OB - Item 2F - Review of Project and Contract for Rosemead Park Improvement ProjectE M E 5 ° 4 ° ROSEMEAD SUCCESSOR AGENCY STAFF REPORT kAIXUTEO 10A TO: THE HONORABLE CHAIR AND BOARD MEMBERS FROM: MATTHEW HAWKESWORTH, ASSISTANT CITY MANAGER DATE: JUNE 12, 2013 SUBJECT: REVIEW OF PROJECT AND CONTRACT — ROSEMEAD PARK IMPROVEMENTS PROJECT SUMMARY As a part of July 2010 tax increment bond issuance by the former Redevelopment Agency, the City included funding for a project to renovate and improve the facilities at Rosemead Park. The bond issuance included approximately $280,000 for miscellaneous improvements at Rosemead Park, including new play equipment for the north playground, improvements to the parking lot and lighting, and removal and replacement of the existing basketball courts. This project will be completed in phases based on the varying components of the project. At this time, staff is ready to procure and install the new play equipment for the north playground and award contracts for design services for the basketball courts, parking lot and lighting enhancements. As a part of the basketball court improvements, staff will issue a purchase order for the procurement of new basketball standards to be installed during the construction phase. Finally, staff would like to award a construction contract for improvements to the north parking lot, which include removal of the existing boundary wall and replacement with landscape and removal of concrete from the parking lot medians to accommodate landscaping. Staff Recommendation It is recommended that the Oversight Board approve Resolution 2013 -08 confirming the contracts associated with the Rosemead Park Improvement Project. DISCUSSION Rosemead Park is an approximately 18 -acre park with amenities that include a recently reconstructed swimming pool, a half -mile walking or jogging t and three basketball courts. The proposed Rosemead Par k includes the renovation of many of the amenities that are widely on a daily basis. rail, three playgrounds, Improvement Project used by the community ITEM NO. 2-f -- Rosemead Successor Agency Oversight Board June 12, 2013 Paae 2 of 3 There are five components to the project at this time and a description and cost for each are included below: 1. Plavaround Equipment The existing playground at the north end of Rosemead Park, adjacent to the preschool was installed in the 1990s. Given its age, the equipment is in disrepair, no longer meets ADA standards, and the manufacturer no longer provides replacement parts. Additionally, the existing poured -in -place safety surfacing is ripped and is pulling away from the curb resulting in trip hazards. The current project includes the replacement of the playground with a new, ADA compliant system and a rubber mulch surface. In order to accommodate the preschool program, a 6' perimeter fence will be installed. The project will be completed by Miracle Playground (the local agent for Miracle Recreation Equipment Company, Inc.). Miracle is the sole source provider of all City of Rosemead playgrounds and provides all services under GSA pricing. The total cost for the Rosemead Park Playground project is $97,645.70. Contract Cost: $97,645.70. Requested Contingency: $9,764.57 (10 %) 2. Civil Engineering Design Services The basketball courts at Rosemead Park are used very heavily throughout the day and especially in the evening. Over time, the courts have deteriorated due to their age and heavy use. At this time, the basketball courts are in need of a complete removal and replacement due to their current condition. Additionally, throughout this project, the adjacent parking lot will receive some improvements including enhanced landscaping, a new slurry coat, and fresh striping. Staff proposes the award of a contract to CEJ Engineers, Inc., in the amount of $14,800.00, for the completion of civil engineering plans and construction documents for the removal and replacement of the basketball courts and parking lot improvements. The scope of work includes a topographic survey of the area and construction plans that include design, demolition, grading and drainage, and striping. Additionally, the engineer will provide complete plans, specifications, and a cost estimate for the project. Requests for proposals were sent to three engineering firms and a summary of the proposals is included as an attachment. Upon award of the contract, staff anticipates work to be completed in approximately 14 -21 days and intends on putting the project out for public bid in the month of July. Contract Cost: $14,800.00. Requested Contingency: $2,960.00 (20 %) 3. Electrical Engineering Design Services In addition to contracting for civil engineering services, there is a need to contract with an electrical engineering consultant to design the lighting upgrades for the parking lot and basketball court areas. CEG Engineering, Inc. has provided electrical design services to the City for a number of capital improvement projects and staff intends to execute a contract with them in the amount $3,800.00 for the electrical engineering design for this project. Contract Cost: $3,800.00. Requested Contingency: $760.00 (20 %) Rosemead Successor Agency Oversight Board June 12, 2013 Page 3 of 3 4. Basketball Court Systems As a part of the basketball court improvements, staff would like to procure new basketball standards to be installed during the construction phase. Staff has specified the Porter Heavy -Duty Basketball System, which is an in- ground system designed to weather a park setting, the elements, and extensive use. The same systems are currently in place on outdoor basketball courts at Rosemead High School. Staff received proposals from authorized porter distributors and desires to execute a purchase order with Buddy's All Stars, Inc. Buddy's All Stars will furnish six of the heavy duty systems, for three courts, for the price of $2,090.00 each. The total for the six units, tax, and freight will not exceed $15,543.60. Contract Cost: $15,543.60. Requested Contingency: $1,554.36 (10 %) 5. Parking Lot Improvements, Phase 1 As a part of the parking lot improvements, a contractor will remove the existing wall that separates the parking lot from the street and prepare the area to be replaced with landscaping. Additionally, concrete will be removed from portions of the existing medians to accommodate landscaping. Staff received proposals from three construction companies for the work and intends to award a contract to CEM Construction in the amount of $14,980.00. A summary of the proposals is included as an attachment. Contract Cost: 14,980.00. Requested Contingency: $1,498.00 (10 %) FINANCIAL REVIEW This project will be funded entirely with tax increment bond proceeds and has a budget of $280,000.00. Current proposed expenditures represent less than 50% of the budget for the project. Staff estimated that the basketball court and parking lot improvements can be achieved with the remaining budgeted funds. PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process in accordance with the Brown Act. Submitted By: Matthew Hawkesworth Assistant City Manager Attachments: 1. Resolution 2013 -0008 2. Proposal for Playground Equipment 3. Proposal Summary for Civil Engineering Design Services 4. Proposal for Electrical Engineering 5. Proposal Summary for Basketball Standards 6. Proposal Summary for Parking Lot Wall Removal and Curb and Gutter RESOLUTION: 2013 -0008 A RESOLUTION OF THE OVERSIGHT BOARD FOR THE SUCCESSOR AGENCY TO THE ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION CONFIRMING THE SELECTION OF VARIOUS VENDORS FOR THE ROSEMEAD PARK IMPROVEMENT PROJECT WHEREAS, the Rosemead Successor Agency received the Finding of Completion on April 18, 2013 from the Department of Finance; and WHEREAS, the Finding Completion states that the Rosemead Successor Agency may utilize proceeds derived from bonds issued prior to January 1, 2011 in a manner consistent with the original bond covenants per Health and Safety Code section 34191.4(c); and WHEREAS, the Rosemead Successor Agency is holding approximately $7.1 million in bond proceeds derived from bonds issued prior to January 1, 2011 for Capital Improvement Projects identified in the bond covenants; and WHEREAS, the Rosemead Successor Agency will be required to provide oversight of the completion of the Capital Improvement Projects to ensure compliance with the bond covenants; and WHEREAS, the approved Capital Improvement Projects have been included on each Recognized Obligation Payment Schedule filed by the Rosemead Successor Agency; and NOW THEREFORE, THE OVERSIGHT BOARD FOR THE SUCCESSOR AGENCY TO ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION HEREBY RESOLVES: The Rosemead Successor Agency Oversight Board confirms the following award of contracts to the following vendors for the Rosemead Park Improvement Project: a. Miracle Playground - $107,410.27 b. CEJ Engineers - $17,760.00 c. CEG Engineering - $4,560.00 d. Buddy's All Stars - $17,097.96 e. CEM Construction - $16,478.00 2. The contracts with these vendors will not exceed the price listed above. If any contract amendments are required in excess of these amounts, all such changes shall be brought back to the Oversight Board for review and approval. 3. Successor Agency staff is directed to submit documents to the Department of Finance as necessary, including an amended Recognized Obligation Payment Schedule. 4. Successor Agency staff is directed to provide a copy of this Resolution to the County Auditor - Controller, the State Controller's Office and the State Department of Finance. PASSED, APPROVED AND ADOPTED this 12th day of June 2013. Pat Wallach Chairperson ATTEST: Matthew E. Hawkesworth Successor Agency Staff Assistant City Manager I HEREBY CERTIFY that the above and foregoing resolution was duly passed and adopted by the Oversight Board for the Successor Agency to the Rosemead Community Development Commission at its special meeting held on the 12th day of June 2013, by the following vote, to wit: AYES: NOES: ABSENT: ABSTAINED: Matthew E. Hawkesworth Successor Agency Staff Assistant City Manager 4 Miracle Miracle Recreation Equipment Co 9106 Pulsar Ct #C Corona, CA 92883 Phone #800- 264 -7225 Fax# 877- 215 -3869 QUOTATION Date Estimate # 5/29/2013 2013 -2153 E -mail sales @miracleplayground.com Web Sitevww.miracle- recreation.com Name / Address ALL PURCHASE ORDERS City of Rosemead MUST HAVE THIS ADDRESS: 8445 Solution Center Chicago IL 60677 -8004 Project Terms Rep FOB Rosemead Park - North Net 30 Rob Factory Item Description Qty Rate Total Miracle KC Play System 1 26,360.10 26,360.10T Ages 2-12 Top -view attached Miracle 3.5" OD Arch Swing with 4 Belt Seats and 2 Tot Seats 1 2,314.55 2,314.55T Miracle ATV Spring Rider 1 840.65 840.65T Miracle Saddle Seat 460.70 460.70T Freight Commercial Freight 4,055.37 4,055.37 Rubber Su... International Mulch Company- NuPlay 75 Cu. Ft. - Redwood Color 30 579.15 17,374.50T Freight Commercial Freight 1 1,374.00 1,374.00 Installation ORTCO SITE WORK AND INSTALLATION INCLUDES: 1 40,604.28 40,604.28 This Quote is Valid for 30 Days Subtotal This quote shall not become bindng until signed and delivered by both customer Sales Tax (9.0%) and Miracle Recreation "Miracle ". To submit this offer, please sign and forward a complete copy of this quote via fax to 877 - 215 -3869 or email sales @miracleplayground.com. Total THIS QUOTE IS LIMITED TO AND GOVERNED BY THE TERMS CONTAINED HEREIN. Miracle objects to any other terms proposed by the customer In writing or otherwise, as matedaIs alterations, and all such proposed terms shall be void. Customer authorizes Miracle to ship the equipment and agrees to pay Miracle the total amount specified. Shipping terms are FOB the place of shipment via common carrier designated by Miracle. Payment terms are Net 30 days from invoice with approved credit and all charges are due and payable In full at 8445 Solution Center Lockbox 778445 Chicago IL 60677 -8004 unless notified otherwise by Miracle in writing. Customer agrees to pay all additional service charges for past due invoices. Customer must provide proper tax exemption certificates to Miracle, and shall promptly pay and discharge all otherwise applicable taxes, license fees, levies and other impositions on the equipment at its own expense. Purchase orders and payments should be made to Miracle Recreation. Page 1 Miracle Miracle Recreation Equipment Co 9106 Pulsar Ct #C Corona, CA 92883 Phone #800 -264 -7225 Fax# 877 - 215 -3869 QUOTATION Date Estimate # 5/29/2013 2013 -2153 E -mail sales @miracleplayground.com Web SitaNww.miracle- recreation.com Name / Address ALL PURCHASE ORDERS City of Rosemead MUST HAVE THIS ADDRESS: 8445 Solution Center Chicago IL 60677 -8004 Project Terms Rep FOB Rosemead Park - North Net 30 Rob Factory Item Description Qty Rate Total UNDERGROUND UTILITIES TO BE MARKED. NOT RESPONSIBLE FOR DELAYS CAUSED BY WEATHER. ANY EXCAVATION TO BE DONE BY MACHINE. ANY HAND EXCAVATION DUE TO UNDERGROUND UTILITIES, KNOW OR UNKNOWN, WILL HAVE AN EXTRA CHARGE. THERE MAYBE AN INCREASE IN PRICE DUE TO UNFORESEEN ROCKY CONDITIONS TO BE DELIVERED TO ORTCO WHERE OFFLOAD AND STORAGE UP TO 30 DAYS IS INCLUDED. STORAGE LONGER THEN 30 DAYS TO BE BILLED ACCORDINGLY. OFFLOAD TO ANOTHER LOCATION IS TO BE COORDINATED TO ENABLE WORK TO PROCEED SAME DAY. SPECIAL TRIPS TO OFFLOAD ONLY, MAY BE SUBIECTTO SERVICE CHARGE. This Quote is Valid for 30 Days Subtotal $93,384.15 This quote shall not become binding until signed and delivered by both customer Sales Tax (9.0 %) and Miracle Recreation "Miracle ". To submit this offer, please sign and forward a $4,261.55 complete copy of this quote via fax to 877 - 215 -3869 or email sales @miracleplayground.com. Total $97,645.70 THIS QUOTE IS LIMITED TO AND GOVERNED BY THE TERMS CONTAINED HEREIN. Miracle objects to any other terms proposed by the customer in writing or otherwise, as materials alterations, and all such proposed terms shall be void. Customer authorizes Miracle to ship the equipment and agrees to pay Miracle the total amount specified. Shipping terms are FOB the place of shipment via common carrier designated by Miracle. Payment terms are Net 30 days from invoice with approved credit and all charges are due and payable in full at 8445 Solution Center Lockbox 778445 Chicago IL 60677 -8004 unless notified otherwise by Miracle in writing. Customer agrees to pay all additional service charges for past due invoices. Customer must provide proper tax exemption certificates to Miracle, and shall promptly pay and discharge all otherwise applicable taxes, license fees, levies and other impositions on the equipment at Its own expense. Purchase orders and payments should be made to Miracle Recreation. Page 3 m O Z m O C_ 3 0 O ;r 4m ME v CA CA N cD J X O N CD 3 CD 2) CL n � i � I T� v , ,1 o �`� li f 4 �l m_ v c � r �n 1 P N y C_ m O O O D D � m O _� an�uvi s a�u m ]MC IGW m JJ LK 91v .t/IK LjKepylt m � � mum.. 4 w � >nu m Love m �K U D CD g � o II $ 41 g � U U) �.:.u. CD o TT \V 3 n CD Z Q F -Lw-ru ouru g >tmo s'uem m LucwL ae+wc s -ors ry alY IOIM R k�4 F - t i aqq F F Y e Z eueem at 7 �e PRICING QUOTE Admin. Policy #50 -01 Use for Purchases ? $1,000 Company Name: I CEJ Engineers.. RSCC MAR Consulting I nc. Engineering, Inc. Engineers Location: I Irwindale, CA I Irwindale, CA I Santa Ana, CA Phone: 1(626) 893 -9266 1 (626) 960-1889 1 (714) 611-3875 Contact: I Joaquin Carlos Alvarado, Richard Madrid Cervantes, P.E. I P.E. Date Contacted: 1 5/9/13 1 5/16/13 5/17/13 Time Contacted: 1 1 "'y " " " "'y ° "' ° "" " " " °r ' °' ° " "`" $14,800.00 $20,500.00 $22,300.00 Scone of Work Total 1 $14,800.00 1 $20,500.00 $22,300.00 VENDORICONTRACTOR RECOMMENDED: #1 Supplies /Equipment —If the low bidder is not recommended, give the reason(s) below: • Reason low bidder was not recommended: • Additional Information: Services —Attach a summary of qualifications of person /firm selected. ADDITIONAL DOCUMENTATION REQUIRED (applicable to type of purchase): Supplies /Equipment $1,000 - $10,000 Vendor Agreement or Letter of Agreement (Product) required. $10,000 - $25,000 Letter of Agreement (Product) required. Services (excluding Professional Services) $1,000 - $10,000 Vendor Agreement or Letter of Agreement (Services) required. $10,000 - $25,000 Letter of Agreement (Sery ices) required Authorized Signature Revised 02/08 Date Department/Division Head Signature Date K: \Sean \PU RC HAS I N G\P rice_Q uote -RS M D_Park -Imp roveme nts_Desi g n. d ocx Scope of Work Rosemead Park Improvement Project Survey & Engineering Proiect Description The project includes the removal and replacement of the existing asphalt in the parking lot adjacent to Encinita Avenue, which includes grinding, asphalt overlay, striping, and curb and gutter replacement. The project also includes the reconstruction of existing basketball courts. Both elements include topographical survey, reconstruction plans, and cost estimates. Scope of Work 1. Field Investigation / Data Collection 2. Topographic Survey a. Include Base Map 3. Construction Plans for Parking Lot and Basketball Court, Including: a. Demolition b. Grading and Drainage c. Striping d. Design e. Complete Specifications for Project 4. Cost Estimate 10 C E G Engineering, Inc. Consulting Engineers Group 1543 West Garvey Ave. North, Suite 210 West Covina, California 91790 626.308.1268 ' Fax: 626.308.1216 City of Rosemead 8836 East Valley Blvd. Rosemead, CA 91770 Attention: Mr. Rafael Fajardo Regarding: Rosemead Park — Parking lot pole lighting Dear Mr. Fajardo, May 25, 2013 We are pleased to present this proposal to provide electrical engineering services for the above referenced project. A. PROJECT DESCRIPTION As we understand it this project consist of lighting improvements at the parking lot area at Rosemead Park. Our engineering services under this proposal will include the following: 1. Site survey of existing electrical equipment that will provide power for the new parking lot lighting. 2. Provide electrical drawings showing the location new parking lot pole lights. 3. Provide photometric calculations of the new parking lot lighting. 4. The drawings will include a lighting control system, installation details and electrical branch circuiting to the new lighting. 5. Electrical Specification will be provided on the drawings. 6. Construction Administration will consist of the following services: a. Office consultation during the bidding period. b. Office consultation during the construction period. c. Shop drawings and submittal review. d. Change order as may be required and review of their cost. e. Field observation of construction followed by a Field Observation Report. Field Observation will be limited to a electrical construction rough -in and final project punch out. city of Xpwwd Pu6GcWA4i DTOWU* , LTvwrtng Division Dm� Os I ✓ Dmiel, IACEG Engineenng%Progea PfopoulsU013%0T OF ROSEMEAOYiosem Px .d C E G Engineering, Inc. City of Rosemead Mr. Rafael Fajardo May 25, 2013 Page 2 B. WORK NOT INCLUDED 1. Changes in the owner's requirements that would result in revisions in a design. C. COMPENSATION 1. For scope of work described above, we propose that our services be at a lump sum as $3,800.00 as payment schedule below: Completion of Design Development 55% $2,090.00 Completion of Construction Document 35% $1,330.00 Completion of Construction Administration 10% $380.00 Total Engineering Fee 100% $3,800.00 2. Compensation for extra service shall be reimbursed on an hourly basis per the attached 2013 Hourly Rate Schedule. 3. All plotting and printing for Architect/Owner review, delivery, photography, postage, and other fees shall be billed as Reimbursable Expenses plus 10% of cost. 11714\:"0111103I WN Y In the event the project is abandoned, the compensation will be based on the last progress billing plus a mutually agreed upon amount for the work completed since the last billing. E. ACCEPTANCE If this proposal is acceptable to you, please sign and return one copy to us. We are prepared to commence work upon execution of this agreement. The proposal will remain in effect for 60 days from the date of proposal. We thank you for the opportunity to present this proposal and look forward to working with you. Very truly yours, CEG Engineering, Inc. Jessica Yueh, M.S., P.E. Accepted by: City of Rosemead, California Date: BCEG EngimmnngWoj "t Pmpos.is\20MCM or ROSEMEAD\Rosemead Park.docx 10 . C E G Eng Inc. W �.>�. ---, -- Consulting Engineers Group 1543 West Garvey Ave. North, Suite 210 West Covina, California 91790 626.308.1268 a Fax: 626.308.1216 2013 HOURLY RATE SCHEDULE The 2013 Hourly Rate Schedule for professional engineering services performed by CEG Engineering will be at the following rates: Principal Engineer $135.00/hour Senior Engineer $125.00 /hour Project Manager $125.00 /hour Construction Administration $115.00/hour Project Engineer $100.00 /hour Design Engineer $95.00 /hour CAD Operator $75.00/hour Clerical $65.00 /hour 1 MEG EnBlnmdnMPmJed Prop sUOMEG HOURLY RATE 2013.dm { Y 1 O � � PRICING QUOTE Admin. Policy #50 -01 Use for Purchases z $1,000 Company Name: Gill Athletics Specialty Buddy's All Stars Solutions, Inc. Location: Champaign, IL I San Diego, CA Burbank, CA Phone: 1 (888) 277 -7778 1 (858) 566 -8800 1 (661) 979 -2106 Contact: I - I Jim Tuft I Daniel Law Date Contacted: 1 6/3/ 1 6/3/13 1 6/4/13 Time Contacted: 9:00 AM 9:00 AM 1 10:30 AM 6 1 Porter Heavy Duty Basketball Units 00195580 1 $2,320.00 1 $2,448.00 1 $2,090.00 1 Sales tax $1,252.80 $1,322.00 $1,128.60 1 Freight to 91770 $1,771.83 $1,772.00 $1,875.00 TOTAL 1 $16,944.63 1 $17,782.00 1 $15,543.60 1 VENDOR/CONTRACTOR RECOMMENDED: #3 Supplies /Eauipment —If the low bidder is not recommended, give the reason(s) below: • Reason low bidder was not recommended: • Additional Information: Services —Attach a summary of qualifications of person /firm selected. ADDITIONAL DOCUMENTATION REQUIRED (applicable to type of purchase): Supplies /Equipment $1,000 - $10,000 Vendor Agreement or Letter of Agreement (Product) required. $10,000 - $25,000 Letter of Agreement (Product) required. Services (excluding Professional Services) $1,000 - $10,000 Vendor Agreement or Letter of Agreement (Services) required. $10,000 - $25,000 Letter of Agreement (Services) required. Authorized Signature Revised 02/08 Date Department/Division Head Signature Date C:Oocuments and Settings\ssullivanNy DocumentsWrice Quote.dot *4 r �I i ti i ■i J 4 4 yT' . 4 s �• �4 V Jmk rl w 1, Back-To-Back System 9 . y ' 4 .7 ! L .+ 4 li s � 1 Y 1' i1 | r (\ !§| § } \�If /o 8no ^� .z -n�� ;,. ;.. 9 Q . , �1��� \z � a . ` | ;[ ;| ; : : : :: �� �' •. . � ! �gg /g /Q; - a # # # ■ ■w,,,,,,l, / / \ / / \\ = , A. § o K| 2 } § )\ \ CIIJ a. 0 \ § \ dG § z- . � f G § 2 C) § � \ f § ;z° ® « 8 � § |� k / § Mlm |j� §I§ 2 0 § E ,.; |2! USE ,. §2= '�§ § /2 h /K 2 § < a 2! \ \ f ƒ| 2� 0 2 ! r ■ ( u m o q( k § § \ (L 'aJ � d! ! & - (n c m N y: »• zo ' 2 § G < ;5. =� =w /§ PIMP a) ) M 0. f§ § /§ G o 0) Z. ■ ``§ 0 . .- as § § ){ c') § = .9-J3 § � J J REVSON DATE po mter4No. 0 19 -8 of /� CU STOMER sEXTeEDHEAVY-DUTY 2moR p g �sas7mR�JaaaReammo �" ®� ° -! -P_� �- .�� We 95 MAY SPECIFICATIONS PORTER No. 00195 -580 - 5' EXTENDED SINGLE POST BACKSTOP WITH RECTANGULAR PERFORATED STEEL BACKBOARD AND HEAVY -DUTY GOAL Face of backboard shall be 5' -0" (1.52m) extended from the front of the 6" (15.2cm) square upright support The 6" (15.2cm) square upright support shall be fabricated from a heavy 1/4" (6.35mm) wall structural tube with a fully - welded weather -proof cap enclosure on the top end. Upright shall extend 4' -0" (1.2m) into concrete footing per drawing detail. Upright shall be finished in a durable black, powder - coated weather - resistant finish after final fabrication. Extension support shall be fabricated from a 6" (15.2cm) square, 1/4" (6.35mm) wall structural tube extending from the upright support at a 45 angle at a point exceeding 7' -0" (2.13m) above the playing surface. Frame shall be a fully - welded unitized unit with a 112" x 9" x 14" (12.7mm x 22.86cm x 35.56cm) steel plate for securing to upright support with six 5/8" diameter Grade 5, plated steel machine bolts. Upper end of frame shall be furnished with a 3/8" x 7" x 3' -5" (9.52mm x 17.78cm x 1.04m) steel plate for securing to backside of backboard, designed to furnish a direct -mount type goal attachment, to eliminate undue strain on the backboard. Frame shall be further reinforced by a 3" (7.62cm) square x 114" (6.35mm) wall horizontal brace tube extending to the center of the goal mounting hole pattern for maximum support. Extension support shall be finished in a durable black, powder - coated weather - resistant finish after final fabrication. Backboard shall be official size X-6" x 6' -0" (1.07m x 1.93m) with a heavy, unitized rear frame fabricated from heavy -wall rectangular steel tubing. Center of frame shall be provided with a heavy 7" (17.78cm) wide x 7 gauge formed steel channel for supporting backboard directly to the extension support frame. Goal mounting area shall be reinforced by horizontal and vertical framing members to minimize undue loading on the perforated steel face section during slam- dunks, etc. Entire unitized frame structure shall be powder - coated in a durable, neutral gray, weather - resistant finish before final fabrication. Face of backboard shall be fabricated from heavy, 11 -gauge steel sheet with 1 -1/2" (3.81cm) deep formed perimeter flanges. Perforations shall be 1/4" (6.35mm) in diameter, spaced on 1/2" (1.27cm) diagonal centers to allow a 23% open area to minimize wind resistance. Perforated areas shall be located to outline a 3" (7.62cm) wide perimeter and an official 24" (60.96cm) wide target area. Formed flanges of face section shall be secured to rear, unitized frame with truss head -type rivets. Formed face section shall be powder-coated in a durable white, weather - resistant finish before assembly to rear framework. Face of backboard to be silk- screened with orange perimeter and target area markings. No. 00151 -H00 goal shall be designed with a double rim, continuous net support and heavy -duty side and center support gusset plates for the ultimate in strength and durability for parks and playgrounds. Double rim design shall be formed to an official 18" (45.72cm) inside diameter with 518" (1.58cm) diameter solid cold rolled steel bars. Rims shall be further supported by a continuous 3/16" x 1" (4.76mm x 2.54cm) steel net tie strip. Net support strip shall be precision die-cut with twelve net attachment openings to eliminate breakage associated with conventional type wire formed net tie clips. Rims shall be supported by a heavy mounting backplate with formed side plates tangentially connecting into the net support strip for maximum strength. Center reinforcing steel gusset shall provide additional rim support. Mounting backplate shall be slotted to provide universal mounting centers from 5" x 5" (12.7cm x 12.7cm) to 5" x 4" (12.7cm x 10.2cm). Goal finished in a durable orange powder -coat finish. Goal furnished complete with Grade 5 carriage bolts, mounting hardware and heavy -duty chain net. Goal covered by an unconditional lifetime warranty. OPTIONAL ITEMS TO SPECIFY • See Page No. B- 324 -72 for specifications on Porter No. 00324 -672 Backboard Padding. ISSUED JULY 1 2001 SUBJECT TO CURRENT MANUFACTURING PROCEDURES AND CHANGES COPYRIGHT 2001 - PORTER ATHLETIC EQUIPMENT COMPANY - ALL RIGHTS RESERVED R -195 City of Rosemead Rosemead Park Improvements Project Bid Analysis Bid Schedule CEM: Item Description Unit Qty Unit Price Total 1 Clearing and Grubbing Per Plans and Specs LS 1 $ 400.00 $ 400.00 2 Disposal of Waste Materials LS 1 $ 800.00 $ 800.00 3 Removal & Disposal of 4' High Block Wall LF 130 $ 38.00 $ 4,940.00 4 Removal & Disposal of Existing Sidewalk SF 600 $ 3.00 $ 1,800.00 5 Removal & Disposal of Existing Trees FA 4 $ 100.00 $ 400.00 6 Install 2" PVC Schedule 40 Sleeve Per Irrigation Including 1 -Foot Wide AC Patch LF 180 $ 18.00 $ 3,240.00 7 Construct 6" PCC Curb Only LF 100 $ 34.00 $ 3,400.00 Total $ 19,290.00 Total Base Bid Price: $ 19,290.00 $ 14,980.00 Total Base Bid Price: $ 14,980.00 Bid Schedule Description Unit Qty Unit Price Total Item 1 Clearing and Grubbing Per Plans and Sr LS 1 $ 525.00 $ 525.00 2 Disposal of Waste Materials LS 1 $ 925.00 $ 925.00 3 Removal & Disposal of 4' High Block Wall LF 130 $ 41.00 $ 5,330.00 4 Removal & Disposal of Existing Sidewalk SF 600 $ 3.25 $ 1,950.00 5 Removal & Disposal of Existing Trees EA 4 $ 125.00 $ 500.00 6 Install 2" PVC Schedule 40 Sleeve Per Irrigation Including 1 -Foot Wide AC Patch LF 180 $ 27.00 $ 4,860.00 7 Construct 6" PCC Curb Only LF 100 $ 52.00 $ 5,200.00 Total $ 19,290.00 Total Base Bid Price: $ 19,290.00 Bid Schedule Description Unit Qty Unit Price Total Item 1 Clearing and Grubbing Per Plans and Sr LS 1 $ 600.00 $ 600.00 2 Disposal of Waste Materials LS 1 $ 1,050.00 $ 1 3 Removal & Disposal of 4' High Block Wall LF 130 $ 45.00 $ 5,850.00 4 Removal & Disposal of Existing Sidewalk SF 600 $ 4.00 $ 2,400.00 5 Removal & Disposal of Existing Trees EA 4 $ 120.00 $ 480.00 6 Install 2" PVC Schedule 40 Sleeve Per Irrigation Including 1 -Foot Wide AC Patch LF 180 $ 30.00 $ 5,400.00 7 Construct 6" PCC Curb Only LF 100 $ 55.00 $ 5,500.00 Total $ 21,280.00 Total Base Bid Price: $ 21,280.00