Loading...
OB - Item 3C - Rosemead Community Recreation Center Improvements - Furniture, Fixtures, and EquipmentROSEMEAD OVERSIGHT BOARD STAFF REPORT TO: THE HONORABLE CHAIR AND BOARD MEMBERS FROM: MATTHEW HAWKESWORTH, ASSISTANT CITY MANAGE DATE: FEBRUARY 19, 2014 SUBJECT: ROSEMEAD COMMUNITY RECREATION CENTER IMPROVEMENTS — FURNITURE, FIXTURES, AND EQUIPMENT SUMMARY As part of the July 2010 tax increment bond issuance by the former Redevelopment Agency, the City included funding for a project to renovate and expand the Rosemead Community Recreation Center (RCRC). The existing facility was built in 1975 and is approximately 17,000 square feet in size. RCRC serves as a major community recreation facility that houses senior programs, recreation classes, special functions, and community events. Renovation on the RCRC facility progressed in several phases that initiated in the spring of 2012. Since this time, a portion of the design and construction has been completed, including the replacement of roof materials, heating /cooling systems, and interior renovations. The final phase of the facility modernization includes the construction of a 3,000 square foot annex and renovation of the exterior of the existing building. It is expected that this work will begin in the spring of 2014. With the recent completion of the interior renovations at the existing facility, a package of furniture, fixtures and equipment has been selected to complete the interior portions of the building. Funding for these materials were included as part of the 2010 bond issuance by the former Redevelopment Agency. Staff Recommendation It is recommended that the Oversight Board approve Resolution 2014 -0003 confirming the purchase furniture, fixtures, and equipment for the Rosemead Community Recreation Center Improvement Project. DISCUSSION In 2010, the City completed the Parks and Facilities Master Plan to help serve as a guide for future capital improvements. As such, the City, with significant public input, identified a need to improve and expand the Rosemead Community Recreation Center (RCRC). Together with the new Civic Center Parking Lot and Downtown Plaza, this area will serve APPROVED FOR SUCCESSOR AGENCY AGENDA. �`W i Rosemead Successor Agency Oversight Board February 19, 2014 Page 2 of 3 as an inviting space for public events and will expand on services available to the community. The RCRC Expansion and Building Improvement Project will include the following elements: • Facade/Beautification Improvements • Improved Disabled Access • Building /Safety Improvements — fire safety, electrical equipment upgrades, structural reinforcement, roof repairs • Energy Efficiency Improvements — heating, ventilation, air conditioning system modernization; efficient lighting fixtures, drought tolerant landscaping, sustainable building materials • Interior Improvements — furniture, fixtures, and equipment for expansion area and adjoining areas to existing building • Building Expansion — the addition of approximately 3,000 square feet to include additional classroom space, a computer lab facility, small teen center, exterior plaza and staff offices. Based on the proposed uses and functions of the facility, the project architect, Cards Ten Architects, and design staff from G/M Business Interiors (G /M) have worked to design a package of furniture, fixtures, and equipment for the new Rosemead Community Recreation Center. The materials will support the facility's classes and uses while also complimenting the recently completed modernization improvements. G/M is a well - respected space planning and furniture design firm located in Southern California. G/M has worked with several other public agencies on similar improvement projects, including the City of Rosemead's recent City Hall Interior Improvements Project. In working with G /M, staff was able to negotiate the use of a competitively bid contract with the County of Riverside for the procurement of furniture and equipment. The County Contract provides the City with access to steep discounts that range from 46% to 70% off of list prices. This process, known as "piggybacking ", provides smaller cities with access to price discounts that would otherwise not be available. Additionally, the use of piggybacking also saves a considerable amount of staff time involved in a large procurement process. This process has been utilized by the city previously in the procurement of capital, including vehicles and equipment. The proposed package of equipment includes new furniture for staff offices, reception and lounge areas, assorted furniture pieces for the lobby and lounge areas, as well as the furnishing of the new computer lab. In addition to the furniture, technology related equipment is necessary for the new computer lab and staff that will be assigned to the facility. Bids for computers, switches, network storage devices, software, printers and other hardware have been solicited. Since the technology items to be furnished are being provided by multiple vendors, the Rosemead Successor Agency Oversight Board February 19, 2014 Page 3 of 3 City's purchasing code allows the City Manager to authorize all of the contracts since they will be less than $25,000. A breakdown of the proposed equipment is as follows: All -in -One Computers Dell $23,600 Cisco Switches PCMG $5,400 Sonicwall Firewall Dell $950 HP Printers PCMG $1,200 Network Storage PCMG $250 Projector PCMG $600 Software PCMG $1,100 Print Station GoPrint $3,400 Contingency (10 %) $1500 Total $40,000 As proposed, these furnishings, fixtures and equipment would be purchased at the end of February. It is expected that these materials would be installed in May, making the existing facility operational in July. FINANCIAL REVIEW This project was included in the City's Capital Improvement Program and is funded entirely with tax increment bond proceeds. The total budget for this project is $1,750,000.00. Submitted By: Chris Marcarello Director of Public Works Attachments: 1. Resolution 2014 -0003 (Oversight Board Confirmation of Furniture, Fixtures and Equipment Purchase) 2. Quote form G/M Business Interiors to Furnish and Install Furniture, Fixtures and Equipment 3. Riverside County Contract with G/M Business Interiors RESOLUTION NO. 2014 -0003 A RESOLUTION OF THE OVERSIGHT BOARD FOR THE SUCCESSOR AGENCY TO THE ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION CONFIRMING THE AWARD OF CONTRACT FOR FURNITURE, FIXTURES AND EQUIPMENT FOR THE ROSEMEAD COMMUNITY RECREATION CENTER IMPROVEMENT PROJECT WHEREAS, THE Rosemead Successor Agency received the Finding of Completion on April 18, 2013 from the Department of Finance; and WHEREAS, the Finding of Completion states that the Rosemead Successor Agency may utilize proceeds derived from bonds issued prior to January 1, 2011 in a manner consistent with the original bond covenants per Health and Safety Code section 34191.4(c); and WHEREAS, the Rosemead Successor Agency is holding approximately $7.1 million in bond proceeds derived from bonds issued prior to January 1, 2011 for Capital Improvement Projects identified in the bond covenants; and WHEREAS, the Rosemead Successor Agency will be required to provide oversight of the completion of the Capital Improvement Projects to ensure compliance with the bond covenants; and WHEREAS, the approved Capital Improvement Projects have been included on each Recognized Obligation Payment Schedule filed by the Rosemead Successor Agency; and NOW, THEREFORE, THE OVERSIGHT BOARD FOR THE SUCCESSOR AGENCY TO ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION HEREBY RESOLVES: 1. The Rosemead Successor Agency Oversight Board confirms that the contractors listed below are qualified and capable to provide furniture, fixtures, and equipment for the Rosemead Community Recreation Center Improvement Project. 2. That the contract with each contractor shall not exceed the price of the bid plus ten (10) percent, as listed in the table below. If any contract amendments are required in excess of this amount, then all such changes shall be brought back to the Oversight Board for review and approval. Trade Firm Total Budget Furniture and Fixtures GM Business Interiors $ 84,015.86 Technology Equipment Various $ 40,000.00• Total Cost $ 124,015.86 *Includes 10% contingency. 3. Successor Agency staff is directed to submit documents to the Department of Finance as necessary. 4. Successor Agency staff is directed to provide a copy of this Resolution to the County Auditor - Controller, the State Controller's Office and the State Department of Finance. PASSED, APPROVED AND ADOPTED THIS 19th DAY OF February, 2014. Pat Wallach Chair ATTEST: Matthew Hawkesworth Successor Agency Staff Euiw IF -111TE wp-- TLlRECUTIEN xemm� NtrEnryxrere EN EeEe. Ll.— RIOTERS. 1 3 1814 3 L1.W ..1 RECETICN TI 1ED 1 b 1501 W 3 1}p1q IT EC2 RECEPTION -E- I C.-PI ERIE- Euiw IF -111TE wp-- TLlRECUTIEN xemm� NtrEnryxrere EN EeEe. Ll.— RIOTERS. 1 3 1814 3 L1.W ..1 RECETICN TI 1ED 1 b 1501 W 3 1}p1q CH� �FICE 2 M9 'A.., TI T.— I- C� LOU�E Ew� 4� �' T,�� T.� L.�� H.— -1 71P (M S�� CH�7 L.—. F.V H . . . C- L—M 1..— 24 iLa -r �.....�RR. UllltT� X. AZ I T. h 1. .2 12 .�CoMRM,ERR� M.WbMb�M rRnf P mwwB 1 WSN F Beads a �„R.W.pp.8.9�R aw4 l UBOBCCMFViERRWN H—Mw7, ,eV.IN,]OVe ] D.1, .Il MB PpU RR[ Eyn m.- M t { NI.W 3 N>w EVS 1Mtt.BBtllFrerrea, CNW MULPNAPoE ROOM Xmm mw,wUp B ,p cwc GwB Fwm 1 0.,05,8 1 BYY S 1.MtW T. M. UR.E R0.M rwnenMW erxp 6wop ECa Imwu 0 0 1 3 i ,SWW 0 i BM,00 $ 9