Loading...
OB - Item 3A - Construction Administration and Support Services Downtown Plaza ProjectROSEMEAD SUCCESSOR AGENCY STAFF REPORT TO: THE HONORABLE CHAIR AND BOARD MEMBERS FROM: MATTHEW HAWKESWORTH, ASSISTANT CITY MANAGER DATE: OCTOBER 16, 2013 SUBJECT: CONSTRUCTION ADMINISTRATION AND SUPPORT SERVICES — DOWNTOWN PLAZA PROJECT SUMMARY In June, 2013, the Oversight Board approved Resolution 2013 -0006 which confirmed the selection of E.C. Construction for the completion of the Downtown Plaza Project. The Downtown Plaza project includes the construction of a public plaza in the area between City Hall and the County Library. The project will include new, decorative hardscape, improved landscape, and multiple water features. The plaza will complement existing parking lot improvements that were completed in spring 2012. It is hoped that once the plaza is completed, it will become a valuable community resource with the addition of seating areas, interactive water features, and space for public events. During the construction phase, it is necessary that construction inspection, administration, and support services be provided to ensure that the new plaza is built in accordance with project plans and specifications. Typically referred to as "soft costs ", these services include day -to -day inspection and construction oversight, project administration, and specialty inspection of specific construction trades, including landscape architectural services and mechanical, electrical, plumbing, and geotechnical engineering services. Such costs will not exceed fifteen (15) percent of the total construction costs and are further detailed in this report. Staff Recommendation It is recommended that the Oversight Board approve Resolution 2013 -0012 confirming the contracts associated with construction support for the Public Plaza Project. DISCUSSION In 2010, the City completed the Parks and Facilities Master Plan to help serve as a guide for future capital improvements. As such, the City, with significant public input, identified a need to create a "Downtown" public plaza that will create a vibrant public gathering space for the community. Together with the new Civic Center Parking Lot and renovated Rosemead Community Recreation Center, this area will serve as an inviting space for public events and will help complement nearby commercial uses. Rosemead Successor Agency Oversight Board October 16, 2013 Page 2 of 5 The Rosemead Downtown Plaza project includes the construction of a public gathering space in between City Hall and the County Library and will include multiple water features, improved landscape and irrigation, and improved hardscape that will contribute to increased aesthetics and utility in the Civic Center. These features will replace the existing parking lot at this location that is in a state of disrepair. Existing conditions in the parking lot include deteriorated paving, little /no site drainage, and a lack of accessible walkways. A construction contract was reviewed and confirmed by the Oversight Board in June 2013 with E.C. Construction in the amount of $1,346,205.34. The contract was subsequently approved by the City Council on September 24, 2013. It is expected that construction will get underway in mid - November 2013. During the construction phase, it is necessary that inspection, oversight, and construction management services be provided to ensure the proper construction of the project. Such services (also known as "soft costs ") will not exceed 15% of the total construction contract amount. Due to complexity of this project, several specialty inspection services are needed and are further described below. Inspection /Construction Cost Overview Trade Firm Total Budget Public Works Project Inspection SCB Inspections $ 57,000.00 Civil Engineering Project Management CEJ Engineering $ 22,000.00 Geotechnical Engineering Inspection Willdan Engineering $ 7,855.00 Electrical Engineering Project Inspection CEG Engineering $ 4,500.00 Mechanical and Plumbing Project Inspection STO Design Group $ 7,200.00 Design /Landscape Architectural Project Inspection LMA $ 45,075.00 Staff Project Administration N/A $ 52,600.10 Total Cost $ 196,230.10 % of Construction 14.58% Rosemead Successor Agency Oversight Board October 16, 2013 Page 3 of 5 Public Works Project Inspection (Demolition, Layout, Paving, Daily Oversight) The City will utilize an existing on -call services agreement with SCB Inspections to provide regular project inspection services. SCB Inspections will supervise daily construction activities and ensure that work is completed in accordance with project plans and specifications. The hourly rate for these services is highly competitive at $57 per hour, and will not exceed a total of 1,000 hours for this project. SCB Inspections is experienced in providing inspection services for public works projects. Contract Cost: $57,000 2. Engineering Proiect Management (Civil Engineering Functions) The City will utilize an existing on -call services agreement with CEJ Engineers to provide project engineering support services. CEJ completed survey, layout, grading, and drainage plans for this project and will ensure that construction is completed in accordance with project plans and specifications. The hourly rate for these services is highly competitive at $110 per hour for construction management services, and will not exceed a total of 200 hours for this project. CEJ Engineers has extensive experience in general engineering and project management services. Contract Cost: $22,000 3. Geotechnical Engineering (Compaction Analysis, Soils Engineering) The City will utilize an existing on -call services agreement with Willdan Geotechnical to provide soils engineering support services. Willdan completed soils testing and concrete mix requirements for this project and will ensure that construction is completed in accordance with project plans and specifications. The hourly rate for regular observation services is highly competitive at $85 per hour, and will not exceed 56 hours for this project. Additional related laboratory and review costs are also included. Willdan has extensive experience in public works geotechnical and observation services. Contract Cost: $7,855 4. Electrical Inspection (Lighting, Conduits, Electrical Panels /Connections) The City will utilize an existing on -call services agreement with CEG Engineering to provide electrical engineering support services. CEG completed electrical design services for this project and will ensure that construction is completed in accordance with project plans and specifications. The hourly rate for these services is highly competitive at $100 per hour, and will not exceed 45 hours for this project. CEG has extensive experience in public works electrical engineering services. Contract Cost: $4,500 Rosemead Successor Agency Oversight Board October 16, 2013 Page 4 of 5 5. The City will utilize STO Design Group to provide mechanical and plumbing engineering support services. STO completed mechanical and plumbing design services for this project and will ensure that construction is completed in accordance with project plans and specifications. The hourly rate for these services is highly competitive, ranging from $125 to $165 per hour, and will not exceed 50 hours for this project. STO has extensive experience in public works mechanical and plumbing services. Contract Cost: $7,200 6. Design and Landscape Architectural Inspection The City will utilize Lawrence Moss and Associates (LMA) to provide overall design review and landscape architectural support services. LMA completed overall design services for this project and will serve as the architect -of- record for the project. The hourly rate for these services is highly competitive, ranging from $135 to $150 per hour, and will not exceed 329 hours for this project. LMA has extensive experience in public works landscape architectural services. Contract Cost: $45,075 7. Project Administration /City Staff Costs In addition to these contractual services expenses, this project will involve a high level of interaction between City staff, design consultants, and construction contractors. As such, an allotment of staff hours is included in the soft cost estimate for this project. These services will include project administration, contractor coordination, and regular oversight of the project. The total hours estimate is detailed in Attachment 3. Estimated Cost: $52,600 FINANCIAL REVIEW This project was included in the City's Capital Improvement Program is funded entirely through tax increment bond proceeds through the former redevelopment agency. The total budget for this project is $2,250,000. The total estimated for the project (construction costs and soft costs) including contingencies is $1,747,366.24. Rosemead Successor Agency Oversight Board October 16, 2013 Page 5 of 5 Submitted By: §ea WSIlivan Management Analyst Submitted By: UwV.Cx—L Chris I arcarello Director of Public Works Attachments: (1) Resolution 2013 -0012 (Oversight Board Confirmation of Construction Contract) (2) Professional Services Inspection /Oversight Proposals (3) City Staff Hours Estimate RESOLUTION NO. 2013-0012 A RESOLUTION OF THE OVERSIGHT BOARD FOR THE SUCCESSOR AGENCY TO THE ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION CONFIRMING THE SELECTION OF PROFESSIONAL SERVICES FIRMS FOR PROJECT SUPPORT SERVICES DURING THE CONSTRUCTION OF THE PUBLIC PLAZA WHEREAS, THE Rosemead Successor Agency received the Finding of Completion on April 18, 2013 from the Department of Finance; and WHEREAS, the Finding of Completion states that the Rosemead Successor Agency may utilize proceeds derived from bonds issued prior to January 1, 2011 in a manner consistent with the original bond covenants per Health and Safety Code section 34191.4(c); and WHEREAS, the Rosemead Successor Agency is holding approximately $7.1 million in bond proceeds derived from bonds issued prior to January 1, 2011 for Capital Improvement Projects identified in the bond covenants; and WHEREAS, the Rosemead Successor Agency will be required to provide oversight of the completion of the Capital Improvement Projects to ensure compliance with the bond covenants; and WHEREAS, the approved Capital Improvement Projects have been included on each Recognized Obligation Payment Schedule filed by the Rosemead Successor Agency; and NOW, THEREFORE, THE OVERSIGHT BOARD FOR THE SUCCESSOR AGENCY TO ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION HEREBY RESOLVES: 1. The Rosemead Successor Agency Oversight Board confirms that the professional services firms listed below are qualified and capable to provide project support services during the construction of the public plaza. 2. That contracts with the following firms shall not exceed the amounts listed in the table below. If any contract amendments are required, all such changes shall be brought back to the Oversight Board for review and approval. Further, that staff time in direct relation to the construction of the public plaza is authorized and shall not exceed the amount listed below. Trade Firm Total Budget Public Works Project Inspection SCB Inspections $ 57,000.00 Civil Engineering Project Management CEJ Engineering $ 22,000.00 Geotechnical Engineering Inspection Willdan Engineering $ 7,855.00 Electrical Engineering Project Inspection CEJ Engineering $ 4,500.00 Mechanical and Plumbing Project Inspection STO Design Group $ 7,200.00 Design /Landscape Architectural Project Inspection Lawrence Moss and Associates $ 45,075.00 City Staff Project Administration N/A $ 52,600.10 Total Cost $ 196,230.10 % of Construction 14.58% 3. Successor Agency staff is directed to submit documents to the Department of Finance as necessary, including an amended Recognized Obligation Payment Schedule. 4. Successor Agency staff is directed to provide a copy of this Resolution to the County Auditor - Controller, the State Controller's Office and the State Department of Finance. PASSED, APPROVED AND ADOPTED THIS 16` DAY OF October, 2013 Pat Wallach Chair ATTEST: Matthew Hawkesworth Successor Agency Staff SCB INSPECTIONS PROPOSAL FOR INSPECTION SERVICES This proposal is for the provision of day to day inspection services for the Rosemead Civic Plaza Phase III Project. This proposal is based on the current hourly rate of $57 per hour. Days Hours Total Hours Hourly Rate Total Cost 100 10 1,000 $57 $57,000.00 Total Cost: $57,000.00 This is a not to exceed proposal and all billings will reflect all hours worked and will contain time sheets. 401 E. Bay State Street Alhambra, CA 91801 Telephone: (714) 293 -8897 Email: pwinspector64CcDgmail.com (1-10 i October 10, 2013 Mr. Rafael Fajardo Associate Civil Engineer City of Rosemead 8838 E. Valley Boulevard Rosemead, CA 91770 Subject: Proposal for the Rosemead Civic Center Phase III — Downtown Plaza #31004 Dear Mr. Fajardo: CEJ Engineers, Inc. can provide the City of Rosemead with the technical expertise required to successfully complete the Project documents as shown above. The CEJ team will provide services for the aspects required for this project as described in the Scope of Work. The following Exhibits are enclosed: • Exhibit A — Scope of work • Exhibit B — Schedule of Hourly Rates CEJ Engineers, Inc. is excited about this opportunity to use our team's skills and expertise to assist the City of Rosemead with this Project. Please feel to contact us to discuss any aspect of this proposal. Respectfully Submitted, CEJ Engineers, Inc. Joaquin Cervantes, P.E. President CEJ Engineers, Inc. 15859 East Edna PI., Suite 101, Irwindale CA., 91706 / 626 - 960 -0152 1626.893.9266 Exhibit A Scope of Work SCOPE OF WORK CEJ_ will provide Project Management for Civil Engineering Support, Survey, Layout, Grading and Drainage for the Civic Center Phase III downtown plaza as indicated on Bid Items 20, 21 and 22 of the Specifications. The major tasks include the following; • Perform Quality Assurance Project Management monitoring of the Construction Contractors activities; • Review construction document transmittals, i.e. shop drawings, Requests for Information, Requests for Change Orders, etc., submitted by the Construction Contractors prior to incorporation into the work; • Attend regular progress review meetings with the Construction Contractors to ascertain job progress and identify and resolve problems; • Collect all Quality Assurance records including As -Built drawings, test reports, As -Built drawings (final revisions) shall be supplied by the Construction Contractors based on the as built conditions. PROPOSED FEE Our proposed fee is based on the proposal required format and is not to exceed lump sum fee amount of $22,000 for an estimated 200 hrs. City of Rosemead Proposal for Phase III - Downtown Plaza #31004 Pg 1 Cegirrzrrs. Lrr. I Exhibit B Schedule of Hourly Rates Effective July 1, 2013 to June 30, 2014 Hourly Rate Schedule ENGINEERING DIVISION Principal Engineer ............ .........................140.00 96.00 Project Manager ........ ............................... 120.00 Senior Project Engineer ........................... 110.00 Senior Engineer ....... ............................... 105.00 Associate Engineer ... ............................... 100.00 Design Engineer .............. ..........................95.00 165.00 Designer /CADD Drafter .................:.......... 85.00 Clerical[Technical Aide .............................. 65.00 SURVEYING DIVISION Senior Surveyor ............... .........................130.00 Senior Survey Analyst ..... .........................120.00 96.00 Survey Analyst II ............. .........................110.00 Survey Analyst I ............... ..........................90.00 Survey Party Chief .......... .........................105.00 Field Party (Three) .......... .........................185.00 Field Party (Two).. .................................... 165.00 Field Party ( One) ......... .........................100.00 Operations Manager ........ .........................110.00 Supervising Public Works Observer ........... 96.00 Construction Manager ...... ..........................85.00 Construction Engineer ...... ..........................80.00 REIMBURSABLE EXPENSES Reproduction ..... ............................... Cost Subconsultant Services ..................... Cost plus 10% Automobile Transportation ..................Current rate Delivery, Freight, Courier .....................Cost Agency Fees ......... ...........................Cost Commercial Travel / Subsistence......... Cost y' City of Rosemead Proposal for Phase III - Downtown Plaza #31004 _' Pg 2 W WI LLDAN I = nding Geotechnical react, October 7, 2013 Mr. Rafael Fajardo City of Rosemead Public Works Department, Engineering Division 8838 E Valley Boulevard Rosemead, California 91770 Subject: Scope of Work & Cost Estimate for Subgrade and Concrete Observation, Sampling & Testing Services, Rosemead Civic Center Project Phase I11, City of Rosemead, California Dear Mr. Fajardo: Willdan Geotechnical is pleased to present this Scope of Work and Cost Estimate per your e -mail request to provide quality assurance (QA) testing of subgrade and concrete for retaining walls and flat areas at the subject project. We propose the following scope of work. Scope of Work 1. Provide a qualified technician to perform subgrade testing for areas to receive concrete and continued testing of retaining wall foundation and backfill operation. Perform slump tests on the concrete being delivered to the site, observe concrete placement, and cast one set of four (4) concrete cylinders for each 150 cubic yards of concrete placed. 2. Perform as needed laboratory testing of subgrade soils and aggregate base to determine mate- rials index and engineering properties. 3. Review construction material specification and concrete mix design. 4. Provide Concrete Special Inspector to confirm the reinforcement and concrete placement. 5. Pick -up concrete cylinders after field -curing period and deliver to Willdan's material testing laboratory for curing under controlled moisture and temperature conditions. 6. Perform and report on -going compression test results (7 -day and 14 -day breaks). 7. Perform and report completed compression test results (28 -day breaks). 8. Provide final report to the City. 9. Provide engineering support, technician coordination, dispatch, material engineering review, test reporting, QA/QC, and administrative support services Engineering -I Geotechnical I Environmental I Sustainability I Financial I Homeland Security Phone 714.634.3318 1 fax: 714.634.3372 11515 South Sunkist Street, Suite E, Anaheim, CA 92806 1 w .viilldan.com Mr. Rafael Fajardo City of Rosemead Public Works Engineering Department October 7, 2013 Page 2 Cost Estimate Our estimated costs for the proposed services are Seven Thousand Eight Hundred Fifty Five Dollars ($7,855). In preparing this estimate we have assumed that prevailing wage rates are applicable. These fees are based on the scope outlined above. An itemized breakdown is provided below. The actual fees will be charged on a time - and - material basis. Weekends, holidays, and overtime hours are not included in this estimate. This is a Prevailing Wage Rate project. Field Observation & Testine Observation and testing of subgrade /aggregate base and retaining wall s backfill Observe Placement of Concrete, Sample Concrete & Perform Slump Tests, and Cast Cylinders for Compression Testing Vehicle Usage Cylinder Pick -Up Laboratory Testine Maximum Density Compressive Strength — Concrete Cylinders (ASTM C39 /AASHTO T22) Test Reports Engineerine Analvsis. Mix Desien Review. OA/OC Principal Engineer Hours $ 85 40 $ 3,400 Hours $ 85 16 $ 1,200 Hours $ 5 56 $ 280 Each $ 45 5 $ 225 Each $ 175 2 $ 350 Each $ 20 20 $ 400 Each $ 10 5 $ 50 Hours $ 195 10 $ 1,950 On behalf of the principals and staff of Willdan Geotechnical we thank you for your consideration. We look forward to the opportunity to be of service. Please call me if you have any questions or need additional information. Respectfully Submitted, WILLDAN GEOTECHNICAL Ross Khiabani, PE, GE Principal Engineer /Director Distribution: Addressee (via e -mail only) 10 C E G Engineering Inc. Consulting Engineers Group 1543 W Garvey Ave N, #210, West Covina, CA 91790 TEL (626) 308 -1268 FAX (626) 308 -1216 Mr. Sean Sullivan, Management Analyst City of Rosemead 8836 East Valley Blvd., Rosemead, CA 91770 Reference: Rosemead Civic Plaza Electrical Construction Observation Dear Mr. Sullivan September 19, 2013 We are pleased to provide this proposal for observation of the electrical construction on behalf of the City. A. SCOPE OF SERVICES: Observation of electrical construction is not to replace observation of construction which may be provided by the Engineer of Record (EOR) or inspection of the electrical installation which is the responsibility of the Building Department. We will observe the progress of the electrical work, general compliance with the contract documents, intent of the contract documents and workmanship of the electrical work. Our scope of work and engineering services will be limited to the following: 1. Pre - construction meeting. 2. Observation of the electrical underground conduit installation prior to cover. 3. Observation of the electrical equipment installation and connection. 4. Observation of the final electrical work. 5. Review of electrical submittal after they have been reviewed by the EOR. 6. Review Change Order and their cost. 7. Attend construction meetings as may be needed during construction. A total of three (3) meetings are included in this proposal. 8. All field observation of construction will be followed by a Field Observation Report indicating non - compliance with the contract documents, deficiencies, observed code issues and recommendations for modifications if any and maintenance issues. i:ICEG En ineartnglPrOjct Frop hl]OIJIClNOFROSEWADR¢e ed Civic Cenier Elms &0&. IOn.d 10 C E G Engineering Inc_ Consulting Engineers Group B. COMPENSATION Mr. Sean Sullivan, Management Analyst City of Rosemead Rosemead Civic Plaza September 19, 2013 Page 2 1. We propose that engineering services provided under this proposal be done on an hourly basis not -to- exceed $4,500.00, invoiced monthly based on our efforts. 2. Extra Services: Compensation for extra services shall be reimbursed on an hourly basis per the attached 2013 Hourly Rate Schedule: 3. Reimbursable Expenses: We do not anticipate that there will be reimbursable expenses on this project. C. ABANDONMENT In the event the project is abandoned, the compensation will be based on the last progress billing plus a mutually agreed upon amount for the work completed since the last billing. D. ACCEPTANCE If this proposal is acceptable to you, please sign and return one copy to us. We are prepared to commence work upon execution of this agreement. This proposal will remain in effect for 60 days from the date of proposal. We thank you for the opportunity for presenting this proposal and look forward to working with you. Very truly yours, CEG Engineering, Inc. Jessica Yueh, M.S., P.E. Accepted by: Date: City of Rosemead C E G Engineering, Inc. O Consulting Engineers Group 1543 West Garvey Ave. North, Suite 210 West Covina, California 91790 626.308.1268' Fax: 626.308.1216 2013 HOURLY RATE SCHEDULE The 2013 Hourly Rate Schedule for professional engineering services performed by CEG Engineering will be at the following rates: Principal Engineer $135.00 /hour Senior Engineer $125.00 /hour Project Manager $125.00 /hour Construction Administration $115.00 /hour Project Engineer $100.00 /hour O Design Engineer $95.00 /hour CAD Operator $75.00 /hour Clerical $65.00 /hour O I9CEG Engineenng \Project ProposalsVWMCEG HOURLY RATE 2013.Ooc STO DESIGN GROUP, INC. October 10, 2013, p.l PROJECT: Rosemead Civic Plaza - Water Features (2 ea.) I. BASIC SERVICES: STO Design Group, Inc. shall provide design and consulting services for the design of the Fountain Features on the reference project as follows: A. Design Phase Assist in finalizing the fountain feature concept: address the issue / requirement of (zero) water depth for the fountain feature. 2. Establish the design criteria for the fountain features in terms of aesthetics and water effects, concrete basin construction including waterproofing, mechanical /hydraulic system including water quality treatment, electrical design for mech. /hydraulic system, equipment room, required support utilities: water, electrical, drainage, etc. 3. Prepare Preliminary Plans for planning coordination - showing equipment room location and layout, piping corridor and preliminary pipe sizing. 4. Coordination of design work with other project Consultants. 5. Prepare Construction Plans and Specifications for the fountain features based on the concept and design criteria established above. B. Bid /Construction Phase Assist the Client in bidding out the project. 2. Review shop drawings and other project submittals, respond to RFls. 3. Site visits for construction review and during operational start up (allow for 2 site visits). IA. EXCLUSIONS 1. Base sheet 2. Utilities (electrical power, water supply, drainage, etc.) bring up to fountain features. 2500 Redhill Ave., Suite 205 • Santa Ana, CA 92705 • Tel: (949) 476 -8777 • Fax: (949) 476 -5048 October 10, 2013, p.2 PROJECT: Rosemead Civic Plaza - Water Features (2 ea.) II. CONSULTANT'S FEE Two (2) Water Features shown on Lawrence R. Moss Plans, namely: Entry Fountain and the Patio Fountain (Not Included in this contract: Interactive Fountain) A. Design Phase $16,600 (Completed) B. Bid /Const. Phase $ 7,200 III. CONSULTANT'S BILLING RATE Principals $210 /hr. Registered Engineer $165 /hr. Project Managers $125 /hr. Project Reimbursables AT COST Submitted by: STO Design Group, Inc. Accepted by: Client - City of Rosemead (signed) Ed Tan, Principal May 14, 2013 Rosemead Civic Center Project -Phase III EVI U City of Rosemead, CA ..E. "I 16 Construction Observation Hour Breakdown Project Manager and Assistant Project a FO w .� $135.00 Item Hourly rate Quantity Cost Lawrence Moss, President Assist in Selection of Contractor process 4 $600 Project Manager and Assistant Project Manager Lawrence Moss, President $150.00 50 4 $600 Project Manager and Assistant Project Manager $135.00 8 $1,080 Submittals /Materials Review $150.00 1 Lawrence Moss, President $150.00 Manager 1 $150 Project Manager and Assistant Project Manager $135.00 Site Observation during Implementation 10 $1,350 RFI Assistance Lawrence Moss, President $150.00 Project Manager and Assistant Project Manager $135.00 $1,500 15 $2,025 Bid Review and Assistance 86 $11,610 Entry Fountain Tile Mosaic Coordination Lawrence Moss, President $150.00 2 $300 Project Manager and Assistant Project Manager $135.00 10 $1,350 Tree Tagging in Field Lawrence Moss, President $150.00 16 $2,400 Project Manager and Assistant Project Manager $135.00 16 $2,160 Contractor Coordination Lawrence Moss, President $150.00 4 $600 Project Manager and Assistant Project Manager $135.00 50 $6,750 Change Orders Lawrence Moss, President $150.00 1 $150 Project Manager and Assistant Project Manager $135.00 8 $1,080 Site Observation during Implementation Lawrence Moss, President $150.00 10 $1,500 Project Manager and Assistant Project Manager $135.00 86 $11,610 Entry Fountain Tile Mosaic Coordination Lawrence Moss, President $150.00 2 $300 Project Manager and Assistant Project Manager $135.00 42 $5,670 Review Proposed Substitutions Lawrence Moss, President $150.00 1 $150 Project Manager and Assistant Project Manager $135.00 20 $2,700 Prepare Deficiency/Punch List Project Manager and Assistant Project Manager $135.00 12 $1,620 Project Closeout - Final Walkthrough Lawrence Moss, President $150.00 3 $450 Project Manager and Assistant Project Manager $135.00 8 $1,080 iTOTAL HOURS 329 1 TOTAL COST._ S o C l O l l O l VCILlb 10VaM N bT /T£ /£ d0 IaaM °° bT /bZ /£ 30 NaaM °° N °� o 17T /LTl£ MaaM N bT /OT /£ 10 MaaM o0 ry ° O o 00 bT /£ /£ 10 NaaM 00 N ° 'o o bT /bZ /Z d laam o N ° 0 00 bT /LT /Z 10 NaaM m N bT /OT /Z 30 IaaM 00 N ° D o 00 bT /£ /Z 1 IaaM o0 ° o 0 00 W- a £bT /LZ /T }O �Z)W 00 N ° 0 0 N bT /OZ /T 3 IaaM 00 > U VT /£T /T ;0 IaaM 00 C N O tp O 00 cc Y bT /9 /T 1 IaaM 00 IZT ° o a W W £T/0£ /ZT ;o laaM N W a £T /£Z /ZT 1O�aaM N ao O x £T /9T /ZT10 �a@N\ 00 N o '= 0 0 0 o 0 o o 0 0 LD o N c co c o oo x+ o o O £T /6 /ZT 30 IaaM N N y r LM £T /Z /ZT d ";)m 00 N Y F £T /SZ /TT }o NaaM 00 £T /8T /TT 30 IaaM 0° N o 0p Y 0 OC N 00 h 0, O M C v, o? o 0 3 V N M r £T /TT /TT 4o IaaM 00 C N 0 _ £T/b/TT 30 IaaM 0o c N 0 N 0 00 £T /8Z /OT 30IaaM °° N o L '0 00 0 o° T o tD x £TOZ /TZ /OTJO IaaM 00 N LO 00 i r U1 c U r c r0 c K N d N C N •N L Y V1 0 Y v O c V J u j �; 6 j E Q 6 Q i@+ 5 llo In J Vl c C Ll V, J V, 0