Loading...
Sully-Miller Contracting CoBIDDER: Sully- Miller Contracting Co. CONTRACT BID FORMS TABLE OF CONTENTS SECTION1 BID SCHEDULE ..................................................................... ..............................1 SECTION 2 BID DATA FORMS ................................................................. ..............................5 2.A BID BOND .............................................................................. ..............................6 2.6 LIST OF PROPOSED SUBCONTRACTORS .......................... ..............................7 SECTION 3 NON - COLLUSION AFFIDAVIT ............................................... .............................10 CBF -13 BIDDER: Sully- Miller Contracting Co. SECTION I o E9® SCf% ULE CBF -1 BIDDER: Sully- Miller Contracting Co. i BID SCHEDULE SCHEDULE OF PRICES FOR HELLMAN AVENUE RESURFACING PROJECT PROJECT No. P82729 BASE BID SCHEDULE CiTRWA UNIT OF EST. UNIT ITEM NO. ITEM DESCRIPTION MEASURE QTY. PRICE COST 1 Clearing & Grubbing per plans and LS 1 specifications. See technical provisions TP -2, TP -3 & TP -4. 2 Disposal of Waste Materials. LS 1 Z110e) -2-f 8'670 - 3 Cold mill 2- inches thick existing SF 76,590 /b y -(O pavement. 4 Cold mill 3- inches thick existing SF 96,102 U• t( 0 571 u pavement. 5 Cold mill 4- inches thick exsting SF 69,840 O• r3 to X06 pavement. �9 1 � 6 Construct variable thickness TONS 3,250 93 269r ifo pavement overlay ARHM -GG -C (PG 64 -16) as indicated on the 97 ign — plans. 7 Construct variable thickness TONS 1280 7Z— Asphaltic Leveling course D1 (PG - 64 -10) as indicated on the plans. 8 Remove 8- inches of existing SF 500 pavement and replace it with 6- inches of AC B -PG 64 -10 Base Zf go' 6� L9067, Course over compacted native. G1 9 Install Survey Well Monument per EA 21 yC� City of Rosemead Std. Plan S08- 001. See Section 2 -9 Surveying of the General Provision -7 per details CIO (Cover, Sleeve & Dome will be provided by the City at no cost). 10 Adjust Sewer Manhole to Grade EA 31 per APWA Sid. Plan 205-1 and SL)�, (Sr SUD . 206 -1. 11 Adjust Water Valve /Gas Valve to EA 38 - Grade. CiTRWA BIDDER:. Sully - Miller Contracting Co. TOTAL BASE BID PRICE (SCHEDULE BID PRICE): $ Y -?Y 7-71.,-62- Fcvp, Nt/t p p FitI6 ildwsS.VvD Jvy Nr/�t D SSv� �v ot/� Dollar amount in written form WJ LAR5 il,vD SrK-Cy Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in the schedule of bid items above, within the limits define in Section 3 -2.2.1 of the Standard Specifications, to stay within the budgeted amount of this project. If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall be added to or deducted from the Total Bid Price entered above. The owner can choose to include one or more of the alternates in the Total Bid Price of the Project. If any of the Alternate Bids are utilized by the Owner, the resulting amount shall be considered the Total Bid Price for the Project. The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and after the bid opening date, or until a Contract forthe Work is fully executed by the Owner and a third party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern. Attached hereto is a certified check, a cashier's check or a bid bond in the amount of l aCJ06A PEA, Dollars ($10 Z A J$said amount being not less than ten percent (10 %) of the Total Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award, we fail or refuse to execute the Contract and furnish the required bonds, certificates and endorsements of insurance and other certifications within the time provided. CBF -3 UNIT OF EST. UNIT ITEM NO. ITEM DESCRIPTION MEASURE QTY. PRICE COST 12 Install Traffic Striping, Traffic LS 1 Signal Loops, and Pavement Markers per Plans and SOa- 3c{, SOO Specifications Complete. 13 Prepare a Storm Water Pollution LS 1 Z 6S O— / Z 0' Prevention Plan (SWPPP) ,65 14 Paint Home Addresses (Curb EA 100 �Z 1 Numbering) r1p0 15 Provide a Traffic Control Plan LS 1 prepared and stamped by a registered Traffic Engineer for approval. TOTAL BASE BID PRICE (SCHEDULE BID PRICE): $ Y -?Y 7-71.,-62- Fcvp, Nt/t p p FitI6 ildwsS.VvD Jvy Nr/�t D SSv� �v ot/� Dollar amount in written form WJ LAR5 il,vD SrK-Cy Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in the schedule of bid items above, within the limits define in Section 3 -2.2.1 of the Standard Specifications, to stay within the budgeted amount of this project. If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall be added to or deducted from the Total Bid Price entered above. The owner can choose to include one or more of the alternates in the Total Bid Price of the Project. If any of the Alternate Bids are utilized by the Owner, the resulting amount shall be considered the Total Bid Price for the Project. The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and after the bid opening date, or until a Contract forthe Work is fully executed by the Owner and a third party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern. Attached hereto is a certified check, a cashier's check or a bid bond in the amount of l aCJ06A PEA, Dollars ($10 Z A J$said amount being not less than ten percent (10 %) of the Total Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award, we fail or refuse to execute the Contract and furnish the required bonds, certificates and endorsements of insurance and other certifications within the time provided. CBF -3 BIDDER: Sully - Miller Contracting Co. If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be prepared bythe Owner for execution, within five (5) Calendar Days following the Letter of Award for the Contract, and will deliver to the Owner within that same period the necessary original Certificates of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other documentation and certification required by the Contract. The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the Business and Professional Code), arising from purchases of goods, materials or services by the Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to he Contractor. Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence satisfactory to the Ownerof Bidders California contractors license(s) in good standing; (2) evidence that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting therefrom; and (3) any other information and documentation, financial or otherwise, needed by Owner to award a Contract to the lowest responsible and responsive bidder. Bidder understands and agrees that liquidated damages shall apply to this Contract in the amounts and subject to the terms and conditions described in the Contract Form and the Contract Documents. Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data submitted herewith into a contract arising out of this Bid. r The undersigned acknowledges receipt, understanding and full consideration of the following addenda to the Contract Documents. Addenda Nos. NoNF The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and equipment or supplies necessary to complete the Work as described in the Bid Documents. If this bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the necessary bonds and accept the Total Bid Price as compensation in full for all Work under the contract. I CBF -4 BIDDEN: Sully- Miller Contracting Co. 135 S State College Blvd #400 Business Street Address Brea, CA 92821 City, State and Zip Code (7141578-9600 Telephone Number Bidder's/Contractor's State of Incorporation: Delaware Partners or Joint Venturers: None Bidder's License Number(s): 747612 NOTES: 1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the representations made on the Contract Bid Forms. 2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address 3) If Bidder is a partnership or joint venture, give full names of all partners or joint venturers. As further discussed in the Instructions to Bidders, Bidder will be required to provide evidence that the person signing on behalf of the corporation, nartnershio or joint venture has the authority to do so. CBF -5 CALIFORNIA ALL - PURPOSE ACKNOWLEDGEMENT STATE OF CALIFORNIA l COUNTY OF ORANGE Jj On September 7, 2010 before me, Sandy Dorswitt, personally appeared Gary Downey }.NeN....... SANDY DORSWrI7 Comm # 1855058 m W NOTARY PUBLIC • CALIFORNIA 3) Q ORANGE COUNTY y My Commission Expires June 21,2013 Z NN.O. OOOOOOOO.00OOOOO.ON.N.N.N.Ni Notary Seal Description of Attached Document who proved to me on the basis of satisfactory evidence to be the persons) whose name(&) is/aFe subscribed to the within instrument and acknowledged to me that he/shekhey executed the same in his'ti i ,,,�rlthe° authorized capacity(ies), and that by his!her the signature(s) on the instrument the person(s), or the entity upon behalf of which the person(&) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official J Signature Sandy ry Public OPTIONAL Title or Type of Document: Bid Proposal- Signature Page Document Date: September 7, 2010 Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s): Signer's Name Gary Downey Signers Name ❑ Individual ❑x Corporate Officer - Title(s) Partner - Limited /General 7 Attorney In Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other Signer is Representing: ❑ Individual Assistant Secretary ❑ Corporate Officer — Title(s) Right Thumbprint a ❑ Partner — Limited /General ❑ Attorney In Fact ❑ Trustee ❑ Guardian or Conservator Other SULLY - MILLER CONTRACTING COMPANY 1 Right Thumbprint of Signer SECTION 2 BID DATA FORMS CBF-6 t `EzecutL•difi'Triplicate BIDDER: Sully - Miller Contracting Company i Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide the information required. Bidder shall ensure that every page of its Bid Data Forms are property identified with the Bidder's name and page number. 2.A BID BOND KNOW ALL MEN BY THESE PRESENTS: THAT Sully - Miller Contracting Company as Principal, and Liberty Mutual Insurance Company as Surety, are held firmly bound unto the CffY OF ROSEMEAD (hereinafter called the OWNER) in the sum of Ten percent of amount bid DOLLARS ($ 10% ), being not less than ten percent (10 %) of the Total Bid Price; forthe payment of which sum will and trulyto be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work required for the Hellman Avenue Resurfacing Project as set forth in the Notice Inviting Bids and accompanying Bid Documents, dated 918110 NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the OWNER and; within the time and in the manner required by the above - referenced Bid Documents, enters into the written form of Contract bound with said Bid Documents, furnishes the required bonds (one to guarantee faithful performance and the other to guarantee payment for labor and materials) furnishes the required insurance certificates and endorsements, and furnishes any other certifications as may be required by the Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by the OWNER and judgment is recovered, said Surety shall pay all costs incurred by the OWNER :in such suit, including reasonable attorneys' fees to be fixed by the court ` SIGNEDAND SEALED, this tat day of September 20 10 ��.. Sully- Miiler.Contracting Comp an (SEAL) Liberty Mutual Insurance Company (SEAL) Principa By l Surety — By l _ Signatur Signature victoria M. Camp el ttorney -in -Fact_ D wnev, Asst. ec. " CBF -7 a7 CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT State of California County of Orange On September 1; 2010 before me, Kim Heredia, Notary Public DATE NAME, TITLE OF OFFICER - E.G., "JANE DOE, NOTARY PUBLIC" personally appeared Victoria M Campbell , who proved to me on the basis of satisfactory evidence to be the person(s) whose names (s) is /aFe subscribed to the within.instrument and acknowledged to me that he /she /" executed the same in kris /her /their authorized capacity(ies), and that by his /her /their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. 0 KIM HEREDIA WITNESS my hand and official seal. COMM. #1757050 CO NOTARY PUBLIC - CALIFORNIA --I ORANGE COUNTY p My Comm. ORANGE July Y Yetl SIGNATURE OF NOTARY OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ❑INDIVIDUAL ❑CORPORATE OFFICER TITLE OR TYPE OF DOCUMENT TITLE(S) ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL NUMBER OF PAGES ® ATTORNEY -IN -FACT ❑ TRUSTEE(S) ❑ GUARDIAN /CONSERVATOR ❑ OTHER: S, €,P` n 1 2010 DATE OF DOCUMENT SIGNER IS REPRESENTING: NAME OF PERSONS) OR ENTITY(IES) Liberty Mutual Insurance Company SIGNER(S) OTHER THAN NAMED ABOVE CALIFORNIA ALL - PURPOSE ACKNOWLEDGEMENT STATE OF CALIFORNIA COUNTY OF ORANGE On September 7, 2010 before me, Sandy Dorswitt, personally appeared Gary Downey N.N�NONONON9N�NNN SANDY DORSWITI a: 855 COMM # 1058 IT IT UU PUB LN:•CALIFORNIA 3) ORANGECOUNTY My Commission Expims June 21,2013 N. OO.O�ONON.NON�N Notary Seal Description of Attached Document Title or Type of Document: who proved to me on the basis of satisfactory evidence to be the persons) whose name(s) is/are subscribed to the within instrument and acknowledged to me that heisheithe executed the same in his4*dtheir authorized capacity0es), and that by his!s°i,r" signature(s) on the instrument the person(, or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal Signature Sandy D s Public OPTIONAL Document Date: September 1, 2010 Number of Pages: Signer(s) Other Than Named Above: None Capacity(ies) Claimed by Signer(s): Signer's Name Gary Downey Signer's Name ❑ Individual FX Corporate Officer — Title(s) ❑ Partner — Limited /General Attorney In Fact Trustee ❑ Guardian or Conservator ❑ Other Signer is Representing: ❑ Individual Assistant Secretary ❑ Corporate Officer — Title(s) Right Thumbprint of Signer ❑ Partner — Limited /General ❑ Attorney In Fact ❑ Trustee Guardian or Conservator Other SULLY - MILLER CONTRACTING COMPANY 1 Right Thumbprint uw BIDDER: Sully- Miller Contracting Co. 2.6 LIST OF PROPOSED SUBCONTRACTORS In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100 through 4114 of the California Public Contract Code, and any amendments thereto, each Bidder shall provide the information requested below for each subcontractor who will perform work, labor or render service to Bidder in or about the construction of the Work in an amount in excess of one -half of one percent (greater than 0.5 %) of the Bidder's Total Bid Price, or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one -half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work which will be done by each subcontractor. Bidder shall list only one subcontractor for any one portion of the Work. Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow Bidders twenty -four (24) additional hours after the deadline for submission of bids to submit the information requested by the Owner about each subcontractor, other than the name and location of each subcontractor. If the Bidder fails to specify a subcontractor for any portion of the Work to be performed under the Contract, it shall be deemed to have agreed to perform such portion itself, and shall not be permitted to subcontract that portion of the Work except under the conditions hereinafter set forth below. Subletting or subcontracting of any portion of the Work in excess of one half of one percent (greater than 0.5 %) of the Total Bid Price or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one -half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, for which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after Owner approval. BIDDER: Sully- Miller Contracting Co. 22 LIST OF PROPOSED SUBCONTRACTORS (continued) [ "Duplicate Next 2 Pages if needed for listing additional subconlractors.'l Name and Location Description of Work of Subcontractor to be Subcontracted Name: 7NS ELEG7P.[C Address: (95(f E KA7Et.(�LA 406 U'1_.d...62 Name and Location Description of Work of Subcontractor to be Subcontracted Name: Svt7fRl2l7t )'A -A,&A 7 - '>q -Kre45 Address: I LJ6 /.v(�i/, r0.v e-f?�LLJ L4 -iNAOA 963v Name and Location of Subcontractor Name: Address: Name and Location of Subcontractor Name: Address: Name and Location of Subcontractor Name: Address: CBF -9 Description of Work to be Subcontracted Description of Work to be Subcontracted Description of Work to be Subcontracted BIDDER: Sully - Miller Contracting Co. SECTION 3 NON-COLLUSION AFFIDAVIT CBF - 11 BIDDER: Sully- Miller Contracting Co. NON - COLLUSION AFFIDAVIT In accordance with Public Contract Code Section 7106, the undersigned, being first duly sworn, deposes and says that he or she holds the position listed below with the bidder, the party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, orcorporation; thatthe bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, orthe contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent I thereof to effectuate a collusive or sham bid. Title Sully - Miller Contracting Co. Bidder * * * ** *Please see attached Jurat for proper wording * * * * ** Subscribed and sworn before me = This _ day of 20 (Seal) Notary Public in and for the State of California My Commission Expires: CBF -12 CALIFORNIA JURAT WITH AFFIANT STATEMENT STATE OF CALIFORNIA COUNTY OF ORANGE Subscribed and sworn to (or affirmed) before me on this 07 day of September, 2010, by Gary Downey, proved to me on the basis of satisfactory evidence to be the person who appeared before me. 40NONOOaONON0000NNNNONONON SANDY DORSWT! T COMM k 1855058 m LU NOTARY PUBLIC - CALIFORNIA D Q OFUWOE COUNTY NNO $�WII.$Qt, OOOOOOOpCO1n.1�I0 M�00I0 Notary Seal Description of Attached Document Title or Type of Document: WITNESS my hand and official seal Signature( cx�� Sandy D ry Public OPTIONAL Non - Collusion Affidavit Document Date: September 7, 2010 Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s): Signers Name Gary Downey Signers Name ❑ Individual [X Corporate Officer — Title(s) ❑ Partner — Limited /General ❑ Attorney In Fact Trustee ❑ Guardian or Conservator Other Signer is Representing: ❑ Individual Assistant Secretary ❑ Corporate officer —Title(s) Right Thumbprint of Signer SULLY - MILLER CO ❑ Partner — Limited /General ❑ Attorney In Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other COMPANY 1 Right Thumbprint of Signer