Loading...
CC - Item 3D - Annual Resident Resurfacing Program - Award of Contracts M E r E *4° ROSEMEAD CITY COUNCIL ivrA ,j STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: JEFF ALLRED, CITY MANAGER 4' y DATE: JANUARY 27, 2015 SUBJECT: ANNUAL RESIDENTIAL RESURFACING PROGRAM — AWARD OF CONTRACTS SUMMARY As a part of the City's Fiscal Year 2014-15 Capital Improvement Program, the City Council approved the "Annual Residential Resurfacing Program" which involves pavement rehabilitation activities on roadways that are in need of repair. The project consists of asphalt concrete overlay and reconstruction of road pavement, repairs to damaged sidewalk, curb and the planting of trees along the parkways. The streets identified for resurfacing in the 2014-15 Fiscal Year Capital Improvement Program are Hellman Avenue, from Jackson Avenue to the westerly City Limit, and Steele Street from Ellis Lane to Rio Hondo Avenue. Additionally, staff recently added improvements at Rio Hondo Avenue and Rose Street to this project as recent rain events have resulted in flooding and the street is in need of repair and drainage improvements. Staff Recommendation It is recommended that the City Council: 1. Approve the plans and specifications for the Annual Residential Resurfacing Program, Hellman Avenue from Jackson Avenue to the westerly City Limit and the Rose Street Rio Hondo Avenue Intersection Improvements Project, 2. Authorize the City Manager to enter into a contract with E.C. Construction in the amount of $218,760.12 for the Annual Residential Resurfacing Project, Hellman Avenue from Jackson Avenue to the westerly City Limit. In addition, authorize an amount of $21,876 (10%) as a contingency to cover the cost of unforeseen construction expenses. 3. Authorize the City Manager to enter into a contact with CEM Construction Corp in the amount of $83,935.00 for Rose Street/Rio Hondo Avenue Intersection Improvements project. In addition, authorize an amount of $8,393.00 (10%) as a contingency to cover the cost of unforeseen construction expenses. ITEM NO. c. D City Council Meeting January 27,2015 Page 2 of 4 DISCUSSION The Annual Residential Resurfacing Program has a budget of $600,000 for Fiscal Year 2014-15 and is funded through State Gas Tax proceeds. Staff identified two sections of residential roadway to be rehabilitated through this project based upon ratings in the Pavement Management Program and through field observations. The sections identified include Hellman Avenue, from Jackson Avenue to the westerly City Limit, and Steele Street from Ellis Lane to Rio Hondo Ave. Public Works Staff determined that since these streets were on opposite ends of the City, it would be appropriate to bid the construction of these projects separately. Tonight's action would be to award a contract for the construction of the segment on Hellman Avenue. It is anticipated that the bid and award of contract for the work on Steele Street will take place in February or March 2015. Hellman Avenue is an east/west arterial roadway that runs parallel to Interstate 10 and has an average daily traffic of more than seven thousand vehicles. Hellman Avenue was resurfaced from Walnut Grove Avenue to Jackson Avenue in Fiscal Year 2009-10; however, the portion from Jackson Ave to the westerly City Limit was not completed due to lack of available funding. The segment of Hellman Avenue from Jackson to the westerly City limit currently has a pavement condition index score of 48 out of 100, and is in need of significant rehabilitation. A Notice Inviting Bids was published in local newspapers and trade publications on January 8th and January 15th, 2015. Sealed bids were received in the Office of the City Clerk until 10:30 a.m. on Wednesday, January 21, 2015. At 11:00 a.m. on January 21, 2015, the City Clerk publicly opened and read six (6) sealed bids with the following result: Rank Bidder Location Bid Amount 1 E.C. Construction South El Monte, CA $ 218,760.12 2 CEM Construction Corp. Downey, CA $ 227,620.00 3 Gentry Brothers, Inc. Irwindale, CA $ 228,955.00 4 All American Asphalt Corona, CA $ 229,587.50 5 Hardy & Harper, Inc. Santa Ana, CA $ 234,000.00 6 Palp, Inc. DBA Excel Paving Co. Long Beach, CA $ 257,940.00 Staff has reviewed the bid documents for completeness and investigated the contractor's background and recent projects for competency. Staff believes that E.C. Construction is the lowest responsive bidder and is qualified to complete the work as specified for this project. E.C. Construction has previously completed similar street rehabilitation projects for the Cities of Pasadena, Monrovia, and San Marino. Rose Street/Rio Hondo Avenue Intersection Improvements Due to the rain activity that has occurred recently, staff determined a need to make roadway and drainage improvements in the area of Rose Street and Rio Hondo City Council Meeting January 27,2015 Page 3 of 4 Avenue. Currently, even minimal rain activity causes flooding at the end of the cul-de- sac on Rose Street as there is insufficient drainage. City Engineering staff and a consultant engineer reviewed the conditions and developed a solution to solve the drainage issue and prevent flooding. It was determined that the installation of a cross gutter along Rio Hondo Avenue, across Rose Street, would carry most of the rainwater in the area further down Rio Hondo Avenue, toward Valley Boulevard, where there is sufficient drainage available. Additionally, the catch basin in the cul-de-sac on Rose Street would be reconstructed to contain an infiltration basin and a larger capacity. These measures will reduce flooding on the Rose Street cul-de-sac and improve safety of residents and motorists. As the flooding was occurring with any rain event, staff determined that action needed to be taken swiftly and undertook an informal bid process. Plans and specifications were distributed to three local general engineering contractors, who have worked regularly with the City in the past, and three proposals were received. The results are as follows: Rank Bidder Location Bid Amount 1 CEM Construction Corp. Downey, CA $ 83,935.00 2 E.C. Construction South El Monte, CA $ 86,848.51 3 Gentry Brothers, Inc. Irwindale, CA $ 104,510.00 CEM Construction has completed many projects for the City in the past and is ready to proceed immediately with this project. It is anticipated that work can be completed within three weeks and this will mitigate any further flooding issues should there be additional rain events this season. FINANCIAL REVIEW The Annual Residential Resurfacing Program is included in the FY 2014-15 Capital Improvement Program. The project has a budget of $600,000 utilizing State Gas Tax funds. The total appropriation needed to award these contracts tonight is approximately $333,000.00. Per the engineer's estimates, sufficient funds remain in the budget to complete the work on Steele Street. ENVIRONMENTAL REVIEW This project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (C) of the CEQA Implementing Guidelines. PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. City Council Meeting January 27,2015 Page 4 of 4 Prepared By: Prepared By: gAle Rafael M. Fajardo, P.E. Sean Sullivan City Engineer Acting Public Works Manager Submitted ccByy::/y Ma ke9Worth Assistant City Manager/Acting Director of Public Works Attachments: A. Plans and Specifications (Available in the City Clerk's Office) B. Bid Analysis for Hellman Avenue Resurfacing C. Bid Analysis for Rose Street/Rio Hondo Avenue Intersection Improvements PUBLIC WORKS SERVICE OEPAPTMFNT,ENGINEERING DIVIS ION 1212015 CITY OF ROSEMEAD ANNUAL RESIDENTIAL RESURFACING PROJECT-HELLMAN AVENUE PROJECT NUMBER: 21019 BID ANALYSIS BID SUBMITTAL: JANUARY 21.2015 E.C.CONSTRUCTION Al BASE BID PRICE ITEM DESCRIPTION CITY UNIT UNIT PRICE TOTAL 1 CLEARING AND GRUB MATERIALS RIA PLANSISPECS. 1.00 LS 400.00 $ 400.00 PER 2 COLD MILOF WASTE NMPAVEMES 0.00 ' LS 1p00.00 $ 774500 3 COLD RUE T'EXISTING HICK PAVEMENT 50]00,00 TONS 0 00 $ 4320500 4 CONSTRUCT 10' SPHA TILEVELING COURSE 350.00 TONS 9830 $ _ 2740500 1 0"5 CONSTRUCT RISING PAVEMENT REPLACE CE WI 4'At 350.00 TONS ]8.30 $ 2]705-00 REMOVE CE M ACTEIDN PAVEMENT REPLACE W/4"AC B-PG 64-10 BASE 6 REMRWMP CO 5 SE 430.00 SF 141 $ 5,46500 7 REMOVE,DISPOSE,POSE,CONHSTRUCT 4' PCC SIDEWALK 394.00 SF 098 $ 542612 7 9 REMOVE,DISPOSE,CONSTRUCT B"CURB/2R RAMPS 394.00 LF 00000 $ 17000.00 9 REMOVE,DISPOSE,CONSTRUCT PCC CURB RAMPS 5.00 EA 701000 $ 12,250.00 10 REMOVE.DISPOSE CONSTRUCT MLE PCC DRIVEWAY APPROACES 825.00 SF 9000 $ 8,63000 12 ADJUST WATER VALVE MANHOLE TO GRADE 9.00 EA 1.09500 $ 342500 12 ADJUST WATER EVALVE/GAS VALVE TO GRADE 19.00 EA 0000 $ 370000 14 INSTALL SURVEY WELL MONUMENT 1.00 EA 1,280.00 $ 70 2000 14 'IINSTALL STRIPING,SIGNAL LOOPS,S,AND PAVEMENT MARKERS 1.00 LS 930 $ n,280.00 15 INSTALL 36"BOX PARKWAY TREE PYRUS BRADFORD PEAR 20 902 5 00 EA 982.50 $ 1965000 16 .'REMOVE AND DISPOSE EXISTING TREES 2R AVERAGE DIAMETER 5.00 EA ]82.00 S 3,910 00 TOTAL BASE BID PRICE $ 218,760.12 CEM CONSTRUCTION H2 BASE BID PRICE I- - -:L 1 I ITEM DESCRIPTION WY UNIT UNIT PRICE TOTAL CLEARING AND GRUBBING PER PLANS/SPECS. 1.00 LS 500000 $ 5,000.00 _. _ DISPOSAL WASTE MATER 0 ES 0.00 LS 5,0060 $ 42000 COLD ONO I 2"EXISTING PAVEMENT 5048000 SF 5.00 $ 450 70000 CONSTRUCT 15"THICK PAVEMENT NG COURSE 350.00 TONS 9000 $ 3150000 CONSTRUCT 6'EXISTING ASPHALTIC VEMENT REPLOOU /4'01 350.00 ',TONS 90.00 $ 31 50000 REMOVE M ACTEINN PAVEMENT REPLACE W/4"AC B-PG 6440 BASE OVER COMPACTED NATIVE 400.00 SF $00 $ 3,200 00 REMOVE.DISPOSE,CONSTRUCT 4"PCC SIDEWALK ]30.00 SF 600 $ 4380.00 REMOVE,DISPOSE,CONSTRUCT B"CURB/24"GUTTER 394,00 LF 5500 2167000 REMOVE,DISPOSE,CONSTRUCT PCC CURB RAMPS 4.00 EA 2.125 $00 $ 8.500 00 REMOVE,DISPOSE CONSTRUCT 6"PCC DRIVEWAY APPROACES 825.00 SF 10.00 $ 8.25000 DOUBLE ADJUST SEWER MANHOLE TO GRADE ].00 EA 25000 $ 1750.00 ADJUST WATER VALVE/GAS VALVE TO GRADE 1900 EA 150.00 $ 285000 INSTALL SURVEY WELL MONUMENT 3.00 EA 60000 $ 1,800.00 INSTALL STRIPING.SIGNAL LOOPS.AND PAVEMENT MARKERS 1 00 LS 27]00 00 $ 2370000 INSTALL 36"BOX PARKWAY TREE PYRUS BRADFORD PEAR 20.00 EA 1.00000 $ 2000000 REMOVE AND DISPOSE EXISTING TREES 24'AVERAGE DIAMETER 5.00 EA 2,000.00 $ 1000000 TOTAL BASE BID PRICE $ 227,620.00 PAGE 1 PUBLIC WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION 1212015 GENTRY BROTHERS,INC. M3 BASE BID PRICE I J ->1 I ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL CLEARING ISPOS L AND GRUB MATERIALS RIA PLANS/SPECS 100 LS 32 000 $ 35,000.00 COLD MILOF WASTE NMPAVEMEN 0.00 SF 5,000.30 $ 521000 COLD MILL 2'EXISTING PAVEMENT 50480.00 SF 0.30 $ $21000 . CONSTRUCT 15"THICK PAVEMENT OVERLAY 480.00 TONS 87 00 $ 41]60.00 CONSTRUCT I0"ASPHALTIC LEVELING COURSE D1 350.00 TONS 75.00 $ 26.25000 OVER COMPACTED 6"EXISTING PAVEMENT REPLACE WN"AC B-PG 64-10 BASE 00.0 OVER COMPACTED NATIVE 400.00 SF 6.00 $ 2,40000 REMOVE,DISPOSE,CONSTRUCT 4'PCC SIDEWALK 730.00 SF 8.00 $ 438000 REMOVE,DISPOSE.CONSTRUCT B"CURB/24"GUTTER 394.00 LF 4500 $ 1]730.00 REMOVE,DISPOSE.CONSTRUCT PCC CURB RAMPS 4.00 EA 190000 $ 760000 REMOVE,DISPOSE. UCT6"POO DRIVEWAY APPROAOES 825.00 ''. SF 700 $ 55 7700 DOUBLE ADJUST SEWER WER MA MANHOLE TO GRADE .001 EA 60000 $ 4,200.00 7 ADJUST WATER VALVE/GAS VALVE TO GRADE 199.00 EA 100.00 $ 190000 INSTALL SURVEY WELL MONUMENT 3.00 EA 75000 5 225000 INSTALL STRIPING,SIGNAL LOOPS AND PAVEMENT MARKERS 1.00 LS 23.000 00 $ 23000.00 INSTALL 36"BOX PARKWAY TREE PYRUS BRADFORD PEAR 20.00 EA 1700 00 $ 36,00000 REMOVE AND DISPOSE EXISTING TREES 2T AVERAGE DIAMETER 500 EA 700.00 $ 3,500.00 TOTAL BASE BID PRICE $ 228,95500 ALL AMERICAN ASPHALT 94 BASE BID PRICE IT M !DESCRIPTOR OTT UNIT UNIT PRICE TOTAL CLEARING AND GRUBBING PER PLANS/SPECS. 1.00 LS 3300000 $ 3300000 DISPOSAL OF WASTE MATERIALS 1.00 LS 3,000.00 $ 3,000.00 COLD MILL 2"EXISTING PAVEMENT 5,700.00 SF 026 $ 13,182.00 CONSTRUCT I.S"THICK PAVEMENT OVERLAY 48000 TONS 8300 $ 3984000 CONSTRUCT EXISTING LEVELING REPLACE /4'01 35000 TONS 75.00 $ 26.25000 REMOVE COMPACTED M ACTEIDN PAVEMENT REPLACE W/4"AC B-PG 64-10 BASE REMOVE DISPOSE CONSE 730.00 SF 5.50 $ 4,01000 REMOVE.DISPOSE,CONSTRUCT 8"CUR 4'GUTTER 34 900 0 _ 00 45 1' $ 6400 / REMOVE.DISPOSE.CONSTRUCT 8"CURB/2 R R 394.00 LF 00.00' $ 2320000 REMOVE.DISPOSE.CONSTRUCT PCC CURB RAMPS LF 4.00 EA 1 80000 $ 7,200.00 REMOVE DISPOSE WECONSTRUCT LE PCC GRADE APPROACES 82700 SF 5000 $ 1005000 DOUBLE WATER VALUER MANHOLE TO GRADE 9.00 EA 1,12700 $ 8,51000 ADJUST WATER WELL MONUMENT TO GRADE 13.00 EA 2700 $ 460.00 INSTALL STRVEYWSLN LLOOPS, 100 EA 500.00 $ 250000 INSTALL STRIPING' OPAR AL TREE PYRUS PAVEMENT RADFOR PEAR 0.00 EA 2340000 $ 26,000.00 REMOVE AND0IPOSE EXISTING TREES PYRUS 4"BRADFORD PEAR 25.00 EA 1,565.00 $ 20825.00 REMOVE AND DISPOSE EXISTING TREE524'AVERAGE DIAMETER 5.00 EA 56500 $ 282600 TOTAL BASE BID PRICE $ 229,587.50 PAGE 2 PUBLIC'WORKS SERVICE DEPARTMENT/ENGINEERING DIVISION 1/21/2015 HARDY&HARPER,INC. #5 BASE BID PRICE ITEM DESCRIPTION OTY 1 UNIT UNIT PRICE TOTAL CLEARING AND GRUBBING PER PLANS/SPECS. 1.00 . LS 24.000.00 $ 24,000.00 DISPOSAL OF WASTE MATERIALS 100 . LS 605.00 $ 60500 COLD MILL RUT" 5ISTHIC PAVEMENT $0,480.00 SF 0.30 $ 4501000 CONSTRUCT 1.5 0 ASPHA TIC LEVELING COURSE 480.00 TONS 96.00 $ 3802500 CONSTRUCT I S"ASPHALTIC ENTELIPL COURSE At 350.00 TONS 91.50 $ 32.025 00 REMOVE EXISTING PAVEMENT REPLACE W/4"AC B-PG 64-10 BASE REMOR COMPACTED NATIVE 400.00 SF 8.20 $ 3,400.00 REMOVE,E,DISPOSE,CONSTRUCT a"CUR SIDEWALK 730.00 SF 000 $ 5200.00 REMOVE,DISPOSE,CONSTRUCT P"CURB/2R RAMPS 394.00 EF 0000 $ 19200.00 REMOVE,DISPOSE,CONSTRUCT 8'PCC CU RI CAMAS 5.00 EA 3,809.50 $ 15830.50 DOUBLEDIJUST EWER MANHOLE E TO GRADE APPROACES 825.00 SF 000 $ ]000.00 ADJUST WATER ADJUST MAN HOLE TO GRADE 9DO EA 1100.00 $ 1,900.00 ADJUST WURVE WELL MONUMENT TO GRADE 13.00 EA 000.00 5 3,000.00 INSTALL SURVEY WELL ALLOOPST 3.00 EA 000000 $ 0,000.00 INSTALL STRIPING,6'BOPARKWAY LOOPS.PYRES BRADFORD PEAR 1.00 LS 2150000 $ 30000.00 REMOVE AND DISPOSE POSE EXISTING TING TREES 24'AVERAGE 20.00 EA 1.55000 $ 30050.00 REMOVE AND DISPOSE EXISTING TREE32a"AVERAGE DIAMETER 5.00 EA 550.00 $ 2050D0 TOTAL BASE BID PRICE $ 234,000.00 PALP INC.DBA EXCEL PAVING COMPANY #6 BASE BID PRICE ITEM DESCRIPTION UTY UNIT UNIT PRICE TOTAL 1 CLEARING AND GRUBBING PER PLANS/SPECS. 100 LS 25,000 00 $ 25000.00 2 DISPOSAL OF WASTE MATERIALS 1.00 LS 50 0000 $ 5,000 00 3 CONS OLD ILL 2"EXISTING PAVEMENT 50,480.00 SF 000 $ 19,773 00 4 CONSTRUCT I.S' THICK PAVEMENT COURSE 480.00 TONS 188.00 $ 30,800.00 5 .CONSTRUCT 6' EXISTING PAVEMENT REPLACE /4"Al 350.00 TONS 8800 $ 30800.00 OVER CEM COMPACTED NPAVEMENT REPLACE W/4"ACB PG 64-10 BASE 6 REMOVE DISPOSE,CONSE 400.00 SF 15.00 $ 6,000 7000 7 REMOVE,DISPOSE CONSTRUCT 8"CUR /SIDEWALK' G 730.00 LF 3.00 $ 0,802.00 9 REMOVE,DISPOSE,CONSTRUCT PCC CURB CU /2R"GUTTER 394.00 LF 00.00 $ 12,800.00 9 REMOVE,DISPOSE.CONSTRUCT PCC 4.00 EA 3,213.00, $ 1282500 10 REMOVE,DISPOSE,EWECONSTRUCT LE ACC GRADE APPROACES 825.00 SF 0000. $ 1000000 11 ADJUST ADJUST MANHOLE TO GRADE 9.00 EA 46000. $ 354000 12 ADJUST SURVEY WELL MONUMENT TO GRADE 19.00 EA 800.00 S 5,400.00 13 INSTALL STRVETWSGML LOOPS, 1.00 EA 7,00000 $ 5,400.00 14 INSTALL STRIPING,6" P SIGNAL LODE$AND BRADFORD PEAR 0.00 LS 1103000 $ 34,600.00 15 INSTALL AND BOX DI PARKWAY TREE TREES A'AVERAGE PEAR 25.00 EA 1,730 00 $ 33,150.00 16 REMOVE ANO DISPOSE EXISTING TREES 24"AVERAGE DIAMETER 5.00 EA 63000 $ 3.15000 TOTAL BASE BID PRICE $ 260,940.00 PAGES PUBLIC WORKS SERVICE DEPARTMEN T/ENGINEERING DIVISION 1mrz015 CITY OF ROSEMEAD ANNUAL RESIDENTIAL RESURFACING PROJECT-ROSE STREET/RIO HONDO INTERSECTION IMPROVEMENTS PROJECT NUMBER: 21019 BID ANALYSIS BID SUBMITTAL: JANUARY 15 2015 CEM CONSTRUCTION CORP 41 BASE BID PRICE 1 ITEM DESCRIPTION OTY UNIT UNIT PRICE'. TOTAL 1 CLEARING AND GRUBBING PER PLANS/SPECS. 1.00 LS 5000.001 $ 5,00000 2 DISPOSAL OF WASTE MATERIALS 100 LS 3000.00. $ 3.000.00 REMOVE 6"EXISTING PAVEMENT REPLACE Wl 4"AC B-PG 64-10 BASE 3 OVER COMPACTED NATIVE 140.00 TONS 140.00 $ 1960000 4 CONSTRUCT 2"PAVEMENT ARHM-GG-C 7000 TONS 14000 $ 9,800.00 5 REMOVE.DISPOSE,CONSTRUCT 4"PCC SIDEWALK 780.00 SF 8.00 $ 6,24000 6 REMOVE.DISPOSE.CONSTRUCT B'CURB/24"GUTTER 100.00 LF 6500 $ 6.500.00 7 REMOVE.DISPOSE,CONSTRUCT 6$24''GUTTER 2000 LF 6000 $__ 1200.00 8 REMOVE DISPOSE CONSTRUCT TRANSITION CURN FROM 8"TO 6" 20.00 LF 75.00, $ 1,500 00_ 9 REMOVE.DISPOSE.CONSTRUCT PCC CURB RAMPS 2.00 EA 2,50000 $ 5.000.00 10 CONSTRUCT PCC CROSS GUTTER PER SPPWC STD PLAN 805.00 SF 1600 $ 12,88000 11 REMOVE CONSTRUCT CATCH BASIN W=3.5'V=2' _ 1.00 EA 1000000 S 10,00000 12 CONSTRUCT LOCAL DEPRESSION PER SPPWC 313-3 2700 SF 4500 $ 1215.00 13 INSTALL TRAFFIC STRIPING 1.00 LS 2,000.00 $ 2,00000 TOTAL BASE BID PRICE $ 83,935.00 E .CONSTRUCTION 42 BASE BID PRICE ITEM DESCRIPTION OTY UNIT UNIT PRICE TOTAL 1 CLEARING AND GRUBBING PER PLANS/SPECS. 1.00 LS 500000 $ 5,00000 2 DISPOSAL OF WASTE MATERIALS 100 LS 2000.00 $ 2000.00 REMOVE 6"EXISTING PAVEMENT REPLACE W/4"AC B-PG 64-10 BASE 3 OVER COMPACTED NATIVE 140.00 TONS 151.15 $ 21,16100 4 CONSTRUCT 2' PAVEMENT 70.00 TONS 15115 $ 10,580.50 5 REMOVE.DISPOSE,CONSTRUCT 4'PCC SIDEWALK 78000 SF 6.00 $ 4,680 00 6 REMOVE,DISPOSE,CONSTRUCT B"CURB/24"GUTTER 100.00 LF 9000 $ 900000 7 REMOVE,DISPOSE,CONSTRUCT 6"/24'GUTTER 20.00 LF 8500 $ 1,700.00 8 REMOVE DISPOSE CONSTRUCT TRANSITION CURN FROM 8"TO 6" 2000 LF 8500 $ 170000 9 REMOVE,DISPOSE,CONSTRUCT PCC CURB RAMPS 2.00 EA 1200.00 $ 6400.00 10 CONSTRUCT PCC CROSS GUTTER PER SPPWC STD PLAN 805.00 SF 17.17 $ 13,821.85 11 REMOVE,CONSTRUCT CATCH BASIN W=35 W2' 1.00 EA 965500 $ 9855.00 12 CONSTRUCT LOCAL DEPRESSION PER SPPWC 313-3 27.00 SF 24.08 $ 650.16 13 INSTALL TRAFFIC STRIPING 1.00 LS 50000 $ 500.00 TOTAL BASE BID PRICE $ 86848.51 GENTRY BROTHERS,INC. N3 BASE BID PRICE _ P----- .__ F -._: 1 I 7 . ITEM DESCRIPTION on UNIT UNIT PRICE TOTAL 1 CLEARING AND GRUBBING PER PLANS/SPECS. 1.00 LS 2500000 $ 2500000 2 DISPOSAL OF WASTE MATERIALS 100 LS 10000.00 $ 1000000 REMOVE 6'EXISTING PAVEMENT REPLACE WI 4"AC B-PG 64-10 BASE 3 OVER COMPACTED NATIVE TONS 14000 $ 1960000 4 CONSTRUCT DI POSE,PAVEMENT N RUCT 4'PCC 8000 TONS 156.00 $ 1068000 5 REMOVE.DISPOSE.CONSTRUCT 4"CUR / 4 GUK 10000 LF 500 $ 450000 6 REMOVE DISPOSE CONSTRUCT 6"CURB 'GUTT"GUTTER 10000 LF 4500 $ 490000 7 REMOVE,DISPOSE CONSTRUCT 6"/24'GUTTER 20.00 . LF 4500 $ 900.00 8 REMOVE DISPOSE CONSTRUCT TRANSITION CURN FROM B'TO 6" 20.00 LF 4500 $ 900.00 9 REMOVE,DISPOSE.CONSTRUCT PCC CURB RAMPS 2.00 ' EA 2.500.00 $ 500000 10 CONSTRUCT PCC CROSS GUTTER PER SPPWC STD PLAN 80500 SF 1200 $ 966000 11 REMOVE,CONSTRUCT CATCH BASIN W=J 5'V=2' 1.00 EA 12,00000 $ 12,000.00 12 CONSTRUCT LOCAL DEPRESSION PER SPPWC 313-3 27.00 SF 10.00 $ 27000 13 INSTALL TRAFFIC STRIPING 1.00 LS 1,500 00 $ 1.500.00 TOTAL BASE BID PRICE $ 104,510.00 PAGE 1