Sully-Miller ContractingCITY OF ROSEMEAD
RESIDENTIAL STREETS RESURFACING PROJECT
PROJECT No. 21003
I
BIDDER: SULLY- MILLER CONTRACTING COMPANY
CONTRACT BID FORMS
•.IL I
SECTION1 BID SCHEDULE ....................................................................... ............................... 1
SECTION2 BID DATA FORMS ................................................................... ............................... 5
2.A BID BOND ................................................................................. ......................:........ 8
2.6 LIST OF PROPOSED SUBCONTRACTORS .......................... ............................... 7
SECTION 3 NON - COLLUSION AFFIDAVIT
10
CBF -15
BIDDER' SULLY-MILLER CONTRACTING COMPANY
SECTION 1- BID SCHEDULE
CBF -1
BIDDER: SULLY - MILLER CONTRACTIN COMPANY
BID SCHEDULE
SCHEDULE OF PRICES FOR
RESIDENTIAL STREETS RESURFACING PROJECT
PROJECT No. 21003
BASE BID SCHEDULE
CBF -2
UNIT OF
EST.
UNIT
ITEM
NO.
ITEM DESCRIPTION
MEASURE
QTY.
PRICE
COST
1
Clearing & Grubbing per plans
LS
1
and specifications. See technical
provisions TP -2, TP -3 & TP-4,
%
A0 000.
2
Disposal of Waste Materials.
LS
1
S0� /v
/Soo io
3
Cold mill 2.0- inches thick existing
SF
533,020
gS aF3.a
pavement.,
4
Construct 1.5 inches thick
TONS
5,000
pavement overlay ARHM -GG -C
(PG 64 -16) as indicated on the
plans.
90.
1 / 5 0co
5
Construct Ar0 inches thick
TONS
1,788
Asphaltic Leveling course D1
$.3.
(PG 64 -10) as indicated on the
plans.
6
Remove 6- inches of existing
SF
7,200
pavement and replace it with 3.5-
inches of AC B -PG 64 -10 Base
Course over compacted native.
y//0.
7
Remove, Dispose and Construct
SF
12,942
4- inches thick PCC Sidewalk per
3J
SPPWC Std. Plan 113 -1.
�,
(vg S
8
Remove, Dispose and Construct
SF
2,500
PCC Driveway Approaches per
SPPWC Std. Plan 110 -2.°
O
9
Remove, Dispose and Construct
LF
533
8- inches Curb and 24- inches
Gutter per SPPWC Std. Plan
120 -2.
10
Remove, Dispose and Construct
LF
100
PCC Cross Gutter per SPPWC
Std. Plan 123 -2.
L/
CBF -2
BIDDER: SULLY - MILLER CONTRACTIN COMPANY
TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$ / 9'3 yL V. y°
amount
CBF -3
UNIT OF
EST.
UNIT
ITEM
NO.
ITEM DESCRIPTION
MEASURE
QTY.
PRICE
COST
11
Remove, Dispose and Construct
EA
22
PCC Curb Ramps per SPPWC
Std. Plan 111-4.
12
Adjust Sewer Manhole to Grade
EA
94
per APWA Std. Plan 205 -1 and
206 -1.
SSO
13
Adjust Water Valve /Gas Valve to
EA
84
Grade.
14
Install Survey Well Monument
EA
27
per City of Rosemead Std. Plan
SOS -001. See Section 2 -9
Surveying of the General
Provision -7 per details (Cover,
Sleeve & Dome will be provided
/
by the City at no cost).
15
Install Traffic Striping, Traffic
LS
1
Signal Loops and Pavement
Markers per the Striping Plans
/
and Specifications Complete.
31 1 5 - 00.
3/ S - 00 .
16
Prepare a Storm Water Pollution
Prevention Plan (SWPPP)
LS
1
3 /2 5 - 00.
J coo
.
17
Paint Home Addresses (Curb
EA
600
Numbering).
18
Install Truncated Domes Only
EA
8
yellow color by Amorcast or
3 75
3 Go E.
Approved Equal.
TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$ / 9'3 yL V. y°
amount
CBF -3
BIDDER: SULLY- MILLER CONTRACTING COMPANY
ALTERNATE BID ITEM No. 7
MUSCATEL AVENUE
FROM Ru91MONAAMWETA)MJARVEYAVENUE
MISSION DRIVE TO GRAND AVENUE.
CBF -4
UNIT OF
EST.
UNIT
ITEM
NO.
ITEM DESCRIPTION
MEASURE
CITY.
PRICE
COST
19
Clearing & Grubbing per plans
LS
1
and specifications. See technical
i
provisions TP -2, TP -3 & TP-4.
SD,
So .
20
Cold mill 2.0- inches thick existing
SF
74,160
�° 1
pavement.
d
21
Construct 1.5 inches thick
TONS
700
pavement overlay ARHM -GG -C
(PG 64 -16) as indicated on the
plans.
22
Construct V0 inches thick
TONS
232
Asphaltic Leveling course D1
(PG 64 -10) as indicated on the
plans.
'
23
Remove, Dispose and Construct
SF
3,318
4- inches thick PCC Sidewalk per
SPPWC Std. Plan 113 -1.
•
/S,,;LYP
24
Remove, Dispose and Construct
SF
595
PCC Driveway Approaches per
SPPWC Std. Plan 110 -2.
25
Remove, Dispose and Construct
EA
9
PCC Curb Ramps per SPPWC
Std. Plan 111
�11
-4.
26
Adjust Sewer Manhole to Grade
EA
6
per APWA Std. Plan 205 -1 and
206 -1.
27
Adjust Water Valve /Gas Valve to
EA
6
Grade.
28
Install Survey Well Monument
EA
5
per City of Rosemead Std. Plan
S08 -001. See Section 2 -9
Surveying of the General
Provision -7 per details (Cover,
Sleeve & Dome will be provided
by the City at no cost).
29
Install Traffic Striping, Traffic
LS
1
Signal Loops and Pavement
Markers per the Striping Plans
and Specifications Complete.
7 G�
7 �o
CBF -4
BIDDER: SULLY - MILLER CONTRACTING COMPANY
TOTAL ALTERNATE BID PRICE No. 1 (SCHEDULE BID PRICE):$ 1y7, 330
ALTERNATE BID ITEM No. 2
TREE PLANTING
UNIT OF
EST.
UNIT
ITEM
NO.
ITEM DESCRIPTION
MEASURE
QTY.
PRICE
COST
30
Install Truncated Domes Only
EA
Z
yellow color by Amorcast or
Approved Equal
�� C o a
TOTAL ALTERNATE BID PRICE No. 1 (SCHEDULE BID PRICE):$ 1y7, 330
ALTERNATE BID ITEM No. 2
TREE PLANTING
TOTAL ALTERNATE BID PRICE No. 2 (SCHEDULE BID PRICE):$ 92x DO V
C
TOTAL BASE & ALTERNATE BID PRICE
amount in written
a�
Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in
the schedule of bid items above, within the limits define in Section 3 -2.2.1 of the Standard
Specifications, to stay within the budgeted amount of this project.
If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall
be added to or deducted from the Total Bid Price entered above. The owner can choose to
include one or more of the alternates in the Total Bid Price of the Project. If any of the
Alternate Bids are utilized by the Owner, the resulting amount shall be considered the Total
Bid Price for the Project.
CBF -5
UNIT OF
EST.
UNIT
ITEM
NO.
ITEM DESCRIPTION
MEASURE
QTY.
PRICE
COST
31
Install 24 -Inch Box Parkway Tree
EA
200
"Chinese Pistache" including 90-
days maintenance period and
�� C o a
tree wells.
/ /
TOTAL ALTERNATE BID PRICE No. 2 (SCHEDULE BID PRICE):$ 92x DO V
C
TOTAL BASE & ALTERNATE BID PRICE
amount in written
a�
Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in
the schedule of bid items above, within the limits define in Section 3 -2.2.1 of the Standard
Specifications, to stay within the budgeted amount of this project.
If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall
be added to or deducted from the Total Bid Price entered above. The owner can choose to
include one or more of the alternates in the Total Bid Price of the Project. If any of the
Alternate Bids are utilized by the Owner, the resulting amount shall be considered the Total
Bid Price for the Project.
CBF -5
BIDDER: SULLY - MILLER CONTRACTING COMPANY
The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which
cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and
after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third
party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the
written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall
govern.
Attached hereto is a 6M(i1MI/t'4K, ga(0gry Td/t1d*dk or a bid bond in the amount of
Dollars ($ 10 % said amount being not less than ten percent (10 %) of the Total
Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award,
we fail or refuse to execute the Contract and furnish the required bonds, certificates and
endorsements of insurance and other certifications within the time provided.
If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be
prepared by the Owner for execution, within five (5) Calendar Days following the Letter of Award for
the Contract, and will deliver to the Owner within that same period the necessary original Certificates
of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other
documentation and certification required by the Contract.
The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body
all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton
Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the
Business and Professional Code), arising from purchases of goods, materials or services by the
Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and
become effective at the time the purchasing body tenders final payment to he Contractor.
Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence
satisfactory to the Owner of Bidder's California contractor's license(s) in good standing; (2) evidence
that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting
therefrom; and (3) any other information and documentation, financial or otherwise, needed by
Owner to award a Contract to the lowest responsible and responsive bidder.
Bidder understands and agrees that liquidated damages shall apply to this Contract in the amounts
of five hundred dollars ($500.00) if oroiect is not completed in forty -five (45) calendar days. The
Contract Time will begin to run ten (10) Working Days from the date of the Notice of Proceed and
subject to the terms and conditions described in the Contract Form and the Contract Documents.
Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be
incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder
further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data
submitted herewith into a contract arising out of this Bid.
The undersigned acknowledges receipt, understanding and full consideration of the following
addenda to the Contract Documents.
F09*l4AiiSRZM
The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and
equipment or supplies necessary to complete the Work as described in the Bid Documents. If this
bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the
necessary bonds and accept the Total Bid Price as compensation in full for all Work under the
contract.
W:
M /19/2012 16:11 FAX
CITY OF ROSEMEAD
ROSEMEAD, CALIFORNIA
ADDENDUM NO.1
To all prospective bidders under Bid Documents for the
RESIDENTIAL STREETS RESURFACING PROJECT
PROJECT No. 21003
1/001/001
1. You are hereby informed that the Bid Item No. 5 and Bid Item No. 22 shall read
as follows:
The estimated tonnage quantity stays the same as in the original bid.
2. In addition, Alternate Bid Item No. 1 on page CBF — 4 shall read as follows:
ALTERNATE BID ITEM No. 1
MUSCATEL AVENUE
FROM MISSION DRIVE TO GRAND AVENUE
The rest of Bid Documents as originally issued shall be used in submitting bids,
and an acknowledgement of receipt of this Addendum Number 1 shall be entered
on the page CBF — 6 of the Contract Bid Forms. Failure to provide such
acknowledgement shall render the bid as non - responsive and subject to
rejection.
BY ORDER OF THE CITY OF ROSEMEAD
Date: March 19 2012.
By
afael Fajardo
Associate Civil Engineer
BIDDER: SULLY - MILLER CONTRACTIN COMPANY
9
ASSISTANT SECRETARY
Title
135 S. STATE COLLEGE BLVD., #400
Business Street Address
BREA, CA 92821
City, State and Zip Code
(714)578.9600
Telephone Number
Bidder's /Contractor's State of Incorporation: DELAWARE
Partners or Joint Venturers:
Bidder's License Number(s): 747612, A a C10
NOTES:
1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the
representations made on the Contract Bid Forms.
2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address
3) If Bidder is a partnership or joint venture, give full names of all partners or joint
venturers.
As further discussed in the Instructions to Bidders, Bidder will be required
to provide evidence that the person signing on behalf of the corporation,
CBF -7
CALIFORNIA ALL - PURPOSE ACKNOWLEDGEMENT
STATE OF CALIFORNIA l
COUNTY OF ORANGE J
On March 20, 2012 before me, Adriana C. Treio personally appeared Gary Downey
who proved to me on the basis of satisfactory evidence to
be the person(s) whose name(o islare subscribed to the
within instrument and acknowledged to me that
helshe/they executed the same in hi rh., . `+cT.c - , 6h authorized
capacity(+W, and that by hi /herlt The'. signatures) on the
instrument the personal, or the entity upon behalf of
which the person(s) acted, executed the instrument.
N•«•H• «1«•«H•�N
j N A C TREJO I certify under PENALTY OF PERJURY under the laws of
COM N the State of California that the foregoing paragraph is true
and correct.
OTNry PUBUC- GLMCRNIA ORAY n n Ocl 13, 2012
«
C'rr b •• «• ................«.� WITNESS my ha d official seal
Signature ( ia ---f-
Adnana C. Trejo, Notary lic
Notary Seal 11 7
OPTIONAL
Description of Attached Document
Title or Type of Document Bid Proposal- Signature Page
Document Date: March 20, 2012 Number of Pages:
Signer(s) Other Than Named Above: None
Capacity(ies) Claimed by Signer(s):
Signer's Name Gary Downey Signers Name
Individual
❑X Corporate Officer — Title(s)
❑ Partner — Limited /General
Attorney in Fact
Trustee
Guardian or Conservator
Other
Signer is Representing:
Individual
Assistant Secretary F Corporate Officer — Title(s)
Right Thumbprint
of Signer
Y- MILLER CONTRACTING COMPANY
Right Thumbprint
of Signer
❑ Partner — Limited /General
❑ Attorney In Fact
Trustee
❑ Guardian or Conservator
E Other
CERTIFICATE OF INCUMBENCY AND RESOLUTION
I, Gary Downey, do hereby certify that I am the Assistant Secretary of Sully - Miller Contracting
Company, a Delaware corporation, and that as such I have access to and custody of the corporate
records and minute books of said corporation.
And I do hereby further certify that the following persons are duly elected officers of said
corporation.
TITLE
NAME
Chairman of the Board
Gordon R. Crawley
President
David Martinez
Chief Financial Officer/Treasurer/Vice President
Timothy P. Orchard
Vice President/Assistant Secretary
Michael Edwards
Vice President
Scott Bottomley
Secretary
Anthony L. Martino II
Assistant Secretary
George Aldrich
Assistant Secretary
Gary Downey
Assistant Secretary
Dennis Gansen
I further certify that the following is a true and correct copy of a resolution duly adopted by the
Board of Directors of said Company at a meeting held on August 11, 2009, and that this
resolution has not been in any way rescinded, annulled, or revoked but the same is still in full
force and effect:
"AUTHORITY TO EXECUTIVE BIDS AND CONTRACTS"
Resolved, that any officer or assistant officer of this Company be and each of them is
hereby authorized to execute in the name and on behalf of this Company under its
corporate seal any and all proposals for the sale of products, merchandise and services of
this Company and any bids and performance bonds required in connection therewith, to
the United States, and of the State, territories and dependencies of the United States, the
District of Columbia, cities, towns, townships, counties, school districts, and to the
department, political subdivisions, agencies or wholly -owned corporations thereof, or to
any other person"
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the corporate seal this 1"
day of September 2011.
(SEAL) 4Gary y, Assis tant ecretary
r Coutrac Company
e(Cplle Blvd., Ste. 400
Brea, CA 92821
BIDDER: SULLY - MILLER CONTRACTING COMPANY
SECTION 2
BID DATA FORMS
BIDDER: Sully - Miller Contracting Company
Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid
Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide
the information required. Bidder shall ensure that every page of its Bid Data Forms are properly
identified with the Bidder's name and page number.
2A BID BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT Sully Miller Contracting Company as
Principal, and Liberty Mutual Insurance Company
, as Surety, are held firmly bound unto the
CITY OF ROSEMEAD (hereinafter called the OWNER) in the sum of
Ten oement of amount bid
($ 10 ) , being not less than ten percent (10 %) of the Total
Bid Price; for the payment of which sum will and truly to be made, we bind ourselves,
our heirs, executors, administrators, successors, and assigns, jointly and severally,
firmly by these presents.
WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work
required for the Residential Streets Resurfacing Project as setforth in the Notice
Inviting Bids and accompanying Bid Documents, dated 3121r12
NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the
OWNER and, within the time and in the manner required by the above- referenced
Bid Documents, enters into the written form of Contract bound with said Bid
Documents, furnishes the required bonds (one to guarantee faithful performance
and the other to guarantee payment for labor and materials) furnishes the required
insurance certificates and endorsements, and furnishes any other certifications as
may be required by the Contract, then this obligation shall be null and void; otherwise
it shall remain in full force and effect. In the event suit is brought upon this bond by
the OWNER and judgment is recovered, said Surety shall pay all costs incurred by
the OWNER in such suit, including reasonable attorneys' fees to be fixed by the
court.
SIGNED AND SEALED, this 1 day of March 20 12
Sully - Miller Contracting Company (SEAL) Liberty Muual Insu Company (SEAL)
Principal Surety
B B {���
Y Y
Sign tUre Signature Kim Heredia. Attomey -in -Fact
/CARWNEY, ASSISTANT 5 RETARY
6_
CBF - 9
CALIFORNIA ALL - PURPOSE ACKNOWLEDGEMENT
STATE OF CALIFORNIA
COUNTY OF ORANGE
On March 20, 2012 before me, Adriana C. Trelo personally appeared Gary Downey
who proved to me on the basis of satisfactory evidence to
be the person( -s) whose name(6) istare subscribed to the
within instrument and acknowledged to me that
he/sheithey executed the same in his /fief /their authorized
capacity0es), and that by his/herlthe r signature(&) on the
instrument the person(s), or the entity upon behalf of
which the person(&) acted, executed the instrument.
ADRIANA C. TREIO
C06IM / 1817109
33 MgAPURX OOUNTY
-
A+r commWW 60M OCL 4 2m2 +
Notary Seal
None
OPTIONAL
Description of Attached Document
Title or Type of Document: Bid Bond - Signature Page
Document Date: March 16, 2012 Number of Pages:
Signer(s) Other Than Named Above:
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true
and correct.
WITNESS my han official seal
Signature
Adnana C. Trejo, Notary, blic
1
Capacity(ies) Claimed by Signer(s):
Signers Name Gary Downey Signers Name
❑ Individual
FX Corporate Officer — Title(s)
E] Partner — Limited /General
❑ Attorney In Fact
Trustee
Guardian or Conservator
Other
Signer is Representing
Right Thumbprint
of Signer
❑ Individual
❑ Partner — Limited /General
❑ Attorney In Fad
Trustee
Guardian or Conservator
❑ Other
Right Thumbprint
of Signer
Y- MILLER CONTRACTING COMPANY
Assistant Secretary ❑ Corporate Officer — Title(s)
CNllffaT� : ► 77` I7�1 6�J1I1: tZ�x ]aIC�Ti�[aI`:IiflZeluIa7M
State of California
County of Orange
On MAR 1 6 2w before me N.M. Campbell, Notary Public
DATE NAME, TITLE OF OFFICER - E.G.. "JANE DOE, NOTARY PUBLIC'
personally appeared Kim Heredia who
proved to me on the basis of satisfactory evidence to be the person(s) whose names (s) is /afe
subscribed to the within instrument and acknowledged to me that he /she /they executed the same in
his /her /theif authorized capacity(ies), and that by his /her /their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
V. M. CAMPBELL
Commission 1 1910804
z :,.�_ Notary Public • California z
= Orange County
SMy Comm. Expires Nov 25. 2014
WITNESS my hand and official seal.
ugl 0&dZA
SIGNATURE OFrRY
OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this fonn.
CAPACITY CLAIMED BY SIGNER
❑INDIVIDUAL
❑CORPORATE OFFICER
TITLE(S)
❑ PARTNER(S) ❑ LIMITED
❑ GENERAL
® ATTORNEY -IN -FACT
❑ TRUSTEE(S)
❑ GUARDIAN /CONSERVATOR
❑ OTHER:
SIGNER IS REPRESENTING:
NAME OF PERSON(S) OR ENTITY(IES)
DESCRIPTION OF ATTACHED DOCUMENT
TITLE OR TYPE OF DOCUMENT
NUMBER OF PAGES
MAR 1 6 2012
DATE OF DOCUMENT
THAN NAMED ABOVE.
THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 5 157086
This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the
extent herein stated.
LIBERTY MUTUAL INSURANCE COMPANY
BOSTON, MASSACHUSETTS
POWER OF ATTORNEY
KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company"), a Massachusetts stock Insurance company,
pursuant to and by authority of the By -law and Authorization hereinafter set forth, does hereby name, constitute and appoint VICTORIA M. CAMPBELL,
KIM HEREDIA, AND ERIK JOHANSSON, ALL OF THE CITY OF IRVINE, STATE OF CALIFORNIA, CHRISTINA JOHNSON, SHIRLEY BAUMAN, ALL OF THE CITY
OFLOS ANGELES, STATE OF CALIFORNIA ....................................................................................................................................................................... ...............................
, each individually if there be more than one named, Its true and lawful attomey -in -fact to make, execute, seal, acknowledge and deliver, for and on its
behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding
ONE HUNDRED MILLION AND 001700' DOLLARS ($ 100. 000 ,000.00' ».. «... «........... »... ) each, and the
execution of such undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company
as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons.
That this power is made and executed pursuant to and by authority of the following By -law and Authorization:
ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the
chairman or the president may prescribe, shall appoint such attorneys-In-fact, as may be necessary to act in behalf of the Company to make,
p execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-
CL in -fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and
Q execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
x I signed by the president and attested by the secretary.
C
a
By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attomeys -in -fact:
7 Pursuant to Article XIII, Section 5 of the By -Laws, David M. Carey, Assistant Secretary of Liberty Mutual Insurance Company, is hereby authorized
0) to appoint such attomeys -in -tact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety
m any and all undertakings, bonds, recognizances and other surety obligations.
O-
`m > That the By -law and the Authorization set forth above are true copies thereof and are now in full force and effect.
m O
— 2 IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of Liberty
c y Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this day of 8th day of February
0 2 2012
"4 LIBERTY MUTUAL INSURANCE COMPANY
C Lo
a q David M. Carey, Aesistant Secretary
0 COMMONWEALTH OF PENNSYLVANIA ss
'H O COUNTY OF MONTGOMERY
OC
E y On this 8th day of February 2012 before me, a Notary Public, personally came David M. Care y , to me known, and
`O m acknowledged that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed
T the above Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said
u corporation.
IN TESTIMONY WHE o subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year
first above written. �e o ,owwp�� (� NM dW sear
ti U S Y Teresa Pa.W[W. Notary Pualb
OF Ptymoutt Tw ., MoMWmery County
My CommL n Eml,es Mar. 2e, 2013 By
�v MeniW, Pennsylvania Teresa Patella, Notary Public
CERTIFICATE LVP
I, the undersigned, Assis any Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is
a full, true and correct copy, I and effect on the date of this certificate; and I do further certify that the officer or official who executed the said
power of attorney is an Assistant Secretary specialty authorized by the chairman or the president to appoint attomeys -in -fact as provided in Article XIII,
Section 5 of the By -laws of Liberty Mutual Insurance Company.
This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following
vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980.
VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified
copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the
same force and effect as though manually affixed. /
IN TESTIMO V WHEREOF hereunto subscribed my name and affixed the corporate seal of the said company, this day of
e
m ar
O
O �
yW
E E
O CL
O
a`r c
3 1 e
OE
i C O
O
Z rn
O C
d
10 a
dy
« co
E a0
� M
`c '?
Oo
V7
H r
NW
Gregory W. Davenport, Assistant Secretary
BIDDER: SULLY - MILLER CONTRACTING COMPANY
2.113 LIST OF PROPOSED SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100
through 4114 of the California Public Contract Code, and any amendments thereto, each
Bidder shall provide the information requested below for each subcontractor who will
perform work, labor or render service to Bidder in or about the construction of the Work in an
amount in excess of one -half of one percent (greater than 0.5 %) of the Bidder's Total Bid
Price, or, in the case of bids or offers for the construction of streets or highways, including
bridges, in excess of one -half of 1 percent of the Contractor's total bid or ten thousand
dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work
which will be done by each subcontractor. Bidder shall list only one subcontractor for any
one portion of the Work.
Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow
Bidders twenty -four (24) additional hours after the deadline for submission of bids to submit
the information requested by the Owner about each subcontractor, other than the name and
location of each subcontractor.
If the Bidder fails to specify a subcontractor for any portion of the Work to be performed
under the Contract, it shall be deemed to have agreed to perform such portion itself, and
shall not be permitted to subcontract that portion of the Work except under the conditions
hereinafter set forth below.
Subletting or subcontracting of any portion of the Work in excess of one half of one percent
(greater than 0.5 %) of the Total Bid Price or, in the case of bids or offers for the construction
of streets or highways, including bridges, in excess of one -half of 1 percent of the
Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, for which no
subcontractor was designated in the original bid shall only be permitted in cases of public
emergency or necessity, and then only after Owner approval.
CBF -10
BIDDER: SULLY- MILLER CONTRACTING COMPANY
2.6 LIST OF PROPOSED SUBCONTRACTORS (continued)
("Duplicate Next 2 Pages If needed for Iisfing add•Nonal suoconlractors." I
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name: P9 > C J /� l
Address: ,'� r i� ,, c�
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name: �g S /`man h�Ce S ' s G✓� /l
Address: Co e o ✓.� �%} / `� 1
Name and Location
of Subcontractor
Name: �l� �A✓� SGa�c¢
Address: /- ftj,L,y t^14e ,
Description of Work
to be Subcontracted
I {2a -e- S
Name and Location
of Subcontractor
Name: �!//�.•r i'u✓ /L}t c. ,- % ✓ rK�Lr L f S
Address:
Description of Work
to be Subcontracted
Name and Location
of Subcontractor
Name:
Address:
Description of Work
to be Subcontracted
CBF - 11
BIDDER: SULLY- MILLER CONTRACTING COMPANY
2.B LIST OF PROPOSED SUBCONTRACTORS (continued)
("Duplicate Next 2 Pages if needed for lsting additional subcontractors."]
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address
Name and Location
of Subcontractor
Name:
Address:
Description of Work
to be Subcontracted
Name and Location
of Subcontractor
Name:
Address:
Description of Work
to be Subcontracted
Name and Location
of Subcontractor
Name:
Address:
Description of Work
to be Subcontracted
Name and Location
of Subcontractor I
Name:
Address:
Description of Work
to be Subcontracted
CBF - 11
BIDDER: SULLY - MILLER CONTRACTIN COMPANY
2.0
The following are the names, addresses and telephone numbers for three public agencies for which BIDDER
has performed similar work within the past two (2) years.
— PLEASE SEE ATTACHED BIDDER'S EXPERIENCE AND QUALIFICATIONS
"'PLEASE SEE ATTACHED LIST OF REFERENCES
1 .
Name and Address of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
2.
Name and Address
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
3.
of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
4.
Name and Address of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
CBF -12
ALL
SULLY- MILLER
CONTRACTING CO
BIDDER'S EXPERIENCE AND QUALIFICATIONS
Project Name /Number:
TORRANCE BOULEVARD / 28791C
Year of Project:
10/2008 — 05/2010
Project Description:
STREET RECONSTRUCTION & ARHM OVERLAY
Agency Name:
CITY OF TORRANCE
Contact Person:
BETH OVERSTREET Telephone: 310 - 618 -3074
Fax: 310 - 781 -6802
Original Contract Amount.
$5,904,267 Final Contract Amount. $6,133,068
Change In original contract amount is due to extra work and /or contract change orders adding work.
Project Name/Number:
LONG BEACH ANNUAL 2009 / 2881GC
Year of Project.
01/2009 — 05-2010
Project Description:
AC /ARHM — CONCRETE — BASE — SIGNALS — SURVEY — STRIPING - LANDSCAPE
Agency Name:
CITY OF LONG BEACH
Contact Person:
CHARLES RAMEY Telephone: 562 -570 -5170
Fax: 562 -570 -5176
Original Contract Amount:
$5,000,000 Final Contract Amount: $4,290,000
Annual Contract — work was done on an as needed basis.
Project Name/Number:
LACMA PHASE II PAVILION PROJECT 28006 / 29820C
Year of Project:
02/2009 — 0412010
Project Description:
B PERMIT
Agency Name:
MATT CONSTRUCTION CORPORATION
Contact Person:
GREG WADE Telephone: 562- 903 -2277
Fax: 562- 903 -2290
Original Contract Amount:
$92,507 Final ContractAmount: $420,000
Change In original contract
amount is due to extra work and /or contract change orders adding work.
Project Name/Number:
LA SOUTHWEST COLLEGE — PARKING LOT 3 / 28795C
Year of Project:
09/2008 — 01 /2010
Project Description:
AC — BASE — CONCRETE — STRIPING
Agency Name:
CHEVRON ENERGY SOLUTIONS
Contact Person:
STEVE PELASYED Telephone: 714 -577 -1374
Fax: 714 -577 -1330
Original Contract Amount:
$1,120,315 Final Contract Amount:
Change in original contract
amount is due to extra work and /or contract change orders adding work.
Project Name /Number:
3 RD STREET BETWEEN RECORD AVENUE TO WOODS AVENUE / 28787C
Year of Project:
11/2008 — 12/2009
Project Description:
AC — CONCRETE — UNDERGROUND — LANDSCAPE — STRIPING - SIGNALS
Agency Name:
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS
Contact Person:
FAHIM RAHIMI Telephone: 626 -45B -3112
Fax: 626 - 458-2197
Original Contract Amount:
$3,411,736 Final ContractAmount: $3,628,000
Change in original contract
amount is due to extra work and /or contract change orders adding work.
Updated August 2010
SULLY- MILLER
CONTRACTING CO.
BIDDER'S EXPERIENCE AND QUALIFICATIONS
Project Name /Number:
2007 -2008 PAVEMENT REHABILITATION- 28750C
Start and Finish Dates:
6/2008 TO 7/2008
Project Description:
AC /ARHM — MANHOLES — SURVEY — STRIPING — COLD MILL
Agency Name:
CITY OF HAWAIIAN GARDENS
Contact Person:
STEVE STEINBRECHER Telephone: 562- 908 -6200
Fax: 562 -695 -2120
Original Contract Amount:
$451,112 Final Contract Amount: $456,287
Change in original contract amount is due to extra work and /or contract change orders adding work.
Project Name /Number:
STREET PAVING PROGRAM-28735C
Start and Finish Dates:
3/2008 TO 5/2008
Project Description:
ARHM — MANHOLES — MONUMENTS — STRIPING — SWPPP- COLD MILL
Agency Name:
CITY OF WEST HOLLYWOOD
Contact Person:
MILA SOLOGUB Telephone: 323- 848 -6338
Fax. 323 -848 -6564
original Contract Amount:
$340,986 Final Contract Amount: $315,916
Change In contract amount
is due to items of work being deleted by the agency.
Project Name /Number:
STREET AND WATER IMPROVEMENTS IN PIONEER BOULEVARD- 27709C
Start and Finish Dates:
1112007 TO 412008
Project Description:
WATER LINE AND STREET IMPROVEMENTS
Agency Name:
CITY OF CERRITOS
Contact Person:
RASH SYED Telephone: 562 -860 -0311
Fax: 562 - 916 -1371
Original Contract Amount.
$1,507,833 Final Contract Amount: $1,443,408
Change in contract amount
is due to items of work being deleted by the agency.
Project Name /Number:
THE LACMA TRANSFORMATION PROJECT- 27662C
Start and Finish Dates:
6/2007 TO 4/2008
Project Description:
B PERMIT
Agency Name:
MATT CONSTRUCTION CORPORATION
Contact Person:
GREG WADE Telephone: 562- 903 -2277
Fax: 562 -903 -2290
Original ContractAmount:
$912,402 Final ContractAmount: $1,363,596
Change In original contract
amount is due to extra work and /or contract change orders adding work.
Project Name/Number.
CATALINA MEDIA / THE POINTE- 27732C
Start and Finish Dates:
1 /2008 TO 3/2008
Project Description:
SEWER MAIN INSTALLATION
Agency Name:
KRISMAR CONSTRUCTION COMPANY, INC.
Contact Person:
GARY MORRISON Telephone: 310 -458 -3170
i
Fax: 310 - 458 -9063
Original Contract Amount:
$315,955 Final Contract Amount: $411,955
Change in original contract
amount is due to extra work and /or contract change orders adding work.
Updated August 2010
KAMA L.
SUIIY- MILLER
CONTRAC - rING CC).
BIDDER'S EXPERIENCE AND QUALIFICATIONS
Project Name /Number: PACIFIC ELECTRIC INLAND TRAIL PHASES 2 & 3 / 27653C
Start and Finish Dates: 3/07 TO 1/08
Project Description: R/R CONCRETE /AC — LANDSCAPE /IRRIGATION — SIGNALS — STRIPE - UTILITIES
Agency Name: CITY OF RANCHO CUCAMONGA
Contact Person: WALTER STICKNEY Telephone: 909 - 477 -2740
Fax: 909- 477 -2746
Original ContactAmount: $3,424,781 Final Contract Amount. $3,424,780
Change In original contract amount Is due to extra work and /or contract change orders adding work.
Project Name /Number:
Start and Finish Dates:
Project Description:
Agency Name:
Contact Person:
Original Contract Amount:
MARQUARDT AVENUE /27689C
7/2007 TO 912007
R/R CONCRETE — AC ON FABRIC — ADJUST UTILITIES
LOS ANGELES COUNTY DEPT. OF PUBLIC WORKS
EMIL KURLYAND Telephone: 626 -458 -3166
Fax: 626- 458 -2197
$183,915 Final Contract Amount: $183,915
Project Name /Number: ALPACA STREET IMPROVEMENT PROJECT / 27699C
Start and Finish Dates: 8/2007 TO 1112007
Project Description:
R/R CONCRETE & ASPHALT — STRIPING — ADJUST UTILITIES
Agency Name:
CITY OF SOUTH EL MONTE
Contact Person:
GEORGE CASTILLO Telephone: 562 - 682-3620
Fax: 562 -684 -0130
Original Contract Amount:
$135,000 Final Contract Amount: $167,074
Change in original contract amount Is due to extra work and /or contract change orders adding work.
Project Name /Number:
REHABILITATION OF LA MIRADA BLVD. / 27661C
Start and Finish Dates:
5/2007 TO 9/2007
Project Description:
ARHM / AC PAVING, CONCRETE WORK — LOOP DETECTORS / SIGNALS
Agency Name:
CITY OF LA MIRADA
Contact Person:
GARY SANUI Telephone: 562- 943 -2385
Fax: 714 -522 -5800
Original Contract Amount:
$2,164,089 Final Contract Amount: $2,575,166
Change in original contract amount is due to extra work and /or contract change orders adding work.
Project Name /Number:
CSULB PARKING LOT 13 REPAIR — REPAVE / 27694C
Start and Finish Dates:
7/2007 TO 8/2007
Project Description:
AC GRIND / OVERLAY — ASPHALT REPAIR - MINOR CONCRETE REPAIR
Agency Name:
CALIFORNIA STATE UNIVERSITY, LONG BEACH
Contact Person:
ENRIQUE ROBLES Telephone: 562- 985 -4175
Fax: 562- 985 -2308
Original Contract Amount:
$375,823 Final Contract Amount: $380,572
Change in original contract amount Is due to extra work and /or contract change orders adding work.
Updated August 2010
SULLY- MIT.LFR
CONTRACTING: CO.
BIDDER'S EXPERIENCE AND QUALIFICATIONS
Project Name/Number: ORANGE LINE — CANOGA STATION PARK AND RIDE / 25568C
Start and Finish Dates: 3/2006 TO 1/2007
Project Description: NEW TRANSPORTATION STATION INCLUDING AC PAVING &CONCRETE WORK
Agency Name: METROPOLITAN TRANSPORATION AUTHORITY
Contact Person: GHULAM SHAIKH Telephone: 818 -262 -6300
Fax. 213 - 922 -7384
Original Contract Amount: 13,732,500 Final Contract Amount: $12,415,392
Change In Contract amount Is due to items of work being deleted by the agency.
Project Name/Number: SOUTH COAST PLAZA PARKING LOT /26608C
Start and Finish Dates: 7/2006 TO 10/2006
Project Description:
COMPLETE REMOVE AND REPLACE OF PARKING LOT, CONCRETE CURB &
GUTTER, LOOP DETECTORS, AND STRIPING
Agency Name:
SOUTH COAST PLAZA
Contact Person:
ROBERT THOMAS Telephone: 714 -546 -0110
Fax: 714 -546 -9835
Original Contract Amount:
$3,100,009 Final Contract Amount: $3,932,226
Change In original contract amount Is due to extra work and /or contract change orders adding work.
Project Name /Number:
RESIDENTIAL STREET REHABILITATION WORK / 26573C
Start and Finish Dates:
2/2006 to 8/2006
Project Description:
ASPHALT CONCRETE OVERLAY AT VARIOUS LOCATIONS CITYWIDE
Agency Name:
CITY OF WEST COVINA
Contact Person:
OSCAR CAPLIN Telephone: 626 -939 -8445
Fax: 626 - 939 -8660
Original Contract Amount.
$1,430,888 Final Contract Amount: $1,512,463
Change In original contract amount Is due to extra work and /or contract change orders adding work.
Project Name /Number:
BERTH 401 -406 BACKLAND IMPROVEMENTS / 25567C
Start and Finish Dates:
1/2006 to 4/2006
Project Description:
ASPHALT AND CONCRETE PAVING / SITE IMPROVEMENT PROJECT
Agency Name:
PORT OF LOS ANGELES
Contact Person:
KEN HARBOR Telephone: 310 -831 -5389
Fax: 310- 831 -5389
original Contract Amount:
$3,286,800 Final Contract Amount: $3,386,333
Change In original contract
amount Is due to extra work and /or contract change orders adding work.
Project Name /Number:
195 STREET IMPROVEMENT/ 25506C
Start and Finish Dates:
5/2005 to 11/2005
Project Description:
MEDIAN ISLAND and STREET REPAIRS
Agency Name:
CITY OF CERRITOS
Contact Person:
VIC MASAYA Telephone: 562- 916 -1231
Fax: 562- 916 -1371
Updated August 2010
r
SULLY - MILLER
CONTRAc. i Co
BIDDER'S EXPERIENCE AND QUALIFICATIONS
Original ContractAmount:
$862,370 Final Contract Amount: $742,488
Project Name /Number:
MALL PARKING LOT IMPROVEMENTS / 25492C
Start and Finish Dates:
312005 to 1012005
Project Description:
REPAIR and PLACE NEW AC PAVING and STRIPE PARKING STALLS
Agency Name:
CITY OF TEMPLE CITY
Contact Person:
JANICE STROUD Telephone: 626 -285 -2171
Fax: 909 - 594 -2858
Original Contract Amount:
$828,837 Final ContractAmount. $894,012
Change in original contract amount is due to extra work and /or contract change orders adding work.
Change in contract amount is
due to items of work being deleted by the agency.
Project Name /Number:
HELLMAN AVENUE STREET IMPROVEMENTS / 24477C
Start and Finish Dates:
6/2004 to 11/2005
Project Description:
STREET RECONSTRUCTION PROJECT
Agency Name:
CITY OF ROSEMEAD
Contact Person:
KEN RUKABINE Telephone: 562- 908 -6262
Fax. 562- 695 -2120
Original Contract Amount:
$1,051,667 Final Contract Amount: $1,067,429
Change in original contract amount is due to extra work and /or contract change orders adding work.
Project Name /Number:
HOLGATE AREA STREET REHABILITATION AND WATER MAIN / 24416C
Start and Finish Dates:
3/2004 to 6/2005
Project Description:
STREET REHABLITATION AND WATER MAIN REPLACEMENT
Agency Name:
CITY OF LA HABRA
Contact Person:
CHUCK STEPHAN Telephone: 562- 905 -9720
Fax: 562- 905 -9643
Original Contract Amount:
$2,996,461 Final Contract Amount: $3,566,942
Change In original contract
amount is due to extra work and /or contract change orders adding work.
Project Name/Number:
PIER 400 BACKLANDS PHASE 2 / 23301C
Start and Finish Dates:
4/2003 to 8/2004
Project Description:
TRANSTAINER FACILITY, GRADING, PAVING, UNDERGROUND, CONCRETE.
PROJECT FINISHED ON TIME — EXTRA DAYS FOR EXTRA WORK ONLY
Agency Name:
PORT OF LOS ANGELES
Contact Person:
MAHMOUDIRSHEID Telephone: 310 - 732 -3525
Fax: 310 -831 -5389
Original ContractAmount:
$30,618,798 Final ContractAmount: $30,030,429
Change in contract amount
is due to items of work being deleted by agency.
Project Name /Number:
Start and Finish Dates:
Project Description:
Agency Name:
Contact Person:
PHANTOM WEST STREET IMPROVEMENT/ 82803C
12/ 2002 to 8/ 2003
UNDERGROUND, ASPHALT REHAB, CURB & GUTTER, COLD MILLING
CITY OF VICTORVILLE
MARK MILLER
Telephone: 760- 955 -9158
Updated August 2010
P AM
SULI.Y- MILLER
CONTRACCING CO.
BIDDER'S EXPERIENCE AND QUALIFICATIONS
Fax: 760- 955 -5159
Original Contract Amount: $4,771,477 Final Contract Amount: $4,994,840
Project Name /Number: ARROW HIGHWAY - LIVE OAK AVENUE PHASE II / 22273C
Start and Finish Dates: 11/ 2002 to 8/ 2003
Project Description: AC GRIND OVERLAY — NEW MEDIANS 8L DECORATIVE CONCRETE
Agency Name: CITY OF IRWINDALE
Contact Person: KWOK TAM . Telephone: 626 - 430-2212
Fax: 626 - 962 -2018
Original Contract Amount: $4,289,147 Final Contract Amount: $4,654,815
Change in original contract amount is due to extra work and /or contract change orders adding work.
Change In original contract amount is due to extra work and /or contract change orders adding work.
Project Name/Number:
PIER 400 CONTAINER TERMINAL / 21130C
Start and Finish Dates:
1/ 2001 to 9/ 2002
Project Description:
BACKLAND IMPROVEMENTS, PHASE I
Agency Name:
PORT OF LOS ANGELES
Contact Person; MAHMOUDISHEID Telephone: 310 - 732 -3525
Fax. 310 -831 -5389
original Conti Amount: $78,134,500 Final Contract Amount: $74,226,254
Change in contract amount is due to items of work being deleted by agency.
Updated August 2010
SULLY - MILLER
CONTRACTING CU.
BIDDER'S EXPERIENCE AND QUALIFICATIONS
PR03ECTS INVOLVING HEAVY STORM DRAIN, SEWER AND WATER IMPROVEMENTS
Project Name /Number:
FOSTER PARK, VALLEY VIEW AVE if FOSTER ROAD / 29891C
Year of Project:
02/2010 - 01/2011
Project Description:
R/R STREETS, (AC /CMB /C &G), STORM DRAIN IMPROVEMENTS
Agency Name:
CITY OF LA MIRADA
Contact Person: GARY SANUI Telephone: 562 - 349 -2727
Fax: 562- 943 -1464
Original Contract Amount: $2,148,000 Final Contract Amount: $3,075,872
Change in original contract amount Is due to extra work and /or contract change orders adding work.
Project Name /Number: OFFSITE EUCLID STREET IMPROVEMENTS / 28803C
Year of Project: 11/2008 - 05/2010
Project Description: OFFSITE IMPROVEMENTS, STORM DRAIN, ELECTRICAL, AC PAVING, CONCRETE
IMPROVEMENTS
Agency Name: WATSON LAND COMPANY
Contact Person: ROBERT DEBERARD Telephone: 310- 952 -6429
Fax: 310 - 522 -8785
Original Contract Amount: $4,083,052 Final Contract Amount: $3,849,675
Change in original contract amount is due to extra work and /or contract change orders adding work.
Project Name/Number: VALLEY WAY / ARMSTRONG ROAD / 27680C
Year of Project: 0112007 - 01/2009
Project Description: RCP, STORM DRAIN, STRUCTURES, MANHOLES, AC /ARHM, CONCRETE
IMPROVEMENTS, BASE, ELECTRICAL, STRIPING
Agency Name: COUNTY OF RIVERSIDE
Contact Person: STAN DERY Telephone: 951- 955 -6785
Fax: 951- 955 -3164
Original Contract Amount: $4,813,000 Fhlal Contract Amount: $6,190,475
Change In original contract amount Is due to extra work and /or contract change orders adding work.
Project Name /Number: DOUGLAS PARK STREET IMPROVEMENTS AND INFRASTRUCTURE/ 26595C
Year of Project:
03/2006- 07/2007
Project Descrlption:
INFRASTRUCTURE - SEWER, WATER, STORM DRAIN
Agency Name:
BOEING REALTY CORPORATION
Contact Person:
STEVE GARIS Telephone: 562 -593 -4730
Fax: 714 -850 -0086
Original Contract Amount.
$11,256,511 Final ContiactAmount: $19,932,964
Change In original contract
amount is due to extra work and /or contract change orders adding work.
Updated March 2011
, 7
SULLY- MILLHR
CONTRACT - ING CO.
BIDDER'S EXPERIENCE AND QUALIFICATIONS
Project Name /Number:
PORTOLA SPRINGS AND MODJESKA / 25534C
Year of Project:
04/2005- 06/2006
Project Description:
SEWER, WATER, STORM DRAIN IMPROVEMENTS
Agency Name:
IRVINE COMMUNITY DEVELOPMENT COMPANY
Contact Person: BILL MARTIN Telephone: 714- 734 -8100
Fax: 949- 464 -9715
Original Contract Amount: $8,625,848 Final Contract Amount: $9,602,943
Change In original contract amount is due to extra work and /or contract change orders adding work.
Updated March 2011
9
� 1
SULLY - M ILLER
CONTRACTING: CO.
BIDDER'S EXPERIENCE AND QUALIFICATIONS
ASPHALT RUBBERIZED HOT MIX (ARHM) PROJECTS
Project Name /Number: ANNUAL OVERLAY PROGRAM / 27697C
Start and Finish Dates. 8/07 TO 7/08
Project Description:
ARHM OVERLAY — CONCRETE (C&G, SIDEWALK, DRIVEWAY) - LOOPS
Agency Name:
CITY OF CARSON
Contact Person:
RICK BOUTROS Telephone: 310 - 952-1700 ext. 1830
Project Value: $2,397,755
I
Project Name /Number:
NORMANDIE AVENUE — STPL-5953(451) / 26647C
Start and Finish Dates:
3/07 TO 9/07
Project Description:
ARHM/AC PAVE — LAN DSCAPE — CONCRETE - SIGNALS /LIGHTING /LOOPS
Agency Name:
LOS ANGELES COUNTY — DEPT. OF PUBLIC WORKS (LACDPW)
Contact Person;
EMILKURLYAND Telephone: 626 -458 -3166
Project Value: $2,713,186
Updated October 2008
S1.1LLY- MILLER t :'UAI'TRAt :'TINCi
Dcsns_ i.VOn : :�
.Slclfe Cv!7c !;le 8h�i7., .aft 600 &ti'c1, i : : 0262 1 + :'HOi•J$ 5701 - �h00
Navumeut Preservation References:
lot_ Ma Job lue
Description
Ovaner
Cuotaci
298810 106,411
AC paving, sealcoat and re-
(finder Morgan
David Lennon
stripe Carson Facility
310 -251 -6093
29875c 257,093
Coldmlll, AC overlay, sealcoat
1'rattwhibmy
Icff Stern
and restripo ilia. North Lots
itocleetdyne
818 -585 -680:1
at the Desoto Facility, CA
298690 266,286
AC paving, sealcoat and "P-stripe
Swlnerton
Raj Ramanathan
Salvation Army pmidug lot
Dullders
213+440 -
In Anaheim, CA.
298530 78,167
AC paving, sealcoat and re-
Ilalhaway-
Reno Contreras
stripe parking lots atTlie
Vinwhidle
562944 -9331
Buckley school.
2881su 28D,472
AC paving, sealcoatanQrestripe
lm'geusen
BillViva
Toyota AlrfliteTerminal at
925 -24,1 -1203
Long Beach Airport, CA.
28792c 369,575
AC repairs, sealcoat & resh'ipe
Toyota Logisdslics
loll Kellar
Part of Los Angeles, CA.
714336-2409
27686c 369,931
AC /PCC repairs, sealcoat and
Pratt Whdluey
Mike Daley
restripingat two facilities In
Rocketdyne
BIR -5BG -9052
Canoga Park, CA.
27675c 623,996
AC /PCC repairs, sealcoat and
The Boeing
Wayne Holt
restripdng at three facilities in
company
562- 797 -•12114
Anaheim, Huntington Beach,
and Seal Beach, CA.
23293c 327,946
South Coast Drive Realignment
Cl segerstroml
Grant Wilson
Included Type II Road Slung
Si Sous
714- 438-3276
w/2% Latex
232920 266,922
Harbor Blvd realignment
C1Segeish'om
Grant Wilson
included Type II Road Slurry
& Sons
714-438 -3278
w /2% Latex
22277c 1,
South Coast Drive Realignment
G segerstrom
Grant Wilson
Included Type ll ltuad Slurry
Se SDI%
7111. 438 -3276
W 12.% Latex
SULLY-M11.1-FR
CONTRACTING OD.
�CIST Jr- REFERENCES
John Wayne Aib-p w�c
Irvine, CA
Lany Serafini, rvoject Engineea-
949- 252 -5270
Los Angeles County Dept. of Public Works
Alhambra, 5A
Issa Adawiya, Resident Eragiraeer
626 - 458 -5100
City of Fontann
Fontana, CA
Mario Estrada, ,asst. CUI Engineer
909 - 350 -7696
C. 3. Segerstrom ,)Mil h Coast Plaza
Costa Mesa, CA
Grant Wilson, r3rpject Fi�an�rger
714-546-0110
City of Baldwin Pavft Enyr. Division
Baldwin Park, CA
Arjan Idnani, Enghaecring Manager
626 - 960 -4011 Ex . 254
LA Arena Company
Staples Center T- Los Angeles, CA
Don Beiges, Construction Manager
213- 742 -7873
City of Fullerton
Fullerton, CA
George Lin, Project Engineer-
714-738-6845
The Irvine Company
Hewpon't Beach, CA
Peggy Xgoos, Sr. Director /Construction
9// -9 -71 20 -2 000
)!rvine counnarrni V Development company
N' ewupow6 Beath, CA
Dill M -Irdin, Mire PresidenrJCorastr, rra ��on
9491-7:V- 4MO
Town of Apple Malleij
Apple Malley, CA
Richard Pederson, Town Engineer
7 F30- 240 -7000
CNC Engineering
City of Industry, CA
John Ballas, City Engineer•
626333 -0336
Fox Studios Operations
Beverly Hills, CA
William Murphy, M.P. of Facilities
310- 369 -3794
KIST Railroad Commerce
Bunsen- Wilson
Roy Rogers, Construction Manager
323-267-4186
Caltrans
Department of Transportatien
Ray Stokes, Regional Engineer
909- 275 -0213
Cal State Long Beach Foundation
Long Beach, CA
Mo Tidemanis, Director
562 -985 -8489
City of Rancho Cucamonga
RanLho (Cucamonga, CA
Cindy Hachett, Associate Engineer
909-477-274
City of Hesperia — Public, Works Dept.
Hesperia, CA
Mike Podegraeiz, City Manager
760-947-1000!
Ufqj C Cu Bazoa ov'j
r3ar•.`.ntow, :CA
HiLe Sierra, r�, ICE'gf Engineer
760 - 255 -5254.
BIDDER: SULLY - MILLER CONTRACTIN COMPANY
SECTION 3
NON - COLLUSION AFFIDAVIT
CBF -13
BIDDER: SULLY - MILLER CONTRACTING COMPANY
NON - COLLUSION AFFIDAVIT
In accordance with Public Contract Code Section 7106, the undersigned, being first duly
swom, deposes and says that he or she holds the position listed below with the bidder, the
party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any
undisclosed person, partnership, company, association, organization, or corporation; that the
bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced
or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly
colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham
bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly
or indirectly, sought by agreement, communication, or conference with anyone to fix the bid
price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the
bid price, or of that of any other bidder, or to secure any advantage against the public body
awarding the contract of anyone interested in the proposed contract; that all statements
contained in the bid are true; and, further, that the bidder has not, directly or indirectly,
submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged
information or data relative thereto, or paid, and will not pay, any fee to any corporation,
partnership, company association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid,
Typed or Printed Name
ASSISTANT SECRETARY
Tide
SULLY - MILLER CONTRACTING COMPANY
Bidder
" "`PLEASE SEE ATTACHED NOTARY JURAT FOR PROPER WORDING ""
Subscribed and swom before me
This _ day of , 20_
(Seal)
Notary Public in and for
the State of California
My Commission Expires:
CBF -14
CALIFORNIA JURAT WITH AFFIANT STATEMENT
STATE OF CALIFORNIA
COUNTY OF ORANGE
Subscribed and sworn to (or affirmed) before me on this 20th day of March 2012, by Gary
Downey proved to me on the basis of satisfactory evidence to be the person who appeared
before me.
ADRIANA C. TREJO
M COMM N 1817403 m
NOTARY RIBW - GAIJURNNA
cam F 1oa tq a p WITNESS my *hand official seal
1 Signature (
Addana C. Tre]o, Notary lie
Notary Seal
OPTIONAL
Description of Attached Document
Title or Type of Document:
Non - Collusion Affidavit
Document Date: March 20, 2012 Number of Pages:
Signer(s) Other Than Named Above:
Individual
Capacity(ies) Claimed by Signer(s):
Signers Name Gary Downey Signer's Name
Individual
Corporate Officer — Title(s)
Partner — Limited /General
Attorney In Fact
7 Trustee
Guardian or Conservator
❑ Other
Signer is Representing:
Assistant Secretary ❑ Corporate Officer — Title(s)
Right Thumbprint
None
1
❑ Partner — Limited/General
Attorney In Fact
El Trustee
Guardian or Conservator
❑ Other
Right Thumbprint
of Signer
SULLY - MILLER CONTRACTING COMPANY