SUMMARY
As a part of the City's Capital Improvement Program, the City Council approved a
project titled "Mission Drive Resurfacing ". The project consists of asphalt concrete
overlay and reconstruction of road pavement; repairs to damaged curb, sidewalk, gutter;
and the replacement of street name signs. The project is funded through Prop C,
Measure R, and Gas Tax Funds.
Staff Recommendation
It is recommended that the City Council:
1. Approve the plans and specifications for the Mission Drive Resurfacing Project
2. Authorize the City Manager to enter into a contract with Silvia Construction, Inc.
for the Mission Drive Resurfacing Project in the amount of $693,781.75, and
establish a contingency in the amount of 10% of the bid ($69,400.00) to cover for
any unforeseen construction expense.
DISCUSSION
Mission Drive is an east -west collector road. The project limits are from Valley
Boulevard to the Westerly City Limit. Mission Drive is approximately 80 feet wide with a
posted speed limit of 40 MPH. It carries a heavy vehicular traffic and, as expected, the
condition of the roadway has deteriorated over time. The Pavement Condition Index
(PCI) of the roadway was calculated at 58 (100 being best), as indicated in the City's
Pavement Management System, which was last updated 4 years ago.
Following a public project advertising, seven (7) sealed bids were received and were
publicly opened by the City Clerk at 11:00 AM on June 6, 2012. Following is the bid list
and ranking:
1 Silvia Construction, Inc. Rancho Cucamonga, CA $693,781.75
2 All American Asphalt Corona, CA $723,000.00
3 Hardy & Harper, Inc. Santa Ana, CA $727,000.00
4 E.C. Construction South El Monte, CA $756,211.99
APPROVED FOR CITY COUNCIL AGENDA: ITEM NO.
City Council Meeting
June 12, 2012
Page 2 of 2
5 Sequel Contractors, Inc. Santa Fe Springs, CA $759,141.00
6 Sully - Miller Contracting Brea, CA $763,923.00
7 Gentry Brothers, Inc Irwindale, CA $808,960.00
Staff has reviewed the bid documents for completeness and investigated the low bid
contractor's background and recent projects for competency. Staff has concluded that
Silvia Construction, Inc. is the lowest responsive bidder to perform the construction of
this project. Silvia Construction, Inc. has satisfactorily completed similar projects for
other public agencies, including the cities of Ontario, Lakewood, Chino Hills, Duarte,
and Rosemead. The City Engineer's estimate for this project was $850,000.
Plans and specifications are available for review at the City Clerk's office.
TIMELINE
If directed to move forward, staff will work to complete this project according to the
following schedule:
June 12 — City Council Awards Contract
July 9th — August 8 th — Tentative Construction Schedule
August 16 — Tentative Project Completion
FINANCIAL REVIEW
The funding for this project has been allocated
Improvement Program Budget. The total appropriation
$763,181.75, which includes a 10% contingency arr
unforeseen construction expenses.
in the City's 2011 -12 Capital
needed to award this project is
ount ($69,400.00) to cover for
ENVIRONMENTAL REVIEW
The project is categorically exempt from the California Environmental Quality Act
(CEQA) pursuant to Section 15301 (a) of the CEQA Implementing Guidelines.
PUBLIC NOTICE PROCESS
This item has been noticed through the regular agenda notification process.
Prepared by: Submitted By:
Rafael Fajardo Chris Marcarello
Associate Civil Engineer Director of Public Works
Attachments:
(1) Bid Summary
PUBLIC WORKS
MISSION DRIVE STREET RESURFACING PROJECT
PROJECT No. 21007
BID ANALYSIS
BID SUBMITTAL JUNE 6. 2012
SILVIA CONSTRUCTION INC.
BASE BID PRICE
#1
6WO12
PAGE 1
1
CLEARING AND GRUBBING PER PLANS /SPECS.
1.00
LS
$ 24,000.00
$ 24,000.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
$ 4
$ 4,025.00
3
COLD MILL 2.0" THICK EXISTING PAVEMENT
291,300._00
SF
$ 0.12
$ 34,956.00
CONSTRUCT 1.5' THICK PAVEMENT OVERLAY ARHM -GG -C
_
4
(PG 64 - 16)
2,735.00
TONS
$ 83.95
$ 229,603.25
CONSTRUCT 1" THICKASPAHLTIC LEVELING COURSE D1 (PG
5
64-10)
1,825.00
TONS
$ 72.83
$ 132,914.75
REMOVE 6" EXISTING PAVEMENT, AND REPLACE IT WITH 3.5'
6
AC B-PG 64 -10 BASE COURSE OVER COMPACTED NATIVE
500.00
SF
$ 8.25
$ 4,125.00
REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC
_
7
SIDEWALK PER SPPWC STD. PLAN 113-1
5,700.00
SF
$ 4.60
$ 26,220.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
8
APPROACHES PER SPPWC STD. PLAN 110-2
820.00
SF
$ 6.70
$
REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24" GUTTER
_5,494.00
9
PER SPPWC STD PLAN 120-2
423.00
LF
$ 34.00
$ 14,382
REMOVE, DISPOSE AND CONSTRUCT PCC CROSS CUTTER
_
10
PER SPPWC STD. PLAN 123 -2
1,500.00
SF
$ 8.45
$ 12,875.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMPS PER
11
SPPWC STD. PLAN 1114
3.00
EA
$ 2,067.00
$ 6,201.00
ADJUST SEWER MANHOLE TO GRADE PER APWA STD. PLAN
12
205-1 &206 -1
58.00
EA
$ 280.00
$ 16,240.00
13
ADJUST WATER VALVE / GAS VALVE TO GRADE
50.00
EA
$ 60.00
$ 3,000.00
INSTALL SURVEY WELL MONUMENT PER CITY OF
14
ROSEMEAD STD. PLAN S08 -001
13.00
EA
$ 444.00
$ 5,772.00
INSTALL TRAFFIC STRIPING, TRAFFIC SIGNAL LOOPS, AND
15
PAVEMENT MARKERS PER STRIPING PLAN AND SPECS
1.00
LS
$ 40,800.00
$ 40,800.00
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
16
(SWPPP)
1.00
LS
$ 3,000.00
$ 3,000.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
17
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
47.00
EA
$ 78.75
$ 3,701.25
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
18
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
6.00
EA
$ 78.75
$ 472.50
FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT
LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 2
19
LOCATIONS WITH TOTAL OF 36 IN -ROAD PAVEMENT LIGHTS
2.00
EA
$ 43,500.00
$ 67,000.00
FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN
_
20
SYSTEM COMPLETE PER PLANS AND SPECS
2.00
EA
$ 19,600.00
$ 39,200.00
TOTAL BASE BID PRICE
I
I
$ 693,781.76
6WO12
PAGE 1
PUBLIC
ALL AMERICAN ASPHALT
BASE BID PRICE
#2
61612012
PAGE 2
1
CLEARING AND GRUBBING PER PLANS /SPECS.
1.00
LS
$ 28,399.00
$ 28,399.00
2
DISPOSAL OF WASTE MATERIALS
_
7.00
LS
$ 500.
$ 500.00
3
COLD MILL 2.0" THICK EXISTING PAVEMENT
291,300.00
SF
$F_0.07_
$ 20,391.00
CONSTRUCT 1.5" THICK PAVEMENT OVERLAY ARHM -GG-C
4
(PG 64-16)
2,735.00
TONS
$ 86.00
$ 235,210.00
CONSTRUCT V THICK ASPAHLTIC LEVELING COURSE D1 (PG
5
64 -10)
1,825.00
TONS
$ 74.00
$ 135,050.00
REMOVE 6" EXISTING PAVEMENT, AND REPLACE IT WITH 3.5"
6
AC B-PG 64-10 BASE COURSE OVER COMPACTED NAT
500.00
SF
$ 5.00
$ 2,500.00
REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC
7
SIDEWALK PER SPPWC STD. PLAN 113 -1
5,700.00
SF
$ 4.50
$ 25,650.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
8
APPROACHES PER SPPWC STD. PLAN 110 -2
820.00
SF
$ 8.00
$ 6,560.00
REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24" GUTTER
9
PER SPPWC STD PLAN 120 -2
423.00
LF
$ 50.00
$ 21,150.00
REMOVE, DISPOSE AND CONSTRUCT PGG CUTTER
10
PER SPPWC STD. PLAN 123-2
1,500.00
SF
$ 16.00
$ 24,000.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMPS PER
_
11
SPPWC STD. PLAN 111 -4
3.00
EA
$ 4,000.00
$ 12,000.00
ADJUST SEWER MANHOLE TO GRADE PER APWA STD. PLAN
12
205 -1 &206 -1
58.00
EA
$ 325.00
$ 18,850.00
13
ADJUST WATER VALVE / GAS VALVE TO GRADE
50.00
EA
$ 175.00
$ 8,750.00
INSTALL SURVEY WELL MONUMENT PER CITY OF
14
ROSEMEAD STD. PLAN SOB -001
13.00
EA
$ 750.00
$ 9,750.00
INSTALL TRAFFIC STRIPING, TRAFFIC SIGNAL LOOPS, AND
15
PAVEMENT MARKERS PER STRIPING PLAN AND SPECS
1.00
LS
$ 35,000.00
$ 35,000.00
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
16
(SWPPP)
1.00
LS
$ 5,000.00
$ 5,000.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
17
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
47.00
EA
$ 80.00
$ 3,760.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
18
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
6.00
EA
$ 80.00
$ 480.00
FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT
LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 2
19
LOCATIONS WITH TOTAL OF 36 IN -ROAD PAVEMENT LIGHTS
2.00
EA
$ 45,000.00
$ 90,000
FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN
20
SYSTEM COMPLETE PER P LANS AND SPECS
2.00
EA
$ 20,000.00
$ 40,000.00
TOTAL BASE BID PRICE
I $ 723,000.00
61612012
PAGE 2
PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION &WO12
HARDY & HARPER, INC.
BASE BID PRICE
#3
PAGE 3
1
CLEARING AND GRUBBING PER PLANS /SPECS.
1.00
LS
$ 30,000.00
$ 30,000.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
$ 1,000.00
$ 1,000.00
3
COLD MILL 2.0" THICK EXISTING PAVEMENT
291,300.00
SF
$ 0.16
$ 46,608.00
CONSTRUCT 1.5" THICK PAVEMENT OVERLAY ARHM -GG -C
4
(PG 64 -16)
2,735.00
TONS
$
$ 233,158.75
CONSTRUCT 1" THICK ASPAHLTIC LEVELING COURSE DI (PG
_85.25
5
64-10)
1,825.00
TONS
$ 73.00
$ 133,225.00
REMOVE 6" EXISTING PAVEMENT, AND REPLACE IT WITH 3.5"
6
AC B -PG 64 -10 BASE COURSE OVER COMPACTED NATIVE
500.00
SF
$ 7.89
$ 3,945.00
REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC
7
SIDEWALK PER SPPWC STD. PLAN 113 -1
5,700.00
SF
$ 4.56
$ 25,99
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
e
APPROACHES PER SPPWC STD. PLAN 110 -2
820.00
SF
$ 8.76
$ 7,183.20
REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24" GUTTER
9
PER SPPWC STD PLAN 120-2
423.00
LF
$ 40.00
$ 16,920.00
REMOVE, DISPOSE AND CONSTRUCT PCC CROSS CUTTER
10
PER SPPWC STD. PLAN 123 -2
1,500.00
SF
$ 9.50
$ 14,250.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMPS PER
11
SPPWC STD. PLAN 111-4
3.00
EA
$ 2,900.00
$ 8,700.00
ADJUST SEWER MANHOLE TO GRADE PER APWA STD. PLAN
12
205 -1 & 206 -1
58.00
EA
$ 282.00
$ 16,356.00
13
ADJUST WATER VALVE I GAS VALVE TO GRADE
50.00
EA
$ 50.00
$ 2,500.00
INSTALL SURVEY WELL MONUMENT PER CITY OF
14
ROSEMEAD STD. PLAN SO8 -001
13.00
EA
$ 350.00
$ 4,550.00
INSTALL TRAFFIC STRIPING, TRAFFIC SIGNAL LOOPS, AND
15
PAVEMENT MARKERS PER STRIPING PLAN AND SPECS
1.00
LS
$ 45,531.05
$ 45,531.05
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
_
16
(SWPPP)
1.00
LS
$ 3,000.00
$ 3,000.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
17
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
47.00
EA
$ 77.00
$ 3,619.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
18
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
6.00
EA
$ 77.00
$ 462.00
FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT
LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 2
19
LOCATIONS WITH TOTAL OF 36 IN -ROAD PAVEMENT LIGHTS
2.0_0
EA
$ 45,000.00
$ 90,000.00
FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN
20
SYSTEM COMPLETE PER PLANS AND SPECS
2.00
EA
$ 20,000.00
$ 40,000.00
_
TOTAL BASE Bill PRICE
$ 727,000.00
PAGE 3
PUBLIC WORKS SERVICE DEPARTMENTiENGINEERING DIVISION
E.C. Construction
BAS BID PRICE
FL1
6/612012
PAGE 4
1
CLEARING AND GRUBBING PER PLANS /SPECS.
LS
$ 1,500.00
$ 1,500.00
2
DISPOSAL OF WASTE MATERIALS
_1.00
1.00
LS
$ 1,500.00
$ 1,500.00
3
COLD MILL 2.0" THICK EX ISTING PAVEMENT
291,300.00
SF
$ 0.16
$ 46,608.00
CONSTRUCT 15' THICK PAVEMENT OVERLAY ARHM -GG -C
4
(PG 6416)
2,735.00
TONS
$ 90.81
$ 248,365.35
CONSTRUCT 1" THICKASPAHLTIC LEVELING COURSE D1 (PG
5
64 -10)
1,825.00
TONS
$ 79.91
$ 145,835.75
REMOVE 6" EXISTING PAVEMENT, AND REPLACE IT WITH 3.5"
6
AC B -PG 64 -10 BASE COURSE OVER COMPACTED NATIVE
500.00
SF
$ 9.80
$ 4,900.00
REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC
_
7
SIDEWALK PER SPPWC STD. PLAN 113 -1
5,700.00
SF
$ 6.00
$ 34,200.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
8
APPROACHES PER SPPWC STD. PLAN 110 -2
820.00
SF
$ 8.00
$ 6,560.00
REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24" GUTTER
9
PER SPPWC STD PLAN 120 -2
423.00
LF
$ 58.94
$ 2 4,931.62
REMOVE, DISPOSE AND CONSTRUCT PCC CROSS CUTTER
10
PER SPPWC STD, PLAN 1 23-2
1,500.00
SF
$ 8.00
$ 12,000.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMPS PER
11
SPPWC STD. PLAN 111-4
3.00
EA
$ 2,800.00
$ 8,400.00
ADJUST SEWER MANHOLE TO GRADE PER APWA STD. PLAN
_
12
205-1 &206 -1
58.00
EA
$ 307.09
$ 17,811.22
13
ADJUST WATER VALV I GAS VALVE TO GRADE
50.00
EA
$ 75.00
$ 3,750.00
INSTALL SURVEY WELL MONUMENT PER CITY OF
14
ROSEMEAD STD. PLAN 508 -001
13.00
EA
$ 474.62
$ 6,170.06
INSTALL TRAFFIC STRIPING, TRAFFIC SIGNAL LOOPS, AND
15
PAVEMENT MARKERS PER STRIPING PLAN AND SPECS
1.00
LS
$ 43,755.00
$ 43,755.00
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
16
(SWPPP)
1.00
LS
$ 5,000.00
$ 5,000.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
17
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
47.00
EA
$ 83.83
$ 3,940.01
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
18
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
6.00
EA
$ 83.33
$ 499.98
FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT
LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 2
19
LOCATIONS WITH TOTAL OF 36 IN -ROAD PAVEMENT LIGHTS
2.00
EA
$ 48,415.00
$ 96,830.00
FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN
20
SYSTEM COMPLETE PER PLANS AND SPECS
2.00
E A
$ 21,827.50
$ 43,655.00
TOTAL BASE BID PRICE
$ 756,211.99
6/612012
PAGE 4
PUBLIC WORKS
SEQUEL CONTRACTORS INC.
BASE BID PRICE
#6
6/62012
PAGE 5
i
CLEARING AND GRUBBING PER PLANS /SPECS.
1.00
LS
$ 20,000.00
$ 20,000.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
$ 29,555.00
$ 29,555.00
3
COLD MILL 2.0" THICK EXISTING PAVEMENT
291,300.00
SF
$ 0.12
$ 34,956.00
CONSTRUCT 1.5' THICK PAVEMENT OVERLAY ARHM -GG -C
4
(PG 64 -16)
2,735.00
TONS
$ 85.00
$ 232,475.00
CONSTRUCT 1" THICK ASPAHLTIC LEVELING COURSE D1 (PG
5
64-10)
1,825.00
TONS
$ 73.00
$ 133,225.00
REMOVE 6" EXISTING PAVEMENT, AND REPLACE IT WITH 3.5'
6
AC B -PG 64 -10 BASE COURSE OVER COMPACTED NATIVE
500.00
SF
$ 6.00
$ 3,000.00
REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC
7
SIDEWALK PER SPPWC STD. PLAN 113-1
5,700.00
SF
$ 4.75
$ 27,075.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
8
APPROACHES PER SPPWC STD. PLAN 110 -2
820.00
SF
$ 5.00
$ 4,100.00
REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24" GUTTER
9
PER SPPWC STD PLAN 120 -2
423.00
LF
$ 25.00
$ 10,575.00
REMOVE, DISPOSE AND CONSTRUCT PCC CROSS CUTTER
10
PER SPPWC STD. PLAN 123 -2
1,500.00
SF
$ 12.00
$ 18,000.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMPS PER
11
SPPWC STD. PLAN 111 -4
3.00
EA
$ 2,500.00
$ 7,500.00
ADJUST SEWER MANHOLE TO GRADE PER APWA STD. PLAN
12
205 -1 & 206 -1
58.00
EA
$ 275.00
$ 15,950.00
13
ADJUST WATER VALVE / GAS VALVE TO GRADE
50.00
EA
$ 300.00
$ 15,000.00
INSTALL SURVEY WELL MONUMENT PER CITY OF
14
ROSEMEAD STD. PLAN S08 -001
13.00
EA
$ 300.00
$ 3,900.00
INSTALL TRAFFIC STRIPING, TRAFFIC SIGNAL LOOPS, AND
15
PAVEMENT MARKERS PER STRIPING PLAN AND SPECS
1.00
LS
$ 64,000.00
$ 64,000.00
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
16
(SWPPP)
1.00
LS
$ 2,000.00
$ 2,000.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
17
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
47.00
EA
$ 110.00
$ 5,170.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
18
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
6.00
EA
$ 110.00
$ 660.00
FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT
LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 2
19
LOCATIONS WITH TOTAL OF 36 IN -ROAD PAVEMENT LIGHTS
2.00
EA
$ 45,000.00
$ 90,000.00
FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN
20
SYSTEM COMPLETE PER PLANS AND SPECS
2.00
EA
$ 21,000.00
$ 42,000.00
TOTAL BASE BID PRICE
I
$ 759,141.00
6/62012
PAGE 5
PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION
SULLY- MILLER CONTRACTING COMPANY
BASE BI D PRICE
N6
6/&/2012
PAGE 6
1
CLEARING AND GRUBBING PER PLANS /SPECS.
1.00
LS
$ 15,221.00
$ 15,221.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
$ 1,500.00
$ 1,500.00
3
COLD MILL 2.0 "THICK EXISTING PAVEMENT
291,300.00
SF
$ 0.12
_
$ 34,956.00
CONSTRUCT 1.5" THICK PAVEMENT OVERLAY ARHM -GG -C
4
(PG 64 -16)
2,735.00
TONS
$ 91.00
$ 248,885.00
CONSTRUCT 1" THICKASPAHLTIC LEVELING COURSE D7 (PG
5
64 -10)
1,825.00
TONS
$ 83.00
$ 151,475.00
REMOVE 6" EXISTING PAVEMENT, AND REPLACE IT WITH 3.5"
6
AC B -PG 64-10 BASE COURSE OVER COMPACTED NATIVE
5
SF
$ 6.00
3,000.00
REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC
_$
7
SIDEWALK PER SPPWC STD. PLAN 113 -1
5,700.00
SF
$ 5.00
$ 28,500.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
8
APPROACHES PER SPPWC STD. PLAN 110 -2
820.00
SF
$ 5.50
$ 4,510.00
REMOVE, DISPOSE AND CONSTRUCT S' CURB & 24" GUTTER
9
PER SPPWC STD PLAN 120 -2
423.00
LF
$ 24.00
$ 10,152.00
REMOVE, DISPOSE AND CONSTRUCT PCC CROSS CUTTER
10
PER SPPWC STD. PLAN 123 -2
1,500.00
SF
$ 7.50
$ 11,250.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMPS PER
11
SPPWC STD. PLAN 111 -4
3.00
EA
$ 2,000.00
$ 6,000.00
ADJUST SEWER MANHOLE TO GRADE PER APWA STD. PLAN
12
205 -1 &206 -1
58.00
EA
$ 550.00
$ 31,900.00
13
ADJUST WATER VALVE / GAS VALVE TO GRADE
50.00
EA
$ 400.00
$ 20,000.00
INSTALL SURVEY WELL MONUMENT PER CITY OF
14
ROSEMEAD STD. PLAN SOB-001
13.00
EA
$ 475.00
$ 6,175.00
INSTALL TRAFFIC STRIPING, TRAFFIC SIGNAL LOOPS, AND
15
PAVEMENT MARKERS PER STRIPING PLAN AND SPECS
1.00
LS
$ 43,000.00
$ 43,000.00
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
16
(SWPPP)
1.00
LS
3,000.00
$ 3,000.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
_$
17
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
47.00
EA
$ 83.00
$ 3,901.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
_
18
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
6.00
EA
$ 83.00
$ 498.00
FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT
LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 2
19
LOCATIONS WITH TOTAL OF 361N -ROAD PAVEMENT LIGHTS
2.00
EA
$ 48,000.00
$ 96,000.00
FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN
20
SYSTEM COMPLETE PER PLANS AND SPECS
2.00
EA
$ 22,000.00
$ 44,000.00
TOTAL BASE BID PRICE
I
1
1
$ 763,923.00
6/&/2012
PAGE 6
PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION
GENTRY BROTHERS INC.
BASE BID PRICE
#7
6/6/2012
PAGE 7
1
CLEARING AND GRUBBING PER PLANS /SPECS.
ommmm
1.00
LS
$ 55,000.00
$ 55,000.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
$ 500.00
$ 500.00
3
_
COLD MILL 2.0" THICK EXISTING PAVEMENT
291,300.00
SF
$ 0.15
$ 43,695.00
CONSTRUCT 1.5' THICK PAVEMENT OVERLAY ARHM -GG -C
4
(PG 64 -16)
2,735.00
TONS
$ 89.00
$ 243,415.00
CONSTRUCT 1" THICK ASPAHLTIC LEVELING COURSE DI (PG
5
64-10)
1,825.00
TONS
$ 72.00
$ 131,400.00
REMOVE 6' EXISTING PAVEMENT, AND REPLACE IT WITH 3.5'
6
AC B -PG 64 -10 BASE COURSE OVER COMPACTED NATIVE
500.00
SF
$ 5.00
$ 2,500.00
REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC
7
SIDEWALK PER SPPWC STD. PLAN 113 -1
5,700.0_0
SF
$ 6.00
$ 34,200.00
REMOVE, DISPOSE AND CONSTRUCT PCC DRIVEWAY
8
APPROACHES PER SPPWC STD. PLAN 110 -2
820.00
SF
$ 7.00
$ 5,740.00
REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24" GUTTER
9
PER SPPWC STD PLAN 120 -2
423.00
LF
$ 40.00
$ 16,920.00
REMOVE, DISPOSE AND CONSTRUCT PCC CROSS CUTTER
10
PER SPPWC STD. PLAN 123 -2
1,500.00
SF
$ 9.00
$ 13,500.00
REMOVE, DISPOSE AND CONSTRUCT PCC CURB RAMPS PER
11
SPPWC STD. PLAN 111-4
3.00
EA
$ 1,800.00
$ 5,400.00
ADJUST SEWER MANHOLE TO GRADE PER APWA STD. PLAN
12
205 -1 & 206 -1
58.00
EA
$ 300.00
$ 17,400.00
13
ADJUST WATER VALVE / GAS VALVE TO GRADE
50.00
EA
$ 25.00
$ 1,250.00
INSTALL SURVEY WELL MONUMENT PER CITY OF
14
ROSEMEAD STD. PLAN 509 -001
13.00
EA
$ 600.00
$ 7,800.00
INSTALL TRAFFIC STRIPING, TRAFFIC SIGNAL LOOPS, AND
15
PAVEMENT MARKERS PER STRIPING PLAN AND SPECS
1.00
LS
$ 55,000.00
$ 55,000.00
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
_ _
16
(SWPPP)
1.00
LS
$ 3,000.00
$ 3,000.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
17
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
EA
$ 80.00
$ 3,760.00
REMOVE, SALVAGE AND INSTALL STREET NAME SIGNS ON
_47.00
18
EXISTING POLESL CITY WILL PROVIDE THE SIGNS
6.00
EA
$ 80.00
$ 460.00
FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT
LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 2
19
LOCATIONS WITH TOTAL OF 361N -ROAD PAVEMENT LIGHTS
2.00
EA
58,000.00
$ 116,000.00
FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN
_$
20
SYSTEM COMPLETE PER PLANS AND SPECS
2.00
EA
$ 26,000.00
$ 52,000.00
TOTAL BASE BID PRICE
_
I
I $ 808,960.00