CC - Item 5F - Safe Routes to School Project - Award of ContractROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: JEFF ALLRED, CITY MANAGER DATE: JUNE 26, 2012 SUBJECT: SAFE ROUTES TO SCHOOL PROJECT —AWARD OF CONTRACT SUMMARY As part of the City's Fiscal Year 2011 -12 Capital Improvement Program, the City Council approved a program titled, "Safe Routes to School Program," which involves traffic safety and calming enhancements at six (6) local schools: Emerson Elementary, Garvey Intermediate, Willard Elementary, Bitely Elementary, Sanchez Elementary, and Temple Intermediate. The bulk of this project is funded through the State of California Safe Routes to School Program, with a total approved grant of $450,000, with $50,000 additional funding from State Gas Tax Funds. Since submitting the grant application in April 2010, additional safety measures were identified and added to the scope of the project. These measures include traffic signal modifications, striping, and signage resulting in an addition cost of $221,000 above the initial project budget. The project includes the installation of new safety traffic striping, traffic signage, speed feedback signs, curb bulb -outs, in- pavement crossing lightings, and traffic signal modifications. All of the proposed traffic enhancements are located within a 2 -mile radius, as required by the State grant guidelines. Staff Recommendation It is recommended that the City Council: 1. Approve plans and specifications for this improvement project; 2. Authorize the City Manager to enter into a contract with PTM General Engineering Service, Inc. for the Safe Routes to School Project in the amount of $655,045.00. 3. Establish an amount of approximately 10% of the contract cost ($65,500.00), as a contingency, to cover the potential cost of unforeseen site conditions. 4. Approve Resolution 2012 -42 appropriating $221,000 in additional State Gas Tax funds. flZMN0,_ City Council Meeting June 26, 2012 Page 2 of 4 DISCUSSION Based on traffic studies, areas along Garvey Avenue, especially those close to schools, are in need of traffic safety improvements. Improvements in this area will help to reduce traffic speeds, enhance pedestrian crossing areas, and improve traffic and pedestrian safety. Project Details The proposed project includes the following improvements: • Repair Sidewalks /Curb Ramps in compliance with ADA accessibility requirements, and installation of curb bulb -outs to lower speed of vehicular traffic and increase pedestrian safety. • Upgrade traffic signal equipment and modify cycles at the intersection of Garvey and Jackson. Add a protected - permissive cycle for vehicles turning left from Garvey to Jackson, providing a dedicated left turn cycle. Additionally, the option will allow left turns, while yielding to opposing traffic. This improvement will reduce the volume of vehicles queuing along Garvey Avenue. • Add In- Pavement Flashing Lights at appropriate crosswalk locations. These lights will be activated by a push -button sensor and will display flashing lights when persons cross the street at this location. • Add Speed Feedback Signs at appropriate locations. These signs will help remind drivers of their speeds and display a flashing yellow light when drivers are driving above the speed limit. • Add Pedestrian Count Down signals for the crosswalks at major intersections • Upgrade Street Signage to a high visibility florescent yellow green color • Restripe Street Markings and Crosswalks with a high visibility design The above - mentioned improvements have been included in previous cycles of Safe Routes to School Project and have received positive feedback from members or the public as well as school administrators. In the time that has passed since the project was developed and the grant application was filed in April 2010, additional needed traffic improvements were identified and added to the scope of work for this project. A protective - permissive signal at Garvey Ave and Jackson Avenue and additional safety signage and striping were identified as necessary and added to the scope of the project. These additional measures have resulted in the additional cost of $221,000 to the project. City Council Meeting June 26, 2012 Paae 3 of 4 A Notice Inviting Bids was published in local news publications and advertised to area contractors. At 11:00 AM on June 20, 2012, the City Clerk publicly opened and read five (5) sealed bids with the following results: RANK CONTRACTOR LOCATION BID AMOUNT 1 PTM General Engineering Riverside, CA $655,045.00 Service, Inc. 2 California Professional Eng. La Puente, CA $657,913.00 3 Sully - Miller Contracting Co. Brea, CA $744,900.00 4 Excel Paving Co. Long Beach, CA $772,911.85 5 MG Enterprises, Inc. Tarzana, CA $784,034.00 Staff reviewed the bid documents for completeness and investigated the contractor's background and recent projects for competency. Staff has concluded that PTM General Engineering Service, Inc. is the lowest responsive bidder to perform the construction of this project. PTM General Engineering Service, Inc. has satisfactorily completed similar projects for other public agencies, including the Cities of Anaheim, Tustin, Santa Ana, and Rosemead. Plans and Specifications are available for review in the City Clerk's Office. Timeline Pending approval by the City Council, staff anticipates completion of this project according to the following schedule: June 26 — City Council Awards Contract July 16 th to August 15th — Tentative Construction Schedule August 30 Tentative Project Completion FINANCIAL REVIEW The total appropriation needed to award this project is $720,545.00 (including contingencies). Funding for this project has been approved in the City's FY 2011 -12 Capital Improvement Program budget. Funding sources include a $450,000 State Safe Routes to School Grant and $50,000 in State Gas Tax. An additional appropriation of State Gas Tax funds is needed in the amount of $221,000 and is hereby requested. The previously approved and recently awarded Mission Drive Street Resurfacing Project has resulted in substantial savings of State Gas Tax Funds. An additional $400,000 in City Council Meeting June 26, 2012 Page 4 of 4 State Gas Tax Funding remains in the Fiscal 2011 -12 budget and $221,000 of this funding is requested to complete this project. ENVIRONMENTAL REVIEW The project is categorically exempt from the California Environmental Quality.Act (CEQA) pursuant to Section 15304 (a) of the CEQA Implementing Guidelines. This exemption covers projects involving minor alterations of land that do not have a significant effect on the environment. Prepared by: Ilivan Analyst Submitted by: Chris Marcarello Director of Public Works Attachments: (1) Bid Analysis (2) Resolution No. 2012 -42 PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION SAFE ROUTES TO SCHOOL CYCLE 9 PROJECT No. 21006 BID ANALYSIS BID SUBMITTAL: JUNE 20.2012 PTM GENERAL ENGINEERING SERVICE, INC. BASE BID PRICE #1 ITEM. !DESCRIPTION':- _ - f CITY'.. I UNIT I UNIT PRICE I TOTAL ' 1 CLEARING AND GRUBBING PER PLANS /SPECS. 1.00 1 LS $ 4,730.00 S 4,730.00 2 TRAFFIC SIGNAL MODIFICATIONS PER PLANS /SPECS 1.00 LS $ 89,100.00 $ 89,100.00 FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 5 3 LOCATIONS WITH TOTAL OF 50 IN -ROAD PAVEMENT LIGHTS 5.00 EA $ 34,900.00 $ 174,500.00 FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN 4 SYSTEM COMPLETE PER PLANS AND SPECS 600 EA $ 19,000.00 $ 114,000.00 FURNISH AND INSTALL SIGNING AND STRIPING PER PLANS 5 AND SPECIFICATIONS 100 LS $ 121,660.63 $ 121.660.63 FURNISH AND INSTALL PEDESTRIAN COUNTDOWN HEADS 6 COMPLETE PER PLANS AND SPECIFICATIONS 128.00 EA $ 180.00 $ 23,040.00 REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC SIDEWALK PER SPPWC STD. PLAN 113 -. SEE APPENDIX -A 7 FOR LOCATIONS 6,525.00 SF $ 8.92 $ 58,203.00 REMOVE, DISPOSE AND CONSTRUCT 6" CURB & 24" GUTTER 8 PER SPPWC STD PLAN 120 -2 110.00 LF $ 28.60 $ 3,146.00 REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24" GUTTER 9 PER SPPWC STD PLAN 120 -2 270.00 LF $ 29.70 $ 8,019.00 REMOVE, DISPOSE AND CONSTRUCT PCC CROSS GUTTER 10 PER SPPWC STD. PLAN 1252 -2 385.00 SF $ 15.99 $ 6,156.15 11 INSTALL PCC CURB RAMP PER SPPWC STD PLAN 111 -4 3.00 EA $ 3,410.00 S 10,230.00 REMOVE EXISTING AND INSTALL 6- INCHES THICK AC 12 PAVEMENT (C2 PG 64 -10) 3,579.00 SF $ 10.18 IS 36,434.22 13 ADJUST SEWER/STORM DRAIN MANHOLE TO GRADE 2.00 EA $ 1,050.00 $ 2,100.00 14 COLD MILL 1 -INCH EXISTING PAVEMENT 810.00 SF $ 4.60 $ 3,726.00 TOTAL BASE BID PRICE E 655,045.00 CALIFORNIA PROFESSIONAL ENGINEERING, INC. BASE BID PRICE #2 ITEM [DESCRIPTION "I. _ I - CITY I UNIT 1 UNITPRICE I TOTAL 1 CLEARING AND GRUBBING PER PLANS /SPECS. 1.00 LS $ 13,000.00 $ 13,000.00 2 TRAFFIC SIGNAL MODIFICATIONS PER PLANS /SPECS 1.00 LS $ 85,550.00 $ 85,550.00 FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 5 3 LOCATIONS WITH TOTAL OF 50 IN -ROAD PAVEMENT LIGHTS 5.00 EA $ 32,800.00 $ 164,000.00 FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN 4 SYSTEM COMPLETE PER PLANS AND SPECS 6.00 EA $ 21,490.00 $ 128,940.00 FURNISH AND INSTALL SIGNING AND STRIPING PER PLANS 5 AND SPECIFICATIONS 1.00 LS $ 147,000.00 $ 147,000.00 FURNISH AND INSTALL PEDESTRIAN COUNTDOWN HEADS 6 COMPLETE PER PLANS AND SPECIFICATIONS 128.00 EA $ 191.00 $ 24,448.00 REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC SIDEWALK PER SPPWC STD. PLAN 113 -. SEE APPENDIX -A 7 FOR LOCATIONS 6,525.00 SF $ 6.00 $ 39,150.00 REMOVE, DISPOSE AND CONSTRUCT 6" CURB & 24" GUTTER 8 PER SPPWC STD PLAN 120 -2 110.00 LF $ 50.00 $ 5,500.00 REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24" GUTTER 9 PER SPPWC STD PLAN 120 -2 270.00 LF $ 50.00 $ 13,500.00 REMOVE, DISPOSE AND CONSTRUCT PCC CROSS GUTTER 10 PER SPPWC STD. PLAN 1252 -2 385.00 SF $ 20.00 $ 7,700.00 11 INSTALL PCC CURB RAMP PER SPPWC STD PLAN 111 -4 3.00 EA $ 2,600.00 $ 7,800.00 REMOVE EXISTING AND INSTALL 6- INCHES THICK AC 12 PAVEMENT (C2 PG 64 -10) 3,579.00 SF $ 5.00 $ 17,895.00 13 ADJUST SEW ER /STORM DRAIN MANHOLE TO GRADE 2.00 EA $ 500.00 $ 1,000.00 14 COLD MILL 1 -INCH EXISTING PAVEMENT 810.00 SF $ 3.00 $ 2,430.00 TOTAL BASE BID PRICE $ 657,913.00 6212012 PAGE 1 PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION SULLY MILLER CONTRACTING BASE BID PRICE #3 ITEM':IDESCRIPTION:. �. QTY I UNIT . UNIT PRICE ) TOTAL 1 ICLEARING AND GRUBBING PER PLANS /SPECS. 1.00 1 LS 1 $ 29,649.00 1 $ 29,649.00 2 TRAFFIC SIGNAL MODIFICATIONS PER PLANS /SPECS 1.00 LS $ 110.000.00 1 $ 110,000.00 FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 5 3 LOCATIONS WITH T0TAL OF 501N -ROAD PAVEMENT LIGHTS 5.00 EA $ 35,000.00 $ 175,000.00 FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN 4 SYSTEM COMPLETE PER PLANS AND SPECS 6.00 EA $ 21,000.00 $ 126,000.00 FURNISH AND INSTALL SIGNING AND STRIPING PER PLANS 5 AND SPECIFICATIONS 1.00 LS $ 109,250.00 $ 109,250.00 FURNISH AND INSTALL PEDESTRIAN COUNTDOWN HEADS 6 COMPLETE PER PLANS AND SPECIFICATIONS 128.00 1 EA $ 390.00 $ 49,920.00 REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC SIDEWALK PER SPPWC STD. PLAN 113 -. SEE APPENDIX-A 7 FOR LOCATIONS 6,525.00 SF $ 12.00 $ 78,300.00 REMOVE, DISPOSE AND CONSTRUCT 6" CURB & 24" GUTTER g IPER SPPWC STD PLAN 120 -2 110.00 LF $ 41.00 $ 4,510.00 REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24' GUTTER 9 PER SPPWC STD PLAN 120 -2 270.00 LF S 43.00 $ 11,610.00 REMOVE, DISPOSE AND CONSTRUCT PCC CROSS GUTTER 10 PER SPPWC STD. PLAN 1252 -2 38500 SF $ 13.00 $ 5,005.00 11 JINSTALL PCC CURB RAMP PER SPPWC STD PLAN 111 -4 3.00 EA $ 2,600.00 $ 7,800.00 REMOVE EXISTING AND INSTALL 6- INCHES THICK AC 12 PAVEMENT (C2 PG 64 -10) 3,579.00 SF $ 9.00 $ 32,211.00 13 ADJUST SEWER/STORM DRAIN MANHOLE TO GRADE 2.00 EA $ 1,000.00 $ 2,000.00 14 ICOLD MILL 1 -INCH EXISTING PAVEMENT 810.00 SF $ 4.50 $ 3,645A0 TOTAL BASE BID PRICE $ 744,9D0.00 EXCEL PACING COMPANY BASE BID PRICE #4 ITEM' DESCRIPTION` -. I CITY I UNIT I UNIT PRICE I_ TOTAL 1 ICLEARING AND GRUBBING PER PLANS /SPECS. 1.00 1 LS $ 30,200.00 $ 30,200.00 2 ITRAFFIC SIGNAL MODIFICATIONS PER PLANS /SPECS 1.00 LS $ 106,400.00 $ 106,400.00 FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 5 3 LOCATIONS WITH TOTAL OF 501N -ROAD PAVEMENT LIGHTS 5.00 EA $ 37,190.00 $ 185,950.00 FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN 4 SYSTEM COMPLETE PER PLANS AND SPECS 6.00 EA $ 21,140.00 $ 126,840.00 FURNISH AND INSTALL SIGNING AND STRIPING PER PLANS 5 AND SPECIFICATIONS 1.00 LS $ 141,230.00 $ 141,230.00 FURNISH AND INSTALL PEDESTRIAN COUNTDOWN HEADS 6 COMPLETE PER PLANS AND SPECIFICATIONS 128.00 1 EA $ 290.00 $ 37,120.00 REMOVE, DISPOSE AND CONSTRUCT 4" THICK PCC SIDEWALK PER SPPWC STD. PLAN 113 -. SEE APPENDIX -A 7 FOR LOCATIONS 6,525.00 SF $ 11.50 $ 75,037.50 REMOVE, DISPOSE AND CONSTRUCT 6" CURB & 24" GUTTER 8 PER SPPWC STD PLAN 120 -2 110.00 LF $ 56.00 $ 6,160.00 REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24" GUTTER 9 PER SPPWC STD PLAN 120 -2 270.00 LF $ 52.00 $ 14,040.00 REMOVE, DISPOSE AND CONSTRUCT PCC CROSS GUTTER 10 PER SPPWC STD. PLAN 1252 -2 385.00 SF $ 915 $ 3,561.25 11 INSTALL PCC CURB RAMP PER SPPWC STD PLAN 111 -4 3.00 EA $ 2,800.00 $ 8,400.00 REMOVE EXISTING AND INSTALL 6- INCHES THICK AC 12 PAVEMENT (C2 PG 64 -10) 3,579.00 SF $ 8.90 $ 31,853.10 13 ADJUST SEWER/STORM DRAIN MANHOLE TO GRADE 2.00 EA $ 630.001 $ 1,260.00 14 COLD MILL 1 -INCH EXISTING PAVEMENT 810.00 SF $ 6.00 $ 4,860.00 TOTAL BASE BID PRICE $ 772,911.85 621/2012 PAGE 2 PUBLIC WORKS SERVICE DEPARTMENTIENGINEERING DIVISION MG ENTERPRISES INC. BASE BID PRICE #5 ITEM {DESCRIPTION - - I QTY I UNIT I UNIT PRICE TOTAL 1 CLEARING AND GRUBBING PER PLANS /SPECS. I 1.00 LS $ 50.000.00 $ 50,000.00 2 TRAFFIC SIGNAL MODIFICATIONS PER PLANS /SPECS 1.00 LS $ 105,000.00 $ 105,000.00 FURNISH AND INSTALL SOLAR IN -ROAD PAVEMENT LIGHTING SYSTEM COMPLETE PER PLANS AND SPECS. 5 3 LOCATIONS WITH TOTAL OF 50 IN -ROAD PAVEMENT LIGHTS 5.00 EA $ 39.000.00 $ 195,000.00 FURNISH AND INSTALL SOLAR SPEED FEEDBACK SIGN 4 SYSTEM COMPLETE PER PLANS AND SPECS 6.00 EA $ 24,000.00 $ 144,000.00 FURNISH AND INSTALL SIGNING AND STRIPING PER PLANS 5 AND SPECIFICATIONS 1.00 LS $ 120,000.00 $ 120,000.00 FURNISH AND INSTALL PEDESTRIAN COUNTDOWN HEADS 6 COMPLETE PER PLANS AND SPECIFICATIONS 128.00 EA $ 265.00 $ 33,920.00 REMOVE, DISPOSE AND CONSTRUCT 4 THICK PCC SIDEWALK PER SPPWC STD. PLAN 113-. SEE APPENDIX -A 7 FOR LOCATIONS 6,525.00 SF $ 12.00 $ 78,300.00 REMOVE, DISPOSE AND CONSTRUCT 6" CURB & 24" GUTTER 8 PER SPPWC STD PLAN 120 -2 110.00 LF $ 42.00 $ 4,620.00 REMOVE, DISPOSE AND CONSTRUCT 8" CURB & 24" GUTTER 9 PER SPPWC STD PLAN 120 -2 270.00 LF $ 42.00 $ 11,340.00 REMOVE, DISPOSE AND CONSTRUCT PCC CROSS GUTTER 10 PER SPPWC STD. PLAN 1252 -2 385.00 SF $ 18.00 $ 6,930.00 11 INSTALL PCC CURB RAMP PER SPPWC STD PLAN 111 -4 3.00 EA $ 2,800.00 $ 8,400.00 REMOVE EXISTING AND INSTALL 6- INCHES THICK AC 12 PAVEMENT (C2 PG 64 -10) 3,579.00 SF $ 6.00 $ 21,474.00 13 ADJUST SEWER /STORM DRAIN MANHOLE TO GRADE 2.00 EA $ 500.00 $ 1,000.00 14 COLD MILL 1 -INCH EXISTING PAVEMENT 810.00 SF $ 5.00 $ 4,050.00 TOTAL BASE BID PRICE $ 784,034.00 6 V2012 PAGE3 RESOLUTION NO. 2012- 42 A RESOLUTION OF THE ROSEMEAD, CALIFORNIA CITY COUNCIL APPROPRIATING $221,000 FOR THE SAFE ROUTES-TO SCHOOL PROJECT WHEREAS, the City's FY 2011 -12 Capital Improvement Program (CIP) budget identified the Safe Routes to School as a desired capital improvement project; and WHEREAS, at the time the initial budget was approved a portion of funding for the project was provided through a California Safe Routes to School Grant in the amount of $450,000 and existing State Gas Tax funds; and WHEREAS, in the time since the project was developed and the grant application was approved, additional safety elements were added to the scope of the project, resulting in additional costs of $221,000; and WHEREAS, additional funding has come available due to significant savings of State Gas Tax funds on the recently awarded Mission Drive Street Resurfacing Project that may be used for the completion of this project; and WHEREAS, the State Safe Routes to School Grant and State Gas Tax Funds will continue to be used to fund a portion of the Project; and NOW THEREFORE, the following account numbers and appropriation are amended to include the amounts listed in the following table: Fund Organization Account Project Description Amount Approriation 301 6005 5395 21006 Construction $221,000 Transfer (Memo) 201 0000 5960 21007 Interfund T/F Out <$221,000> 201 0000 4860 21006 Interfund T/F In $221,000 The additional appropriation is made a part of the approved FY 2011 -12 budget as though it were a part of the initial approved budget fully set forth. PASSED, APPROVED and ADOPTED this 26 day of June 2012. Sandra Armenta, Mayor ATTEST: Gloria Molleda, City Clerk