CC - 2010-29 - Joint Resolution - Making Findings required by section 33445 and 33679 of CA Redevelopment Law and Determining that the Construction of Certain Public Improvements for Project Area No. 1 and 20
•
RESOLUTION NO. 2010-29 and CDC 2010-15
A JOINT RESOLUTION OF THE ROSEMEAD CITY
COUNCIL AND THE ROSEMEAD COMMUNITY
DEVELOPMENT COMMISSION, MAKING THE FINDINGS
REQUIRED BY SECTIONS 33445 AND 33679 OF
CALIFORNIA REDEVELOPMENT LAW AND
DETERMINING THAT THE CONSTRUCTION OF CERTAIN
PUBLIC IMPROVEMENTS IS OF BENEFIT TO
REDEVELOPMENT PROJECT AREAS NOS. 1 AND 2.
WHEREAS, the Rosemead Community Development Commission (the
"Commission") is a public body, corporate and politic, duly established and authorized to
transact business and exercise powers under and pursuant to the provisions of the Community
Redevelopment Law of the State of California, constituting Part I of Division 24 of the Health
and Safety Code of the State of California (the "Law"), including the power to expend funds
for public improvements for the benefit of Redevelopment Project Areas Number 1 and 2
("Project Areas"); and
WHEREAS, the City of Rosemead ("City") is the legislative body for the
community in which the Project Areas are located and pursuant to Health & Safety Code
section 33445 is required to consent to payments to be made by its Commission for the
provision of public improvements; and
WHEREAS, the provision of the public improvements identified herein are
consistent with the Commission's Five-Year Implementation Plan Goals adopted for 2005-
2009; and
WHEREAS, there are appropriate facts supporting the findings required by Health
& Safety Code Sections 33445 and 33679 for the City Council to consent to the Commission's
expenditure of funds for provision of funds for the public improvements identified in this
Resolution; and
WHEREAS, the Resolution is being considered at a properly noticed Public
Hearing as required by Health and Safety Code section 33679, and further that the report
required by section 33679 has been available with the City Clerk/Commission Secretary for
the past two weeks.
NOW, THEREFORE, THE ROSEMEAD CITY COUNCIL AND THE
ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION, CALIFORNIA DO
HEREBY RESOLVE AS FOLLOWS:
SECTION 1. Recitals. The City Council and Commission Board finds and declares
that the above recitals are true and correct and incorporates them herein.
SECTION 2: Public Improvements. The public improvements that the Commission
Board believes are of benefit to the Project Areas (as described in Section 3 herein) are set
forth below, including approximate cost estimates for each project.
• 0
(i) Replace equipment at Klingerman Park - $50,000
This project includes the removal of an existing playground (excluding swings) to be
replaced with a new ADA accessible system and safety surfacing. This project will be
completed as soon as possible to ensure that all safety concerns are resolved. A contract
for the repairs and replacement will be brought to the Commission on May 25, 2010. The
project estimate including all financing costs is $73,400
(ii) Replace northern equipment at Zapopan Park - $50,000
This project includes the removal of an existing playground to be replaced with a new
ADA accessible system and safety surfacing. This project will be completed as soon as
possible to ensure that all safety concerns are resolved. A contract for the repairs and
replacement will be brought to the Commission on May 25, 2010. The project estimate
including all financing costs is $73,400.
(iii) Replace playground equipment at Rosemead Park - $180,000
Project includes the removal of the existing hilltop and southern playgrounds to be
replaced with new ADA accessible systems and safety surfacing. This project will be
completed as soon as possible to ensure that all safety concerns are resolved. A contract
for the repairs and replacement will be brought to the Commission on May 25, 2010. The
project estimate including all financing costs is $264,300.
(iv) Construct Aquatic Center at Rosemead Park - $6,520,000
The project is a complete renovation of Rosemead Pool to include demolition of the entire
existing facility and construction of new pool, deck area, shade structure and covered
bleachers, turf area, chemical and mechanical systems, and bath house. Schematic design
development is underway. The next phase of the project would include design
development and construction documents, followed by construction. The project would
take approximately six months to complete once design development is approved. The
project estimate including all financing costs is $9,574,500.
(v) Expand Rosemead Community Center and parking Lot - $2.5 to $3.5 Million
This project includes the creation of a civic center campus with increased and unified
parking between City Hall, the library, and Rosemead Community Recreation Center,
expanded pedestrian areas, landscape and lighting improvements, and a 2500 square foot
expansion of the RCRC to include offices, teen center, and community computer lab as
well as roof/HVAC repairs. Only such portions of the project as allowable under
Redevelopment Law would be charged to the Community Development Commission. The
project estimate including all financing costs are between $3,671,200 to $5,139,700.
(vi) Develop a new neighborhood park at Rush and Walnut Grove - $500,000
Acquisition and development of a parcel currently owned by SCE as a neighborhood park
to include turf and landscaped areas, playground, walking path, and benches. The project
estimate including all financing costs is $734,250.
(vii) Construct new restrooms at Zapopan Park - $212,000
Project includes the demolition and removal of the existing modular restroom at the park
to be replaced with a 650 square foot structure. The project estimate including all financing
costs is $310,200.
(viii) Develop and install 10th Anniversary of 9/11 Memorial at Civic Center -
$50,000
The project includes design, creation, and installation on the City Hall Plaza of a public art
sculpture to commemorate the 10th Anniversary of 9/11 using an artifact from the World
Trade Center. The project estimate including all financing costs is $73,400.
(ix) Renovate fields at Rosemead Park - $196,000 to $784,000
The project includes grading and soil preparation of 400,000 square feet of turf area. To
hydro-seed the area, the estimate is $196,000; the estimate to sod the same area is
$784,000. The project estimate including all financing costs is between $287,850 and
$1,151,400.
(x) Replace/construct new preschool playground at Rosemead Park - $100,000
Project includes the removal of an existing preschool playground to be replaced with a
new ADA accessible system, safety surfacing, and fencing. The project estimate including
all financing costs is $146,850.
SECTION 3. Findings Required by Health & Safety Code Sections 33445 and
33679. The City Council and Commission Board hereby determine that:
(i) The use of Commission funds is of benefit to the project areas.
The Projects are of benefit to the Redevelopment Project Areas as they will improve
community amenities for businesses and residences within the project areas. The ability to
provide amenities to the community will help to improve property values and assist with
the sale and resale of new and existing homes. Projects such as the development of the
Aquatics Center or the expansion of the Rosemead Community Center will enhance the
Project Area and will provide new resources. These projects will also assist in the growth
of existing and new businesses by attracting additional patrons and residents to the project
areas, thereby helping to reduce stagnant economic conditions.
(ii) There is no other reasonable means of financing the improvements.
At this time, no other reasonable means of financing the Projects are available from the
City as the City is using its funds to undertake other projects, services and public
improvements throughout the City. The City's budget does not currently project any
surplus which could be utilized for these improvements. Accordingly, bonding against
current City revenues is also not an option. Further, given the current economic condition
of California, the City believes that all fund reserves must be utilized for emergencies and
further reductions in tax and other revenues to ensure that the City can continue to fund its
• •
basic ongoing services and maintain its existing facilities. Finally, given the current
economic conditions in California, the City does not believe that any new taxes or
assessments would receive the appropriate voter approval levels to finance these
improvements. The only available funding source for the improvements is bonding which
does not require additional taxes be levied or additional assessments to be imposed.
(iii) Funding the project will assist in the elimination of one or more blighting
conditions inside the project areas.
The payment of funds for the Projects will assist in the elimination of blighting conditions
inside the Redevelopment Project Areas by improving the appearance of community
amenities and facilities in the City of Rosemead and Redevelopment Project Area. It is
anticipated that such improved appearance and enhanced facilities will attract additional
new investment into the project areas in terms of new businesses and improvements to
existing businesses in light of additional residential patronage and use of these nearby
public facilities-or at least minimize the likelihood of any continued decline of the
project areas as a result of decreased patronage resulting from deteriorating public
facilities in the project areas.
(iv) Consistency with 5-Year Plan
The use of Commission funds for these Projects is consistent with the Commission's 5-
year Implementation Plan (2009-2014). The Plan indicates the goal of eliminating
blighting influences, including deteriorating buildings, incompatible land uses, obsolete
structures, and other environmental, economic, and social deficiencies; improve the overall
appearance of existing buildings, streets, parking areas and other facilities, public and
private; and assure that all buildings, new and old, are safe for persons and business to
occupy. Additional plan goals include providing new or improved public improvements
and facilities, the absence or inadequacy of which constitute an economic liability of the
City, are impediments to development, and which cannot be remedied by private or
governmental action without redevelopment.
The Implementation Plan also specifies capital improvement projects to improve the public
infrastructure and facilities in the Project Areas. The plan specifically indentifies that the
Commission may also assist in funding the construction of new and rehabilitated public
facilities within or serving the Project Areas. Projects are intended to stimulate the growth
of existing and new businesses and reduce stagnant economic conditions.
(v) Redevelopment Purpose for funding Public Improvements
As set forth herein, the redevelopment purpose for the funding of the public
improvements described herein is the elimination of blight within the project areas.
SECTION 4. Council Consent to use of Funds. The City Council hereby consents to
the use of Rosemead Community Development Commission Funds to fund the improvements
identified herein to the extent that the Commission Board approves the use of any of the
Commission's funds for such purpose. The City Council and Commission Board understand
that the actual costs of public improvements identified herein could vary from the cost
• •
estimates set forth herein. However, neither the City Council nor the Commission Board find
that such a variance, even if material, would alter the findings set forth in this Resolution.
SECTION 5. Effective Date: This Resolution shall take effect from and after its date
of passage; approval and adoption.
SECTION 6. Certification: The City Clerk and the Commission Secretary shall certify
to the adoption of this Resolution.
PASSED, APPROVED AND ADOPTED this 1- day of May, 2010.
ARY TA R, MAYOR/C MISSION CHAIR
ATTEST:
)l 9 93.
GLORIA MOLLEDA, CITY CLERK/COMMISSION SECRETARY
APPROVED AS TO FORM
Josep ontes, J Attorney/Commission Counsel
•
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS.
CITY OF ROSEMEAD 1
•
I, Gloria Molleda, City Clerk/Commission Secretary of the City of Rosemead, do hereby certify that
the foregoing City Council Resolution No. 2010.29 and CDC Resolution No. 2010-15 being:
A JOINT RESOLUTION OF THE ROSEMEAD CITY COUNCIL AND THE ROSEMEAD
COMMUNITY DEVELOPMENT COMMISSION, MAKING THE FINDINGS REQUIRED
BY SECTION 33554 AND 33679 OF CALIFORNIA REDEVELOPMENT LAW AND
DETERMINING THAT THE CONSTRUCTION OF CERTAIN PUBLIC IMPROVEMENT
was duly and regularly approved and adopted by the Rosemead City Council/Community
Development Commission on the 11th of May, 201010, by the following vote to wit:
Yes: Armenta, Clark, Low, Ly,
No: Taylor
Abstain: None
Absent: None
Gloria Molleda
City Clerk/Commission Secretary
E M F
5
O
F 1
9
~~ORaTEO i9~
•
ROSEMEAD CITY COUNCIL &
COMMISSION STAFF REPORT
TO: THE HONORABLE MAYOR AND CHAIRMAN AND MEMBERS OF THE
CITY COUNCIL AND COMMUNITY DEVELOPMENT COMMISSION
FROM: JEFF ALLRED, CITY MANAGER/EXECUTIVE DIRECTOR
DATE: MAY 11, 2010
SUBJECT: PUBLIC HEARING ON THE CONSENT TO USE COMMUNITY
DEVELOPMENT FUNDS FOR FUTURE CAPITAL IMPROVEMENT
PROJECTS PURSUANT TO HEALTH & SAFETY CODE SECTIONS 33445
AND 33679
SUMMARY
On March 9, 2010, the City Council unanimously approved the project list component of the
Parks, Recreation and General Facilities Master Plan. Contained in the list are thirty-two
identified projects within the City that are to be considered. There are ten projects that
require the use of Commission funds.
Redevelopment Law (Health and Safety Code Sections 33445 and 33679) requires that, if
redevelopment funds are to be used to pay for improvements which will be publicly owned,
both within and adjacent to the project area, the City Council and the Community
Development Commission must list and describe the improvements and the costs
associated therewith, as well as make the following findings: a) that the proposed
improvements are of benefit to the Project Areas or the immediate neighborhood in which
the projects are located; b) that there are no other reasonable means of financing for the
proposed projects available to the community; c) that the projects will assist in the
elimination of blighting conditions in the Project Areas and are consistent with the adopted
5-year Implementation Plan.
Staff Recommendation
Staff recommends the following:
1. That the Community Development Commission and City Council adopt Joint
(Resolution No--20_1'0=29"and-CDC_201.0-1 (Attachment A) making the appropriate
findings under Health and Safety Code Section 33445; and
2. That the Community Development Commission and City Council adopt Resolutions
No. 2010-30 (Attachment B) and CDC No. 2010-16 (Attachment C) appropriating
$280,000 from the existing 2006A Bond proceeds to fund the three urgent
playground equipment projects listed as priorities 1 through 3 in this report.
ITEM NO. _7 F
APPROVED FOR CITY COUNCIL AGENDA:
0 •
City Council/Community Development Commission Meeting
May 11, 2010
Paoe 2 of 6
ANALYSIS
The following is a detailed list of the projects included in the master plan that require funding
through the Commission. As required under the Code, the detailed section for each project
includes the total anticipated cost of the project including assumed interest of 6.0% for a
term of 13 years. The cost estimate provided in the project title are the anticipated
construction costs that have been discussed previously.
1. Replace equipment at Klingerman Park - $50,000
This project includes the removal of an existing playground (excluding swings) to
be replaced with a new ADA accessible system and safety surfacing. This project
will be completed as soon as possible to ensure that all safety concerns are
resolved. A contract for the repairs and replacement will be brought to the
Commission on May 25, 2010. The project estimate including all financing costs
is $73,400
2. Replace northern equipment at Zapopan Park - $50,000
This project includes the removal of an existing playground to be replaced with a
new ADA accessible system and safety surfacing. This project will be completed
as soon as possible to ensure that all safety concerns are resolved. A contract
for the repairs and replacement will be brought to the Commission on May 25,
2010. The project estimate including all financing costs is $73,400.
3. Replace playground equipment at Rosemead Park - $180,000
Project includes the removal of the existing hilltop and southern playgrounds to
be replaced with new ADA accessible systems and safety surfacing. This project
will be completed as soon as possible to ensure that all safety concerns are
resolved. A contract for the repairs and replacement will be brought to the
Commission on May 25, 2010. The project estimate including all financing costs
is $264,300.
4. Construct Aquatic Center at Rosemead Park - $6,520,000
The project is a complete renovation of Rosemead Pool to include demolition of
the entire existing facility and construction of new pool, deck area, shade
structure and covered bleachers, turf area, chemical and mechanical systems,
and bath house. Schematic design development is underway. The next phase of
the project would include design development and construction documents,
followed by construction. The project would take approximately six months to
complete once design development is approved. The project estimate including
all financing costs is $9,574,500.
• 0
City Council/Community Development Commission Meeting
May 11, 2010
Paoe 3 of 6
5. Expand Rosemead Community Center and parking Lot - $2.5 to $3.5 Million
This project includes the creation of a civic center campus with increased and
unified parking between City Hall, the library, and Rosemead Community
Recreation Center, expanded pedestrian areas, landscape and lighting
improvements, and a 2500 square foot expansion of the RCRC to include offices,
teen center, and community computer lab as well as roof/HVAC repairs. Only
such portions of the project as allowable under Redevelopment Law would be
charged to the Community Development Commission. The project estimate
including all financing costs are between $3,671,200 to $5,139,700.
6. Develop a new neighborhood park at Rush and Walnut Grove - $500,000
Acquisition and development of a parcel currently owned by SCE as a
neighborhood park to include turf and landscaped areas, playground, walking
path, and benches. The project estimate including all financing costs is $734,250.
7. Construct new restrooms at Zapopan Park - $212,000
Project includes the demolition and removal of the existing modular restroom at
the park to be replaced with a 650 square foot structure. The project estimate
including all financing costs is $310,200.
8. Develop and install 10th Anniversary of 9/11 Memorial at Civic Center - $50,000
The project includes design, creation, and installation on the City Hall Plaza of a
public art sculpture to commemorate the 10th Anniversary of 9/11 using an
artifact from the World Trade Center. The project estimate including all financing
costs is $73,400.
9. Renovate fields at Rosemead Park - $196,000 to $784,000
The project includes grading and soil preparation of 400,000 square feet of turf
area. To hydro-seed the area, the estimate is $196,000; the estimate to sod the
same area is $784,000. The project estimate including all financing costs is
between $287,850 and $1,151,400.
10. Replace/construct new preschool playground at Rosemead Park - $100,000
Project includes the removal of an existing preschool playground to be replaced
with a new ADA accessible system, safety surfacing, and fencing. The project
estimate including all financing costs is $146,850.
In addition, the proposed Aquatics Center at Garvey Park can be constructed at an
estimated cost of $3,320,000. The primary anticipated source of these funds is the
repayment of an outstanding loan to the City's General Fund from the Community
Development Commission's proposed bond proceeds.
•
City Council/Community Development Commission Meeting
May 11, 2010
Page 4 of 6
Health and Safety Code Sections 33445 and 33679 Findings and Requirements
As stated above, Health and Safety Code Section 33445 requires that the City Council
consent to the Commission expenditures for public improvement projects and that the
Commission and Council find that:
1) The use of Commission funds is of benefit to the project areas.
The Projects are of benefit to the Redevelopment Project Areas as they will
improve community amenities for businesses and residences within the
project areas. The ability to provide amenities to the community will help to
improve property values and assist with the sale and resale of new and
existing homes. Projects such as the development of the Aquatics Center or
the expansion of the Rosemead Community Center will enhance the Project
Area and will provide new resources. These projects will also assist in the
growth of existing and new businesses by attracting additional patrons and
residents to the project areas, thereby helping to reduce stagnant economic
conditions.
2) There is no other reasonable means of financing the improvements.
At this time, no other reasonable means of financing the Projects are
available from the City as the City is using its funds to undertake other
projects, services and public improvements throughout the City. The City's
budget does not currently project any surplus which could be utilized for these
improvements. Accordingly, bonding against current City revenues is also
not an option. Further, given the current economic condition of California, the
City believes that all fund reserves must be utilized for emergencies and
further reductions in tax and other revenues to ensure that the City can
continue to fund its basic ongoing services and maintain its existing facilities.
Finally, given the current economic conditions in California, the City does not
believe that any new taxes or assessments would receive the appropriate
voter approval levels to finance these improvements. The only available
funding source for the improvements is bonding which does not require that
additional taxes be levied or additional assessments imposed.
3) Funding the project will assist in the elimination of one or more blighting
conditions inside the project areas.
The payment of funds for the Projects will assist in the elimination of blighting
conditions inside the Redevelopment Project Areas by improving the
appearance of community amenities and facilities in the City of Rosemead
and Redevelopment Project Area. It is anticipated that such improved
appearance and enhanced facilities will attract additional new investment into
the project areas in terms of new businesses and improvements to existing
businesses in light of additional residential patronage and use of these
nearby public facilities-or at least minimize the likelihood of any continued
• 0
City Council/Community Development Commission Meeting
May 11, 2010
Page 5 of 6
decline of the project areas as a result of decreased patronage resulting from
deteriorating public facilities in the project areas.
4) Consistency with 5-Year Plan
The use of Commission funds for these Projects is consistent with the
Commission's 5-year Implementation Plan (2009-2014). The Plan indicates
the goal of eliminating blighting influences, including deteriorating buildings,
incompatible land uses, obsolete structures, and other environmental,
economic, and social deficiencies; improve the overall appearance of existing
buildings, streets, parking areas and other facilities, public and private; and
assure that all buildings, new and old, are safe for persons and business to
occupy. Additional plan goals include providing new or improved public
improvements and facilities, the absence or inadequacy of which constitute
an economic liability of the City, are impediments to development, and which
cannot be remedied by private or governmental action without
redevelopment.
The Implementation Plan also specifies capital improvement projects to
improve the public infrastructure and facilities in the Project Areas. The plan
specifically indentifies that the Commission may also assist in funding the
construction of new and rehabilitated public facilities within or serving the
Project Areas. Projects are intended to stimulate the growth of existing and
new businesses and reduce stagnant economic conditions. Development of
the Parks, Recreation, and General Facilities master plan has aided in
identifying the public projects requiring rehabilitation.
Section 33679 requires that a public hearing be held on the funding of the improvements.
This staff report satisfies the requirements of section 33679 that a report be prepared and
available prior to the public hearing. The report contains the required list of improvements,
the costs associated therewith, the findings required by section 33445, and, as stated
above, the redevelopment purpose for the funding of such facilities is the elimination of
blight within the project areas.
FISCAL IMPACT
A request to appropriate $280,000 from the existing 2006A bond proceeds is included to
expedite the work necessary to complete the work for the first three projects listed. Staff is
not recommending a specific allocation for any others projects at this time, but will be
bringing back the items individually for an allocation of funds and specific project approval.
It is anticipated that there will be approximately $7 million of proceeds from the proposed
2010 Tax Allocation Bonds for the funding of the improvements described in this report.
PUBLIC NOTICE PROCESS
This item has been noticed as required by Health and Safety Code section 33679 and
through the regular agenda notification process and a copy of this report has been available
with the City Clerk's office since the date of the first public notice publication.
•
City Council/Community Development Commission Meeting
May 11, 2010
Paqe 6 of 6
Submitted by:
vylam'
Matthew E. Hawkesworth
Assistant City Manager
10