CC - Item 4F - Hellman Avenue/Del Mar Avenue Intersection Improvements Project - Award of Contract Design Engineering E M * • O ,A� ROSEMEAD CITY COUNCIL f„.1110 xf„.1110 STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: JEFF ALLRED, CITY MANAGER ' DATE: OCTOBER 14, 2014 SUBJECT: HELLMAN AVENUE I DEL MAR AVENUE INTERSECTION IMPROVEMENTS PROJECT — AWARD OF CONTRACT DESIGN ENGINEERING SUMMARY As part of the City's Fiscal Year 2014-15 Capital Improvement Program, the City Council approved a project entitled "Hellman Avenue / Del Mar Avenue Intersection Improvements". The project will replace the existing intersection at Hellman Avenue and Del Mar Avenue with new concrete paving as well as the construction of colored concrete crosswalks, traffic signal upgrades, traffic stripping, miscellaneous sidewalk, and other appurtenances. This project is funded through Federal Surface Transportation Local Funds (STP-L) through the Los Angeles County Metropolitan Transportation Authority (LACMTA) in the amount of$450,000. Staff Recommendation It is recommended that the City Council authorize the City Manager to enter into a contract with CEJ Engineers, Inc. for design engineering services for the Hellman Avenue/Del Mar Avenue Intersection improvements project in an amount of $37,500.00 and authorize a contingency of $5,750.00 (approximately 15%) to cover the cost of any unforeseen elements in the design process. BACKGROUND During Fiscal Year 2013-14, the intersection of Hellman Avenue and San Gabriel Boulevard was reconstructed in concrete and the project was received throughout the community as a success for both the aesthetic appearance as well as the functional utility of the improvements. It has been proposed to complete a similar project at the intersection of Hellman Avenue and Del Mar Avenue which serves as a major entry and exit point from Interstate 10 in Rosemead. Beginning in Fiscal Year 2010-11, Hellman Avenue has received substantial improvement in the form of asphalt overlays and reconstruction as needed. ITEM NO. "If City Council Meeting October 14,2014 Page 2 of 3 Additionally, the final stretch of Hellman Avenue (Jackson Street to the West City Limit) is scheduled to receive an overlay this fiscal year. Given the existing pavement structure and the large volume of traffic from the adjacent San Bernardino freeway, it was determined that this intersection, Hellman Avenue and Del Mar Avenue, should be constructed in concrete. Concrete is more durable and has a longer lifespan than conventional asphalt. The proposed project will include the reconstruction of the intersection with concrete pavement as well as the construction of colored concrete crosswalks, traffic signal improvements, miscellaneous sidewalk work, landscape improvements, and other appurtenant work. As part of the Federal Surface Transportation Local Funds (STP-L), the City of Rosemead received $450,000.00 that will be utilized to construct the improvements at the intersection of Hellman Avenue and Del Mar Avenue. Funding for this program is administered through the California Department of Transportation (Caltrans) and the Los Angeles County Metropolitan Transportation Authority (LACMTA). City staff, as well as the design consultant, will be coordinating with these two agencies during the design and construction phases of this project. All elements of this project are subject to the approval of Caltrans. The proposed consulting services will complete all design elements to create a comprehensive construction package, including: • Topographic Survey • Environmental Approval • Right-of-Way Certification • Utility Coordination • All Construction Plans and Specifications, including Traffic Control Plans • Engineer's Cost Estimate • Construction Management Additionally, the consultant will oversee all necessary submittals and coordination with the California Department of Transportation (Caltrans) to receive the Authorization to Proceed with Construction (E-76), which is a required element of expending federal funds. City Staff distributed a request for proposal (RFP) to four engineering firms that are maintained on the City's On-Call Engineering Services List. Proposals were received from two of the four firms with the following result: City Council Meeting October 14,2014 Page 3 of 3 RANK CONSULTANT LOCATION BID AMOUNT 1 CEJ Engineers, Inc. Irwindale, CA $37,500.00 2 RKA Consulting Group Walnut, CA $38,885.00 Willdan Engineering Industry, CA No Response Harris & Associates Irvine, CA No Response Staff has reviewed the proposal documents as well as the consultants' background and recent projects for competency. Staff determined that CEJ Engineers, Inc. is the lowest responsible bidder and is experienced in this type of project, as this firm completed the design for the Hellman Ave/San Gabriel Boulevard Intersection Improvements Project as well as many other projects throughout the City. FINANCIAL REVIEW Funding for this project was approved by the City Council as part of the City's FY2014- 15 Capital Improvement Program. There is $450,000 available in STP-L Funds and $50,000 in Lighting District Funds. Prepared by: 2iiivan Rafael M. F jardo, P.E. Acting Public Works Manager City Engineer Submitted by: ,'�y�j��''�('y f Matt`Hawk worth Assistant City Manager/Acting Director of Public Works Attachments: 1. Proposal from CEJ Engineers, Inc. CEJ October 1, 2014 Mr. Rafael Fajardo, P.E. City Engineer City of Rosemead 8838 E. Valley Boulevard Rosemead, CA 91770 Subject: Proposal for Hellman Avenue/Del Mar Blvd Intersection Improvements Project. Dear Mr. Fajardo: CEJ Engineers, Inc. can provide the City of Rosemead with the technical expertise required to successfully complete the Hellman Avenue/Del Mar Blvd Intersection Improvements Project. The CEJ team will provide services for the aspects required for this project as described in the Scope of Work. The following Exhibits are enclosed: ❑ Exhibit A— Scope of work ❑ Exhibit B— Schedule of Hourly Rates CEJ Engineers, Inc. is excited about this opportunity to use our team's skills and expertise to assist the City of Rosemead with this important project. Please feel free to contact us to discuss any aspect of this proposal. Respectfully Submitted, CEJ Engineers, Inc. Joaquin Cervantes, P.E. President CD Engineers,Inc. 15859 East Edna Pt,Suite 101,Irwindale C4.,91 706/626-960-0152 1 626.893.9266 CEJ Exhibit A Scope of Work Project Understanding The project consists in the construction of a PCC Intersection, traffic signal upgrade, striping and appurtenances. The Construction is proposed to begin in April and be completed in June 2015. Hellman/Del Mar Intersection Project is a federally funded project through Caltrans (STP- L). CEJ design services include the preparation of a topographic survey, preparation of a Caltrans package approval (preliminary engineering, construction engineering and final submittal package) and construction plans and specifications. Project Team Management Project Manager— CEJ's designated Project Manager, under the general direction of the City Engineer, will be responsible for overseeing the aspects of project development and coordination. The project management and constant monitoring of the schedule with all parties involved in this project is critical to the successful completion of the project. Schedules—Constant contact with the City will be maintained to ensure issues are being resolved in a timely manner to allow the design to stay on schedule. CEJ will be proactive by continuously looking at the overall project and make recommendations to the City to provide a high quality project. CEJ will provide budget planning and monitoring to ensure that the project is designed and constructed within the City's budget. This shall include establishing and maintaining cost controls by tracking forecasted costs, project budget, and actual costs. Project Coordination—CEJ will coordinate efforts with the City, Caltrans and City subconsultants, public, private utilities, and other agencies to obtain the necessary technical and operational information for completion of the work. Record Keeping— CEJ will maintain comprehensive records that track all incoming and outgoing correspondence, submittals, request for information, contract documents, invoices, and all other project related documents. All records shall be considered the property of the City and as such the City shall have access to any records. QA/QC—The primary mission of our Quality Assurance/Quality Control plan is to provide staff with the technical and managerial expertise to plan, organize, implement, and control the overall quality effort, thereby providing a complete quality project that conforms with the City standards and within the time and budget established. CEJ will provide quality control measures throughout the duration of the project. Milso City of Rosemead Proposal for Hellman Ave/Del Mar Blvd. Improvements Pg 1 CEJ Scope of Work 1. Field Investigation and Topographic Survey Data Collection—CEJ will provide written requests to the City to obtain available as-built drawings, reports, studies, and utility contact information. CEJ will prepare and send utility notifications to the utility companies and other agencies providing services within the City. We will request copies of available maps, plans and records of any existing facilities within the project limits that may be affected by the proposed improvements. Field Survey and Mapping—CEJ will perform a review of the project site to familiarize design staff with project constraints and observe the general site conditions and perform a complete topographic survey, including the following; a) Portion of the public street abutting the frontages of the properties such as sidewalk, top of curb, flow line, existing grade elevation of asphalt, edge of gutter, grade breaks elevations. b) Location and description of the existing, lighting, walls, landscape and trees. c) Elevations at every 25 feet(grid method) and at critical locations as necessary to map contours at 1-foot intervals. d) Elevations will be based on County datum using bench mark provided by City of Rosemead. 2. Right of Way Engineering CEJ will perform right of way engineering including appraisal, descriptions and right of way maps as necessary. We will identify all right way acquisition required for the construction of the project and prepare documents if necessary. 3. Construction Plans CEJ will prepare construction plans for project design. CEJ will submit three sets of plans, specifications, and estimate (PS&E)to the City and Caltrans for review and comment in 70%, 90%, and 100% stages prepared on 22" x 34" plans. CEJ shall address the City's comments and incorporate the comments into the plans, specifications, and estimate. The Final submittal shall include one set of wet-signed hard copy plans on mylar sheets, one reproducible set of specifications, a final engineer's estimate, and one CDROM of the full set of AutoCAD plan sheets, specifications, and estimate. The review submittals will be in City of Rosemead Proposal for Hellman Ave/Del Mar Blvd.Improvements Pg 2 CEJ submitted on half size (11" x 17"); five copies and an electronic copy(PDF format). The submittals will include the following plan components; Plan Construction list of sheets. • Title Sheet and Location Map, • Traffic Control Plans, • Utility Plans, • Erosion Control Plans, • Roadway Plans, • Profiles, • Sections and Details, • Traffic Signal Plans, • Striping Plans 4. Specifications—Since this is a Federal Funded project, CEJ with prepare the specifications using Caltrans Special Provisions boiler plate specifications and general technical provisions and amendments. CEJ will be responsible for preparing the technical specifications and compiling the project specifications, signed by a civil engineer registered in the State of California, which are complete and ready for bidding purposes. 5. Engineer's Estimate—CEJ will prepare a detailed engineer's estimate in Microsoft Excel spreadsheet format that includes the bid items described within the contract specifications. The estimate will be based upon recent bid prices for similar projects as maintained by CEJ and Caltrans. Backup quantity calculations will be provided showing detailed computations for accuracy of the quantities upon request. 6. Permits/Enviromental Assesment —CEJ will coordinate with Caltrans and submit PS&E to obtain permit approval for CEQA and NEPA(PES and NES forms). CEJ will prepare certifications and checklists for E-76 to obtain Authorization to Proceed. CEJ will attend any necessary meetings and prepare all applicable application as required for permit approval. Plan checking and Encroachment fees will be paid by the City. 7. Construction Support—CEJ will coordinate and attend meetings including the preconstruction meeting with the City. CEJ will provide support services during the bid solicitation period. CEJ will be available to answer questions regarding the technical provisions of the contract special provisions, the design drawings or design issues brought up during the bidding process. RFI's will be responded within two (2)working days. Cost for this task will be considered as part of the preparation of the PSE documents at no additional cost to the City. .n� City of Rosemead I Proposal for Hellman Ave/Del Mar Blvd. Improvements `''`�, Pg3 CEJ City Responsibilities 1. Provide copies of City files, record drawings, existing geotechnical data, and other information for the project 2. Provide potholing data if required 3. Provide City base sheet for improvement plans in AutoCAD format Assumptions 1. CEJ will attend a maximum of six meetings 2. Construction inspections services are not included in this scope of work. Deliverables 1. Project Schedule 2. 70% Plans, Specifications, and Estimate (PS&E) 3. 90% Plans, Specifications, and Estimate (PS&E) 4. 100% Plans, Specifications, and Estimate (PS&E) Exclusions: Geotechnical Investigation—Geotechnical investigation and recommendations are not included in our scope of work. The City will provide a geotechnical report, boring logs, and recommendations required for this project. A copy of the geotechnical report will be included in the project plans and specifications. SWPPP—SWPPP is not included in our scope of work. Since the project area of disturbance appears to be less than an acre, no SWPPP is required. If Caltrans requires a SWPPP, CEJ will prepare one at a negotiated fee. Hydrology and Hydraulics Report—A hydrology analysis and report is not included in our scope of work. If Caltrans requires a Hydrology/Hydraulics Report, CEJ will prepare one at a negotiated fee. PROPOSED FEE Our proposed fee is based on the proposal required format and is not to exceed lump sum fee amount of$37,500. City of Rosemead Proposal for Hellman Ave/Del Mar Blvd. Improvements Pg 4 CJ Exhibit B Schedule of Hourly Rates CEJ ENGINEERS, INC. Effective July 1,2014 to June 30,2015 Hourly Rate Schedule ENGINEERING DIVISION SURVEYING DIVISION Principal Engineer 140.00 Senior Surveyor 140.00 Project Manager 125.00 Senior Survey Analyst 130.00 Senior Project Engineer 115.00 Survey Analyst II 115.00 Senior Engineer . 105.00 Survey Analyst I 100.00 Associate Engineer 100.00 Survey Party Chief 105.00 Design Engineer 95.00 Field Party(Three) 19000 Designer/CADD Drafter 85.00 Field Party(Two) 175.00 Clerical/Technical Aide 65.00 Field Party(One)..................................110.00 CONSTRUCTION MANAGEMENT/INSPECTION LANDSCAPE ARCHITECTURE Operations Manager 110.00 Senior Landscape Architect 105.00 Supervising Public Works Observer 100.00 Associate Landscape Architect 95.00 Construction Manager 110.00 Construction Engineer 80.00 REIMBURSABLE EXPENSES Reproduction....................................Cost Subconsultant Services..................... Cost plus 10% Automobile Transportation. Current rate Delivery, Freight, Courier....................Cost Agency Fees ....................................Cost Commercial Travel/Subsistence......... Cost *, City of Rosemead Proposal for Hellman Ave/Del Mar Blvd. Improvements Pg5