RCRC Expansion ProjectRCRC Expansion Project
RCRC Renovation and Expansion
Completed Projects
Roof and HVAC System replacement
Interior renovations
Windows and door replacement
Pending Projects
Southeast restroom renovation
Kitchen renovation
Exterior façade replacement
Landscape/Mini-Plaza construction
New building construction
Awarded contracts for $1.96 million
Options
Status quo
Add an annex building to RCRC that will provide a 3,000 square foot building with one meeting space.
Rebid the entire project. Estimated cost increase of at least $600,000 and identify new funding source.
Push back the completion until late Summer 2015.
Pursue another option
Utilize existing contract to complete restroom, kitchen, façade and mini-plaza work at existing building for $500,000
Re-design the space of the new building with a skate plaza and park setting.
Reduce total cost of the project by at least $500,000
Repurpose any savings of bond funds to other projects such as Zapopan, Garvey Sewer, Valley Blvd or Rosemead Park.
Skate Plaza Conceptual Drawing
80’ x 60’ Pad for the Skate Plaza
Walking nature trail around the plaza and East side of RCRC
Green screen and wall improvements along residences surrounding RCRC
Wrought iron fencing to enclose the back portion of RCRC for special event rentals
Skate Plaza Conceptual Drawing
Water feature or Public Art at the base of the existing Plaza and parking lot walkway
Seat walls in the park space
Skate Plaza amenities that look similar to a concrete plaza and not a traditional skate park
Skate Plaza Sample
Westchester Skate Plaza
Skate Plaza Sample
Hollenbeck Skate Plaza
Skate Plaza Sample
Charmette Bonpua Skate Plaza
Skate Plaza Sample
Charmette Bonpua Skate Plaza