As a part of the City's Fiscal Year 2013 -14 Capital Improvement Program, the City
Council approved the "Mission Drive Resurfacing Project, Phase II." The project
consists of asphalt concrete overlay and reconstruction of road pavement, and repairs
to damaged sidewalk, curb and gutter along Mission Drive from Rosemead Boulevard to
Valley Boulevard. This is a continuation of the resurfacing of Mission Drive that began in
Fiscal Year 2012 -13 when the street was resurfaced from the West City Limit to
Rosemead Boulevard. This project is being funded through Measure R funds.
Staff Recommendation
It is recommended that the City Council:
1. Approve the plans and specifications for the Mission Drive Resurfacing Project,
Phase II; and,
2. Authorize the City Manager to enter into a contract with Gentry Brothers, Inc. in
the amount of $467,526.00. In addition, authorize an amount of $70,128.90
(15 %) as a contingency to cover the cost of unforeseen construction expenses.
DISCUSSION
Mission Drive is an east -west collector road that is approximately 80 feet wide. This
street carries heavy vehicular traffic, including trucks, and has deteriorated over time
due to its heavy use. In Fiscal Year 2012 -13, the western portion of Mission Drive, from
the West City Limit to Rosemead Boulevard, was resurfaced. The continuation of this
project to the eastern end of the street will result in the complete resurfacing of Mission
Drive which greatly improves its condition and extends its useful life.
A Notice Inviting Bids was published in local newspapers and trade publications on May
2 May 9 and May 16 2013. At 11:00 a.m. on May 22, 2013, the City Clerk publicly
opened and read nine (9) sealed bids with the following result:
ITEM NO. ;Z�
City Council Meeting
May 28, 2013
Page 2 of 3
Rank
Bidder
Location
Base Bid
Bid Amount
Amount
with Alte
1
Gentry Brothers, Inc.
Irwindale, CA
$397,166.00
$467,526.00
2
Sully - Miller Contracting Co.
Brea, CA
$419,100.00
$471,500.00
3
Silvia Construction, Inc.
Rancho Cucamonga, CA
$427,850.00
$494,250.00
4
All American Asphalt, Inc.
Corona, CA
$432,000.00
$491,440.00
5
Sequel Contractors, Inc.
Santa Fe Springs, CA
$444,362.00
$524,962.00
6
E.C. Construction
South El Monte, CA
$455,229.61
$509,454.41
7
Hardy & Harper, Inc.
Santa Ana, CA
$464,000.00
$573,000.00
8
Excel Paving Company
Long Beach, CA
$501,077.00
$608,877.00
9
Vido Samarzich, Inc.
Alta Loma, CA
$593,679.00
$681,879.00
Staff has reviewed the bid documents for completeness and investigated the
contractor's background and recent projects for competency. Staff believes that Gentry
Brothers, Inc. is the lowest responsive bidder and is qualified to complete the work as
specified for this project. Gentry Brothers, Inc. has completed similar public works
project for many local agencies, including the Cities of Claremont, Covina, and LaVerne.
It is recommended that the award include the Base Bid as well as Alternates 1 & 2.
Alternate 1 includes streetscape and fencing improvements adjacent to the project area.
Alternate 2 includes a storm drain improvement to Mission Drive that will increase
drainage capacities and prevent pavement deterioration from storm water.
FINANCIAL REVIEW
This project was included in the Fiscal Year 2012 -13 Capital Improvement Program.
The budget for this project is $650,000.00 and is funded entirely through Measure R
Proceeds. Measure R is a county -wide one half percent sales tax to fund transportation
projects. The total appropriation needed to award the contract is approximately
$538,000.00.
ENVIRONMENTAL REVIEW
This project is categorically exempt from the California Environmental Quality Act
(CEQA) pursuant to Section 15301 (C) of the CEQA Implementing Guidelines.
PUBLIC NOTICE PROCESS
This item has been noticed through the regular agenda notification process.
Prepared By:
Rafael Fajardo
Associate Civil Engineer
Prepared By:
6eWSullivan
Management Analyst
City Council Meeting
May 28, 2013
Page 3 of 3
Submitted By:
Chris Marcarello
Director of Public Works
Attachments:
A. Plans and Specifications (Available in the City Clerk's Office)
B. Bid Analysis
PUBLIC WORKS
CITY OF ROSEMEAD
MISSION DRIVE STREET RESURFACING PROJECT, PHASE II
PROJECTNUMBER: 21015
BID ANALYSIS
BID SUBMITTAL: MAY 22, 2013
GENTRY BROTHERS, INC.
BASE BID PRICE
IH
0523/2013
PAGE 7
ITEM
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL
1
CLEARING AND GRUBBING PER PLANS /SPECS.
1.00
LS
34,000.00
$ 34,000.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
1,000.00
$ 1,000.00
3
COLD MILL 2" EXISTING PAVEMENT
183,700.00
SF
0.15
$ 27,555.00
4
CONSTRUCT I.5" THICK PAVEMENT OVERLAY
1,653.00
TONS
79.00
$ 130,587.00
5
CONSTRUCT 1.0" ASPHALTIC LEVELING COURSE Di
1,102.00
TONS
66.00
$ 72,732.00
6
REMOVE 6" EXISTING PAVEMENT REPLACE WITH 3.5' OF AC B
PG 64 -10 BASE COURSE OVER NATIVE COMPACTED
500.00
SF
6.00
$ 3,000.00
7
REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK
7,778.00
SF
4.00
$ 31,112.00
8
REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY
APPROACES
2,270.00
SF
5.00
$ 11,350.00
9
IREMOVE, DISPOSE, CONSTRUCT 8" CURB / 24" GUTTER
592.00
LF
30.00
$ 17,760.00
10
REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS
5.00
EA
1,800.00
$ 9,000.00
11
ADJUST SEWER MANHOLE TO GRADE
29.00
EA
300.00
$ 8,700.00
12
ADJUST WATER AND GAS VALVES TO GRADE
3200 .
EA
20.00
$ 640.00
13
INSTALL SURVEY WELL MONUMENT (CITY FURNISHED)
5.00
EA
450.00
$ 2,250.00
14
INSTALL TRAFFIC STRIPING, SIGNAL LOOPS, AND PAVEMENT
MARKERS, INCLUDING 8" RAISED PAVEMENT MARKERS
1.00
LS
45,000.00
$ 45,000.00
15
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP)
1.00
LS
1,500.00
$ 1,500.00
16
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
EXISTING POLES, CITY PROVIDED SIGNS
6.00
EA
90.00
$ 540.00
17
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
NEW POLES, CITY PROVIDED SIGNS
2.00
EA
220.00
$ 440.00
TOTAL BASE BID PRICE
$ 397,166.00
ALTERNATEI
ALT 1
INSTALL WROUGHT IRON FENCE
320.00
LF
110.00
$ 36,200.00
ALTERNATE
ALT 2
INSTALL STORM DRAIN PER PLANS AND SPECIFICATIONS
1.00
LS
35,160.00
$ 35,160.00
TOTAL BASE BID + ALT 1 + ALT 2
$ 467,526.00
0523/2013
PAGE 7
PUBLIC WORKS
SULLY - MILLER CONTRACTING, CO.
BASE BID PRICE
#2
05232013
PAGE 2
ITEM
DESCRIPTION
CITY
UNIT
UNIT PRICE
TOTAL
1
CLEARING AND GRUBBING PER PLANSISPECS.
1.00
LS
9,940.00
$ 9,940.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
5,000.00
$ 5,000.00
3
COLD MILL 2" EXISTING PAVEMENT
183,700.00
SF
0.12
$ 22,044.00
4
CONSTRUCT I.5" THICK PAVEMENT OVERLAY
1,653.00
TONS
85.00
$ 140,505.00
5
CONSTRUCT 1.0" ASPHALTIC LEVELING COURSE D1
1,102.00
TONS
76.00
$ 63,752.00
6
REMOVE 6" EXISTING PAVEMENT REPLACE WITH 3.5' OF AC B-
PG 64 -10 BASE COURSE OVER NATIVE COMPACTED
500.00
SF
9.001
$ 4,500.00
7
REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK
7,778.00
SF
4.50
$ 35,001.00
8
REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY
APPROACES
2,270.00
SF
11,350.00
9
REMOVE, DISPOSE, CONSTRUCT 8" CURB 124" GUTTER
592.00
LF
17,168.00
10
REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS
5.00
EA
$ 10,500.00
11
ADJUST SEWER MANHOLE TO GRADE
29.00
EA
17,400.00
12
ADJUST WATER AND GAS VALVES TO GRADE
32.00
EA
4500.00
3,200.00
13
INSTALL SURVEY WELL MONUMENT (CITY FURNISHED)
5.00
EA
$ 5,000.00
14
INSTALL TRAFFIC STRIPING, SIGNAL LOOPS, AND PAVEMENT
MARKERS, INCLUDING 8" RAISED PAVEMENT MARKERS
1.00
LS
48,500.00
15
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP)
1.00
LS
3,700.00
$ 3,700.00
16
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
EXISTING POLES, CITY PROVIDED SIGNS
6.00
EA
165.00
$ 990.00
17
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
NEW POLES, CITY PROVIDED SIGNS
2.00
EA
275.00
$ 550.00
TOTAL BASE BID PRICE
$ 419,100.00
ALTERNATEI
ALT 1
INSTALL WROUGHT IRON FENCE
320.00
LF
95.00
$ 30,400.00
ALTERNATE
ALT 2
INSTALL STORM DRAIN PER PLANS AND SPECIFICATIONS
1.00
LS
22,000.00
$ 22,000.00
TOTAL BASE BID + ALT 1 + ALT 2
$ 471,500.00
05232013
PAGE 2
PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION
SILVIA CONSTRUCTION, INC.
BASE BID PRICE
#3
0523/2013
PAGE 3
ITEM
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL
1
CLEARING AND GRUBBING PER PLANS /SPECS.
1.00
LS
11,000.00
$ 11,000.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
6,168.00
$ 6,188.00
3
COLD MILL 2" EXISTING PAVEMENT
183,700.00
SF
0.15
$ 27,555.00
4
CONSTRUCT I.5" THICK PAVEMENT OVERLAY
1,653.00
TONS
8100
$ 135,546.00
5
CONSTRUCT 1.0" ASPHALTIC LEVELING COURSE Dl
1,102.00
TONS
70.50
$ 77,691.00
6
REMOVE 6" EXISTING PAVEMENT REPLACE WITH 3.5' OF AC B
PG 64 -10 BASE COURSE OVER NATIVE COMPACTED
500.00
SF
5.701
$ 2,050.00
7
REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK
7,778.00
SF
4.90
$ 38,112.20
8
REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY
APPROACES
2,270.00
SF
7.10
$ 16,117.00
9
REMOVE, DISPOSE, CONSTRUCT 8" CURB 124" GUTTER
592.00
LF
51.90
$ 30,724.80
10
REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS
5.00
EA
2,250.00
$ 11,250.00
11
ADJUST SEWER MANHOLE TO GRADE
29.00
EA
567.00
$ 16,443.00
12
JADJUST WATER AND GAS VALVES TO GRADE
32.00
EA
80.00
$ 2,560.00
13
INSTALL SURVEY WELL MONUMENT (CITY FURNISHED)
5.00
EA
707.00
$ 3,53S.00
14
INSTALL TRAFFIC STRIPING, SIGNAL LOOPS, AND PAVEMENT
MARKERS, INCLUDING 8" RAISED PAVEMENT MARKERS
1.00
LS
43,600.00
$ 43,600.00
15
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP)
1.00
LS
3,800.00
$ 3,800.00
16
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
EXISTING POLES, CITY PROVIDED SIGNS
6.00
EA
83.00
$ 498.00
17
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
NEW POLES, CITY PROVIDED SIGNS
2.00
EA
190.00
S 380.00
TOTAL BASE BID PRICE
$ 427,860.00
ALTERNATEI
ALT 1
INSTALL WROUGHT IRON FENCE
320.00
LF
90.00
$ 28,800.00
ALTERNATE
ALT 2
INSTALL STORM DRAIN PER PLANS AND SPECIFICATIONS
1.00
LS
37,600.00
$ 37,600.00
TOTAL BASE BID + ALT 1 + ALT 2
$ 494,256.00
0523/2013
PAGE 3
PUBLIC WORKS
ALL AMERICAN ASPHALT, INC
BASE BID PRICE
#4
0&232013
PAGE4
ITEM
DESCRIPTION
CITY
UNIT
UNIT PRICE
TOTAL
1
CLEARING AND GRUBBING PER PLANS /SPECS.
1.00
LS
20,313.80
$ 20,313.80
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
4,000.00
$ 4,000.00
3
COLD MILL 2" EXISTING PAVEMENT
183,700.00
SF
0.07
$ 12,859.00
4
CONSTRUCT I.5" THICK PAVEMENT OVERLAY
1,653.00
TONS
83.50
$ 138,025.50
5
CONSTRUCT 1.0" ASPHALTIC LEVELING COURSE D7
1,102.00
TONS
74.00
4 81,540.00
6
REMOVE 6" EXISTING PAVEMENT REPLACE WITH 3.5" OF AC B
PG 64-10 BASE COURSE OVER NATIVE COMPACTED
500.00
SF
5.50
$ 2,750.00
7
REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK
7,778.00
SF
6.40
$ 49,779.20
8
REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY
APPROACES
2,270.00
SF
8.55
$ 79,408.50
9
REMOVE, DISPOSE, CONSTRUCT 8" CURB / 24" GUTTER
592.00
LF
68.00
$ 40,256.00
70
REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS
5.00
EA
2,100.00
$ 10,500.00
11
ADJUST SEWER MANHOLE TO GRADE
29.00
EA
325.00
$ 9,425.00
12
ADJUST WATER AND GAS VALVES TO GRADE
32.00
EA
35.00
V 1,120.00
13
INSTALL SURVEY WELL MONUMENT (CITY FURNISHED)
5.00
EA
525.00
$ 2,625.00
14
INSTALL TRAFFIC STRIPING, SIGNAL LOOPS, AND PAVEMENT
MARKERS, INCLUDING 8" RAISED PAVEMENT MARKERS
1.00
LS
35,000.00
$ 35,000.00
15
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP)
1.00
LS
3,500.00
$ 3,500.00
16
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
EXISTING POLES, CITY PROVIDED SIGNS
6.00
EA
85.00
$ 510.00
17
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
NEW POLES, CITY PROVIDED SIGNS
2.00
EA
190.00
$ 380.00
TOTAL BASE BID PRICE
$ 432,000.00
ALTERNATE?
ALT1
INSTALL WROUGHT IRON FENCE
320.00
LF
92.00
$ 29,440.00
ALTERNATE 2
ALT
INSTALL STORM DRAIN PER PLANS AND SPECIFICATIONS
1.00
LS
30,000.00
$ 30,000.00
TOTAL BASE BID +ALT 1 +ALT 2
$ 491,440.00
0&232013
PAGE4
PUBLIC WORKS
SEQUEL CONTRACTORS, INC.
BASE BID PRICE
96
0523/2013
PAGE 5
ITEM
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL
1
CLEARING AND GRUBBING PER PLANS /SPECS.
1.00
LS
25,000.00
$ 25,000.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
29,000.00
$ 29,000.00
3
COLD MILL 2" EXISTING PAVEMENT
183,700.00
SF
0.15
$ 27,555.00
4
CONSTRUCT I.5" THICK PAVEMENT OVERLAY
1,653.00
TONS
79.00
$ 130,587.00
5
CONSTRUCT 1.0 ASPHALTIC LEVELING COURSE Di
1,102.00
TONS
70.00
$ 77,140.00
6
REMOVE 6" EXISTING PAVEMENT REPLACE WITH 3.5' OF AC
PG 64 -10 BASE COURSE OVER NATIVE COMPACTED
500.00
SF
8.00
$ 4,000.00
7
REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK
7,778.00
SF
5.00
$ 38,890.00
0
REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY
APPROACES
2,270.00
SF
8.00
$ 18,160.00
9
REMOVE, DISPOSE, CONSTRUCT 8" CURB 124" GUTTER
592.00
LF
40.00
$ 23,680.00
10
REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS
5.00
EA
3,500.00
$ 17,500.00
11
ADJUST SEWER MANHOLE TO GRADE
29.00
EA
150.00
$ 4,350.00
12
ADJUST WATER AND GAS VALVES TO GRADE
32.00
EA
100.00
$ 3,200.00
13
INSTALL SURVEY WELL MONUMENT (CITY FURNISHED)
5.00
EA
500.00
$ 2,500.00
14
INSTALL TRAFFIC STRIPING, SIGNAL LOOPS, AND PAVEMENT
MARKERS, INCLUDING 8" RAISED PAVEMENT MARKERS
1.00
LS
40,000.00
$ 40,000.00
15
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP)
1.00
LS
2,000.00
$ 2,000.00
16
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
EXISTING POLES, CITY PROVIDED SIGNS
6.00
EA
100.00
$ 600.00
17
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
NEW POLES, CITY PROVIDED SIGNS
2.00
EA
100.00
$ 200.00
TOTAL BASE BID PRICE
$ 444,362.00
ALTERNATEI
ALT 1
INSTALL WROUGHT IRON FENCE
320.00
LF
80.00
$ 25
ALTERNATE
ALT 2
INSTALL STORM DRAIN PER PLANS AND SPECIFICATIONS
1.00
LS
55,000.00
$ 55,000.00
TOTAL BASE BID + ALT I + ALT 2
$ 524,962.00
0523/2013
PAGE 5
PUBLIC WORKS SERVICE DEPARTMENPIFNGINEERING DIVISION 05
E.C. CONSTRUCTION
BASE BID PRICE
#6
PAGE 6
ITEM
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL
1
CLEARING AND GRUBBING PER PLANSISPECS.
1.00
LS
12,000.00
$ 12,000.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
3,500.00
$ 3,500.00
3
COLD MILL 2" EXISTING PAVEMENT
183,700.00
SF
0.22
$ 40,414.00
4
CONSTRUCT I.5" THICK PAVEMENT OVERLAY
1,653.00
TONS
93.25
$ 154,142.25
5
CONSTRUCT 1.0" ASPHALTIC LEVELING COURSE D1
1,102.00
TONS
72.95
$ 80,390.90
6
REMOVE 6" EXISTING PAVEMENT REPLACE WITH 3.5" OF AC B
PG 64-10 BASE COURSE OVER NATIVE COMPACTED
500.00
SF
10.81
$ 5,405.00
7
REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK
7,778.00
SF
3.75
$ 29,167.50
8
REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY
APPROACES
2,270.00
SF
6.00
$ 13,620.00
9
REMOVE, DISPOSE, CONSTRUCT 8" CURB 124" GUTTER
592.00
LF
60.00
$ 35,520.00
10
REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS
5.00
EA
2,800.00
$ 14,000.00
11
ADJUSTSEWER MANHOLE TO GRADE
29.00
EA
307.24
$ 8,909.96
12
ADJUST WATER AND GAS VALVES TO GRADE
32.00
EA
75.00
$ 2,400.00
13
INSTALL SURVEY WELL MONUMENT (CITY FURNISHED)
5.00
EA
810.00
$ 4,050.00
14
INSTALL TRAFFIC STRIPING, SIGNAL LOOPS, AND PAVEMENT
MARKERS, INCLUDING e" RAISED PAVEMENT MARKERS
1.00
LS
47,260.00
$ 47,260.00
15
PREPARE STORM WATER POLLUTION PREVENTION PLAN
(SWPPP)
1.00
LS
3,500.00
$ 3,500.00
16
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
EXISTING POLES, CITY PROVIDED SIGNS
6.00
EA
90.00
$ 540.00
17
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
NEW POLES, CITY PROVIDED SIGNS
2.00
EA
205.00
$ 410.00
TOTAL BASE BID PRICE
$ 466,229.61
ALTERNATEI
ALT 1
INSTALL WROUGHT IRON FENCE
320.00
LF
69.14
$ 22,124.80
ALTERNATE
ALT 2
INSTALL STORM DRAIN PER PLANS AND SPECIFICATIONS
1.00
LS
32,100.00
$ 32,100.00
TOTAL BASE BID + ALT I + ALT 2
$ 509,454.41
PAGE 6
PUBLIC WORKS SERVICE DEPARTMENTiENGINEERING DIVISION
HARDY & HARPER, INC.
BASE BID PRICE
#7
0523/2013
PAGE 7
ITEM
DESCRIPTION
CITY
UNIT
UNIT PRICE
TOTAL
1
CLEARING AND GRUBBING PER PLANS /SPECS,
1.00
LS
35,000.00
$ 35,000.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
3,000.00
$ 3,000.00
3
COLD MILL 2 EXISTING PAVEMENT
183,700.00
SF
0.13
$ 23,881.00
4
CONSTRUCT I.5" THICK PAVEMENT OVERLAY
1,653.00
TONS
83.00
$ 137,199.00
5
CONSTRUCT 1.0" ASPHALTIC LEVELING COURSE D7
1,102.00
TONS
74.00
$ 81,548.00
6
REMOVE 6" EXISTING PAVEMENT REPLACE WITH 3.5' OF AC B
PG 64 -10 BASE COURSE OVER NATIVE COMPACTED
500.00
SF
6.00
$ 3,000.00
7
REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK
7,778.00
SF
5.78
$ 44,956.84
8
REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY
APPROACES
2,270.00
SF
1 8.76
$ 19,885.20
9
REMOVE, DISPOSE, CONSTRUCT 8" CURB 124" GUTTER
592.00
LF
52.00
$ 30,784.00
10
REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS
5.00
EA
2,300.00
$ 11,500.00
11
ADJUST SEWER MANHOLE TOGRADE
29.00
EA
550.00
$ 75,950.00
12
ADJUST WATER AND GAS VALVES TO GRADE
32.00
EA
100.00
$ 3,200.00
13
INSTALL SURVEY WELL MONUMENT (CITY FURNISHED)
5.00
EA
800.00
$ 4,000.00
14
INSTALL TRAFFIC STRIPING, SIGNAL LOOPS, AND PAVEMENT
MARKERS, INCLUDING 8" RAISED PAVEMENT MARKERS
1.00
LS
47,185.96
$ 47,185.96
75
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP)
1.00
LS
2,000.00
$ 2,000.00
16
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
EXISTING POLES, CITY PROVIDED SIGNS
6.00
EA
85.00
$ 510.00
17
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
NEW POLES, CITY PROVIDED SIGNS
2.00
EA
200.00
$ 400.00
TOTAL BASE BID PRICE
$ 464,000.00
ALTERNATE?
ALT 1
INSTALL WROUGHT IRON FENCE
320.00
LF
200.00
$ 64,000.00
ALTERNATE2
ALT 2
INSTALL STORM DRAIN PER PLANS AND SPECIFICATIONS
1.00
LS
45,000.00
$ 45,000.00
TOTAL BASE BID + ALT ? + ALT 2
$ 573,000.00
0523/2013
PAGE 7
PUBLIC WORKS
EXCEL PAVING COMPANY
BASE BID PRICE
N8
05232013
PAGEB
ITEM
DESCRIPTION
CITY
UNIT
UNIT PRICE
TOTAL
1
CLEARING AND GRUBBING PER PLANS /SPECS.
1.00
LS
17,101.00
$ 17,101.00
2
DISPOSAL OF WASTE MATERIALS
1.00
LS
2,200.00
$ 2,200.00
3
COLD MILL 2" EXISTING PAVEMENT
183,700.00
SF
0.20
$ 36,740.00
4
CONSTRUCT I.5" THICK PAVEMENT OVERLAY
1,653.00
TONS
92.00
$ 152,076.00
5
CONSTRUCT 1.0" ASPHALTIC LEVELING COURSE D1
1,102.00
TONS
78.00
$ 85,956.00
6
REMOVE 6" EXISTING PAVEMENT REPLACE WITH 3.5' OF AC
PG 64 -10 BASE COURSE OVER NATIVE COMPACTED
500.00
SF
5.75
$ 2,875.00
7
REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK
7,778.00
SF
6.00
$ 46,668.00
8
REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY
APPROACES
2,270.00
SF
10.00
$ 22,700.00
9
REMOVE, DISPOSE, CONSTRUCT 8" CURB 124" GUTTER
592.00
LF
50.00
$ 29,600.00
10
REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS
5.00
EA
2,600.00
$ 13,000.00
11
ADJUST SEWER MANHOLE TO GRADE
29.00
EA
700.00
$ 20,300.00
12
ADJUST WATER AND GAS VALVES TO GRADE
32.00
EA
450.00
$ 14,400.00
13
INSTALL SURVEY WELL MONUMENT (CITY FURNISHED)
5.00
EA
450.00
$ 2,250.00
14
INSTALL TRAFFIC STRIPING, SIGNAL LOOPS, AND PAVEMENT
MARKERS, INCLUDING B" RAISED PAVEMENT MARKERS
1.00
LS
45,911.00
$ 45,911.00
15
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP)
1.00
LS
8,370.00
$ 8,370.00
16
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
EXISTING POLES, CITY PROVIDED SIGNS
6.00
EA
$ 528.00
17
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
NEW POLES, CITY PROVIDED SIGNS
2.00
EA
$ 402.00
6201.00
TOTAL BASE BID PRICE
$ 501,077.00
ALTERNATE1
ALT 1
INSTALL WROUGHT IRON FENCE
320.00
LF
$ 84,800.00
ALTERNATE2
ALT 2
INSTALL STORM DRAIN PER PLANS AND SPECIFICATIONS
1.00
LS
23,000.00
$ 23,000.00
TOTAL BASE BID + ALT 1 + ALT 2
$ 608,877.00
05232013
PAGEB
PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION
VIDO SAMARZICH, INC.
BASE BID PRICE
#9
05°132013
PAGE9
ITEM
DESCRIPTION
QTY
E
TOTAL
1
CLEARING AND GRUBBING PER PLANSISPECS,
1.00
0
$ 25,000 .00
2
DISPOSAL OF WASTE MATERIALS
1.00
00
$ 70,000.00
3
COLD MILL 2" EXISTING PAVEMENT
183,700.00
20
7SF6.001$
$ 36,740.00
4
CONSTRUCT 1.5" THICK PAVEMENT OVERLAY
1,653.00
00
$ 173,565.00
5
CONSTRUCT 1.0' ASPHALTIC LEVELING COURSE D1
1,102.00
00
$ 104,690.00
6
REMOVE 6" EXISTING PAVEMENT REPLACE WITH 3.S' OF AC B
PG 64 -10 BASE COURSE OVER NATIVE COMPACTED
500.00
.00
$ 3,000.00
7
REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK
7,778.00
SF
6.501
8 50,557.00
8
REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY
APPROACES
2,270.00
SF
8.50
$ 19,295.00
9
REMOVE, DISPOSE, CONSTRUCT 8" CURB 124" GUTTER
592.00
LF
46.00
$ 27,232.00
10
REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS
5.00
EA
3,200.00
$ 16,000.00
11
ADJUST SEWER MANHOLE TO GRADE
29.00
EA
700.00
$ 20,300.00
12
ADJUST WATER AND GAS VALVES TO GRADE
3200 .
EA
500.00
$ 16,000.00
13
INSTALL SURVEY WELL MONUMENT (CITY FURNISHED)
5.00
EA
1,500.00
$ 7,500.00
14
INSTALL TRAFFIC STRIPING, SIGNAL LOOPS, AND PAVEMENT
MARKERS, INCLUDING 8" RAISED PAVEMENT MARKERS
1.00
LS
75,000.00
$ 75,000.00
15
PREPARE A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP)
1.00
LS
5,000.00
$ 5,000.00
16
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
EXISTING POLES, CITY PROVIDED SIGNS
6.00
EA
300.00
$ 1,800.00
17
REMOVE, SALVAGE, AND INSTALL STREET NAME SIGNS ON
NEW POLES, CITY PROVIDED SIGNS
2.00
EA
1,000.00
$ 2,000.00
TOTAL BASE BID PRICE
$ 593,679.00
ALTERNATE?
ALT 1
INSTALL WROUGHT IRON FENCE
320.00
LF
135.00
$ 43,200.00
ALTERNATE
ALT 2
INSTALL STORM DRAIN PER PLANS AND SPECIFICATIONS
1.00
LS
45,000.00
$ 45,000.00
TOTAL BASE BID + ALT 1 - ALT 2
$ 681,879.00
05°132013