Loading...
MIG, Inc......................... ef. ALA to T-4 E. T 41, 0 SUBMITT @D BY MIG, Inc. -JURCUM Fullerton, CA 92832 (714) 871 -3638 IN ASSOCIATION WITH Willcian Financial Leisure Vision G) 0- 0 1 RMYS, RECREMMONIUD CgEME96% L F&CLOMM WZMWER PLAN PUBLOC OPEN W&CE&ND VRML F EEO DOLOTY SUUDV M G David Montgomery -Scott November 13, 2008 Parks & Recreation Director City of Rosemead 8838 E. Valley Boulevard Rosemead, California 91770 Re: City of Rosemead Park, Recreation and General Facilities Master Plan Dear Mr. Montgomery -Scott and Selection Committee Members: MIG, Inc., in association with Willdan Financial, Leisure Vision and Crane Architectural Group (the MIG Team), is pleased to submit this proposal to prepare an update to the City's Park, Recreation and General Facilities Master Plan. Our team will work with you to create a master plan for the City that contributes to community livability and vitality, is financially sustainable and is responsive to the City's dynamic population. The MIG Team understands that Rosemead is celebrating its first half - century of incorporation and during that time the city has grown 280% in population. According to the latest General Plan Update, the City is expecting a signif- icant population growth in the next 20 years. Therefore, it needs to know how it is going to manage the recreational needs of those residents and retain a high quality of life for its diverse citizenry. MIG is well known for successfully implementing community- supported park and recreation plans that serve as a resource for future development and redevelopment. Since 1981, MIG has completed over 100 park, recreation and facilities master plans for cities as small as 2,000 and as large as one million residents. Our interdisciplinary approach in all areas of municipal government, combined with our extensive experience in park and recreation planning and design contributes to the usability and success of our plans. The MIG Team offers the City of Rosemead the following strengths: • An extensive track record in diverse communities uniting residents in support of a master plan by successfully identifying a common vision for the future; • Proven techniques for assessing community and facility needs that provide a detailed and defendable park, recreation facility and program analysis; • Practical knowledge regarding park and facility operations and maintenance, and how to plan to achieve an acceptable maintenance level of service; • Public financing expertise to ensure the plan can be implemented; and • Accessible, available professional staff who are dedicated to meeting your needs. The MIG Team is excited about the opportunity to work with the City of Rosemead to prepare this master plan, and we look forward to sharing our ideas and approach with you in person. This proposal is valid for a period of 90 days. If you have any questions or would like to request additional information, please do not hesitate to contact me at (714) 871 -3638, extension 113 or jimp @migcom.com. Sincerely, Jim Pickel, ASLA Principal 801 N. Harbor Boulevard • Fullerton, CA 92832 • 714.871.3638 • fax 714.871 .1188 • www.migcom.com Offices in Berkeley, Fullerton, Pasadena and Davis, CA • Eugene and Portland, OR • Raleigh, NC 0 0 0 0 0 0 • 0 0 0 • 0 0 0 • • 0 0 0 • • • 0 • • 0 0 0 0 0 0 0 0 0 • M I G table of contents SECTIONONE qualifications about mig 1.1 about willdan financial 1.3 about leisure vision 1.4 about crane architectural group 1.5 team introduction and organization 1.6 key staff 1.8 SECTIONTWO project approach scope of work - park, recreation and general facilities master plan 2.1 scope of work - trail system feasibility study 2.11 project schedule 2.15 SECTIONTHREE related experience mig projects & references 3.1 willdan financial projects & references 3.8 leisure vision projects & references 3.9 crane architectural group projects & references 3.12 SECTION FOUR compensation and fee schedule introduction 4.1 park, recreation and general facilities master plan 4.2 trail system feasibility study 4.5 SECTION FIVE additional information proposed alternative schedule and budget 5.1 testimonials 5.4 Rosemead Parks, Recreation and General Facilities Master Plan I TABLE OF CONTENTS �' i • • • • • • • • • • • • • • • • • • • ,; i j l �� 1' '� f�i i M G qualifications ABOUT MIG Primary Contact Person Jim Pickel, ASLA, Principal 801 N. Harbor Boulevard Fullerton, CA 92832 ph: (714) 871 -3638 fx: (714) 871 -1188 email: jimp@migcom.com MIG, Inc. builds custom - tailored and action- oriented park, recreation and facilities plans that help communities realize their vision, goals and aspirations. With backgrounds in community involvement, planning, park design, organiza- tional development and financing, MIG's multi- disciplinary team has developed park and recre- ation comprehensive and strategic plans for over 100 communities. These plans have resulted in stronger communities, sustainable environments, healthy lifestyles and energized organizations. In our 27 years of operation, MIG has completed park master plans for cities as small as 2,000 people to as large as one million throughout the western and midwestern United States. MIG has offices in Fullerton, Pasadena, Berkeley and Davis, California; Portland and Eugene, Oregon; and Raleigh, North Carolina. Our financial stability and health is evident in the range of clients we have supported with our services and the successful completion of projects across the country. Areas of Expertise Comprehensive Planning MIG develops comprehensive park and recre- ation master plans that address park facilities, open space and trails, and habitat and watershed restoration. Our plans also address programs and services, partnerships, maintenance, and management, including identification of future staffing needs and funding strategies. MIG staff utilize a benefits -based approach to park and recreation planning, and incorporate substantial public involvement into each project to tailor each plan to community desires. Strategic Planning MIG provides organizational development and strategic planning services for park and recre- ation agencies based on a thorough exploration of lessons learned, existing conditions, and future opportunities and trends. MIG emphasizes collab- orative thinking and problem solving; linking resource allocation to organizational values, goals, and objectives; and developing effective perfor- mance and progress measures. Community Outreach and Involvement MIG provides an engaging, multi - leveled community participation process that involves both users and non -users in determining future park and recreation services. MIG's communi- cation and facilitation skills ensure an effective process aimed at increasing public awareness and confidence, and building future support for an agency's activities and funding needs. Our in -house graphics studio and editorial staff produce materials in a range of media to support planning and design processes, such as reports, presentations, web sites, press releases, and newsletters. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.1 M G qualifications ABOUT MIG Recreation Programs and Community Services MIG develops needs assessments and strategic plans for recreation and community services, and conducts recreation program evaluations. Our staff translates desired benefits and outcomes, such as increasing adult role models, into program plans that reflect community needs and desires. MIG explores various delivery systems for service implementation, including partnerships, sets revenue goals, and develops a plan for measuring and tracking outcomes. Quantifying Park & Facility Needs Through the years, we have improved our planning approach to the point where we can now quantify the amount of park land or number of recreation facilities needed for any specific community. By using information from past surveys and from mathematical models we have developed in the past, we can create demand standards specifically for the Rosemead community. Park Maintenance and Operations MIG has extensive experience in park mainte- nance and operations. In addition to tracking maintenance costs and personnel requirements for western communities, MIG has prepared park maintenance management plans, opera- tional audits, and personnel and management recommendations. MIG staff have taught park maintenance classes for many years at the Pacific Northwest Park Maintenance School, including classes on how to reduce maintenance costs through park design. Feasibility Studies and Funding Options Understanding the economic impacts of new and renovated facilities is essential for a successful project. MIG offers years of experience developing accurate operation and maintenance expense projections and revenue estimates for parks and recreation agencies. We also can assist in identi- fying partnering opportunities and funding options for capital and operating expenses. GIS Analysis and Mapping MIG offers substantial experience in GIS analysis and mapping, including demographic, network, and spatial analysis, data collection and production, database development and design, and cartography. We produce maps that are attractive, easy -to- understand and provide critical analysis that lead to informed decision - making. Landscape Architecture MIG has a proven track record in innovative and award - winning landscape design. We provide a full range of services, including programming, concept and schematic design, feasibility analysis, and construction documentation and admin- istration. We have broad experience in the design of sustainable outdoor environments that integrate the needs of people with the protection of the environment, contribute to community livability, and enhance people's ability to lead healthy lifestyles. Our work includes parks; sports complexes; trails, greenways, open space, and natural areas; and children's environments. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.2 MINI- `t qualifications ABOUT WILLDAN FINANCIAL Willdan Financial 1700 Broadway, Sixth Floor Oakland, California 94612 ph: (800) 755 -MUNI (6864) 1 fx: (888) 326 -6864 Contact Person Jeff Kay, Project Manager jeffk@muni.com Willdan Financial Services, a division of Willdan Group, Inc., is a financial and economic consulting firm. Their clients include cities, counties, and special districts in more than 35 states. They serve as an extension of our clients' staff, providing such services as: ■ Economic studies, such as fiscal analyses of new development, proposed annexations and incor- porations, and development impact fees; ■ Financial studies to identify funding sources or to determine optimal utility rates, standby charges and cost of services; ■ Municipal disclosure reports preparation and dissemination; • Arbitrage rebate calculations; • Administration of special taxes, assessments, standby charges and utility rates; and • District formation services for capital projects, assessment /local improvement districts, community facilities districts, landscaping and lighting districts, and special taxes. uvt ���A tv They serve as an extension of their clients' staff, augmenting existing personnel by providing specialized expertise. In support of this, their staff members regularly write articles and conduct presentations for local, state and national organi- zations. They hold client workshops, and conduct onsite training throughout the year to assist clients in keeping abreast of the latest developments, while helping new agency staff understand our services. The success of Willdan is based on a corporate philosophy of personal service. They provide support throughout the year — and for years after. Clients can be assured that they can be reached should any questions or issues arise. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.3 qualifications ABOUT LEISURE VISION Leisure Vision 725 W. Frontier Circle Olathe, Kansas 66061 ph: (913) 829 -1215 Contact Person Ron Vine, President rvine@etcinstitute.com The ability to effectively listen and involve citizens and clients has given Leisure Vision a reputation as one of the premier public policy market research firms in the country. Leisure Vision's services focus on involving citizens, users, and stakeholders in the decision making process and developing creative and sustainable funding strategies. Core services of the firm involve conducting statistically valid phone and mail /phone services and related market research. They have conducted more than 500 surveys for parks and recreation systems in 46 states across the country for a wide variety of projects including parks and recre- ation master plans, strategic plans and feasibility studies. Since 1992, the principals and associates of Leisure Vision have helped secure funding for more than $1 billion of parks and recreation projects. The firm has extensive experience conducting surveys as components of plans leading to successful voter elections. Leisure Vision's work allows the community to see itself in their planning efforts, providing buy -in and trust in the process. ETC Institute. is the parent company of Leisure Vision. ETC Institute is a 62- person market research firm that specializes in the design and administration of market research for state and local governmental organizations. Areas of emphasis include: community attitude surveys; citizen satisfaction surveys; employee surveys; focus groups; and stakeholder interviews. The company is woman -owned and certified as a Disadvantaged Business Enterprise (DBE). Since 1982, ETC Institute has completed research projects for city and county governments in 46 states. ETC Institute has designed and adminis- tered more than 1,500 statistically valid surveys and our team of professional researchers has moderated more than 700 focus groups and 1400 stakeholder meetings. Internal Capacity and Resources Unlike many firms who outsource data collection activities, Leisure Vision /ETC Institute has in -house capabilities for performing all data collection tasks. This provides their clients with two advantages. First, they are able to directly control the scheduling of all research activities to ensure that all surveys are completed on time. Second, their senior research professionals are able to directly monitor the administration of the survey, which allows their team to understand anomalies in the data collection process which could later compromise the analysis and interpre- tation of the data. Leisure Vision /ETC Institute's in -house resources will allow the project team to monitor all phases of the survey administration process, which will ensure that the highest standards of quality are maintained. In -house services include: ■ Mail Center; ■ Call Center; and ■ Foreign Languages translation and telephone recruitment services for Spanish, French, and various Asian languages. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.4 N1- 1 G qualifications ABOUT CRANE ARCHITECTURAL GROUP Crane Architectural Group 110 E Wilshire Ave, Suite 300 Fullerton, CA 92832 ph: (714) 525 -0363 Contact Person Richard Crane, AIA, President crane@cranearchitecturalgrp.com Crane Architectural Group is a service - oriented architecture and planning firm with a team of dedicated professionals providing services to a broad spectrum of the building industry, including governmental and park and recreation agencies and private developers. The firm is committed to design excellence and responsive architecture. Crane Architectural Group provides architecture and planning services that include land planning, site analysis, programming, feasibility studies, ADA studies, construction cost estimating, building design, construction documents, govern- mental processing, project bidding and negoti- ation, and construction contract administration and observation. Crane Architectural Group has a strong working relationship with members of the MIG Team and has worked with MIG on numerous projects over the past 15 years. Mr. Crane, the founding principal, involves himself directly in each phase of a project. His hands -on approach guarantees effective communi- cation between client and architect. Mr. Crane has designed many recreational and commercial projects. In addition, he has directed the design and planning of community centers, outdoor amphitheatres, senior centers, sports complexes, and office buildings. His comprehensive background in design and planning serves as the outstanding element in their architectural team. CRANE ARCHRECTURA! GROUP _ innavalibm in ArWedure BOER AVF,0Y300 114&5= Serving in the past as chairman of the City of Fullerton's Redevelopment Design Review Committee, Mr. Crane provided consulting services for the design of educational centers, recreation facilities, sports complexes, community centers and a variety of office buildings. Committed to participating in civic and profes- sional organizations, Crane Architectural Group has been or is currently active in the City of Fullerton's Planning Commission, the American Institute for Architects, the International Conference of Building Officials, the National Trust for Historic Preservation, the American Planning Association, Fullerton Heritage and the Rotary Club of Fullerton. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.5 qualifications TEAM ORGANIZATION MIG has assembled a team of highly qualified park and recreation professionals to develop the Rosemead Parks, Recreation and General Facilities Master Plan as well as the Trails Feasibility Study. Jim Pickel, ASLA, a firm principal with over 27 years of experience in recreation and community planning, will serve as Principal -in- Charge, providing quality control and consultation on process management and strategy. Maxine Surks will be our Project Manager, bringing to this project her extensive experience in all areas of landscape architecture and master planning. Ms. Surks will coordinate the team's work efforts as well as provide analysis and writing. Technical Advisor Cindy Mendoza brings a wealth of experience in park and recre- ation planning to assist Mr. Pickel and Ms. Surks with project administration, data gathering, analysis, public outreach and documentation. To complement our resources and expertise, we are pleased to have Bob Spencer, Jeff Kay, AICP, and Carlos Villarreal of Willdan Financial to develop solid funding and financial strategies for the Plan. Ron Vine and Dr. Elaine Tatham of Leisure Vision are available to provide expert telephone survey services. Finally, Richard Crane, AIA, and Steve Kalthoff of Crane Architectural Group will provide analysis of facilities buildings. Each have had a long and successful working relationship with MIG on similar projects in California. This proven MIG Team will be supported as needed by our in -house staff of planners, landscape architects and facilitators. An organi- zation chart showing the structure and responsi- bilities of the MIG Team is presented on the next page. Resumes for key personnel from the MIG Team are presented beginning on page 1.8. The staff members on the MIG Team will be fully devoted to completing your project on time and on budget. MIG has a 27 -year track record of successfully managing park and recreation planning and design projects. We have developed project coordination and cost control mechanisms to ensure timely delivery of services in a cost- effective manner. Prior to commencing work on the project, MIG will refine the detailed work plan and schedule to illustrate the project on a task -by -task basis, making clear the project's critical path, key deadlines and checkpoints, and the responsibilities of each team member. Work will be reviewed weekly by Mr. Pickel and Ms. Surks, and through regularly scheduled project team meetings to ensure work quality and the appropriate allocation of staff time and project resources. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.6 0 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • /vl M qualifications TEAM ORGANIZATION COMMUNITY OUTREACH & NEEDS ASSESSMENT Maxine Surks Jim Pickel Cindy Mendoza MIG PROJECT MANAGEMENT Jim Pickel, ASLA Principal -in- Charge Maxine Surks Project Manager MIG INVENTORY, MASTER FUNDING AND COMMUNITY FACILITIES & PLANNING & FINANCIAL TELEPHONE PROGRAM DOCUMENTATION STRATEGY SURVEY EVALUATION Maxine Surks Jim Pickel Jeffrey Kay Ron Vine Jim Pickel Maxine Surks Robert Spencer Elaine Tatham Cindy Mendoza Cindy Mendoza Carlos Villarreal Leisure Vision MIG MIG Willdan Financial Richard Crane, AIA Steve Kalthoff Crane Architectural Group MIG TEAM RESOURCES Landscape Architecture, Recreation Planning, Public Outreach, Meeting Management and Facilitation, Communications and Graphic Design Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.7 I M WG: qualifications KEY PERSONNEL - MIG Jim Pickel, ASLA Principal -in- Charge Education Bachelor of Science in Landscape Architecture, California State Polytechnic University Professional Registrations Landscape Architect: CA #4385, TX #2171 Qualifications Jim Pickel has over 27 years of experience in park design, park and recreation planning, landscape architecture, and urban design. He has completed a wide range of projects including park and recre- ation master plans, sports complexes, streetscapes, and commercial, industrial and residential devel- opments. He has extensive experience in project management, site design and analysis, plan check review, public meeting facilitation, construction documentation, and construction administration. As Principal, Mr. Pickel has led the development of parks and recreation master planning projects for the Cities of Bakersfield, Stanton, Perris, Santa Paula, Diamond Bar, Murrieta, Chula Vista, Irvine, Ontario, and Moorpark, California. Mr. Pickel served on the Board of Directors for the California Parks and Recreation Society, District Ten, and was a Park and Recreation Commissioner for the City of Yorba Linda. He is currently a member of the Yorba Linda Planning Commission and serves as a faculty member in the Landscape Architecture Program at the University of California, Los Angeles Extension. Relevant Experience • Bakersfield Recreation and Parks Master Plan, Bakersfield, California • Ontario Parks and Recreation Master Plan, Ontario, California • Perris Parks and Recreation Master Plan, Perris, California • Rosita Park Master Plan, Santa Ana, California • McFarland Recreation and Parks Master Plan, McFarland, California • Diamond Bar Parks and Recreation Master Plan, Diamond Bar, California • Murrieta Parks and Recreation Master Plan, Murrieta, California • Santa Barbara Sports Field Master Plan, Santa Barbara, California • Big League Dreams, Redlands, California • Big League Dreams, League City, Texas • Irvine Building Master Plan, Irvine, California Professional Affiliations • California Park and Recreation Society • Southern California Municipal Athletic Federation ■ American Society of Landscape Architects ■ Current Faculty, UCLA Extension Landscape Architecture • American Planning Association • American Institute of Architects Rosemead Parks, Recreation and General Facilities Master Plan l PAGE 1.8 qualifications KEY PERSONNEL - MIG Maxine Surks Project Manager Education Landscape Architecture Professional Certificate, UCLA Extension, Los Angeles, California Certificate in Multimedia /Web Design, Pasadena City College Bachelor of Arts, English /Writing, California State University, Northridge Qualifications Maxine Surks has extensive experience in all areas of landscape architecture and master planning for the development of parks and recreation master plans and other significant design projects in Southern California. She has proven experience managing projects from the conceptual design phase through construction. Prior to joining the firm in 2003, Ms. Surks was employed by the County of Los Angeles Department of Parks and Recreation in the Planning Division, where she assisted in ADA documentation and compliance with Federal and State requirements for facility accessibility; county trails mapping; park facility design; planting plans and cost estimation. Before entering the field of landscape archi- tecture, Ms. Surks spent 13 years as a corporate communications professional, producing internal and external publications, providing writing and editing support to management, designing graphic materials, participating in strategic planning and serving as an in -house consultant for graphic and publishing software program use for such companies as Great Western Financial Securities and California Federal Bank. Relevant Experience • Bakersfield Recreation and Parks Master Plan, Bakersfield, California • Moorpark Parks.and Recreation Master Plan, Moorpark, California • Santa Paula Parks and Recreation Master Plan, Santa Paula, California • Perris Trails Master Plan Update, Perris, California • West San Gabriel River Parkway, Long Beach, California • McFarland Recreation and Park District Master Plan, McFarland, California • Burris Basin Recreation Area, Anaheim, California • William S. Hart Union High School District Master Plan, Santa Clarita, California • Fullerton Lemon Street Underpass and Fullerton Park Renovation Project, Fullerton, California McCoy Equestrian Facility, Chino Hills, California ■ North Long Beach Street Enhancement I & II, Long Beach, California ■ Victoria Avenue Beautification, San Bernardino, California Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.9 qualifications KEY PERSONNEL - MIG Cindy Mendoza Technical Advisor Education Master of Arts, Cultural /Behavioral Geography, University of Oregon Bachelor of Science, Geography, minors in Environmental Studies and English, James Madison University Qualifications Cindy Mendoza specializes in comprehensive and strategic planning for parks and recreation. She has assisted in developing plans for commu- nities of all sizes, from Tacoma, Washington to Arcata, California. A geographer by education, Ms. Mendoza's background includes training and experience in recreation and youth services. Her strengths include her ability to synthesize environ- mental, cultural and behavioral information in order to develop and write clear, customized plans that reflect the needs and values of a community. Ms. Mendoza served as the Project Manager of the Albany Park and Recreation Master Plan. She helped identify recreation needs through a public involvement program, including a needs assessment survey, community fair, recreation providers focus group meeting, and sports group questionnaire. She also helped promote a new vision for parks and recreation based on community collaboration, coordinated planning, and partnerships. Through discussions with key staff and with input from the Technical Advisory Committee, she helped create an affordable five - year capital facilities plan and recommendations to revitalize park facilities; acquire new parks to serve underserved areas; increase trail - related recreation, riverfront access, and park connec- tivity; and meet sport facility needs. Relevant Experience • Arcata Parks and Recreation Master Plan, Arcata, California • Sunnyvale Parks and Recreation Master Plan, Sunnyvale, California • Gresham Parks and Recreation Master Plan, Gresham, Oregon • Leisure Services Plan, Medford, Oregon • Park and Recreation Master Plan, Albany, Oregon • Timber Linn Park Master Plan, Albany, Oregon • Presidio Trails and Bikeways Master Plan, Golden Gate National Recreation Area, San Francisco, California • Pierce County Parks, Recreation, and Open Space Plan, Pierce County, Washington • Metro Parks Tacoma Strategic Parks and Program Services Plan, Tacoma, Washington • Parks, Recreation and Open Space Plan, DuPont, Washington • Park, Recreation and Open Space Plan, West Linn, Oregon • Parks and Recreation Master Plan, Wilsonville, Oregon • Parks, Recreation and Open Space Comprehensive Plan, Eugene, Oregon • Park and Recreation Plan, Spokane Valley, Washington • Willamalane Park and Recreation Comprehensive Plan, Springfield, Oregon • Livingston Park and Recreation Master Plan, Livingston, California • Carmel -Clay Parks and Recreation Master Plan, Carmel -Clay, Indiana Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.10 Robert D. Spencer Principal Consultant Robert D. Spencer is a Principal Consultant in the Financial Consulting Services group at Willdan Financial Services. He is an economist with extensive experience assisting public agencies with the development of sound financial and economic policies. Much of his work is related to infrastructure financing and public services funding to serve a community's growth or revitalization. Based on this expertise, Mr. Spencer has assisted agencies with land use policy, growth management, economic development, and business regulation. Comprehensive Funding and Financing Plans Mr. Spencer has prepared funding and financing plans for proposed development projects, specific plans, and master plans. His plans provide a strategy for financing backbone facilities, integrating various funding sources, and allocating costs fairly across all benefiting land uses. Recent significant projects include: • Led a series of studies for City of Santa Rosa to evaluate the financial status of over $400 million in development - related capital improvement programs and develop a strategy to address the need for substantial additional funding. • Prepared a public facilities financing plan for the Oasis Road Specific Plan for the City of Redding. The plan required $100 million in funding including $50 million in financing for backbone facilities to accommodate 2,500 dwelling units and 3.1 million square feet of retail use. • Advising Tehama County and Sutter County on public facilities financing and urban services funding plans. The Tehama project included 3,700 dwelling units and the Sutter project included 17,500 units and 50 million square feet of commercial and industrial space. • Preparing wastewater financing plans for the City of Stockton to fund $80 million in infrastructure to serve developing areas, including development projections, cash flow modeling, and connection fee justification to fund debt service on wastewater revenue bonds. Development Impact Fee Programs Mr. Spencer is one of California's leading experts on development impact fee programs. He has been engaged by over 100 cities, counties, special districts, and school districts to assist with fee WILLDAN Financial Services 20 Years of Experience Areas of Expertise ■ Infrastructure Funding and Financing • Public Services Funding • Economic Analysis Education ■ Master of Public Policy, John F. Kennedy School of Government, Harvard University, with a concentration in Urban Economic Development ■ Bachelor of Arts in Economics, Colorado College Professional Affiliations • Urban Land Institute • National Impact Fee Roundtable Recent Teaching and Speaking Experience ■ National Impact Fee Roundtable, moderator and speaker (various topics), 2002 -2007. ■ "Stormwater Funding Strategies," Regional Water Quality Control Board Workshop, April 23, 2008. ■ "Takings and Exactions: Imposing Conditions on Development Without 'Going Too Far," University of California at Davis Extension, 2002- 2004. • "Effective Local Approaches for Promoting Smart Growth: Financing and Planning Strategies," Urban Land Institute and the Association of Bay Area Governments, September 26, 2003. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.11 W a—J WILLDAN VAFinancial Services programs to fund a wide range of public facilities: • Utilities (water, wastewater and storm drainage); • Streets, transit, bicycle and pedestrian facilities; • Public works, fire, police, and administrative facilities; • Parks, open space, and habitat conservation; and • Affordable housing. Mr. Spencer's assistance to local agencies includes preparation of capital improvement plans, documenting statutory nexus findings, facilitating stakeholder involvement, and analyzing economic impacts of fee programs. He has supported adoption of regional fee programs that require the participation of multiple jurisdictions. Mr. Spencer has provided expert advice to the plaintiff (City of Stockton) in a court case regarding a sewer connection fee that settled prior to trial. Recent significant projects include: • Development of regional transportation fee programs for two counties and five cities in Shasta and Tehama counties to widen Interstate 5. • Comprehensive update to City of Fresno's urban growth management (impact) fee program including fire, police, parks, and traffic facilities. Fiscal Impact Analysis Mr. Spencer has managed over 50 fiscal impact studies for a broad range of public agencies. He assists clients in understanding the fiscal impacts of land use policy decisions. Mr. Spencer has played the role of "honest broker," providing objective analysis to multiple agencies in property tax sharing negotiations for annexations and incorporations. Recent significant projects include: • Fiscal impact analysis of the Delhi Specific Plan for Merced County for 3,200 dwelling units and 3.2 million square feet of commercial and industrial space. • Ongoing fiscal impact analysis services for the City of Roseville for the past 15 years related to general plan updates, re- zonings, specific plans, annexations, and voter initiatives. • As a technical advisor and principal provided fiscal impact analysis of alternative development strategies and tax sharing negotiations support for Sacramento County related to city incorporations and annexations. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.12 Jeffrey Kay, AICP Project Manager Jeffrey Kay is a Project Manager in Willdan's Financial Consulting Services' Oakland office. His responsibilities include supervising analysts on development impact fee studies and preparing fiscal impact analyses. Prior to joining Willdan, Mr. Kay worked as a research analyst for the Urban Strategies Council in Oakland. His responsibilities included collecting and analyzing statistical data from a variety of sources pertaining to economic opportunity, housing, crime and real estate development in the Bay Area. Capital Improvement Programs and Infrastructure Financing Shasta County Regional Transportation Planning Agency; Regional Traffic Impact Fee Program for Mainline Interstate 5: Development of a regional transportation fee for 2 counties and 5 cities in Shasta and Tehama counties to contribute to a $546 million widening project on Interstate 5. Project included a survey of development costs across all partner jurisdictions, development of a phased capital improvement program, and an extensive public outreach effort. County of Kern: Capital improvement plan and associated funding plan for 9 facility categories, including parks, documenting over $900 million in public facility needs through 2030. City of Redding: Public facilities financing plan for the Oasis Road Specific Plan. The plan required $100 million in funding including $50 million in financing for backbone facilities to accommodate 2,500 dwelling units and 3.1 million square feet of retail use. Development Impact Fees Counties of Shasta, Tulare and Yolo: Prepared analysis and documentation for countywide development impact fee programs covering a comprehensive range of facility categories. City of Long Beach: Prepared impact fee study for public safety (police, fire, and dispatch) facilities and an associated fee burden analysis that assessed the costs of development in eight cities. County of San Diego: Conducted multi - jurisdictional, regional impact fee study for transportation improvements. City of Shasta Lake: Conducted a development impact fee update for parks and recreation facilities. City of Soledad: Conducted a comprehensive development impact fee update for eight facility categories. WILLDAN Financial Services 4 Years Experience Areas of Expertise ■ Public Facilities Financing ■ Development Impact Fees ■ Fiscal Impact Analyses Education • Master of Regional Planning; University of North Carolina, Chapel Hill, Dual Concentrations in Regional Economic Development and Community Development ■ Bachelor of Arts, Political Science, Vassar College (Correlate Sequence: Urban Studies) Professional Affiliations • American Planning Association • American Institute of Certified Planners Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.13 Jonathan Young Senior Project Analyst Mr. Jonathan Young is a Senior Project Analyst in Willdan's Financial Consulting Services' Oakland office.Mr. Young has experience developing technically sound and defensible development impact fee programs, as well as putting impact fees in the larger context of public facilities financing. Related Experience County of Kern: Prepared analysis and documentation to establish County impact fees for the first time. Fee categories include public protection, sheriff patrol and investigation, animal control, fire, library, community and regional parks, public health, general government, and waste management. City of Rio Vista: Provided a comprehensive update of City's existing impact fee program to reflect current facility plans and growth projections. The City's impact fee program included police, fire, parks, traffic, and municipal facilities. County of Shasta and City of Redding: Provided fee documentation to establish impact fees to fund county facilities. Calculated development impact fees for justice system, public health, libraries, parks and open space, sheriffs department, traffic, and general government facilities. City of Coachella: Impact fee program for multiple public facilities including traffic, public safety, and libraries. City of Gustine: Updated impact fees for water, sewer, storm drainage, fire, police, parks, and general government. City of Rolling Hills Estates: Documented impact fees to fund traffic, park, library, and streetscape improvements. City of Soledad: Based on the findings of a new storm drainage master plan, calculated updated storm drainage impact fees. City of Oceanside: Calculated impact fee to fund development of a major new park facility. City of South Gate: Established new traffic impact fee program for arterial and traffic signal improvements. WILLDAN MEFinancial Services 4 Years Experience Areas of Expertise • Development Impact Fees • Fiscal and Economic Analysis • Funding and Financing Plans Project Highlights • County of Kern • City of Rio Vista • County of Shasta and City of Redding Education ■ Bachelor of Arts, Economics, Carleton College Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.14 RESUMES OF KEY PERSONNEL RONALD A. VINES PRESIDENT LEISURE VISION VICE-PRESIDENT ETC INSTITUTE 1999-PRESENT Education M.S., Leisure Services Administration, University of Illinois, 1975 B.S., History, University oflllinois, 1973 For more than 30 years, Mr. Vine has strategically involved citizens and clients into decision making processes that affect their lives, with these efforts resulting in over $1.3 billion of voter approved initiatives for a wide range of parks and recreation initiatives. Mr. Vine has worked on over 600 public opinion surveys and strategic planning and consulting assignments for a wide variety of parks and recreation master plans, strategic plans and feasibility studies for community centers, family aquatic centers, ice - rinks, trails, etc. He has extensive highly successful experience assisting communities with projects leading to sales tax and other tax referendums. Mr. Vine has directed survey efforts in 46 states across the United States, with public sector clients of various sizes ranging up to over 4 million populations. Mr. Vine is skilled in both the use of quantitative phone and mail survey research efforts and qualitative research. He has served as a facilitator for over 500 stakeholder interviews, focus groups, public forums and consensus building workshops. Ron is considered one of the nation's leading experts in the use of benchmarking research to assist communities in understanding the results of their citizen survey data, developing realistic performance measurements, and short and long range strategic decision - making and in the development of strategic planning initiatives to successfully pass voter initiatives. Prior to starting work as a private consultant in 1989, Mr. Vine worked for 15 years in a series of high level governmental administrative positions, including serving as the Chief Administrative Officer for the City of Topeka, Kansas where he managed a work force of over 1,200 municipal employees as well as an operations and capital budget in excess of $200 million. In this position, he was one of the first municipal officials in the country to embrace the development of public /private and non - profit partnerships, and the establishment of creative funding strategies such as public foundations as a tool for addressing community needs. Mr. Vine's unique experience in the public, non - profit, and private sectors have proven to be of tremendous benefits to his clients. Leisure Vision Key Personnel - 1 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.15 RESUMES OF KEY PERSONNEL Mr. Vine has considerable experience conducting quantitative and qualitative research for large scale planning studies involving other design, planning and economics consultants. He is a recognized expert in the financial operations of public governments and non - profits and is particularly skilled in the development of innovative public private partnerships to provide needed customer services, while reducing the tax costs to construct and operate facilities. Mr. Vine has managed Market Research Surveys for over 600 parks and recreation projects including: Aberdeen (SD) Elk Grove (IL) Naperville (IL) St. Louis County (MO) Aiken (SC) Fort Wayne (IN) New Haven (CT) St. Paul (MN) Albemarle County (VA) Fulton County (GA) Normal (IL) South Burlington (VT) Arlington County (VA) Greenville CT (SC) Northville (MI) Springdale (AR) Atlanta (GA) Henderson (NV) Oakland County (MI) State of Connecticut Bend (OR) Huron (OH) Palm Desert (CA) State of Rhode Island Bloomington (IN) Kansas City (MO) Park City (UT) Superior (CO) Boonville (MO) Kettering (OH) Peoria (AZ) Tempe (AZ) Canon City (CO) Key Biscayne (FL) Platte County (MO) The Woodlands (TX) Carol Stream (IL) Las Vegas (NV) Portland (OR) Tyler (TX) Cedar Rapids (IA) Lawrence (KS) Pinellas County (FL) Union County (PA) Champaign, IL Lee Summit (MO) Richmond (VA) University Place (WA) Chandler (AZ) Lemont (IL) Rock Island (IL) University of Missouri Claremont (NH) Lindenhurst (IL) San Diego (CA) Wake County (NC) Columbia (MO) Los Angeles (CA) San Francisco (CA) Westchester Ct. (NY) Deerfield (IL) Mecklenburg CT (NC Sheridan (WY) Wheeling (IL) Denver (CO) Miami (FL) Shoreline (WA) Winnetka (IL) E. Baton Rouge (LA) Morris County (NJ) St. Charles Ct. (MO) Mr. Vine is a regular speaker at numerous state and national conferences and workshops on conducting statistically valid surveys for public and non - profit projects and using survey feedback in strategic planning, master planning, voter elections, and short and long range decision making. Mr. Vine is currently serving as a Vice - President of ETC Institute and President of Leisure Vision. Under his leadership, the firm has completed more than 600 surveys for public, non- profit, and private sector clients in 46 states across the country. The firm is recognized as a national leader in the strategic use of public input for strategic planning, customer satisfaction and importance identification, performance measurements, funding decisions, benchmarking, and strategic decision making. Leisure Vision Key Personnel - 2 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.16 RESUMES OF KEY PERSONNEL DR. ELAINE TATHAM, PRESIDENT, ETC INSTITUTE PARENT COMPANY OF LEISURE VISION Education M.B.A., Management, Kansas State University, 1996, first in class Education Ed. D., Educational and Psychological Research, University of Kansas, 1971 M.A., Mathematics, University of Kansas, 1960 B.A., Mathematics, Carleton College, 1958 Professional Affiliations Olathe Medical Center Board of Trustees, member. National Association of Women Business Owners Institute of Management Consultants (New York City) Mathematical Association of America; served as president of the Kansas Section from 1979 -80 City of Olathe, KS, Planning Commission, 1982 to 1992; served as chair 1987 -88 Mid - America Regional Council: Urban Core Growth Strategies Committee (1991 -92) Citizens' Advisory Committee to the Kansas City Power & Light Company (1982 -1990) Experience Dr. Tatham serves as the President of ETC Institute, the parent company of Leisure Vision. She has served as the project manager and /or research manager on over 1,500 public opinion surveys across the country for a wide range of public, non - profit, and private sector clients. Research efforts she has lead have included projects related to customer satisfaction research; transportation research; public utilities research; libraries research; children's education and social welfare research; health care research; parks and recreation research; non - profit research, etc. Dr. Tatham has both the experience and academic credentials to design and administer all aspects related to research projects including: research design, information management, statistical applications, and analysis, quality control of research processes, and make a final assessment of the results. She is a certified management consultant through the Institute of Management Consultants (New York City). She was for 20 years an adjunct lecturer in the University of Kansas graduate Engineering Management program. Her specialties include operations research, forecasting, and system simulation for management decision - making. Leisure Vision Key Personnel - 3 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.17 RESUMES OF KEY PERSONNEL Dr. Tatham was a member of the Olathe Planning Commission for almost ten years and served as chair of the commission. She is currently a member of the Board of Directors for Olathe Medical Center and serves as chair of the patient satisfaction committee. She has been instrumental in the design and successful administration of patient satisfaction surveys for more than a dozen health related organizations. Dr. Tatham has served as the research manager for over 700 governmental organizations during the past five years including: Aberdeen (SD) E. Baton Rouge (LA) New Haven (CT) State of Kansas Aiken (SC) East Providence (RI) Normal (IL) State of Missouri Albemarle County (VA) Elk Grove (IL) Northville (MI) Arlington County (VA) Fort Wayne (IN) Oakland County (MI) Atlanta (GA) Fulton County (GA) Palm Desert (CA) Auburn (AL) Greenville CT (SC) Park City (UT) Bend (OR) Henderson (NV) Peoria (AZ) Bloomington (IN) Huron (OH) Platte County (MO) Blue Springs (MO) Kansas City (MO) Portland (OR) Boonville (MO) Kent (WA) Pinellas County (FL) Broward County (FL) Key Biscayne (FL) Richmond (VA) Canon City (CO) Las Vegas (NV) Rock Island (IL) Cedar Rapids (IA) Lawrence (KS) Rutland (VT) Champaign, IL Lee Summit (MO) San Francisco (CA) Chandler (AZ) Lindenhurst (IL) Sheridan (WY) Claremont (NH) Lucas County (OH) Shoreline (WA) Columbia (MO) Miami (FL) St. Charles Ct. (MO) Deerfield (IL) Mundelein (IL) St. Louis County (MO) Denver (CO) Moon Township (PA) St. Paul (MN) Des Moines (IA) Morris County (NJ) South Burlington (VT) Durham (NC) Naperville (IL) Springdale (AR) State of North Carolina State of Rhode Island State of South Carolina State of South Dakota Superior (CO) Tempe (AZ) Temple (TX) Tucson (AZ) The Woodlands (TX) Tyler (TX) Union County (PA) University Place (WA) University of Missouri Wake County (NC) Westchester Ct. (NY) West Des Moines (IA) Wheeling (IL) Winnetka (IL) Yuma (AZ) Dr. Tatham is currently serving as the senior executive and principal owner of ETC Institute a company that provides management consulting services including marketing research, demography, information management, statistical applications, strategic planning, forecasting, simulation, and operations research for management decision - making. The firm's focus is on the acquisition and display of information for management decision - making. Clients include businesses, public school systems, colleges, vocational technical schools, governmental units, and not - for - profit agencies. Leisure Vision Key Personnel - 4 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.18 RESUME RICHARD J. CRANE, 7R., AIA PRINCIPAL REGISTRATION Registered Architect; State of California No. 21132 National Council of Architectural Registration Board; NCARB #40467 EXPERIENCE After graduating from Cal Poly Pomona's Architecture Program, Mr. Crane worked with Thomas Maurer AIA & Associates. Promoted, in turn, to Project Manager, to Design Administrator, and finally to Vice President, Mr. Crane was responsible for all phases of architectural process, including programming, budgeting, planning, design, construction document preparation, contract administration, and general office management. When Mr. Crane left Thomas Maurer, he joined Belair -Crane Design Group as principal partner. He remained in that position for four years, and was again responsible for all phases of architectural process. Today Mr. Crane is the principal of his own firm, Crane Architectural Group, where he provides architectural services for projects ranging from private developments to civic structures designed for public use. EDUCATION Bachelor of Architecture, California State Polytechnic University, Pomona, California Associate of Arts in Business Management, Cerritos College, Norwalk, California PROFESSIONAL AFFILIATION American Institute of Architects AIA National Trust for Historic Preservation American Planning Association APA International Conference of Building Officials COMMUNITY INVOLVEMENT Past Member, City of Fullerton Planning Commission Active Member, Rotary Club of Fullerton Past Member, City of Fullerton =s Redevelopment Design Review Committee Past Member, Fixed Guiderail Review Committee - City of Fullerton Board Member, YMCA of North Orange County Active Member, Fullerton Heritage Past Member, City of Fullerton Affordable Housing Review Committee Committee Member, City of Fullerton Redevelopment PAC II.Committee Past Member, Parent Advisory Committee, Rolling Hills Daycare Center Past Member, Rolling Hills Elementary School Site Council Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.19 RESUME STEVE KALTHOFF PROJECT MANAGER EXPERIENCE After graduating from Cal Poly Pomona's Architecture Program, Mr. Kalthoff entered the employment of Crane Architectural Group. His duties have included the entire range of architectural practice, but especially the construction phase. He has long experience working with City personnel, construction teams, and regulatory agencies. He has worked on many types of projects, including park and.recreation, commercial and industrial; and custom residential projects. EDUCATION Bachelor of Architecture California State Polytechnic University, Pomona, California Similar projects for which Mr. Kalthoff has provided services include the following: FULLERTON SPORTS COMPLEX - Fullerton, CA BIG LEAGUE DREAMS SPORTS COMPLEX - Chino Hills, CA BIG LEAGUE DREAMS SPORTS COMPLEX - Redding, CA SLEEPY HOLLOW COMMUNITY CENTER, Restroom /Office renovation - Chino Hills, CA PIONEER, LONEHILL, VIA VERDE PARKS, Restrooms - San Dimas, CA TUSTIN SENIOR CENTER, TUSTIN, CA BURBANK TENNIS CENTER, BURBANK, CA SANTEE SPOTS COMPLEX, SANTEE, CA MOUNTAIN LODGE COMMUNITY CENTER, LAKEWOOD, CA ASSISTANCE LEAGUE COMMUNITY CENTER, FULLERTON, CA CHINO HILLS EQUESTRIAN CENTER, Community Center - Chino Hills, CA Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 1.20 s s i • • s • • f, e • • • • �� • • • project approach PARKS, RECREATION AND GENERAL FACILITIES MASTER PLAN Phase I - Initiating the Project Task 1: Project Initiation Meeting MIG will meet with the City's Project Manager and staff to refine the overall work program for the project, including contract administration, scope, schedule, budget, roles and responsibilities, and logistical issues in order to tailor and focus the planning process. MIG will also collect data from the City, including demographics and population projections, digital mapping files, inventory data on all parks and facilities, and background reports. This meeting will also serve to determine the composition of the Project Management Team (PMT). In addition to the project initiation meeting above and the PMT meetings, MIG will meet with City staff throughout the project via telephone and e -mail to coordinate the development of key products and to review findings. Task 2: Refine Scope and Schedule Based on the Project Initiation Meeting, MIG will revise the scope of services, budget, process chart and timeline, and provide the City with a hard copy and a digital file of revisions. Phase II — Understanding the Context Task 3: Meeting with Project Management Team MIG recommends the formation of a Project Management Team (PMT) composed of represen- tatives from all relevant City departments. MIG will meet regularly with the PMT throughout the process for briefings and review. The purpose of the first meeting is to: • Review the planning process; • Discuss desired outcomes; • Clarify roles and responsibilities; • Identify and discuss issues and opportunities related to meeting the City's park and recreation needs; • Finalize specific meeting times and dates; and • Explain the assessment and survey process and start planning for activities. MIG will develop agendas and handouts for the meeting and provide them to the City for duplication. Task 4: Data Collection The MIG Team will review existing documents and background information pertinent to the planning effort including, but not limited to: the City's General Plan and any existing Update if applicable; current Revitalization Projects; City Council Goals; specific development plans and existing park development plans; the City's current park inventory data; other current facility information and park plans; the agency budget and Capital Improvement Plan; and information about related Citywide planning efforts. This scope of work assumes that base materials (site plans, topographic surveys, aerial photog- raphy, City- and County -wide maps in GIS format, etc.) and copies of any previous studies and reports will be available to MIG in digital format at project initiation. Task 5: Master Plan Base Map - Existing Parks and Facilities Using park inventory data provided by the City in electronic format, MIG will produce one (1) GIS or AutoCAD map of all existing park sites and major recreation buildings along with projected new park sites and opportunity areas. One (1) digital file will be provided to the City for review. Task 6: Recreation Program Evaluation MIG will review and evaluate all existing recre- ation and community activity programs. This recreation program review would also include activities sponsored by community organizations such as Little League, youth football, soccer, Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.1 M I G °r project approach PARKS, RECREATION AND GENERAL FACILITIES MASTER PLAN swimming programs and adult sports providers. Interviews with service clubs, civic leaders, senior advocates and others providing services will also be conducted. In concert with the park and facility assessment and program evaluation, MIG will assess and evaluate parks and recreation department opera- tions. This will be an analysis of the department's organizational structure, staffing levels and operations, including the operating budget. The MIG Team will research and compare City staffing levels, department budget and operating costs with three (3) comparable communities and agencies sharing similar development and growth characteristics with the City. MIG will list available and unavailable recreation services and facilities. Any "gaps" in the recreation programs menu will receive special attention. Staff will provide park and facility inventory data during the Project Initiation Meeting, preferably in digital format. Findings will be summarized in the Existing Conditions Summary Report. Task 7: Park and Facility Evaluation MIG will interview maintenance and operation personnel regarding current facility conditions and maintenance issues. We will also interview City staff to review program attendance and membership figures, profile participants (e.g., age, residence, length of involvement) regarding programs and determine the cost to participate. Based on the review of the City's park and facility inventory data, MIG will prepare an overall evaluation of the park system. MIG will also identify the current parkland, open space and facility standards in Rosemead, expressed in terms of a ratio of acres per 1,000 people in the City's General Plan. Task 8: Park and Facility Tour The MIG Team will tour the City parks, open spaces, trails and recreation facilities by a method determined in Task 1. We will then review and evaluate the City Hall, Public Safety Services Center, one (1) City Maintenance Yard and two (2) temporary maintenance facilities as part of the park tour and review. The general conditions of the buildings will be reviewed and documented as part of the facilities evaluation. Task 9: Draft and Final Existing Recreation Resources Summary Memo Based on the park and facility inventory data provided by the City and MIG's observations from touring the system, the Team will prepare an Existing Recreation Resources Summary Memo that classifies the park and trail system and summarizes the City inventory. MIG will provide an Adobe PDF file to the City for review and revise the memo based on one (1) collated set of City comments. Task 10: Demographic Analysis and Community Profile The purpose of this task is to describe the planning area and to determine how population changes in the City will affect future needs for parks, facilities and services. Using current population data and projections provided by the City, MIG will summarize important changes and their impact on parks and recreation service provision. . MIG will provide one (1) copy and one (1) digital file of this report to the City for distribution. The City will provide one (1) set of consolidated comments to MIG. Key report findings, including City comments, will be summarized in the Community Needs Assessment Report. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.2 M 1 G project approach PARKS, RECREATION AND GENERAL FACILITIES MASTER PLAN Task 11: Park Standards Benchmark Research and Report Using a list of three (3) comparable commu- nities and agencies selected by the City, MIG will research parkland standards and prepare a table to summarize the findings. The standards research will include park and facility classifica- tions, size and locations, as well as sports facilities, community centers, playgrounds, bike, equestrian and pedestrian trail systems, landscaping, passive recreation, open space and maintenance. Results will be incorporated into the Existing Conditions Summary Report. Task 12: Review of Current Operations The MIG Team will review current financial conditions of the Department in terms of service delivery costs. The purpose of this task is to analyze current costs and revenues from services provided. Findings from this task will result in departmental operation recommendations. Task 13: Existing Conditions Summary Report MIG will prepare a brief existing conditions summary report to summarize the results of all initial activities. It will include a description of planning areas; current and projected demographics along with implications for parks, recreation, trails and open space service provision; existing parks and facilities and current level of service and standards; results of standards research; and an overview of current recreation programs offered by the City. MIG will provide one (1) hard copy and one (1) digital file to City staff for reproduction and appropriate distribution. The City will provide revisions to MIG as one (1) copy of collated comments. Phase III — Defining Needs Task 14: Progress Meeting #2 with Project Management Team MIG will conduct a second meeting with the PMT to review results and input to date and to prepare for the outreach tasks in this phase, including the community telephone survey. MIG will develop agendas and handouts for the meeting and provide them to the City for dupli- cation. City staff will prepare a summary report of the meeting. Task 15: Stakeholder Interviews MIG will conduct up to ten (10) interviews with the Mayor and City Council members, Commis- sioners, individuals or representatives from stake- holder groups (e.g., Little League or soccer clubs) for input on current community priorities, issues, perceived needs and opportunities. Interviews will be conducted by telephone. MIG will develop an interview questionnaire in English, and another language if needed, for staff review and work with City staff to identify appropriate stakeholders. MIG will then provide a summary of findings to City staff. Task 16: Community Questionnaire Working with City staff, the MIG Team will develop a community questionnaire designed to collect information about: current use of parks and facilities; activity participation rates by age; perceived recreation program, park and facility needs; and priorities for improvements. The Community Questionnaire would be distributed to the public via a variety of different channels, including community intercept events, local outreach activities and where the public gathers. The Department will be responsible for conducting outreach related to the questionnaire, such as publishing notices in local papers, the City's website, and with utility bills. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.3 M G' project approach PARKS, RECREATION AND GENERAL FACILITIES MASTER PLAN MIG will prepare a report summarizing Community Questionnaire findings, and provide a digital file to the Department for distribution. Findings also will be included in the Master Plan Task 17: Community Intercept Events (Workshops) The purpose of community workshops is to take the planning process to the community in a forum that involves community members in developing a vision for future park and recreation services. Displays and activities would be set up to inform residents about their community resources and allow them to identify their own needs and priorities. The project team will conduct and facilitate a total of three (3) public community workshops to review (including in the planning stage), evaluate and provide a "reality check" on the research and analysis phase of the project. The community will be led through a series of input sessions and be informed of the Park Master Planning process. The results of all the analysis done to date and the survey of recreation needs will be presented to the community in the course of the workshop presentations, and additional comments will be solicited. The outcome of these workshop sessions will provide important input to determining the future of park and recreation development within the City. MIG will summarize results in a memorandum and provide a digital file to the City for distribution. Task 18: Community Telephone Survey Leisure Vision, as part of the MIG Team will administer a statistically valid random sampling phone survey of 400 households for use in the Parks and Recreation Master Plan in Rosemead to assess community needs. Overall results for the entire survey of 400 households will have a 95% level of confidence with a margin of error of +/- 5% overall. The survey will include an importance /satisfaction matrix and comparisons to Leisure Vision's propri- etary national benchmarking database of over 60,000 citizen surveys for parks and recreation projects. The surveys will be geocoded to allow GIS mapping of survey results. Leisure Vision will develop a report of survey findings and attend one meeting to present the survey results. All surveys will be administered in -house with Leisure Vision staff. Questions on the survey will be developed in partnership with City staff in association with the MIG Team. It is anticipated that the survey will take approximately 15 minutes to administer over the phone and will be administered bilingually in English and Spanish. This length will allow for between 25 -28 questions to be asked, many with multiple components. Generally, it will take 3 -4 survey drafts until a survey is approved. At that time, Leisure Vision staff will conduct a pretest of 8 -10 households to ensure that all questions are understood and can be answered by household respondents. Should any issues arise, they will be immediately discussed with the City and MIG, and corrections will be made. The survey will be administered by Leisure Vision staff at their corporate facilities including all aspects of phone calling, development of the data base, data entry, etc. Total quality control for the project will be under the supervision of Ron Vine, Project Manager and President of Leisure Vision and Dr. Elaine Tatham, Research Manager. All phone callers and data processing staff are in the same office complex as Ron Vine and Dr. Tatham and have worked on dozens of parks and recre- Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.4 M _I_ , 6 project approach PARKS, RECREATION AND GENERAL FACILITIES MASTER PLAN ation projects. All survey data is maintained on- site for a minimum of five years and then off -site. Leisure Vision will conduct up to eight (8) cross - tabular comparisons of survey results by key demographic factors, such as gender, age of respondent, length of residency, income, users /non -users of services, region, etc. The demographic factors to be cross - tabbed will be selected by the City and MIG in consultation with Leisure Vision. A draft needs assessment survey report and final report will be developed for review by the City. Inclusive will be an executive summary of findings, graphs and charts, cross - tabular analysis by gender, household size and composition, age of respondent, etc. The MIG Team will provide to the City of Rosemead several unique analysis tools that have been developed over the years and will provide powerful planning instruments for the Parks and Recreation Master Plan. Leisure Vision has an unparalleled database of more than 60,000 survey responses from recreation and parks needs assessment surveys from communities across the country and in California. Benchmarking "National Averages" have been developed for numerous strategically important recreation planning and management issues including: customer satisfaction and usage of recreation programs; methods for receiving marketing information regarding recreation programs; reasons that prevent members of households from using recreation programs and facilities more often; priority recreation programs, outdoor and indoor recreation facilities to improve or develop; etc. This information will be provided as compared to survey findings from the City of Rosemead to aid in the planning process and consensus devel- opment. Leisure Vision will geocode survey results to the latitude and longitude coordinates of the area where a respondent lives. This technique allows survey data to be integrated with geographic information systems (GIS), which allows your community to "map" survey responses. In addition to enhancing the quality of presenta- tions, these maps can be used to support strategic analysis and decision making. Task 19: Recreation and Program Analysis The purpose of the Program Analysis is to identify community demand and relevant emerging trends based on the findings of the Community Needs Assessment process, and to identify potential strat- egies for program service improvements as well as improvements in marketing, inclusion of persons with disabilities, and program evaluation. This task will tie programs and services to benefits that are most important to the community. Task 20: Park and Facility Needs Analysis Based on the Standards Research, survey results, other community input and a service area analysis, MIG will identify park and facility needs in the City for each of the park classification types. Based on these needs, MIG will develop parkland and open space level -of- service standards specific to Rosemead. The standards will be developed specifically for the City, will be expressed in terms of a ratio of acres per 1,000 people and will reflect the realities of existing plans, land availability, land costs, available funding, community need and values, and goals stated in the City's General Plan. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.5 project approach PARKS, RECREATION AND GENERAL FACILITIES MASTER PLAN The recommended standard will be used to compare the demand with the existing supply to identify existing needs in terms of acres, miles or number of facilities and accessibility. Future needs will be projected based on projected population growth. As part of this analysis, MIG will prepare service area maps for neighborhood parks and community parks, providing digital files. Task 21: Community Needs Assessment Report MIG will prepare a Community Needs Assessment Report with accompanying tables, charts and illustrations to summarize the results of all the assessment activities conducted to date. It will include the results of the community profile, parkland and facility inventory and evalu- ation, program analysis, interviews, focus groups, community telephone survey, focus groups and Project Team and Advisory Committee meetings. MIG will prepare a draft Community Needs Assessment Report, providing one (1) copy and one (1) digital file to the City for distribution. MIG will revise the draft Community Needs Assessment Report based on one (1) set of consoli- dated comments provided by the City. MIG will provide one (1) digital file of the revised report to the City. Task 22: Project Management Team Meeting #3 MIG will conduct a third meeting with the PMT to review the Administrative Draft Master Plan. MIG will develop agendas and handouts for the meeting and provide them to the City for dupli- cation. City staff will prepare a summary report of the meeting. Suggested revisions to the Admin- istrative Plan will be incorporated into the Draft Master Plan. Task 23: City Council Presentation MIG will present the Community Needs Assessment Report to the Rosemead City Council. Phase IV — Developing the Plan Task 24: Draft Recommendations /Strategies Based on the results of all activities and the joint workshop with the PMT. The MIG Team will draft a set of potential strategies and actions in areas such as: • Community Services; • Community Facilities; • Expansion and Renovation of Community Facilities; • Operations and Maintenance; • Funding; and • Management Results of this task will be incorporated into the Administration Draft Master Plan. Task 25: Capital Improvement Plan Based on the results of the Community Needs Assessment, MIG will create a list of all capital and non - capital projects recommended over the course of the 15 -year planning horizon. Based on meetings in which the PMT and CAC will prioritize the 15 -year list as high, medium and low priority, MIG will develop cost estimates for the high priority projects. Task 26: Financing Plan MIG will prepare a financing plan to: ■ Project available revenues for capital improve- ments by source, including any new revenue sources; • Determine the potential shortfall within the planning period, if any; • Identify capital requirements to implement the plan; and • Identify and assess options to meet those requirements. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.6 M_l G project approach PARKS, RECREATION AND GENERAL FACILITIES MASTER PLAN Results of this task will be incorporated into the Administrative Draft Master Plan. Task 27: Action Plan MIG will draft an Action Plan that consolidates the proposed 15 -year CIP, funding plan and policy recommendations into one document. The Action Plan will present a specific implementation plan for the entire City. MIG will provide a digital file of the document to the City for review. MIG will revise the Action Plan based on one (1) set of consolidated comments provided by the City and incorporate the revisions into the Draft Comprehensive Plan. Task 28: Performance Measures MIG will develop performance indicators to measure the City's success in implementing the plan. The measures will be designed to be updated annually. The performance measures will be incor- porated into the Draft Plan. Task 29: Administrative Draft Master Plan Map MIG will produce one (1) draft Master Plan map in GIS showing proposed parks, trails and special use facilities. Task 30: Administrative Draft Master Plan MIG will produce an Administrative Draft Plan for review by key staff before publishing a public document for presentation to the CAC and public. Task 31: Project Management Team Meeting #4 MIG will conduct a fourth meeting with the PMT to review the Administrative Draft Master Plan. MIG will develop agendas and handouts for the meeting and provide them to the City for duplication. City staff will prepare a summary report of the meeting. Suggested revisions to the Administrative Plan will be incorporated into the Draft Master Plan. Task 32: Draft Master Plan Based on the consolidated comments received from the City on the Administrative Draft Master Plan, MIG will prepare a Draft Master Plan for CAC and community review. The draft will be formatted as a clear, readable and attractive document suitable for public distribution. MIG will provide one (1) hard copy and one (1) digital file to the City for reproduction and appropriate distribution. The appendices will be published separately as an accompanying document. Task 33: City Council Presentation MIG will present the Draft Master Plan to the City Council for review and comment. Task 34: Final Master Plan Based on one (1) copy of collated comments prepared by the City, MIG will revise the Draft Master Plan and deliver a final document to the City. The Final Master Plan document will include an Implementation Plan which will include the following components: ■ Financial Plan; ■ Action Plan; and ■ Performance Measures MIG will provide seven (7) hard copies and one (1) digital file to City staff for reproduction and appropriate distribution. Task 35: Project Close -out MIG will complete all administrative duties, such as final invoicing and delivery of final digital files, related to the project. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.7 project approach PARKS, RECREATION AND GENERAL FACILITIES MASTER PLAN ADDITIONAL SERVICES Task A: Youth Questionnaire As with the Community Questionnaire, MIG will work with City staff to develop a youth question- naire instrument that assesses current use of parks and facilities; perceived needs; recreation activity participation rates; and priorities for improvements. Like the Community Question- naire, the Youth Questionnaire will be distributed throughout the City's facilities, including City Hall, Library, Community Center, etc., for " teens" and teens to obtain and complete. This will allow a broad range and large number of youth to participate. The City will be responsible for recruiting participants. Recruitment could be done via schools and local youth hangouts. MIG will prepare a report summarizing the Youth Questionnaire findings and provide a digital file to the City for distribution. Findings will also be included in the Master Plan. Task B: Focus Groups (2) Focus groups are conducted to determine key issues, priorities and community facility and programming needs of key stakeholder groups. MIG can coordinate with the City's Project Manager and the PMT to determine which focus groups to hold and work with City staff to schedule participants, facilities and provide mailing support. A preliminary list of groups may include the following: Trails, Open Space and Natural Resources Areas MIG suggests conducting a focus group with representatives from key outdoor and environ- mental organizations (e.g., bicycle groups, equestrians, naturalist organizations, etc.) and community advocates to discuss opportunities to develop trails, greenways and open space networks that protect natural resources while providing recreational opportunities. Seniors With the aging of baby boomers, seniors are a growing population segment nationwide. MIG suggests conducting a focus group with older adults to gain input into programming, service and facility needs. Tweens and Teens MIG suggests conducting focus groups with middle and high school youth (12 -18 year -olds) to explore service and facility needs, and how the City could best reach this population group and motivate them to participate. Non-Users To gain insight into how to attract non - users, MIG suggests conducting a focus group with residents who do not use City park and recreation facilities and programs. The purpose of this focus group would be to identify barriers to use and participation. Other potential focus groups include recreation providers, religious organizations, business leaders, facility managers and school principals, among others. The specific focus groups can be deter- mined during the project initiation phase. Task C: Stakeholder Interviews MIG will conduct an additional ten (10) inter- views with individuals or community representa- tives from stakeholder groups for input on current community priorities, issues, perceived needs and opportunities. Interviews will be conducted by telephone. MIG will develop an interview questionnaire in English and another language if needed for staff review and work with City staff to identify appropriate stakeholders. MIG will then provide a summary of findings to City staff. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.8 project approach PARKS, RECREATION AND GENERAL FACILITIES MASTER PLAN Task D: Community Visioning Fair The purpose of the Community Visioning Fair is to take the planning process to the community in a forum that involves community members in developing a vision for future park and recreation services. The fair would be scheduled as part of another existing local event or would be held at a location where a large number of residents visit. Displays and activities would be set up to inform residents about their community resources and allow them to identify their own community needs and priorities. Materials would be provided for children and youth to contribute their ideas. The event will involve community members of all ages in the plan development process and will attract residents who may not normally attend more conventional public meetings. Community groups can host booths with activities geared to showcase parks and activities or key questions and interactive exercises related to the vision and future of neighborhood and community parks, trails, recreation and arts opportunities and open space. Youth volunteers will lead children's input activities and games. MIG will work with the City to create the vision for the Community Fair and produce graphics to support the fair, including signage, flyers and displays. The City will help secure the fair location, invite community group participation and provide basic booth supplies and equipment. MIG will summarize results in a memorandum. One (1) digital file of the memorandum will be provided to the City for distribution. Task E: Needs and Opportunities Corps Training MIG suggests creating a Needs and Opportu- nities Corps (NOC) comprised of City staff and other outreach volunteers, parent- teacher associa- tions, homeowner groups, etc. The corps concept will allow the project to capitalize on the depth of community information, understanding and connection held by such groups by enlisting them in the outreach effort on a variety of levels. The NOC will also allow for maximum outreach coverage while having the added benefits of building local capacity and fostering strong relationships among City agencies and organiza- tions. Finally, it will assist in effectively leveraging the MIG Team's time and reach. Training and Kits MIG will develop a NOC outreach kit and training program. A two -hour training will be designed and conducted by MIG at one (1) location. The outreach kits will include models for outreach meeting agendas, the community and youth questionnaires, handouts describing project schedules and process, instructions for conducting outreach meetings and other project - related materials. MIG will provide an initial set of 30 community outreach kits, which will be designed for easy reproduction by City staff as needed. The NOC, trained by the MIG Team and equipped with the outreach workshop kits, will facilitate local community outreach activities. The local community outreach meetings will be designed, as scripted in the outreach kits, to ensure clear understanding of the meeting purpose and structure and to gather information at the grassroots and local community level on key community issues and opportunities associated with park and recreation services and needs. During the training session, corps members will be given a review of the kit as well as best practices for successful facilitation. The training will also provide a valuable opportunity for corps members to strategize and develop a plan for their outreach efforts. MIG will prepare 15 of these outreach kits in Spanish. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.9 project approach PARKS, RECREATION AND GENERAL FACILITIES MASTER PLAN Outreach Activities The NOC's outreach efforts could include presenting at a regular meeting with a formed group such as chambers of commerce, block clubs, book groups, Rotary clubs, mothers groups, etc. They could also concentrate outreach efforts on more general audiences by working with schools to make classroom presentations, passing out materials at local street festivals or other community events. These same corps members can assist the project team with the planned community intercept events (Task 17). As NOC members conduct outreach meetings, they will submit notes and feedback to the City for compilation. MIG will analyze the information and prepare a "Key Findings Summary." MIG will work with the project management team to identify community leaders and other likely volunteer participants. The stakeholder interviews will also provide an effective means of identifying organizations and individuals to serve as NOC members. Task F: Asset Management Plan The MIG Team will provide an economic analysis of potential revenue generation associated with using existing and proposed recreational facilities for asset management. Proper asset management can offset maintenance and operations costs while providing advertisement opportunities for local businesses. The components we will examine for an asset management plan include: revenue from facility rentals, fees, and charges; leases or licenses for private concessions; and revenue from such programs as advertising, vending facilities and community /corporate sponsorship opportunities. MIG will prepare recommendations for designing recreational facilities with advertisement opportu- nities in mind. After reviewing all of the City's parks and recreation sites, MIG will develop a list of asset management opportunities for the City's consid- eration for inclusion in the Parks and Recreation Master Plan. These may include such items as: • Vending machines; • Parking lot and walkway banner programs; • Lease of park space for restaurants and other commercial ventures; • Shade shelter advertising; • Portable food concessions; • Information and advertising kiosks; • Lease of building space to non - profits and other similar organizations; • ATM sites; ■ Telecommunication cell tower leases; • Sale or trade of surplus parkland; and • Naming rights and /or facility sponsorships Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.10 M ,G project approach TRAIL SYSTEM FEASIBILITY STUDY The City of Rosemead is interested in preparing a Feasibility Study for the development of an open space, parkland and trail system along three miles of Edison Transmission Corridor. Today, walking, jogging and bicycling are three of the top recre- ation interests in most communities. With this interest has come the demand for more off- street open space, recreation trails and pathways. MIG proposes to help meet this demand by devel- oping a comprehensive feasibility study for the Edison Transmission Corridor trail system that travels the length of the City. The proposed trail system would be developed on Edison Trans- mission Corridor and would take advantage of natural settings and view opportunities wherever possible. MIG has prepared a proposed scope of services describing the specific tasks that will be under- taken. These tasks are listed in the planning process's sequence. Phase A — Project Initiation Task 1: Project Initiation Meeting The MIG Team will meet with City staff to kick off the project, coordinate procedures and processes to be employed throughout the project and discuss key products and strategies. The team will review and confirm the scope of services and work plan, project objectives, approach, param- eters, schedule of work, budget and discuss project issues. In addition to the project initiation meeting, MIG will meet with City staff throughout the project during monthly teleconference calls to coordinate the development of key products and to review project findings and overall project status. MIG will prepare a brief memo to summarize the major agreements made during these discussions and provide the City with hard copies. Based on the Project Initiation Meeting, MIG will revise the scope, budget and project timeline, and provide the City with a hard copy of revisions. Task 2: Progress Meeting #1 MIG recommends the formation of a Project Management Team (PMT) composed of represen- tatives from all relevant City departments, agency and community representatives. MIG will meet regularly with the PMT throughout the process for briefings and review. The purpose of the first meeting is to: • Identify and discuss issues and opportunities related to meeting the City's and community's needs for the Edison Transmission Corridor open space, park and trail system; and • Finalize specific meeting times and dates. Community outreach for the Trail Feasibility Study will be included in the community outreach process for the Parks and Recreation Master Plan. The MIG Team will review and identify require- ments with any other governing agencies which have utility easements within the transmission corridor, access and land use jurisdiction and any other interests within the corridor. Phase B — Project Analysis Task 3: Data Collection The MIG Team will collect available data including the utility easement, existing aerial topographical survey provided by the City and other relevant information on current existing conditions. The City will provide the MIG Team with the Title Reports for all sections of the trans- mission corridor. Currently, there are approxi- mately 45 to 48 parcels within three miles of the transmission corridor, all of which are owned by Southern California Edison. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.11 project approach TRAIL SYSTEM FEASIBILITY STUDY The MIG Team will review existing documents and background information pertinent to the planning and design effort including, but not limited to: existing plans, aerial and topographic information, site features, current agreements, existing environmental studies and documents provided by the City. The MIG Team will research similar recreational use agreements in other California cities. If directed by the City, the team will contact Southern California Edison to review available options for lease, purchase or use agreements. This scope of services does not include aerial photography, a topographic map,.ground survey or boundary survey. Task 4: Site Program and Analysis The MIG Team will conduct on -site reconnais- sance of the existing corridor conditions. The MIG Team will review the existing conditions, physical limitations, constraints and opportunities of the corridor and the surrounding properties and area. The MIG Team will consider natural terrain, open space, view and vistas, access, access for maintenance and operations, pedestrian circu- lation, surrounding land use, safety and security, aesthetics, utilities and other factors. The team will identify trail destination nodes such as current and proposed parks, business districts, government centers, schools and other areas along with cultural and environmental features that provide educational and opportunities, park amenities and trail heads. This will include projected residential, commercial and industrial developments. Using the data gathered from the analysis conducted above, the MIG Team will walk and assess the potential corridors for feasibility of use. The MIG Team will utilize these conditions and site analysis findings to investigate the feasibility of designing the trail system along the trans- mission corridor. Task 5: Property Acquisition The MIG Team will provide the City of Rosemead with recommendations for property acquisition along the Edison Transmission Corridor. With information provided by the City and Southern California Edison, the MIG Team will conduct market research of recent land acquisitions throughout the region. If comparable sales data is available, the MIG Team will focus on land sales for open space or recreational purposes. The team will then determine estimated market value of the subject properties and collect any available data on comparable lease arrangements, with particular emphasis on public agency /utility leases. Phase C — Financial Analysis Task 6: Prepare Estimated Cost for Capital Improvement Based on corridor use and facilities recommenda- tions from prior task, the MIG Team will generate estimated capital improvement costs. The estimate will be based on costs for comparable projects in California and will be broken down by significant components. Cost estimates will be aligned with the assumptions used in the Parks, Recreation, and Facilities Master Plan. Task 7: Prepare Estimated Cost for Maintenance and Operation The MIG Team will estimate maintenance and operational expenses by building upon similar cost estimates for maintenance and operation of standard park facilities as determined in the Parks, Recreation, and Facilities Master Plan. We will adjust the estimation as needed to reflect site specific characteristics of the corridor and its proposed uses. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.12 0 s s s O O A s O • • M � G project approach TRAIL SYSTEM FEASIBILITY STUDY Task 8: Identify Funding Sources for all Aspects of the Project The MIG Team will review feasibility and funding potential of sources such as impact fees, special taxes and assessments, grants and public/ private partnerships. Task 9: Provide Assessment of Public Use Traffic and Volume The MIG Team will review available published sources, including the Institute of Transportation Engineers Trip Generation Handbook, to provide a high -level assessment of likely trip generation resulting from development of the associated property. Task 10: Identify possible Financial Resources Available for All Aspects of the Project Development and Operation The MIG Team will consider applicability of existing and new funding sources for land acqui- sition, land improvement and ongoing operational expenses. Acquisition and improvement may be suitable for use of impact fee revenues, whereas operation costs may be funded by assessments, special taxes or user fees. The MIG Team will suggest adjustments to the City's impact fee program if appropriate, and will consider the applicability of grants and private funding for costs, as appropriate. Finally, the MIG Team will assess overall feasibility of the project in light of estimated costs and availability of funding sources. Task 11: Teleconference Meeting with Project Management Team #2 MIG will conduct a second meeting with the Project Management Team to present the initial findings of the Site Program and Site Analysis to City staff for discussion and input. MIG will develop agendas and handouts for the meeting and provide them to the City staff for duplication and distribution. The meeting agenda and handouts will be emailed to the City's project manager for distribution prior to the teleconference meeting. Task 12: Existing Conditions and Analysis Summary Based on the MIG Team meeting and staff input, MIG will prepare an existing conditions summary report to summarize the results of all data collection including site conditions, site review, inventory, opportunities and site constraints, initial educational opportunities and site analysis activities. The report will include the health and fitness benefits for the proposed parkland, open space and trail / walkway system improvements. The report will also include the results of the project management team meetings; and City staff input. MIG will provide one (1) digital file to City staff for reproduction and appropriate distribution. The City will provide revisions to MIG as one (1) copy of collated comments. Phase D — Site Recommendations and Final Feasibility Study Task 13: Proposed Recommendations The MIG Team will prepare a Conceptual Site Plan that illustrates the open space opportunities, general parkland improvements, routing of the trails and pathways, and linkage opportunities. We will also develop park improvement design exhibits, trail segment cross - sections and open space treatment. Task 14: Prepare Final Feasibility Study The MIG Team will prepare a final document of the process, analysis, criteria and recommenda- tions, including appendices on statistics, research, recommendations and other information that went into developing the Feasibility Study for the Edison Transmission Corridor. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.13 M" G project approach TRAIL SYSTEM FEASIBILITY STUDY The Conceptual Site Plan indicating the proposed parkland, open space and trail / walkway system improvements will be included in the final study document. Capital Improvement Costs identified in the Parks and Recreation Master Plan will be aligned with the estimated Capital Improvement Costs for the parkland, open space and trail / walkway system Feasibility Study. These estimated costs will be included in the final study. The final study will also include maintenance and operational cost estimates as determined in the Parks and Recreation Master Plan, and the funding potential of sources such as impact fees, special taxes and assessments, grants, and public/ private partnerships. Task 15: Presentation to Parks and Recreation Commission The MIG Team will present the Feasibility Study for the Edison Transmission Corridor to the City Parks and Recreation Commission for review and comments. The City will provide revisions to MIG as one (1) copy of collated comments. Task 16: Presentation to the City Council MIG will present the Final Feasibility Study for the Trail System to the City Council for review and approval. Task 17:.Project Close Out MIG will complete all administrative duties related to the Feasibility Study, such as final invoicing and delivery of final digital files to the City. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 2.14 D m N a J ® 1 C-) _0 o CD CD CD CD m 9l N W In W .4� W W W N W --• W O N V' N 00 N V N G\ N In N .L N W N N N --• N O •- V' --• Oo --• V --• G\ -� 4-1 '-' W � N -� --' O V. W V G\ l.n .L W N •� n d a a = a 21 n d O ?; f° O O O O n < w n o _ UO w n O = w w= w _ B C) 7 w a C" O- O " z O aq 7 o w o ^�,- "� ,� "O Wn rD N _ '� '� UO z ': 0. 5 /� _ �• P- " y w `,' `"` a'OO H 7 7` .w7 p' 8 ti y tl0 0• R. aq _ � O ry 7 =• tl0 1 • Cf0 � � � p S 7 = '-� w 0 = w 7= n ,n G 0. D p � n j F 3 3 w n O ct i 0 � � R F �a I y I rlt, iLl L n -7 \V mm _3 ^m r'F lTI \V M c� I- O +, 70 O LO (D 3 (D v v Z7 (D n (D O v G� (D (D n� v n r+ (D v CD v D G) m N U O O 7J C 7 _n CD 2 ((D CD CD CD (D CD C-- (a 0 — (D O' 7 ¢� (D INEW (D �. Cn O v Z7 n Q (D N I (D v 3 7 0- N (D 7 C — U- r-F cn `� m D 0 cQ m Q 0 v 3 (' 0 I n 0 0 m� (V pw /n n r-+ n S E • ! • • • • • • • • • • s • s • • • • ! • • • e • • • • • • i • • • • • • • • • • • 1 t 7 j f,, SECTION THREE related experience and references related experience and references MIG - SIMILAR PROJECTS & REFERENCES Bakersfield Recreation and Park Master Plan Bakersfield, California With 47 parks, ranging in size from two -acre "mini parks" to regional specialty parks encom- passing aquatic centers, sports complexes, and golf courses, the City of Bakersfield needed a comprehensive Park Master Plan. MIG is working closely with the City and community stakeholders to develop a Master Plan, providing the tools the City needs to make informed decisions about the future of its parks, including an existing condi- tions inventory and analysis, a demand and needs analysis, general policy guidelines, fiscal analysis, and recommendations for implementation. Bakersfield has a truly diverse population with a wide range of recreational needs. MIG led an extensive effort to gather input from the community through interviews with City staff, School District Staff, non -profit agency repre- sentatives, County officials, youth sports organi- zation members, and other stakeholders. The firm also led two community workshops, distributed surveys to stakeholders who could not participate in the interview process directly, and conducted a citywide telephone survey to further widen the input process. To guide the design of new parks in the city, MIG is developing criteria to ensure that the parks are easily accessible, include the proper recreational amenities, and meet the maintenance budget limits of the City. MIG also provided a range of policy recommendations and action items to meet future sports field demands, reduce maintenance costs and improve service, enhance park programsr and activities, and identify sources of future funding, financing, and revenue. Project Dates 2006 -2007 Reference Dianne Hoover, Director Recreation and Parks City of Bakersfield (661) 326 -3014 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.1 MIN wG -. related experience and references MIG - SIMILAR PROJECTS & REFERENCES McFarland Park & Recreation Master Plan McFarland, California The City of McFarland is a community of about 12,000 located 27 miles north of Bakersfield. Like many agricultural cities in California's Central Valley, it is in transition. With the decrease or closure of working farms in the Central Valley, much of the agricul- tural land is being bought for residential and commercial development. In the not too near future McFarland could see its population triple to 45,000 at build out. Therefore, the McFarland Recreation & Park District and the City of McFarland began working with MIG on updating its Recreation and Parks Master Plan in the fall of 2006 in order to: • Assess its past and future growth; • Identify park and recreation facility and program needs; and ■ Develop policies, guidelines and action items that will be supported by the community. In addition, MIG undertook the task of producing a five -year strategic plan for the improvement of existing parks, acquisition of park land, devel- opment of new park facilities and the provision of recreation activities that reflect the desires of the community as it exists today and into the future. Project Dates 2006 -2007 Project Details Gary Farrell, General Manager McFarland Recreation and Park District (661) 792 -3187 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.2 f q 4, 1_M related experience and references MIG - .SIMILAR PROJECTS & REFERENCES Perris Parks and Recreation Master Plan and Financing Strategy City of Perris, California The City of Perris located in south of Riverside and is divided by State Highway 215. The western side of the City is part of the original town devel- opment while the eastern side of the City is the more recent development. MIG was hired by the City to prepare a park and recreation master plan that would address current and future recreational needs, land acquisition opportunities, trail systems, joint use opportu- nities and maximizing park amenities in existing parks by identifying deficiencies and surplus. The firm also prepared an asset management plan to address an aggressive Capital Improvement Plan separated into short -term and long -term goals, which allows the City time to allocate money for future projects that are identified in the Needs and Demand Analysis. Project Dates 2004-2005 Project Details Darren Madkin, Assistant to the City Manager City of Perris (951) 943 -6100, ext. 276 ±A r�r R_ * � � - �- , �� . _ {`' • rye �' 'q.` i r 'v fl� ,N, o ° 3yy'r a' - Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.3 Ivl G related experience and references MIG - SIMILAR PROJECTS & REFERENCES Lancaster Park, Recreations and Arts Master Plan Lancaster, California The City of Lancaster is experiencing extensive growth in population and related development. In response to this, MIG is working with the City to develop a Master Plan for the Department of Parks, Recreation and Arts. Lancaster residents enjoy superior recreation and arts facilities including the Lancaster national Soccer Center and the Performing Arts Center. With its growing population, residents are seeking closer to home facilities. One product of this effort will be to update the Department's park classifi- cation and standards for incorporation into the General Plan Through this planning effort, the City strongly emphasized the involvement of the community in this effort. MIG conducted extensive public outreach including two major surveys. At the California Poppy Festival, which attracted 41,000 visitors over two days, MIG spoke with several thousand Lancaster residents over two days and received input from almost 1,000 adults, teens and children. MIG also conducted a bilingual telephone survey of more than 600 residents, MIG also received feedback from the public through input provided from a 20 person Community Advisory Committee that met quarterly throughout the project, five focus groups, and interviews with key stakeholders and decision makers. The plan was finalized in March 2007. The plan was completed according to the client- approved scope, budget and schedule. Project Dates 2006 -2007 Project Details Lyle Norton, Director Parks, Recreation & Arts Department (661) 723 -6080 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.4 related experience and references MIG - SIMILAR PROJECTS & REFERENCES West San Gabriel River Parkway Nature Trail Lakewood, California MIG worked closely with the City of Lakewood to plan and design this trail amid its 17 acres of naturalized open space along the San Gabriel River between Carson Street and Monte Verde Park in Lakewood. Vacant, surplus land under the Department of Water & Power (DWP) transmission power line easement was "recreated" with funding from the Rivers and Mountains Conservation Authority to promote riparian habitat enhancement along the San Gabriel River. The decomposed granite trail provides access throughout the area. The construction cost for the first phase of this project was $984,000. Amenities • One -half mile decomposed granitetrail • Secured fenced entries to site • Fully automated irrigation system • California grassland cover • Native, riparian plant materials • Drought tolerant plant materials • Informal boulder seating area • Convenient parking adjacent to Monte Verde Park Awards 2007 APWA, Southern California Chapter Project of the Year, Parks & Recreation Facilities 2003 ASLA Merit Award - Quality of Life 2003 APWA Project of the Year Project Dates 2002 -2003 Project Details Mr. Ken Tate, Parks Superintendent (562) 866 -9771 x2430 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.5 related experience and references MIG - SIMILAR PROJECTS & REFERENCES Presidio Trails and Bikeways Master Plan National Park Service and Presidio Trust, San Francisco, California The Presidio of San Francisco, one of the country's largest urban parks, is registered as a National Historic Landmark. A unit of the Golden Gate National Recreation Area, jurisdiction is shared between the National Park Service and the Presidio Trust. MIG worked with both organizations to craft the Presidio Trails and Bikeways Master Plan and Environmental Assessment, a document that now serves as a management tool, providing National Park Service and Presidio Trust staff with design guidance and an implementation framework for all future construction, modification, and mainte- nance of Presidio -wide pedestrian and bicycling trails. Originally designed as a military installation, MIG crafted a plan to better support the natural, cultural, historical, and recreational resource goals of the Presidio. The Presidio is an ideal setting for a variety of recreational activities —soft surface trails, paths, sidewalks, and roadways provide access to most of the Presidio landscape. These travel ways function as an integral part of the Presidio's transpor- tation access network, and also play a vital role in shaping visitor experience and behavior. The Trust, GGNRA and NPS have recently completed improvements to Immigration Point Outlook and surrounding trails. P -- RAW- Ta Fig 44A _..Ptd —.s d y Alternative B - Mixed Use Tai ; i Pedestrian and Multi-Use Trads be ft—d a­b� - ti eaec«en aac �� Project Dates 2003 Project Details Andrea Lucas National Park Service – Presidio (415) 561 -4975 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.6 ,Iv1 G, related experience and references MIG ADDITIONAL EXPERIENCE • Albany Parks and Recreation Master Plan • Amador County Long -Range Plan for Park and Recreation Services • Anaheim Parks, Recreation & Community Services Needs Assessment and Strategic Plan Update • Baldwin Park Comprehensive Park Master Plan • Calabasas Park and Recreation Master Plan • Carmichael District -Wide Recreation and Park Master Plan Update • Chico Area Recreation District Master Plan • Chula Vista Parks and Recreation Master Plan • Culver City Parks and Recreation Master Plan • El Dorado Hills Park and Recreation Facilities Master Plan • Danville Park, Recreation & Arts Strategic Plan • Diamond Bar Parks and Recreation Master Plan • Dublin Facility Needs Study for Camp Parks • East Palo Alto Recreation Services Strategic Plan • Fulton -El Camino Recreation and Park District Master Plan • Grass Valley Park, Recreation, and Open Space Plan • Greater Vallejo Park and Recreation Master Plan • Goleta Park and Open Space Master Plan Study • Huntington Beach Coastal Recreation Master Plan • Irvine Recreational Facilities Master Plan • Lancaster Parks, Recreation and Arts Master Plan • Livingston Park and Recreation Master Plan ■ Lodi Park and Recreation Master Plan • Los Angeles Park and Recreation Strategic Plan • Marin County Open Space District Policy • Marin Parklands Comprehensive Management Plan • Merced Park and Recreation Master Plan • Moorpark Parks and Recreation Master Plan • Murrieta Parks and Recreation Master Plan • Ontario Parks and Recreation Master Plan • Orcutt Parks Implementation Plan • Pleasant Hill Recreation and Park Master Plan • Port Hueneme Parks & Recreation Master Plan • Presidio Trails and Bikeways Master Plan • Rancho Cucamonga Parks and Recreation Master Plan • Redding Park & Recreation Master Plan • Redwood City Park Fee Study • Sacramento Park and Recreation Master Plan • San Carlos Park and Recreation Strategic Plan • San Gabriel River Master Plan • Santa Barbara Parks & Recreation Baseline Study • Santa Paula Parks and Recreation Master Plan • Santa Monica Open Space Element and Parks and Recreation Master Plan • Santa Ynez Valley Parks and Recreation Plan • Seaside Park and Recreation Master Plan • Shasta Lake Park and Recreation Master Plan • Southgate Park & Recreation Master Plan • West Roseville Park and Recreation Needs Assessment Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.7 rM I G-' related experience and references WILLDAN FINANCIAL - SIMILAR PROJECTS & REFERENCES Sunnyvale Parks and Open Space Plan Sunnyvale, California For the City of Sunnyvale's Parks and Open Space Plan, Willdan Financial Services served as a subconsultant to MIG. Willdan's tasks for this project included the following: Provided baseline financial analysis describing current funding for parks, open space, and recreational facilities; • Identified appropriate funding sources and financing mechanisms for the Parks and Open Space of the Future Plan; and • Developed recommendations for implemen- tation of the plan. Project Dates 2007 - Present Reference David A. Lewis, Director, Parks and Recreation City of Sunnyvale (408) 740 -7516 Santa Rosa Public Facility Financing Strategy and Business Plan; Park Impact Fee; Input to Park Business and Strategic Plan Santa Rosa, California The City of Santa Rosa has attempted to keep its funding for capital improvements programs up -to- date but over the past decade cost increases have far exceeded adjustments to program resources. Faced with a $172 million deficit the City engaged Willdan to determine the scope of the problem across multiple funds, identify available revenues, suggest procedural changes, and recommend alternatives for reducing costs and /or increasing revenues. As part of this process Willdan evaluated the financial status of over $400 million in devel- opment- related capital improvement programs and developed a strategy for substantial additional funding. As an implementation effort the firm provided specific support in the development of a Parks and Recreation Business and Strategic Plan, and updated the park impact fee to significantly increase park funding. Project Dates 2007 -2008 Reference Michael Frank, Administrative Services Director City of Santa Rosa (707) 543 -3091 Fresno Park Facilities Fee Update and Financing Plan Fresno, California In 2005, Willdan Financial completed a compre- hensive update of the City's park impact fees. The study included both land dedication and in -lieu fees based on the Quimby Act as well as devel- opment impact fees for park land and improve- ments based on the Mitigation Fee Act. Upon completion of the fee study, Willdan Financial prepared a public facilities financing plan for fire, police and park facilities. The plan included estimates of impact fee and General Fund revenues available to fund planned projects and a feasible financing plan based on available funding and debt capacity. Project Dates 2005 Reference Jon Ruiz, Assistant City Manager City of Fresno (559) 621 -7774 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.8 related experience and references LEISURE VISION - SIMILAR PROJECTS & REFERENCES Palm Desert Parks and Recreation Needs Assessment Study Palm Desert, California Leisure Vision conducted a Community Attitude and Interest Survey during April and May of 2006 to help establish priorities for the future improvement of parks and recreation facilities, programs and services within the community. The survey was designed to obtain statistically valid results from households throughout the City of Palm Desert. The survey was administered by a combination of mail and phone. Leisure Vision worked extensively with City of Palm Desert officials in the development of the survey questionnaire, including conducting a series of stakeholder interviews with community leaders. This work allowed the survey to be tailored to issues of strategic importance to effec- tively plan the future system. In April 2006, surveys were mailed to a random sample of 2,500 households in the City of Palm Desert. Approximately three days after the surveys were mailed, each household that received a survey also received an electronic voice message encouraging them to complete the survey. In addition, about two weeks after the surveys were mailed, Leisure Vision began contacting house- holds by phone, either to encourage completion of the mailed survey or to administer the survey by phone. The goal was to obtain a total of at least 600 completed surveys. This goal was accom- plished, with a total of 641 surveys having been completed. The results of the random sample of 641 households have a 95% level of confidence with a precision of at least +/ -3.9 %. Results of the survey showed many opportunities to improve the parks and recreation system, including strong support for a new outdoor aquatic center that the City is currently developing. Project Dates 2006 Reference Janis Steele Parks and Recreation Services Manager City of Palm Desert' (760) 776 -6423 010." Aquatic Features Respondent Households Would Be Most Likely to Use if Incorporated into a New Outdoor Aquatic Center ty percentage olrespmdents who selected the Item as one of their top Mree choices La river all orratg for raft or flotawl deme 28•N. ry ooler sides 2r o Leiswe pool with gentle slope entry 26% 25 yard lap lanes for exerase, fessons. etc. 2 6, Hot tuh or Jacuzzi 16% Water sprays %%ith inceracliva play features 1456 concession area area Wit') deep wwstei 43`76 S7telav pool for Infants or loaders 896 Water sprayplaygiomd 8'?6 25 yard lap tanes to cornpeitive Van) 656 •. Other 3% 0% 5% 10:U 1'"_+% 20% 25% 40;0 '35% ®Most Mely C32nd Most Likely ❑3rd Most L efy Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.9 t related experience and references LEISURE VISION - SIMILAR PROJECTS & REFERENCES Parks and Recreation Needs Assessment Study Los Angeles, California Leisure Vision conducted a statistically valid mail /phone survey for this City of over 4 million residents. 2,800 surveys were completed for the City, including 400 surveys in each of 7 areas in the City. The survey was administered by mail and phone. Leisure Vision worked extensively with City of Los Angeles officials, as well as members of the prime consulting team in the development of the survey questionnaire. This work allowed the survey to be tailored to issues of strategic impor- tance to effectively plan the future system. 10,000 surveys were sent out to a random sampling of residents in Los Angeles. The surveys were sent out in both English and Spanish. Extensive cross - tabular analysis of survey responses was conducted for a wide range of demographic factors, including age of respon- dents, gender, household size and types, income, education, etc. Results are also being compared to Leisure Vision's national database of survey responses. Project Dates 2008 Contact Michael A. Schull, Civil Engineer Los Angeles Department of Recreation and Parks (213) 928 -9195 Parks and Recreation Needs Assessment Survey Bend, Oregon Leisure Vision conducted a statistically valid mail/ phone survey for this rapidly growing Oregon community that won the 2006 Gold Medal Award. The survey was conducted to help establish priorities for the future development and maintenance of parks and recreation facilities, programs and services within the community, as part of a comprehensive parks and recreation master plan. The goal was to obtain at least 600 completed surveys. This goal was far exceeded, with 707 surveys being completed, including 372 by mail and 335 by phone. The results of the random sample of 707 households had a 95% level of confidence with a precision of at least 4 -3.7 %. The response rate for the entire survey was 33 %, based on 2,163 surveys being delivered and 707 being completed. Extensive cross - tabular analysis of survey responses was conducted for a wide range of demographic factors, including age or respondents, gender, household size, income, ethnicity, etc., as well as comparisons of the responses from bend to Leisure Vision's national benchmarking data base. Leisure Vision worked with Bend on an update of their needs assessment survey and benchmarking in 2008. Project Dates 2004, 2008 Contact Bruce Ronning, Director of Planning and Development Bend Metro Park and Recreation District (541) 389 -7275 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.10 • • • related experience and references LEISURE VISION - SIMILAR PROJECTS & REFERENCES Bloomington Parks and Recreation Open Space Comprehensive and Strategic Plan, Survey of Adults over 50 years of age and Needs Assessment Bloomington, Indiana Leisure Vision served as the prime consultant on this 2001 -2002 parks and recreation compre- hensive and strategic planning effort for this community of 75,000 residents. Ron Vine served as project manager. The community of Bloomington desired to take a very citizen driven approach to their Plan, led by a broad based community steering committee and including conducting stakeholder interviews, focus groups, public forums and a statistically valid mail /phone needs assessment survey to 600 residents of the city and county. Other components of the planning process included a comprehensive review of recreation programs, lifecycles and marketing; a review of current and potential operations and capital funding sources; a park by park inventory and analysis of current parks and recreation facilities; benchmarking comparisons of Bloomington's operations to 11 other communities regarding issues relating to numbers and types of parks, recreation, and trail facilities, capital and operating budgets, staffing, and fees and charges. Facility and park standards unique to the Bloom- ington community and based on the citizen survey, national benchmarks and community benchmarking were developed and adopted by the City. Leisure Vision has also worked with the City of Bloomington on a survey of adults over 50 years of age regarding their needs, unmet needs, and priorities for outdoor and indoor programming spaces and an updated needs assessment for a new master plan being done in 2007. Project Dates 2006 Contact Mick Renneisen, Administrator Parks and Recreation Department City of Bloomington (812) 349 -3700 Miles o (Trait For Benchmarked Communities @ 10,001 Citizejqnchding VerticialLime ;lar Mean and Cizele fiw B]o mrington) Blamin y Miles ofTrais Lin W N'i'. Al Pro d+ td S�%-frj nt: t;.0 rr-";rre.s @ 10, V ix, rtvro�r•ts. G�rrr��L7e�c.�•; 9.� rare$. rn$r!'•i�fi7 c�94� �$.�: 7 -rfi�S kire .den Ain 4.7 10 16 20 25 LOW ------ MEA.H - - -_, LGH Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.11 related experience and references CRANE ARCHITECTURAL GROUP - SIMILAR PROJECTS & REFERENCES McPherson Park Orange, California Crane Architects worked with MIG to prepare the Master Plan and construction documents for McPherson Park, an 18 -acre collaborative development between the City of Orange and Orange Unified School District. Under a joint -use agreement, the City funded and supervised the enhancement of the renovated Magnet School grounds that included recreation amenities to serve both the students and the greater community during off hours. Design was fast - paced, and improvements were scheduled to coincide with the schools' renovation as well as the soccer and baseball seasons. Amenities • Concession building with restrooms • Concession building with office meeting room • Building storage and building yard • Five (5) Little League fields • Four (4) 180' x 330' soccer fields • Kindergarten play area • Two (2) ball walls • Six (6) basketball courts with volleyball overlay ■ Court games Project Dates 1998 -1999 Project Reference Gary Wann, Director of Community and Library Services (714)744 -5597 Redding Sports Park Big League Dreams City of Redding, California Crane Architects worked with MIG to create a unique sports complex for Redding that would serve the greater Redding and Northern California sports market and strengthen the local economy. The result is an extremely successful flagship community park, which earned $16 million for the City of Redding in 2005, after Phase I was constructed. The first - class, 70 -acre recreation sports park was developed in a private /public partnership. Big League Dreams features three replica Major League fields (Yankee Stadium, Fenway Park, and Wrigley Field), two minor league ballfields and a four -field lighted soccer complex. Over 200 softball teams use the lighted, all- weather, synthetic turf fields year- round; indoor soccer teams and other sports use the 27,000- square -foot pavilion structure. A second - phase, four -field, tournament level, synthetic turf soccer complex, was completed in March 2007. All ongoing maintenance costs at Big League Dreams are incurred by the long -term operator, relieving the City of a major continual expense. Project Dates 2000 -2007 Note: Major winter storms and subsequent flood damage delayed completion. Project Reference Phil Perry, Assistant City Manager (Retired) (530) 297 -8977 (cellular) Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.12 related experience and references CRANE ARCHITECTURAL GROUP - SIMILAR PROJECTS & REFERENCES Big League Dreams - League City League City, Texas Prepared design, design development and construction documents for 31 -acre multi -use sports complex, including: • Six Replica Major League Ballparks - Yankee Stadium - Crosley Field - Fenway Park - Sportsman Park - Wrigley Field - Ebbets Field • Covered Multi -Sport Pavilion • Skate Park • Batting Cages • Instructional Area • Two Children's Playgrounds • Four Sand Volleyball Courts • Two Sports- Themed Concession Buildings • Administration Offices Project Dates 2004-2005 Project Reference Monica Kohlenberg, CPA Former Director of Finance City of League City, Texas Now Director of Finance City of Tomball, Texas (281) 290 -1417 Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 3.13 �' a • • • • • • • �� • • • compensation & fee schedule Preliminary Cost Estimate The following pages summarize our preliminary estimate of costs for the Parks, Recreation and General Facilities Master Plan and the Trail Feasibility Study. These cost estimates reflect the professional fees and direct costs that MIG would anticipate for projects of this type and scale. MIG will work with the City to develop a custom process and set of deliverables that are most appropriate to each project. Should we be selected, it is our intention to review the scope and project objectives carefully with City staff, and we will tailor our scopes and costs to best meet the needs and resources of the City. Cost and Pricing Data Project costs are incurred as professional time costs and direct costs associated with the perfor- mance of project tasks. Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 4.1 N O Z7 O ND 3 (D Q N N M n N O, 7 N 7 Q ci 7 N T v n N N T D) 7 D L� m N O O 3 (D n m Q O v Ln v r-F 0 N Q m obi D < C) . fU 1, D 7 W N N-• O V' 00 V G\ lA .L W N �. O. V' OD V G\ l/� .L W N -• on on o O G a, C G G O d tl0 p w 0. 0. '-J O tl0 (n "o WPM pj' EL .Gw. ^ R W w 7 'o w p i O y y O O O oo cD W � EA {A EH fA fA Eft <vs fA (f-� EA V.. E_A ff> EA fA 6n fH Ef� EA fA . � V� EA CT � 'y V' [/-� 69 EH EA '-• fA � 6A 69 fA V to EA 69 [» Efi 69 W 69 4A EA � EA 69 N V� N In N lJ� N In V O O In O N O N O N N N W O Vi V' O �• N '-- N O O iL O O O �-• -� O O �-• --� � O O O` - O O O O o O' li� O EA EA fA fA fli dj 69 (A Cl W . c9 O O �./• N � G, � C\ O cD .4 E/3 O G� cl O W • cD O ,4 69 O G� W 69 O .: G\ fA Cl 69 O V' � V' � fA O b9 O V' � �^.• •-/� o O O O O . O . O • , 0 W W 69 •L N N OD N W W V V a_, W W G1 G\ — V W W O •L G\ G\ W W Gam\ cl FA O O In O .,. N `O C G\ V. V' W N V ,L 00 V' N oo V \.v oo N w W 'V1 ln. O V� In O In V� Cl O j, '--' '-• O O N O O O V In N O G1 00 Cl Cl 69 � b�9 oo !Ll O O �•p fA �./� (A, EH W 69 Eft V� C .O- W .. O Vi In .69 `J' EA . [» En O en ,L O .. E ba fA W 'n V' N W W N V o W 'o DD 0 V' C, 0 N N � 0 � 0 � 0 V o V 0 N 0 N� C9 0 C7 cD 0 In N 0 --• 0 W 0 W V 0 � .;o N C fA ffY 69 EA 69 fA ff1 69 fA EA 69 (J} 69 fA 69 ff> fly EA fA fA EA „ Vi fA .•:(p'.. Vi 69 N N — O V' N oo ` Oo ' W 00 Oo G1 Cl 6s G 1 fA L Q, G\ ^ l O O O EH- O fA O H� EA bi fA '. in iA EA fA ff� 69 Ef> EH 6a fA EA 0a" oo' o. 00 00 �' 69 HA fii EH W V� fH fA fA W b9 �.. b9 H9 (A EH fA fR fA (A 0 o O O c cA O' cD O C) O' o O Cl O E9 69 FA b9 fA ffi 69 b9 EH fA to fA fA 69 {Ya fA 69 di 69 fA fA fA fA W b9 OD 00 cl 1p O O O O • oD --• V' W O N Oo V. V' L N -O O V� ll� O �./• O V� Cl N� i.n O W l.n lNn O O O . O VNi V •-' W Oo In O O 3 (D n m Q O v Ln v r-F 0 N Q m obi D < C) . fU 1, D 7 c� n l< O O O N 3 Q D G) m is 1�1 W N (/� IA N IA N • G1 \.n T m p n W D• • i` r n c a a DznNT{ N (D O s� O O N D Q 3 �� �^ s S ' o (D G� p CD n v 0 CD 4'•' aco 3 O� -� 5 3 !-O O (D N O. (D 3 7 D N T N fD fD N. d x n,Q 0 o' d m 7 N 7 Z (D 0000-0-0 0 0 w 7 0l 7 N 7 d 7 O1 O' 7 Ol O. W W N O N N .. �• N �' N N Nnn (D (D �. N O T T T N N T N O O p N N m ,. 4A 0 Vfl EA b9 fA fA EA _. N co W W W v (.n O 0 O 0 N 0 0 0 0 0 0 o 00 010100 n l< O O O N 3 Q D G) m is O O 3 CD n 0 Q v � m r•+ v � a (NOD C w 7 1�1 W N O V 00 V G1 \.n � r-1 n c a a '� d d • s� 0. �� :d n w aco 3 o o 5 o o x w N o ! y (00 N ` N fA V O V V V fA V V V V V E W .A., W CT. OD N W r r G1 9 d0 69 (A 69 fA di fA 69 w (A (A 69 0 0 0 � �.n O v� v�. � o l r O O l.n O O Vt W V N G1 N OD N� G1 00 W N N 00 �"� z., �N O � N fA fA fA s9 fA fA fA y fA is � n V V n V c\ V cr ` 0 W vJ 00 V tJ N .A G, O di O 69 :A yj yi Vf O fA O O E p'. Vi-- yi • ✓�0� O O O O G _� O O O O C %O; O O 00 00 N W •� •� C1 N O g,O-, o O CD 0 0 O o 0 Y fA EA 69 fA fA fA fA fA fA fA ER N Nt O CD EA .. .. �.. �tfl'Vi 69 fA (A .EA EA FH b9 fA fA E9 i EA FPO* N O O O O O O O O O O O fA G. EA fA fA fA fA SA fA fA W 69 wW Go � V- In O O fA x,69 � 69 69 Vi fA &3 69 69 fA 69 69 69 fA • O � w P N .L V .F ` 00 co 4L V 00 VNi V .4, V G�� O O 3 CD n 0 Q v � m r•+ v � a (NOD C w 7 00000000•00000000 000oo•••••••••••••••••e••• a N 1.0 00 V C, O '10 no 0 (p F' O / n w n 0. n O" UQ 0. P C O H tl=0 a- 3 0 ao c a 3 � o n v, � n 5' � CA- cn (n O C vo m G -.. G 1 W O fJ ut -V1 w+ N N 00' �yyyyuke - V� W r-. EA EA EA V1 EA �L - EA EA EA EA EA EA 0000. EA V E/i Eli EA O Eli EA S�,Q`y O v' O CDv v� v v� V v. va O o V v� v v� CD o V v� _. v v� .r v v� ._. V, V �n w Cl o w .-. ut ^ W t.� N ut V, C1 EA fli EA fA G1 00 Efl EA EA fli EA EA EA V E! ff EA ut. EA [» '•..: O Va -ln O ...._ O O . . W In O 4� V� O In O .•:...� V� V� V� In In Ufa' tJ O O O N 4 ^ O O O O o O O ^ O O O O u c I.D 3� Eli t l A s9 N W N ,L ,- O W N O O O O O N Va 00 ut �.n O tn ID N .V fA 00 Ui*�"Y l/1 EA b9 fA '-' O N O Vi EA Vf.. r 6H EA EA O in O O 00 O G\ Cl Vr O EA O Eli O EA O EA O Eli O •L O" V v� C) O V EA N9 14n • - .,5n Eli W in EA HS b^9 6^9 W EA �O� SP OD y In N . V� O W yV' N" W EA fA fA 6s EA Eii N N N 'V r yA Ws .L G\ V V� G\ N W .L� W N ,L .-• O �;. yi 4 cc to EA 69 fA tj EA ON EA yi ti Flfy '0 i O O O O O N O^ 64 ^ v+ ^ 64 FA O ^ ^ Q O O In V� O fA In EA 0 O Cl O O 0 O O O O O O W W W 1/f W 01 W N .-• O a (fl - EA G EA Eli EA GA EA Gli ER EA EA EA Eli fA EA 69' fA FA EA EA Eli Eli � a 00 00 •-• F. 0\ 00 W v� v� A �. W �.n N O\. N .L Eli a,. EA fA fA {>i : fill 00 00 ffl di. fA fA tA' EA fA Eli 4R EH 69 EA di Hi EH fli fA 69 b9 b9 fA 6'i di ON 4 at, .6, -00 C\ W -- 00 .L� G1 V� �- N \. W _,.OD.. W u• ''A f, O O 00 VI O O u• V1 V� A �.n V� w l/� w ,L V' O V� Vi O ut N � o o D G) m on M < 7 0 (n 2- v .Z7 0 fD N CD a 3 m of � Q a m d p � Q N C U- c = n' `G � N v rr N � m 3 D O co m a 0 7 3 N_ n O Q O O r-r O m(n \V n additional information PROPOSED ALTERNATIVE SCOPE, SCHEDULE AND BUDGET While MIG has provided a project scope, schedule and budget that meets the six -month timeline desired by the City, it is our view that a nine -month project schedule would best meet the City's needs. Furthermore, the addition of three months allows for the inclusion of additional services that will leverage the labor hours of the MIG Team, produce improved Master Plan and Feasibility Studies, and make both more defensible thanks to increased community outreach and engagement. Our proposed schedule and budget for a nine - month project may be found beginning on the following page. r Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 5.1 ICI o CD D G� m N CD m ro < m CD D G� m N Al 1 D CD _3 -z _O n n S CD C CD CD i r+ S _O m n r+ s g S s eD CD i MINNIE lillill III Ell Im NINE■� MIN =iii 11 III 1 n III 11111 IN 11 milli 11 Ell 111 � s■�o■ w IIIIII NINE Ell 11 IIIIIIIIII IIIIII Ell Ell 11 11 Al 1 D CD _3 -z _O n n S CD C CD CD i r+ S _O m n r+ additional information 9 -MONTH ALTERNATIVE COST OF SERVICE Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 5.3 1M1 G' additional information TESTIMONIALS "On behalf of the City of Lancaster, I want to express my appreciation for your dedication and contribution to the development of a successful Parks, Recreation, Open Space and Cultural Master Plan. The stakeholders and overall community embraced the process that provided affirmation to some of our existing services and new direction in others." Lyle W Norton, Director Parks, Recreation and Arts City of Lancaster "Your staff was professional, responsive, and most helpful throughout the process, and assisted in seeing our objectives come to fruition.... . Working with organizations like MIG enables the City of Redding to provide the community with superior amenities and services. Thank you again for your assistance on this project." —Danny Baugh, Project Manager Redding Transportation & Engineering Dept. "I would work with MIG again in a heartbeat! They deliver quality products consistently and really worked as a team with my 5- member Board of Directors, 22- member Citizen's Advisory Committee and EDH CSD staff. Due to your work, our Park and Recreation Master Plan reflects the needs of our community and provides a detailed guide that we can use to continue to improve our services to District residents." — Dianna Hillyer, District Planning Director El Dorado Hills Community Services District "Pleasant Hill Recreation & Park District has enjoyed working with MIG on the development of our Master Plan. The professional staff of MIG are outstanding and excellent to work with on the development of a plan for additional recre- ational facilities and parks in our community. They work well with our Board of Directors, Staff, and are terrific with the public. MIG is efficient, organized, and a tremendous resource of infor- mation. — Bob Berggren, General Manager Pleasant Hill Recreation & Park District "I realize that it's not always an easy thing to balance the needs of the community with available resources, but the MIG staff worked diligently to produce a Master Plan, the imple- mentation of which will benefit our community for years to come." Jeff Rubin, Community Services Director City of Calabasas "I wish to express our appreciation for the magnitude and depth of the Building Acces- sibility and Feasibility Study which your firm completed... The thoroughness of the report was educative to us and its physical set up and presen- tation in the least, outstanding." — Louis R. Zlokovich, Assistant to the Superintendent Berkeley Unified School District Board of Education Rosemead Parks, Recreation and General Facilities Master Plan I PAGE 5.4