T1
LIST OF STANDARD DRAWINGS GENERAL NOTES NOTICE TO CONTRACTOR(S) CONTRACTOR NOTES: 1. CONTRACTOR SHALL PROVIDE ALL NECESSARY MEANS TO AVOID TRACKING ASPHALT OIL ON EXISTING ASPHALT PAVEMENT
OR CONCRETE PAVEMENT DURING OPERATIONS. SEE TECHNICAL SPECIFICATIONS FOR CONDITIONS. 2. CONTRACTOR SHALL PROTECT IN PLACE ANY MAIL BOXES, IRRIGATION SYSTEM, ELECTRICAL CONDUIT, CABLE
CONDUIT OR UTILITY LINE. IF DAMAGED DURING CONSTRUCTION, CONTRACTOR SHALL REPLACE IN KIND. 3. CONTRACTOR SHALL ADJUST TO GRADE ANY PULLBOXES AFFECTED BY THIS IMPROVEMENT. IF PULLBOXES
(WATER, GAS, ETC) ARE DAMAGED, CONTRACTOR SHALL REPLACE THEM IN KIND. 4. CONTRACTOR SHALL POTHOLE TO VERIFY LOCATION AND DEPTH OF UTILITIES. 5. CONTRACTOR SHALL PROTECT RELOCATE OR REPLACE
IN KIND EXISTING IRRIGATION SYSTEM (PIPES, HEADS, ETC) AS NECESSARY. 6. CONTRACTOR SHALL BACKFILL AND RESEED LANDSCAPE.AS NECESSARY FOR LANDSCAPE AREAS AFFECTED BY THIS IMPROVEMENT.
7. CONTRACTOR SHALL COORDINATE LAYOUT OF AC REMOVALS WITH PUBLIC WORKS INSPECTOR. 8. THE CITY WILL LAYOUT THE PRECISE LOCATION OF ALL CONCRETE PAVING AND OTHER IMPROVEMENTS SHOWN ON
THE PLANS. THESE IMPROVEMENTS AS SHOWN MAY VARY SLIGHTLY AS TO LOCATION. CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION AND QUANTITIES AS MARKED OUT BY THE CITY. 9. CONTRACTOR SHALL
INSTALL TEMPORARY ASPHALTIC CONCRETE PAVEMENT AS INDICATED BY THE ENGINEER OR INSPECTOR. THE ENGINEER OR INSPECTOR SHALL DETERMINE THE EXACT LOCATION WHERE TEMPORARY RESURFACING WILL
BE NEEDED. THE CONTRACTOR SHALL NOT MIX TEMPORARY ASPHALTIC CONCRETE WITH PERMANENT ASPHALTIC CONCRETE, PORTLAND CEMENT CONCRETE, EARTH OR OTHER MATERIALS THAT ARE TO BE REMOVED FROM
THE SITE. ALL COSTS INVOLVED IN COMPLYING WITH THE ABOVE REQUIREMENTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR CLEARING AND GRUBBING. 1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE
WITH THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("SPECIFICATIONS") 2012 EDITION, AND AMERICAN PUBLIC WORKS ASSOCIATION STD. PLANS, 2012 EDITION AND CURRENT AMENDMENTS.
2. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER FORTY-EIGHT (48) HOURS PRIOR TO STARTING ANY WORK; TELEPHONE NUMBER (626) 569-2151. 3. THESE PLANS ARE HEREBY MADE A PART OF THE SPECIFICATIONS
AND CONTRACTUAL AGREEMENT. 4. NO REVISION SHALL BE MADE TO THESE PLANS WITHOUT THE PRIOR APPROVAL OF THE CITY ENGINEER. 5. THE CONTRACTOR SHALL APPLY FOR ALL NECESSARY CONSTRUCTION PERMITS
FOR ALL WORK AS SHOWN ON THESE PLANS FROM THE CITY OF ROSEMEAD. 6. ANY CONTRACTOR PERFORMING WORK AS INDICATED HEREON FOR THIS PROJECT SHALL FAMILIARIZE HIMSELF WITH THE SITE AND SHALL
BE SOLELY RESPONSIBLE FOR ANY DAMAGE TO EXISTING FACILITIES RESULTING DIRECTLY OR INDIRECTLY FROM HIS OPERATIONS, WHETHER OR NOT SUCH FACILITIES ARE SHOWN ON THESE PLANS. 7. THE CONTRACTORS
ATTENTION IS EXPRESSLY DIRECTED TO ALL THE REQUIREMENTS AND PROVISIONS OF THE STATE OF CALIFORNIA SAFETY REGULATIONS. CONFORMANCE THERETO SHALL BE STRICTLY ENFORCED DURING THE ENTIRE
LIFE OF THE CONTRACT. 8. THE CONTRACTOR SHALL DISPOSE OF ALL SURPLUS EARTH EXCAVATION OUTSIDE OF THE PROJECT AREA UNLESS APPROVED OTHERWISE BY THE CITY ENGINEER. ALL AC AND CONCRETE
REMOVALS SHALL BE DISPOSED OF OFF-SITE. 9. THE CONTRACTOR SHALL REVIEW AND VERIFY ALL CONDITIONS AN DIMENSIONS AT THE JOB SITE BEFORE COMMENCING ANY PORTION OF THE WORK; COMPARE ACTUAL
CONDITIONS WITH DRAWINGS TO ASCERTAIN CONDITIONS UNDER WHICH WORK IS TO BE PERFORMED; CHECK AND CONFIRM LOCATION OF EXISTING STRUCTURES, EQUIPMENT, AND UTILITIES WHICH MAY AFFECT WORK.
COMMENCEMENT OF WORK SHALL CONSTITUTE FULL ACCEPTANCE OF EXISTING SITE CONDITIONS. THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES TO THE CITY ENGINEER PRIOR TO THE COMMENCEMENT OF WORK.
10. THE CONTRACTOR SHALL ENACT ALL MEASURES TO PROTECT AND SAFEGUARD WORKERS AND THE GENERAL PUBLIC FROM INJURY DURING THE ENTIRE TIME OF CONSTRUCTION; MAINTAIN THE JOB SITE IN AN ORDERLY,
CLEAN MANNER THROUGHOUT THE COURSE OF WORK AND NOT BLOCK LEGAL EXITS OR ENTRANCES; LEAVE WORK AREA CLEAN, FREE OF DEBRIS AT THE END OF EACH DAY; AND COMPLY WITH ALL APPLICABLE CODES.
11. ALL CONCRETE AND ASPHALT CONCRETE PAVEMENT TO BE REMOVED SHALL BE REMOVED UTILIZING A SAW CUT (MINIMUM CUT DEPTH 1 1/2" AND/OR OTHER METHODS AS APPROVED BY THE CITY ENGINEER. 12.
THE CONTRACTOR SHALL ADJUST ALL UTILITY VALVE BOXES, MANHOLES, ETC. TO GRADE UPON COMPLETION OF PAVING. CONCRETE PAVEMENT SHALL BE USED TO PATCH AROUND RAISED UTILITIES IN CONCRETE STREETS;
ASPHALT CONCRETE PAVEMENT IN ASPHALT CONCRETE STREETS. 13. THE CONTRACTOR SHALL REPLACE IN KIND, TO THE SATISFACTION OF THE CITY ENGINEER, ANY PAVING, CURB AND GUTTER OR OTHER IMPROVEMENTS
CUT, REMOVED, OR DAMAGED IN CONJUNCTION WITH THIS PROJECT. 14. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR
SHALL DEFEND, INDEMNIFY AND HOLD THE CITY, THE CITY ENGINEER AND THEIR REPRESENTATIVE, HARMLESS FROM ANY ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF
WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE CITY OR THE CITY ENGINEER. 15. THE CONTRACTOR SHALL PROVIDE DUST CONTROL AND TRAFFIC CONTROL AT
ALL TIMES TO THE SATISFACTION OF THE CITY ENGINEER, AND SHALL BE IN COMPLIANCE WITH SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (A.Q.M.D.) RULE 403 FOR MITIGATING DUST CONTROL. 16. BARRICADES
WITH FLASHING LIGHTS ARE TO BE MAINTAINED ON ALL OBSTRUCTIONS WITHIN EXISTING STREET RIGHT-OF-WAYS AT ALL TIMES. CONSTRUCTION WARNING SIGNS AND FLAGMEN ARE TO BE PRESENT AT THE JOB SITE.
17. UPON COMPLETION OF THIS PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE INCURRED DUE TO HIS OPERATION. 18. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT
AT (800) 422-4133 TWO (2) DAYS PRIOR TO BEGINNING WORK. 19. ABBREVIATIONS INDICATED ON THE PLANS SHALL BE IN ACCORDANCE WITH SECTION 1-3 OF THE "SPECIFICATIONS". 20. CIRCLED NUMBERS
(FOR EXAMPLE, 1 ) REFER TO CONSTRUCTION LEGEND NUMBERS. 1. ALL AVAILABLE RECORDS FROM THE CITY AND UTILITY COMPANIES INVOLVED HAVE BEEN INVESTIGATED AND ALL KNOWN UTILITY CONDUITS AND
SUBSTRUCTURES ARE SHOWN HEREON. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL UTILITY CONDUITS AND SUBSTRUCTURES SHOWN OR NOT SHOWN ON THESE PLANS. THE CONTRACTOR SHALL
BEAR THE TOTAL EXPENSE OF REPAIR AND/OR REPLACEMENT OF SAID UTILITY CONDUITS AND SUBSTRUCTURES DAMAGED BY HIS OPERATION IN CONNECTION WITH THE LIMITS OF THIS PROJECT. 2. EXISTING UTILITIES
SHALL BE MAINTAINED IN-PLACE BY THE CONTRACTOR, UNLESS OTHERWISE NOTED. RELOCATION OR REMOVAL OF ANY EXISTING UTILITIES NOT COVERED BY THESE PLANS SHALL BE PERFORMED BY OR UNDER THE
DIRECTION OF THE RESPECTIVE UTILITY OWNERS AT THE EXPENSE OF THE CONTRACTOR. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF ALL, IF ANY, EXISTING SURVEY MONUMENTS. 4.
THE CONTRACTOR SHALL POSSESS A VALID STATE CONTRACTOR'S LICENSE AND SHALL BE REQUIRED TO POSSESS A VALID CITY BUSINESS LICENSE WHILE PERFORMING WORK ON THIS PROJECT. 5. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS PRIOR TO COMMENCEMENT OF ANY WORK COVERED BY THESE PLANS. 6. THE CITY SHALL NOT BE RESPONSIBLE FOR, OR LIABLE FOR UNAUTHORIZED
CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PROJECT ENGINEER STANDARD PLANS FOR CONSTRUCTION OF LOCAL STREETS AND ROADS,
JULY 2006 (STATE OF CALIFORNIA). STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION -2009 EDITION AMERICAN PUBLIC WORKS ASSOCIATION-SOUTHERN CALIFORNIA CHAPTER PLAN No. TITLE 110-1 DRIVEWAY
APPROACHES 112-0 CURB & SIDEWALK JOINTS 113-1 SIDEWALK AND DRIVEWAY REPLACEMENT 120-1 CURB AND GUTTER-BARRIER 122-1 CROSS AND LONGITUDINAL GUTTERS 132-1 CONCRETE PAVEMENT REPLACEMENT
133-2 ASPHALT CONCRETE PAVEMENT REPLACEMENT 205-1 SEWER MANHOLE ADJUSTMENT 206-1 MANHOLE RAISING RINGS S08-001 SURVEY WELL MONUMENT PAGE INDEX 1 OF 10 TITLE SHEET 2 OF 10 BARTLETT AVENUE
-CONSTRUCTION PLANS FROM GARVEY AVE. TO RAMONA AVE. 3 OF 10 FERN AVENUE -CONSTRUCTION PLANS FROM ANGELUS AVE. TO WALNUT GROVE AVE. 4 OF 10 FERN AVENUE -CONSTRUCTION PLANS FROM NEW AVE.
TO JACKSON AVE. 5 OF 10 GLENDON WAY -CONSTRUCTION PLANS FROM MUSCATEL AVE. TO ROSEMEAD BLVD. 6 OF 10 GLENDON WAY -STRIPING AND TRAFFIC IMPROVEMENTS FROM MUSCATEL AVE. TO ROSEMEAD BLVD.
7 OF 10 GRAND AVENUE -CONSTRUCTION PLANS FROM ROSEMEAD BLVD. TO WALNUT AVE. 8 OF 10 HART AVENUE -CONSTRUCTION PLANS FROM RAMONA BLVD. TO MARSHALL AVE. 9 OF 10 MUSCATEL AVENUE -CONSTRUCTION
PLANS FROM MISSION RD. TO GRAND AVE. ALTERNATE NO. 1 10 OF 10 IVAR AVENUE -CONSTRUCTION PLANS FROM GARVEY AVE. TO RAMONA AVE. UTILITY TITLE WATER GOLDEN STATE WATER CO. 110 E. LIVE OAK
AVENUE ARCADIA, CA 91006 CONTACT: GABRIEL GOMEZ (626) 446-5176 *ADAMS RANCH MUTUAL WATER CO. P.O. BOX 6841 ROSEMEAD, CA 91770 DOMENIC CIMARUSTIC (626) 444-6050 *CALIFORNIA AMERICAN WATER
CO. 8657 GRAND AVE. ROSEMEAD, CA 91770 LOUIE ROMERO (626) 712-8340 *SAN GABRIEL COUNTY WATER DISTRICT 8366 E. GRAND AVENUE ROSEMEAD, CA 91770 STEVEN TERRA (626) 287-0341 *SAN GABRIEL
VALLEY WATER CO. 11142 GARVEY AVENUE EL MONTE, CA 91733 LUIS MONTENEGRO (626) 448-6183 X252 SCE 1000 POTRERO GRANDE DRIVE MONTEREY PARK, CA 91755 CONTACT: ELIAS BERMUDEZ (323) 720-5263
SCG THE GAS COMPANY 9400 OAKDALE, CHATSWORTH CA 91311-6511 CONTACT:MICHEL DUENAS (714) 634-7265 CHARTER COMMUNICATIONS 4781 IRWINDALE AVENUE IRWINDALE, CA 91706 CONTACT JESSE GONZALES
(626) 430-3570 ATT 8633 GRAND AVENUE ROSEMEAD, CA 91770 CONTACT: STEVE GILLESPIE (626) 570-7193 PUBLIC WORKS DEPARTMENT -ENGINEERING DIVISION 8838 E. VALLEY BOULEVARD ROSEMEAD, CA 91770
(626) 569-2152 DWG. NO.