OB - 2014-0007 - Confirming the Contractors and Expenditures Related to the Rosemead Community Recreation Center Expansion and Facade Improvements ProjectROSEMEAD SUCCESSOR
AGENCY STAFF REPORT
TO: THE HONORABLE CHAIR AND BOARD MEMBERS
FROM: MATTHEW HAWKESWORTH, ASSISTANT CITY MANAGER
DATE: JULY 30, 2014
SUBJECT: ROSEMEAD COMMUNITY RECREATION CENTER EXPANSION AND
FACADE IMPROVEMENTS PROJECT
SUMMARY
As a part of the City's Fiscal Year 2013 -14 Capital Improvement Program, the City
Council approved the Rosemead Community Recreation Center Expansion and Fagade
Improvement Project (Project). This project was included in the July 2010 bond
issuance by the former Redevelopment Agency to improve and expand the facility that
was originally constructed in 1976. This project consists of the construction of a stand-
alone 3,367 square foot expansion building adjacent to the existing RCRC building.
Additionally, fagade improvements will be completed on the existing RCRC building to
create a modern and uniform look. Additionally, miscellaneous site improvement will be
completed including the construction of a new mini plaza that will create an outdoor
gathering space and connect the two buildings. This project is being funded entirely
through bond proceeds from the former redevelopment agency.
Staff Recommendation
It is recommended that the Oversight Board approve Resolution 2014 -007 confirming
the contracts and expenditures related to the Rosemead Community Recreation Center
Expansion and Fagade Improvements Project.
DISCUSSION
The existing Rosemead Community Recreation Center (RCRC) was built in 1975 and is
approximately 17,000 square feet in size. This facility serves as a major community
recreation facility that houses senior programs, recreation classes, special functions,
and community events. In 2010, the City completed a Parks and Facilities Master Plan
to guide future capital improvement programs. Through the process, which included
significant community input, the RCRC was identified as needing significant upgrading
and expansion. Together with the new Civic Center Parking Lot and Downtown Plaza,
this area will serve as an inviting space for public events and will expand on services
available to the community.
To date, significant improvements to the RCRC have been completed or are underway.
These improvements include the removal and replacement of roofing materials and the
r MN0.--,a4&"—
Rosemead Successor Agency Oversight Board
July 30, 2014
Page 2 of 4
heating /cooling system, thorough interior renovations, and the replacement of exterior
doors and windows (in progress).
This project will consist of the construction of a new stand -alone 3,367 square foot
building adjacent to the existing RCRC. This building will provide for much needed
space with a large multi - purpose room, prep kitchen area, restrooms, and a lobby area.
Similar fagade treatments will be completed on the existing RCRC building to upgrade
the appearance of the aging building and to create a uniform look within the recreation
complex. The two components, as well as the included site work, will complete the
expansion and improvements to the Rosemead Community Recreation Center. This
project, which is being funded entirely with bond proceeds from the former
Redevelopment Agency, has an estimated construction cost of $1,638,500.00.
The following items are a cost analysis and discussion of the construction and soft costs
associated with this project. Soft costs include project management and inspection,
specialty consulting, and City staff time.
Construction
A Notice Inviting Bids for this project was published in local newspaper on May 22, May
29, and June 5, 21 At 11:00 a.m. on June 11, 2014, the City Clerk publicly opened
and read eight (8) sealed bids with the following result:
Rank
Bidder
Base Bid
Alternate Bid
Amount
Items #2 &3
1
California Averland Construction, Inc.
$ 1,444,040.00
$
20,100.00
2
CEM Construction
$ 1,600,000.00
$
38,500.00
3
Thomco Construction, Inc.
$ 2,061,363.50
$
47,732.38
4
Cal -City Construction, Inc.
$ 2,100,000.00
$
35,000.00
5
Nile Advanced Construction, Inc.
$ 2,282,345.00
$
33,400.00
6
Professional Services Construction, Inc
$ 2,390,242.68
$
84,045.00
7
Woodcliff Corporation
$ 2,548,51
$
42,900.00
8
CWS Systems, Inc.
$ 3,394,000.00
$
81,000.00
Staff additionally recommends the award of Alternate Bid Items No. 2 & 3, which include
additional items pertaining to the existing RCRC Building. Alternate Item No. 2 includes
the replacement of existing exterior lights and Alternate Item No. 3 includes the removal
of some surface mounted conduit and reinstalling the electrical system below the
finished surface. Items include in Alternate Item No. 1 (window replacement) are
currently under construction and will not be included in this contract.
On Friday, June 13, 2014, staff received a letter from California Averland Construction,
Inc., the apparent low bidder, asking that their bid be withdrawn for reason of clerical
error. City staff accepted the withdrawal of the bid as the City maintains the right to
reject any and all bids. Subsequently, staff recommended to the City Council that the
Rosemead Successor Agency Oversight Board
July 30, 2014
Page 3 of 4
contract be awarded to CEM Construction, the second lowest bidder. At their regularly
scheduled on July 22, 2014, the City Council awarded a contract to CEM Construction
in the amount of $1,638,500.00 and authorized a contingency amount of $240,000.00
(Approximately 15 %). The total contract award, including allotted contingencies, is
$ 1,878,500.00.
Construction Support Services
Construction Management/ Inspection
The City will utilize an existing on -call services agreement with CEJ Engineers, Inc. for
the provision of construction management and inspection services. CEJ Engineers, Inc.
completed the civil engineering plans for this project will provide general project
oversight, ensuring that construction is completed in accordance with project plans and
specifications. CEJ Engineers, Inc. has a qualified, professional staff and their hourly
rate for these services is highly competitive at $110 per hour. Construction Management
and Inspection services will not exceed a total of $80,000 (5% of construction costs)
based on established hourly rates.
Specialty Inspection: Structural
In addition to general construction management and inspection, a project of this
magnitude is required to have third party review by a structural engineer. Staff has
received a proposal from Montenegro Consultants, Inc. to provide the required
structural inspection. The cost for inspection is $360 per site visit and staff estimates it
will require no more than 15 site visits to complete the required services. Costs for these
services will not exceed $5,400.00.
Project Administration /Staff Time
In addition to these construction and support services, this project will involve a high
level of interaction between City staff, inspectors, and construction contractors. As such,
an allotment of staff hours is included in the soft cost estimate for this project for project
administration, contractor coordination, and general oversight. The total staff costs will
not exceed $80,000.00 (5% of construction costs).
Security Camera Installation
During this phase of construction, a new surveillance system will be installed in the
existing RCRC building. This new system will interface with the system that will be
installed in the expansion building and result in complete surveillance coverage for the
RCRC complex. This system will provide 12 cameras for surveillance of the RCRC
building, specifically the entrance, lobby desk and computer lab areas and maintain a
360 degree view of the exterior of the building. Proposals were received from two
contractors to provide these services, and the lowest proposal was from Ocean Electric
Construction in the amount of $8,700.00. The proposal results were:
Rosemead Successor Agency Oversight Board
July 30, 2014
Page 4 of 4
Rank Contractor Proposal Amount
1 Ocean Electric Construction $ 8,700.00
2 Nationwide Security Cameras & $ 12,473.80
Spy Equipment, Inc.
FINANCIAL REVIEW
This project was included in the Fiscal Year 2013 -14 Capital Improvement Program and
is funded entirely through bond proceeds from the former Redevelopment Agency. The
total estimated cost for this phase of improvements is approximately $2,052,600.00
Prepared By:
FL•
Se ullivan
Management Analyst
Submitted By:
Chris Marcarello
Director of Public Works
Attachments:
A. Resolution No. 2014 -007
B. Bid for Rosemead Community Recreation Center Expansion and Fagade Improvements
Project
C. Proposal from CEJ Engineers for Construction Management / Inspection
D. Proposal from Montenegro Consultants, Inc. for Specialty Inspection
E. Proposal from Ocean Electric for the Installation of Surveillance System
RESOLUTION NO. 2014 -07
A RESOLUTION OF THE OVERSIGHT BOARD FOR THE SUCCESSOR
AGENCY TO THE ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION
CONFIRMING THE CONTRACTS AND EXPENDITURES RELATED TO THE
ROSEMEAD COMMUNITY RECREATION CENTER EXPANSION AND FACADE
IMPROVEMENTS PROJECT
WHEREAS, the Rosemead Successor Agency received the Finding of
Completion on April 18, 2013 from the Department of Finance, and
WHEREAS, the Finding of Completion states that the Rosemead Successor
Agency may utilize proceeds derived from bonds issued prior to January 1, 2011 in a
manner consistent with the original bond covenants per Health and Safety Code Section
34191.4(c); and
WHEREAS, the Rosemead Successor Agency is holding approximately $7.1
million in bond proceeds derived from bonds issued prior to January 1, 2011 for Capital
Improvement Projects identified in the bond covenants; and
WHEREAS, the Rosemead Successor Agency will be required to provide
oversight of the completion of the Capital Improvement Projects to ensure compliance
with the bond covenants; and
WHEREAS, the approved Capital Improvement Projects have been included on
each Recognized Obligation Payment Schedule filed by the Rosemead Successor
Agency,
NOW, THEREFORE, THE OVERSIGHT BOARD FOR THE SUCCESSOR
AGENCY TO THE ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION
HEREBY RESOLVES:
1. The Rosemead Successor Agency Oversight Board confirms that the vendors
and professional services firms listed below are qualified and capable to provide
materials and construction services necessary to complete the Rosemead
Community Recreation Center Expansion and Fagade Improvements.
2. That the contract with the following firms shall not exceed the amounts listed in
the table below. If any contract amendments are required, all such changes shall
be brought back to the Oversight Board for review and approval.
Trade
Firm
Total Budget
Construction
CEM Construction
$ 1,878,500.00
Construction Management/
Ins ection
CEJ Engineers, Inc.
$ 80,000.00
Specialty Inspection:
Structural
Montenegro Consultants, Inc.
$ 5,400.00
Project Administration/ Staff
Time
N/A
$ 80,000.00
Total Cost: $ 2,052,600.00
3. Successor Agency staff is directed to submit documents to the Department of
Finance as necessary, including an amended Recognized Obligation Payment
Schedule.
4. Successor Agency staff is directed to provide a copy of this Resolution to the
County AuditorOController, the State Controller's Office and the State
Department of Finance.
PASSED, APPROVED AND ADOPTED THIS 30TH DAY OF JULY 2014.
Pa Mallaizfi
Chair
ATTEST:
Matthe Hawkesivorth
Successor Agency Staff
CITY OF ROSEMEAD
ROSEMEAD COMMUNITY RECREATION CENTER EXPANSION AND
FACADE IMPROVEMENT PROJECT
PROJECT No. 31 DO4
FCONTRACT
BIDDER: CEM CONSTRUCTION
CONTRACT BID FORMS
TABLE OF CONTENTS
SECTION1 BID SCHEDULE .................................................................. ._..........._.._.............1
SECTION2 BID DATA FORMS ..... ... ................................................. .... .. ..... .... .... .................5
2.A BID BOND... - ... ... .... .. ... ...... ..... .. _ ...... ......... ..... ...... ....................... .. .. .... 6
23 LIST OF PROPOSED SUBCONTRACTORS ............... .... .............. __ ... ,............. 7
SECTION3 NON - COLLUSION AFFIDAVIT .... ......... _..__...................... .._......................_...10
CBF -16
SECTION 1 - BID
SCHEDULE
BIDDER
BID SCHEDULE
SCHEDULE OF PRICES FOR
ROSEMEAD COMMUNITY RECREATION CENTER
EXPANSION AND FACADE IMPROVEMENT PROJECT
PROJECT No. 31004
BASE BID SCHEDULE
DIVISION
ITEM DESCRIPTION
ITEMIZED
DIVISION COST
NO.
COST
TOTAL
1
General Requirements $50,000.00
$50,000.00
2
Site Work $255,000.00
$255,000.00
Demolition
$25,000.00
Site Clearing
$25,000.00
Grading
$25,000.00
Site Utilities
$25,000.00
�4 Asphaltic Concrete Paving
$10,000.00
Portland Cement Corcrete Site work
$25,000.00
Landscaping
$30,000.00
Irrigation
$20,000.00
Site Furnishings
$20,000.00
Hardscape
$25,000.00
Other Site Work
$25,000.00
3.
Concrete Footings /Foundation/ Slab
$50,000.00
4.
Masonry
$50,000.00
5
Metals
$60,D00.00
Misc Steel
$10,000.00
Stainless Steel Countertops
$20,000.00
Metal Ladders
$20,000.00
Other Metals
$10,000.00
CBF -1
BIDDER: CEM CONSTRUCTION
6
Woods & Plastics
$100,000.00
Rough Carpentry
$15,000.00
$10,000.00
Interior Finish Carpentry
Architectural Woodwork (Cabinets)
$25,000.00
Acrylic Solid Surfacing Countertops
$25,000.00
Other Woods & Plastics
525,000.00
7
Thermal & Moisture Protection
$200,000.00
Fiberglass Building Insulation $25,000.00
Water- ResisLve Air Barrier Membrane $25,000.00
Aluminum Metal Plate Wall Panels $25,000,00
PVC Thermoplastic Membrane Roofing .00
k$25,000
Flashing and Sheet Metal ,000.00
Peel and Stick Flashing ,000.00
Roof Hatches With Safety Pole �'� $25,000.00
Other Thermal & Moisture Protection $25,000.00
B
Doors & Windows $125.000.00
Hollow Metal Doors And Frames
$25,000.00
Aluminum Windows, Doors And Frames
$25,000.00
Storefront
Aluminum Folding Door System
$25.000.00
Finish Hardware
$10,000.00
Solar Tubular Daylighting System
$15,000.00
Other Doors & Windows
$25,000.00
CBF -2
BIDDER'. CEM CONSTRUCTION
9
Finishes
$310,000.00
Metal Framing And Furring
$25,000.00
$25,000.00
$25,000. CO
$25,000.00
$25,000.00
$25.000.00
$100.000.00
$10.000.00
$25,000.00
$25,000.00
math And Portland Cement Plaster
Gypsum Board
Ceramic Tile
Acoustical Ceiling Systems
Acoustical And Tackable Wall Systems
Linoleum Sheet Flooring
Anti -Graflih Coating
Painting
Other Finishes
10
Specialties
$100,000.00
Marker Boards
$10,000.00
Toilet Partitions
$10,000.00
Signage
$10,000.00
Atomic Wall Clocks
$10.000.00
Fire Extinguishers And Cabinets
Toilet And Bath Accessories
Other Specialties
Fire Alarm
$15,000.00
$25,000.00
$10,000.00
$20.000.00
11
Equipment
$25,00100
Appliances
$25,000.00
12
Furnishings
$25,000.00
Entrance Cleaning Mats
$12,000.00
$13.000.00
Roller Shades
13
Special Construction
Not Used
14
Conveying Systems
Not Used
CBF -3
BIDDER:
15
Mechanical
1 $125,000.00
Plumbing
$50,000.00
$50,000.00
$25,000.00
HVAG
Other Mechanical
16
Electrical
$125,000.00
Hough Electrical
$15,000.00
Finish Electrical
$25,000.00
Lighting Fixtures
$25,000.00
Exterior Pole Lighting
$25,000.00
Fire Alarm System
$10,000.00
Intrusion Detection And Security Access
Control Systems
$10,000.00
Other Electrical
$10,000.00
Finish Electrical
$5,000.00
TOTAL BASE BID PRICE (SCHEDULE BID PRICE): $1.600.000.00
One Million Six Hundred Thousand Dollars
Dollar amount in written form
Ce:la1
BIDDER. CEM CONSTRUCTION
ALTERNATE BID ITEM 1
NO.
ITEM DESCRIPTION
UNITOF
MEASURE
EST.
OTY.
UNIT
LP RICE
ITEM
COST
17
Removal and replacement of all
LS
1
$20,000.00
$20,000.00
exterior storefront windowsldoor
system in existing RCRC
building with new storefront that
matches the storefront system in
the new building te.g, model,
EA
11
$250
stile, door, color, glazing etc).
$2,750.00
Work includes all hardware,
1
remedial work & all other
appurtenances needed for a full
and complete installation. Any
modifications including repair,
restoring or replacement of
existing ntenor and exterior
finishes (e.g. paint, soffits, gyp
board, fioonng, ceiling,
thresholds, etc) for a finished
appearance is part of this bid
alternate.
TOTAL ALTERNATE BID ITEM #1 PRICE
Twenty Thousands Dollars
Dollar amount in written form
ALTERNATE BID ITEM 2
$20,000,00
N0.
ITEM ESCRIPTION
UNIT OF
MEASURE
EST.
CITY.
UNIT
PRICE
ITEM
COST
18
A. Modify existing downlight fixtures at
EA
23
$250
$5,750.00
overhang of existing RCRC
building. All work required to install
Fixture AA -1 as described in
electrical drawings
B. New Building B: Substitute Fixture
EA
11
$250
AA (11 total) with the following Light
$2,750.00
Fixture. Rebelle - 8000 HC 2000
1
35K VOLT PR CG FINISH
TOTAL ALTERNATE BID ITEM #2 PRICE
Eight Thousand Five Hundred
Dollar amount in written form
CBF -5
$8,500.00
BIDDER. CEM CONS I RUCTION
ALTERNATE BID ITEM 3
NO.
ITEM DESCRIPTION
UNIT OF
MEASURE
EST.
CITY.
UNIT
PRICE
ITEM
COST
19
A. Existing exposed electrical conduits (5)
LS
1
$15,000.00
$15,000.00
on Eastelevation Removeexisting
exposed conduits and reinstalli relocate
concealed within building wall. Patch &
paint as necessary to fully conceal
within building assemblies.
B. Existirg exposed downspout and leader
LS
1
$15,000.00
$15,000.00
box (1) on West elevation: Remove
existing exposed downspout & leader
box and install new drain line concealed
within building wall and terminating
through exterior wall at bottom. Provide
concrete splash pan. Patch & paint as
necessary to fully conceal within
building assemblies.
TOTAL ALTERNATE BID ITEM #3 PRICE
Thirty Thousands Dollars
Dollar amount in written form
$30,000.00
TOTAL BASE BID PRICE INCLUDING ALTERNATE BID ITEM No. 1, No. 2 & No. 3
$56.500.00
Fifty Eight Thousand Five Hundred Dollar
Dollar amount in written form
Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items
in the schedule of bid items above, within the limits define in Section 3 -2.2.1 of the Standard
Specifications, to stay within the budgeted amount of this project.
If the Bid Documents specify alternate bid items, the following Alternate Bid amounts
shall be added to or deducted from the Total Bid Price entered above. The City can
choose to Include one or more of the alternates in the Total Bid Price of the Project. If
any of the Alternate Bids are utilized by the City, the resulting amount shall be
considered the Total Bid Price for the Project.
The undersigned agrees that these Contract Bid Forms constitute a firm offer to the City which
cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from
and after the bid opening date, or until a Contract for the Work is fully executed by the City and
a third party, whichever is earlier_ The undersigned also agrees that if there is a discrepancy
CBF -6
BIDDER: CEM CONSTRUCTION
between the written amount of the Bid Price and the numerical amount of the Bid Price, the
written amount shall govern.
Attached hereto is a certified check, a cashier's check or a bid bond in the amount of
Dollars ($ ) said amount being not less than ten percent (10 %) of the Total Bid Price.
The undersigned agrees that said amount shall be retained by the City if, upon award, we fail or
refuse to execute the Contract and furnish the required bonds, certificates and endorsements of
insurance and other certifications within the time provided.
If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be
prepared by the City for execution, within five (5) Calendar Days following the Letter of Award
for the Contract, and will deliver to the City within that same period the necessary original
Certificates of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and
all other documentation and certification required by the Contract.
The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing
body all rights, title, and interest in and to all causes of action it may have under Section 4 of the
Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7
of the Business and Professional Code), arising from purchases of goods, materials or services
by the Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be
made and become effective at the time the purchasing body tenders final payment to he
Contractor.
Bidder understands and agrees that, when requested by City, he shall provide: (1) evidence
satisfactory to the City of Bidder's California contractor's license(s) in good standing; (2)
evidence that the person signing this Bid is authorized to bind Bidder to this Bid and to a
contract resulting there from; and (3) any other information and documentation, financial or
otherwise, needed by City to award a Contract to the lowest responsible and responsive bidder.
Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be
incorporated into a Contract arising out of this Submittal has been so identified by Bidder.
Bidder further acknowledges that the City may, at its discretion, incorporate any of the
remaining data submitted herewith into a contract arising out of this Bid.
The undersigned acknowledges receipt, understanding and full consideration of the following
addenda to the Contract Documents.
Addenda Nos. 0
The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials,
and equipment or supplies necessary to complete the Work as described in the Bid Documents.
If this bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract
with the necessary bonds and accept the Total Bid Price as compensation in full for all Work
under the contract.
CBF -7
By: &,-,n �
Signature
Elise Michel
Type or Print Name
President
Title
BIDDER.
8207 Brookoreed Road
Business Street Address
Downey, CA 90240
City, State and Zip Code
562- 714 -2886
Telephone Number
Bidders /Contractors State of Incorporation: C, C ^^ Co rJ.TT AUcT 1 a hl CO.
Partners or Joint Venturers:
Bidder's License Number(s): A B 951234
NOTES:
1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of
the representations made on the Contract Bid Forms.
2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address
3) If Bidder is a partnership or joint venture, give full names of all partners or joint
ventures.
As further discussed in the Instructions to Bidders, Bidder will be
required to provide evidence that the person signing on behalf of the
corporation, partnership or joint venture has the sutbority
P1.1m.]
BIDDER: CEM CONSTRUCTION
SECTION 2
BID DATA FORMS
CBF -9
BIDDER: CEM CONSTRUCTION
Bidder shall submit its Bid data in accordance with the format shown on each of the following
Bid Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately
provide the information required. Bidder shall ensure that every page of its Bid Data Forms are
properly identified with the Bidder's name and page number.
2.A BID BOND
KNOW ALL MEN BY THESE PRESENTS.
THAT
as Principal, and
, as Surety, are held firmly bound unto the
CITY OF ROSEMEAD (hereinafter called the CITY) in the sum of
DOLLAR
S is ), being not less than ten percent (10 %) of the
Total Bid Price; for the payment of which sum will and truly to be made, we bind
ourselves, our heirs, executors, administrators, successors, and assigns, jointly
and severally, firmly by these presents.
WHEREAS, said Principal has submitted a bid to the CITY to perform all Work
required for the Rosemead Community Recreation Center Expansion and
Fagade Improvement Project as set forth in the Notice Inviting Bids and
accompanying Bid Documents, dated
NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the
CITY and, within the time and in the manner required by the above- referenced
Bid Documents. enters into the written form of Contract bound with said Bid
Documents, furnishes the required bonds (one to guarantee faithful performance
and the other to guarantee payment for labor and materials) furnishes the
required insurance certificates and endorsements, and furnishes any other
certifications as may be required by the Contract, then this obligation shall be null
and void; otherwise it shall remain in full force and effect. In the event suit is
brought upon this bond by the CITY and judgment is recovered, said Surety shall
pay all costs incurred by the CITY in such suit, including reasonable attorneys'
fees to be fixed by the court.
SIGNED AND SEALED, this day of 20
Principal
,0
Signature
(SEAL)
Surety
By:
Signature
CBF - 10
BIDDER. CEM CONSTRUCTION
2.8 LIST OF PROPOSED SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100
through 4114 of the California Public Contract Code, and any amendments thereto, each
Bidder shall provide the information requested below for each subcontractor who will
perform work, labor or render service to Bidder in or about the construction of the Work
in an amount in excess of one -half of one percent (greater than 0.5 %) of the Bidders
Total Bid Price, or, in the case of bids or offers for the construction of streets or
highways, including bridges, in excess of one -half of 1 percent of the Contractors total
bid or ten thousand dollars ($10,000), whichever is greater, and shall further set forth the
portion of the Work which will be done by each subcontractor. Bidder shall list only one
subcontractor for any one portion of the Work.
Pursuant to Public Contract Code Section 4104, the City has determined that it will allow
Bidders twenty -four (24) additional hours after the deadline for submission of bids to
submit the information requested by the City about each subcontractor, other than the
name and location of each subcontractor.
If the Bidder fails to specify a subcontractor for any portion of the Work to be performed
under the Contract, it shall be deemed to have agreed to perform such portion itself, and
shall not be permitted to subcontract that portion of the Work except under the
conditions hereinafter set forth below.
Subletting or subcontracting of any portion of the Work in excess of one half of one
percent (greater than 05%) of the Total Bid Price or, in the case of bids or offers for the
construction of streets or highways, including bridges, in excess of one -half of 1 percent
of the Contractors total bid or ten thousand dollars ($10,000), whichever is greater, for
which no subcontractor was designated in the original bid shall only be permitted in
cases of public emergency or necessity, and then only after City approval.
CBF - 11
BIDDER: CEM CONSTRUCTION
2.8 LIST OF PROPOSED SUBCONTRACTORS (continued)
I"Duphi,ateNeA2 Pages If needed NrIisYm additional sud nUJMe -1
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name: Super Air Air Conditioning
Address:2436 Ch cc Avenue, EI Monte, CA 91732 — 626 350 -0238
Name and Location
of Subcontractor
Description of Work
to be Subcontracted
Name: Ramirez Construction Linolium, Dry Wall, Painting
Address: 8602 Paramount Blvd Downey, CA 90240 — 310 - 849 -1526
Name and Location Description of Work
of Subcontracts to be Subcontracted
Name: Sierra Roofing Roofing
Address: 323- 854 -2207
Name and Location
of SubcontraptQr
Name:
Address
Name and Location
of Subcontractor
Name.
CBF -12
Description of Work
to be Subcontracted
Description of Work
to be Subcontracted
BIDDER: CEM CONSTRUCTION
2.0 REFERENCFS
The following are the names, addresses and telephone numbers for three public agencies for which
BIDDER has performed similar work within the past two (2) years:
1. City of Rosemead - Garvey Gym Restroom Renovation Project
Name and Address of City
Sean Sullivan - 626 569 -2189
Name and telephone number of person familiar with project
$10E0100,00 00 Rest rooms Renovation 02/25/14
Contract amount Type of Work Date
Completed
2. City of Rosemead - Garvey Gym Window Replacement Project
Name and Address of City
Sean Sullivan - 626 569 -2189
Name and telephone number of person familiar with project
$14500000 Windows Replacement In Progress
Contract amount Type of Work Date
Completed
Name and Address of City
Name and telephone number of person familiar with project
Contract amount Type of Work Date
Completed
Name
Name and telephone number of person familiar with project
Contract amount Type of Work Date
Completed
CBF -13
BIDDER: CEM CONSTRUCTION
SECTION 3
NON - COLLUSION AFFIDAVIT
CBF - 14
BIDDER. CEM CONSTRUCTION
NON - COLLUSION AFFIDAVIT
In accordance with Public Contract Code Section 7106, the undersigned, being first duly
sworn, deposes and says that he or she holds the position listed below with the bidder,
the party making the foregoing bid, that the bid is not made in the interest of, or on
behalf of, any undisclosed person, partnership, company, association, organization, or
corporation; that the bid is genuine and not collusive or sham; that the bidder has not
directly or indirectly induced or solicited any other bidder to put in a false or sham bid,
and has not directly or indirectly colluded, conspired, connived, or agreed with any
bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that
the bidder has not in any manner, directly or indirectly, sought by agreement,
communication, or conference with anyone to fix the bid price of the bidder or any other
bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any
other bidder, or to secure any advantage against the public body awarding the contract
of anyone interested in the proposed contract; that all statements contained in the bid
are true; and, further, that the bidder has not, directly or indirectly, submitted his or her
bid price or any breakdown thereof, or the contents thereof, or divulged information or
data relative thereto, or paid, and will not pay, any fee to any corporation, partnership,
company association, organization, bid depository, or to any member or agent thereof to
effectuate a collusive or sham bid.
Signature
Et_ISn M M He�
Typed or Printed Name
(,V-t;S 1 9 En�7
Title
(` -E f.1 CcirUS "!LJCTI6(t) C.At`(
1:107,,
Subscribed and sworn before me
This '& day of _Sl��� , 20�
i-^- a Publi and for
the State of California
My Commission Expires:
CBF -15
(Seal)
A
eow+. nnAatt
Cann. '
July 23, 2014
Mr. Rafael Fajardo, RE
Associate Civil Engineer
City of Rosemead
8838 E. Valley Boulevard
Rosemead, CA 91770
Subject: Proposal for the Rosemead Community Recreation Center Expansion and Fagade
Improvement Project—Project Management
Dear Mr. Fajardo:
CEJ Engineers, Inc. can provide the City of Rosemead with the technical expertise required to
successfully complete the Project documents as shown above. The CEJ team will provide services for the
aspects required for this project as described in the Scope of Work.
The following Exhibits are enclosed:
• Exhibit A — Scope of work
• Exhibit B— Schedule of Hourly Rates
CEJ Engineers, Inc. is excited about this opportunity to use our team's skills and expertise to assist the
City of Rosemead with this Project. Please feel to contact us to discuss any aspect of this proposal.
Respectfully Submitted,
CEJ Engineers, Inc
Joaquin Cervantes, P.E.
President
CEJ Engineers, Inc
15859 Eas( Edna P7.. Suite 101
Iwindale, CA 91706
(626) 960 -0152 - Direct
(626) 960 -9002 - Fax
(626) 893 -9266- While
CEJ Engineers, Inc.
15859 East Edna PI., Suite 101, Irwindale CA., 91706 / 626 - 960 -0152 1 626.893.9266
.J
Exhibit A
Scope of Work
SCOPE OF WORK
CEJ will provide Project Management Services for Civil Engineering Support, for the Rosemead
Community Recreation Center Expansion and Facade Improvement project as indicated on Plans and
Specifications.
The major tasks include the followine:
L Perform Quality Assurance monitoring, and surveillances of the Construction Contractors activities to
assure compliance with the design criteria and requirements and the Construction Contractors Project
Plans.
2. Perform Quality Assurance inspections;
3. Review construction document transmittals, i.e. shop drawings, Requests for Information. Requests
for Change Orders, etc., submitted by the Construction Contractors prior to incorporation into the
work;
4. Attend regular progress review meetings with the Construction Contractors to ascertain job progress
and identify and resolve problems;
5. Review the Construction Contractors' cost- loaded schedule initially and monthly prior to
recommending payment of monthly invoices;
6. Review monthly Construction Contractors' invoices and recommend payment;
7. Respond to all of the Construction Contractors' Requests for Information;
8. Negotiate all changes with the Construction Contractors;
9. Maintain an accurate and current record of daily construction progress. Such record shall include
daily reports, Resident Engineer's diary, use of photographs, minutes of all meetings and
correspondence files;
10. Maintain shop drawings logs, tracking the date submitted by the Construction Contractors. date
returned to the Construction Contractors.
11. Process plans and shop drawings submittals in a timely manner, and stamp acceptable documents
"Released For Construction"
12. Maintain Request for Information Logs and Request for Change Order Logs, tracking the data
submitted by the Construction Contractors and date returned to the Construction Contractors;
13. Respond to every notice of potential claim received from the Construction Contractors and take all
steps necessary to mitigate delays and damages;
14. Analyze all of the Construction Contractors' claims and make recommendations for possible
resolutions:
15. Collect all Quality Assurance records including As -Built drawings, test reports, As -Built drawings
(final revisions) shall be supplied by the Construction Contractors based on the as built conditions.
PROPOSED FEE
Our proposed fee is based on the proposal required format and is not to exceed lump sum fee amount of
$80,000 based on established hourly rates.
s City of Rosemead
Proposal for the Rosemead Community Center Improvement,
Exhibit B
Schedule of Hourly Rates
CEJ ENGINEERS, INC.
Effective July 1, 2014 to June 30, 2015
Hourly Rate Schedule
Principal Engineer ............ .........................140.00
Project Manager ........ ...............................
125.00
Senior Project Engineer ...........................
115.00
Senior Engineer ....... ...............................
105.00
Associate Engineer ... ...............................
100.00
Design Engineer .............. ..........................95.00
Designer /CADD Drafter _...__ ......
............ 85.00
Clencal,rTechnical Aide ..............................
65.00
Senior Landscape Archiect ......................105.00
Associate Landscape Architect .................. 95.00
REIMBURSABLE EXPENSES
Senior Surveyor ............... .........................140.00
Senior Survey Analyst ..... .........................130.00
100.00
Survey Analyst II ............. .........................115.00
Survey Analyst I .............. .........................100.00
Survey Party Chief .......... .........................105.00
Field Party (Three) .......... .........................190.00
Field Party ( Two) ............. .........................175.00
Field Parry ( One) ......... .........................110.00
Operations Manager ........ .........................110.00
Supervising Public Works Observer.........
100.00
Construction Manager ..... .........................110.00
Construction Engineer ...... ..........................80.00
Reproduction ..... ............................... Cost
Subconsultant Services ..................... Cost plus 10%
Automobile Transportation.. ...... ... ...... Current rate
Delivery, Freight, Courier.... .............. ...Cost
Agency Fees ......... ...........................Cost
Commercial Travel / Subsistence....._.. Cost
PLI� City of Rosemead
Proposal for the Rosemead Community Center Improvements
-u
Montenegro Consultants Inc
8660 Mission Dr, Rosemead , CA 91770;
Ph: (626) 786 -4359, Fax # 626 - 723 -3059
E -mail address: pedro(o)monteneoroconsultants.com
July 23, 2014
Submitted to
Mr Rafael Fajardo, P.E.
Public Works Department
City of Rosemead
Email: rfajardo @cityofrosemead.org
PROJECT: Expansion and Remodeling of Rosemead Community Recreation Center
3936 N. Muscatel Ave, Rosemead, CA 91770.
PURPOSE: To provide structural engineering services as follows:
Structural observation site reports during construction.
Not included in these services are: any engineering services not expressly specified in this
agreement, nor any governmental fee.
PAYMENT: The sum of $ 360.00 per site visit.
The number of site visits will depend on compliance of work to approved plans and
specifications and job schedule.
Based on structural observation required inspections on approved set of plans, I anticipate
about 12 structural observations under normal circumstances.
CUSTOMER SIGNATURE Pedro Montenegro, Structural Engineer
Lic S 5345
Ocean Electric Construction Proposal
Date: July 22, 2014
Rosemead Community Recreation
Customer: Center Home No.: N/A
Street Address: 3936 North Muscatel Avenue Cell No.: 626 - 625 -4421
City /State /Zip: Rosemead, Ca. 91770 Work No: 626 - 569 -2260
The Contractor proposes to furnish all listed material and labor necessary for the completion of
the following job specifications: Ocean Electric Construction - License # 987831 B C10 will be
providing a new SDI HD 12 security camera system to the Rosemead Community Recreation
Center. This project will consist of installing a (DVR) Digital Video Recording System with 8
fixed SDI HD exterior varifocal lens cameras to the community center buildings perimeter and 4
fixed SDI HD interior cameras inside of the lobby entrance and computer lab room. Installation
will also consist of a 19" viewing monitor and two Infra -red illuminator lighting fixtures for
increased night time visibility in low light areas behind RC building.
Service & Support — Ocean Electric Construction will provide all instructional and tutorial
services needed to assist you in operation of your fully functional security camera
system. A security camera system diagnostic check will be conducted every three (3)
months for the first year. The system will allow remote viewing of the cameras from the
IP internet address connection via computer or cell phone. Technical support will also
be available when any malfunctions or questions of system usage may arise.
Ocean Electric Construction will provide all required bonding, liability insurance and workers'
compensation insurance for the above specified project as required by City of Rosemead and
California Labor Law. The insurance coverage will provide a $2,000,000.00 for Occurrence and
$4,000,000.00 Aggregate.
The Contractor hereby proposes to furnish material and labor with above specifications
or the sum of: Eight Thousand Seven Hundred Dollars ($8,700.00).
Payment schedule as follows: 30 days after completion of project.
All material is guaranteed to be as specified and the work will be completed in a workmanlike
manner in accordance to specifications. Any and all alterations or deviations from the stated
specifications involving extra costs and materials will be executed only upon written orders.
These changes turn into an extra charge, over and above the estimate. All agreements are
contingent upon strikes, accidents or delays beyond contractor's control. Owner of property to
carry fire, tornado, and other necessary insurance. Our workers are fully covered by workmen's
compensation
insurance. If either party commences legal action to enforce its rights pursuant to this
agreement, the prevailing party in said legal action shall be entitled to recover its reasonable
attorney's fees and costs of litigation relating to said legal action, as determined by a court of
competent jurisdiction.
Submitted by: Ocean Electric Construction — Owner Patrick W. Monjaras
ww ca.aia., mm Page 1 of 2 vxi i3s ae.. osiw
This proposal may be withdrawn if not accepted within 30 days.
Acceptance of Proposal
As stated in the above specifications, the costs, materials and specifications are satisfactory
and are hereby accepted. I authorized the contractor to perform the work as specified and
payments will be made as summarize above.
Customer Signature:
Date:
wwwsousez wn Page 2 of 2 rrcn zb- aev. M.
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS.
CITY OF ROSEMEAD )
I, Malt Hawkesworth, Successor Agency Staff and Assistant City Manager of the City of
Rosemead, do hereby certify that the foregoing Resolution No. 2014 -07 being:
A RESOLUTION OF THE OVERSIGHT BARD
FOR THE SUCCESSOR AGENCY TO THE
ROSEMEAD COMMUNITY DEVELOPMENT
COMMISSION CONFIRMING THE
CONTRACTS AND EXPENDITURES RELATED
TO THE ROSEMEAD COMMUNITY
RECREATION CENTER EXPANSION AND
FAQADE IMPROVEMENTS PROJECT
was duly and regularly approved and adopted by the Oversight Board on the 30th of July, 2014, by
the following vote to wit:
Yes: Allred, Jones, Redondo- Churchward
No, None
Abstain: Lash
Absent: Miller, Solelo, Wallach
Matt HaWkeswr
Successor Agency Staff
Assistant City Manager