Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Kasa Construction
CITY OF ROSEMEAD ROSEMEAD CIVIC CENTER PROJECT PHASE III - DOWNTOWN PLAZA PROJECT No. 31004 BIDDER: y=t &44SIYU720_ tC- CONTRACT BID FORMS TABLE OF CONTENTS SECTION1 BID SCHEDULE ....................................................................... ............................... 1 SECTION 2 BID DATA FORMS ......................................................... ............................... ....... 5 2 .A BID BOND ................................................................................. ............................... 6 2.B LIST OF PROPOSED SUBCONTRACTORS. ............... ........................................ 7 SECTION 3 NON - COLLUSION AFFIDAVIT ........ ..................... ............... ............... ..'................ 10 CBF - 14 BIDDER: SECTI ON 1 - BID SCHEDULE CBF -1 R .-; BIDDER: __XvG BID SCHEDULE SCHEDULE OF PRICES FOR ROSEMEAD CIVIC CENTER PROJECT PHASE III — DOWNTOWN PLAZA PROJECT No. 31004 BASE BID SCHEDULE CBF -2 UNIT OF EST. UNIT ITEM NO. ITEM DESCRIPTION MEASURE CITY. PRICE COST 1 Clearing & Grubbing per plans LS 1 and specifications. See technical / provisions TP -2, TP -3 & TP-4. 2 Disposal of Waste Materials LS 1 / 3 Demolition Per Plans and LS 1� Specifications Complete. 13v>QQ0— /6 QOD 4 Construct Grading Per Plans and LS 1 Specifications Complete. //0/0 //0000 5 Construct Erosion Control per LS 1 Plans and Specifications /'V1 /' Complete. 6 Relocate Existing Pine tree as indicated the Plans. EA 1 on 7 Construct 4- Inches Colored SF 14,487 Concrete Paving Midnight Glitter, Ocean Buff and Rosemead Buff as indicated on Sheet L1.01 & _ /L 11.02 Complete per Glynn /� 7� / Construction. Contact Person: Patrick Glynn (818) 957 -7474. Or Approved Equal. 8 Construct 6- Inches Colored SF 1,513 Concrete Paving Midnight Glitter, Ocean Buff and Rosemead Buff as indicated on Sheet 11.01 & 1-1.02 Complete per Glynn -- Construction. Contact Person: Patrick Glynn (818) 957 -7474. Or Approved Equal. 9 Construct 8- Inches PCC Curb & LF 205 Gutter per SPPWC Std. Plans CBF -2 BIDDER: 144 -&,4 64,4 i CBF -3 UNIT OF EST. UNIT ITEM NO. ITEM DESCRIPTION MEASURE QTY. PRICE COST 10 Construct ADA Ramp as shown SF 850 in plans and described in / specifications 11 Construct PCC Curb Ramp per SPPWC Std. Plans EA 1/ ®� _ 3 COD 12 Construct Raised Planters per LF 269 Plans and Specifications �5V _ 7 � J 5 - 0 // Complete. 13 Construct Seat Walls per Plans and Specifications Complete. LF 161 / — / 14 Install Tree Wells & Grates per EA 21 SPPWC Std. Plan 519 -3 ©o ^ 1 /7/6 7,6V Complete. 15 Furnish and install LF 257 Handrails /Guardrails per Plans 23 J and Specifications Complete. 16 Water Feature (Upper Plaza) Per LS 1 Plans and Specifications /05 OOD 1051 Complete. 17 Water Feature (Lower Plaza) Per LS 1 ' G it . Plans and Specifications Complete. ©O0 — coo / 18 Install City of Rosemead LS 1 Fountain Mosaic provided by City per Plans and Specifications 2 / 00o Complete. 19 Furnish and install Interactive LS 1 Splash Pad per Plans and / 00 , 000 — / ®O � Specifications Complete. 20 Install Irrigation System per LS 1 Plans and Specifications Complete. bo 000— ! OQ00_ �(! / 21 Install Landscape per Plans and Specifications Complete. LS 1 /J�J/ 000 y ©0 22 Install Pedestrian Lighting, LS 1 Landscape Lighting and Electrical System per Plans and Specifications Complete. 23 Furnish and install Trash EA 10 Receptacles per Plans and 000- Specifications Specifications Complete. CBF -3 BIDDER: ,Ii�c TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$ Dollar amount in written form - A00 Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in the schedule of bid items above, within the limits define in Section 3 -2.2.1 of the Standard Specifications, to stay within the budgeted amount of this project. If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall be added to or deducted from the Total Bid Price entered above. The owner can choose to include one or more of the alternates in the Total Bid Price of the Project. If any of the Alternate Bids are utilized by the Owner, the resulting amount shall be considered the Total Bid Price for the Project. The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern. Attached hereto is a certified check, a cashier's check or a bid bond in the amount of Dollars ($ said amount being not less than ten percent (10 %) of the Total Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award, we fail or refuse to execute the Contract and furnish the required bonds, certificates and endorsements of insurance and other certifications within the time provided. CBF -4 UNIT OF EST. UNIT ITEM NO. ITEM DESCRIPTION MEASURE QTY. PRICE COST Furnish and install Drinking fountain per Plans and 24 Specifications Complete. EA 1 /O 000_ 25 Furnish and install Benches per EA 4 Plans and Specifications Complete. — 26 Furnish and install Bicycle Racks EA 10 per Plans and Specifications Complete. 7 27 Furnish and install (3) Flagpoles LS 1 within- ground per and Foundations Plans and /b 000 / / �� Specifications Complete. TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$ Dollar amount in written form - A00 Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in the schedule of bid items above, within the limits define in Section 3 -2.2.1 of the Standard Specifications, to stay within the budgeted amount of this project. If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall be added to or deducted from the Total Bid Price entered above. The owner can choose to include one or more of the alternates in the Total Bid Price of the Project. If any of the Alternate Bids are utilized by the Owner, the resulting amount shall be considered the Total Bid Price for the Project. The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern. Attached hereto is a certified check, a cashier's check or a bid bond in the amount of Dollars ($ said amount being not less than ten percent (10 %) of the Total Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award, we fail or refuse to execute the Contract and furnish the required bonds, certificates and endorsements of insurance and other certifications within the time provided. CBF -4 BIDDER: ���(�lsTfy�V�vtrf�i If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be prepared by the Owner for execution, within five (5) Calendar Days following the Letter of Award for the Contract, and will deliver to the Owner within that same period the necessary original Certificates of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other documentation and certification required by the Contract. The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the Business and Professional Code), arising from purchases of goods, materials or services by the Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to he Contractor. Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence satisfactory to the Owner of Bidder's California contractor's license(s) in good standing; (2) evidence that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting therefrom; and (3) any other information and documentation, financial or otherwise, needed by Owner to award a Contract to the lowest responsible and responsive bidder. Bidder understands and agrees that liquidated damages shall apply to this Contract in the amounts of five hundred dollars ($500.00) if project is not completed in NINETY (90) calendar days. The Contract Time will begin to run ten (10) Working Days from the date of the Notice of Proceed and subject to the terms and conditions described in the Contract Form and the Contract Documents. Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data submitted herewith into a contract arising out of this Bid. The undersigned acknowledges receipt, understanding and full consideration of the following addenda to the Contract Documents. Addenda Nos. The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and equipment or supplies necessary to complete the Work as described in the Bid Documents. If this bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the necessary bonds and accept the Total Bid Price as compensation in full for all Work under the contract. CBF -5 BIDDER: 9 644J LJ1 _ By: Signature 1'1��aoA ILas�Cwi� Type or Print Name t'dOh� T Title 316 , U - ✓ohm Ar,�-- Business Street Address pity, Stater d Zip Code V4 - yS 7 — Telephone Number Bidder's /Contractor's State of Incorporation: ObAi LiLt.. Partners or Joint Venturers: tJ /�A— Bidder's License Number(s): 9 2 S 9 L NOTES: 1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the representations made on the Contract Bid Forms. 2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address 3) If Bidder is a partnership or joint venture, give full names of all partners or joint venturers. As further discussed in the Instructions to Bidders, Bidder will be required to provide evidence that the person signing on behalf of the corporation, partnership or point venture has the authority to do so. CBF -& CERTIFICATE OF CORPORATE RESOLUTION Of KASA CONSTRUCTION INC. I, DIANA KASBAR President of KASA CONSTRUCTION INC. organized and existing under the laws of the State of California and having its principal place of business at 316 N. CORONA AVE. ONTARIO, CA 91764 , hereby certify that the following is a true copy of a resolution adopted by the Board of Directors of the Corporation at a meeting convened and held on NOVEMBER 09, 2010, at which a quorum was present and voting throughout and that such resolution is now in full force and effect and is in accordance with the provisions of the charter and by -laws of the Corporation. RESOLVED : That the DIRECTORS are hereby authorized and directed to certify to any interested party that this resolution has been duly adopted, is in full force and effect, and is in accordance with the provisions of the charter and by -laws of the Corporation. FURTHER RESOLVED, none at this time. I further certify that this Corporation is duly organized and existing, and has the power to take the action called for by the foregoing resolution. DIRECTORS DIANA KASBAR 11 -09 -10 President Date SAM KASBAR 1/� 11 -09 -10 Vice President p Date SAM KASBAR �(�. 11 -09 -10 Secretary Date DIANA KASBAR _ 11 -09 -10 Treasurer Date Witness my hand seal of this Corporation on this 9 day of November , 2010 . BIDDER: A S6A 8 SECTION 2 BID DATA FORMS CBF -7 Bond No.: KASCO -340 Job /Bid No.: 31004 BIDDER: Kasa Construction, Inc. Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide the information required. Bidder shall ensure that every page of its Bid Data Form's are properly identified with the Bidder's name and page number. 2.A BID BOND KNOW ALL MEN BY THESE PRESENTS: THAT Kasa Construction, Inc. , as Principal, and The Ohio Casualty Insurance Company , as Surety, are held firmly bound unto the CITY OF ROSEMEAD (hereinafter called the OWNER) in the sum of Ten Percent Of The Total Amount Bid DOLLARS ($ 10 Of Bid ) , being not less than ten percent (10 %) of the Total Bid Price; for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work required for the Rosemead Civic Center Project Phase 111 — Downtown Plaza as set forth " the Notice Inviting Bids and accompanying Bid Documents, dated 2 ,- z NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the OWNER and, within the time and in the manner required by the above- referenced Bid Documents, enters into the written form of Contract bound with said Bid Documents, furnishes the required bonds (one to guarantee faithful performance and the other to guarantee payment for labor and materials) fumishes the required insurance certificates and endorsements, and furnishes any other certifications as may be required by the Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by the OWNER and judgment is recovered, said Surety shall pay'all costs incurred by the OWNER in such suit, including reasonable attorneys' fees to be fixed by the court. SIGNED AND SEALED, this 17 th day of Kasa Construction, Inc. (SEAT Principal By: wnn �f S ignature May 20 The Ohio Casualty Insurance M Attorney -in -Fact CBF -8 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. 606002 American Fire and Casualty Company Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: ThatAmerican Fire & Casualty. Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and WestAmedcan Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the'Companies7, pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Matthew R. Dobyns; Randy Spohn all of the city of Santa Ana state of CA each individually if there be more than one named, its true and lawful attorney- in- fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as If they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 291h day of March , 2013 �Nn c¢, ��1v in.; �cnsu �., v,sc� American Fire and Casualty Company The Ohio Casualty Insurance Company l s. e s� "Y�, ? 4` a n &z�M (/ Liberty Mutual Insurance Company e. ' a 1512 0 5 1�a1 West American InsuranceCom an y . West 9 ,C C STATE OF WASHINGTON ss _ Gregory W. Davenport, Assistant Secretary .: COUNTY OF KING m ti of On this 29th day of March 2013 before me personally appeared Gregory W. Davenport, who acknowledged himself to be the Assistant Secretary of American u v y Fire and Casualty Company, Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, p? execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. d r > IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Seattle, Washington, on the day and year first above written. R .N ' 40YARY _ By. O ` . Fusuc � KID Riley, No Public � O R `s''��;. =V��`� c This Power ofAltorney is made and executed pursuant to and by authority of the following By -laws and Authorizations ofAmedcan Fire and Casualty Company, The Ohio Casualty Insurance ai ," Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: Co W ` ARTICLE IV- OFFICERS - Section 12. Power of Attorney Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject t w to such limitation as the Chairman or the President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, pc acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in- fact, subject to the limitations set forth in their respective E y - powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -tact under v T the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. -011 c ARTICLE All - Execution of Contracts - SECTION 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, > ` and subject to such limitations as the chairman or the president may prescribe, shall appoint such ahorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, O seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys -in -fact subject to the limitations set forth in their Z V respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Gregory W. Davenport, Assistant Secretary to appoint such attomeys -in -fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization- By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, David M. Carey, the undersigned, Assistant Secretary, of American Fire and Casualty Company, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this E-911ay of T1ay 2Q ( 0(00 P4V ilv ;o L�NtiURq ti `NSURAt � - 0 J �mx�wiV.9�. i�F'fn au,0 o� 4S� �.,i� ✓� ° �"' r o c 0 B , 919 1912 1991 y: ° : .. David M. Carey, Assistant Secretary a *,y'k'�nnros'". `a'hb s� §bon <�1` 3 '�Xrnrvx �` � & * a A O� N C 3W of a �o L G O c �? 0 m � dv ' 00 E N = M c 00 Oo 0, F r Live _12873_092012 19 Of 150 CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT State of CALIFORNIA County of ORANGE On L 1 V� before me ERIKA GUIDO, NOTARY PUBLIC, personally appeared RANDY SPOHN ® who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is /are subscribed to the within instrument and acknowledged to me that he /she/they executed the same in his /heF /theif authorized capacity Gies), and that by his /trier /the# signaturew on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. ERIKAGUgo WITNESS my hand and official seal. COMM. # 2022671 , NOTARY PUBLIC CALIFORNIA ORANGE COUNTY My wmm. ezDlros Mey 5,1011 Of Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this forma CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER ❑ PARTNER(S) ❑ LIMITED ® ATTORNEY -IN -FACT ❑ TRUSTEE(S) ❑ GUARDIAN /CONSERVATOR ❑ OTHER: SIGNER IS REPRESENTING: NAME OF PERSON(S) OR ENTITY(IES) DESCRIPTION OF ATTACHED DOCUMENT CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT °�h. �Yy�..'CL_•S <X�:.�' hen:.' �t' Y.' 3 :�.'�c'i..le�5` `.' r�`.' ��.[ t +i4Y�.£c' <: .T`i'^ S' �' � 'a�_.- 3`C`�3`L.'{ �- t�.A.s�'L�' vv�^.L State of California County of San Bernardino On before me, Hector Zavala, Notate " Public Dale _ q0 _ 1.0 inae,i hams• a C Liie al the or,o r personally appeared .... Diana Kasbar HECTOR ZAVALA Commission # 18 it Notary Public - California v. z ` •.. - Los Angeles County My Comm. Expires Oct 28, 2013 who proved to me on the basis of satisfactory evidence to be the persons) whose name(s) Is /are subscribed to the within instrument and acknowledged to me that he /she /they executed the same in his/her /Their authorized capacity(ies), and that by his /heritheir signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my h an fficial seal. Pa N o $ Signature y. enl tirwa /p Pf°�p�p�q 5'v�ry,mre of Notary WB;f�c, Y.96 ! 1S YMI� though the information below is not required by law, it may prove valuable tD persons m {yinSi ar. the dasurnant and could prevent fraudulent removal and reaftachment of this form to another document. Description of Attached Document Title or Type of Document; Document Date: Signer(a) Other Than Named Above: _ Capacity(ies) Claimed by Signer(s) Signer's Name: .. -� Individual Corporate Officer--- Tltle(s) Partner -- " ' Limited '; General Attorney in Fact ......i Trustee T O pt l re Guardian or Conservator Other: Signer Is Repro enbng; — - __ l Number of Pages; Signer's Name Individual L _t Corporate Officer — Title(s): "__ 1 Partner Limited I General Attorney in Fact ......1 Trustee Guardian or Conservator Other' Signer Is Representing: RIGHTTWONWpgINT OF SIGNER . p ,� � L ...... t � `�-a: �,Kyk�L2"`k,L°L �" . :f.?`CR^- 4�kYY,N� c.'.+• .l":,L`: k"5K:v�(["`F.Z'i" fv yt {K" R `Y ,'.N =( 72(L ,a e Iutry,,�c.. e,�i 4;1,]De31l1AVr..,PC r,x ?,p2•nM1ats olh CA 9 1313 iaT n..,, N..tion_INUlarpo� 1{ 0114.` 1}}0, 'A.rtlanQJITM- Fly -0WT76652] BIDDER: 23 LIST OF PROPOSED SUBCONTRACTORS In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100 through 4114 of the California Public Contract Code, and any amendments thereto, each Bidder shall provide the information requested below for each subcontractor who will perform work, labor or render service to Bidder in or about the construction of the Work in an amount in excess of one -half of one percent (greater than 0.5 %) of the Bidder's Total Bid Price, or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one -half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work which will be done by each subcontractor. Bidder shall list only one subcontractor for any one portion of the Work. Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow Bidders twenty -four (24) additional hours after the deadline for submission of bids to submit the information requested by the Owner about each subcontractor, other than the name and location of each subcontractor. If the Bidder fails to specify a subcontractor for any portion of the Work to be performed under the Contract, it shall be deemed to have agreed to perform such portion itself, and shall not be permitted to subcontract that portion of the Work except under the conditions hereinafter set forth below. Subletting or subcontracting of any portion of the Work in excess of one half of one percent (greater than 0.5 %) of the Total Bid Price or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one -half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, for which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after Owner approval. ". alwo BIDDER: 2.B LIST OF PROPOSED SUBCONTRACTORS (continued) P "Duplicate Next 2 Pages if needed for listing additional subcontractors."] Name and Location Description of Work of Subcontractor to be Subcontracted Name: C, I. 00 14 6 Address Of 7 1 - 00 1 A C14 x'1702 Name and Lo cation Description of Work ,n l { of Subcontractor to be Subcontracted Name: Address Name and Location of Subcontractor Description of Work to be Subcontracted Name: Hic oo rowslrl t 7�1' � �✓ J•�a � Address — 1 1( 9 1 481 aL� - � ✓ - , I "tC1. ec �l `6 Name and Location Description of Work of Subcontractor to be Subcontracted Name: S. �— Address: fvv k vv / 01 q 2 �6 D Name and Location of Subcontractor Name: Address _ Description of Work . to be Subcontracted CBF -10 BIDDER: MA- ILVLS'h�9�Z+�� c 2.0 REFERENCES The following are the names, addresses and telephone numbers for three public agencies for which BIDDER has performed similar work within the past two (2) years: 1. �► h -���� am� and Address of O ner f lWivLQ- G ere;, UJE"r - 31v- 25 3. , 5 -- 7 7 - 7 Name and telephone nuhnber of person familiar with project b s r I 4 0 . 21) K" . £ Srylo � < �'t l' > R .tt�n M47 pit �. r.n Contract amo nt Type of Work Date 1 3ompleted 2 \ Name land Address of Owner t (�a G �I PP-V" bi)) �liv�o- 4"24 - --P4 G - 7yl Name Jnd telephone number of person familiar with project zc . 4�� N+zw 560V Gam," t,( d14A — la wyi -- 7 /�� /Iz Date 3. 9 R� � fh „ >, 6 T17N Nam and Address of Owner 15t-vd V-c- - q r 1- 36 00 Name and telephone number of person familiar with project �R �f--70A 10( .);f t�e�S7 ��av1cM✓�� J � Oontract amount Type of Work at Completed CBF -'11 Name hnd Address of Owner \ CVA S62 ✓ - JZ)� -395" -267 Name and telephone number of person familiar with project BIDDER: k�fw lr�2s SECTION 3 NON- COLLUSION AFFIDAVIT CBF -'12 e .. NON - COLLUSION AFFIDAVIT In accordance with Public Contract Code Section 7106, the undersigned, being first duly sworn, deposes and says that he or she holds the position listed below with the bidder, the party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding, that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. 'Signature r/ I Typed or Printed Name I V,,,'( Lai Title Bidder Subscribeo and sworn before me This - jeday of M 20j_3_ j q *ary P c in and for e State of California My Commission Expires: Uk. 2 1:Z0l (Seal) HECTOR ZAVALA Commission # 1868453 z Notary Public - California z Los Angeles County Z D My Comm. Expires Oct 28, 2013 CBF -'13 c iii o f ,�-,qdQtzdl June 20, 2011 KASA Construction 316 North Corona Avenue Ontario, CA 91764 Subject: Letter of Recommendation; Terrace Park Improvements Project. To Whom It May Concern: On Behalf of the City of Redlands, we would like to thank KASA Construction for their exemplary performance in completing the Terrace Park Improvements project. KASA Construction completed this project with diligence and commitment, maintaining the highest level of professionalism, attention to detail and work ethic. The project management team always kept the City's best interest in mind and if a problem or issue were to arise, KASA always resolved it in a quick and efficient manner. The City could not be more pleased with the final project results. It has been a pleasure working with KASA and we would not hesitate to recommend their outstanding services tol others. We would like to express our gratitude for a job well done and look forward to working together again. "Preserving the Past, Protecting the Future" P.O. BOX 3005 a REDLANDS, CA 92373 PAUL K. TANAKA, Mayor TASHA CERDA, Mayor Pro Tem DAN MEDINA, Coundimember RONALD K- IKE,IIRI, Councllmember RACHEL C. JOHNSON, Cauncllmember 1700 W LS 162 " SI REST i GARDE.,NA. CAL(FORN;A 8024 778 i 1.310) 217 -9500 1 FAX (310) 217 -6119 City of Gardena MARIA E_ MARQUEZ- BROOKES, City Clerk J.INGRIDTSl1KIYAMA, City Treasurer MII - CHELL G. LANSDELL, City Manager PETER L. WALLIN, City Attorney August 19, 2010 KASA Construction Inc_ 316 N- Corona Ave, Ontario, CA 917174 Project : Arthur Johnson Park — Restrooni Facility, JN 819 1200 W, 170th Street Subject t better of Recommendation '10 Whom It Mav Concern: The City of Gardena would like to thank your company, KASA Construction Inc„ for the job well done and :succcsfully completing the Arthur Johnson Park ReAroonl Facility project located at 1200 W, 171 St., Gardena, CA 90247, Within Inc. 112 calendar days allocated For the project, your company has shown due diligence and dedication to finish the work 36 Days ahead of schedule, which greatly benefited the community. 'Hie ('it y of Gardena also acknowledged that the project was complex due to the electrical, mechanical and other utility retrofits required for functionality, however, your attention to the specifics of the construction in detail as well as proper scheduling has been very remarkable, resulting to a job well done. In addition to the high level of professional and quality workmanship in the field, KASA have proven to maintain the same high level of service on the Project Management and Administrative portions of the prgic et. Again, I would like to express my gratitude in providing your 110% in completing this much needed project for the City of Gardena_ We would not hesitate to refer KASA Construction Inc. to other organizations who are; also in need of quality services front such a dedicated and hard working company. 4incerely, �, Joltnr{elix,�liir�ject. Engineer Public Works Department P1A ]Ii M!""U -0 PRO I Eta: E�6RV Rai LQ�+ .. .... ° %,.tiq August 25, 2010 KASA Construction Inc. Attn: Sam Kasbar 316 N. Corona Ave. Ontario. CA 91 764 08:38 F... VAL -EY ROJLEVAPU)- F0, HOX 30 90SENtAri t,f UFOR A 91770 r;7LGE Frc NF c a srs :ac FAX W 5? 307-921b Project : Rosemead / Walnut Grove Median Beautification and Traffic Congestion Improvements Subject: Letter of Recommendation 1 would like to thank KASA Construction for a job well done. When the job was awarded, the Agency was a little concerned due to the fact that KASA was a rather new company. Now that thejob is done, you have far surpassed the commits nutially made and in -turn, the City of Rosemead has received an exceptional finished project. Not only was the quality of work outstanding, the project was completed before schedule and under budget. The project was constructed on a main city artery which exposed the work to potential political criticism. Fortunately, City Council, Staff, and the Community had nothing but positive continents. I truly hope you win more project with the City of Rosemead as it has been a pleasure working with KASA Construction. Sincerely, Rafael Fajardo Project Manager City of Rosemead LCC3 Construction Service, Inc 1)SA Testing & Inspection = I.(:.B.O Testing &- NSpection . E= nAronment Services Geotechnical Services a Labor Compliance Services , Program Management Construction Management October 6, 2010 Mr. Sam Kasbar Kasa Construction 316 N. Corona Ave. Ontario, Ca 91764 Dear Mr. Kasbar, It is with great pleasure that I write this testimonial for Kasa Construction. As Vice President of Construction for LCC3 Construction Services, Inc, I have been afforded the opportunity to benefit firsthand from the talents of the Kasa Construction project team. This testimonial is best exemplified in the following example. In June of 2010 Kasa Construction started a project for the Pomona Unified School District which was being managed by me as owner's agent. This project consisted of reconstructing a hill slope which had started to fail and was causing damage to one of the district's elementary school campuses. The project was scheduled to complete under a tight time line and reduced budget. Larry Edwards, Project Superintendant, and his support team's relentless commitment to cost containment, schedule recovery and customer satisfaction truly made the difference in the successful completion of the above mentioned project. I am pleased to share that not only did the project complete under budget, but do to Mr. Edward's commitment to the success of the project it came in on schedule with no disruption to any school programs. Kasa Construction's project team always searched for the best solution whenever possible and kept the goal of the project in sight. I found the project team to be professional, courteous, and very organized. I have added Kasa Construction to our contractor list and I look forward to working with the Kasa Construction team in the near future. Sincerely, , �I< Brian Watt Vice President, Construction LCC3 Construction Services, Inc Cc: File 4295 Jurnpa Street If 203 Ontario, Ca 91761 Office: (909) 396 -0500 - Fax (800) 420 -3407 September 13, 2010 KASA Construction Inc. 316 N. Corona Avenue Ontario, CA 91764 Project: Citrus College Campus Safety Landscape Project To Whom It May Concern: CITRUS COMMUNITY COLLEGE D1STRlCr BOARD OF TRUSTEES .Ctrs. Susan Nr Keith, President ClaremonJAxo,V n Verne /Pomona Represenrativc, Dr. Gary L. Woods, Vme Pres;dew Azusa /Covina(Glendora /lrwindalc Repm,cnrznve Dr. Pamcia [lasinnc�n, OM/Secretaty GtendoraiAnsa /San Dlrnns Represenrative Mrs. Joanne Moorgomery, Merrrber MonroviaBradburp/Duanc Reprearnrariae Dr. Edward C Oadl, Member Duacrt'Arcadia /Azusa(Nlourovix Represenra nve Nis_ Karm Ponce, Sladeut Reyreserrlat,ve De C;rroidine i \1. Perri, Superinievdent /}'rzsidenl 1 am writing this letter of referral to thank your company, KASA Construction Inc., for the due diligence and dedication in successfully completing the Campus Safety Landscape Project located at Citrus Community College, 1000 West Foothill Boulevard, Glendora, CA 91741. KASA Construction worked well within an active campus setting and construction activity. Product deliveries were coordinated in a manner which was supportive of ongoing campus business, I have also been pleased with your approach which constantly recognizes the College's best interest. KASA Construction provided a safe and clean environment when working on campus and when students were present. The project was completed on time. We would not hesitate to refer KASA Construction to other agencies. Your team has remained positive and pro - active throughout our association in this project administratively and in the field. It has been a pleasure to work with your team on this project and we look forward in working with KASA in the future. Sincerely, i Ro °rt J. Bradshaw Construction Program Manager Citrus College RJB1a row West Foorhill Bouteeord Glendora, CA g17V -1549 TEL: 6 i 6.96q.o 3 www.c a rusco l l ege. e d u City of V illa a Saaliago l3atJe.zard kalfaAark f altfikrtttu Y?86l- 41N z- >lfupatfi.au - g ( 99's -1500 » Fur. (%TI, �9Y- I?t7,' February 23, 2011 KASA Construction 316 North Corona Ave. Ontario, CA 91764 Subject: Letter of Recommendation;Taft Ave. Median Project and Lemon Street Trail and Median Project To Whom It May Concern: KASA Construction has completed the subject projects in the City of Villa Park. KASA completed the projects in a most satisfactory way. The work was done in the time flame allowed even thought we experienced rain delays. The staff from KASA was very responsive,replying to our requests on a same day basis. The field team was great to work with and kept the job sites in a very clean and safe condition. I am pleased with the final proect results and we have received many compliments from residents in the co ummity.l would certainly recommend KASA for future projects. Very truly yours t. Joe O'Neil P.E. City Engineer City of Villa Park %k RICHARD t- C.M1d[3Ct, Wy-k)r ^ t3lZA1 RH YNvor Pro Toll ROP I RI i A1111A �h. Coi!nc[Ir,wn)?er > s} B 11.. MhicAL( f+' Ii.4" t ouuc 1 If�Icf, • IIFI10RAI-I VAUI Y, t, euet -.il mor,,ibre C I T Y O F ONTARIO RECREATION / COMMUNITY SERVICES DEPARTMENT PAULS.LEON MAYOR JIM W. BOWMAN MAYOR PRO TEM ALAN D. WAPNER DEBRA DORST - PORADA PAUL VINCENT AVILA COUNCILMEMBERS December 18, 2012 Mark Chase 1265 S. Palmetto Ave. Ontario, CA 91762 Sam Kasbar Kasa Construction 316 N. Corona Ave. Ontario, CA 91764 Dear Sam Kasbar, CHRIS HUGHES CITY MANAGM MARY E. WIRTES, MMC CITY CLERK JAMES R. MILHISER TREASURER MARKCHASE COMMUNITY & PUBLIC SERVICES DIRECTOR On behalf of the City of Ontario's Recreation & Community Services Department, I would like to extend my most sincere thanks for your contribution to our 5K Reindeer Run and Rudolf s Dash. This year's event was a grand success resulting in over 1,000 participants and spectators attending. All attendees were able to see Kasa Construction on all sponsorship promotional materials and banner and know the great support your business gives to such a worthwhile community event. As you know your funds went to the Ontario - Montclair Schools Foundation (OMSF) to help the Promise Scholars Program. Your donation will go a long way to ensure that the children of lower income families will have equal footing in applying and attending colleges and post - secondary education institutions. Thank you again for your generous contribution, The City of Ontario Recreation and Community Services Department is happy and fortunate to have such a worthwhile relationship with Kasa Construction and we look forward to a continued future partnership. Sincerely, Mark Chase City of Ontario Community and Public Services Director 1265 SOUTH PALMETTO AVENUE • ONTARIO, CALIFORNIA 91762 -4996 • (909) 395 -2020 • FAX: (909) 395 -3671 ® Printed on recVded paper. 7 i i 2 �k�tlN City Of SANTA CLARITA 23920 Valencia Boulevard + Suim 300 • S=a Coma, Caldomia 913552196 Phone (661) 259 -2489 • FAX; (661) 2D9 -8125 wunmsantmdarita. corn January 4, 2011 KASA Construction 316 North Corona Avenue Ontario, CA 91.764 Subject: Utter of Recommendation; Valencia Industrial Center Median Improvements, Project 131008 To Whom It May Concern: On behalf of the City of Santa Clarita, we would like to thank KASA Construction for their exemplary performance in completing the Valencia Industrial Center Median Improvements, Project B 1008, located on Avenue Stanford and Avenue Scott. KASA Construction completed this project with diligence and commitment, maintaining the highest level of professionalism, attention to detail, and work ethic. The project management team always kept the City's best interests in mind and if a problem or issue were to arise, KASA Construction always resolved it in a quick and efficient manner. KASA Construction's scheduling and coordination was extremely smooth, which was further perpetuated by their closely- monitored traffic control and safety precautions. They maintained an excellent relationship with the City inspection team, and kept the job running in a compliant and organized fashion, In many instances, KASA Construction went beyond the City's expectations in order to assure that the project was delivered at the highest standard possible. The City could not be more pleased with the final project result. It has been a pleasure working with KASA Construction and we would not hesitate to recommend their outstanding services. We would like to express our gratitude for ajob well done and look forward to working together again soon. Sincerely. Francisco J. Lujan Project Manager FJ L:dp S IM M rc.ummenCatioe In dc., cc- Curtis L- Nay, Assistant City Engineer Harry Corder, Senior Engineer yn NCe a - ti C I `I' 1' 0 P NCE N 9 Gp _.____.. _.._..__ ........ ....._- --•— - oevr P PUBLIC WORKS DEPARTMENT Hobert J. Beste Public Works Director September 6, 2011 KASA Construction Inc. i 16 N. Corona Avenue Ontario, CA 91764 Project; Median Island Improvements for the Beautification of Western Avenue from 190` Street to Carson Street 'ro Whom It May Concern: KASA Construction Inc. completed the above project in a timely manner and within the budgeted amount. KASA's staff showed experience and professionalism in their work, The work also involved lane closures on Cahrans right -of -way. KASA's staff tirllowed the Traffic Control Plans and worked closely With the Celtrans inspector and personnel from other utility companies.- I am glad to say that there were no incidents throughout the project. KASA's foremast and superintenilent were easy to work with and made sure that the job site was clean and secure at the end of each working day. I am pleased Willi the finished product, and I am glad to recommend KASA Construction for future projects. _.. f 'r /John C. Dettle, P.B. Project Manager , ill = ]ieiELle2in' -:Prry iris 201]iWeirem Ave Iaadsr clCott pandenceII..euer ofRecommcndaddn CA r Y 01 MURR11- 1. September 12, 2011 KASA Construction 316 North Corona Avenue Ontario, CA 91764 Subject: Letter of Recommendation; Torrey P nes Park Project 1C- 40109GP7343 To Whom It May Concern: On behalf of the City of Murrieta, we would like to thank KASA Construction for their exemplary performance in completing the Torrey Pines Park Project, 410- 40109GP7343. KASA Construction completed this project with diligence and commitment, maintaining the highest !eve, of professionalism, attention to detail, and work ethic. The project management team always kept the City's best interest in mind and if a problem or issue arose, KASA Construction always resolved it ir: a quick and efficient manner. KASA Construction's scheduling and coordination was extremely smooth. They maintained an excellent relationship with the City inspection team and kept the job running in a compliant and organized fashion. In many instances, KASA Construction went beyond the City's expectations in order to assure that the project was delivered at the highest standard possible. The City of Murrieta could not be more pleased with the final project result! It has been a pleasure working with KASA Construction and we would not hesitate to recommend their outstanding services. We would like to express our gratitude for a job well done and look forward to working toget`:er again in the future. 6 I r' Sincer I , tt Jeff Cadien Project Manager 1i J Town Souarc, 24601 Jefferson Avenue • Murricia, California 9262 phone: 951..304 -CI ti (2 89) - [ax 951.698.4509 web: murricra_org f PA8 Fe` OF. P�S'�O k* ``OR�YED ^�6y DEPARTMENT Or PUBLIC WORKS I n ty 24, 2012 To Whom It May Concern: Kasa. Construction In July 2012, Kasa Construction completed work on the Improvements of Oak Grove Drive from Foothill Boulevard to Berkshire place in the Cities of La Canada Flintridge and Pasadena Ca. This was an $282,000 Project that included both major sheet rehabilitation, and landscaping betterments. The project is on the frontage of the La Canada Flintridge High School, and the street serves as the primary access for.let propulsion Laboratory, which has around 20,000 employees. Kasa's performance on this project was excellent and the project looks great. Kasa's staff was responsive and Flexible. Kasa worked hard to keep the project on schedule and to mitigate the impact on the school and on JPL. In addition Kasa's experienced Staff was helpful in resolving typical construction problems such as changed conditions and interpretation and implementation of the Plans. Kasa Construction and the City of Pasadena were able to work out contract problems, such as changes in scope of work in an open, fair, and expeditious manner. The City of Pasadena would be happy to work with Kasa Construction on any future project. Please feel free to call me at for verbal confirmation of reference. Robert Gardner Resident Engineer Department of Public Works City of Pasadena Ph. 626- 744 -4643 Fax 626- 744 -3823 bgardn er@c,Osadena,ca.is 100 Nofth Carfteld Avenue • P.O. Box 7119 - Pasadena, CA 91109-7215 (626 744 -4 1,91