Loading...
CC - Item 3G - Rosemead Community Recreation Center Expansion and Facade Improvement Project - Award of ContractROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: JEFF ALLRED, CITY MANAGER ([�jf DATE: JUNE 24, 2014 ^' 1 SUBJECT: ROSEMEAD COMMUNITY RECREATION CENTER EXPANSION AND FACADE IMPROVEMENT PROJECT — AWARD OF CONTRACT SUMMARY As a part of the City's Fiscal Year 2013 -14 Capital Improvement Program, the City Council approved the "Rosemead Community Recreation Center Expansion and Fagade Improvement Project." The project consists of the construction of a stand -alone 3,367 square foot expansion building adjacent to the existing RCRC building. This new building will include a large multi - purpose room, a prep kitchen, restrooms, and lobby area. Additionally, fagade improvements will be completed on the existing RCRC building to create a uniform and modern look. Miscellaneous site work will be completed, as well as the construction of a new mini plaza that will serve as an outdoor gathering space and to connect the two buildings. This project is being funded entirely through bond proceeds from the former redevelopment agency. Staff Recommendation It is recommended that the City Council: 1. Approve the plans and specifications for the Rosemead Community Recreation Center Expansion and Fagade Improvement Project, and; 2. Authorize the City Manager to enter into a contract with CEM Construction in the amount of $1,638,500.00, which includes the Base Bid and Alternate Bid Items No. 2 and 3, and authorize a contingency in the amount of $240,000.00 (Approximately 15 %) to cover the cost of any unforeseen construction expenses. DISCUSSION The existing Rosemead Community Recreation Center was built in 1975 and is approximately 17,000 square feet in size. This facility serves as a major community recreation facility that houses senior programs, recreation classes, special functions, and community events. In 2010, the City completed a Parks and Facilities Master Plan to guide future capital improvement programs. Through the process, with significant community input, the Rosemead Community Recreation Center was identified as needing significant upgrading and expansion. Together with the new Civic Center ITEM NO. -(? . City Council Meeting June 24, 2014 Page 2 of 4 Parking Lot and Downtown Plaza, this area will serve as an inviting space for public events and will expand on services available to the community. To date, a portion of the RCRC improvements have been completed, including the replacement of roof materials and heating /cooling systems and interior renovations. Additional interior updates as well as furnishings are currently underway and will be completed within the next couple of weeks. This project will consist of the construction of a new, stand -alone 3,367 square foot building adjacent to the existing RCRC. This building will provide for much needed space with a multi - purpose room, prep kitchen area, restrooms, and a lobby area. Similar fagade treatments will be completed on the existing RCRC building to upgrade the appearance of the aging building and to create a uniform look within the recreation complex. The project, which will be funded entirely with bond proceeds from the former redevelopment agency, has an estimated cost of $1,800,000.00. A Notice Inviting Bids for this project was published in local newspapers on May 22, May 29, and June 5, 2014. At 11:00 a.m. on June 5, 2014, the City Clerk publicly opened and read eight (8) sealed bids with the following result: Rank Bidder Base Bid Alternate Bid Amount Items #2 &3 1 California Averland Construction, Inc. $ 1,444,040.00 $ 20,100.00 2 CEM Construction $ 1,600,000.00 $ 38,500.00 3 Thomoo Construction, Inc. $ 2,061,363.50 $ 47,732.38 4 Cal -City Construction, Inc. $ 2,100,000.00 $ 35,000.00 5 Nile Advanced Construction, Inc. $ 2,282,345.00 $ 33,400.00 6 Professional Services Construction, Inc $ 2,390,242.68 $ 84,045.00 7 Woodcliff Corporation $ 2,548,500.00 $ 42,900.00 8 CWS Systems, Inc. $ 3,394,000.00 $ 81,000.00 Staff additionally recommends the award of Alternate Bid Items No. 2 & 3, which include additional items pertaining to the existing RCRC building. Alternate Item No. 2 includes the replacement of existing exterior lights and Alternate Item No. 3 includes the removal of some surface mounted conduit and reinstalling the electrical below the finished surface. Items included in Alternate No.1 (window replacement) are currently under construction and will not be included with this contract. On Friday, June 13, 2014, staff received a letter from California Averland Construction, Inc., the lowest bidder, asking that their bid be withdrawn for reason of clerical error (Letter is included as Attachment 3). City Staff has accepted the withdrawal of bid as the City maintains the right to reject any and all bids. Subsequently, staff recommends award of contract to the second lowest bidder, CEM Construction. City Council Meeting June 24, 2014 Page 3 of 4 Staff has reviewed the bid documents for completeness and investigated the contractor's background and recent projects for competency. CEM Construction is the lowest responsive bidder and is qualified to complete the work as specified for this project. CEM Construction has completed a number of building related projects for the City of Rosemead, including the City Hall Interior Renovations, the renovations to the Garvey Park Gym, and is currently completing interior finishes and the replacement of doors and windows at the existing RCRC facility. A bid protest letter was received from Thomco Construction of Anaheim, CA protesting the bids of both California Averland Construction, Inc. and CEM Construction. Staff has reviewed the letter and issued a letter to the contractor rejecting it as it is without merit. Copies of both letters are included as attachments for your review. FINANCIAL REVIEW This project was included in the Fiscal Year 2013 -14 Capital Improvement Program and is funded entirely through bond proceeds from the former redevelopment agency. The total appropriation necessary to award this contract is $1,878,500.00. ENVIRONMENTAL REVIEW This project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (C) of the CEQA Implementing Guidelines. PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Prepared By: X Stedfirl Sullivan Management Analyst Submitted By: Chris Marcarello Director of Public Works Prepared By: Rafael Fajardo Associate Civil Engineer City Council Meefing June 24, 2014 Pace 4 of 4 Attachments: 1. Plans and Specifications (Available in City Clerk's Office) 2. Bid Analysis 3. Bid Withdrawal Letter from California Averland Construction, Inc. 4. Bid Protest Letter from Thorl Construction, Inc. 5. Letter to Thomco Construction, Inc. Rejecting Bid Protest Letter CM O/Paarnee0 Pu41rc WwRa 5ervke DepenmenvErglneerlry Olrlamn CM of Roe meeE RCRC EXPANSION 4L FACADE ROVEMENT PROJECT Protect No. MU Bid Analysis Bid Summery Paget on $ 42,900 Oo 15 a 81.000 00 s City of Rosemead RCRC EXPANSION & FACADE IMPROVEMENT PROJECT Project No. 31004 Bid Analysis Contractor: California Averland Construction, Inc. RANK: 1 Bid Summary Item Qty 1 Description �', 1 General Requirements - - -- 2 LS ork 3 _ 1 Concrete Footings /Foundation /Slab 4 $ Masonry _ _ 5 $ Metals 6 LS li Woods & Plastics 7 57,000.00 _ h al & Moisture Protection 8 Doors & Windows _ 9 Finishes 10 Specialties 11 Equipment 12 Furnishings 13 Special Construction - NA 14 Conveying Systems - NA 15 Mechanical 16 Electrical Total Base Bid Alternate Bid Item No. 1 Alternate Bid Item No. 2 Alternate Bid Item No. 3 Unit Qty 1 $ $ Unit Price 83,000.00 243,240.00 $ $ Total 83,000.00 243,240.00 LS LS LS _ 1 LS 1 $ 76,000.00 1 - $ 76,000.00 LS 1 $ 57,000.00 $ 57,000.00 LS 1 $ 24,100.00 $ 24,100.00 LS 1 $ 144,500.00'$ 144,500.00 LS 1 $ 153,100.00 $ 153,100.00 LS 1 $ 58,700.00 $ 58,700.00 IS 1 $ 212,700.00 $ 212,700.00 LS 1 $ 39,700.00 $ 39,700.00 LS 1 $ 7,000.00 $ 7,000.00 LS 1 $ 15,000.00 $ 15,000.00 LS 0 LS 0 - - LS 1 $ 118,000.00 _ $ 118,000.00 LS 1 $ 212,000.00 $ 212,000.00 $ 1,444,040.00 LS 1 $ 36 000.00 $ 36,000.00 LS 1 $ 12100.00 $ 12,100.00 LS 1 - _ $ 8000.00 $ 8,000.00 Base Bid and All Alternates $ 1,500,140.00 Contractor: CEM Construction RANK: 2 Bid Summary -., - Item Description Unit Qty Price Total 1 General Requirements L S 1 `$ 50,000.0 0 $ 50,000.00 2 __ _ !Site Work _ LS 1 $ 255,000.00$ 255,000.00 3 ',Concrete_ Footings/Foundation/Slab LS 1 _ $ 50,000.00 $ 50,000.00 4 'Masonry LS 1 -T $ 50,000.00 $ 50,000.00 5 Metals LS -s 60,000.00 $ 60,000.00 6 Woods & Plastics LS 1 $ 100,000.00 $ 100,000.00 7 Thermal & Moisture Protection LS 1 $ 200,000.00 $ 200,000.00 8 Doors & Windows LS_ 1 !$ 125,000.00 $ 125,000.00 9 Finishes LS 1 !310,0 00.00 $ 310,000.00 10 Specialties __ ._. LS . 1. _lil $ 110,000.00 $ 110,000.00 11 Equipment LS 1 $ 25,000.00 $ 25,000.00 12 _ Fumishings LS 1 ! $ 25,000.00 $ 25,000.00 13 Special Construction - NA LS 0 - _ _ _ 14 Conveying Systems -_NA LS 0 - - 15 _ _ (Mechanical LS 1 $ 125,000.00 $ 125,000.00 16 Electrical LS Imo$ 125,000.00 $ 125,000.00 Total Base Bid ' $ 1,600,000.00 _. - -_ '(Alternate Bid Item No 1 LS_ � 1 $ 20,000.00 - $ 20,000.00 Alternate Bid Item No 2 LS i 1 $ 8,500.00 $ 8,500.00 Alternate Bid Item No. 3 LS 1 $ 30,000.00 $ 30,000.00 Total Base Bid and All Alternates $ 1,658,500.00 Contractor: Thomco Construction, Inc. Bid Summary RANK: 3 Item 1 Description Unit Qty 159,40987 Unit Price 1 total 1 $ General Requirements LS 1 _ $ 276,652,00 $ 276,652.00 2 Site Work LS _ 1 _ $ 384,474,00 $ 384,474.00 3 Concrete Footings/FOundatioNSlab LS 1 $ 73 000 00 $ 73,000.00 4 Masonry LS 1 _ $ 35,350.00 $ 35,350.00 5 Metals LS 1 $ 14,600.00 $ 14,600.00 6 .Woods &Plastics LS 1 $ 158,773.00 $ 158,773.00 7 !Thermal & Moisture Protection LS $ 431,270.00 $ 431,270.00 8 _ 11 Doors & Windows LS _1 1 $ 95,674,00 $ 95,674.00 9 'Finishes LS 1 $ 195,894.00 $ 195,894.00 10 '.Specialties LS 1 $ 28,156.00 $ 28,156.00 11 Equipment LS 1 $ 4,500.00 $ 4,500.00 _— 12 _ Furnishings _ _ LS 1 i $ 13,190.00 $ _ 13,190.00 13 Special Construction - NA LS 0 - - 14 Conveying Systems - NA LS 0 - - 15 Mechanical LS I 1 $ 121,224.00 $ 121,224.00 16 Electrical LS 1 $ 208,466.00 $ 208,486.00 (Total Base Bid _ _ $ _. 2,061,363.50 Alternate Bid Item No 1 _ Alternate Bid Item No. 2 _ Alternate Bid Item No. 3 I Total Base Bid and All Alternates LS 1 $ 159,409.87 $ 159,40987 LS 1 $ 23523.74 $ 23,523.74 LS 1 $ 24208.64 $ 24,208.64 $ 2,268,505.75 Contractor: Cal -City Construction Bid Summary RANK: 4 Item Description Unit oty Unit Price Total 1 General Requirements 1 $ 119,500.00 $ _ 119,500.00 2 Site Work LS.. 1 $ 310,800.00 $ 310,800.00 3 Concrete Footings/Foundation /Slab LS 1'1 $ 95,000.00 $ 95,000.00 4 Masonry LS 1 !. $ 28,000.00 $ 28,000.00 5 Metals 1 $ 30,300.00 $ 30,300.00 6 Woods &Plastics _LS 1 LS 1 $ 99,500.00 $ 99,500.00 7 Thermal & Moisture Protection 1 LS 1 ?$ 228,800.00 $ 228,800.00 8 Doors & Windows LS 1 $ n, 800.00 $ 93,800.00 9 Finishes ! LS _ 1 $ 223,150.00 $ 223,150.00 10 ,Specialties LS 1 $ 31,900.00 _ $ 31,900.00 11 'Equipment LS 1 $ 5,000.00 $ 5,000.00 12 Furnishings LS i 1 $ 23,500.00 $ 23,500.00 13 Special Construction - NA LS '�, 0 - - 14 Conveying Systems---NA- LS 0 - - 15 Mechanical LS '.. 1 $ 183,000.00 $ 183,000.00 16 Electrical LS 1 $ 333,400.00 $ 333,400.00 Total Base Bid Bid Item No. 1 Bid Item No. 2 Bid Item No. 3 Base Bid and All Alternates $ 2,100,000.00 LS 1 $ 115,000.00 $ 115,000.00 LS 1 $ 20,000.00 $ 20,000.00 LS 1 $ 15,000.00 $ 15,000.00 $ 2,250,000.00 Contractor: Nile Advanced Construciton Bid Summary RANK: 5 Item Description Unit Qty Unit Price Total 1 General Requirements LS 1 $ 545,145.00 $ 545,145.00 2 Site Work LS '.. 1 $ 463,400.00 $ 463 400.00 3 Concrete Footings /Foundation /Slab LS 1 $ 40,000.00 $ 40,000.00 4 Masonry ! LS 1 $ 40,000.00 $ 40,000.00 5 _. Metals LS 1 $ 16,500.00 $ 16,500.00 6 Woocls- stics LS 1 �� $ 63,000.00 $ 63,000.00 7 Thermal B Moisture Protection LS 1 _ $ 382,600.00 $ 382,600.00 _ 8 _Doors &Windows LS 1 $ 98,09"0 i $ 98,000.00 9 Finishes LS 1 $ 200,000.00 $ 2.00,000.00 10 _ Specialties LS 1 $ 39,000.00 $ 39,000.00 11 Equipment _ LS 1 $ 9,000.00 $ 9,000.00 12 (Furnishings LS 1 $ 18,700.00 $ 18,700.00 13 'Special Construction - NA LS 0 - - 14 Conveying Sy_ stems - NA LS 0 - - 15 Mechanical LS 1 $ 175,000.00 $ 175,000.00 16 Electrical LS 1 $ 192,000.00 $ 192,000.00 Total Base Bid 1 $ 2,282,345.00 Alternate Bid Item No 1 LS 1 $ 74,000.00 $ 74,000.00 Alternate Bid Item No 2 LS 1 $ 21,400.00. $ 21,400.00 Alternate Bid Item No. 3 LS 1 $ 12,000 00 $ 12,000.00 Total Base &d and All Alternates _ _ $ 2,389 745 00 Contractor: Professional Services Construction, Inc. RANK: 6 Bid Summary Item Description 1 General Requirements _ _ 2 1 ,Site Work 3 _ Concrete Footings/Fo-undation /Slab 4 Masonry 5 Metals _ 6 Woods & Plastics 7 Thermal & Moisture Protection 8 Doors & Windows 9 LS 10 ..Finishes 11 ii!Specialties !Equipment _ 12', Furnishings 13 Special Construction - NA 14 Conveying Systems - NA 15 Mechanical 16 Electrical LS Total Base Bid $ Alternate Bid Item No. 1 Alternate Bid Item No. 2 Alternate Bid Item No. 3 Total Base Bid and All Alternates -$ 2,390,242.68 LS 1 $ 140,000.00 $ 140,000.00 LS 1 $ 49,615.00 $ 49,615.00 LS 1 $ 34,430.00 $ 34 430.00 $ 2,614,287.68 LS 1 $ 149,589.40 $ 149,589.40 LS 1 $ 514,878.00 i _ $ _ _514,878.00 LS 1 $ _ 75,611_00 $ 75,611.00 LS 1 $ 59,890.00 $ 59,890.00 LS 1 $ 21,809.00 $ 21,809.00 LS 1 $ 195,208.00 $ 195,208.00 LS 1 $ 469,873.00 $ 469,873.00 LS 1 $. 214,372.00 $ 214,372.00 LS 1 $ 242,343.00 $ 242,343.00 LS 1 $ 16,021.00 $ 16,021.00 LS 1 $ 2 260.00 $ 2,260.00 LS 1 $ 11,402.00 $ _ 11,402.00 _ LS 0 _�__... _ LS 0 1_ LS 1 $ 186,290.00 $ 186,290.00 LS 1 $ 223,005.00 $ 223,005.00 -$ 2,390,242.68 LS 1 $ 140,000.00 $ 140,000.00 LS 1 $ 49,615.00 $ 49,615.00 LS 1 $ 34,430.00 $ 34 430.00 $ 2,614,287.68 Contractor: Woodcliff Corporation Bid Summary RANK: 7 Item Description Unit Oty Unit Price total 1 General Requirements LS 1 $ 270000 $ 270,000.00 2 _ Site Work LS 1 $ 541,00N00 $ 541,000.00 3 Concrete Footings /Foundation /Slab _ LS 1 $ 65 000 ,00 $ _ 85,000.00 4 Masonry LS 1 $ 60,000.00 $ 60,000.00 5 Metals LS 1 $ 25,500.00 $ 25,500.00 6 Woods & Plastics LS 1 _.1 $ 199,000.00 $ 199,000,00 7 Thermal & Moisture Protection LS $ 410,500.00 $ 410,500.00 8 Doors & Windows LS 1 $ 123,000.00 $ 123,000.00 9 (Finishes LS _ 1 $ 181,000.00 $ 181.000.00 10 Specialties LS 1 _ $ 25,000.00 $ 25,000.00 11 'Equipment LS 1 $ 10,000.00 $ m000.00 12. Furnishings LS 1 $ 20,000.00 $ 20,000.00 13 Special Construction - NA LS 0 - - 14 Conveying Systems - NA LS 0 - _ - 15 Mechanical LS _- 1 $ 150,000.00 $ 150,000.00 16 Electrical _ LS 1 $ 460,000.00 $ 460,000.00 Total Base Bid $ 2,548,500.00 Alternate Bid Item No. 1 LS 1 $ 85,000.00 $ _85,000.00 Alternate Bid Item No. 2 LS 1 $ 15,900.00 $ 15,900.00 Alternate Bid Item No. 3 LS 1 $ 27,000.00 $ 27,000.00 Total Base Bid and All Alternates $ 2,676,400.00 Contractor: CWS Systems, Inc. RANK: 8 Bid Summary Item Description Unit Qty Unit Price Total 1 _ General Requirements _ LS 1 $ 400,000.00 $ 400,000.00 2 Site Work LS 1 $ 382,000.00 $ 382,000.00 _ 3 'Concrete Footings/Foundation/Slab_ LS 1 $ 114,000.00 $ 114,000.00 4 Masonry LS 1 32,000.00 $ 32,000.00 5 Metals LSi, $ 244,000.00 $ 244,000.00 6 Woods & Plastics LS 1 j $ 143,000.00 $ 143,000.00 7 Thermal & Moisture Protection LS 1 $ 506,000.00 $ 506,000.00 8 Doors &Windows L LS 1�',$ 212,000.00 $ 212,000.00 9 Finishes _. + LS 1� $ 308,000.00 $ 308,000.00 10 Specialties _ LS 1 $ 101,000.00 $ 101,000.00 11 Equipment LS 1 $ 18,000.00 $ 18,000.00 12 Furnishings LS 1 $ 50,000.00 $ 50,000.00 13 Special Construction - NA LS 0 - - 14 Conveying Systems - NA _ LS 0 - - 15 Mechanical _ LS 1 $ 170 00000 $ 170,000.00 16 Electrical LS 1 $ 200 000.00 $ 20Q000.00 Total Base Bid $ 3,394,000.00 Alternate Bid Item No. 1 LS 1 $ 110,000.00 $ 110,000.00 Alternate Bid Item No. 2 LS 1 $ 45,000.00 _ $ 45,000.00 Alternate Bid Item No. 3 LS 1 $ 36,000.00 $ 36,000.00 Base Bid and All Alternates $ 3,585,000.00 CULTORnlfl flVMND COnSTRUCTIOM, InC. June 13, 2014 ATTN: Sean Sullivan, Management Analyst TO: City of Rosemead 8838 East Valley Boulevard Rosemead, California 91770 PROJECT NAME: "Rosemead Community Recreation Center Expansion and Facade Improvement Project" RE: Withdrawal of Bid Dear Mr. Sullivan, California Averland Construction, Inc. is requesting forthe withdrawal of our bid for the "Rosemead Community Recreation Center Expansion and Facade Improvement Project' due to the fact that a human clerical error was made in writing down the correct figure in the components of the bid schedule. The mistake was made in filling out the bid and not due to error in judgment or to carelessness in inspecting the site of the work, or in reading the plans or specifications. Thank you for your understanding and we look forward to working with you in the future. Sincer/ely,/// Joseph Kim President June 16, 2014 RECEIVED Rosemead City Hall CITY of ROSEMEAD Public Works Department, Engineering Division JUN 1 2014 8838 E. Valley Blvd. Rosemead, CA 91770 CITY CLERK'S OFFICE BY: Attn.: Gloria Molleda, City Clerk Re: Bid Protest NIB No.: 2014 -08 Project: Rosemead Community Recreation Center Expansion and Facade Improvement Please consider this letter Thomco Construction's formal bid protest to the two (2) low bids submitted by Cal Avedand Construction, Inc. and CEM Construction on June 11, 2014. Thomco Construction realizes that the City of Rosemead's Public Works Department is presently reviewing the bids submitted for this project and will likely make the following discoveries during their review. This protest is submitted in a timely manner as required by Filing of Bid Protests, Item No. 21. Per the Subletting and Subcontracting Fair Practices Act of the Public Contract Code of the State of California, it states, '...each Bidder shall set forth: (a) the name and location of the place of business and (b) portion of the Work which will be done by each listed Subcontractor of each Subcontractor who will perform work or labor or render services to the Contractor in or about the construction of the Work in an amount in excess of one -half of one percent (112 %) of the Contractors Total Bid Price". One -half of one percent (0.5 %) of Cal Avedand's bid proposal would be only $7,220.20. One -half of one percent (0.5 %) of CEM's bid proposal would be only $8,000. So per the Public Contracting Code of California, any trades work that is to be perforated with a cost in excess of the above stated costs should be listed on the Bid Proposal Form and submitted at the time of bid. Thomco Construction has reviewed the Designation of Subcontractors Fomt submitted by Cal Averland and CEM Construction, and has discovered multiple violations. Cal Avedand has failed to list multiple subcontractors required to complete this project. Those subcontractors not listed are: Demolition, Grading, Surveying, Acoustical Ceiling, Site Utilities, Wood Framing, Metal Stud and Drywall, Doors/Frames/Hardware, Insulation, Exterior Plaster, Anti - Graffiti Coating, Restroom Accessories, Marker Board Wall Panels, and Aluminum Wall Panels. Thomco Construction obtained subcontractor proposals for these items and all of those costs are much greater than one -half of one percent (0.5 0/6) of Cal Averiand's bid amount. We realize certain items can be self performed, but several items cannot be performed without the required specialty licenses. CEM Construction has failed to list many, subcontractors required to complete this project. Those subcontractors not listed are: Demolition, Clear & Grub, Grading, Surveying, Concrete (Site, building, and CMU), Site Utilities, Wood Framing, DoorsffwmestHardware, Insulation, Exterior Plaster, Anti-Graffiti Coating, Flooring, Restroom Accessories, Marker Board Wall Panels, Millwork, Aluminum Wall Panels, Store Front & Glazing, Plumbing, Landscape, and Electrical. Thomco Construction obtained subcontractor proposals for these items and all of those costs are much greater than one -half of one percent (0.5 %) of In addition to both of these subcontractors failure to fully list all of the required subcontractors, CEM Construcfion's references of past projects do not appear complete. We would like to bring to your attention specifically the aluminum wall panel scope of work. Thomco received multiple numbers for this Rem, ranging from $329,000 to over $500,000 to supply and install the required aluminum wail panels as listed on the drawings. While we understand pricing varies from contractor to contractor, the discrepancy in pricing listed by Cal Avedand and CEM Construction is far too great to be overlooked. The numbers these two contractors listed for this ftem are so obviously inadequate, that we believe for this reason alone both of their bids should be deemed non - responsive. These are just a few examples of the level of non - responsiveness discovered by Thomco Construction, Inc. at first glance. We are certain that the Rosemead Public Works Department will also discover the same bid violations. If either Cal Averland Construction or CEM Construction is deemed lowest responsive bidder and awarded the project, then Thomco Construction considers that they have been given an unfair advantage by the Rosemead Public Works Department by not following and upholding the laws and practices in place to protect bidders against this very scenario. If general contractors are not required to list subcontractors then everyone can "job shop' projects after they have been awarded, and the subcontractors have no protection against fair practices being enforced. This is against both the current bid documents for this project and more importantly the Fair Practices Act (Califomia Public Contract Code 4100, et seq.) and amendments thereof. We thank you in advance for reviewing this Bid Protest and look forward to speaking with you in more detail on this matter. Thank you, A �--- Glenn Thompson Vice President: Glenn Thompson Thomco Construction 1279 N. Patt Street Anaheim, CA 92801 Dear Mr. Thompson, 5939 E_ VALLEY BOULEVARD : O BOX 199 ROSEMEAD. CALIFORNIA 91770 TFLEPHONE (626),6R2 100 FAX, 626) 307 -9219 The City has received your Bid Protest Letter, dated June 16, 2014, protesting the low bids of both California Averland Construction, Inc. and CEM Construction for the Rosemead Community Recreation Center Expansion and Facade Improvements Project. City staff received and reviewed eight bids on June 11 for the project. City staff has reviewed your bid protest letter and is rejecting it as it is without merit. Both contractors in question possess general building contractor's licenses and are authorized, as such, to be awarded prime contracts for building projects. California Averland Construction, Inc, License No. 810681, Class B, and CEM Construction, License No. 951254, Class A & B, are both active and valid. Furthermore, California Averland Construction, Inc. and CEM Construction have specified subcontractors for several of the pertinent trades and are both qualified to self - perform any work that is not specifically listed for a particular subcontractor. Please contact the Engineering Division at (626) 569 -2150 if you have any additional questions or concerns. Regards, Rafael Fajardo Associate Civil Engineer 2ouv LOw 6m� 2^A'. "' E & N1LLV.S ALARCCN %* u.4 C1. M1Um;.xe� Ci=xx STe�tiN Lv June 17, 2014 Glenn Thompson Thomco Construction 1279 N. Patt Street Anaheim, CA 92801 Dear Mr. Thompson, 5939 E_ VALLEY BOULEVARD : O BOX 199 ROSEMEAD. CALIFORNIA 91770 TFLEPHONE (626),6R2 100 FAX, 626) 307 -9219 The City has received your Bid Protest Letter, dated June 16, 2014, protesting the low bids of both California Averland Construction, Inc. and CEM Construction for the Rosemead Community Recreation Center Expansion and Facade Improvements Project. City staff received and reviewed eight bids on June 11 for the project. City staff has reviewed your bid protest letter and is rejecting it as it is without merit. Both contractors in question possess general building contractor's licenses and are authorized, as such, to be awarded prime contracts for building projects. California Averland Construction, Inc, License No. 810681, Class B, and CEM Construction, License No. 951254, Class A & B, are both active and valid. Furthermore, California Averland Construction, Inc. and CEM Construction have specified subcontractors for several of the pertinent trades and are both qualified to self - perform any work that is not specifically listed for a particular subcontractor. Please contact the Engineering Division at (626) 569 -2150 if you have any additional questions or concerns. Regards, Rafael Fajardo Associate Civil Engineer