CC - Item 3E - Annual Residential Resurfacing Project - Muscatel Avenue - Award of ContractROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: JEFF ALLRED, CITY MANAGER DATE: AUGUST 13, 2013 SUBJECT: ANNUAL RESIDENTIAL RESURFACING PROJECT — MUSCATEL AVENUE — AWARD OF CONTRACT SUMMARY As a part of the City's Fiscal Year 2013 -14 Capital Improvement Program, the City Council approved the "Annual Residential Resurfacing Project — Muscatel Avenue." The project consists of asphalt concrete overlay and reconstruction of road pavement, and repairs to damaged sidewalk, curb and gutter along Muscatel Avenue from Marshall Street to Grand Avenue. This project is being funded through State Gas Tax Proceeds. Staff Recommendation It is recommended that the City Council: 1. Approve the plans and specifications for the Annual Residential Resurfacing Project — Muscatel Avenue; and, 2. Authorize the City Manager to enter into a contract with Gentry Brothers, Inc. in the amount of $473,013.80. In addition, authorize an amount of $70,952.07 (15 %) as a contingency to cover the cost of unforeseen construction expenses. DISCUSSION Muscatel Avenue is a north -south collector road that is approximately 40 feet wide. This road carries a moderate to heavy level of vehicle traffic due to its proximity to the Civic Center, the Valley Boulevard commercial area, a dense residential neighborhood, and it is frequently utilized as a bypass to avoid Rosemead Boulevard. This project will be a continuation of the work that began when the portion of Muscatel Avenue to the south of Marshall Street was resurfaced in 2012. This project will result in the complete resurfacing of the north end of Muscatel Avenue which greatly improves its condition and extends its useful life. ITEM NO. 3E City Council Meeting August 13, 2013 Page 2 of 3 A Notice Inviting Bids was published in local newspapers and trade publications on July 18 July 25 and August 1s 2013. At 11:00 a.m. on August 7, the City Clerk publicly opened and read seven (7) sealed bids with the following result: Rank Bidder Location Base Bid Amount 1 Gentry Brothers, Inc. 2 All American Asphalt, Inc. 3 E.C. Construction 4 Sequel Contractors, Inc. 5 Hardy & Harper, Inc. 6 Sully - Miller Contracting Co. 7 Excel Paving Company Irwindale, CA $473,013.80 Corona, CA $517,000.00 South El Monte, CA $523,513.68 Santa Fe Springs, CA $537,829.96 Santa Ana, CA $555,000.00 Brea, CA $557,843.00 Long Beach, CA $596,478.15 Staff has reviewed the bid documents for completeness and investigated the contractor's background and recent projects for competency. Staff believes that Gentry Brothers, Inc. is the lowest responsive bidder and is qualified to complete the work as specified for this project. Gentry Brothers, Inc. recently completed the Mission Drive Resurfacing Project on schedule and within budget estimates. Additionally, Gentry Brothers, Inc. has completed similar public works project for many local agencies, including the Cities of Claremont, Covina, and LaVerne. FINANCIAL REVIEW This project was included in the Fiscal Year 2013 -14 Capital Improvement Program. The budget for this project is $625,000.00 and it is funded entirely through Gas Tax Funds. The total appropriation needed to award the contract is approximately $544,000.00. ENVIRONMENTAL REVIEW This project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (C) of the CEQA Implementing Guidelines. PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. City Council Meeting August 13, 2013 Page 3 of 3 Prepared By: Rafael Fajardo Associate Civil Engineer Prepared By: Sean Sullivan Management Analyst Submitted By: e/ Chris Marcarello Director of Public Works Attachments: A. Plans and Specifications (Available in the City Clerk's Office) B. Bid Analysis PUBLIC WORKS SERVICE DEPARTMENDENGINEERING DIVISION CITY OF ROSEMEAD ANNUAL RESIDENTIAL RESURFACING PROJECT - MUSCATEL AVENUE PROJECT NUMBER: 21846 BID ANALYSIS BID SUBMITTAL: AUGUST 7. 2013 GENTRY BROTHERS, INC. #1 BASE BID PRICE ALL AMERICAN ASPHALT BASE BID PRICE 07 ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL 1 CLEARING AND GRUBBING PER PLANS /SPECS. 1.00 LS 48,400.00 $ 48,400.00 2 DISPOSAL OF WASTE MATERIALS 1.00 LS 500.00 $ 500.00 3 COLD MILL 2" EXISTING PAVEMENT 208,172.00 SF 0.15 $ 31,225.80 4 CONSTRUCT I.5" THICK PAVEMENT OVERLAY 1,950.00 TONS 79.00 $ 154,050.00 5 CONSTRUCT 0.5" ASPHALTIC LEVELING COURSE D1 655.00 TONS 68.00 $ 44,540.00 6 REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK 6,755.00 SF 4.00 $ 27,020.00 7 REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY APPROACES 2,350.00 SF 5.00 $ 11,750.00 8 REMOVE, DISPOSE, CONSTRUCT 8" CURB / 24" GUTTER 1,214.00 LF 30.00 $ 36,420.00 9 REMOVE, DISPOSE, CONSTRUCT 8" PCC CURB ONLY 200.00 LF 25.00 $ 5,000.00 10 REMOVE, DISPOSE, CONSTRUCT PCC CROSS GUTTER 416.00 SF 8.00 $ 3,328.00 11 REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS 20.00 EA 1,700.00 $ 34,000.00 12 DOUBLE ADJUST SEWER MANHOLE TO GRADE 30.00 EA 400.00 $ 12,000.00 13 ADJUST WATER VALVE/ GAS VALVE TO GRADE 29.00 EA 20.00 $ 580.00 14 INSTALL SURVEY WELL MONUMENT 16.00 EA 450.00 $ 7,200.00 15 INSTALL STRIPING, SIGNAL LOOPS, AND PAVEMENT MARKERS 1.00 LS 57,000.00 $ 57,000.00 TOTAL BASE BID PRICE 1 $ 473,013.80 ALL AMERICAN ASPHALT BASE BID PRICE 07 O&V72013 PAGE 1 ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL 1 CLEARING AND GRUBBING PER PLANS /SPECS. 1.00 LS 33,995.64 $ 33,995.64 2 DISPOSAL OF WASTE MATERIALS - 1.00 LS 500.00 $ 500.00 3 COLD MILL 2" EXISTING PAVEMENT 208,172.00 SF 0.13 $ 27,062.36 4 CONSTRUCT I.S "THICK PAVEMENT OVERLAY 1,950.00 TONS 79.00 $ 154,050.00 5 CONSTRUCT 0.5" ASPHALTIC LEVELING COURSE D7 655.00 TONS 82.00 $ 53,710.00 6 REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK 6,755.00 SF 4.80 $ 32,424.00 7 REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY APPROACES 2,350.00 SF 7.10 $ 16,685.00 e REMOVE, DISPOSE, CONSTRUCT 8 " CURB /24 "GUTTER 1,214.00 LF 40.50 $ 49,167.00 9 REMOVE, DISPOSE, CONSTRUCT 8" PCC CURB ONLY 200.00 LF 35.00 $ 7,000.00 10 REMOVE, DISPOSE, CONSTRUCT PCC CROSS GUTTER 416.00 SF 16.00 $ 6,656.00 11 REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS 20.00 EA 2,850.00 $ 57,000.00 12 DOUBLE ADJUST SEWER MANHOLE TO GRADE 30.00 EA 625.00 $ 18,750.00 13 ADJUST WATER VALVE / GAS VALVE TO GRADE 29.00 EA 200.00 $ 5,800.00 14 INSTALL SURVEY WELL MONUMENT 16.00 EA 1 575.00 $ 9,200.00 15 INSTALL STRIPING, SIGNAL LOOPS, AND PAVEMENT MARKERS 1.00 LS 45,000.00 $ 45,000.00 TOTAL BASE BID PRICE $ 617,000.00 O&V72013 PAGE 1 PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION OBN72013 E.C. CONSTRUCTION BASE BID PRICE ml< SEQUEL CONTRACTORS, INC. BASE BID PRICE #4 ITEM DESCRIPTION CITY UNIT UNIT PRICE TOTAL 1 CLEARING AND GRUBBING PER PLANS /SPECS. 1.00 LS 5,000.00 $ 5,000.00 2 DISPOSAL OF WASTE MATERIALS 1.00 LS 5,250.00 $ 5,250.00 3 COLD MILL 2" EXISTING PAVEMENT 208,172.00 SF 0.20 $ 41,634.40 4 CONSTRUCT I.5" THICK PAVEMENT OVERLAY 1,950.00 TONS 90.75 $ 176,962.50 5 CONSTRUCT 0.5" ASPHALTIC LEVELING COURSE D1 655.00 TONS 94.44 $ 61,858.20 6 REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK 6,755.00 SF 4.00 $ 27,020.00 7 REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY APPROACES 2,350.00 SF 6.00 $ 14,100.00 8 REMOVE, DISPOSE, CONSTRUCT B" CURB / 24" GUTTER 1,214.00 LF 41.97 $ 50,951.58 9 REMOVE, DISPOSE, CONSTRUCT 8" PCC CURB ONLY 200.00 LF 20.00 $ 4,000.00 10 REMOVE, DISPOSE, CONSTRUCT PCC CROSS GUTTER 416.00 SF 1 7.001 $ 2,912.00 11 REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS 20.00 EA 2,600.001 $ 52,000.00 12 DOUBLE ADJUST SEWER MANHOLE TO GRADE 30.00 EA 615.00 $ 18,450.00 13 ADJUST WATER VALVE / GAS VALVE TO GRADE 29.00 EA 75.00 $ 2,175.00 14 INSTALL SURVEY WELL MONUMENT 16.00 EA 645.00 $ 10,320.00 15 INSTALL STRIPING, SIGNAL LOOPS, AND PAVEMENT MARKERS 1.00 LS 50,880.00 $ 50,880.00 TOTAL BASE BID PRICE $ 523,513.88 SEQUEL CONTRACTORS, INC. BASE BID PRICE #4 PAGE2 ITEM DESCRIPTION CITY UNIT UNIT PRICE TOTAL 1 CLEARING AND GRUBBING PER PLANS /SPECS. 1.00 LS 19,300.00 $ 19,300.00 2 DISPOSAL OF WASTE MATERIALS 1.00 LS 20,000.00 $ 20,000.00 3 COLD MILL 2" EXISTING PAVEMENT 208,172.00 SF 0.18 $ 37,470.96 4 CONSTRUCT I.5" THICK PAVEMENT OVERLAY 1,950.00 TONS 81.00 $ 157,950.00 5 CONSTRUCT 0.5" ASPHALTIC LEVELING COURSE DI 655.00 TONS 82.00 $ 53,710.00 6 REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK 6,755.00 SF 8.00 $ 54,040.00 7 REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY APPROACES 2,350.00 SF 9.00 $ 21,150.00 8 REMOVE, DISPOSE, CONSTRUCT 8" CURB / 24" GUTTER 1,214.00 LF 35.00 $ 42,490.00 9 REMOVE, DISPOSE, CONSTRUCT 8" PCC CURB ONLY 200.00 LF 15.00 $ 3,000.00 10 REMOVE, DISPOSE, CONSTRUCT PCC CROSS GUTTER 416.00 SF 9.00 $ 3,744.00 11 REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS 20.00 EA 2,500.00 $ 50,000.00 12 DOUBLE ADJUST SEWER MANHOLE TO GRADE 30.00 EA 500.00 $ 15,000.00 13 ADJUST WATER VALVE / GAS VALVE TO GRADE 29.00 EA 75.00 $ 2,175.00 14 INSTALL SURVEY WELL MONUMENT 16.00 EA 800.00 $ 12,800.00 15 INSTALL STRIPING, SIGNAL LOOPS, AND PAVEMENT MARKERS 1.00 LS 45,000.00 $ 45,000.00 TOTAL BASE BID PRICE $ 537,829.96 PAGE2 PUBLIC WORKS SERVICE HARDY & HARPER, INC. BASE BID PRICE #5 SULLY - MILLER CONTRACTING CO, INC. #6 BASE BID PRICE DESCRIPTION CITY UNIT UNIT PRICE TOTAL ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL 1 CLEARING AND GRUBBING PER PLANS /SPECS. 1.00 LS 36,000.00 $ 36,000.00 2 DISPOSAL OF WASTE MATERIALS 1.00 LS 3,224.92 $ 3,224.92 3 COLD MILL 2" EXISTING PAVEMENT 208,172.00 SF 0.14 $ 29,144.08 4 CONSTRUCT I.5" THICK PAVEMENT OVERLAY 1,950.00 TONS 82.50 $ 160,875.00 5 CONSTRUCT 0.5" ASPHALTIC LEVELING COURSE D1 655.00 TONS 82.50 $ 54,037.50 6 REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK 6,755.00 SF 5.50 $ 37,152.50 7 REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY APPROACES 2,350.00 SF 7.68 $ 18,048.00 0 REMOVE, DISPOSE, CONSTRUCT 8" CURB 124" GUTTER 1,214.00 LF 49.00 $ 59,486.00 9 REMOVE, DISPOSE, CONSTRUCT 8" PCC CURB ONLY 200.00 LF 36.00 $ 7,200.00 10 REMOVE, DISPOSE, CONSTRUCT PCC CROSS GUTTER 416.00 SF 15.00 $ 6,240.00 11 REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS 20.00 EA 2,345.00 $ 46,900.00 12 DOUBLE ADJUST SEWER MANHOLE TO GRADE 30.00 EA 567.00 $ 17,010.00 13 ADJUST WATER VALVE / GAS VALVE TO GRADE 29.00 EA 50.00 $ 1,450.00 14 INSTALL SURVEY WELL MONUMENT 16.00 EA 577.00 $ 9,232.00 15 INSTALL STRIPING, SIGNAL LOOPS, AND PAVEMENT MARKERS 1.00 LS 69,000.00 $ 69,000.00 TOTAL BASE BID PRICE $ 667,843.00 TOTAL BASE BID PRICE $ 566,000.00 SULLY - MILLER CONTRACTING CO, INC. #6 BASE BID PRICE PALP, INC. DBA EXCEL PAVING COMPANY BASE BID PRICE #7 DESCRIPTION CITY UNIT UNIT PRICE TOTAL ITEM CLEARING AND GRUBBING PER PLANS /SPECS. 1.00 LS 14,200.20 $ 14,200.20 1 DISPOSAL OF WASTE MATERIALS 1.00 LS 9,000.00 $ 9,000.00 77REMOVE, COLD MILL 2" EXISTING PAVEMENT 208,172.00 SF 0.15 $ 31,225.80 3 CONSTRUCT I.5" THICK PAVEMENT OVERLAY 1,950.00 TONS 95.00 $ 185,250.00 4 CONSTRUCT 0.5" ASPHALTIC LEVELING COURSE Di 655.00 TONS 100.00 $ 65,500.00 5 REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK 6,755.00 SF 6.00 $ 40,530.00 6 DISPOSE, CONSTRUCT PCC DRIVEWAY APPROACES 2,350.00 SF 7.50 $ 17,625.00 8 REMOVE, DISPOSE, CONSTRUCT 8 " CURB /24 "GUTTER 1,214.00 LF 33.00 $ 40,062.00 9 REMOVE, DISPOSE, CONSTRUCT 8" PCC CURB ONLY 200.00 LF 35.00 $ 7,000.00 10 REMOVE, DISPOSE, CONSTRUCT PCC CROSS GUTTER 416.00 SF 10.00 $ 4,160.00 11 REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS 20.00 EA 3,000.00 $ 60,000.00 12 DOUBLE ADJUST SEWER MANHOLE TO GRADE 30.00 EA 600.00 $ 18,000.00 13 ADJUST WATER VALVE / GAS VALVE TO GRADE 29.00 EA 110.00 $ 3,190.00 14 INSTALL SURVEY WELL MONUMENT 16.00 EA 1,000.00 $ 16,000.00 15 INSTALL STRIPING, SIGNAL LOOPS, AND PAVEMENT MARKERS 1.00 LS 46,100.00 $ 46,100.00 15 INSTALL STRIPING, SIGNAL LOOPS, AND PAVEMENT MARKERS 1.00 LS 57,000.00 $ 57,000.00 TOTAL BASE BID PRICE $ 667,843.00 PALP, INC. DBA EXCEL PAVING COMPANY BASE BID PRICE #7 088172013 PAGE3 ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL 1 CLEARING AND GRUBBING PER PLANS /SPECS. 1.00 LS 35,000.00 $ 35,000.00 2 DISPOSAL OF WASTE MATERIALS 1.00 LS 5,500.00 $ 5,500.00 3 COLD MILL 2" EXISTING PAVEMENT 208,172.00 SF 0.20 $ 41,634.40 4 CONSTRUCT I.5" THICK PAVEMENT OVERLAY 1,950.00 TONS 89.00 $ 173,550.00 5 CONSTRUCT 0.5" ASPHALTIC LEVELING COURSE D1 655.00 TONS 92.00 $ 60,260.00 6 REMOVE, DISPOSE, CONSTRUCT 4" PCC SIDEWALK 6,755.00 SF 5.25 $ 35,463.75 7 REMOVE, DISPOSE, CONSTRUCT PCC DRIVEWAY APPROACES 2,350.00 SF 7.50 $ 17,625.00 e IREMOVE, DISPOSE, CONSTRUCT 8" CURB / 24" GUTTER 1,214.00 LF 59.00 $ 71,626.00 9 IREMOVE, DISPOSE, CONSTRUCT 8" PCC CURB ONLY 200.00 LF 27.00 $ 5,400.00 10 REMOVE, DISPOSE, CONSTRUCT PCC CROSS GUTTER 416.00 SF 14.00 $ 5,824.00 11 REMOVE, DISPOSE, CONSTRUCT PCC CURB RAMPS 20.00 EA 2,400.00 $ 48,000.00 12 DOUBLE ADJUST SEWER MANHOLE TO GRADE 30.00 EA 688.00 $ 20,640.00 13 ADJUST WATER VALVE / GAS VALVE TO GRADE 29.00 EA 471.00 $ 13,659.00 14 INSTALL SURVEY WELL MONUMENT 16.00 EA 331.00 $ 5,296.00 15 INSTALL STRIPING, SIGNAL LOOPS, AND PAVEMENT MARKERS 1.00 LS 57,000.00 $ 57,000.00 TOTAL BASE BID PRICE 1 $ 596,478.16 088172013 PAGE3