Loading...
CC - Item 4F - Sidewalk, Curb and Gutter Replacement Project - Award of ContractROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: JEFF ALLRED, CITY MANAGER c YC� - {��//j DATE: FEBRUARY 14, 2012 ((// `"' �� SUBJECT: SIDEWALK, CURB AND GUTTER REPLACEMENT PROJECT — AWARD OF CONTRACT SUMMARY As a part of the City's Fiscal Year 2011 -12 Capital Improvement Program, the City Council approved the "Sidewalk, Curb and Gutter Replacement Project," which consists of the repair and replacement of sidewalk, curb and gutter in various locations in the City. This project will improve American with Disabilities Act (ADA) compliance and is funded through gas tax monies. Due to the current competitive construction climate, the successful bid received was lower than anticipated and budgeted. It is therefore prudent to take advantage of the low prices received and add additional sidewalk locations to this project. Additional locations will be added based on the City's Sidewalk, Curb, and Gutter Repair List. These locations have been compiled with input from the Traffic Commission, the public, and staff observations. Based on this, it is recommended that a 25% contingency amount be allocated to this construction project. The contingency amount is within the limits established in the City Purchasing Policy and will be used to cover unforeseen construction expenses and the installation of additional repair locations. Staff Recommendation It is recommended that the City Council: 1. Approve the plans and specifications for the Sidewalk, Curb and Gutter Replacement Project. 2. Authorize the City Manager to enter into a contract with Kormx, Inc. for the Sidewalk, Curb and Gutter Replacement Project in the amount of $142,057. In addition, authorize an amount of $35,500, as a contingency, to cover the cost of additional sidewalk locations and unforeseen construction expenses. APPROVED FOR CITY COUNCIL AGENDA: ITEM NO. _.. City Council Meeting February 14, 2012 Page 2 of 3 DISCUSSION At 11:00 AM on February 8, 2012, the City Clerk publicly opened and read nineteen (19) sealed bids with the following results 1 Kormx, Inc. Walnut, CA $142,057.00 2 Interlog Hym Engineering Brea, CA $145,905.00 3 Ruiz Concrete & Paving Long Beach, CA $149,171.40 4 FS Construction Sylmar, CA $150,150.00 5 Black Rock Construction Brea, CA $154,000.00 6 La Strada Construction Orange, CA $156,249.80 7 Moras Equipment Pico Rivera, CA $160,710.00 Construction 8 EBS General Engineering Corona, CA $163,895.00 9 Gentry Brothers Irwindale, CA $171,300.00 10 Martinex Concrete Azusa, CA $174,507.50 11 Vido Samarzich, Inc Alta Loma, CA $189,275.00 12 Link Engineering Norco, CA $192,425.00 13 Kalban Inc. Sun Valley, CA $198,307.50 14 Super Technical Inc Anaheim, CA $199,525.00 15 Nobest Incorporated Garden Grove, CA $209,000.00 16 Premier Developing Rowland Heights, CA $215,195.00 Services, Inc 17 EC Construction South El Monte, CA $235,470.00 18 Mallcraft, Inc. Pasadena, CA $240,461.00 19 JDC Inc. Rancho Cucamonga, CA $257,225.00 Staff has reviewed the bid documents for completeness and investigated the contractor's background and recent projects for competency. Staff has concluded that Kormx, Inc. is the lowest responsive bidder to perform the construction of this project. Kormx, Inc. has satisfactorily completed similar projects for other public agencies, including the cities of Fullerton, Orange, Redlands, and Riverside. TIMELINE If directed to move forward, staff will work to complete this project according to the following schedule: February 14 — City Council Awards Contract March 15 — April 15th — Tentative Construction Schedule May 1 st —Tentative Project Completion City Council Meeting February 14, 2012 Paae 3 of 3 FINANCIAL REVIEW The funding for this project has been allocated in the City's approved FY 2011 -12 Capital Improvement Program Budget ($200,000; Gas Tax Funding). The total appropriation needed to award this project is $177,557, which includes a 25% contingency amount ($35,500) for unforeseen construction expenses and construction of additional sidewalk locations. The contingency amount is within the limits established in the City Purchasing Policy. ENVIRONMENTAL REVIEW The project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (a) of the CEQA Implementing Guidelines. PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Prepared by: Rafael Fajardo Associate Civil Engineer Submitted By: e V,,A.� Chris Marcarello Director of Public Works Attachments: (1) Bid Summary (2) Project Specifications (Available in City Clerk's Office) PUBLIC WORKS SERVICE DEPARTMENTIENGINEERING DIVISION CITY OF ROSEMEAD SIDEWALK, CURB AND GUTTER REPLACEMENT PROJECT PROJECT No. P24002 BID ANALYSIS BID OPENING: FEBRUARY 8.2012. Kormx Inc. BASE BID PRICE #1 LTA, ?3.�5 1 ,I"d' . 4: ICU.. 4NlYN BEM WAMOTAW 1 CL EARING AND GRUBBING. 1.00 1.00 LS LS $ 500.00 $ 500.00 $ 50 0.00 $ 500._00 2 DISPOSAL OF WASTE MATERIALS. _ 3 REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC PER SPPWC STD. PLAN 113-1. 21,000.00 SF $ 4.66 $ 97,860.00 _ 4 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY APPROACHES PER SPPWC STD. PLAN 110 -2. REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- INCHE GUTTER PER SPPWC STD PLAN 120 -2. 500.00 SF $ 6.52 $ 3,260.00 5 1,015.00 LF $ 32.30 $ 32,784.50 6 REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY PE SPPWC STD 120 -2. 100.00 1.00 LF $ 15.00 $ 1,500.00 1 $ 2,090.00 7 SPPWC STD PL 111-4. INSTA SURVEY CENTERLINE TIE MONUMENT EA 1 $ 2,090.00 8 10.00 EA $ 356.25 $ 3,562.50 INCHES GUTTER PER SPPWC STD PLAN 120 -2. TOTAL BASE BID PRICE LF $ 27.00 $ 27,405.00 $ 142,057.00 Interlog Hym Engineering BASE BID PRICE #2 lTI A?ESG LION ', �M 9- OCIRPA #AG.. 74TA.. 1 CLEARING AND GRUBBING. 1.00 LS $ 2,000.00 $ 2,000.00 _ 2 DISPOSAL OF WASTE MATERIALS. 1.00 LS $ 1,000.00 $ 1,000.00 SF REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC $ 91,350.00 4 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY APPROACHES PE SPPWC STD. PLA 110 -2. 500.00 3 SIDEWAL PER SPPWC STD. PLAN 113 -1. 21,000.00 SF $ 4.90 $ 102,90 LF REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY $ 34,570.90 6_ 4 APPR OACHES PER SPPWC STD. PLAN 110 -2. _ 500.00 SF $ 8.00 $ 4,000.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER SPPWC STD PLAN 111-4. INSTALL SURVEY CENTERLINE TIE MONUMENT REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24 EA $ 1,975.00 $ 1,975.00 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 27.00 $ 27,405.00 _ _ REMOVE, DISPOSE AND CONSTRUCT B- INCHES CURB ONLY I I $ 149,171.40 6 PER SPPWC STD 120 -2. 100.00 LF $ 23.00 $ 2,300.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 SPPWC STD PLAN 111 -4. 1.00 EA $ 2,300.00 $ 2,300.00 8 INSTA SURVEY CENTERLINE TIE MONUMENT 10.00 E A $ 400.00 $ 4000.00 TOTAL BASE BID PRICE $ 145,905.00 Ruiz Concrete 8 Paving BASE BID PRICE #3 A . IE 14N , TWMtlNk'09,0,NMPRAOESNMKTO 1 CLEARING AN GRUBBING. 1.00 LS $ 7,_340.00 $ 5,580.00 $ _ _ 7,34 $ 5,580.00 2 DISPOSAL OF WASTE MATERIALS. - 1.00 21,000.00 LS 3 REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC SIDEWALK PER SPPWC STD. PLAN 113 -1. SF $ 4.35 $ 91,350.00 4 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY APPROACHES PE SPPWC STD. PLA 110 -2. 500.00 SF $ 5.23 $ 2,615.00 5 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 34.06 $ 34,570.90 6_ REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY PER SPPWC STD 120 -2. 100.00 LF $ 24.63 $ 2,463.00 _ _ _ 7 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER SPPWC STD PLAN 111-4. INSTALL SURVEY CENTERLINE TIE MONUMENT 1.00 EA $ 1,975.00 $ 1,975.00 8 10.00 EA $ 327.75 $ 3,277.50 TOTAL BASE BID PRICE I I $ 149,171.40 2132012 PAGE PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION FS Construction BASE BID PRICE #4 Black Rock Construction BASE BID PRICE #5 ITS._�$� mmm wct .. 1 !� XQNI 'pRIC. 'YOTA..... 1 CL EARING AND GRUBBING. 1.00 LS $ 2,0_00.00 $ 2,000.00 _ 2 DISPOSAL OF WASTE MAT 1.00 LS _$ 2,000.00 _$_ _ 2,00 _ REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 3 SIDEWALK P SPP WC STD PLAN 11 3-1. 21,000.00 SF $ 5.00 $ 105,000.00 21,000.00 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY $ 4.85 $ 10 _. 4 APPRO ACHES PER SPPWC STD. PLAN 110 -2. 500.00 SF $ 6.00 $ 3,000.00 SF REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- $ 3,000.00 $ 5.31 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- 5 INCH GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 30.00 $ 30,450.00 LF REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY $ 30,450.00 $ 35,240.80 6 PER SPPWC STD 120 -2. 100.00 LF $ 25.00 $ 2,500.00 PER S PPWC STD 120 -2. REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER LF $ 25.00 $ 2,500.00 $ 4,714.00 7 SPPWC STD PLAN 111 -4. 1.00 EA $ 2,200.00 $ 2,200.00 _ 8 INSTALL SURVE CENTERLINE TIE MONU 10.00 EA $ 300.00 $ 3,000.00 INS TALL SURVEY C ENTERLINE TIE MONUMENT TOTAL BASE BID PRICE TOTAL BASE BID PRICE EA $ 375.00 $ 3,750.00 $ 154,000.00 $ 150,150.00 Black Rock Construction BASE BID PRICE #5 ITS._�$� mmm wct .. 1 !� XQNI 'pRIC. 'YOTA..... 1 CLEARING AND GRUBBING. 1.00 LS $ 8,000.00 $ 8,000.00 2 DISPOSAL OF WASTE MATERIALS. 1.00 LS $ 2,450.00 $ 2,450.00 _ REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 3 SIDEWALK PER SPPWC STD. PLAN 113 -1. _ REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY 21,000.00 SF $ 4.85 $ 10 _. REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY 4 APPROACHES P ER SPPWC STD. PLAN 110 -2. 500.00 SF $ 6.00 $ 3,000.00 $ 5.31 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- 5 INCHES GU TTER PER SPPWC STD PLAN 120 -2. 1,015 LF $ 30.00 $ 30,450.00 $ 35,240.80 AND C REMOVE, DISPOSE ONSTRUCT 8- INCHES CURB ONLY REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY 6 PER S PPWC STD 120 -2. 100.00 LF $ 25.00 $ 2,500.00 $ 4,714.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 7 SPPWC STD PLAN 111 -4. 1.00 EA $ 2,000.00 $ 2,000.00 e INS TALL SURVEY C ENTERLINE TIE MONUMENT TOTAL BASE BID PRICE 10.00 EA $ 375.00 $ 3,750.00 $ 154,000.00 TOTAL BASE BID PRICE - La Strada Construction BASE BID PRICE #6 IT-4 O15'S„CIR T( -. ,. . 1 ,41 Qhj1AT AUNIT'PRIC.E .: TgTAQ ' t41. 1 CLEARING AND GRUBBING. 1.00 LS $ 13,300.00 $ 13,300.00 2 DISPOSAL OF WASTE MATERIALS. 1.00 LS $ 21,400.00 $ 21,400.00 REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 3 SIDEWALK PER S PPWC STD. PLAN 113 -1. 21,000.00 SF $ 3.44 $ 72,240.00 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY 4 APPROA PER SPPWC STD. PLAN 110 -2. 500.00 SF $ 5.31 $ 2,655.00 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 34.72 $ 35,240.80 _5 REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY 6 PER SPPWC STD 120 - 100.00 LF $ 47.14 $ 4,714.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 SPPWC STD PLAN 111 -4. 1.00 EA $ 3,370.00 $ 3,370.00 8 INSTALL SURVEY CENTERLINE TIE MONUMENT 10.00 EA $ 333.00 $ 3,330.00 TOTAL BASE BID PRICE - $ 156,249.80 2/9/2012 PAGE 2 PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION Moras Equipment Construction BASE BID PRICE #7 EBB General Engineering, Inc. BASE BID PRICE #8 ?q, Tl €SCSI :ION ?"..i:' UN _ A mul"pRICEN TAL 1 CL EARING AND GRUBBING. DISPOSAL OF WASTE MATER 1.00 LS $ 5,000.00 $ 5,000.00 2 1.00 LS $ 5,000.00 _ $ 5,000.00 REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC _ REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 3 3 SIDEWALK PE SPPWC STD. PLAN 113-1. 21,000.0 SF $ 5.00 $ 105,000.00 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY EMOVE, DISPOS RE AND CONSTRUCT PCC DRIVEWAY 4 4 APPROAC PER SPPWC STD. PLAN 110 -2. 500.00 SF $ 5.75 $ 2,875.00 $ 3,000.00 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- REMOVE, DISPOSE AND CONSTRUc 8- INCHES CURB AND 24. 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 29.00 $ 29,435.00 $ 20,300.00 REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY 6 PER SPPWC STD 120 -2. 6 PER SPPWC STD 120 -2. 100.00 LF $ 29.00 $ 2,900.00 $ 1,800.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 SPPWC STD PLAN 111-4. 7 SP PWC STD PLAN 111 -4. 1.00 EA $ 3,000.00 $ 3 8 INSTALL SURVE CENTERLINE TIE MONUMENT 10.00 EA $ 750.00 $ 7,500.00 TOTAL BASE BID PRICE $ 160,710.00 EBB General Engineering, Inc. BASE BID PRICE #8 ?q, Tl €SCSI :ION ?"..i:' UN _ A mul"pRICEN TAL 1 CLEARING AND GRUBBING. 1.00 LS 1 $ 1 2,500.00 500.00 $ 12,500.00 $ 500.00 2 DIS POSAL OF WASTE MATERIAL 1.00 LS __$ 1.00 REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 3 SIDEWALK PER SP PWC STD. PLAN 113 -1. 21,000.0 SF $ 5.00 $ 105,000.00 _ REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY EMOVE, DISPOS RE AND CONSTRUCT PCC DRIVEWAY 4 APPROACHES PE SPPWC STD. PLAN 110 -2. REMOVE, DISPOSE AND CONSTRUTt 8- INCHES CURB AND 24- 500.00 SF $ 6.00 $ 3,000.00 $ 6.00 $ 3,000.00 REMOVE, DISPOSE AND CONSTRUc 8- INCHES CURB AND 24. 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 33.00 $ 33,495.00 LF REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY $ 20,300.00 REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY 6 PER SPPWC STD 120 -2. 100.00 LF $ 33.00 $ 3,300.00 LF REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER $ 1,800.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 SPPWC STD PLAN 111-4. 1.00 EA $ 3,00 $ 310.00 $ 3,000.00 e_ INSTALL SURVEYCENTERLINE TIE MONUMENT 10.00 8 $ 3,100.00 _ 8 TOTAL BASE BID PRICE $ 250.00 _EA $ 163,895.00 Gentry Brothers BASE BID PRICE #9 ITEM§(IIE,SCaIRTIO "�. ?"..i:' t Q. „UNITJV14NIT 1 CLEARING AND GRUBBING. 1.00 LS $ _ _ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 2 DISPOSAL OF WASTE MATERIALS. 1.00 LS REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 3 SIDEWALK PER SP PWC STD. PLAN 113 -1. 21, 000.00 SF $ 6.00 $ 126,000.00 EMOVE, DISPOS RE AND CONSTRUCT PCC DRIVEWAY 4 APPROACHES PER SPPWC STD. PLAN 110 -2. 500.00 SF $ 6.00 $ 3,000.00 REMOVE, DISPOSE AND CONSTRUc 8- INCHES CURB AND 24. 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF 20.00 $ 20,300.00 REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY _$ 6 PER SPPWC STD 120 -2. 100.00 LF $ 18.00 $ 1,800.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 SPPWC STD PLAN 111 -4. 1.00 EA $ 1,700.00 $ 1,700.00 8 INSTALL SURVEYCENTERLINETIEMONUMENT 10.00 EA $ 250.00 $ 2,50 TOTAL BASE BID PRICE $ 171,300.00 29/2012 PAGE3 PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION Martinez Concrete BASE BID PRICE #10 P....w �.�1 T..IR 4,T.,1'. U..N P0MPKIe!,jpMToTAV:..... T.DTAI, 1 CLEARING AND GRUBBING. 1.00_ LS_ $ 37,000.00 $ 37,000.00 2 _ DISPOSAL OF WASTE M ATERIALS. REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC SIDEWALK PER SPPWC STD. PLAN 113-1. 1.00 21,000. 500.00 LS $ 14,000.00 $ 14,000.00 3 SF $ 4.50 $ 94,500.00 4 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY APPRO ACHES PER SPPWC STD. PLAN 110 -2. SF $ 6.10 $ 3,050.00 5 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 18.50 $ 18,777.50 6 REMOVE, DISPOSE AND CONSTRUCT B- INCHES CURB ONLY PER SPPWC STD 120 -2. 100.00 LF $ 16.80 $ 1,680.00 7 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER SPPWC STD PLAN 111 -4. 1.00 EA $ 2,300.00 $ 320.00 $ 2,300.00 $ 3,200.00 8 INSTALL SU RVEY CENTERLINE TIE MONUMENT 10.00 EA $ 45,675.00 TOTAL BASE BID PRICE REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY $ 174,507.50 Vido Samamlch Inc BASE BID PRICE #11 ITEM 0E m QS kuNlT1 llivar.?!?_lC., T.DTAI, 1 CLEARING AND GRUBBING. 1.00 LS $ $ 1,000.00 $ 3 $ 1,000.00 2 DISPOSAL OF WASTE MATERIALS. REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 1.00 LS 3 SIDEWALK PER SP PWC STD. PLAN 113 -1. REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY 21,000 SF $ 6.00 $ 126,000.00 4 APPROACH PER SPPWC STD. PLAN 110 -2. 500.00 SF $ 8.00 $ 4,000.00 $ 12,500.00 REMOVE, DISPOSE AND CONSTRUct B- INCHES CURB AND 24- REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 45.00 $ 45,675.00 $ 45,675.00 REMOVE, DISPOSE AND CONSTRUCT B- INCHES CURB ONLY REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY 6 PER SPPWC STD 120 -2. 100.00 LF $ 35_.00 _$ 3,500.00 $ 2,200.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 SPPWC STD PLAN 111 -4. 1.00 EA 3,600.00 $ 3,600 B INSTALL SURVEY CENTERLINE TIE MONUMENT 10.0 EA _$ $ 200.00 $ 2,000.00 $ 55.00 TOTAL BASE BID PRICE TOTAL BASE BID PRICE $ 189,275.00 Link Engineering BASE BID PRICE #12 ITEM„ U $CI1lP "i aE'�d`3' s'a "i"u.3 a „.O .., °xUNITi $?.4NIlaPRIC� ` 4 TQT.AL , ;"�c.`1�.;, 1 CLEARING AND GRUBBING. 1.00 LS _ $ 2,000.00 $ 2,000.00 $ 2,0 00.00 $ 2,000.00 _ 2 DISPOSAL OF WASTE MATERIALS. REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 1 LS 3 SIDEWALK PE SPPWC STD. PLAN 113-1. REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY 2 1,000.00 SF $ 6.00 $ 126,000.00 4 APPROACHES PER SPPWC STD. PLAN 110 -2. 500.00 SF $ 25.00 $ 12,500.00 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF_ $ 45.00 $ 45,675.00 _ REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY 6 PERSPPWCSTD120 -2. REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 100.00 LF $ 22.00 $ 2,200.00 7 SPPWC S TD PLAN 111 -4. 1.00 EA $ 1,500.00 $ 1,500.00 8 INSTALL SURVEY CENTERLINE TIE MONUMENT 10.00 EA $ 55.00 $ 550.00 $ 192,425.00 TOTAL BASE BID PRICE 2/92012 PAGE 4 PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION M12012 Kalban Inc. BASE BID PRICE #13 Super Technical Inc BASE BID PRICE #14 1TE. d S . I 6N O . !:N - 0NMRR (CEO QTA 1 CLEARING AND GRUBBING. 1.00 LS $ 1,500.00 $ 1,500.00 2 DISPO OF WASTE MATERIALS. _ 1.00 LS $ 1,600.00 $ 1,500.00 REMOV DISPOSE AND CONSTRUCT 4- INCHES THICK PCC E, 3 3 SIDEWALK PER SPPWC STD. PLAN 113 -1. 21,000.00 SF $ 6.00 $ 126,000.00 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY 4 4 APPROACHES PER SPPWC STD. PLAN 110 -2. 500.00 SF $ 9.00 $ 4,500.00 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- REMOVE, DISPOSE AND CONSTRUct B- INCHES CURB AND 24- 5 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 52.50 $ 53,287.50 REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY REMOVE, DISPOSE AND CONSTRUCT B- INCHES CURB ONLY 6 PER SPPWC STD 120 -2. 6 PER SPPWC STD 120 -2. 100.00 LF $ 52.50 $ 5,250.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 7 SPPWC STD PLAN 111 -4. 1.00 EA $ 3,000.00 $ 3,000.00 10 .00 EA $ 300.00 $ 3,000.00 8 INSTALL S URVEY CENTERLINE TIE MONUMENT TOTAL BASE BID PRICE $ 199,525.00 $ 198,037.50 Super Technical Inc BASE BID PRICE #14 1TE. d S . I 6N O . !:N - 0NMRR (CEO QTA 1 CLEARING AND GRUBBING. 1.00 LS $ 3,000.00 $ 3,000.00 2 DISPOSAL OF WASTE MATERIALS. _- - REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 1.00 _ LS $ 2,000.00 $ 2,000.00 3 SIDEWALK PER S PPWC STD. PLAN 113 -1. 2 1,000.00 SF $ 7.00 $ 147,000.00 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY 4 APPROACHES PER SPPWC STD. PLAN 110 -2. 500.00 SF $ 8.00 $ 4,000.00 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ _ 35 $ 35,525.00 REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY 6 PER SPPWC STD 120 -2. 100.00 LF $ 30.00 $ 3,000.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 SPPWC STD PLAN 111 -4. 1.00 EA $ 1,000.00 $ 1,000.00 _ _ 8 INSTALL SURVE CENTERLINE TIE MONUMENT TOTAL BASE BID PRICE 10.00 EA $ 400.00 $ 4,000.00 $ 199,525.00 PAGE 5 Nobest Incorporated #15 PUBLIC WORKS SERVICE DEPARTMENTIENGINEERING DIVISION Premier Developing Services Inc BASE BID PRICE #16 EC Construction BASE BID PRICE #17 DE5C �3tp„YfON.. :'$dr�} .. w.,� '? , , R, 4 _ ., I CI- IT` x. UNI[TjRP E�'u,';S ., 1TOTAISd14Vf0. 1 CLEARING AND G RUBBING. 1.00 LS $ 4,500.00 $ 4,500 _ _ __ $ _ 1,400.0 __. 2 -_ DISPOSAL OF WASTE MATERIALS. REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC _ 1.00 LS -. $ 1_,40 $ 3,750.00 _ 3 SIDEWA PER SPPWC STD. PLAN 113 -1. 21,000.00 SF $ _ 6.25 $ 131,250.00_ SF _ REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY $ 131,670.00 4 APPR OACHES PER SPPWC STD. PLAN 110 -2. 500.00 SF $ 7.75 $ 3,875.00 500.00 REMOVE, DISPOSE AND CONSTRUCt 8- INCHES CURB AND 24- $ 10.00 $ 5,000.00 $ 5,240.00 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF _ _ 5 8.00 $ 58,870.00 INCHES GUTTER PER SPPWC STD PLAN 120 -2. REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY LF _$ 70.00 _$ $ 66,381.00 6 PE SPPWC STD 120 -2. 100.00 LF _$ 50.00 $ 5,000.00 PER SPPWC STD 120 -2. REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER LF $ 35.00 $ 3,500.00 $ 2,910.00 7 SPPWC STD PLAN 111 -4. 1.0 EA $ 1,800.00 $ 1,800.00 _8 INSTALL SUR VEY CENTERLINE TIE MONUMENT 10.00 EA $ 850.00 $ 8,500.00 INSTALL SURVEY CEN TERLINE TIE MO NUMENT _ TOTAL BASE BID PRICE TOTAL BASE BID PRICE EA $ 250.00 $ 2,500.00 $ 235,470.00 $ 215,195.00 EC Construction BASE BID PRICE #17 Mallcraft, Inc. BASE BID PRICE #18 ITE DE5C �3tp„YfON.. :'$dr�} .. w.,� '? , , R, 4 _ ., I CI- IT` x. UNI[TjRP E�'u,';S ., 1TOTAISd14Vf0. 1 CLEARING AND GRUBBING. 1.00 LS $ 15,000.00 $ 15,000.00 2 DISPOSAL OF WAS MATERIALS. __ - - 1.00 LS $ 3,750.00 $ 3,750.00 _ _ _ - - -. RSE AND CONSTRUCT 4-INCHES THICK PCC EMOVE, DISPO RE MOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 3 SIDEWALK PER S PPWC STD. PLAN 113 -1. 21,000.00 SF $ 6.27 $ 131,670.00 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY 4 APPROACHES PER SPPWC STD. PLAN 110 -2. 500.00 SF $ 10.00 $ 5,000.00 $ 5,240.00 REMOVE, DISPOSE AND CONSTRUCt 8- INCHES CURB AND 24- REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF _$ 70.00 $ 71,050.00 $ 66,381.00 REMOVE, DISPOSE AND CONSTRUCT e- INCHES CURB ONLY REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY 6 PER SPPWC STD 120 -2. 100.00 LF $ 35.00 $ 3,500.00 $ 2,910.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 7 SPPWC STD PLAN 111 -4. 1.00 EA $ 3,000.00 $ 3,000.00 8 INSTALL SURVEY CEN TERLINE TIE MO NUMENT _ TOTAL BASE BID PRICE 10.00 EA $ 250.00 $ 2,500.00 $ 235,470.00 TOTAL BASE BID PRICE _ Mallcraft, Inc. BASE BID PRICE #18 ITE DE5C �3tp„YfON.. :'$dr�} .. w.,� '? , , R, 4 _ ., I CI- IT` x. UNI[TjRP E�'u,';S ., 1TOTAISd14Vf0. 1 CLEARING AND GRUBBING. 1.00 LS $ 6,000.00 $ 6,000.00 2 DISPOSAL OF WASTE MATERIALS. 1.00 LS $ 4,800.00 $ 4 ,800.0 0 _ _ _ RE MOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 3 SIDEWALK PER SPPWC STD. PLAN 113 -1. 21,000.00 SF $ 6.87 $ 144,270.00 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY 4 APPROACHES PER SPPWC STD. PLAN 110 -2. 500.00 S_ F_ $ 10.48 $ 5,240.00 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 65.40 $ 66,381.00 REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY 6 PER SPPWC STD 120 -2. REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 100.00 LF $ 29.10 $ 2,910.00 7 SPPWC STD PLAN 111 -4. 1.00 EA $ _4,_860.00 $ 4,860.00 8 INSTALL SURVEY CENTERLINE TIE MONUMENT 10.00 EA $ 600.00 $ 6,000.00 TOTAL BASE BID PRICE _ $ 240,461.00 2/92012 PAGE 6 PUBLIC WORKS SERVICEDEPARTMENTIENGINEERING DIVISION JDC Inc. BASE BID PRICE #19 M12012 PAGE 7 1 CLEAR AND GRUBBING. 1.00 LS _ LS $ 21,000.00 $ 21,000.00 2 _ DI SPOSAL OF WASTE MATERIALS. _ _ 1.00 $ 3,500.00 $ 3,500.00 REMOVE, DISPOSE AND CONSTRUCT 4- INCHES THICK PCC 3 SIDEWALK PER SPPWC STD. PLAN 113 -1. 21 ,000.00 SF $ 7.50 $ 157,500.00 REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY 4 APPROACHES PER S PPWC STD. PLAN 110 -2. 500.00 SF $ 16.00 $ 8,000.00 REMOVE, DISPOSE AND CONSTRUct 8- INCHES CURB AND 24- 5 INCHES GUTTER PER SPPWC STD PLAN 120 -2. 1,015.00 LF $ 55.00 $ 55,825.00 REMOVE, DISPOSE AND CONSTRUCT 8- INCHES CURB ONLY 6 PERSPPW CSTD120 -2. 100.00 LF $ 48.00 $ 4,800.00 REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMP PER 7 SPPWC ST PLAN 111-4. 1.00 EA $ 3,000.00 $ 360.00 $ 3,000.00 $ 3,600.00 8 INSTA SURVEY CENTERLINE TIE MONUMEW 10.00 EA TOTAL BASE BID PRICE I I I $ 257,225.00 M12012 PAGE 7