C.S. Legacy Construction Inc.CITY OF ROSEMEAD
ROSEMEAD PARK IMPROVEMENTS PROJECT
BASKETBALL COURTS
PROJECT No. 41020
CONTRACT BID FORMS
BIDDER' C 5. t'�PCU GDI'I SL1(:nOi1� �rlt
CONTRACT BID FORMS
TABLE OF CONTENTS
SECTION?
BIDSCHEDULE ............................. . ..... .... .. ...... .._. ........ ...... ..... ._............. ..... .......... 1
SECTION 2
BID DATA FORMS ............................... ................... .................................... - .......... 5
2.A
BID BOND ................................................................................. ............................... S
2.6
LIST OF PROPOSED SUBCONTRACTORS .......................... ............................... 7
SECTION3 NON - COLLUSION AFFIDAVIT ................................................ ............................. 10
BIDDER: C'S.
SECTION 1- BID SCHEDULE
CGF -1
BIDDER: �s -T C.a(1S iYliCF10Yl,lYl(.
BID SCHEDULE
SCHEDULE OF PRICES FOR
ROSEMEAD PARK IMPROVEMENTS PROJECT
BASKETBALL COURTS
PROJECT No. 41020
TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$ 1 45 O7 2. GD
Foal- y- -r-lVe +hmusrtnci 1'(�nef>_1' �1(rz/S a
form � 6 uz/�11�.
CBF -2
UNIT
ITEM
NO.
F
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
1
Clearing d Grubbing Par plans and
LS
1
�'r,�
`ICJOCJ
I r 55 DO
specifications.
2
Disposal Of Waste Materials-
LS
1
13, 32 DO
13, 320 rp
3
Remove, Dispose e)dsting and
Tons
345
Construct 44nches Thick CMB 95 %
Relative Compaction Over 90 %
t q 00
11, - 73D 00
Compacted Native As indicated on
Plans and Specifications Complete.
4
Construct 4-Inches Thick PCC
SF
11,550
Basketball Court (3250 PSI) as
S
3 qq0
Indicated on the Plans and
7 V
Specifications Complete.
5
Construct 4- Inches Thick Colored
SF
2,000
Concrete (Chromic) with
Lithochrome Colorhardener on top
per Plans and Specifications
S too
I 1 200 lap
Complete per LM Scofield Company
or Approved Equal.
e
Construct Concrete Seat Wall
LF
200
including grading, concrete stairs,
weep holes and miscellaneous as
/9 00
I
5 7,700 co
indicated on the Plans and
Specifications Complete.
7
Install Basketball Court Pole and
FA
5
Backboard Per Manufacturer
-7 q O6
4 1)
�7 D cn
Recommendations Complete; City
- 5
r
will provide equipment
B
Install Basketball Court Striping as
LS
1
Indicated on the Plans and
I 527.
27 DD
Specifications Complete.
TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$ 1 45 O7 2. GD
Foal- y- -r-lVe +hmusrtnci 1'(�nef>_1' �1(rz/S a
form � 6 uz/�11�.
CBF -2
BIDDER: C -5 t 0" ah, Inc..
Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in
the schedule of bid items above, within the limits define in Section 3.2.2.1 of the Standard
Specifications, to stay within the budgeted amount of this project.
If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall
be added to or deducted from the Tots] Bid Price entered above. The owner can choose to
Include one or more of the sflemates In the Total Bid Price of the Project If any of the
Alternate Bids are utilized by the Owner, the resulting amount shall be considered the Total
Bid Price for the Project
The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which
cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and
after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third
party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the
written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall
govern.
Attached hereto is a certified the k, a cashier's check or a bid bond in the amount of
ID "l, 01cl 13u>J Dollars ($ ICI. Bit d amount being not less than ten percent (10 %) of the Total
Bid Price. The undersigned agrees that said amount shall be retained by the Owner'R, upon award,
we fail or refuse to execute the Contract and furnish the required bonds, certificates and
endorsements of insurance and other certifications within the time provided,
If awarded a Contract, the undersigned agrees to execute the formal Contact, which wig be
prepared by the Owner for execution, within five (5) Calendar Days following the Letter of Award for
the Contract, and will deliver to the Owner within that same period the necessary original Certificates
of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other
documentation and certification required by the Contract.
The undersigned offers and agrees that R this bid is accepted, it will assign to the purchasing body
all rights, tige, and interest in and to all causes of action it may have under Section 4 of the Clayton
Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the
Business and Professional Code), arising from purchases of goods, materials or services by the
Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and
become effective at the time the purchasing body tenders final payment to he Contractor.
Bidder understands and agrees that, when requested by Owner, he shall provide; (1) evidence
satisfactory to the Owner of Bidders California contractor's licensa(s) in good standing; (2) evidence
that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting
therefrom; and (3) any other Information and documentation, financial or otherwise, needed by
Owner to award a Contract to the lowest responsible and responsive bidder.
CBF -3
Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be
incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder
further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data
submitted herewith into a contract arising out of this Bid.
BIDDER:
The undersigned acknowledges receipt, understanding and full consideration of the following
addenda to the Contract Documents.
Addenda Nos. 10,
The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and
equipment or supplies necessary to complete the Work as described in the Bid Documents. If this
bid Is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the
necessary bonds and accept the Total Bid Price as compensation in full for all Work under the
contract.
CBF -4
By:
Signature
GIY i
Type or Pnk Name
PY�sicl;i9�-
Title
BIDDER: C . U)) c J Gir7d-y 'I A'1, 1 /1(.
13 Yorbo
Business Street Address
(44-, klcz C# 9/7)0
City, Stale and Zip Code
C/cn 590 2&2�i
Telephone Number
Bidders/ Contractor's State of Incorporation: C�ir ✓1�tiychcn 20irc/'v
Partners or Joint Venturers:
Bidders Lloense Numbegs): gu $Q
NOTES:
1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the
representations made on the Contract Bid Forms.
2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address
3) if Bidder is a partnership or joint venture, give full names of all partners or joint
venturers.
As further discussed in the Instructions to Bidden, Bidder will be required
to provide evidence that the person signing on behalf of the corporation,
partnership or joint venture has the authority to do so.
CBF -5
BIDDER: G Ifi[CD115� Vl.iGilOfl�Ilt("
SECTION 2
BID DATA FORMS
CBF -6
BIDDER C . Legacy Construction, Inc.
Bidder shall submit its Bid data in accordance with the fomtat shown on each of the following Bid
Data Forma. Bidden shall prepare and use as many sheota as are becessary to adequMay prmi
the information required- Bidder shall ensure That every page or its Bid Data Forms are properly
identified with the Bidder's name and page number.
7JA BID BOND
KNOW ALL MEN BY THESE PRESENTS'
THAT GS. Legacy Construction, Inc.
Prncipal, and Internationa Fidelity Insurance Co mpany 'q5
as Surety, are held finely bound unto the
CITY OF ROSEMEAD (hereinafter celled the OWNER) in the sum of
_Ten Percent of Amount Bid
DOLLARS
($,
10 of amount bid ), being not leas than ten percent (1Cti of the Total
Bid Price; for the payment of which sum will and truly to be made, we bind oursehes,
our hairs, executors, administrators, successors, and assigns, jointly and seweratly,
firmly by these presents.
WHEREAS, said PrIni ipal has submitted a bid to the OWNERto perform all Work
required for the ROSEMEAD PARK MWROVEMENTS PROJECT - BASKETBALL
COURTS as set forth in the Notice Inviting Bids and eccoripanying Bid Documents,
dated - January 22, 2014 _
NOW, THEREFORE, If said Principal Is awarded a Conlract for the Work by the
OWNER and, within the time and in the manner required by the above- referenced
Bid Documents, enters into the written form of Contract bound with said Bid
Documents, banishes the required bounds (one to guarantee faurfal pmformanre
and this char to guarantee payment for labor and materials) fumishesthe required
insurance certificates and endorsements, anti furnishes any, other certlkcatiorhs es
may be required by the Convect, then this obligation shall be but end vold; otherwise
it shall remain in full force and affect. In the event suit is brought upon this bond try
One OWNER and judgment is recovered, said Suety shell pay at costa incurred by
the OWNER in such suit. Including reasonable attorneys' fees to be fixed by the
court.
SIGNED AND SEALED, this 17th day of January, 2 014
C . Legacy Construction, Inc. (SEAL)
Pon pal
By: 81
Slgnatur
Gregg S mpt Pretle t
International Fidelity Insurance (SEAL)
Surety
Signature
Kevin P. Reed Anorney -in -Fact
CBF -7
CALIFORNIA ALL PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
SIa10of Cafrfamia
Coom,af ORANGE
on January 17, 2014 Mfort 0randon K. Grineal, Notary Publ¢
.—
1>< Kevin P Reed .
rsonally appeared
who pm d w me on UK bails ofsaitisfiartory evidCllR ae be ft parsoo(s) whoY mac(s) Gaut srUxrrbcd to
the within au me mt aad sdim lodged to ra tlm b ~h.7 ar..W the , in his bohhctr mnBarvcd
capwhy(ies), and that by hisrheMheirskvme(s)uo the iavwvreN the person(s). or the "tiff upon behalf of
abich the pvson(s) annL eaa'. t d be aavnmmc
I anify undo YLNALTY OF PERIMY undo the Taws of me Stara ofCelifomia Nat the lone,% ina oare¢napb
is noc wad cane.,.
BRANDON K. l
COMM p 18930]9 93079
WITNESS my band and official =L Z ? _ ORANGE COUNTY
/) Q NOTARY PUBLIC-C
4 2 1 MY COMMISSION NEXPIRES
r rumrru. JUNE 18. 2014
ADOITTONAL DVTBJNAL INFORBEATTON
_.
oeseno'noN w rHE nnnermn ooeumeNr
frRVb.vW �mtlnfduurml
-- _ R+au 6vVV ^ ✓aaJ 6aa ®m�.+11. Pala
NYPW MPag<z lharwaM Par ian
CAPAM Y CI.APIFDBY lHE SN:affA
IMIvfAtl p)
Cwaa,re tae
Tbl
❑
Avalon)
%
AonooYyo Eri
n
rnataait
RISTRt10E]ONS FOR COAtN.EfIN6llBS faaAa
9ae� Dane Y bosl amv. a e mss ma�aA. ar b
I1.r alia,aJmmaals�b bs, ]b d/wpV 4 ✓^
br.Y.bmail g4oNbr.trr rea.vw..
sJ,a.nym...ey. - trpmam..aobr aiasas
eNyr b, a rTi, b.vl n tr sKa ur a alb c anJ u
CdWtra M1.. mMav ak mamwf F /ba anatr
eO.mdMhTrai.vu,[�m.nuM ✓.vino
al f.mY.a+vmmv. ae Sac NOSY Was 0e Oca+
• �M.lo W.ovlape146.eeerlpi6 rss
. om,rar:e.nrbaeare. >nw^41a+.bspM ` a'1
. ls. rre+a=rrm s.. aaeaaa
®+ ue�vs.ysW:1
. Prtl m aagllAVm apepl.b N+onaY m. u m a. al
. m�eeum. •�O+aM 4n.b ubw grmvrm ar�oe
a Ia..emmNara:m
Lw ®wa salawfa®Iamm• ®i�r
. 1k may d _bmee m tr m N d�vsa:.a �s��'•.
Lymp,r olm IfaW ��nfol !•
efiae P�a.r.�su^es�,sav - � Ne
. bppaerRrYPaaa �ovYRKaa.mak wT a. eT
aaa�vy
�.br ®a . srs.,aar.®aas
e ba�saba.na•aome..va. �eassaa.aem
uce<kmsr m.ey ae va as .. . rw =.
ow aiJri, Yii kYkl�e. RD. vV. 4a vr1
. se,errnremrssw<a®
4_avev 1.11"via aal. wv'.NwyO._
ACKNOWLEDGMENT
State of California
County of SAN BERNARDINO )
On JANUARY 20, 2014 before me, GLORIA MACIAS, NOTARY PUBLIC
(insert name and title of the officer)
personally appeared GREGG STRUMPF
who proved to me on the basis of satisfactory evidence to be the on(N whose name is re
cribed to the within instrument and acknowle d to me the (h he /they executed the same in
r his/ erltheir authorized capaciry(iAs), and that by is erltheir sig turej on the instrument the
son(N,, or the entity upon behalt�of which the pe songs) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
GLORIA MACiAs
{'
Commission # 1926029
�
Now, P bhi C,lllornla
�
L ( 1 0'
San6 artllno County
Signatur N Ar e
Q09 (Seal
My LounT rres Mar 18 . 2015
Tel f973) 6247200 POWER OF ATTORNEY.
INTERNATIONAL FIDELITY INSURANCE COMPANY
ALLEGHENY CASUALTY COMPANY '
ONE NEWARK. CENTER, 20TH FLOOR NEWARK, NEW JERSEY 07102 -5207
KNOW ALL MEN BY THESE PRESENTS: That INTERNATIONAL FIDELITY INSURANCE COMPANY, a corporation organized and existing under
melaws of The State of New Jersey, and ALLEGHENY CASUALTY COMPANY a corporation organized and existing under the laws ofthe State of
Pennsylvani ha ving their principal prince In th e Clty of Newark, New Jersey, do hereby constitute and a ppoint
MARCUS REED, KEVIN R. REED
Santa Ana, CA
seal and deliver for and on its behalf as surety, any and all bonds and undertakings contracts of indeml
COMPANY antl ALLEGHENY CASUALTY COMPANY as fully and amply, [call intents and purposes, as IT me canro III oea" ��y =•_���
acknowledged by their r elected Officers at tall principal offices. yy tyty y of COMPANY and ALLEGHENY CASUALTY CO MPANY andtls granted under and by of t lhe follow adopted N by L the Boartl of
Oirectors
of INTERNATIONAL FIDELITY INSURANCE COMPANY at a meeting du lv held on Me 20th day of July, 2010 and by the Board of Directors of ALLEGHENY
CASUALTY COMPANY at a meeting duly held on me 1W day of August 2000:
;yoke
behalf
in the
b oqbs
of any
of any
when
of the
IN WITNESS WHEREOF, INTERNATIONAL FIDELITY INSURANCE COMPANY and ALLEGHENY CASUALTY COMPANY havesach executed and
attracted these presents on this 121h day of March, 2012.
��{ �k50Aliy
\ 9y+Tr lAf� STATE of NEW JERSEY
Count o f Essex
c sEAL m 6.�,1F`9 //(.'GL --t. a 1936
y !E x w
ROBERT W. MINSTER
Executive Vice PresidenVChief Operating Officer '
(International Fidelity Insurance Company)
and President (Allegheny Casualty Company)
On this 12th day of March 2012, before me came the individual who executed the preceding instrument, to me personally known, and, being by me duly
sworn, said he is the therein described and authorized officer of INTERNATIONAL FIDELITY INSURANCE COMPANY and ALLEGHENY CASUALTY
COMPANY; that the seals affixed to said instrument are the Corporate Seals of said Companies; that fire said Corporate Seals and his signature were -
duly affixed by order of the enab of Directors of said Companies.
IN TESTIMONY WHEREOF, J have hereunto set m hand affixed my Official Seal,
at the City of Newark, New Jersey the day and year ist above written-
. , Vp,Z
f°} g UBi. YG - A NOTARY PUBLIC OF NEW JERSEY
9 .+ Q, a•` - - My Commission Expires Mar. 27, 2014
M1 � oFN`, CERTIFICATION
1, the undersigned officer of INTERNATIONAL FIDELITY INSURANCE COMPANY antl ALLEGHENY CASUALTY COMPANY do hereby certify that I have
compared the foregoing copy of the Power of Attemey and affidavit, antl the copy of the Sections of the By -Laws of said Companies as setforth. in said
Power of Attorney,. with the ongleals on file in the home office of said minpames, and that the same are correct th nscnpts thereof, and of the whole
of the said originals, and that the said Power of Attorney has not been revoked and is now in full force and affect. 4 ,
IN TESTIMONY WHEREOF, I have hereunto . set my hand this Irh day of
MARIA BRANCO, Assistant Secretary
r'A a N ON E
. ■ ■■■■
Emosommom
■ ■ ■ ■■ ■ ■■ ■■■
C.S. LEGACY
C.S. LEGACY CONSTRUCTION, INC.
MINUTES OF BOARD OF DIRECTORS MEETING
A SPECIAL MEETING OF THE BOARD OF DIRECTORS OF C.S. LEGACY CONSTRUCTION, INC, A
CALIFORNIA CORPORATION, WAS HELD AT 13263 YORBA AVE_ CHINO, CA. ON
JANUARY 6, 2014
THE BOARD OF DIRECTORS OF THE CORPORATION:
GREGG STRUMPF DIRECTOR
CONSTITUTING ALL OF THE MEMBERS OF THE BOARD OF DIRECTORS WERE PRESENT AT THE
MEETING.
THE MOTION WAS DULY MADE, SECONDED AND CARRIED THE FOLLOWING RESOLUTION
WAS ADOPTED:
RESOLVED, GREGG STRUMPF, PRESIDENT, IS SOLELY VESTED FULL AUTHORITY TO
SIGN ANY AND AN ALL CONTRACTUAL DOCUMENTS FOR THE CORPORATION, AND
THEREFORE HAS THE FULL AUTHORITY TO OBILIGATE THE CORPORATION IN ALL
CONTRACTURAL MATTERS.
THE UNDERSIGNED, RICHARD GONZALES, SECRETARY, CERTIFIED THAT GREGG STRUMPF IS
THE DULY APPOINTED PRESIDENT OF C.S. LEGACY CONSTRUCTION, INC. AND THAT THE
ABOVE, IS A TRUE AND CORRECT COPY OF THE RESOLUTION DULY ADOPTED AT A MEETING
OF BYLAWS OF SAID CORPORATION ON JANUARY 6, 2014
IN WITNESS THEREOF, 1 HAVE AFFIXED MY NAME AS SECRETARY OF THE CORPORATION,
AND HAVE ATTACHED THE SEAL OF C.S. LEGACY CONSTRUCTION, INC. TO THIS RESOLUTION.
DATE: JANUARY 6, 20 4
(CHARD GONZAL -SECRETARY
13263 Yorba Ace. Chino, Ca. 91710
(909)590.2626 (909) 190.4117 fa,
BIDDER: C -5. l lr 1_ CY1S' ckcnr Inc -
2.B UST OF PROPOSED SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100
through 4114 of the California Public Contract Code, and any amendments thereto, each
Bidder shall provide the information requested below for each subcontractor who will
perform work, labor or render serviceto Bidder in or about the construction of the Work In an
amount in excess of one -half of one percent (greater than 0.5 %) of the Bidder's Total Bid
Pnce, or, in the case at bids or offers for the construction of streets or highways, including
bridges, in excess of one -half of 1 percent of the Contractor's total bid or ten thousand
dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work
which will be done by each subcontractor. Bidder shall list only one subcontractor for any
one portion of the Work.
Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow
Bidders twenty -four (24) additional hours after the deadline for submission of bids to submit
the information requested by the Owner about each subcontractor, other then the name and
location of each subcontractor.
If the Bidder fails to specify a subcontractor for any portion of the Work to be performed
under the Contract, it shall be deemed to have agreed to perform such portion itself, and
shall not be permitted to subcontract that portion of the Work except under the conditions
hereinafter set forth below.
Subletting or subcontracting of any portion of the Work in excess of one half of one percent
(greater than 0.5 %) of the Total Bid Price or, in the case of bids or offers for the construction
of streets or highways, including bridges, in excess of one -half of 1 percent of the
Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, for which no
subcontractor was designated in the original bid shall only be permitted in cases of public
emergency or necessity, and then only after Owner approval.
CBF -8
BIDDER: C-S� "OLq tQ/15 7071 ��/u
29 LIST OF PROPOSED SUBCONTRACTORS (continued)
[- ougiws xm s r+c..rc�eemna rw�q aaa�d.wwwdmn.�l i,
Name and Location Description of Wwk
of Subcontactor to be Subconbacted
Name:
Address
Name and Location
of Subcontractor
Name:
Address:
Description of Work
to be Subcontracted
Name and Location
of Subcontractor
Name:
Name and Location
of Subcontractor
Name:
Description of Work
to be Subcontracted
Description of Work
to be Subcontracted
Name and Location
of Subcontractor
Name:
Address:
Description of Work
to be Subcontracted
CBF -9
BIDDER: C1
2.0 REFERENCES
The following are the names, addresses and telephone numbers for three public agencies forwhich BIDDER
has performed similar work within the past two (2) years:
PeYYis Ibl NJ p. 4rr.J PfrriS. C{4 `72570
Name an Addrosa of Owner
Mkyk 4.l Mey6Ius- C15-I 2120
Name and telephone number of person familiar with project
I IZ3 �3 rob S{" -e4? irk K+ 20/3
ConVa 1 amount Type of Work r Da Completed
2. IOINrI cF A�t'JLZ. Ualtac.� l4`155 Di k - Euaofs Arwv.pnnlE,
Name and Address of
G�1n °/nnk r Mo0rz 71Cn zVO 7000
Name end telopho a number of person famikar with project
�4Wh7 '73-3 F1 HP,- / p 5�2oi
Contract amount Ty of Work Date Completed
3- NVA"m SC CrOCan wCCf/ kmakn, rn cg 9 z£-c3
Name and Address of Owner
,enniF�r E]1mv1e 7N 9`/9 3511
Name and telephone number of person familiar with project
a. KwPrsi Cie U.S.
)x.v mncnasGr NISI 352
Name and telephone number f pe on familiar with project
3 6Cl2. {SL �t' F-n11l r...r. ts:p 1 /�2rI:
r,...r.�.r��.....�„a T —. nr
CBF -10
BIDDER: C 6 Y . YtS 4U[•bV'7, IN
SECTION 3
NON - COLLUSION AFFIDAVIT
CBF - 11
NON- COLLUSION AFFIDAVIT •�
_ In accordance with Public Contract Code Section 7106, the undersigned, being first duty
sworn, deposes and says that he or she holds the position listed below with the bidder, the
party making the foregoing bid, that the bid is not made in the interest at, or on behalf of, any
undisclosed person, partnership, company, association, organization, or corporation; that the
bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced
or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly
colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham
bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly
or indirectly, sought by agreement, communication, or conference with anyone to fixthe bid
price of the bidder or any other bidder, or to fix any overhead, profit, or coat element of the
bid price, or of that of any other bidder, or to secure any advantage against the public body
awarding the contract of anyone interested in the proposed contract; that as statements
contained in the bid are true; and, furt that the bidder has not directly or indirectly,
submitted his or her bid price or any breakdown thereof, orthe contents thereof, ordivuiged
Information or data relative thereto, or paid, and will not pay, any fee to any corporation,
partnership, company association, organization, bid deposit or to arry member a agent
thereof to effectuate a collusive or sham bid. / /
Typed or Printed Name
PEPS'� -/f
Title
C.S. (R� eect� �ZV95�Y LtC,-{t�rlh Ilx
Bidder
Subscribed and swo before me
This�'l day of n 20__d
(Seal)
AIQA a. C/C n
Notary Public in and for , cfoaiA MACIAS
the State of California Comm stun # 1926029
Notary Public - Callornla
My Commission Expires: ValA /� �OtS .�. Sn earnarmna Cb":y -
My Comm E p ee Par 15, 2015
CBF - 12
REFERENCES
Eagle Glen Corner Drainage Improvements
Eagle Glen Apartments LLC
c/o Mr. Michael S. Aimola
J & M Realty Company
1651 E. Fourth St. Suite 250
Santa Ana, Ca. 92701
(714) 285 -1170
(714) 285 -1178 FAX
Completed March, 2004, $56,000.00
2. Santa Ana Zoo DG
Howard S. Wright Construction
Mr. Greg Ahman
18500 Von Kaman Ave. Suite 420
Irvine, Ca. 92012
(949) 567 -1909
(949) 567 -1917 FAX
Completed April, 2004 $52,000.00
3. Canada Vista Park Parking Lot Expansion
City of Rancho Santa Margarita
Jacque Niemi
30211 Avenida de las Banderas Suite 101
Rancho Santa Margarita, Ca. 92688
(949) 635 -1800
(949) 635 -1840 FAX
Completed May, 2004 $351,577 49
4. Crown Valley Park Synthetic Soccer Field
City of Laguna Niguel
Nicholas Reno
27911 La Paz Road
Laguna Niguel, Ca. 92677
(949) 362 -4341
(949) 362 -4385 FAX
Completed June 2004 $539,217.49
5. Freeman, Bell, & Thornburg Park Playground Renovation
City of Gardena
Dave Negrete
P _ Box 47003
Gardena, Ca. 90247
(310) 217 -9500
(310) 217 -9876
Completed June 2004 $355,069.90
6. Delta Plant Fencing & Landscaping
City of Monterey Park
Mr. Elias Saykali
320 W. Newmark Ave.
Monterey Park, Ca. 91754
(626) 307 -1320
(626) 307 -2500 FAX
Completed July 2004 $120,580.00
Eagle Glen Street Improvements
Eagle Glen Apartments, LLC
c/o Mr. Michael S. Aimola
J & M Realty Co.
1651 E. Fourth St. Suite 250
Santa Ana, Ca. 92701
(714) 285 -1170
(714) 285 -1178
Completed July2004 $153,250.00
8. Ayala Park Temporary Parking Lot
City of Chino
Carolyn Baltzer, Asst. Project Coordinator
P.O. Box 667
Chino, Ca_ 91708
(909) 627 -7577
(909) 464 -0799 FAX
Completed 9/04 $95,730.00
9. Site Prep for 2 Relocatables @ New Ventures
Huntington Beach Union High School District
Nelson M. Cayabyab Director of Facilities
10251 Yorktown Ave.
Huntington Beach, Ca. 92646
(714) 964 -3339
(714) 963 -7684 FAX
Completed 9/04 $227,455.00
DSA Inspected
10. SR 79S Sidewalk Improvement Project
City of Temecula
Avlin R. Odviar Asst. Engineer
P.O. Box 9033
Temecula, Ca. 92589
(951) 694 -6411
(951) 693 -3929 FAX
Completed 9/04 $147,328.00
11. Lincoln Ave. Median Landscape Improvements
City of Buena Park
Wood Nousome Asst. Engineer
P.O. Box 5009
Buena Park, Ca. 90622
(714) 562 -3676
(714) 562 -3677 FAX
Completed 6/05 $816,000.00
12. Floe Packer Landscape Improvement
City of Lake Forest
Steve Velasco, Engineer
(949) 461 -3480
(949) 461 -3511 FAX
25550 Commercentre Drive
Lake Forest, Ca. 92630
Completed 5/05 $91,974.32
13. Replacement of Lang Park Play Equipment
City of Laguna Beach
Derek Wieske, Asst. City Engineer
505 Forest Ave.
Laguna Beach, Ca. 92651
(949) 497 -3311
(949) 497 -0771 FAX
Completed 1105 $182,299.00
14. Edison High School SAC Addition
15. Huntington Beach High School Elevators
Huntington Beach Union High School District
10251 Yorktown
Huntington Beach, Ca. 92646
Nelson Cayabyab Director of Facilities
(714) 964 -3339
(714) 963 -7684 FAX
Edison High School Completed 5105 $391,576.42
Huntington Beach Elevators Completed 05/06 $780,956.00
16. Talega Recreation Center Phase 3
Talega Partners
951 Calle Negocio Suites D
San Clemente, Ca. 92673
Charlie Mallon Project Manager
(949) 498 -1366
(949) 369 -7659
Complete 6/05 $490,679.55
17. Rancho San Jacinto Play Areas Imp.
City of San Jacinto
201 East Main St.
San Jacinto, Ca. 92583
Ray Sanchez / Pam Stull
(951) 487 -7342
(951) 654 -3728 FAX
Completed 3/05 $294,836.00
18. Shady Grove Park
City of Chino
13220 Central Avenue
Chino, CA 91708 -0667
Mike Knolling
(909) 464 -0768
(909) 464 -0799 FAX
Completed 10105 $1,344,705.00
19.Pinacate Middle School
Perris Union High School District
155 East Fourt Street
Perris, Ca 92570
Jeremy Chou
(909) 987 -0909
Completed 2005 $298,182.00
DSA Inspected
20.Monte Vista Splashpad
City of Chino
P.O. Box 667
Chino, Ca 91708
Arlene Salazar
(909) 464 -0770
(909) 590 -5581 Fax
Completed 4/06 $227,18212
21.Playground Retrofit
City of Chino
13220 Central Ave.
Chino, CA 91708 -0667
Carolyn Baltzer
(909) 627 -7577
(909) 464 -0799 FAX
Completed 12/05 $285,965.00
22.Starshine Park
City of Diamond Bar
21825 Copley Drive
Diamond Bar, CA 91765 -4177
Ryan Wright
(909) 839 -7072
(909) 861 -3117 FAX
Completed 06/05 $269,337.00
23.Sycamore Canyon Park
City of Diamond Bar
21825 Copley Drive
Diamond Bar, CA 917654177
Ryan Wright
(909) 839 -7072
(909) 861 -3117 FAX
Est. Completion 01/06 $462,373.52
24. Rancho San Jacinto Basins
City of San Jacinto
201 East Main St.
San Jacinto, Ca. 92583
Ray Sanchez / Pam Stull
(951) 487 -7342
(951) 654 -3728 FAX
Completed 07/05 $868,589.12
25.Child Development Center Playground
Santa Monica - Malibu Unified School District
1651 Sixteenth Street
Santa Monica, CA 90404
J. Wallance Berriman
(310) 450 -8338
(3 10) 450 -1667 FAX
Completed 08/05 $359,551.76
26.Granada Streetscape
City of San Clemente
910 Calle Negocio Ste. 100
San Clemente, CA 92673
Gary Vobmsky
(949) 361 -6100
(949) 361 -8316 FAX
Completed 12/05 $197,245.91
27.Victoria Gardens Lane Median
City of Rancho Cucamonga
10500 Civic Center Drive
Rancho Cucamonga, CA 91729 -0807
Jerry Dyer
(909) 477 -2700
(909) 477 -2849 FAX
Completed 12/05 $155,482.00
28.MM O'Neil Park
City of Mission Viejo
200 Civic Center
Mission Viejo, CA 92691
Keith Rattay
(949) 470 -3000
(949) 581 -0983 FAX
$718,029.96
29.ATL Building Irrigation & Landscape
Chaffey College
5885 Haven Ave.
Rancho Cucamonga, CA 91737
Sarah Riley
(909) 477 -8547
(909) 477 -8571 FAX
Completed 05/06 $286,910.61
30. YMCA Daycare Center
City of Mission Viejo
200 Civic Center
Mission Viejo, CA 92691
Jerry Hill
(949) 470 -3052
(949) 581 -0983 FAX
Completed 04/06 $239,542.00
31.Grass Playfields
Long Beach Community College
4901 E. Carson Street
Long Beach, CA 90808
Sandy Mathis
(562) 938 -4111
(562) 938 -4118 FAX
Completed 05/06 $520,247.88
32.La Habra Landscape & Electrical
City of La Habra
201 E. La Habra Blvd.
La Habra, CA 90631
Contact: Sam Makar
(562) 905 -9720
(562) 905 -9643 FAX
Completed 01/06 $862,344.87
33.Yucca Park
City of Los Angeles
200 N. Spring Street
Los Angeles, CA 90012
Contact: Richard Chang
(213) 978 -1912
(213) 978 -1901 Fax
Completed 10/06 $574,960.24
34. Fullerton High School Landscape
35.Fullerton High School Site Work
Erickson -Hall Construction Co.
1021 W. Bastanchury # 110
Fullerton, CA 92833
Contact: Samosh Mhapsekar
(714) 738 -4995
(714) 738 -5194 Fax
Fullerton High School Landscape Completed 03/06 $113,051.00
Fullerton High School Site Work Completed 03/06 $239,422.00
36.Sidewalk, Curb & Gutter
City of Newport Beach
3300 Newport Blvd.
Newport Beach, CA 92663 -3884
Contact: Frank Tran
(949) 644 -3340
(949) 644 -3308 Fax
Completed 05/06 $595,3410.0
37.Brea Blvd. Median Landscape
City of Brea
1 Civic Center Circle
Brea, CA 92821
Contact: Raul Lising
(714) 671 -4450
(714) 990 -2258 Fax
Completed 08/06 $1,344,650.00
38.Villegas Park Improvements
39.Monroe Street Wall
40.Sidewalk Curb & Gutter
City of Riverside
3900 Main Street
Riverside, CA 92522
Contact: Daniel J. Simmons
(951) 826 -5591
(951) 826 -5542 Fax
Villegas Park Imp. Completed 2006 $306,523.00
Monroe Street Wall Completed 10/2006 $200,679.00
Sidewalk Curb & Gutter Completed 10/2006 $948,142.00
41.West Chapman Ave. Parking Lot Expansion
City of Fullerton
303 West Commonwealth Ave.
Fullerton, CA 92832 -1775
Contact: Mehrdad Miralaie
(714) 738 -6866
(714) 738 -3115 Fax
Completed 2006 $353,903.0
42.Teen Square Improvements
City of Lynwood
11330 Bullis Road
Lynwood, CA 90262
Contact: Jorge Roque
(310) 603 -0220
(310) 635 -0493 Fax
Completed 10/06 $470,047.00
43.Harbor Hills Community Center
Community Development Commission of LA County
4800 E. Cesar E Chavez Ave.
Los Angeles, CA 90022
Contact: Bill Yee
(323) 260 -3412
(323) 266 -5930 Fax
Completed 09/06 $209,034.00
44.Patricia Lane Park Improvements
City of Santa Ana
20 Civic Center Plaza M -22
Santa Ana, CA 92702
Contact: Ed Torres
(714) 647 -5018
(714) 647 -5058 Fax
Completed: 10/06 $456,181.00
45.1,a Palma Play Area Rehabilitation
City of La Palma
7822 Walker Street
La Palma, CA 90623 -1771
Contact: Ismile Noorbaksh
(714) 690 -3310
(714) 523 -2141 Fax
Completed: 10/06 $245,372.00
46.Freeway Beautification
City of Riverside
3900 Main Street
Riverside, CA 92522
Contact: Daniel J. Simmons
(951) 826 -5591
(951) 826 -5542 Fax
Completed 09/06 $245,685.00
47.Veterans Memorial
City of Paramount
16400 Colorado Ave.
Paramount, CA 90723 -5012
Contact: Jack Perich
(562) 220 -2000
(562) 630 -6731 Fax
Completed 10/06 $995,680.77
48.Ray Moore Stadium Improvements
CAL K -12
32598 Oak Glen Road
Yucaipa, CA 92399
Contact: Nolan Ballard
(909) 795 -9169
(909) 795 -9432 Fax
Completed 09/06 $594,464.00
49.Fountain Valley Sidewalks
City of Fountain Valley
10200 Slater Ave.
Fountain Valley, CA 92708
Contact: Harry Drake
(714) 593 -4606
(714) 593 -4494 Fax
Completed 09/06 $150,2X00
50.Civic Center Hardscape
City of Apple Valley
14955 Dale Evans Parkway
Apple Valley, Ca 92307
Contact: Gina Whiteside
(760) 240 -7000
Completed 02/07 $698,802.96
51.Mpower Parking Lot
City of Bellflower
16600 Civic Center Drive
Bellflower, Ca 90706
Contact: Paul Zweip
(562) 804 -1424
(562) 925 -8660
Completed 01 /07 $317,361.06
52.Loma Linda Tennis Courts
City of Loma Linda
25541 Barton Road
Loma Linda, Ca 92354
Contact: Eleazar Alex Rubalcava
(909) 799 -2800
(909) 799 -2890 Fax
Completed 12/06 $351,278.42
53.Adelanto Road Imp.
City of Adelanto
11600 Airbase Road
Adelanto, Ca 92301
Contact: Wilson So
(760) 246 -2300
Completed 11/06 $967,788.90
54.Perris Blvd. Median
City of Moreno Valley
14177 Frederick Street
Moreno Valley
Contact: Ben Rahimian
(951) 413 -3130
(95 1) 413 -3170 Fax
Completed 12/06 $96,96205
55.Highland Sidewalks
City of Highland
7231 Boulder Avenue 4531
Highland, Ca 92346
Contact: John C. Egan
(909) 748 -0010
(909) 748 -0016 Fax
Completed 01/07 $283,989.03
56.Lincoln St. Park
City of Lake Elsinore
130 S Main St.
Lake Elsinore, Ca 92530
Dave Solomon
(951) 674 -87 -61
(951) 674 -3124 Fax
Completed 3/07 $769,634,40
57.Shirpser Elementary School
El Monte City School District.
3540 N. Lexington Ave.
El Monte, Ca 91731
Contact: Lila Hovennan
(909) 305 -2332
(909) 305 -2180
Completed 03/07 $160,391.68
58.Mistletoe Park Imp.
City of San Jacinto
248 E. Street
San Jacinto, Ca 92583
Contact: Mike Emberton
(951) 654-4041
(951) 487 -7382
Completed 02/07 $220,966.60
59.Allendale Park
City of Pasadena
100 N. Garfield Ave.
Pasadena, Ca 91105
Contact: Alba lraheta
(626) 744-4124
Completed 02/07 $278,093.32
60.Ramsey Street Medians
City of Banning
99 E. Ramsey Street
Banning, Ca 92220
Contact: Arturo Vela
(951) 922 -3130
(909) 922 -3141 Fax
Completed 05/07 $914,522.00
61.Boeing St.
City of Moreno Valley
14177 Frederick Street
Moreno Valley, Ca 92552
Contact: Christopher L. Wiberg
(951) 413 -3135
(951) 413 -3170 Fax
Completed 02/07 $281,834.81
62.Alicia Parkway Medians
City of Laguna Mills
24035 El Toro Road
Laguna Hills, Ca 92653
Contact: Kenneth Rosefield
(949) 707 -2650
(949) 707 -2633
Completed 05/07 $434,021.89
63.Cesar Chavez Park Imp.
City of South Gate
8650 California Avenue
South Gate, Ca 90280
Contact: Adel Freij Willdan
(323) 357 -9657
(323) 563 -9572 Fax
Completed 05/07 $1,503,328.08
64.Chino Concrete Repair
City of Chino
13220 Central Avenue
Chino, Ca 91710
Contact: Jerry Perez
(909) 627 -7577
(909) 591 -6829 Fax
Completed 06/07 $362,006.00
65.Chapman Ave. Streetscape
City of Stanton
7800 Katella Ave
Stanton, Ca 90680
Contact: Patricia A. Simpson
(714) 379 -9222
(714) 890 -3123 Fax
Completed July 2007 $905,480.50
66.Imperial Highway
County of Los Angeles
900 South Fremont Avenue
Alhambra, Ca 91803
Contact: Hector Hernandez
(626) 458 -5100
Completed June 2007 $333,355.35
67.Fairplex Park & Ride
County of Los Angeles
900 South Fremont Avenue
Alhambra, Ca 91803
Contact: Jose Pou
(626) 458 -5100
Completed 2007
68.Holifield Park
City of Norwalk
127000 Norwalk Blvd,
PO Box 1030
Norwalk, Ca 90651
Contact: Brenda L. De Jager
(562) 929 -5700
(562) 929 -5773 Fax
$96,987.50
69.Veterans Park Walkway
City of Yorba Linda
4845 Casa Loma Ave.
P.O. Box 87014
Yorba Linda, Ca 92885
Contact: Steve Campbell
(714) 961 -7100
Completed 04/07 $139,643.00
70.Foothill Blvd. Medians
Lewis Operating Corporation
1156 North Mountain Ave.
P.O. Box 670
Upland, Ca 91785
Contact: Stacy Lin
(909) 985 -0971
Completed 05/07 $166,373.29
71.Foothill Blvd. Perimeter
Lewis Operating Corporation
1156 North Mountain Ave.
P.O. Box 670
Upland, Ca 91785
Contact: Stacy Lin
(909) 985 -0971
Completed 05/07 $475,333.22
72.Chino Hills Pkwy Monument
City of Chino Hills
2001 Grand Avenue
Chino Hills, Ca 91709
Contact: Anne Dutrey
(909) 364 -2760
(909) 364 -2791 Fax
Completed 4/07 $300,175.00
73.Civic Center Park Landscape
City of Apple Valley
14955 Dale Evans Parkway
Apple Valley, Ca 92307
Contact: Gina Whiteside
(760) 240 -7000
Completed 08/07 $534,283.01.
74.Friendship Park
City of Bellflower
16600 Civic Center Drive
Bellflower, Ca 90706
Contact: Paul Zweip
(562) 804 -1424 Ext2250
(562) 8044465 Fax
Completed 11/07 $919,500.00
75.Kessler Park
County of San Bemardino157 W. 5' Street
San Bernardino, Ca 92415
Contact: Greg Bacon
(909) 387 -6076
(909) 397 -5968
Completed 9/07 $456,152.00
76.Barstow High School Landscape
City of Barstow
551 South Avenue H
Barstow, Ca 92311
Contact: Steve Prince
Phone: (909) 989 -9979
Completed 08/07 $326,412.00
77.Laguna Niguel Amphitheater
City of Laguna Niguel
27791 La Paz Road
Laguna Niguel, Ca 92677
Contact: Nicholas Renn
(949) 362 -43414
Completed 5/07 $157,900.00
78.Valley High School
PCM3
1801 S. Greenville Street
Santa Ana, Ca 92704
Contact Pamela Goodrich
(714) 662 -0227
(714) 662- 0233Fax
Completed 10/07 $234,830.00
79.Chapman Ave and Katella Ave Streetscape
City of Stanton
7800 Katella Ave
Stanton, Ca 90680
Contact: Sean Crumby
(714) 379 -9222 Ext. 204
(714) 890 -3123 Fax
Completed July 2007 $905,480.50
80.Cerritos Ave Streetscape
City of Stanton
7800 Katella Avenue
Stanton, Ca 90680
Contact: Sean Crumby
(714) 379 -9222 Ext204
Completed 9/07 $1,059,468.62
81.Rivera Park
City of Pico Rivera
6767 Passons Blvd.
Pico Rivera, Ca 90660
Contact: Jose Rico
(562)802 -4432
Completed 8/07 $237,59100
82..San Gabriel Blvd
City of San Gabriel
425 S. Mission Drive
San Gabriel, Ca 91776
Contact: Mark Moreno
(714)293 -0278
(714) 973 -2263 Fax
Completed 11/08 $228,927.00
83..Tree Removal and Sidewalk
City of Bellflower
16600 Civic Center Drive
Bellflower, Ca 90706
Contact: Paul Zwiep
(562)804 -1421 Ext.2250
(562) 8044465 Fax
Completed 6/07 $183,182.00
84.G race Street Reconstruction
City of Barstow
220East Mountain View Street
Barstow, Ca 92311
Contact:William Henderson
(760)255 -5157
(760) 760- 256 -1750 Fax
Completed 6/07 $297,741.00
85.Recreation Trail Improvements
City of Villa Park
17855 Santiago Blvd
Villa Park, Ca 92861
Contract: Blanc Frandsen
(714) 973 -2230
Completed 9/07 $144,242.32
86.Veterans Memorial Park
City of Stanton
7800 Katella Avenue
Stanton, Ca 90680
Contact: Sean Crumby
(714) 379 -9222 Ext.204
Completed 12/07 $1,096,382.35
87.Santa Fe High School
Whittier Unified School District
9401 S. Painter Ave.
Whittier, Ca 90605
Contact: Dan Romo
(562) 698 -8121
(562) 693 -5371
Completed 10/07 $349,309.00
DSA Inspected
88.Curbs, Gutters & Sidewalks
City of El Segundo
350 Main Street
El Segundo, Ca 90245
Contract: Maryam Jones
(310)524 -2361
Completed 9/07 $182,201.00
89.Yucca Park
City of Indio
100 Civic Center Mall
Indio, Ca 92201
Contact: Connie Allen
(760) 391 -4005
Completed 03/08 $1,044,965.00
90.Foglesong Park
City of Barstow
220 East Mountain View Street
Barstow, Ca 92311
Contact: Jeanette Hayhurst
(760)255 -5146
(760) 760- 256 -5621
Completed 02/08 $381,825.00
Percent Completed 100%
91.Las Flores Park
City of Malibu
23815 Stuart Ranch Road
Malibu, Ca 90265
Contact: Arthur Aladjadjian
(310) 456 -2489
(310) 456 -3356 Fax
Completed 09/08 2,040.673.00
92.Imperial Median
City of La Mirada
13700 La Mirada Blvd.
La Mirada, Ca 90638
Contact: Steve Forster
(562)902 -2371
Completed 12/07 $990,381.00
93.Rialto Concrete
City of Rialto
150 South Palm Ave.
Rialto, Ca 92376
Contact: Naddem Syes
(909) 421 -4986
(909)421 -7210 Fax
Completed 11/07 $170,701.00
94.UCR Parking Lot
The Regents of The University of California
3615A Canyon Crest Drive
Riverside, Ca 92507
Contact John A. Friedrach
(951) 781 -0811
(951) 781 -8435 Fax
Completed 12/07 $357,924.00
95.Serrano Creek Play Structure
City of Lake Forest
25550 Commercentre Dr.
Lake Forest, Ca 92630
Contact: Jesse Caballero
(949) 855 -5764
(949) 855 -7050 Fax
Completed 12/07 $417,545.32
96.Azusa Ave. Medians
City of West Covina
1444 West Garvey Ave.
West Covina, Ca 91793
Contact: Sam Guitierrez
(626) 939 -8734
(626)939 -8660 Fax
Completed 12/07 $325,320.00
97.Thompson Basketball Park
City of Oxnard
305 West Third Street
Oxnard, Ca 93030
Contact: Patricia C. Friend
(805) 385 -7821
(805)805- 385 -8329 Fax
Completed 11/07 $200,462.85
98.College Park
City of Oxnard
1060 Pacific Avenue. Building 2
Oxnard, Ca 93030
Contact: Patricia C. Friend
(805) 385 -7821
(805) 385 -8329 Fax
Completed 4/08 2,343,473.50
99.Warner Basin
City of Anaheim
200 S. Anaheim Blvd. Suite 276
Anaheim, Ca 92805
Contact: Caster D. Williams
(714) 765 -5176
(714) 765 -5225 Fax
Completed 3/08 166,199.00
100.Dog Park
City of Culver City
9770 Culver Blvd.
Culver City, Ca 90232
Contact: Hong Wang
(310) 253 -5604
(310) 253 -5626 Fax
Completed 3/08 $123,102.00
101. Maxwell Park Renovation
City of Anaheim
200 S. Anaheim, Ca 92805
Contact: Robert Palaeologus
(714) 765 -5175 Ext 5711
Completed 11 /08 $1,669,90150
102.Whittier High School Quad
Whittier Union High School District
9401 So. Painter Ave.
Whittier, Ca 90605
Contact: Doug Omdorff
(562) 698 -8121 Ext 1537
Completed 08/2008 $1,009,783.00
103.Meadows Park
City of Lynwood
11330 Bullis Road
Lynwood, Ca 90262
Contact: Arsenio Frontela
(310) 603 -0220
(310) 635 -0493
Completed 9/08 $1,473,593.20
104.11esperia Civic Plaza
City of Hesperia
9700 Seventh Ave.
Hesperia, Ca 92345
Contact: David R. Burkett
(760) 947 -1202
Completed 9/2008 $3,500,000.00
105.PCH Roadway Improvements
City of Dana Pont
33282 Golden Lantern
Dana Point, Ca 92629
Contact: Todd Niemann
(949) 213 -4231
Completed 09/2008 $712,343.30
106.Dateland Park
City of Coachela
1515 Sixth Street
Coachella, Ca 92236
Contact: Mark Chappell
(760) 398 -5744
(760) 398 -1630
Completed 10/2008 $1,679,765.61
107.Thornton & Windsor Parks
City of Santa Ana
P.O. Box 1988
Santa Ana, Ca 92702
ContactVilliam Albright
(714) 647 -5029
Completed 9/2008 $331,240.00
108. Dotson Park
City of Stanton
7800 Karelia Avenue
Stanton, Ca 90680
Contact: Sean Crumby
(714) 379 -9222 Ext.204
Completed 12/08 $1,866,279.00
109.Garcia Park
City of Rancho Cucamonga
10500 Civic Center Dr.
Rancho Cucamonga, Ca 91729
Contact: Karen Emery Meguire
(909) 477 -2740 Ext.4080
(909) 477 -2746 Fax
Completed 09/08 $1,831,717.25
110.Estudillo Parking Lot
City of San Jacinto
595 S. San Jacinto Ave
San Jacinto, Ca 92583
Contact: Holly Binkley
(951) 654 -3592
(951) 651 -3672
Completed 8/08 $215,783.00
111.Memorial Park Walkway & Walkway Lighting
City of Pasadena
100 North Garfield Ave
Pasadena, Ca 91109
Contact: Reny Q. Quijano
(626) 744 -6741
(626) 7443892
Completed 09/2008 $130,000.00
112. Oak Glen Park Improvements
County of San Bemardino
157 West Fifth Street
San Bernardino, Ca 92415
Contact: Greg Bacon
(909) 387 -5940
(909) 387 -5968
Completed 2008
Original Contract $911,488.00
113.Westmister H.S. Parking Lot
Huntington Beach U.H.S.D
5832 Balsa Ave.,
Huntington Beach, Ca 92646
Contact: Celia Taylor
(714) 903 -7000
(714) 372 -8105
Completed 01/09 $854,83100
114. 1000 Palms Community Park
Riverside County Redevelopment
C/O Ian Davison Landscape Architecture, Inc.
3744 Tenth St. Suite 200
Riverside, Ca 92501
Contract: Ian Davison
(951) 683 -1282
(951) 683 -4352
Completed 12/08 $ 775,OOOA0
115.Centennial H.S. Softball Park
Compton U.S.D
C/O DelTerra
13181 Crossroads Pkwy North Ste. 200
City of Industry, CA 91746
Contact: Lisa Estrada
(626) 839 -9300
(626) 592 -3595
Completed 11/08 $310,000.00
116.Moorpark College Walkway
Ventura Community College
C/O Heery
103 Durley Avenue
Camarillo, Ca 93010
Contact: Dick Jones
(805) 384 -8152
(805) 384 -8155
Completed 12/08 $359,956.00
117.Sky Water Trail Sidewalk
City of Cathedral City
68 -700 Avenida Lalo Guerrero
Cathedral City, CA 92234
Contact: Mitchell J. Nieman
(760) 770 -0348
(760)202 -1460
Completed 10/08 $143,021.00
118.Playfield Expansion
Pomona Unified School District
800 S. Garey Ave
Pomona, Ca 91766
Contact Ava Hill
(909) 397 -4800
(909) 397 -5050
Completed 11/2008 Original Contract $257,205.00
119.13anning Parking Lot
City of Banning
99 E. Ramsey Street
Banning, Ca 92220
Contact: Holly Stuart
(951) 922 -3138
(951) 922 -3141
Completed 12/08 $961,941.00
120.11all Jr. High Concrete
Anaheim Unified School District
501 Crescent Way
Anaheim, Ca 92803
Contact: Ralph Figueroa
(714) 999 -2188
(714) 520 -5741
Completed 8/2008 $198,698.00
121. Slauson Ave Median
Los Angeles County
900 South Fremont Ave 8 Floor
Alhambra, Ca 91803
Contact: Irma V. Serra
(626) 458 -4951
(626) 458 -2197
Completed 08/2008 $ 698,729.00
122.Cypress St. Improvement
City of Highland
27215 Base Line
highland, Ca 92346
Contact: Etta R. Pulce
(909) 890 -1255
(909) 890 -0995
Completed 09/09 Original Contract $437,389.00
123. Huntington Beach HS Tennis Courts
Huntington Beach
Union High School District
5832 Bolsa Ave
Huntington Beach, Ca 92649
Contact: Celia Taylor
(714) 903 -7000
(714) 372 -8105
Completed 03/2009 $1,475,370.00
124. Downtown Infrastructure
City of Indio
100 Civic Center Mall
Indio, Ca 92201
Contact: Mariano Aguire
(760) 541 -4230
(760) 391 -4021
Completed 09/2009 $3,550,000.00
125.Soccer Field
Beverly Hills Unified School District
255 S. Lasky Drive
Beverly Ilills, Ca 90212
Contact: Arturo Arce
(310) 550 -8049
(310) 551 -0287
Completed 05/2009$363,935.00
126.Community Services Parking Lot
City of Westminster
8200 Westminster Boulevard
Westminster, Ca 92683
Contact: Jake Ngo
(714)898 -3311
(714) 895 -4499
Completed 10/09 Original Contract $237,314.00
127.Veterans Park Sports
City of Colton
650 N. La Cadena Dr
Colton, Ca 92324
Contact: Thomas I Williams
(909) 370 -5099
Completed 11/2009 $3,046,000.00
128. South Laguna Streetseape
City of Laguna Beach
505 Forest Ave
Laguna Beach, Ca 92651
Contact: Lisa M. Penna
(949) 497 -0792
Completed 11/2009 $848,282.00
129. Challenger Youth Center
County of Los Angeles
900 South Fremont Avenue
Alhambra, Ca 91803
Contact: Brian Soria
(626) 459 -5100
Completed 06/09 Original Contract $101,294.00
130. Tierra Bonita Park
City of Lancaster
44933 Fern Avenue
Lancaster, Ca 93534
Contact: Jon H Manager
(661) 723 -6000
Completed 07/09 Original Contract $101,294.00
131. Marina High School Courts
Huntington Beach U.H.S.D
5832 Bolsa Ave
Huntington Beach, Ca 92649
Contact: Celia Taylor
(714) 903 -7000
Completed 10/2009 $1,268,639.00
132.Thundersky Park
City of Riverside
3900 Main Street
Riverside, Ca 92522
Contact: Andy Emery
(951) 826 -5311
Completed 10/2009 $1,259,000.00
133.Mary Van Dyke Park
City of South El Monte
1415 N. Santa Anita Avenue
South El Monte, Ca 91733
Contact: Norma Macias
(626) 579 -6540
Completed 12/2009 $1,259,000.00
134.Prime Desert Pavilion
City of Lancaster
44933 Fem Ave
Lancaster, Ca 93534
Contact: Neal Knopik
(661) 72 -6000
Completed 10/2009 $145,674.00
135.Robinson Park
City of Pasadena
100 North Garfield Avenue
Pasadena, Ca 91109
Contact: Steven L. Wright
(626) 744 -7389
Completed 12/2009 S 2,459,699.00
136.Westminster H.S. South Parking Lot
Huntington Beach Union High School District
5832 Bolsa Avenue
Huntington Beach, Ca 92649
Contact: Celia Taylor
(714) 903 -7000
Completed 10/2009 $ 1,065,526.00
137.Huntington Beach H.S. Fire lane
Huntington Beach Union High School District
5832 Bolsa Ave
Huntington Beach, Ca 92649
Contact: Nelson Cayabyab
(714) 903 -7000
Completed 10/2009 $664,687.00
138. Villa & Singer Restrooms
City of Pasadena
100 North Garfield Avenue
Pasadena, Ca 91 109
Contact: Steven L. Wright
(626) 744 -7389
Completed 7/2010 $458,855.00
139.Lake Skinner Improvements
Riverside County Regional Park & Open - Space District
4600 Crestmore Rd
Riverside, Ca 92509
Contact: Jason Plotkin
(951) 955 -0169
(951) 955 -1383
Completed 7/2010 $4,162,378.55
140.West Downtown Pedestrian Improvement
City of Santa Barbara
630 Carden Street
Santa Barbara, Ca 93102
Contact: Eric Maple
(805) 564 -5377
(805) 897 -2613
Completed 04/2011 $2,299,220.00
141.Fairmount Park Universal Play Area
City of Riverside
3900 Main Street
Riverside, Ca 92522
(951) 826 -2000
(951) 826 -2005
Contact: Andy Emery
Completed 06/2010 $2,207,907.00
142.Palm Dr & Pierson Streetscape
City of Desert Hot Springs
65 -950 Pierson Blvd
Desert Hot Springs
(760) 329 -6411
(760) 288 -0606
Contact: Jonathan Joy
Completed 06/2010 $3,221,889.93
143.Eastside Box & Woodward Parks
City of Yorba Linda
4845 Casa Loma Avenue
Yorba Linda, Ca 92885
Steve Campbell
(714) 961 -7168
Completed 06/2010 $1,067,515.41
144.Peck Park
City of Los Angeles
1149 South Broadway
Los Angeles, Ca 90015
(213) 847 -1922
Contact: Mary Carter
Completed 09/11 Original Contract $3,636,946.00
145.Pioneer High School Sitework— Quad
Whittier Union High School District
9401 S Painter Ave
Whittier, Ca 90605
(562) 698 -8121
Contact: Stephanie Ruternbeck
Completed 09/2010
Original Contract $1,088,487.00
146. El Toro Park Renovation
City of Lake Forest
25550 Commercentre Dr Suite 100
Lake Forest, Ca 92630
(949) 461 -3400
Contact: Luis Estevez
Completed 09/2010
Original Contract $ 563,681.00
147. Van Wig Courtyard Renovation
Bassett Unified School District
904 N. Willow Ave
La Puente, Ca 91746
(626) 839 -9300
Contact: Wilson Vasconez
Completed 10/2010
Original Contract $ 648,276.00
148. Hunter Hobby Park
City of Riverside
3900 Main St
Riverside, Ca 92522
(951) 826 -2012
(951) 826 -2038
Contact: Ewina Lau
Completed 12/2011
Original Contract $4,754,813.00
149. Costa Mesa High School
Newport —Mesa Unified School District
2985 — A Bear Street
Costa Mesa, Ca 92626
(714) 424 -5000
Contact: James Lamond
Completed: 09/2010
Original Contract $ 369,072.00
150. Sepulveda Basin Sports Complex
City of Los Angeles
221 N. Figueroa St. Ste 1510
Los Angeles, Ca 90012
(213) 202 -2640
Contact: Mary E Alvarez
Completed 01/2012
Original Contract $ 7,301,548.00
151. Corona Del Mar High School
Newport Mesa Unified School District
2985 -- A Bear Street
Costa Mesa, Ca 92626
(714) 424 -5000
Contact: Jeffery Trader
Completed 02 /2011 $916,155.00
152. Multi -Site Track & Field Improvements
Huntington Beach Unified H.S.D.
5832 Balsa Ave
Huntington Beach, CA 92649
(714) 903 -7000 x 4359
Contact: Celia Taylor
Completed 05/2011 3,208,884.00
153.Atwater Park
City of Los Angeles
221 N Figueroa Street
Los Angeles, Ca 90012
(213) 202 -2640
Contact: Mary E Alvarez
Completed 12/2011 Original Contract: 2,170,632.00
154.Pier Bowl Lighting
City of San Clemente
910 Calle Negocio
San Clemente, Ca 92673
(949) 361 -8267
Contact: Tim Shaw
Completed 07/11 Original Contract: 1,326,322.00
155.0 Avenue Park
County of Los Angeles
4800 Cesar E Chavez Avenue
Los Angeles, Ca 90022
(323) 260 -3449
Contact: Jeffrey Biben
Completed 5/12 Original Contract: 3,866,188.00
156. College Park
City of Oxnard
1060 Pacific Avenue
Oxnard, Ca 93030
(805) 385-7821
Contact: Patricia Friend
Completed 1/12 Original Contract: 11,056,475.00
157.Doty Trust Park
City of Riverside
3900 Main Street
Riverside, Ca 92522
(951) 826 -2000
Contact Andy Emery
Completed 5/12 Original Contact: $3,531,462.00
158.Gibson Mariposa Park
City of El Monte
11333 Valley Blvd
El Monte, Ca 91731
(626)580 -2058
Contact: James Emiquez
Completed 01/12
Original Contract 2,905,629.00
159.11untington Beach High School Athletic Field Imp
Huntington Beach Union High School District
5832 Bolsa ave
Huntington Beach, Ca 92649
(714) 903 -7000
Contact Celia Taylor
Completed 12/2011 Original Contract $ 2,235,567.00
160.Cucamonga Elementary School Site Imp
Cucamonga School District
8776 Archibald Ave
Rancho Cucamonga, Ca 91730
(909) 484 -1009
Contact: Lynn Ashton
Completed 08/11 Original Contract: $212,426.00
161.Costa Mesa High School Paving & Landscape
Newport — Mesa Unified School District
2985 — A Bear Street
Costa Mesa, Ca 92626
(714) 424 -5079
Contact: Jeffery Trader
Completed 09/11 Original Contract $ 467,692.00
162.Don Julian Elementary Path of Travel
Basset Unified School District
904 N Wilson Ave
La Puente, Ca 91746
(626) 931 -3000
Contact: Wilson Vasconez
Completed 08 /11 Original Contract $ 779,654.00
163.Atlantis Splash Pad
City of Garden Grove
11222 Acacia Parkway
Garden Grove, Ca 92842
(714) 741 -5040
Contact: Sandra Segawa
Completed 03/12 Original Contract $ 668,192.00
164.Costa Mesa H.S. Utilities
Newport — Mesa Unified School District
2985 — A Bear Street
Costa Mesa, Ca 92626
(714) 424 -8950
Contact: Craig P. Scaringi
Completed 09/11 Original Contract $ 1,215,274.00
165.Copper Hill Park
County of Los Angeles
900 South Fremont Ave
Alhambra, Ca 91803
(626) 300 -2329
Contact: Claire Chang
Completed 5/2012 Original Contract $ 795,555.00
166.Florence Ave. Parking Lot
County of Los Angeles Community Development Commission
1616 E. Florence Ave
Los Angeles, Ca 90001
(323) 864 -2574
Contact: Chen Kan
Completed 1/2012
Original Contract $364,104.00
167. Full Half Width
County of San Bernardino
222 W. Hospitality Lane
San Bernardino, Ca 92415
(909)386 -8775
Contact: Arthur 1. Rivera
Completed 10/2012
Original Contract $ 2,696,336.00
168.Tequesquite Park Imp.
City of Riverside
3900 Main St
Riverside, Ca 92522
(951) 826 -2000
Contact: Andy Emery
Completed 6/2013
Original Contract $7,016,220.00
169.Arlington H.S. Field Upgrades
Riverside Unified School District
3380 W Street
Riverside, Ca 92501
951- 352 -6729
Contact: Chenchim (Jane) Jumnongslip
Completed 11/2012
Original Contract $3,092,452.00
170.Roosevelt 11 Elementary School
San Bernardino City Unified School District
777 N. F Street
San Bernardino, Ca 92410
909 - 384 -1785
Contact: Andres Ramirez
Completed 12/12
Original Contract $1,088,938.00
171.Poly High School — Stadium Improvements
Riversde Unified School District
3380 W Street
Riverside, Ca 92501
951 - 788 -7147
Contact: Janet Dixon
Completed 01/12
Original Contract $1,223,921.00
172.Monterey Ave Entrance
Desert Community College District
43 -500 Monterey Ave
Palm Desert, Ca 92260
760 - 346 -8041
Contact: Karen LeSassier
Completed 08/2013
Original Contract $1,201,040.00
173.North Campus Front Quad Landscape
Long Beach Community College District
4901 East Carson Street
Long Beach, Ca 90808
562- 9384947
Contact: Margie Padron
Completed 5/2013
Original Contract $2,271,564.25
174.Magnolia High School
Anaheim Union High School District
501 Crescent Way
Anaheim, Ca 92803
714- 999 -3511
Contact: Jennifer Ellmore
Completed 12/2012 Original Contact $1,427,100.00
175. Fitness Park
City of Paramount
16400 Colorado Avenue
Paramount, Ca 90723
562- 220 -2000
Contact: Bill Pagett
Completed 4/2013
Original Contact $3,767,348.23
176. Bagdouma Park
City of Coachella
1.515 Sixth St
Coachella, Ca 92236
760 -398 -5744
Contact: Gordon Fisher
Completed 4/2013
Original Contract $2,447,971.00
177. Hwy 18 Imp
Town of Apple Valley
14955 Dale Evans Pkwy
Apple Valley, Ca 92307
760 - 240 -7000
Contact: Christopher Moore
Completed 412013
Original Contract: $967,933.41
178.Valley College
San Bernardino Valley College District
114 S. Del Rosa Dr
San Bernardino, Ca 92408
Contact: Charlie NG
909- 382 -4000
Completed 4/2013
Original Contract: $1,356,776.00
179.Orange Grove Park
Community Development Commission County of Los Angeles
700 W. Main St
Alhambra, Ca 91801
(323) 260 -3449
Contact: Jeffrey Biben
Completed 01/14
Original Contract: $1,756,889.72
180.11) Street Improvements
City of Perris
101 N D Street
Perris, Ca 92570
Contact: Michael Morales
951- 956 -2120
Completed 11/2013
Original Contract: $ 1,723,873.60
181.Chittick Field
City Of Long Beach
333 West Ocean Blvd 10' Floor
Long Beach, Ca 90802
Contact: Gillis Monroe
562 -570 -6283
Still Working
Original Contract: $5,148,583.00
182.Avocado Heights Trail
County of Los Angeles
900 S Fremont Ave
Alhambra, Ca 91803
Contact: Irma Vasquez
626- 458 -4951
Still Working
Original Contract: $4,038,400.00
183.Rimrock Road
City of Barstow
220 E Mountain View Street
Barstow, Ca 92311
Contact: JoAnne V. Cousin
760- 256 -3531
Still Working
Original Contract: $ 7,547,936.24
184. Median Improvements
Town of Yucca Valley
58928 Business Center Dr
Yucca
Valley, Ca 92284
Contact: Alex Qishta
760 - 369 -6579
Still Working
Original Contract: $2,161,147.00