RRA - Item 6 - Approval Of Plans And Specifications And Authorization To Seek Bids For The San Gabriel Bridge Overpass At The Pomona FreewayRQSEMEAD REDEVELOPMENT AGENCY
8838 VALLEY BLVD., ROSEMEAD, CA 917709(818)288-6671 • Telecopier 8183079218
TO: FRANK G. TRIPEPI, EXECUTIVE DIRECTOR
FROM: ALFONSO RODRIGUEZ, CITY ENGINEER
DATE: OCTOBER 12, 1990
RE: APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO
SEEK BIDS FOR THE SAN GABRIEL BRIDGE OVERPASS AT THE POMONA
FREEWAY
The subject project involves the widening of the existing San Gabriel
Boulevard bridge over the Pomona Freeway. The bridge will be widened
from 53 feet to 84 feet with a curbed median. Project construction,
including procurement of the bridge panels, is expected to take nine
months.
The proposed schedule for construction is as follows:
Receive Bids
Award Contract
Begin Work
Complete Work
The specifications have been reviewed and are acceptable to the City
Engineer. The Engineer's estimate for construction is $640,000.
It is recommended that the city Council approve the plans and
specifications and authorize advertisement for bids by the City
Clerk.