CC - 2012-16 - Contracting for HVAC Replacement and Award of Contract to K & J Air Conditioning at Rosemead Community Recreation CenterRESOLUTION NO. 2012 -16
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROSEMEAD
REGARDING CONTRACTING FOR HVAC REPLACEMENT AND AWARD OF
CONTRACT TO K &J AIR CONDITIONING
AT THE ROSEMEAD COMMUNITY RECREATION CENTER
WHEREAS, the City of Rosemead desires to complete upgrades of the Heating
and Ventilation Systems at Rosemead Community Recreation Center utilizing
approximately $200,000 from the Energy Efficiency and Conservation block Grant, as a
part of the American Recovery and Reinvestment Act of 2009; and
WHEREAS, the City of Rosemead has competitively bid this project, consistent
with state public contracting law, to award a contract for the completion of the
improvements, and subsequently rejected all bids because the bids came in beyond the
allotted Grant funds for the project; and
WHEREAS, the terms of the Energy Efficiency and Conservation Block Grant
require the awarding of a contract and encumbering of funds by March 19, 2012 in order
to prevent the forfeiture of the awarded funds; and
WHEREAS, the City of Rosemead Municipal Code section 3.24.090(H) provides
that the City Council, on recommendation of the City Manager, may determine that an
alternate procedure will be in the best interests of the City, the City may follow another
process to award a contract; and
WHEREAS,.the City of Rosemead Purchasing Policy also provides that where
unique costs savings can be obtained, the City may use of alternative bid and award
measures under certain circumstances; and
WHEREAS, in order to avoid the forfeiture of the Grant funds, the City of
Rosemead conducted a shortened proposal process in which the notice, plans and
specifications for the project were publically posted on the City's website and ten (10)
qualified contractors were invited to participate in the proposal process, and the City
received said proposals on February 23, 2012
NOW THEREFORE BE IT RESOLVED that the City Council of the City of
Rosemead hereby declares and finds the following:
Section 1. The above recitals are hereby incorporated.
Section 2. The Rosemead City Council acknowledges and accepts the
extenuating circumstances related to this project and that in order to avoid the loss of
the Grant funds and in the best interest of the City Council finds that it is necessary to
use the shortened bidding process for the award of the project to K &J Air Conditioning.
Section 3. The Citv Clerk shall certifv as to the adootion of this Resolution.
ATTEST:
"Gloria Molleda
City Clerk
AS TO FORM:
City Attomey
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS.
CITY OF ROSEMEAD )
I, Gloria Molleda, City Clerk of the City of Rosemead, do hereby certify that the foregoing
Resolution No. 2012 -16 being:
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROSEMEAD REGARDING
CONTRACTING FOR HVAC REPLACEMENT AND AWARD OF CONTRACT TO K & J AIR
CONDITIONING AT THE ROSEMEAD COMMUNITY RECREATION CENTER
was duly and regularly approved and adopted by the Rosemead City Council on the 28th of
February, 2012, by the following vote to wit:
Yes: Alarcon, Armenta, Clark, Low, Ly
No: None
Abstain: None
Absent: None
Gloria Molleda
City Clerk
PUBLIC WORKS SEP.VICE DEPARTMENT/ENGWEERING DIVISION
CITY OF ROSEMEEAD
PROJECT No. P31002 -1
BID ANALYSIS
BID SUBMITTAL FEBRUARY 23 2012.
K & J AIR CONDITIONING
BAS BID PRIG:
#1
ITEMjDESCRLP,TON ut1 ,.':"TU = ._ >. ?_ � xMe.. a ^`T'...,.l
;FtSIQTY jUNIL.¢UNIPP.RICEw
, UNIT ;
F,UNIT: BRICE
{s" N,r
1 (CLEARING AND GRUBBING.
1.00
LS
1 $ 5,000.00
$ 5,000.00
;DEMOLITION OF EXISTING RTUs INCLUDING ALL AUXILLARY
2 1 COMPONENTS & DISPOSAL OF WATE MATERIAL
1.00
LS
$ 14,000.00
$ 14,000.00
3 !WOOD FRAMING UNDER NEW CURBS
1.00
LS
S 1,500.00
$ i,500 .00
4 NEW ROOF TOP UNITS (RTU) & CURBS
1.00
LS
i $ 114,000.00
1 $ 114,00000
DUCTWORK, PIPE, CONDUIT AND ALL MECHANICAL
COMPONENTS INCLUDING AIR BALANCING AND RELOCATION
5 OF EXISTING EXHAUST FANS
1.00
LS
$ 28,700.00
$ 28700.00
6 ELECTRICAL WORK -
1.00
LS
$ 5,500.00
$ 5.500.00
ITOTAL BASE BID PRICE
LS
$
58,000.00
$ 168,700.00
PARDESS AIR
BASE BID PRICE
#2
ITEM�IDESCRIPTIONV -.'., 1r!,.'W - Z+ $;'g. �I'.•:_,
DESCRIPTION;,." 3 '' ._', i3ida $�$�GS'�'+w" .' - n;•aY
, UNIT ;
F,UNIT: BRICE
,TOTAL?r AT-Z - '
1
ICLEARING AND GRUBBING.
1.00
1 LS
I S
1,000.00
1 $ 1,000.00
2
(DEMOLITION OF EXISTING RTUs INCLUDING ALL AUXILLARY
!COMPONENTS & DISPOSAL OF WATE MATERIAL
1.00
LS
$
10,000.00
$ 10,000.00
3
!WOOD FRAMING UNDER NEW CURBS
1.00
LS
S
22,000.00
$ 22,00000
4
NEW ROOF TOP UNITS (RTU) & CURBS
1.00
LS
S
135,000.00
$ 135,000.00
5
DUCTWORK, PIPE, CONDUIT AND ALL MECHANICAL
COMPONENTS INCLUDING AIR BALANCING AND RELOCATION
[OF EXISTING EXHAUST FANS
1.00
LS
$
58,000.00
$ 58,000.00
6
!ELECTRICAL WORK
1.00
LS
$
22,000.00
$ 22,000.00
I $ 275,860.00
ITOTAL BASE BID PRICE
$ 248,000.00
AC PROS
BASE BID PRICE
#3
ITEM('
DESCRIPTION;,." 3 '' ._', i3ida $�$�GS'�'+w" .' - n;•aY
° ;;fQTK_�'L"
UNIT
R UNIT ;PRICE5''=
,.g1$.TOTAL'
1
CLEARING AND GRUBBING.
1.00
LS
$
$
2
(DEMOLITION OF EXISTING RTUs INCLUDING ALL AUXILLARY
ICOMPONENTS & DISPOSAL OF WATE MATERIAL
1.00
LS
8 8,000.00
$ 8,000.00
3
(WOOD FRAMING UNDER NEW CURBS
1.00
LS
$ 36,420.00
$ 36,420.00.
4
INEW ROOF TOP UNITS (RTU) & CURBS
1.00
1 LS
$ 145,600.00
$ 145 60000
5
DUCTWORK, PIPE, CONDUIT AND ALL MECHANICAL
COMPONENTS INCLUDING AIR BALANCING AND RELOCATION
OF EXISTING EXHAUST FANS
1.00
LS
$ 38,840.00
!
9 38,840.00
6
(ELECTRICAL WORK
1.00
LS
$ 4],000.00
$ 47,000.00
(TOTAL BASE BID PRICE
I $ 275,860.00
PACIFIC AIR HEATING AND COOLING
BASE BID PRICE
#4
ITEM - 'DESCRIPTION
= #- -.
',_ :�-'
QT,Y .'
UNIT Jn UNIT- PRICE °I!�
' )L`,.
1
CLEARING AND GRUBBING.
1.00
LS 1 $ 4,500.00
1 $ 4,50000
2
DEMOLITION OF EXISTING RTUs INCLUDING ALL AUXILLARY
COMPONENTS & DISPOSAL OF WATE MATERIAL
1.00
LS $ •27,000.00
$ 27,000.00
3
WOOD FRAMING UNDER NEW CURBS
1.00
I LS I $ 18,000.00
$ 18,000.00
4
INEW ROOF TOP UNITS (RTU) & CURBS
1.00
LS $ 108,000.00
$ 108000.00
5
DUCTWORK, PIPE, CONDUIT AND ALL MECHANICAL
COMPONENTS INCLUDING AIR BALANCING AND RELOCATION
OF EXISTING EXHAUST FANS
1.00
LS $ 181 000.00
$ 181,000.00
6
IELECTRICAL WORK
1 1.00
LS $ 40,500.00
S 40,50000
ITOTAL BASE BID PRICE
1
I
1 $ 379,000.00
=012
PAGE i
CITY OF ROSEMEAD
ROSEMEAD COMMUNITY RECREATION CENTER
HVAC REPLACEMENT PROJECT
PROJECT No. 31002 -1
BIDDER: KI's h%2 Cowi'Rc�or"�, � •
le
Is] :yl:t_L
TABLE OF CONTENTS
SECTION 1 BID SCHEDULE ....................................................................... ............................... 1
SECTION 2
BID DATA FORMS .............. ...............................
2.A
BID BOND ............................ ...............................
2.13
LIST OF PROPOSED SUBCONTRACTORS....
SECTION 3 NON - COLLUSION AFFIDAVIT ...........................
......... ............................... 5
.................................... I... 6
......... ............................... 7
...... ............................... 10
CBF -12
SECTION 1 - BID SCHEDUL .
BIDDER: K4-3' Auc I j tic- •
REVISED BID SCHEDULE
SCHEDULE OF PRICES FOR
ROSEMEAD COMMUNITY RECREATION CENTER
HVAC REPLACEMENT PROJECT
PROJECT No. 31002 -1
HVAC BID SCHEDULE
TOTAL BASE BID PRICE (SCHEDULE BID PRICE).$ 4 1 1 6 13 , 40i�s• e�
Ol.S HU1 -oP-eA s14Ltr E &4rr -ItiousA# -O se41MJ HW-Of o Lky.XA"
Dollar amount in written form
CBF -1
UNIT OF
EST.
UNIT
ITEM
NO.
ITEM DESCRIPTION
MEASURE
CITY.
PRICE
COST
1
Clearing and Grubbing
LS
t
$
2
Demolition of existing RTU units,
LS
1
including all auxiliary components
& disposal of waste materials
�e f OCR >i�
& ly 0o6 0
3
Wood Framing Under New Curbs
LS
1
Jel So'b-
4
New Roof Top Units (RTU) &
LS
1
Curbs
11y ' 000. 1111 -
ti 14 om,"
5
Ductwork, Pipe, Conduit and All
LS
1
Mechanical Components Including
Air balancing and relocation of
Existing Exhaust Fans
1 6
1 Electrical Work
LS
1
$S Scx�-S
$• m
TOTAL BASE BID PRICE (SCHEDULE BID PRICE).$ 4 1 1 6 13 , 40i�s• e�
Ol.S HU1 -oP-eA s14Ltr E &4rr -ItiousA# -O se41MJ HW-Of o Lky.XA"
Dollar amount in written form
CBF -1
BIDDER: ({f$ Ait CDnroITIoNINtr, iNc .
BID SCHEDULE
SCHEDULE OF PRICES FOR
ROSEMEAD COMMUNITY RECREATION CENTER
HVAC REPLACEMENT PROJECT
PROJECT No. 31002 -1
HVAC BID SCHEDULE
TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$
Dollar amount in written form
CBF -1
UNIT OF
EST.
UNIT
ITEM
NO,
ITEM DESCRIPTION
MEASURE
QTY.
PRICE
COST
1
Clearing and Grubbing
LS
1
2
Demolition of existing RTU units,
LS
1
including all auxiliary components
& disposal of waste materials
3
Wood Framing Under New Curbs
LS
1
4
New Roof Top Units (RTU) E
LS
1
Curbs
5
Ductwork, Pipe, Conduit and All
LS
1
Mechanical Components Including
Air balancing and relocation of
Existing Exhaust Fans
6
Electrical Work
LS
1
7
Asbestos Abatement
8
Lead Paint Abatement
ESF
TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$
Dollar amount in written form
CBF -1
BIDDER: 143 Ala (bsb1T1o, -t tw(r, I esL= ,
Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items
in the schedule of bid items above, within the limits define in Section 3 -2.2.1 of the Standard
Specifications, to stay within the budgeted amount of this project.
The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which
cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and
after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third
party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the
written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall
govern.
Attached hereto is a certified gheck, a cashier's check or a bid bond in the amount of
yciz �aau'"" ib �8•'� said amount being not less than ten percent (10 %) of the Total
Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award,
we fail or refuse to execute the Contract and furnish the required bonds, certificates and
endorsements of insurance and other certifications within the time provided.
If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be
prepared bythe Owner for execution, within five (5) Calendar Days following the Letter of Award for
the Contract, and will deliver to the Owner within that same period the necessary original Certificates
of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other
documentation and certification required by the Contract.
The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body
all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton
Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the
Business and Professional Code), arising from purchases of goods, materials or services by the
Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and
become effective at the time the purchasing body tenders final payment to he Contractor.
Bidder understands and that, when requested by Owner, he shall provide: (1) evidence
satisfactory to the Owner of Bidder's California contractor's license(s) in good standing; (2) evidence
that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting
therefrom; and (3) any other information and documentation, financial or otherwise, needed by
Owner to award a Contract to the lowest responsible and responsive bidder.
Bidder understands and agrees that liquidated damages shall apply to this Contract in the amounts
of five hundred dollars ($500.00) if project is not completed in forty-five (45) calendar days. The
Contract Time will begin to run ten (10) Working Days from the date of the Notice of Proceed and
subject to the terms and conditions described in the Contract Form and the Contract Documents.
Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be
incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder
further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data
submitted herewith into a contract arising out of this Bid.
The undersigned acknowledges receipt, understanding and full consideration of the following
addenda to the Contract Documents.
Addenda Nos. #1
CBF -2
BIDDER: V }S ML CO UOrr IO UlNfr 1 Nc .
The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and
equipment or supplies necessary to complete the Work as described in the Bid Documents. If this
bid is accepted, the unders!dned Bidder agrees to enter into and execute the Contract with the
necessary bonds and a the Total Bid Price as compensation in full for all Work under the
contract. /j . A�
CBF -3
By: ()OJRA
Sign ure
Ski APTO L,t lJ
Type or Print Name
'Pf.cSl EY ST o N U
Title
BIDDER: 1(. TMIZ CAuDtSl , 0iu( r , Iu
U01 %w we p(Z..
Business Street Address
'BUepA PePaL took • god �
City, State and Zip Code
Telephone Number
Bidder's/Contracior's State of Incorporation: CAL. *00 -.Jl&
Partners or Joint Venturers:
/./ j'A
Bidder's License Number(s): 64830 - 1 C -aQ
NOTES:
1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the
representations made on the Contract Bid Forms.
2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address
3) If Bidder is a partnership or joint venture, give full names of all partners or joint
venturers.
As further discussed in the Instructions to Bidders, Bidder will be required
to provide evidence that the person signing on behalf of the corporation,
nartnershin or ioint venture has the authority to do so.
CBF -4
BIDDER: k,'ZS Alt CDUDtTls411uG IL.
SECTION 2
BID DATA FORMS '
BIDDER: K &J Air Conditioning, Inc.
Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid
Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide
the information required. Bidder shall ensure that every page of its Bid Data Forms are properly
identified with the Bidder's name and page number.
2.A BID BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT K & J Air Conditioning, Inc.
as
, as Surety, are held firmly bound unto the
CfTY OF ROSEMEAD (hereinafter called the OWNER) in the sum of
Ten Percent of total amount bid
($ , being not less than ten percent (10 9 /6) of the Total
Bid Price; for the payment of which sum will and truly to be made, we bind ourselves,
our heirs, executors, administrators, successors, and assigns, jointly and severally,
firmly by these presents.
WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work
required for the Rosemead Community Recreation Center HVAC Replacement
Project as set forth in the Notice Inviting Bids and accompanying Bid Documents,
dated 02/2312012
NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the
OWNER and, within the time and in the manner required by the above- referenced
Bid Documents, enters into the written form of Contract bound with said Bid
Documents, furnishes the required bonds (one to guarantee faithful performance
and the other to guarantee payment for labor and materials) furnishes the required
insurance certificates and endorsements, and furnishes any other certifications as
may be required by the Contract, then this obligation shall be null and void; otherwise
it shall remain in full force and effect In the event suit is brought upon this bond by
the OWNER and judgment is recovered, said Surety shall pay all costs incurred by
the OWNER in such suit, including reasonable attorneys' fees to be fixed by the
court.
SIGNED AND SEALED, this 21st day of February 20 12
K & J Air Conditioning, Inc. (SEAL) Con bectom Bonding am msumnca Company (SEAL)
Principal Surety
By: B
Signature Signature Edilh Ganbay, Attomeydn Facl
CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT
STATE OF CALIFORNIA
Countyof Orange
On 02 -21 -2012 before me, R Rivas. Notary Public
I
Date Here Insert Name and Tie of the Office,
personally appeared Edith Garibay —
Name(s) of &gner(s)
R. RIVAS
. Commission M 1954551
-� Notary Public - California i
Orange County
My Comm. Er Tres Oct 28, 2015
who proved to me on the basis of satisfactory evidence to
be the person(6) whose name(a) is /ardsubscribed to the
within instrument and acknowledged to me that iefshe/tbey
executed the same in bWher /)petr authorized capacity(iso
and that bybis signature(' on the instrument the
person(;}, or the entity upon behalf of which the persoq(ar
acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true
and correct.
Witness my hgn ' ial seal.
t t
Signature —t-c1.e-c..
Place Notary Seal Above Signature of Notary Puok
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of
Document
Signer(s) Other Than Named
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Individual
❑ Corporate Officer —Thle(s):
❑ Partner — ❑ Limited ❑ General
9 Attorney in Fact
❑ Trustee
❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
Number of Pages:
Signer's Name:
❑ Individual
❑ Corporate Officer— Tdle(s)
❑ Partner— ❑ Limited ❑ General
❑ Attorney in Fact
• -
Q Trustee
e
❑ Guardian or Conservator
Top of Ihumb here
❑ Other:
Signer Is Representing:
Know All Men by These Presents:
POWER OF ATTORNEY
Contractors Bonding and Insurance Company
That this Power of Attorney is not valid or in effect unless attached to the,bond which it authorizes executed, but may be detached by the
approving officer if desired
That Contractors Bonding and Insurance Company, a Washington corporation, does hereby make, constitute and appoint:
Jolm F. Monroe. Edith Garibay. Eugene T. Zondlo. Rosa E. Rivas. jointly or severally
in the City of Irvine . State of California its true and lawful Agent and Attorney in Fact, with full
power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, the following described
bond.
Any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million and 00 /100
Dollars ( $10,000,000.00 k for any single obligation.
The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon this Company as if such bond had
been executed and acknowledged by the regularly elected officers of this Company.
The Contractors Bonding and Insurance Company further certifies that the following is a true and exact copy of the Resolution
adopted by the Board of Directors of Contractors Bonding and Insurance Company, and now in force to-wit:
"AB bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation shall be executed in the
corporate name of the Corporation by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by
such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant
Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or
undertakings in the name of the Corporation. The corporate seal is not necessary for the validity of any bonds, policies,
undertakings, Powers of Attorney or other obligations of the Corporation. The signature of any such officer and the corporate
seal may be printed by facsimile or other electronic image."
IN WITNESS WHEREOF, the Contractors Bonding and Insurance Company has caused these presents to be executed by its Vice
President with its corporate seal affixed this 22nd day of June 2011
•,`�aP'•• " •••.•, Contractors Bonding and Insurance Company
c•-I 4 .a. ♦lac
SEAL; Zf
State of Washington 1 9 7 9 . ..- * •. 1979 • Roy C. Die Vice President
SS
County of King •,4xexixo�o�,,.``��`
CERTIFICATE
On this 22nd day of June 2011
before me, a Notary Public, personally appeared Roy C. tie . who
being by me duly sworn, acknowledged that he signed the above Power of
Attorney as the aforesaid officer of the Contractors Bonding and
Insurance Company and acknowledged said insbvrnent to be the voluntary
act and deed of said corporation. '
�...t a VU
�
Joseph B. uller Notary Public
Naar? Public
state d wohingloa
JOSEPH B. MULLER
MY COMMISSION ORRES
Mach 2a. 2012
I, the undersigned officer of Contractors Bonding and Insurance
Company, a stock corporation of the State of Washington, do hereby
certify that the attached Power of Attorney is in full force and effect
and is irrevocable; and furthermore, that the Resolution of the
Company as set forth in the Power of Attorney, is now in force. In
testimony whereof, I have hereunto set my hand and they S` of the
Contractors Bonding and Inmrance Company this LL day
of Fohrnar 90 "
Contractors Bonding and Insurance Company
Roy C. Die Vice President
047561903M2 A0059511
Bonding and Insurance Company
chic
1213 Valley
1213 alley Slnxt
P.O.Box9271
Mauaw.v
,
Seance, WA 98109-0271
Know All Men by These Presents:
POWER OF ATTORNEY
Contractors Bonding and Insurance Company
That this Power of Attorney is not valid or in effect unless attached to the,bond which it authorizes executed, but may be detached by the
approving officer if desired
That Contractors Bonding and Insurance Company, a Washington corporation, does hereby make, constitute and appoint:
Jolm F. Monroe. Edith Garibay. Eugene T. Zondlo. Rosa E. Rivas. jointly or severally
in the City of Irvine . State of California its true and lawful Agent and Attorney in Fact, with full
power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, the following described
bond.
Any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million and 00 /100
Dollars ( $10,000,000.00 k for any single obligation.
The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon this Company as if such bond had
been executed and acknowledged by the regularly elected officers of this Company.
The Contractors Bonding and Insurance Company further certifies that the following is a true and exact copy of the Resolution
adopted by the Board of Directors of Contractors Bonding and Insurance Company, and now in force to-wit:
"AB bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation shall be executed in the
corporate name of the Corporation by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by
such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant
Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or
undertakings in the name of the Corporation. The corporate seal is not necessary for the validity of any bonds, policies,
undertakings, Powers of Attorney or other obligations of the Corporation. The signature of any such officer and the corporate
seal may be printed by facsimile or other electronic image."
IN WITNESS WHEREOF, the Contractors Bonding and Insurance Company has caused these presents to be executed by its Vice
President with its corporate seal affixed this 22nd day of June 2011
•,`�aP'•• " •••.•, Contractors Bonding and Insurance Company
c•-I 4 .a. ♦lac
SEAL; Zf
State of Washington 1 9 7 9 . ..- * •. 1979 • Roy C. Die Vice President
SS
County of King •,4xexixo�o�,,.``��`
CERTIFICATE
On this 22nd day of June 2011
before me, a Notary Public, personally appeared Roy C. tie . who
being by me duly sworn, acknowledged that he signed the above Power of
Attorney as the aforesaid officer of the Contractors Bonding and
Insurance Company and acknowledged said insbvrnent to be the voluntary
act and deed of said corporation. '
�...t a VU
�
Joseph B. uller Notary Public
Naar? Public
state d wohingloa
JOSEPH B. MULLER
MY COMMISSION ORRES
Mach 2a. 2012
I, the undersigned officer of Contractors Bonding and Insurance
Company, a stock corporation of the State of Washington, do hereby
certify that the attached Power of Attorney is in full force and effect
and is irrevocable; and furthermore, that the Resolution of the
Company as set forth in the Power of Attorney, is now in force. In
testimony whereof, I have hereunto set my hand and they S` of the
Contractors Bonding and Inmrance Company this LL day
of Fohrnar 90 "
Contractors Bonding and Insurance Company
Roy C. Die Vice President
047561903M2 A0059511
BIDDER: KlrS AOL �D MowluG -, INC.
Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid
Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide
the information required. Bidder shall ensure that every page of its Bid Data Forms are properly
identified with the Bidder's name and page number.
2.A BID BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT as
Principal, and
as Surety, are held firmly bound unto the
CITY OF ROSEMEAD (hereinafter called the OWNER) in the sum of
($ ) , being not less than ten percent (10 %) of the Total
Bid Price; for the payment of which sum will and truly to be made, we bind ourselves,
our heirs, executors, administrators, successors, and assigns, jointly and severally,
firmly by these presents.
WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work
required for the Rosemead Community Recreation Center HVAC Replacement
Project as set forth in the Notice Inviting Bids and accompanying Bid Documents,
dated
NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the
OWNER and, within the time and in the manner required by the above- referenced
Bid Documents, enters into the written form of Contract bound with said Bid
Documents, furnishes the required bonds (one to guarantee faithful performance
and the other to guarantee payment for labor and materials) furnishes the required
insurance certificates and endorsements, and furnishes any other certifications as
may be required by the Contract, then this obligation shall be null and void; otherwise
it shall remain in full force and effect. In the event suit is brought upon this bond by
the OWNER and judgment is recovered, said Surety shall pay all costs incurred by
the OWNER in such suit, including reasonable attorneys' fees to be fixed by the
court.
SIGNED AND SEALED, this day of -20
Principal
0
Signature
In
(SEAL)
Surety
Signature
Is] ]I.
BIDDER: KVS At& COVDtl I*JLa. r [NC.
2.B LIST OF PROPOSED SUBCONTRACTORS
In compliance with the *Subletting -and Subcontracting Fair Practices Act," Sections 4100
through 4114 of the California Public Contract Code, and any amendments thereto, each
Bidder shall provide the information requested below for each subcontractor who will
perform work, labor or render service to Bidder in or about the construction of the Work in an
amount in excess of one -half of one percent (greater than 0.5 %) of the Bidder's Total Bid
Price, or, in the case of bids or offers for the construction of streets or highways, including
bridges, in excess of one -half of 1 percent of the Contractor's total bid or ten thousand
dollars ($10,000), whichever is greater, and shall further set forth the portion.of the Work
which will be done by each subcontractor. Bidder shall list only one subcontractor for any
one portion of the Work.
Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow
Bidders twenty -four (24) additional hours after the deadline for submission of bids to submit
the information requested by the Owner about each subcontractor, other than the name and
location of each subcontractor.
If the Bidder fails to specify a subcontractor for any portion of the Work to be performed
under the Contract, it shall be deemed to have agreed to perform such portion itself, and
shall not be permitted to subcontract that portion of the Work except under the conditions
hereinafter set forth below.
Subletting or subcontracting of any portion of the Work in excess of one half of one percent
(greater than 0.5 %) of the Total. Bid Price or, in the case of bids or offers forthe construction
of streets or highways, including bridges, in excess of one -half of 1 percent of the
Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, for which no
subcontractor was designated in the original bid shall only be permitted in cases of public
emergency or necessity, and then only after Owner approval.
CBF -7
S
BIDDER: OC T Atf— tDuOiT ootl.1c', l ur .
2.B UST OF PROPOSED SUBCONTRACTORS (continued)
["Duplicate Next 2 Pages it needed for listing additional subcontractors. — I
Name and Location Description of Work
of Subcontractor to be Subcontracted
Al4 BALA"CA - t.
Name: Ptk4StJwt Al C. &AL4 s[ Z
Address: 1940 Q. i1Wftv,cjpwJ 5r• surm H
rw�tmtM ca 4x80
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name: WVLVVDA C-Lk( UCAL-
Address: `J3 S1 W � AVE b
A4 JANr!itl cA. 9a -804
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
LWUMU
BIDDER: k4r �f AtR Cowhiri owc, iwc.
2.0 REFERENCES
The following are the names, addresses and telephone numbers for three public agencies for which BIDDER
has performed similar work within the past two (2) years:
t.
CAT( 61 oR-A.j&r-- 3$0 S. t4E4, -Z S ouwrn - C& JAW
Name and Address of Owner
GXAvx. '&M rtti, C71 yl 41
Name and telephone number of person
V4
amount
a
2. SArJ DIEtln� ULAfmn Sc.+ys - DisTA.mX Y610 QWxcc Sr. SAU Dje&� CA. 71 411
Name and Address of Owner
AOAM Wtr.JOHAM ( -9803
Name and telephone number of person familiar with project
amount
Type
3. AB(- ULAFMO SC44CM- DLST GT 167CO /.6t)wLALt, etAro, C9 - 4"PS I CA. 90?o3
Name and Address of Owner
-3810
of person familiar with project
.1b 43 $c'A.
amount
Type of Work Date
4. Axe Ul-AP00 se4A93- 011-194e 16 CX AvZ''S , ra 9 0703
Name and Address of Owner
Th/4, FADS - nom 1;S6a -� S
Name and telephone number of person familiar with project
-ft 438 kescs o0
Contract amount
2Al O
Completed
CBF -9
BIDDER: Kl S A1L WD(aghy6 -� Iw
SECTION 3
NON - COLLUSION AFFIDAVIT
CBF -10
BIDDER: ,+'g Ax2 i Dt
NON - COLLUSION AFFIDAVIT
In accordance with Public Contract Code Section 7106, the undersigned, being first duly
sworn, deposes and says that he or she holds the position listed below with the bidder, the
party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any
undisclosed person, partnership, company, association, organization, or corporation; that the
bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced
or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly
colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham
bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly
or indirectly, sought by agreement, communication, or conference with anyone to fix the bid
price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the
bid price, or of that of any other bidder, or to secure any advantage against the public body
awarding the contract of anyone interested in the proposed contract; that all statements
contained in the bid are true; and, further, that the bidder has not, directly or indirectly,
submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged
information or data relative thereto, or paid, and will not pay, any fee to any corporation,
partnership, company association, organization, bid deposRory, or to any member or agent
thereof to effectuate a collusive or sham bid.
Signa re
TF�-WT �lrlCOli+rJ
Typed or Printed Name
"Pry
Title
K+-S Ate- co"chTtor - k t�lc.
Bidder
Subscribed and sworn before me
This day of 20_
(Seal)
Notary Public in and for
the State of California
My Commission Expires:
CBF- 11'
MAYOR:
STEVEN LY
MAYOR PRO TEM:
SANORAARMENTA
COUNCIL MEMBERS:
BILL ALARCON
MARGARET CLARK
POLLY LOW
Rosemead
8838 E. VALLEY BOULEVARD • P.O. BOX 399
ROSEMEAD, CALIFORNIA 91770
TELEPHONE (626) 569 -2100
FAX (B26) 307 -9218
CITY OF ROSEMEAD
ROSEMEAD, CALIFORNIA
ADDENDUM NUMBER
To all prospective bidders under Bid Documents for the
ROSEMEAD COMMUNITY RECREATION CENTER
HVAC REPLACEMENT PROJECT
Project No. P31002 -1
You are hereby informed that Bid Schedule Items shall be deleted:
NO.
ITEM DESCRIPTION
UNIT OF
MEASURE
EST.
QTY.
UNIT
PRICE
ITEM
COST
7
Asbestos Abatement
SF
8
Lead Paint Abatement
SF
These items shall not be a part of this project. Please see the attached revised
bid schedule (Page CBF -1) for proposal submittal.
2. The rest of Bid Documents as originally issued shall be used in submitting bids, and
an acknowledgement of receipt of this Addendum Number 1 shall be entered on the
page CBF — 2 of the Contract Bid Forms. Failure to provide such
acknowledgement shall render the bid as non - responsive and subject to rejection.
BY ORDER OF THE CITY OF ROSEMEAD
Date: February 21, 2012.
By
Rafael Fajardo
Associate Civil Engineer
ROSEMEAD CITY COUNCIL
STAFF REPORT
TO: THE HONORABLE MAYOR AND CITY COUNCIL
FROM: JEFF ALLRED, CITY MANAGER C.. *54+ A164
DATE: FEBRUARY 28, 2012
SUBJECT: REPLACEMENT OF COMMUNITY CENTER HVAC SYSTEM — AWARD
OF CONTRACT
SUMMARY
As a part of the City's Capital Improvement Program, the City Council approved a
project titled, "Citywide Energy Efficiency Program ", which consists of several
modernization projects of existing infrastructure and systems at City facilities. This
project includes the replacement of the existing HVAC system, with nine (9) new energy
efficient roof top units, and other related work at the Rosemead Community Recreation
Center. Grant funding, through the Energy Efficiency and Conservation Block Grant, is
available for this project.
On January 24, 2012, following a formal bidding process, the City Council rejected all
bids received for the project and directed staff to pursue other means of completing the
scope of work. This was the second time in the last three months that a bid was
rejected for an HVAC /Mechanical project due to high bid prices. In continuing this
project, the initial project was split from one project encompassing both Roof and HVAC
replacement to two distinct projects based on the specific trades, as this was
determined to be the best manner of working within the estimated costs.
In order to meet a Department of Energy grant obligation deadline of March 19, 2012, a
shortened bid process was conducted and new bids were received. Plans,
specifications and notices were posted on the City's website and ten (10) qualified
HVAC contractors were contacted and invited to participate in the bidding process. On
February 23, 2012, informal bids were accepted and analyzed.
Staff Recommendation
It is recommended that the City Council:
1. Approve the plans and specifications for the Replacement of HVAC System for
Rosemead Community Recreation Center Project; and
2. Authorize the City Manager to enter into a contract with K &J Air Conditioning in
the amount of $168,700 and establish a contingency in the amount of 20% of bid
($33,740) to cover any unforeseen construction expenses.
APPROVED FOR CITY COUNCIL AGENDA: . ITEM NO. ®. �
City Council Meeting
February 28, 2012
Pace 2 of 3
3. Approve Resolution No. 2012 -18, Regarding Contracting for the Replacement of
HVAC System at Rosemead Community Recreation Center.
DISCUSSION
The City's purchasing policy allows for projects to be awarded outside of the traditional
bidding process in situations with extenuating circumstances. Based on the rejection of
all initial bids on this project and the Department of Energy time constraints on the
grant, staff believes this is the best means of proceeding with this project. Failure to
award a contract and encumber the money for the project prior to the March 19
deadline may result in the forfeiture of the Energy Efficiency and Conservation Block
Grant funds.
Staff proceeded with a shortened bid process. Plans, specifications and a notice inviting
bids were also posted on the City's website and 10 qualified Roofing contractors were
contacted and invited to participate in the bidding process. A pre- bid /job walk meeting
was held on February 21, 2012 at 9:00 a.m. and nine (9) qualified contractors attended.
At 11:00 AM on February 23, 2012, the City Clerk received and opened six (6) sealed
informal bids with the following results:
RANK
CONTRACTOR
LOCATION
BID AMOUNT
1
K &J Air Conditioning
Buena Park, CA
$168,700.00
2
Pardess Air
Los Angeles, CA
$248,000.00
3
AC Pros
Tarzana, CA
$275,860.00
4
Pacific Air
Riverside, CA
$379,000.00
Staff has reviewed the bid documents for completeness and investigated the
contractor's background and recent projects for competency. Staff has concluded that
K &J Air conditioning is the lowest responsive bidder to perform the construction of this
project. K &J Air Conditioning has satisfactorily completed similar projects for other
public agencies, including the City of Orange, San Diego Unified School District, and
ABC School District.
TIMELINE
If directed to move forward, staff will work to complete this project according to the
following schedule:
February 28 — City Council Awards Contract
April 1 st — May 31 st — Tentative Construction Schedule
June 1 st — Tentative Project Completion
City Council Meeting
February 28, 2012
Page 3 of 3
FINANCIAL REVIEW
The funding for this project has been allocated in the City's approved FY 2011 -12
Capital Improvement Program Budget through the Energy Efficiency Conservation
Block Grant. The total appropriation needed to award this project is $202,440, which
includes a 20% contingency amount ($33,740) for unforeseen construction expenses.
The contingency amount is within the limits established in the City Purchasing Policy.
ENVIRONMENTAL REVIEW
The project is categorically exempt from the California Environmental Quality Act
(CEQA) pursuant to Section 15301 (a) of the CEQA Implementing Guidelines.
LEGAL REVIEW '
The initial bid rejection and the subsequent informal bid process was reviewed and
approved by the City Attorney.
PUBLIC NOTICE PROCESS
This item has been noticed through the regular agenda notification process.
Prepared by:
Sean Sullivan
Management Analyst
Submitted By:
Chris Marcarello
Director of Public Works
Attachments:
(1) Bid Summary
(2) Project Specifications (Available in City Clerk's Office)