OB - Item 3D - Rosemead Park Improvements Project - EMUHSD/City of Rosemead Perimeter Fence ReplacementROSEMEAD SUCCESSOR AGENCY STAFF REPORT TO: THE HONORABLE CHAIR AND BOARD MEMBERS FROM: MATTHEW HAWKESWORTH, ASSISTANT CITY MANAGER -� DATE: APRIL 30, 2014 SUBJECT: ROSEMEAD PARK IMPROVEMENTS PROJECT — EMUHSD /CITY OF ROSEMEAD PERIMETER FENCE REPLACEMENT SUMMARY As part of the July 2010 tax increment bond issuance by the former Redevelopment Agency, the City included funding for a project to renovate and improve portions of Rosemead Park and its amenities. The project identifies several elements of Rosemead Park that need improvement including playground equipment, the north parking lot, court lighting, basketball courts, turf and other improvements. Recently, El Monte Union High School District asked the City to share costs to replace the dilapidated perimeter fence between the two properties. The District, in accordance with its own purchasing policy, solicited bids for tubular steel fencing to replace 950 linear feet of existing chain link fence than runs along the park/school property line. A review of the project indicates that other adjacent improvements would be required including a small support wall and landscape and irrigation enhancements. Funding for this project would be provided through bond proceeds from the former Redevelopment Agency. Staff Recommendation It is recommended that the Successor Agency approve Resolution 2014 -0006 affirming expenditures of funds, in a an amount not to exceed $76,500, for the joint City /EMUHSD fence replacement and adjacent landscape enhancements as part of the Rosemead Park Improvements Project. DISCUSSION Rosemead Park is an 18 acre community park in the northern section of the City. It features numerous amenities including a pedestrian walking /jogging trail, fitness equipment, two baseball /softball diamonds, three playground facilities, basketball courts, expansive turf areas, and the Rosemead Aquatic Center. The park is bordered to the west by Rosemead High School. The park and school are separated by an unsightly chain link fence. The proposed project includes removal of 950 linear feet of existing chain link fence, installation of approximately 800 linear feet of Tf 1a ah . Successor Agency Meeting April 30, 2014 Page 2 of 3 tubular steel fence, and construction of 40 linear feet of a three foot cinder block support wall. The El Monte Union High School District, at its regular meeting of February 5, 2014, approved bids for district -wide fence repairs. The three lowest responsible bidders were selected in accordance with District policy. The District subsequently solicited quotes from approved contractors for the above referenced project. District representatives have requested the City of Rosemead share 50% of actual associated project costs in an amount not to exceed $50,000. During a walk- through of the project site with a District representative and their approved contractor, it was determined that 40 linear feet of support wall would also be needed on adjacent park property to support the proposed replacement fence. The City solicited a quote for construction of the block wall in accordance with our purchasing policy. Project quotes are attached and costs are as follows: Removal of existing fence /installation of 750 LF of tubular steel fence $77,500 Installation of 42 LF tubular steel fence (at grade change) $ 7,800 Construction of 3' support wall (40 LF) $ 5,000 Contingency (10 %) 9,030 Project Total $99,330 EMHUSD will be responsible for project management of the fence installation and, as noted above, the City's costs for the fence portion of the project will be 50% of the total (not to exceed $50,000). Further, as the removal and installation of the fence will impact the adjacent landscape and irrigation located on City property, staff proposes to upgrade existing irrigation and landscape to be consistent with the City's ongoing drought tolerant landscape efforts. TruGreen, the City's current landscape contractor, has provided a quote of $26,500 for the proposed enhancements including irrigation, trees, shrubs, and labor. The City's total project costs for the fence replacement and adjacent landscape enhancements will not exceed $76,500. It is the view of staff that these improvements are consistent with the goals of the broader Rosemead Park Improvements Project. FINANCIAL REVIEW The Rosemead Park Improvement Project was included in the Fiscal Year 2013 -14 Capital Improvement Program and is funded entirely through bond proceeds from the former Redevelopment Agency. ENVIRONMENTAL REVIEW This project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (C) of the CEQA Implementing Guidelines. Successor Agency Meeting April 30, 2014 Pace 3 of 3 PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. for A. Resolution 2014 -0006 B. Project Proposals from JB.A Fence and CEM Construction C. Landscape /Irrigation Proposal (Trugreen LandCare) RESOLUTION NO. 2013 -0006 A RESOLUTION OF THE OVERSIGHT BOARD FOR THE SUCCESSOR AGENCY TO THE ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION CONFIRMING THE EXPENDITURE OF FUNDS FOR THE REPLACEMENT OF PERIMETER FENCING AND ADJACENT ENHANCEMENTS AS PART OF THE ROSEMEAD PARK IMPROVEMENTS PROJECT WHEREAS, THE Rosemead Successor Agency received the Finding of Completion on April 18, 2013 from the Department of Finance; and WHEREAS, the Finding of Completion states that the Rosemead Successor Agency may utilize proceeds derived from bonds issued prior to January 1, 2011 in a manner consistent with the original bond covenants per Health and Safety Code section 34191.4(c); and WHEREAS, the Rosemead Successor Agency is holding approximately $7.1 million in bond proceeds derived from bonds issued prior to January 1, 2011 for Capital Improvement Projects identified in the bond covenants; and WHEREAS, the Rosemead Successor Agency will be required to provide oversight of the completion of the Capital Improvement Projects to ensure compliance with the bond covenants, and WHEREAS, the approved Capital Improvement Projects have been included on each Recognized Obligation Payment Schedule filed by the Rosemead Successor Agency; and NOW, THEREFORE, THE OVERSIGHT BOARD FOR THE SUCCESSOR AGENCY TO ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION HEREBY RESOLVES: 1. The Rosemead Successor Agency Oversight Board confirms that the firms listed below are qualified and capable to provide project support and /or construction services during this phase of the Rosemead Park Improvements Project. 2. That contracts with the following firms shall not exceed the amounts listed in the table below. If any contract amendments are required, all such changes shall be brought back to the Oversight Board for review and approval. Trade Firm Total Budget Project Coordination /Management El Monte Union High School District $ 44,500.00* Support Wall Construction CEM Construction $ 5,500.00* Landscape /Irrigation TruGreen _ $ 26,500.00 Total Cost $ 76,500.00 *includes 10% contingency. 3. Successor Agency staff is directed to submit documents to the Department of Finance as necessary. 4. Successor Agency staff is directed to provide a copy of this Resolution to the County Auditor - Controller, the State Controller's Office and the State Department of Finance. PASSED, APPROVED AND ADOPTED THIS 30th DAY OF APRIL, 2014 Pat Wallach Chair ATTEST: Matthew Hawkesworth Successor Agency Staff J & A FENCE 5117 Calmviety Ave, Bald7vin Park, CA 91706 Tel. (626) 338 -1714 " Fax (626) 338 -1738 License M 913941 TO: El Monte Union High School District Revised Proposal # 0677 1003 N. Durfese Ave., So. III Monte, CA 91733 ORDER DATE 4/23/14 CUSTOMER P. O. No. JOB LOCATION Rosemead HS ORDER TAKEN BY: Mike Miranda _ STARTING DATE ORDERED BY: Mathew Strother TERMS DATE COMPLETED Item Description Units Price Total 1 Furnish and install 7501f. of Wrought Iron Picket Fence, 8' high. (Minus approx. 1901f. of fencing and three man gates). Remove and haul existing fencing. 2 To install one Double Gate. Post: 3 X 3, 3/16" spaced 7' on center, posts capped Footings: 12" X 48" (no rebar cages) Panels: 1 -1 /2' X 1 -1/2" X I Iga, top & bottom rails Pickets: I" X 1" X 1Iga, capped. Panels— 8'X 8' and welded to posts. All posts, panels and brackets be hot dip galvanized. Paint Color: Burgundy (to match the existing). TOTAL $77,500.00 We peopeae hereby to fhrnish material & labor - complete in aavrdance with the above specifications for the sum with payments to be made as des-bed on this p.1-1, Any aliermion or devlmion an be alwve specificaions:.,coking cilia cost will be executed onto upon written order, midnIt bea sort doe,ri and above the estinowe_All epn:mwn's conticgtta upon ".he'. aooidem; or delays betond our control. ACCEPTANCE OF PROPOSAL TLe above price, spec fi,iou & cloth; Ions we causholory and hareby accepted. You we andmrictimdothe work as spaif..1 I'm'e;;[ms wd1 be made as mulund abmc. Signature: _. _... Date: J & A FENCE 5117 Cabnviety Ave., Baldwin Park, CA 91706 Tel. (626) 338 -1714 " Fax: (626) 338 -1738 License x 913941 TO: El Monte Union High School District Quote # 0689 1003 N. Durfee Ave., So. El Monte, CA 91733 ORDER DATE 4/23/14 CUSTOMER P. O. No. JOB LOCATION Rosemead HS ORDER TAKEN BY: Mike Miranda STARTING DATE _ ORDERED BY: Mathew Strother TERMS DATE COMPLETED Item Description Units Price Total 1 Furnish and install 42 If. of Wrought iron Fence, 9' high on top of the retaining wall that will be built. TOTAL $7,800.00 We propose hereby m furnish material & labor- complete in accordance with the above specifications for the sum, with payments to be wade as desarbed on Nis propasnl. Any alleralim of deviation fiom Ne nWSe sp,oflu i- si-.1 -, -t,. —, will be emcoled only upon xrillen oMc, ad will Mwnc vi exne elix'e orn and A— Ibe utonnluv All a,,eeinevCS —ainpenl uWa strikes, nmd-ts or ddms beyond our contmi ACCEP C.W CF. OF PROPOSAL Tbcab., spuitirztions& mndiliowc mumnufudery and hereby amWted. Yau areroal edmdone -F as s,F,.Fcd. Payments wdl be made as calmed abom. CEM CONSTRUCTION LIC. Y 951234 PROPOSAL April 23, 2014 City of Rosemead Attn.: Rafael Fajardo 8838 E. Valley Boulevard Rosemead, CA 91770 626 - 569 -2151 SUBJECT Rosemead Park — Retaining Wall Dear Mr. Fajardo SCOPE OF WORK 8207 BROOKGREEN RD. DOWNEY, CALIFORNIA 90240 5621708 -0014 5521714 -2886 Item Description Unit Quantity Unit Price Total 1 Clearing and Grubbing LS 1 $500.00 $500.00 2 Construct 3 feet high retaining wall, 8 inches block as indicated by Sean Sullivan LF 45 $100.00 $4,500.00 Total $5,000.00 No part of this proposal: 1. Construction of new chain link or wrought iron fence. 2. Permit fees Thank you for your consideration, if you have any question please call at 562 - 714 -2886. Sincerely, CEM Construction Emigdio Carrillo Page II TRUGREEN LandCareba Landscape Enhancement Proposal JOB# 63540011 Branch Name: Pasadena Management Address: 4134 Temple City Blvd. City: Rosemead, Ca.91770 Phone Number: 626.478.2168 Fax number: 626.376.9176 Proposal Submitted To Conrad Date City of Rosemead Chris Marcarello April 22, 2014 Street Property Customers Phone # 7933 Emerson PI. Rosemead High School City, State, Zip Description Customers Fax # Rosemead, Ca Planter Demo TruGrees LantlCare hereby submits specifications and estimates for the following work: >> Along the fence line east aide of Rosemead High School, we propose. » Remove (20) trees, stump included >> Remove all existing vegetation » Install (18) 36" box trees >> Install (68) 15 gallon shrub >> Install drip systmn $4,320.00 $1,080.00 $13,50(1 $5,100.00 $2,500.00 Twenty-six thousand five hundred and 00/100 Dollars $26,500.00 varmern m De mada as two.a. In hull Upon com lathed is quarane sspo a wmpee m mqo a pro m nybesides, i or a ay»n vsamm�w ring ed BacDSra wll Da eveculaD Drily uPon water b ace and vall become an ¢Nay sense ovee and a0co m Ne accused egnemen,, de,Mgenl upon oble, , —1i ar dome remains ow control reaertodemM1re, mmadd and cNerneceseary s —rance our maern are only nal by WOAmer' mpenababn lnewance. TauGeeen LantlCare REPRESENTATIVE AUTHORIZED SIGNATURE jol9fe&ri&z NOTE: This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The a eve Pnaea apadead dns and wrratme are sanetaclary and are herehy —cea You ere aalhorrred to do the work as speared Payment wall be made as n,tlmed¢ dove Date