CC - Item 4B - Installation of Full Capture Trash System in Catch Basins Project - Award of Contract� �11 ROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: JEFF ALLRED, CITY MANAGER DATE: FEBRUARY 14, 2012 SUBJECT: INSTALLATION OF FULL CAPTURE TRASH SYSTEM IN CATCH BASINS PROJECT — AWARD OF CONTRACT SUMMARY As a part of the City's Fiscal Year 2011 -2012 Capital Improvement Program, the City Council approved the "Installation of Full Capture Trash System in Catch Basins Project ", which consists of retrofitting sixty -one (61) of the City's 661 stormwater catch basins with trash capture devices to prevent infiltration of trash from the storm water system to the waterways. The retrofit of these sixty -one basins is the first phase in retrofitting all catch basins by October 2016 in compliance with the LA River Trash Total Maximum Daily Load (TMDL) and water quality permit mandates. Staff Recommendation It is recommended that the City Council: 1. Approve the plans and specifications for the project; and 2. Authorize the City Manager to enter into a contract with Time Structure in the amount of $26,960.00 and establish an amount of $4,000.00 (approximately 15 %) to cover the cost of unforeseen construction expenses. At 11 :00 a.m. on February 1, 2012, the City Clerk publicly opened and read two (2) sealed bids with the following results: RANK CONTRACTOR LOCATION BID AMOUNT 1 Time Structure Santa Ana, CA $26,960.00 2 West Coast Storm, Inc. Rialto, CA $30,361.00 Staff has reviewed the bid documents for completeness and investigated the contractors' backgrounds and recent projects for competency. Staff has concluded that Time Structure is the lowest responsible bidder to perform the construction of this project. ITEM NO. _qb _.. APPROVED FOR CITY COUNCIL AGENDA: City Council Meeting February 14, 2012 Page 2 of 2 The LA River Trash TMDL, one of seven TMDLs that the City is subject to under the Multiple Separate Storm Sewer System (MS4) Permit. This TMDL is aimed at reducing the amount of trash discharged into the LA River and its tributaries. In order to be compliant with the TMDL, all cities within the Los Angeles River Watershed must install full capture devices in their catch basins by October 2016. A full capture device is one that collects all trash larger than 5mm and prevents its discharge into the waterways. The City has planned a phased approach to install catch basin inserts over the next 5 years to be compliant by the October 2016 deadline. The City is subject to five TMDLs: LA River Trash, Nitrogen Compounds, Metals, Bacteria, and the Long Beach Beaches and LA River Estuary Bacteria. All TMDLs have specific details of compliance and compliance deadlines. As can be seen with the LA River Trash TMDL, compliance with these measures also represents a significant unfunded mandate for the City. TIMELINE If contract is awarded, staff anticipates the project will be completed according to the following schedule: February 14 — City Council Awards Contract May Vt — July Vt — Tentative Construction Schedule August Vt — Tentative Project Completion September 1 — Tentative Notice of Completion by City Engineer Financial Review Funding for this project is provided for in the City's approved Fiscal Year 2011 -2012 Capital Improvement Program Budget. The total appropriation needed to award this contract is $30,960.00, which includes a 15% contingency amount ($4,000.00) for unforeseen construction expenses. The total budgeted amount for this project is $50,000 (gas tax funds). PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Prepared By: Sean Sullivan Management Analyst Submitted By: Chris Marcarello Public Works Director Attachments: A. Bid Summary B. Project Specifications (Available in City Clerk's Office) PUBLIC WORKS SERVICE DEPARTMENTIENGINEERING DIVISION CITY OF ROSEMEAD INSTALLATION OF CONNECTOR PIPE SCREEN IN CATCH BASINS BID ANALYSIS BID OPENING: FEBRUARY 1. 201 TIME STRUCTURE Base Bid Price M1 1 ...e FURNISH AND INSTALL CONNECTOR PIPE SCREEN 47 LS $ 380.00 QT1 $ 17,860 2 FURNISH AND INSTALL ARS (X<5 FEET) 5 LS $ 380.00 $ 1 ,900.00 3 FURN AND INSTALL AIRS (6 X 8 FEET) 6 LS $ 720.00 $ _ 4,320.00 4 FURNISH AND INSTALL ARS(8 FEET) 3 LS $ 960.00 $ 2,880.00 TOTAL BASE BID PRICE $ 26,960.00 WESTCOASTSTORM BASE BID PRICE N2 ago 1 QC. FURNISH AND INST CONNECTOR PIPE SCREEN FURNISH AND INSTALL AIRS (X F EET) 47 LS $ 423.0 $ 19,881.00 2 5 LS $ 416.00 $ 2,08_0 3 FURN ISH AND INSTALL ARS(5< X< B FEET) _ 6 LS $ 800.00 $ 4,800.00 4 FURNISH AND INSTA ARS(8 <X FEET) 3 LS $ 1,200.00 $ 3,600.00 TOTAL BASE BID PRICE $ 30,361.00 2 12012 PAGE