
,
F~
kD
w
u
$
<
6
a
~
w
E
d
~
§ 44 cE 7''g-j~~
A ~9 8 9~YS 6 ~
d
~
~
{by9T
°m
p
b
99
r~
o
m
~T
w
w
Reb
r/ qyt ~
b9 R !1S id ~
9
~6Ft
E
b ~
i~ 6g
~
I~y~R/~~
I d_pJl I ~ e
] t S
F 6
a
yy
sr...
AQUATIC
y
y
F
ewnai Ruw ~wuree eexlEx
_ .
4/
DES
GN GROUP
e
~
:
I
N
Uw 9L7f1 RR
MflEAO. 4 OVN
o
g ff g
m
r
mm
T
9
'
E
1 IIIIII
9
m
y
9
gpgC
Oa
li
t
~
ps
~3 C
m
C
p
s
~ P
F
0
s
1 'I''~..
I
I
r
c
~
l
a s F
,
r
- -
S
s
Y
'
6
V
y 3
Ry{ 5(€
ES$ Li
F'sp~z~~
a
C
G
E
o
o
[g jE
G2 9
a
i
s
m
A
S a ~SFS
F
~ ~ cs
C
-
pit, 11ji
s
c
$G
f
1rty9
a6 ~
3i_
pi
°
p
N
s
m
~
~
a
k ;b
8£ f
B
A
c
AQUATIC
S
GN
R
UP
DE
I
W
WaE
1R
..o.
_ ~rJ
C,
ROYM'AD C1 . 911N
i
II I I
- - - - - - - - - - - - - - - -
y
a
O
a
O
y
v
i9 i9
L
i
d
9
~
'
! ~
k71
1ga
t
MiWL19MLL 900E L 9 K N
- - .
~
A Q U A T I C
,
~
DE
IGN GROUP
S
~®'r
m.nm~
W] FM:YIi i9!
u.u n.
RONMAR a 9VA
Y
~ 4G ~
a
I
I I
l I
I I
?
I I
I I
I I
I
'
. g
I\ /I
I\ /I
I \ / I
I \ / I
I
I
v
I
~•9
/
d
9d\
H
-
-
T
T I
I
~
m
>
e ~
~
m
yV
m
m
y
1
9
I
~
rr
y
y
y
D
>
O
Q
0
Y
I
m
m
MO
0
y
y
1
O
O
L
X
I
I
I
I
I
I
-
I
I
ie[
eaep
m,mceovy .om RC,ImI.
. i
A Q U A T I C
~i E
Cu~Pw°~aulq mxlEE
-
~
ESIGN G0.0UP
_
_
roxle.a n evm
e
gq
(Bit
will,
A
S
$
a
l
s
v ~
~
$
g i4
~
m
Q
~F
_
m
g
~ `fy3
O
e
31!
B
B'
Rage C%I, 011~ (01%
S$i
p
N
m
O
Z z
S
~~Kk
g' C)
o
It
o
t
[k a-
3x
Q
E
pi A
o
°
" 3
tt is 3 Y
it
f
i
o
l
m
-
y
bIM;~~~~
6y9 o!~ S { ~ia~6ki
P
°ai d aI-all ~~a
p
e e a
ea~e
~
~ i '
II2~
S ~
9
y
~gi
~9
P
g
~
i
t
~3 / •b ti
3 9
!
S ff k
~
5
}
@
~
Q3Q Y3 ke
R ®
~ ~ ~ i] 9~
a
~t
a asses easge
c f~!a'~€3 pppp¢E ~ g@@ gpi~
yi6g~ c $a
~
~ Ra ° €3
B
R
~
0
.
y
y
-
0
i
6 Az $P
;d b
o
vp`¢~tF ~i ! a e f i
9 k f~ ~yE 5e . a
B
6
`
ie
m
+
~
4
e
g
yf~
ei
6 A B 6~ 3 8
4
~4 ! i
~~l B~~
, aya6~ k k i
E ~g g a y€ 2
i
6{
1
*ALA
AQUATIC
cuv[R PNIR ~punte c[env
•1 - / .
44
DESIGN G R O U P
' rnu+m w. ~nu»i
uu OCelf/~ .Ye.
.OfEWY, q Yvm
- -
a
g
P
~ ~ s
~;~5 a-ffA~ 4f ; f~l~ ~~9€~ a 8 6" g5
i¢~ a ~pap~ ~f (Sit : f 6 f f
B~~
~
+3
~
fi
i
;
y
s
~ ~
p
d it ' _ f 11;
p
d
gg8
•
S
A
o
pp gg
~S YfM1
N
g YY pp
of C 's's
a
Y~fA
~ d
d
A
e
f
aE
f
f
~
c
n'~
A
I
a ,d.
AjpA
y
Ada 4
A ~
pp
s~i
b ~~j
~
=
{
a
E
m
_
~ gA~f
~ Af F~
s
A
y
F
A
a
g
~Af
y
#
E
p
E
L.-, L
T
05
_
ii$A 3 3 , P+ a{
'•f5
ta'6Is~iIM
c
p
p
¢f a A ~0151~gf ~i 3p; f~
i ~~s EA °
~A~~~
i~i
~
'
a F'ggg
~
gx~g
SYr
~ °
' €s
i
~
f'
]
g
~
~
~
]
®i p'
• .£A~
t
Y3
t
PP
9
i
9
r
AQUATIC
E
GYIYEf =IIR SOY\IICI COI~FA
ESI GROUP
a;
W=O A M
p==I114 C1 Y
-
0
z
o
's
ao
all
o ~yQ • R
n rt~
s n
0 •
z
z
m
1
0
5
H
9g a
8
~
p
fn
~ yyyy iitt
0
5~5
AQUATIC
c•RVER RRa •punf' tuna
- .O.
DESIGN I G N GROUP
V 6
°
uu Ewsu RY!
- -
RMFI••Y. G YVA
r„
-
i► AQUATIC
r
canal vYR ECUEKe cane
_
E51GN G0.0UP
i ~
a
~ v rra~ n, rnami
Yt] aLil11YG
WaFM c1 KN
Garvey Park Aquatic Center
Schematic Design Phase Cost Estimate
NO. DESCRIPTION QTY. UNIT UNIT COST EXTENSION
1.0 Site Work:
1.1
General Conditions
I
LS
$50,000
$50,000
1.2
Demolition
I
LS
$150,000
$150,000
1.3
Engineered Fill
3,000
CY
$10
$30,000
1.4
Pool Decks
13,500
SF
$14
$189,000
1.5
Deck Drainage
480
LF
$50
$24,000
1.6
Landscape & Irrigation
7,500
SF
$15
$112,500
1.7
Perimeter Fencing
700
LF
$80
$56,000
1.8
Site Lighting Fixtures
10
EA
$5,000
$50,000
1.9
Site Concrete Benches
I
LS
$30,000
$30,000
1.10
Pilasters
18
EA
$2,000
$36,000
Subtotal- Site Work
$727,500
2.0 Site Utilities:
2.1
3" Domestic Water
70
LF
$60
$4,200
2.2
3" Backflow Preventer
I
EA
$25,000
$25,000
2.3
3" Gate Valve
2
EA
$400
$800
2.4
Domestic Water Hook-up
I
LS
$30,000
$30,000
2.5
6" Sanitary Sewer
70
LF
$80
$5,600
2.6
Sanitary Sewer Hook-up
I
LS
$15,000
$15,000
2.7
6" Storm Sewer
70
LF
$50
$3,500
2.8
Storm Sewer Hook-up
I
EA
$15,000
$15,000
2.9
2" Natural Gas
70
LF
$60
$4,200
2.10
Natural Gas Hook-up
I
LS
$10,000
$10,000
2.11
3" Electrical Conduit
70
LF
$50
$3,500
2.12
Electrical Hook-up
I
LS
$15,000
$15,000
Subtotal- Site Utilites
$131,800
3.0
Buildings:
3.1
Bathhouse Building
3,366
SF
$260
$875,160
3.2
Shade Structures
3,388
SF
$25
$84,700
Subtotal- Buildings $959,860
Aquatic Design Group, Inc. 5/4/2010 Page I of 3
Garvey Park Aquatic Center
NO. DESCRIPTION
4.0 Swimming Pools:
4.1 Wet Play
4.2 Teaching Pool
4.2 Water Slides
Subtotal- Swimming Pools
Schematic Design Phase Cost Estimate
QTY. UNIT UNIT COST EXTENSION
I LS $175,000
1,500 SF $110
1 LS $180,000
$175,000
$165,000
$180,000
$520,000
Aquatic Design Group, Inc. 5/4/2010 Page 2 of 3
Garvey Park Aquatic Center
SUMMARY OF COSTS:
1.0
SITE WORK
2.0
SITE UTILITIES
3.0
BUILDINGS
4.0
SWIMMING POOLS
Schematic Design Phase Cost Estimate
$727,500
$131,800
$959,860
$520,000
TOTAL HARD COSTS
PLUS CONSTRUCTION CONTINGENCY AT 10%
PLUS GENERAL CONTRACTOR O/H & PROFIT AT I S%
PLUS BONDS & INSURANCE AT 2%
PLUS SOFT COSTS AT 10%
GRAND TOTAL
$2,339,160
$233,916
$385,961
$59,181
$301,822
$3,320,040
Aquatic Design Group, Inc. 5/4/2010 Page 3 of 3
.5 on ~ ~ ty
n 9
00
S
N
0 N _
m ~
p
i
6
gad
~E y
fas
ert w
r
AQUATIC
j
pppElF110 v1R 1tlYR'~ GCIIIE~
jtj
r
~
ESIGN GROUP
~
D
r
a
ufnr
'
r~ DIOVf~ ~k.
rn,a~ r..
r
~
PofE1G4 C1 0910
AQUATIC
E
vT
`
WIflE/10 P~AI 10YTC~ Qn0
N
0.
11P
to
DESIG
G
0
~
Wa B A AM
_
m ru~~~o w. mums
~WFIfM fA PVN
N
I
N~
RO
In', 8
U
~
O~ TTT®~
FFF
A
w
s
n
B ~ gf~ B
O
m
0
'
0
h:R I:...:
~ B
$
o
r`
.
90x00
AQUATIC
Ne
xooF~r~rua naYEncs c9rtv
DESIGN GROUP
_
j¢
~
IroR1~I1q fA OVA
-
V
N
8
m
K
m
a
0
m
H
O
s
i
O
m
s
y
9
R
e
O
X
%
y
T
O
a
O
a
.
M
y
y
Q
0
P
8
$
~
x
a
0
i
$
o
P
z
i
wimoe uav~+aw
AQUATIC
♦
N GR
~
•
~ DESIG
OUP
~
~ uu i1~M EVE
e
r, rruim w..n.vai
_
XMF]FJU.W X]a
L_I I I I i L:II.
r
T
~
IA-
-
r-------
-
-
---------1.
r-
.
- may.
I
CIF
.
I
I
_
1 ~
I
1 I IP
~c
I
I
1
I
t -
r
I
_JI
I
I
I
I ~I~
-
p
,I
l I
I 1 I ~ I
II
IR
I(
V1,
si P b...LS
e ev~ 7 C
R a Ea
...G.C .M Y.qR M1.II
a,
AQUATIC
l
RO~FI'P.~b011nKA C01A
-
ESIGN GROUP
i b
'l
D
~ rnx.m rru.saoi
eL\ FIICeLf~ 1YE
ROK111iQH Nle
p
W
T
!E
sE
A
I _
I
I.
I
I
E
p
9
~ ~
I
9~f•
COL
+
O
z
~
If
~
I
Ic
I -
I
I
I
~
I
I'
I
_ 9
I _
i f
I
I
O
4
r
O
I
C
m
o
W
t
o
W
h
p
L _
I
f'
~
I _
r
f _
W
i
pI~
S
p
3
1
a
-
I En,-_
I
I
m
I
s
1
..eRm .oa WcECn
AQUATIC
Ell
DESIGN GROUP
_
W pR10fA M
IIORIEAD, W W]A
gE
$
ai
P R
'
g
kkg
g
i1
F i
!
n
•
A
i
A
F 4
_
~
!
b
R
$
g
~
d
C
S
6
~
a
~
R ~
P
$
R
FF
i
g
_
'
F
i4~$ 3
i
~
pLpL
(
ppp
!
a
S~
S
$ E~ E
i
~F
2
F 5
i
°R
'
r
R
~
8
~m 1
®9
H
p
!
8
0
O
H
n;1
d
iF JQ2PG
e
$
F
pit
®
IE@9d~g ga iQ[°
Pq~gy~
E
5
ffi
Fg1
~
R`.
Sy
[A
3 7
3
Qf
~l
~
~
p
7
4
Q
q
l
~
~
~
~
~
t~
2
+
9
1
as
b
s
d 2
g
a S
:i~a~ iaa a~
8
F
s
,
,
,
r
~
~
~
>
S
idf' F
y
a
a
e
a
~
!
yy' .
f
u
p
c~a
9
m
~
i
~
!
~
3
3
~
!R R ~
R.
b
9R
~
s soe weeeo
t
i
6
@
i
€
~ ~
r
Fs
~
x~~d1CE ( {ig[i{R;$3
§
~
~ ~d33~
d
v
€
~
:
B
:
B
R
a
i
~
~
F
@6a0
i
@
al1 $ta
~IK
E
,t
~
s
F
6
i
2
fl
~
~
Sj
i dd
R
E,
s
p~
i!
gp
~
?
ad
7.F
E
~~i
g
R
B
R
$
if
g
G
ap
e
l
~
"
E'M16
Fi
[
!
p
A ]
R
1
d
F
~
'
t
@p@p ~5! p~y^
y
72
p
AQUATIC
g
~r
"'°'m
,,:V
_ ~D
ESIGN GROUP
~
lomrw w !vm
® a a~a 5
g~
'
pp 9a1~
L k @9~•
.aas
z
@B
'
_
n
i
f
e
v /
MAUR
O
3
n
s
=
n
9 V
q
f[
7
1!pp
m
m
9
rid
Q~4F I
llv
Qig
o
t ppyy
•CCCCCC''SS i ON
BB
M
1- 1
Q
~I
~I I
e
r
E
BB
- k
cF`a9 a$sp
3 B~ A~ 2d
~ ~ F Q3 ~B
~
i
m
v
A
BQ Qs
a
'
I
i
c
m
i
i Q3
f
~
r kJ
{
i
S E
e
I I~ I I I I
a a
x
®
aQ!
s
>
y
E
7
~
in
m
e
~
~
g-
c
~
QE [
~
[P~
B F
qq
is
g1
~
iq
QB9E aB€€3A
~Rn
e
AQUATIC
L
.
_
GN GROUP
~
ES
v
ID
I
L
~
e
NW I)I=A eve
POR14C.Y EVN
,i
9
~
p
E
'
a~E~
a
r
i. m.
d
d
4
N
-
-
x
T -
-
a
~
O
9
~ ~nrrr
R
i
<
I I
~
r
'
•
T
~
i
f
9
W
f
a
z
0
4
EoE
§
i~9
Ids
f
:*r
ti
~
,
3ile
4
i
n
Q
m
i
o
D
~i~
9 3po
m
~
~
S
a
~
3
°i
i
J
ED
a
999 999
y
aO
?
Z AQUATIC
11
[
[
E
9 wca 9W191FI1Y 91W IOIYM\mnv
_
N GROUP
S
V
DE
IG
p
.y WW uN9sr° °°a
nauwo. w Wag
ei lip Ni
I lid
i
~$5S
S
~ ~
s
I
y
°
I
Y
°
•s
T
~
4
R
f
3}
R i. 3
S
/
s~
4
y
`
C}~j
P
y
E
;~2
ya
1
~
~ ~
T
k
k
p
T77
8 q
~9gbg
yy
~j=a~ ~Ra®
R44
p[ pk y
~g 9901
a,i 9
sib
Etd p
T
T
r
fY
D
y
b
m
~
O
9
y
J(
J
3
.
O
>
r
i
i; d
zt!
?9d
dk~
,
PH
~ i
cd
6 ~
i~
~
d
~
O
P
m
•
gdF
~
4
8
a
-
4aea (
v
s
E
gs~
:
ab9b
4
,
9Ee
Yaa
8
E
a
N
-
.
-
~
e AQUATIC
,
.RC86AR r.u .PPnu
P
ESIGN GROU
`
4%f YKIR~A AY!
.mg1FAO.w vvm
p N
It by r M
a € ? ± F
u
N
p d ~
e
b'? °;31~ i3
0
die " i b
~
'
i i ¢
•
.b ~t€a
~
o
~
B X33 ~g
~
➢
b~ ~a ~ bk ~ bb ~i3 ~ 3~ gi ~ i
~ i 8~
Q
b ~4:P ~ ~
g
~
i~.
i a Egg•' >Fai
~ tre'~4~"
~
m
~ i
~~b ~
g
i
p
!g IN
b
dR'
€
4
J
b
It
•
m
>
k
b b ~ ba
p 3
miP
PI ¢
s
4
;a; cab
~bil bq~
p
>
$ ~
N
d
R
a a~
N ~
-
'
S5.5 ®y gg®
~~g(•gp~~BC9i9 Nb pb
b~S§Gg
ON
3§b6 ~a0E~ gar;~~bb`si~~~ "ie~
~
~
Its.
m
O d
g bb
i i6~"
b~g3g~v ~Fa~6~
4
~~5 ~~~"b~~~
~
s
❑
p R R P r
> igg ~ b~ ~ 8f`f~
~
b
C
pp
~ t ` oa " ib~~~~Ai#~~~ €b~E~ddi"
i
=
~ ~
~
~ ~ • a~ `~2
b
'
~
'
F a ~§b
~ da ~
it
b ~
i
s F l~5ld
Nd 4 i
~
~
+
S4
v
3F
; S
d i
B
°
0
P
AQUATIC
e
NMflRAP P1R ~°YIIW CEIII[V
_
~
~ ~
GN GROUP
4
~D
E~I
.
~
' rmu~ r rmasai
rgr m1a fV WR1 d.L
'
"0. W VINO
OMFIR
f3 0yyyfjs ~ ' 9
r~ o ~ ~eG
!
F
e a
is ~~bgy~9 ~3 i
¢g6
Ilk
o
oil
s
F 6 0
@i !6
!
AQUATIC
~ •
a0lt]~P Pau a0i~aiW tEYIFa
P
GN GRO
DES
~
U
I
'
J .w...~ ,.a..y+i
era aura ave
.wer.R w emo
!a
aq
~ ~
~
' NSF
°
n
a
3i
s
x
a
Q a l
m
ei~
;
~
c
~
a
o
a
s
z
~FF~•Si
z~4~# ~
gS
Q
a
a
9
{e ;3
iia
jqp 6i35 7~
t~t
y
~
s
m
~P
55
~FA~3 B
m
5
8
[
9
p
{
R9 3~~a~t~al!$Ga66~~ ~
t~~
qq
~ a °aa
a
qq
ES
~ E a
a
g
~
~Z
bQ
g a
a
ii tj
O
Q
~
N
D
N C
a
t SSE
iE9?" 3 F
~a
ugN
F
L
~ 9
O
~
8p~tt3t
4~a
~
C
o,
~
O
s
~
e
D O g=
n
o
y
Si
y
1111''"
°
S S
a 3 t
p
y
W
a
'rill
5
`g$
3 )
9i
~
4 i
ag pg
ax,
6
9 3
e
Via
ag
a2~
o
3a ~
e
1+
saanf •S g~~
~
3~ •S
v
y
~
~a
x
55
1
p
2
_
°
a
as a~ ~ 9 a
~
~ s:
g€. _
S a
i
IL 3
g•. ~;E- _ 999
IL
I
AQUATIC
tOtE~al~P tut(toutllt'~°
DESIGN GROUP
ra
tNi FMCtR1 tV!
toecr~o. a tvm
m
m
~
aa' I
~
d
9
1
~1 I
7
L
o
~
[
L
y
1
g
z
tie I
5a
I iF? i j'.j Jill
~
t
Fa
I s~
t!~9t'l
s
3
~
I
i
!
S
i
p
6B
€ IB
£
€
~
pop
~;4si
Fy~1R
ii !!1
i 6tlg
:
m
f 3
~
E'
A y2
O
t' '
~
~ 777
2
F
~
~
r
R
hl
leil
R
S
j
o
_
o
a
E
F
~
m
m
O
e
d
x e
~R R
e 1
t
R
m
~
Z
m
t
5
p
~
f
ooe
g
§
~
E
7
e 4$
c
n
m
$ "
a RI f
9
Egg
e
r
EE
€ a
9
R
e
iel
AQUATIC
c
ESIGN GROUP
roEOe~a a rLm
N
N
Ae
.0 5
•
S
R ¢ q
5
ynfi!
GE F
ryT
F
c
I~
>
o
Y
_
~~t
y
~ i A 1~5
g
Rn
on
"
Q
M
re
S
^
f F f~
a
0
3
e
5
^
~J
~
s
o
S0S
a
o000
A
a
B
m
T>
O
a
>
"a
n41 31 vi
>
t
N
~1 Rfi
4 g
$
p
g
~
"
g
~
~
~
o
i
Poe
a
8
O
>
~
a
m
?
e
ve
~
FF
-
i
o
~
a
I
R
~
1
i
P
I
a
% F
y~1@
AQUATIC
~'^m
a0lf>R.~o PaP[~OIIERCl o9nE~
~DESIGN GROUP
®
N ~
J roars a rn~u
ni
r~
NI! ocrra aY!
_
110HIGD. C1 evm
Rosemead Park Aquatic Center
Schematic Design Phase Cost Estimate
NO. DESCRIPTION QTY. UNIT UNIT COST EXTENSION
1.0 Site Work:
1.1
General Conditions
I
LS
$100,000
$100,000
1.2
Demolition
I
LS
$200,000
$200,000
1.3
Engineered Fill
4,000
CY
$10
$40,000
1.4
Pool Decks
21,400
SF
$14
$299,600
1.5
Deck Drainage
560
LF
$50
$28,000
1.6
Concrete Walkways
4,500
SF
$10
$45,000
1.7
Landscape & Irrigation
6,000
SF
$5
$30,000
1.8
Perimeter Fencing
900
LF
$80
$72,000
1.9
Site Lighting Fixtures
10
EA
$15,000
$150,000
1.10
Bleachers
8
EA
$4,200
$33,600
1.11
Pilasters
25
EA
$2,000
$50,000
Subtotal- Site Work
$1,048,200
2.0 Site Utilities:
2.1
4" Domestic Water
100
LF
$80
$8,000
2.2
4" Backflow Preventer
I
EA
$25,000
$25,000
2.3
4" Gate Valve
2
EA
$500
$1,000
2.4
Domestic Water Hook-up
I
LS
$50,000
$50,000
2.5
8" Sanitary Sewer
120
LF
$80
$9,600
2.6
Sanitary Sewer Hook-up
I
LS
$25,000
$25,000
2.7
8" Storm Sewer
300
LF
$60
$18,000
2.8
Storm Sewer Hook-up
I
EA
$25,000
$25,000
2.9
2" Natural Gas
120
LF
$60
$7,200
2.10
Natural Gas Hook-up
I
LS
$10,000
$10,000
2.11
4" Electrical Conduit
200
LF
$50
$10,000
2.12
Electrical Hook-up
I
LS
$25,000
$25,000
Subtotal- Site Utilites
$213,800
3.0
Buildings:
3.1
Bathhouse Building
4,471
SF
$260
$1,162,460
3.2
Shade Structures
8,300
SF
$45
$373,500
3.3
Solar System
7,200
SF
$22
$158,400
Subtotal- Buildings $1,694,360
Aquatic Design Group, Inc. 5/4/2010 Page I of 4
Rosemead Park Aquatic Center
NO. DESCRIPTION
4.0 Swimming Pools:
4.1 25 Y x 45 M Pool
4.2 Timing System / Scoreboard
4.3 Competition Equipment
Subtotal- Swimming Pools
Schematic Design Phase Cost Estimate
QTY. UNIT UNIT COST EXTENSION
11,154 SF $135 $1,505,790
1 LS $80,000 $80,000
1 LS $50,000 $50,000
$1,635,790
Aquatic Design Group, Inc. 5/4/2010 Page 3 of 4
Rosemead Park Aquatic Center
SUMMARY OF COSTS:
1.0
SITE WORK
2.0
SITE UTILITIES
3.0
BUILDINGS
4.0
SWIMMING POOLS
Schematic Design Phase Cost Estimate
$1,048,200
$213,800
$1,694,360
$1,635,790
TOTAL HARD COSTS
PLUS CONSTRUCTION CONTINGENCY AT 10%
PLUS GENERAL CONTRACTOR O/H & PROFIT AT I S%
PLUS BONDS & INSURANCE AT 2%
PLUS SOFT COSTS AT 10%
GRAND TOTAL
$4,592,150
$459,215
$757,705
$116,181
$592,525
$6,517,776
Aquatic Design Group, Inc. 5/4/2010 Page 4 of 4
Pt: AQUATIC
E~e DESIGN GROUP
PROPOSAL FOR CONSULTANT SERVICES
1.0
INTRODUCTION
1.1 AQUATIC DESIGN GROUP, INC. of Carlsbad, California (hereinafter referred
to as "CONSULTANT'), proposes to provide consulting design services to
CITY OF ROSEMEAD (hereinafter referred to as "CLIENT") for the following
project:
Rosemead and Garvey Park Aquatic Centers
Rosemead, California
2.0
1.2 In conformance with the Request for Proposal dated 10 February 2010 as
issued by Mr. David Montgomery Scott, CONSULTANT shall provide:
SCOPE OF WORK
2.1 CONSULTANT shall provide design and engineering services as hereinafter
described for the following aquatic centers:
2. I.1 Rosemead Park Aquatic Center which includes the following elements:
demolition of existing pool building, mechanical building, and swimming
pool and pool deck; new bathhouse of approximately 3.850 SF; new
utility points of connection; new structures and solar system; new 25Y
x 45M swimming pool; new pool decks and deck drainage; and
associated landscape.
2.1.2 Garvey Park Aquatic Center which includes the following elements:
demolition of existing pool building, mechanical enclosure, swimming
pool and pool deck; new bathhouse building of approximately 2,480 SF;
new utility points of connection; new shade structures; new wet play
area; new teaching pool; new water slides; new pool deck and deck
drainage; and associated landscape.
3.0
SCOPE OF SERVICES
3.1 Schematic Design Phase:
3.1.1 CONSULTANT shall review the program furnished by CLIENT to
ascertain the requirements of the project and shall arrive at a mutual
understanding of such requirements with CLIENT.
Proposal for Consultant Services
Rosemead and Garvey Park Aquatic Centers- Rosemead, California
Page 2 of I I
3.1.2 Based upon the mutually agreed upon program, schedule and
construction budget requirements, CONSULTANT shall prepare, for
approval by CLIENT, Schematic Design Documents consisting of
drawings and other documents illustrating the scale and relationship of
project components. Schematic Design Phase deliverables shall include
the following:
. I Swimming pool plan views.
.2 Swimming pool longitudinal sections.
.3 Swimming pool finish details.
.4 Swimming pool decks and drainage details.
.5 Site and building plan views.
.6 Building longitudinal sections.
.7 Building finish details.
.8 Landscaping and hardscape details.
3.1.3 CONSULTANT shall submit to CLIENT an estimate of probable
construction cost based upon current area, volume, or other unit costs.
3.2 Design Development Phase:
3.2.1 Based upon the approved Schematic Design Documents and any
adjustments authorized by CLIENT in the program, schedule or
construction budget, CONSULTANT shall prepare, for approval by
CLIENT, Design Development Documents consisting of drawings and
other documents to fix and describe the size and character of the
Project as to architectural, structural, mechanical and electrical systems,
materials and such other elements as may be appropriate. Design
Development Phase deliverables shall include the following
.I Swimming pool plan views.
.2 Swimming pool longitudinal and cross-sections.
.3 Swimming pool finish details.
.4 Swimming pool rail goods / competitive equipment details.
.5 Site and building plan views.
.6 Building longitudinal sections.
.7 Building finish details.
.8 Landscaping and hardscape details.
Proposal for Consultant Services
Rosemead and Garvey Park Aquatic Centers- Rosemead, California
Page 3 of I I
9 Outline specification in CSI format
10 Swimming pool decks and drainage details.
3.2.2 CONSULTANT shall provide CLIENT with building and infrastructure
requirements, including design criteria, as needed to service the
swimming pool and building equipment, including.
.I Swimming pool equipment room dimensions.
.2 Building mechanical room dimensions.
.3 Sanitary/storm sewer requirements and points of connection.
.4 Domestic water requirements and points of connection.
.5 Natural gas requirements and points of connection.
.6 HVAC requirements for swimming pool and building
equipment.
.7 Electrical requirements and points of connection for swimming
pool and building equipment.
.8 Swimming pool decks and drainage details
.9 Landscaping and hardscape details.
3.2.3 CONSULTANT shall advise CLIENT of any adjustments to the estimate
of probable construction cost.
3.3 Construction Documents / Permit Drawings Phase:
3.3.1 Based upon the approved Design Development Documents and any
further adjustments in the scope or quality of the Project or in the
construction budget authorized by CLIENT, CONSULTANT shall
prepare, for approval by CLIENT, Construction Documents consisting
of Drawings and Specifications setting forth in detail the requirements
for construction of the swimming pools. Construction Documents
Phase deliverables shall include the following:
Architectural Drawings:
• Swimming pool plan views.
• Swimming pool longitudinal and cross-sections.
• Swimming pool finish details.
• Swimming pool rail goods / competitive.equipment details.
^7
Proposal for Consultant Services
Rosemead and Garvey Park Aquatic Centers- Rosemead, California
Page 4 of I I
• Swimming pool decks and drainage details.
• Building plan view.
• Site plan view.
• Building longitudinal and cross-sections.
• Building equipment details.
.2 Structural Drawings:
• Swimming pool / surge tank structural sections.
• Swimming pool / surge tank reinforcement schedules.
• Building structural sections.
• Building reinforcement schedules.
• Miscellaneous building and swimming pool structural details.
.3 Mechanical Drawings:
• Swimming pool piping plan.
• Swimming pool mechanical equipment piping plan.
• Swimming pool mechanical equipment sections.
• Building piping plan.
• Building equipment piping plan.
• Building mechanical equipment sections.
• Miscellaneous building and swimming pool mechanical
details.
.4 Electrical Drawings:
• Swimming pool underwater lighting plan.
• Swimming pool timing system / scoreboard plan.
• Swimming pool single phase panel schedule.
• Building lighting plan.
• Building marquee plan.
• Building panel schedule.
• Miscellaneous building and swimming pool electrical details.
.5 Miscellaneous:
0 Swimming pool / surge tank structural calculations.
Proposal for Consultant Services
Rosemead and Garvey Park Aquatic Centers- Rosemead, California
Page 5 of I I
• Final form swimming pool technical specifications in CSI
format
• Swimming pool decks and appurtenances details
3.3.2 CONSULTANT shall advise CLIENT of any adjustments to previous
estimates of probable construction cost indicated by changes in
requirements or general market conditions.
3.3.3 CONSULTANT shall assist CLIENT in the preparation of the necessary
bidding information, bidding forms, the Conditions of the Contract, and
the form of Agreement between the Owner and the Contractor, as it
relates to the design program elements.
3.3.4 CONSULTANT shall assist CLIENT in connection with CLIENT's
responsibility for filing documents required for the approval of
governmental authorities having jurisdiction over the Project.
3.4 Construction Observation Phase:
3.4.1 CONSULTANT shall be a representative of and shall advise and consult
with CLIENT: 1) during construction until final payment to the
Contractor is due; and 2) as an Additional Service at CLIENT's
direction from time to time during the correction period described in
the Contract for Construction. CONSULTANT shall have authority to
act on behalf of CLIENT only to the extent provided in this proposal
unless otherwise modified. CONSULTANT shall provide the following
construction support services:
I Provide clarification, as required, of construction documents
and respond to contractor requests for information.
.2 Review and approval of swimming pool-related sample and
material submittals specified in Contract Documents.
.3 Assistance with the issuance and negotiation of change orders.
.4 Review of contractor-submitted Record Drawings for contract
conformance and completeness based upon field observations.
3.4.2 CONSULTANT shall visit the site at intervals appropriate to the stage
of construction or otherwise agreed by CLIENT and CONSULTANT in
Proposal for Consultant Services
Rosemead and Garvey Park Aquatic Centers- Rosemead. California
Page 6 of I I
writing to become generally familiar with the progress and quality of the
Work completed and to determine in general if the Work is being
performed in a manner indicating that the Work when completed will
be in accordance with the Contract Documents. However,
CONSULTANT shall not be required to make exhaustive or
continuous on-site inspections to check the quality or quantity of the
Work. On the basis of on-site observations, CONSULTANT shall keep
CLIENT informed of the progress and quality of the Work, and shall
endeavor to guard CLIENT against defects and deficiencies in the
Work.
3.4.3 CONSULTANT shall visit the site at approximately eleven (11) months
following the completion of project to conduct a warranty review / site
walk with CLIENT and owner. Other than reimbursable expenses
which will be billed in accordance with 7.1.3 below, CLIENT will not be
billed for this visit
3.5 Visits to the Project Site:
3.5.1 CONSULTANT shall visit the offices of CLIENT and/or the Project Site
in conformance with the following schedule:
.I Schematic Design Phase
.2 Design Development Phase
.3 Construction Documents Phase
.4 Construction Observation Phase
.5 1 1-Month Warranty
4.0 EXCLUSIONS TO SCOPE OF SERVICES
Two (2) site visits
Two (2) site visits
Four (4) site visits
Twelve (12) site visits
One (I) site visit
4.1 CLIENT shall provide full information regarding requirements for the project,
including a program which shall set forth CLIENTs design objectives,
constraints and criteria, including space requirements and relationships,
flexibility and expandability, special equipment, systems and site requirements.
Additional information that may be required by CONSULTANT as prepared by
other members of the project team shall include:
Proposal for Consultant Services
Rosemead and Garvey Park Aquatic Centers- Rosemead, California
Page 7 of I I
4.1.1 Soils testing/engineering, including finalized geotechnical investigation
report Note: Unusual soil conditions such as expansive soils, fill soils, .
soils with low bearing capacity (under 2,000 psf), and high water tables
which require additional engineering will be considered an additional
service and compensated for in conformance with Article 7.1.2, below.
4.1.2 Destructive testing of existing pool structures to confirm as-built
condition. Note: CONSULTANT cannot guarantee structural integrity
of existing pool structures without confirming as-built condition of pool
wall thickness, concrete reinforcement and compressive strength.
Additional engineering for deficient structures will be considered an
additional service and compensated for in conformance with Article
7.1.2, below.
4.1.3 Site topography surveys.
4.1.4 Miscellaneous plan check and permit fees as may be required by
regulatory agencies.
5.0 INDEMNITY
5.1 The CONSULTANT agrees, to the fullest extent permitted by law, to
indemnify and hold the CLIENT harmless from any damage, liability or cost
(including reasonable attorney's fees and costs of defense) to the extent caused
by the CONSULTANT's negligent acts, errors or omissions in the performance
of professional services under this Agreement and those of his or her
subconsultants or anyone for whom the CONSULTANT is legally liable. The
CLIENT agrees, to the fullest extent permitted by law, to indemnify and hold
the CONSULTANT harmless from any damage, liability or cost (including
reasonable attorney's fees and costs of defense) to the extent caused by the
CLIENT's negligent acts, errors or omissions and those of his or her
contractors, subcontractors or consultants or anyone for whom the CLIENT is
legally liable, and arising from the project that is the subject of this Agreement
The CONSULTANT is not obligated to indemnify the CLIENT in any manner
whatsoever for the CLIENT's own negligence.
6.0 USE OF DOCUMENTS / ELECTRONIC FILES
Proposal for Consultant Services
Rosemead and Garvey Park Aquatic Centers- Rosemead, California
Page 8 of I I
6.1 CLIENT acknowledges the CONSULTANT's construaion documents as
instruments of professional service. Nevertheless, the drawings and specifications
shall become the property of CLIENT upon completion of the work and payment
in full of all monies due to the CONSULTANT. CLIENT shall not reuse or make
any modifications to the drawings and specifications without the prior written
consent of CONSULTANT. CLIENT agrees, to the fullest extent permitted by
law, to indemnify and hold the CONSULTANT harmless from any claim, liability
or cost (including reasonable attorney's fees and defense costs) arising or allegedly
arising out of any unauthorized reuse or modification of the construction
documents by CLIENT or any person or entity that acquires or obtains the plans
and specifications from or through CLIENT without the written authorization of
the CONSULTANT.
6.2 Electronic files may be provided by CONSULTANT for review by CLIENT and
use by the Design Team in the preparation of construction documents.
CONSULTANT assumes no responsibility for determining whether the data or
software format are correct, up-to-date, or together represent actual
conditions, or liability for the translations or results thereof. Acceptance or use
by CLIENT of electronic files shall constitute a total release from liability, and as
an indemnification for all costs or expenses from any claims, suits, judgments, or
any other actions or liability as a result of such use. Under no circumstances
shall delivery of the electronic files be deemed a sale by CONSULTANT, and
CONSULTANT makes no warranties, either express or implied, of
merchantability and fitness for any particular purpose. In no event shall
CONSULTANT be liable for any loss of profit of any consequential damages as
a result of re-use of electronic files. Drawing plan views may be delivered in
AutoCAD dwg or Adobe.pdf format. Drawing detail sheets will be delivered
in Adobe pdf format only. For use outside of the Design Team or for purposes
other than the generation of construction documents a handling fee of $250.00
plus $25.00 per drawing sheet shall be remitted to CONSULTANT.
7.0 COMPENSATION
7.1 CLIENT shall compensate CONSULTANT for services rendered as follows:
7.1.1 Basic Services: The Scope of Services described above shall be
compensated for by a lump sum, fixed fee equivalent to: FIVE
Proposal for Consultant Services
Rosemead and Garvey Park Aquatic Centers- Rosemead, California
Page 9 of I I
HUNDRED EIGHTY THOUSAND FIVE HUNDRED AND 00/100
DOLLARS ($580,500.00) equivalent to 7% of construction valuation.
7.1.2 Additional Services: If requested, additional services will be billed for
on an hourly basis, in conformance with the rates outlined in Article
7.3, below.
7.1.3 Reimbursable Expenses: In addition to basic compensation, an
allowance of $2,000 shall be provided for reimbursable expenses.
Reimbursable expenses will be billed at CONSULTANT's direct cost,
and shall include the following:
I Plotting and reproduction expense of Drawings, Specifications
and other documents.
.2 Special delivery and handling of documents and correspondence
such as courier and overnight delivery services.
.3 Travel and lodging expense associated with travel outside of
Southern California in connection with the Project.
7.2 Terms of Payment
7.2.1 Payments for Basic Services shall be made based upon percentage of
completion in not less than monthly installments, in conformance with
the following schedule of values:
I
Schematic Design Phase
$ 58,050.00 COMPLETED,
.2
Design Development Phase
$ 145,125.00
.3
Construction Documents Phase
$ 290,250.00
.4
Bidding or Negotiation Phase
$ 29,025.00
.5
Construction Observation Phase
$ 58,050.00
7.3 Hourly Rates:
7.3.1 Compensation for additional services (when requested and authorized
in advance by CLIENT) shall be provided in conformance with the
following hourly rates:
Proposal for Consultant Services
Rosemead and Garvey Park Aquatic Centers- Rosemead. California
Page 10 of I I
.1 Principal
$ 195.00 per hour
.2 Project Engineer
$ 165.00 " "
.3 Senior Project Manager
$ 135.00 " "
.4 Project Manager
$ 125.00 " "
.5 CAD Technician
$ 100.00 " "
.6 Graphics Technician
$ 85.00 " "
.7 Clerical
$ 50.00
8.0 TIME
8.1 CONSULTANT shall prosecute design work in conformance with the following
schedule, contingent upon receipt of all required
information (program, base
sheets, soils data, etc.) from CLIENT or CLIENTS designated representative:
8.1.1 Schematic Design Phase: Complete within forty (40) calendar days of
CONSULTANTS receipt of fully executed professional services
agreement between CLIENT and CONSULTANT.
8.1.2 Design Development Phase: Complete within fifty (50) calendar days of
approval of Schematic Design Documents and authorization to proceed
with Design Development Phase.
8.1.3 Construction Documents Phase: Complete within sixty (60) calendar
days of approval of Design Development Documents and authorization
to proceed with Construction Documents Phase.
RESOLUTION NO. 2010-17
A RESOLUTION OF THE ROSEMEAD COMMUNITY DEVELOPMENT
COMMISSION, ROSEMEAD, CALIFORNIA APPROPRIATING $350,100 FOR
ROSEMEAD AQUATIC CENTER DESIGN DEVELOPMENT
Whereas, the FY 2009-10 budget was passed and adopted by the
Community Development Commission on June 23, 2009; and
Whereas, appropriations are the legal authority for redevelopment
agencies to spend; and
Whereas, as program and project plans change throughout the year,
specific appropriations need to be amended to accommodate the changes; and
Therefore, $350,100 is appropriated in 4215-4420-P53245 (Special
Projects - Architectural Services - Aquatic Renovation - Rosemead) to be
funded from 2006A Bond Proceeds for Rosemead Aquatic Center Design
Development.
PASSED, APPROVED AND ADOPTED this 11th day of May 2010.
GARY TAYLOR
CHAIRMAN
ATTEST:
GLORIA MOLLEDA
COMMISSION SECRETARY
APPROVE AS TO FORM:
JOSEPH M. MONTES
COMMISSION ATTORNEY