CC - Item IV.CC-C - Proposal To Provide Engineering Services For Traffic Signal Modifications On Various StreetsTO: HONORABLE MAYOR
AND MEMBERS
ROSEMEAD CITY COUNCIL
FROM: FRANK G. TRIPEPI, CITY MANAGER >g
DATE: FEBRUARY 19, 2002
RE: PROPOSAL TO PROVIDE ENGINEERING SERVICES FOR TRAFFIC
SIGNAL MODIFICATIONS AT WALNUT GROVE AVENUE /HELLMAN
AVENUE /RAMONA BOULEVARD AND INSTALLATION OF TRAFFIC
SIGNAL AT HELLMAN AVENUE /1 -10 ON /OFF RAMPS
Attached for your consideration is an engineering proposal from Willdan for engineering
design, utility coordination, contract administration, and construction observation services
for the traffic signal modification at Walnut Grove Avenue /Hellman Avenue /Ramona
Boulevard and installation of a new traffic signal at Hellman Avenue /1 -10 On /Off Ramps.
A traffic study was recently completed analyzing the existing traffic flow at the intersections
of Walnut Grove Avenue and Hellman Avenue /Ramona Boulevard and at Hellman Avenue
and the 1 -10 Freeway Ramps. The traffic study concluded the installation of anew traffic
signal at the Hellman Avenue /1 -10 Freeway Ramps was justifiable using Caltrans traffic
signal warrant analysis. Due to the close proximity of the two intersections, it is
recommended that the existing traffic signal at Walnut Grove Avenue and Hellman
Avenue /Ramona Boulevard and the new signal at Hellman Avenue and the 1 -10 Freeway
Ramps operate as one signalized location.
The project consists of modifying the existing traffic signal at Walnut Grove Avenue and
Hellman Avenue /Ramona Boulevard to include new intersection phasing and vehicle
heads, and to install new traffic signal poles, vehicle indications and detection at the 1 -10
Freeway Ramps at Hellman Avenue. Both intersections will be connected to the traffic
signal controller at Walnut Grove Avenue and Hellman Avenue /Ramona Boulevard.
A description of the proposed traffic signal timing can be found in Exhibit "A ".
COUNCIL
FEB 2 6 2002
ITEM No. :1Z • M - e
February 20, 2002
Page 2
The total construction cost for this project is estimated to be $75,000, and the estimated
contract period is 25 working days. The proposed project is currently programmed in
the City's FY 2001 -02 budget. Construction of the project is anticipated to occur in the
summer of 2002.
The proposed fees are as follows:
• Preliminary and Final Design $ 9,000
• Utility Coordination 3,900
• Construction Observation 6,600
• Contract Administration 1,500
Total Proposed Fee $21,000
The total fee, excluding utility coordination, is in conformance with that portion of the
City's agreement with Willdan which pertains to design engineering services.
RECOMMENDATION
It is recommended that the Rosemead City Council approve the attached engineering
proposal and direct staff to begin the preparation of the necessary plans and
specifications.
Attachment
Exhibit "A"
The following is the proposed combined traffic signal phasing for the Walnut Grove
Avenue /Hellman Avenue /Ramona Boulevard /1 -10 Freeway Ramps Intersections. These
phases are graphically represented in the attached Phase Diagrams.
Phase 1 + 5
Phase 4
Walnut Grove Ave.
Walnut Grove Ave.
• NB and SB left turns — Green
o NB and SB left turns — Stop
• NB and SB through — Stop
o NB and SB through — Stop
Ramona Blvd.
Ramona Blvd.
o WB — Stop
o WB — Green
Hellman Ave. at Walnut Grove Ave.
Hellman Ave. at Walnut Grove Ave.
o EB —Stop
o EB —Green
1 -10 On /Off Ramp
1 -10 On /Off Ramp
o SB —Stop
o SB —Stop
Hellman Ave. at 1 -10 On /Off Ramp
Hellman Ave. at 1 -10 On /Off Ramp
o EB and WB — Green
o EB and WB — Green
Phase 2 + 6
Phase 3
Walnut Grove Ave.
Walnut Grove Ave.
o NB and SB left turns — Stop
o NB and SB left turns — Stop
o NB and SB through — Green
o NB and SB through — Stop
Ramona Blvd.
Ramona Blvd.
o WB — Stop
o WB — Stop
Hellman Ave. at Walnut Grove Ave.
Hellman Ave. at Walnut Grove Ave.
o EB — Stop
o EB — Green
1 -10 On /Off Ramp
1 -10 On /Off Ramp
o SB — Stop
o SB — Green
Hellman Ave. at 1 -10 On /Off Ramp
Hellman Ave. at 1 -10 On /Off Ramp
o EB and WB — Green
o EB and WB — Stop
Legend: NB = Northbound SB = Southbound EB = Eastbound WB = Westbound
m
cQ
0
c�
•any 9AOJ0 jnuleM
-- - - - - --
O
O
O
r
T
m
U
O
Z
LO
\N
N
cu
0
SZ-
0
0
m
c�
0
c�
flL
•any OAO.10 eM
N
ca
Q m
� o
2
N
ca
m
0
c�
0
0
M
•any 9A0.l J 3nuleM
m
0
Z
N
C/)
m
cQ
0
c�
4
Q
T
any OA0.40 anuleM
m
U
O
O
Z
W
C
li
�WILLDAN
Serving Public Agencies
February 19, 2002
Mr. Frank G. Tripepi
City Manager
City of Rosemead
8838 East Valley Boulevard
Rosemead, CA 91770
1 1191 "(W11, SUlti
IllIILI't I, ( ahiumla'11746 -.1497
,6 2%908 -6201) fax 962 2120
www.w I din ,. um
Subject: Proposal to Provide Engineering Services for Traffic Signal Modifications
at Walnut Grove Avenue /Hellman Avenue /Ramona Boulevard and
Installation of Traffic Signal at Hellman Avenue /1 -10 On /Off Ramps
Dear Mr. Tripepi:
As requested, we are pleased to be given the opportunity to submit this proposal for
installation of a new traffic signal at Hellman Avenue /1 -10 On /Off Ramps and
modification to the traffic signal at Walnut Grove Avenue /Hellman Avenue /Ramona
Boulevard.
A traffic study was recently completed analyzing the existing traffic flow at the
intersections of Walnut Grove Avenue and Hellman Avenue /Ramona Boulevard and at
Hellman Avenue and the 1 -10 Freeway Ramps. The traffic study concluded the
installation of a new traffic signal at the Hellman Avenue /1 -10 Freeway Ramps was
justifiable using Caltrans' traffic signal warrant analysis. Due to the close proximity of
the two intersections, it is recommended that the existing traffic signal at Walnut Grove
Avenue and Hellman Avenue /Ramona Boulevard and Hellman Avenue and the new
traffic signal at 1 -10 Freeway Ramps operate as one signalized location.
The project consists of modifying the existing traffic signal at Walnut Grove Avenue and
Hellman Avenue /Ramona Boulevard to include new intersection phasing and vehicle
heads, and to install traffic signal poles, vehicle indications, and detection at the 1 -10
Freeway Ramps at Hellman Avenue. Both intersections will be connected to the traffic
signal controller at Walnut Grove Avenue and Hellman Avenue /Ramona Boulevard.
SCOPE OF SERVICES
We propose to provide the following basic services for the project:
February 19, 2002
Page 2
Preliminary Design
1. Confer with City staff to review, in full detail, the requirements for the project.
Review available information and data assembled by City staff.
2. Develop base drawings, including collecting and plotting of field data, and the
identification and plotting of substructures and utilities.
3. Prepare traffic signal plans for the intersection of Walnut Grove Avenue and
Hellman Avenue /Ramona Boulevard and the intersection of Hellman Avenue and
the 1 -10 Freeway Ramps. The plans will also include necessary signing and
striping revisions at the intersections.
4. Submit preliminary traffic signal plans to the City of Rosemead and Caltrans for
review and comments.
5. Develop preliminary project cost estimates.
Final Design Phase
1. Based on comments received form the City of Rosemead, Caltrans, and utility
companies, revise plans.
2. Prepare detailed final plans and attend coordination meetings, as necessary, with
City personnel at various times during the design phase to obtain additional input
and review work.
3. Obtain final approval and construction permit from Caltrans.
4. Prepare specifications and contract documents to conform to applicable
requirements of the City of Rosemead
5. Prepare final project cost estimates.
Utility Coordination
1. Submit copies of plans to all affected utilities and agencies.
2. Coordinate with affected utility companies to provide for any utility relocations to
accommodate new traffic signal pole and foundation installation.
3. Send notification to affected utility companies, other agencies, contractor, and
City staff, and attend and coordinate the preconstruction conference.
February 19, 2002
Page 3
Contract Administration
1.
2.
3.
4.
5.
6.
7.
Assist the City in securing bids and awarding project.
Attend preconstruction conference and prepare minutes
Provide contract administration for proper enforcement of the contract plans and
specifications.
Provide engineering support, as needed, to make as -built revisions to the original
plans.
Provide the necessary consulting services required to coordinate the efforts
between the City and contractor.
Review and approve progress payment requests.
Answer inquiries and complaints for the City relating to the project.
Construction Observation
1
2
3
4
5
6
Provide daily construction observation during the construction period.
Provide the necessary weekly, monthly, and final reports as needed.
Provide copies of daily construction observation reports on a weekly basis, if
requested.
Provide necessary coordination with other agencies to provide final inspection of
the project.
Perform as -built corrections on original drawings.
Provide report to City following final inspection stating that the project has been
completed, and provide necessary data for City acceptance of the project. .
Our proposed fixed fees are as follows:
Preliminary and Final Design
9,000
Utility Coordination
3,900
Contract Administration
1,500
Construction Observation
6,600
TOTAL (Fixed Fee)
$21,000
February 19, 2002
Page 4
The current estimated construction cost for the total project is $95,000. The design fee
is based on the fee curve schedule from the American Society of Civil Engineers. The
total fee, excluding utility coordination, is in conformance with that portion of the City's
agreement with Willdan which pertains to design engineering services. The
construction contract period is estimated to be 25 working days. Compensation for
weekend inspection and inspection beyond the allocated working days and hours will be
on a time - and - materials basis.
If you have any questions regarding this proposal, please contact me at (562) 908 -6210.
Respectfully submitted,
' WILLLIDAN
William C. Pagett, P.E"
Senior Vice President
AF:mh
95610- 02 \06- 155\P02 -038
IV. CONSENT CALENDAR (Item CC -C was removed for discussion purposes)
A. AUTHORIZATION TO REJECT CLAIMS AGAINST THE CITY FROM
CATHERINE AND LAWRENCE PANARELLI
B. AUTHORIZATION TO REJECT CLAIMS AGAINST THE CITY FROM
HONG BUM CHOI AND KIE SOK CHOI
Councilman Taylor referring to CC -B, asked why the claim is filed against the City when
it was the Gas Company that was doing the work.
Nancy Valderrama, City Clerk, replied that the attorney representing the claimants was
informed of that fact but insisted on filing a claim against the City nevertheless. The claim was
sent to the City's adjuster Carl Warren & Company who recommended rejection of the claim and
will ultimately tender the claim over to the Gas Company.
Councilmember Clark requested an explanation from the City Attorney on the standard
procedure of claims filed.
Robert Kress, City Attorney, explained that the City is part of the Joint Powers Insurance
Authority pool. Claims are typically referred to the City's adjuster, Carl Warren & Company,
and they routinely recommend rejection. Mr. Kress stated that this does not indicate that the
matter will not be settled in a future time. However, it does set up time parameters on the statute
of limitations in which to file a claim.
MOTION BY COUNCILMAN TAYLOR, SECOND BY MAYOR PRO TEM
BRUESCH that the Council approve the aforementioned items on the Consent Calendar. Vote
resulted:
Yes: Bruesch, Taylor, Imperial, Clark, Vasquez
No: None
Absent: None
Abstain: None
The Mayor declared said motion duly carried and so ordered.
C -C APPROVAL OF PROPOSAL TO PROVIDE ENGINEERING SERVICES
FOR TRAFFIC SIGNAL MODIFICATIONS AT WALNUT GROVE
AVENUE AND HELLMAN AVENUE/RAMONA BOULEVARD AND
INSTALLATION OF TRAFFIC SIGNAL AT HELLMAN AVENUE/I-
10 /ON -OFF RAMP
Juan Nunez, 2702 Del Mar, Rosemead, asked if the City is going to purchase the Cal
Trans maintenance yard property.
Mr. Nunez was informed that Cal Trans is not selling that property.
CCMIN:z_z "z y
pap a6
Councilman Taylor asked if the No Right Turn on Red would remain at southbound
Walnut Grove and Hellman?
Joanne Itagaki, Traffic Engineer, will check to assure that it remains.
MOTION BY COUNCILMAN TAYLOR, SECOND BY MAYOR PRO TEM
BRUESCH that the Council approve the engineering proposal and direct staff to begin the
preparation of the necessary plans and specifications. Vote resulted:
Yes: Bruesch, Taylor, Imperial, Clark, Vasquez
No: None
Absent: None
Abstain: None
Mayor declared said motion duly carried and so ordered.
V. MATTERS FOR DISCUSSION AND ACTION — None
VL STATUS REPORTS — None
VII. ORAL COMMUNICATIONS FROM THE AUDIENCE - None
IX. ADJOURNMENT
There being no further action to be taken at this time, the meeting was adjourned at 8:40
p.m. in memory of Charles Bruesch, Mayor Pro Tern Robert Bruesch's father, and in memory of
Daniel Pearl, Wall Street news journalist murdered by Pakistani terrorists.
Respectfully submitted:
City Clerk