Loading...
RCRC Expansion ProjectRCRC Expansion Project RCRC Renovation and Expansion Completed Projects Roof and HVAC System replacement Interior renovations Windows and door replacement Pending Projects Southeast restroom renovation Kitchen renovation Exterior façade replacement Landscape/Mini-Plaza construction New building construction Awarded contracts for $1.96 million Options Status quo Add an annex building to RCRC that will provide a 3,000 square foot building with one meeting space. Rebid the entire project. Estimated cost increase of at least $600,000 and identify new funding source. Push back the completion until late Summer 2015. Pursue another option Utilize existing contract to complete restroom, kitchen, façade and mini-plaza work at existing building for $500,000 Re-design the space of the new building with a skate plaza and park setting. Reduce total cost of the project by at least $500,000 Repurpose any savings of bond funds to other projects such as Zapopan, Garvey Sewer, Valley Blvd or Rosemead Park. Skate Plaza Conceptual Drawing 80’ x 60’ Pad for the Skate Plaza Walking nature trail around the plaza and East side of RCRC Green screen and wall improvements along residences surrounding RCRC Wrought iron fencing to enclose the back portion of RCRC for special event rentals Skate Plaza Conceptual Drawing Water feature or Public Art at the base of the existing Plaza and parking lot walkway Seat walls in the park space Skate Plaza amenities that look similar to a concrete plaza and not a traditional skate park Skate Plaza Sample Westchester Skate Plaza Skate Plaza Sample Hollenbeck Skate Plaza Skate Plaza Sample Charmette Bonpua Skate Plaza Skate Plaza Sample Charmette Bonpua Skate Plaza