TC - Item 2A - Minutes of 04-29-26 (DRAFT)
Rosemead Beautification & Traffic Commission Meeting
Minutes of April 29, 2026
Page 1 of 6
Minutes of the Regular
ROSEMEAD BEAUTIFICATION & TRAFFIC COMMISSION SPECIAL JOINT MEETING
April 29, 2026
The special meeting of the Rosemead Beautification & Traffic Commission was called to order by Chair
Drange at 6:02 p.m. in the Council Chambers, 8838 E. Valley Boulevard, Rosemead, California.
FLAG SALUTE: Chair Drange
PRESENT: * Beautification Commission - Chair Flores, Vice-Chair Liu, Commissioners Liu, Commissioner
Tee, and Commissioner Wong * Traffic Commission - Chair Drange, Vice-Chair Nguyen, Commissioner
Lang, Commissioner Tran, Commissioner Trieu
ABSENT: Vice-Chair Liu
STAFF PRESENT: Director of Public Works Gutierrez, City Engineer Basilyous and City Clerk Hernandez
The City received a public comment via email from Jonathan Loc regarding Agenda Item 2A. The comment
addressed five areas: reducing urban heat, supporting protected bike lanes, increasing landscape greenery,
improving northern Rosemead, and evaluating traffic signal timing.
Director of Public Works Gutierrez introduced the item regarding the Walnut Grove Avenue Resurfacing Phase
2 Project and the Valley Boulevard Corridor Median and Bike Feasibility studies presentation and asked the
commission for suggestions and comments on the options presented by staff.
Commissioner Lang asked where is the City considering the Valley Boulevard approach.
Director of Public Works Gutierrez responded that the proposed improvements would extend slightly beyond
Temple City Boulevard to the City limit. Similarly, on the other side of the City, the improvements would extend
just west of Walnut Grove Avenue.
Commissioner Lang asked about the standard roadway widths in El Monte and San Gabriel and whether the
other cities were aware of the proposal.
Director of Public Works Gutierrez responded that the City has not discussed the proposal with El Monte or
San Gabriel. Valley Boulevard is identified in the regional bike lane master plan for consideration of bike lanes,
but it is unclear whether the neighboring cities have explored those options. Currently, there are no bike lanes
in either El Monte or San Gabriel.
Chair Drange commented that El Monte and San Gabriel are relatively similar throughout the area.
Commissioner Trieu asked how soon the approximately one-and-a-half-mile roadway reconstruction,
including the four different approaches, was expected to occur. He asked whether the project would take
another year and whether businesses would have time to reconsider or reject the proposal.
1. PUBLIC COMMENTS
2. MATTERS FROM STAFF
Rosemead Beautification & Traffic Commission Meeting
Minutes of April 29, 2026
Page 2 of 6
Director of Public Works Gutierrez responded that the City is working under a timeline due to concerns
regarding a potential funding lapse, with a deadline at the end of the year. The City is working to complete the
design by that deadline. Once the design is completed and the commissioners' feedback is incorporated, the
proposal will be presented to the City Council to determine whether to proceed with the bike lanes. If
everything proceeds as planned, construction is anticipated to begin early next year, around late January to
early February.
Vice Chair Nguyen asked whether the budget would cover any of the four proposed approaches. She
questioned why the other options were being considered if the budget would only allow for whichever option
is feasible.
Director of Public Works Gutierrez responded that the purpose was to provide thoroughness and
transparency. He explained that Option 3 maintains the standard widths for the parking and travel lanes ,
however, accomplishing this would require reducing the sidewalk width to accommodate protected bike lanes.
As Romany mentioned, this option would involve a high capital cost due to the roadway widening required
and is therefore not currently feasible.
Vice Chair Nguyen clarified that, in simple terms, the City could only afford Option 1 or Option 2.
Director of Public Works Gutierrez confirmed that this was correct.
Chair Drange mentioned that the City Council had previously expressed interest in learning more about
protected bike lanes. He commented that, under Option 4, portions of the route could potentially be
implemented in areas such as east of Temple City Boulevard or along roads where there is less demand for
parking. He asked whether this could be considered as an option.
Director of Public Works Gutierrez responded that removing street parking involves land use considerations
and would need to be further explored if the City decides to pursue that approach.
Commissioner Lang asked for clarification on what those considerations would entail.
Director of Public Works Gutierrez stated that the Planning Division would be better suited to provide additional
details. He explained that removing street parking could have implications for parking availability and density
for nearby commercial businesses. If the City chooses to pursue this approach, Public Works would coordinate
with the Planning Division to evaluate the impacts and present the findings to the City Council.
Chair Drange asked whether consideration had been given to installing a two-way bike lane along the east
side of Walnut Grove Avenue underneath the freeway.
Director of Public Works Gutierrez responded that this option was not provided by the consultant.
Commissioner Lang asked for clarification regarding what is being proposed at the two locations identified in
the presentation for center medians.
Director of Public Works Gutierrez clarified that, out of the 10 potential median locations, two are being
recommended because they would have a minimal impact on traffic. These two medians are located at the
City’s eastern and western entry points along Valley Boulevard. He explained that both locations can
accommodate the proposed medians with minimal impacts to traffic while providing opportunities for
beautification, such as installing City entry signs.
Rosemead Beautification & Traffic Commission Meeting
Minutes of April 29, 2026
Page 3 of 6
Vice Chair Nguyen asked how the artist was selected to develop the designs for the City entry monuments.
City Engineer Basilyous responded that it was a subconsultant working under RKA Consultants, the consultant
selected by the City. RKA Consultants is based in the City of Walnut.
Commissioner Tee asked whether the consultant or staff had a strong recommendation regarding which bike
lane option the City should adopt.
Director of Public Works Gutierrez responded that the City is currently only gathering input and feedback.
Although Options 1 and 2 are feasible, there are some concerns associated with each option.
Commissioner Tee asked whether the remaining design elements would be consistent and uniform throughout
the City. He expressed that the bike lane design should be consistent and uniform, similar to the approach
used by the City of Temple City. He also suggested that, once the plans are established, the City share them
with neighboring cities as an example for consideration.
Director of Public Works Gutierrez responded that the City wants to ensure that whatever design is ultimately
selected is consistent with the City's adopted branding, color scheme, and existing design elements. He added
that the City will reach out to neighboring cities to share information and discuss their bike lane plans.
Commissioner Tran asked what the budget is for this project.
Director of Public Works Gutierrez replied our current project budget is almost $8,000,000.
Commissioner Lang asked what the cost is for the Valley Boulevard portion. Could we consider approach 4
and do this in 2 step phase where we do Valley Boulevard this year and Walnut Grove in the future.
Director of Public Works Gutierrez replied it could be done as a phased approach.
Commissioner Liu asked would the bike lane on Valley Boulevard affect the bus stops.
Director of Public Works Gutierrez replied it would not have an impact and the buses will still be able to use
that travel lane.
Vice Chair Nguyen commented that if we are considering adding bike lanes, it should be safe bike lanes. She
suggested a multiyear phase approach on approach 3 at a minimum would be ideal in terms of a risk mitigation
standpoint. For the city entry monuments, we should engage the community for their input. The design should
incorporate the rose because the branding of the city, but over the last two decades, diversity inclusion should
be merged into the design.
Commissioner Tran asked whether the City Council's goal is to install bike lanes on both Walnut Grove Avenue
and Valley Boulevard.
Director of Public Works Gutierrez responded that the City does not have an answer at this time, as the City
Council directed staff to meet with both commissions and gather their feedback. He clarified that the current
project does not include the installation or final design of bike lanes. Rather, it includes feasibility studies, and
the current options are the result of those studies. Due to the project timeline, staff is proceeding with the
design process. Since the proposed changes would primarily involve minor modifications to roadway striping,
staff can continue with the design while these discussions and feedback are taking place.
Rosemead Beautification & Traffic Commission Meeting
Minutes of April 29, 2026
Page 4 of 6
Commissioner Tran commented that he appreciated the City's efforts to create a distinct identity, including
the proposed two City entry monuments. He mentioned the development of the Myriad Food Hall and
Pasadena City College and expressed hope for creating a downtown area in Rosemead. He suggested that
the City consider incorporating a structure or monument that identifies the area as "Welcome to Downtown
Rosemead" or something similar. He then asked whether all five options presented were available for Walnut
Grove Avenue.
City Engineer Basilyous responded that Walnut Grove Avenue is not significantly different from Valley
Boulevard and that the options are generally the same.
Commissioner Tran asked whether Options 3 or 4, which would involve impacts to the roadway, would also
require undergrounding utilities and whether that would make the bike lanes safer. He also noted that medians
were installed along Walnut Grove Avenue several years ago but currently consist primarily of dirt. He asked
whether there was an opportunity to improve and clean up those medians.
Director of Public Works Gutierrez responded that the City is currently revisiting all of the medians along
Walnut Grove Avenue.
Commissioner Tee recommended conducting further analysis of the safety considerations associated with
each proposed approach.
Chair Drange discussed the bike lanes in Temple City and noted that, on trash collection days, bicyclists are
sometimes required to enter the traffic lane to navigate around dumpsters and parked vehicles. He expressed
that the two options presented may not be his preferred approaches, however, he believes Approach 1 or 2
may be better suited for the City. He also noted that Walnut Grove Avenue is the only route that provides
access underneath the I-10 freeway. If a bike lane is installed under the freeway, he suggested considering
the installation of barriers within the underpass or widening the sidewalk between Marshall Street and Hellman
Avenue.
Commissioner Trieu asked whether both streets need to be included together to meet the funding
requirements or whether the City could prioritize one street over the other.
Director of Public Works Gutierrez responded that he does not believe the two streets are required to be
completed together. However, they are being included together to keep the work under a single contract.
Commissioner Trieu expressed appreciation for the City's efforts to have this discussion and gather input.
However, he expressed concerns about the rushed timeline. He agreed with Chair Drange regarding
Approach 1, noting that there could be too many obstacles for bicyclists. For that reason, he stated that he
does not believe Approach 1 should be considered from a safety perspective.
Chair Drange commented that, if he had to choose which street to prioritize, he would select Walnut Grove
Avenue because there are multiple streets that provide access across the City. He also noted that new
developments along Valley Boulevard, such as the food court, could potentially result in changes to the plans
and designs in the future.
The Commissioner agreed with Chair Drange that the City should prioritize Walnut Grove Avenue.
Commissioner Tee asked if the city entry monuments on the same timeline as the bike lanes.
Director of Public Works Gutierrez replied yes.
Rosemead Beautification & Traffic Commission Meeting
Minutes of April 29, 2026
Page 5 of 6
Commissioner Wong asked about Approach 2 and whether placing the bike lanes closer to the sidewalk could
create confusion for drivers who may not know how to park adjacent to a bike lane. He expressed concern
about how vehicles would navigate and park next to the bike lane.
Chair Drange commented that delivery vehicles could also present an issue with this type of bike lane
configuration.
Commissioner Tran asked Chair Drange how the bike lanes in Temple City have been working.
Chair Drange responded that the bike lanes work well when it is not trash collection day and when delivery
trucks are not parked along the bike path. He also expressed concerns regarding the proposed bike lanes on
Valley Boulevard and asked whether parking restrictions would be in place if the other approaches were
considered.
City Engineer Basilyous explained that staff has concerns with Approach 2 because the proposed parking
area would be approximately 7 feet wide and the adjacent bike lane would be approximately 10 feet wide,
with both being considered substandard widths. He noted that this configuration creates a higher risk of
collisions when vehicle doors are opened.
Commissioner Lang asked how this project was prioritized over other City projects.
Director of Public Works Gutierrez responded that he could not speak to the circumstances surrounding the
project's delay. When he began his position with the City, he was provided with a list of projects, and this
project was included. He explained that the project was selected due to its timeline and the City's desire to
avoid losing federal funding that had already been programmed for the project. Staff explored the possibility
of reprogramming the funds toward another project, however, that was not an available option.
Commissioner Lang commented that, if he were to encounter Approach 1 or 2, he would not feel comfortable
using the bike lanes. He stated that he would feel safer using Approaches 3 or 4. He added that a multifaceted
approach may be ideal, allowing the City to reassess the project rather than committing all of its resources to
a single project. He emphasized that the goal should be to encourage more people to bicycle and help reduce
vehicle congestion.
Director of Public Works Gutierrez responded that the City is still evaluating the options and gathering
feedback and input. He stated that Approach 4 appears feasible along the Walnut Grove Avenue segment.
He noted that the City of Monterey Park is currently working on a project along Potrero Grande Drive that
continues onto Rush Street, which will include a bike lane. He added that Walnut Grove Avenue presents a
good opportunity to incorporate bike lanes because the City would not need to eliminate parking, and the
existing space is currently underutilized.
Chair Flores commented there is a lot taking place on Valley Boulevard, specifically many businesses,
driveways, and parked cars along Valley Boulevard. She does not personally see a bike lane working.
Regarding the city entry monuments she liked the idea and options provided, but did not love them. She felt
it could be better.
Commissioner Tee asked if the item on the city entry monuments can be agendized for the next meeting for
further discussion.
Director of Public Works Gutierrez responded yes.
Rosemead Beautification & Traffic Commission Meeting
Minutes of April 29, 2026
Page 6 of 6
Chair Flores suggested surveys should be sent out to residents as this item is for the residents.
Director of Public Works Gutierrez replied once the City decides which direction, there will be an outreach
program including social media and mailings.
Chair Drange asked if there will be a Traffic Commission meeting next week.
Director of Public Works Gutierrez replied this joint meeting is in lieu of the meeting next week and a
cancellation notice will be sent out.
4. ADJOURNMENT
The meeting adjourned at 7:02 p.m. The next Traffic Commission meeting is scheduled for May 7, 2026,
at 7:00 p.m. and will take place at the Rosemead City Hall, City Council Chambers, 8838 East Valley
Boulevard.
ATTEST:
________________________
Sam Gutierrez
Director of Public Works
_______________________
Michael Drange
Chair