CC - Item 4F - Sidewalk, Curb and Gutter Replacement Project - Award of ContractROSEMEAD CITY COUNCIL
STAFF REPORT
TO: THE HONORABLE MAYOR AND CITY COUNCIL
FROM: JEFF ALLRED, CITY MANAGER c YC�
- {��//j
DATE: FEBRUARY 14, 2012 ((// `"' ��
SUBJECT: SIDEWALK, CURB AND GUTTER REPLACEMENT PROJECT —
AWARD OF CONTRACT
SUMMARY
As a part of the City's Fiscal Year 2011 -12 Capital Improvement Program, the City
Council approved the "Sidewalk, Curb and Gutter Replacement Project," which consists
of the repair and replacement of sidewalk, curb and gutter in various locations in the
City. This project will improve American with Disabilities Act (ADA) compliance and is
funded through gas tax monies.
Due to the current competitive construction climate, the successful bid received was
lower than anticipated and budgeted. It is therefore prudent to take advantage of the
low prices received and add additional sidewalk locations to this project. Additional
locations will be added based on the City's Sidewalk, Curb, and Gutter Repair List.
These locations have been compiled with input from the Traffic Commission, the public,
and staff observations. Based on this, it is recommended that a 25% contingency
amount be allocated to this construction project. The contingency amount is within the
limits established in the City Purchasing Policy and will be used to cover unforeseen
construction expenses and the installation of additional repair locations.
Staff Recommendation
It is recommended that the City Council:
1. Approve the plans and specifications for the Sidewalk, Curb and Gutter
Replacement Project.
2. Authorize the City Manager to enter into a contract with Kormx, Inc. for the
Sidewalk, Curb and Gutter Replacement Project in the amount of $142,057. In
addition, authorize an amount of $35,500, as a contingency, to cover the cost of
additional sidewalk locations and unforeseen construction expenses.
APPROVED FOR CITY COUNCIL AGENDA: ITEM NO. _..
City Council Meeting
February 14, 2012
Page 2 of 3
DISCUSSION
At 11:00 AM on February 8, 2012, the City Clerk publicly opened and read nineteen (19)
sealed bids with the following results
1
Kormx, Inc.
Walnut, CA
$142,057.00
2
Interlog Hym Engineering
Brea, CA
$145,905.00
3
Ruiz Concrete & Paving
Long Beach, CA
$149,171.40
4
FS Construction
Sylmar, CA
$150,150.00
5
Black Rock Construction
Brea, CA
$154,000.00
6
La Strada Construction
Orange, CA
$156,249.80
7
Moras Equipment
Pico Rivera, CA
$160,710.00
Construction
8
EBS General Engineering
Corona, CA
$163,895.00
9
Gentry Brothers
Irwindale, CA
$171,300.00
10
Martinex Concrete
Azusa, CA
$174,507.50
11
Vido Samarzich, Inc
Alta Loma, CA
$189,275.00
12
Link Engineering
Norco, CA
$192,425.00
13
Kalban Inc.
Sun Valley, CA
$198,307.50
14
Super Technical Inc
Anaheim, CA
$199,525.00
15
Nobest Incorporated
Garden Grove, CA
$209,000.00
16
Premier Developing
Rowland Heights, CA
$215,195.00
Services, Inc
17
EC Construction
South El Monte, CA
$235,470.00
18
Mallcraft, Inc.
Pasadena, CA
$240,461.00
19
JDC Inc.
Rancho Cucamonga, CA
$257,225.00
Staff has reviewed the bid documents for completeness and investigated the
contractor's background and recent projects for competency. Staff has concluded that
Kormx, Inc. is the lowest responsive bidder to perform the construction of this project.
Kormx, Inc. has satisfactorily completed similar projects for other public agencies,
including the cities of Fullerton, Orange, Redlands, and Riverside.
TIMELINE
If directed to move forward, staff will work to complete this project according to the
following schedule:
February 14 — City Council Awards Contract
March 15 — April 15th — Tentative Construction Schedule
May 1 st —Tentative Project Completion
City Council Meeting
February 14, 2012
Paae 3 of 3
FINANCIAL REVIEW
The funding for this project has been allocated in the City's approved FY 2011 -12
Capital Improvement Program Budget ($200,000; Gas Tax Funding). The total
appropriation needed to award this project is $177,557, which includes a 25%
contingency amount ($35,500) for unforeseen construction expenses and construction
of additional sidewalk locations. The contingency amount is within the limits established
in the City Purchasing Policy.
ENVIRONMENTAL REVIEW
The project is categorically exempt from the California Environmental Quality Act
(CEQA) pursuant to Section 15301 (a) of the CEQA Implementing Guidelines.
PUBLIC NOTICE PROCESS
This item has been noticed through the regular agenda notification process.
Prepared by:
Rafael Fajardo
Associate Civil Engineer
Submitted By:
e V,,A.�
Chris Marcarello
Director of Public Works
Attachments:
(1) Bid Summary
(2) Project Specifications (Available in City Clerk's Office)
PUBLIC WORKS SERVICE DEPARTMENTIENGINEERING DIVISION
CITY OF ROSEMEAD
SIDEWALK, CURB AND GUTTER REPLACEMENT PROJECT
PROJECT No. P24002
BID ANALYSIS
BID OPENING: FEBRUARY 8.2012.
Kormx Inc.
BASE BID PRICE
#1
LTA,
?3.�5 1 ,I"d' .
4:
ICU..
4NlYN BEM
WAMOTAW
1
CL EARING AND GRUBBING.
1.00
1.00
LS
LS
$ 500.00
$ 500.00
$ 50 0.00
$ 500._00
2
DISPOSAL OF WASTE MATERIALS.
_
3
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
PER SPPWC STD. PLAN 113-1.
21,000.00
SF
$ 4.66
$ 97,860.00
_
4
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
APPROACHES PER SPPWC STD. PLAN 110 -2.
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
INCHE GUTTER PER SPPWC STD PLAN 120 -2.
500.00
SF
$ 6.52
$ 3,260.00
5
1,015.00
LF
$ 32.30
$ 32,784.50
6
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
PE SPPWC STD 120 -2.
100.00
1.00
LF
$ 15.00
$ 1,500.00
1 $ 2,090.00
7
SPPWC STD PL 111-4.
INSTA SURVEY CENTERLINE TIE MONUMENT
EA
1 $ 2,090.00
8
10.00
EA
$ 356.25
$ 3,562.50
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
TOTAL BASE BID PRICE
LF
$ 27.00
$ 27,405.00
$ 142,057.00
Interlog Hym Engineering
BASE BID PRICE
#2
lTI
A?ESG LION
',
�M
9- OCIRPA #AG..
74TA..
1
CLEARING AND GRUBBING.
1.00
LS
$ 2,000.00
$ 2,000.00
_
2
DISPOSAL OF WASTE MATERIALS.
1.00
LS
$ 1,000.00
$ 1,000.00
SF
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
$ 91,350.00
4
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
APPROACHES PE SPPWC STD. PLA 110 -2.
500.00
3
SIDEWAL PER SPPWC STD. PLAN 113 -1.
21,000.00
SF
$ 4.90
$ 102,90
LF
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
$ 34,570.90
6_
4
APPR OACHES PER SPPWC STD. PLAN 110 -2.
_ 500.00
SF
$ 8.00
$ 4,000.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
SPPWC STD PLAN 111-4.
INSTALL SURVEY CENTERLINE TIE MONUMENT
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24
EA
$ 1,975.00
$ 1,975.00
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 27.00
$ 27,405.00
_ _
REMOVE, DISPOSE AND CONSTRUCT B- INCHES CURB ONLY
I
I $ 149,171.40
6
PER SPPWC STD 120 -2.
100.00
LF
$ 23.00
$ 2,300.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
SPPWC STD PLAN 111 -4.
1.00
EA
$ 2,300.00
$ 2,300.00
8
INSTA SURVEY CENTERLINE TIE MONUMENT
10.00
E A
$ 400.00
$ 4000.00
TOTAL BASE BID PRICE
$ 145,905.00
Ruiz Concrete 8 Paving
BASE BID PRICE
#3
A
. IE 14N
, TWMtlNk'09,0,NMPRAOESNMKTO
1
CLEARING AN GRUBBING.
1.00
LS
$ 7,_340.00
$ 5,580.00
$ _ _ 7,34
$ 5,580.00
2
DISPOSAL OF WASTE MATERIALS. -
1.00
21,000.00
LS
3
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
SIDEWALK PER SPPWC STD. PLAN 113 -1.
SF
$ 4.35
$ 91,350.00
4
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
APPROACHES PE SPPWC STD. PLA 110 -2.
500.00
SF
$ 5.23
$ 2,615.00
5
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 34.06
$ 34,570.90
6_
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
PER SPPWC STD 120 -2.
100.00
LF
$ 24.63
$ 2,463.00
_ _ _
7
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
SPPWC STD PLAN 111-4.
INSTALL SURVEY CENTERLINE TIE MONUMENT
1.00
EA
$ 1,975.00
$ 1,975.00
8
10.00
EA
$ 327.75
$ 3,277.50
TOTAL BASE BID PRICE
I
I $ 149,171.40
2132012
PAGE
PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION
FS Construction
BASE BID PRICE
#4
Black Rock Construction
BASE BID PRICE
#5
ITS._�$�
mmm wct
..
1 !�
XQNI 'pRIC.
'YOTA.....
1
CL EARING AND GRUBBING.
1.00
LS
$ 2,0_00.00
$ 2,000.00
_
2
DISPOSAL OF WASTE MAT
1.00
LS
_$ 2,000.00
_$_ _ 2,00
_
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
3
SIDEWALK P SPP WC STD PLAN 11 3-1.
21,000.00
SF
$ 5.00
$ 105,000.00
21,000.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
$ 4.85
$ 10
_.
4
APPRO ACHES PER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 6.00
$ 3,000.00
SF
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
$ 3,000.00
$ 5.31
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
5
INCH GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 30.00
$ 30,450.00
LF
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
$ 30,450.00
$ 35,240.80
6
PER SPPWC STD 120 -2.
100.00
LF
$ 25.00
$ 2,500.00
PER S PPWC STD 120 -2.
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
LF
$ 25.00
$ 2,500.00
$ 4,714.00
7
SPPWC STD PLAN 111 -4.
1.00
EA
$ 2,200.00
$ 2,200.00
_
8
INSTALL SURVE CENTERLINE TIE MONU
10.00
EA
$ 300.00
$ 3,000.00
INS TALL SURVEY C ENTERLINE TIE MONUMENT
TOTAL BASE BID PRICE
TOTAL BASE BID PRICE
EA
$ 375.00
$ 3,750.00
$ 154,000.00
$ 150,150.00
Black Rock Construction
BASE BID PRICE
#5
ITS._�$�
mmm wct
..
1 !�
XQNI 'pRIC.
'YOTA.....
1
CLEARING AND GRUBBING.
1.00
LS
$ 8,000.00
$ 8,000.00
2
DISPOSAL OF WASTE MATERIALS.
1.00
LS
$ 2,450.00
$ 2,450.00
_
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
3
SIDEWALK PER SPPWC STD. PLAN 113 -1.
_
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
21,000.00
SF
$ 4.85
$ 10
_.
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
4
APPROACHES P ER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 6.00
$ 3,000.00
$ 5.31
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
5
INCHES GU TTER PER SPPWC STD PLAN 120 -2.
1,015
LF
$ 30.00
$ 30,450.00
$ 35,240.80
AND C
REMOVE, DISPOSE ONSTRUCT 8- INCHES CURB ONLY
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
6
PER S PPWC STD 120 -2.
100.00
LF
$ 25.00
$ 2,500.00
$ 4,714.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
7
SPPWC STD PLAN 111 -4.
1.00
EA
$ 2,000.00
$ 2,000.00
e
INS TALL SURVEY C ENTERLINE TIE MONUMENT
TOTAL BASE BID PRICE
10.00
EA
$ 375.00
$ 3,750.00
$ 154,000.00
TOTAL BASE BID PRICE -
La Strada Construction
BASE BID PRICE
#6
IT-4
O15'S„CIR T( -. ,. .
1 ,41
Qhj1AT
AUNIT'PRIC.E
.: TgTAQ ' t41.
1
CLEARING AND GRUBBING.
1.00
LS
$ 13,300.00
$ 13,300.00
2
DISPOSAL OF WASTE MATERIALS.
1.00
LS
$ 21,400.00
$ 21,400.00
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
3
SIDEWALK PER S PPWC STD. PLAN 113 -1.
21,000.00
SF
$ 3.44
$ 72,240.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
4
APPROA PER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 5.31
$ 2,655.00
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 34.72
$ 35,240.80
_5
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
6
PER SPPWC STD 120 -
100.00
LF
$ 47.14
$ 4,714.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
SPPWC STD PLAN 111 -4.
1.00
EA
$ 3,370.00
$ 3,370.00
8
INSTALL SURVEY CENTERLINE TIE MONUMENT
10.00
EA
$ 333.00
$ 3,330.00
TOTAL BASE BID PRICE -
$ 156,249.80
2/9/2012
PAGE 2
PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION
Moras Equipment Construction
BASE BID PRICE
#7
EBB General Engineering, Inc.
BASE BID PRICE
#8
?q,
Tl €SCSI :ION
?"..i:'
UN _
A mul"pRICEN
TAL
1
CL EARING AND GRUBBING.
DISPOSAL OF WASTE MATER
1.00
LS
$ 5,000.00
$ 5,000.00
2
1.00
LS
$ 5,000.00
_
$ 5,000.00
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
_
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
3
3
SIDEWALK PE SPPWC STD. PLAN 113-1.
21,000.0
SF
$ 5.00
$ 105,000.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
EMOVE, DISPOS
RE AND CONSTRUCT PCC DRIVEWAY
4
4
APPROAC PER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 5.75
$ 2,875.00
$ 3,000.00
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
REMOVE, DISPOSE AND CONSTRUc 8- INCHES CURB AND 24.
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 29.00
$ 29,435.00
$ 20,300.00
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
6
PER SPPWC STD 120 -2.
6
PER SPPWC STD 120 -2.
100.00
LF
$ 29.00
$ 2,900.00
$ 1,800.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
SPPWC STD PLAN 111-4.
7
SP PWC STD PLAN 111 -4.
1.00
EA
$ 3,000.00
$ 3
8
INSTALL SURVE CENTERLINE TIE MONUMENT
10.00
EA
$ 750.00
$ 7,500.00
TOTAL BASE BID PRICE
$ 160,710.00
EBB General Engineering, Inc.
BASE BID PRICE
#8
?q,
Tl €SCSI :ION
?"..i:'
UN _
A mul"pRICEN
TAL
1
CLEARING AND GRUBBING.
1.00
LS
1 $ 1 2,500.00
500.00
$ 12,500.00
$ 500.00
2
DIS POSAL OF WASTE MATERIAL
1.00
LS __$
1.00
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
3
SIDEWALK PER SP PWC STD. PLAN 113 -1.
21,000.0
SF
$ 5.00
$ 105,000.00
_
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
EMOVE, DISPOS
RE AND CONSTRUCT PCC DRIVEWAY
4
APPROACHES PE SPPWC STD. PLAN 110 -2.
REMOVE, DISPOSE AND CONSTRUTt 8- INCHES CURB AND 24-
500.00
SF
$ 6.00
$ 3,000.00
$ 6.00
$ 3,000.00
REMOVE, DISPOSE AND CONSTRUc 8- INCHES CURB AND 24.
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 33.00
$ 33,495.00
LF
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
$ 20,300.00
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
6
PER SPPWC STD 120 -2.
100.00
LF
$ 33.00
$ 3,300.00
LF
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
$ 1,800.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
SPPWC STD PLAN 111-4.
1.00
EA
$ 3,00
$ 310.00
$ 3,000.00
e_
INSTALL SURVEYCENTERLINE TIE MONUMENT
10.00
8
$ 3,100.00
_ 8
TOTAL BASE BID PRICE
$ 250.00
_EA
$ 163,895.00
Gentry Brothers
BASE BID PRICE
#9
ITEM§(IIE,SCaIRTIO
"�.
?"..i:'
t Q.
„UNITJV14NIT
1
CLEARING AND GRUBBING.
1.00
LS
$ _ _ 8,000.00
$ 8,000.00
$ 8,000.00
$ 8,000.00
2
DISPOSAL OF WASTE MATERIALS.
1.00
LS
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
3
SIDEWALK PER SP PWC STD. PLAN 113 -1.
21, 000.00
SF
$ 6.00
$ 126,000.00
EMOVE, DISPOS
RE AND CONSTRUCT PCC DRIVEWAY
4
APPROACHES PER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 6.00
$ 3,000.00
REMOVE, DISPOSE AND CONSTRUc 8- INCHES CURB AND 24.
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
20.00
$ 20,300.00
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
_$
6
PER SPPWC STD 120 -2.
100.00
LF
$ 18.00
$ 1,800.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
SPPWC STD PLAN 111 -4.
1.00
EA
$ 1,700.00
$ 1,700.00
8
INSTALL SURVEYCENTERLINETIEMONUMENT
10.00
EA
$ 250.00
$ 2,50
TOTAL BASE BID PRICE
$ 171,300.00
29/2012
PAGE3
PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION
Martinez Concrete
BASE BID PRICE
#10
P....w
�.�1 T..IR
4,T.,1'.
U..N
P0MPKIe!,jpMToTAV:.....
T.DTAI,
1
CLEARING AND GRUBBING.
1.00_
LS_
$ 37,000.00
$ 37,000.00
2
_
DISPOSAL OF WASTE M ATERIALS.
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
SIDEWALK PER SPPWC STD. PLAN 113-1.
1.00
21,000.
500.00
LS
$ 14,000.00
$ 14,000.00
3
SF
$ 4.50
$ 94,500.00
4
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
APPRO ACHES PER SPPWC STD. PLAN 110 -2.
SF
$ 6.10
$ 3,050.00
5
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 18.50
$ 18,777.50
6
REMOVE, DISPOSE AND CONSTRUCT B- INCHES CURB ONLY
PER SPPWC STD 120 -2.
100.00
LF
$ 16.80
$ 1,680.00
7
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
SPPWC STD PLAN 111 -4.
1.00
EA
$ 2,300.00
$ 320.00
$ 2,300.00
$ 3,200.00
8
INSTALL SU RVEY CENTERLINE TIE MONUMENT
10.00
EA
$ 45,675.00
TOTAL BASE BID PRICE
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
$ 174,507.50
Vido Samamlch Inc
BASE BID PRICE
#11
ITEM
0E
m QS
kuNlT1
llivar.?!?_lC.,
T.DTAI,
1
CLEARING AND GRUBBING.
1.00
LS
$
$ 1,000.00
$ 3
$ 1,000.00
2
DISPOSAL OF WASTE MATERIALS.
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
1.00
LS
3
SIDEWALK PER SP PWC STD. PLAN 113 -1.
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
21,000
SF
$ 6.00
$ 126,000.00
4
APPROACH PER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 8.00
$ 4,000.00
$ 12,500.00
REMOVE, DISPOSE AND CONSTRUct B- INCHES CURB AND 24-
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 45.00
$ 45,675.00
$ 45,675.00
REMOVE, DISPOSE AND CONSTRUCT B- INCHES CURB ONLY
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
6
PER SPPWC STD 120 -2.
100.00
LF
$ 35_.00
_$ 3,500.00
$ 2,200.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
SPPWC STD PLAN 111 -4.
1.00
EA
3,600.00
$ 3,600
B
INSTALL SURVEY CENTERLINE TIE MONUMENT
10.0
EA
_$
$ 200.00
$ 2,000.00
$ 55.00
TOTAL BASE BID PRICE
TOTAL BASE BID PRICE
$ 189,275.00
Link Engineering
BASE BID PRICE
#12
ITEM„
U $CI1lP "i aE'�d`3' s'a "i"u.3
a „.O .., °xUNITi
$?.4NIlaPRIC� `
4 TQT.AL , ;"�c.`1�.;,
1
CLEARING AND GRUBBING.
1.00
LS
_ $ 2,000.00
$ 2,000.00
$ 2,0 00.00
$ 2,000.00
_
2
DISPOSAL OF WASTE MATERIALS.
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
1
LS
3
SIDEWALK PE SPPWC STD. PLAN 113-1.
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
2 1,000.00
SF
$ 6.00
$ 126,000.00
4
APPROACHES PER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 25.00
$ 12,500.00
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF_
$ 45.00
$ 45,675.00
_
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
6
PERSPPWCSTD120 -2.
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
100.00
LF
$ 22.00
$ 2,200.00
7
SPPWC S TD PLAN 111 -4.
1.00
EA
$ 1,500.00
$ 1,500.00
8
INSTALL SURVEY CENTERLINE TIE MONUMENT
10.00
EA
$ 55.00
$ 550.00
$ 192,425.00
TOTAL BASE BID PRICE
2/92012
PAGE 4
PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION M12012
Kalban Inc.
BASE BID PRICE
#13
Super Technical Inc
BASE BID PRICE
#14
1TE.
d S . I 6N
O .
!:N
- 0NMRR (CEO
QTA
1
CLEARING AND GRUBBING.
1.00
LS
$ 1,500.00
$ 1,500.00
2
DISPO OF WASTE MATERIALS.
_
1.00
LS
$ 1,600.00
$ 1,500.00
REMOV DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
E,
3
3
SIDEWALK PER SPPWC STD. PLAN 113 -1.
21,000.00
SF
$ 6.00
$ 126,000.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
4
4
APPROACHES PER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 9.00
$ 4,500.00
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
REMOVE, DISPOSE AND CONSTRUct B- INCHES CURB AND 24-
5
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 52.50
$ 53,287.50
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
REMOVE, DISPOSE AND CONSTRUCT B- INCHES CURB ONLY
6
PER SPPWC STD 120 -2.
6
PER SPPWC STD 120 -2.
100.00
LF
$ 52.50
$ 5,250.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
7
SPPWC STD PLAN 111 -4.
1.00
EA
$ 3,000.00
$ 3,000.00
10 .00
EA
$ 300.00
$ 3,000.00
8
INSTALL S URVEY CENTERLINE TIE MONUMENT
TOTAL BASE BID PRICE
$ 199,525.00
$ 198,037.50
Super Technical Inc
BASE BID PRICE
#14
1TE.
d S . I 6N
O .
!:N
- 0NMRR (CEO
QTA
1
CLEARING AND GRUBBING.
1.00
LS
$ 3,000.00
$ 3,000.00
2
DISPOSAL OF WASTE MATERIALS.
_- -
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
1.00
_
LS
$ 2,000.00
$ 2,000.00
3
SIDEWALK PER S PPWC STD. PLAN 113 -1.
2 1,000.00
SF
$ 7.00
$ 147,000.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
4
APPROACHES PER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 8.00
$ 4,000.00
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ _ 35
$ 35,525.00
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
6
PER SPPWC STD 120 -2.
100.00
LF
$ 30.00
$ 3,000.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
SPPWC STD PLAN 111 -4.
1.00
EA
$ 1,000.00
$ 1,000.00
_ _
8
INSTALL SURVE CENTERLINE TIE MONUMENT
TOTAL BASE BID PRICE
10.00
EA
$ 400.00
$ 4,000.00
$ 199,525.00
PAGE 5
Nobest Incorporated #15
PUBLIC WORKS SERVICE DEPARTMENTIENGINEERING DIVISION
Premier Developing Services Inc
BASE BID PRICE
#16
EC Construction
BASE BID PRICE
#17
DE5C �3tp„YfON.. :'$dr�} .. w.,� '? , , R, 4 _ ., I
CI-
IT`
x. UNI[TjRP E�'u,';S
., 1TOTAISd14Vf0.
1
CLEARING AND G RUBBING.
1.00
LS
$ 4,500.00
$ 4,500
_ _ __
$ _ 1,400.0
__.
2
-_
DISPOSAL OF WASTE MATERIALS.
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
_
1.00
LS
-.
$ 1_,40
$ 3,750.00
_
3
SIDEWA PER SPPWC STD. PLAN 113 -1.
21,000.00
SF
$ _ 6.25
$ 131,250.00_
SF
_
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
$ 131,670.00
4
APPR OACHES PER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 7.75
$ 3,875.00
500.00
REMOVE, DISPOSE AND CONSTRUCt 8- INCHES CURB AND 24-
$ 10.00
$ 5,000.00
$ 5,240.00
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
_ _ 5 8.00
$ 58,870.00
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
LF
_$ 70.00
_$
$ 66,381.00
6
PE SPPWC STD 120 -2.
100.00
LF
_$ 50.00
$ 5,000.00
PER SPPWC STD 120 -2.
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
LF
$ 35.00
$ 3,500.00
$ 2,910.00
7
SPPWC STD PLAN 111 -4.
1.0
EA
$ 1,800.00
$ 1,800.00
_8
INSTALL SUR VEY CENTERLINE TIE MONUMENT
10.00
EA
$ 850.00
$ 8,500.00
INSTALL SURVEY CEN TERLINE TIE MO NUMENT _
TOTAL BASE BID PRICE
TOTAL BASE BID PRICE
EA
$ 250.00
$ 2,500.00
$ 235,470.00
$ 215,195.00
EC Construction
BASE BID PRICE
#17
Mallcraft, Inc.
BASE BID PRICE
#18
ITE
DE5C �3tp„YfON.. :'$dr�} .. w.,� '? , , R, 4 _ ., I
CI-
IT`
x. UNI[TjRP E�'u,';S
., 1TOTAISd14Vf0.
1
CLEARING AND GRUBBING.
1.00
LS
$ 15,000.00
$ 15,000.00
2
DISPOSAL OF WAS MATERIALS.
__ - -
1.00
LS
$ 3,750.00
$ 3,750.00
_
_
_ - - -.
RSE AND CONSTRUCT 4-INCHES THICK PCC
EMOVE, DISPO
RE MOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
3
SIDEWALK PER S PPWC STD. PLAN 113 -1.
21,000.00
SF
$ 6.27
$ 131,670.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
4
APPROACHES PER SPPWC STD. PLAN 110 -2.
500.00
SF
$ 10.00
$ 5,000.00
$ 5,240.00
REMOVE, DISPOSE AND CONSTRUCt 8- INCHES CURB AND 24-
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
_$ 70.00
$ 71,050.00
$ 66,381.00
REMOVE, DISPOSE AND CONSTRUCT e- INCHES CURB ONLY
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
6
PER SPPWC STD 120 -2.
100.00
LF
$ 35.00
$ 3,500.00
$ 2,910.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
7
SPPWC STD PLAN 111 -4.
1.00
EA
$ 3,000.00
$ 3,000.00
8
INSTALL SURVEY CEN TERLINE TIE MO NUMENT _
TOTAL BASE BID PRICE
10.00
EA
$ 250.00
$ 2,500.00
$ 235,470.00
TOTAL BASE BID PRICE
_
Mallcraft, Inc.
BASE BID PRICE
#18
ITE
DE5C �3tp„YfON.. :'$dr�} .. w.,� '? , , R, 4 _ ., I
CI-
IT`
x. UNI[TjRP E�'u,';S
., 1TOTAISd14Vf0.
1
CLEARING AND GRUBBING.
1.00
LS
$ 6,000.00
$ 6,000.00
2
DISPOSAL OF WASTE MATERIALS.
1.00
LS
$ 4,800.00
$ 4 ,800.0 0
_
_
_
RE MOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
3
SIDEWALK PER SPPWC STD. PLAN 113 -1.
21,000.00
SF
$ 6.87
$ 144,270.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
4
APPROACHES PER SPPWC STD. PLAN 110 -2.
500.00
S_ F_
$ 10.48
$ 5,240.00
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 65.40
$ 66,381.00
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
6
PER SPPWC STD 120 -2.
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
100.00
LF
$ 29.10
$ 2,910.00
7
SPPWC STD PLAN 111 -4.
1.00
EA
$ _4,_860.00
$ 4,860.00
8
INSTALL SURVEY CENTERLINE TIE MONUMENT
10.00
EA
$ 600.00
$ 6,000.00
TOTAL BASE BID PRICE
_
$ 240,461.00
2/92012
PAGE 6
PUBLIC WORKS SERVICEDEPARTMENTIENGINEERING DIVISION
JDC Inc.
BASE BID PRICE
#19
M12012
PAGE 7
1
CLEAR AND GRUBBING.
1.00
LS
_
LS
$ 21,000.00
$ 21,000.00
2
_
DI SPOSAL OF WASTE MATERIALS.
_ _
1.00
$ 3,500.00
$ 3,500.00
REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC
3
SIDEWALK PER SPPWC STD. PLAN 113 -1.
21 ,000.00
SF
$ 7.50
$ 157,500.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
4
APPROACHES PER S PPWC STD. PLAN 110 -2.
500.00
SF
$ 16.00
$ 8,000.00
REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24-
5
INCHES GUTTER PER SPPWC STD PLAN 120 -2.
1,015.00
LF
$ 55.00
$ 55,825.00
REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY
6
PERSPPW CSTD120 -2.
100.00
LF
$ 48.00
$ 4,800.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER
7
SPPWC ST PLAN 111-4.
1.00
EA
$ 3,000.00
$ 360.00
$ 3,000.00
$ 3,600.00
8
INSTA SURVEY CENTERLINE TIE MONUMEW
10.00
EA
TOTAL BASE BID PRICE
I
I
I
$ 257,225.00
M12012
PAGE 7