Loading...
CC - Item IV E - Approval Of Engineering Proposal To Provide Engineering Services For The FY 01-02 Slurry Seal Project On Various Streetsq111 TO: HONORABLE MAYOR AND COUNCILMEMBERS ROSEMEAD CITY COUNCIL FROM: FRANK G. TRIPEPI, CITY MANAGER DATE: APRIL 2. 2002 RE: APPROVAL OF ENGINEERING PROPOSAL TO PROVIDE ENGINEERING SERVICES FOR THE FY 2001-02 SLURRY SEAL PROJECT ON VARIOUS STREETS Attached for your consideration is an engineering proposal from Willdan for engineering design (preliminary and final), construction observation and contract administration, and utility coordination for the slurry seal of pavement on those streets identified in Exhibit A. The total construction cost for this project is estimated at $80,000. The proposed project is programmed in the 2001-02 City budget, utilizing State Gas Tax funds. Construction is anticipated to begin this Spring. The streets were selected based on the recommendations of the City's Pavement Management Program. The proposed fees are as follows: Preliminary and Final Design: $ 4,900 Utility Coordination $ 2,100 Construction Observation $ 7,400 'Construction Administration $ 2,100 Total Proposed Fee $16,500 The total fee, excluding utility coordination, is in conformance with that portion of the City's agreement with Willdan, which pertains to design engineering services. COUNCIL AGENDA APR Q-9 2002 ITEM No. April 2, 2002 Page 2 RECOMMENDATIONS It is recommended that the Rosemead City Council: Approve the attached engineering proposal. Direct staff to begin the preparation of the necessary plans and specifications. Attachment ~WILLIDAN Serving Publ Agencies March 28, 2002 Mr. Frank G. Tripepi City Manager City of Rosemead 8838 E. Valley Boulevard Rosemead, CA 91770 13191 Crossroads Parkway North, Suite 405 Industry, California 91746-3497 562/908-6200 fax 562/695-2120 www.willdan.com Subject: Proposal for Professional Engineering Design, Construction Observation, Contract Administration, and Utility Coordination for the 2001-2002 Slurry Seal Program on Various Streets Dear Mr. Tripepi: As requested, we are pleased to be given the opportunity to submit this proposal for the above-referenced services. Generally, this project includes a slurry seal coat for the streets throughout and serving the City as listed in Exhibit "A." The streets selected conform to priorities shown in the current Pavement Management System report. SCOPE OF SERVICES We propose to provide the following basic services for the project: Preliminary and Final Design Confer with City staff to review, in full detail, the requirements for the project. Review available information and data assembled by City staff. 2. Prepare plans identifying the streets to be slurried, the trash pickup schedule, and street sweeping schedule. 3. Attend coordination meetings, as necessary, with City personnel at various times during the design phase to obtain additional input and review work. 4. Prepare specifications and contract documents to conform to applicable requirements of the City of Rosemead. 5. Prepare final project cost estimates. March 28, 2002 Page 2 Utility Coordination 1. Submit copies of plans to all affected utilities and agencies. 2. Send notification to affected utility companies, other agencies, contractor and City staff, and attend and coordinate the preconstruction conference. Contract Administration 1. Provide the City with 20 sets of final plans and specifications for bidding. 2. Assist the City in securing bids and awarding project. 3. Attend preconstruction conference and prepare minutes. 4. Provide contract administration for proper enforcement of the contract plans and specifications. 5. Provide engineering support, as needed. 6. Provide the necessary consulting services required to coordinate the efforts between the City and contractor. 7. Review and recommend approval of progress payment requests. 8. Answer inquiries and complaints for the City relating to the project. Construction Observation 1. Provide daily construction observation during the construction period. 2. Provide the necessary weekly, monthly, and final reports. 3. Provide copies of daily construction observation reports on a weekly basis. 4. Provide necessary coordination with other agencies to provide final inspection of the project. 5. Provide report to City following final inspection stating that the project has been completed, and provide necessary data for City acceptance of the project. March 28, 2002 Page 3 Our proposed fees are as follows: • Preliminary and Final Design (Fixed Fee) $ 4,900 • Utility Coordination (Fixed Fee) $ 2,100 0 Construction Observation (Fixed Fee) $ 7,400 • Contract Administration (Fixed Fee) $ 2.100 Total Proposed Fee $16,500 The current estimated construction cost for the project is $80,000. The total fee, excluding utility coordination, is in conformance with that portion of the City's agreement with Willdan Associates which pertains to design engineering services. The construction contract period is estimated to be 15-working days. Compensation for weekend inspection and inspection beyond the allocated working days and hours of the construction contract will be on time- and-materials basis. If you have any questions regarding this proposal, please contact Mr. Rey Alfonso at (562) 908-6237. Respectfully submitted, W ILLDAN William C. Pagett, P.E. Senior Vice President Enclosure RA:mec 95610-02\06-155\P02-065 EXHIBIT "A" 2001-2002 SLURRY SEAL PROGRAM Street Limits Bartlett Garvey/Ramona Brighton Dorothy/Hellman Brookline South End/Loftus Charlotte Dorothy/Hellman Columbia East End/West End Delta Hellman/Earle Delta South End/Wells Dorothy Del Mar/Kelburn Dorothy San Gabriel/Walnut Grove Gernert Ralph/Valley Gladys Hellman/South End Graves Angelus/San Gabriel Guess Muscatel/Rosemead Guess Strang/Ellis Ivar Valley/Mission Jackson Hellman/North End Kelburn Hellman/Emerson Lawrence Rosemead/Ivar Loftus East City Limit/Temple City Marshall Temple City/West End Steele East End/Gernert Strang Loftus/Valley