Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
KASA Construction Inc.
CITY OF ROSEMEAD MONTEBELLO BLVD. /TOWNE CENTER DRIVE RESURFACING MEDIAN AND LANDSCAPE ENHANCEMENTS PROJECT No. 21806 CONTRACT BID fORMS BIDDER: 3AS)A CONTRACT BID FORMS TABLE OF CONTENTS SECTION 1 BID SCHEDULE....... ..................................... ............................... 1 SECTION2 BID DATA FORMS ............................................................. ............................... 2.A BID BOND... .. 5 2.B LIST OF PROPOSED SUBCONTRACTORS .......................... ............................... 7 SECTION 3 NON - COLLUSION AFFIDAVIT .............................................. ............................... 10 CBF -12 BIDDER: ; A SECTION 1 - BID SCHEDULE CBF -0 BID SCHEDULE SCHEDULE OF PRICES FOR MONTEBELLO BLVD. / TOWNE CENTER DRIVE RESURFACING MEDIAN AND LANDSCAPE ENHANCEMENTS PROJECT No. 21806 BASE BID SCHEDULE NO. ITEM DESCRIPTION UNIT OF MEASURE EST. QTY. UNIT RICE ITEM COST 1 Clearing & Grubbing per plans LS 1 and specifications. See technical ®° cJ 9 ©Cj provisions TP -2, TP -3 & TP -4. 2 Disposal of Waste Materials. LS 1 �� 2 �? 3 Cold mil 2.0- inches thick existing SF 164,360 32/F 72 4 Construct 1.5 inches thick TONS 1,545 pavement overlay ARHM -GG -C (PG 64 -16) as indicated on the Q® S C) plans. 5 Construct 1.0 inches thick TONS 1,030 Asphaltic Leveling course D1 C� (� z, (PG 64 -10) as indicated on the bO l 7 plans. 6 Remove 6- inches of existing SF 4,800 pavement and replace it with 4- inches of AC B -PG 64 -10 Base 3 J O �b Course over compacted native. 7 Remove, Dispose and Construct SF 3,524 4- inches thick PCC Sidewalk per SPPWC Std. Plan 113 -1. 8 Remove, Dispose and Construct LF 145 8- inches Curb and 24- inches Gutter SPPWC per Std. Plan 120 -2. 9 Remove, Dispose and Construct LF 135 8- inches PCC Curb Only per SPPWC Std. Plan 120 C 3, 7�- -2. 10 Remove, Dispose and Construct EA 10 PCC Curb Ramps per SPPWC Std. Plan 111 2 P; -4. J CBF -1 BIDDER: 1%SA �h5�f U(ti0vt � �b1 NO. ITEM DESCRIPTION UNIT OF MEASURE EST. QTY. UNIT PRICE ITEM COST 11 Double Adjust Sewer Manhole to EA 5 Grade per APWA Std. Plan 205- /, 000 51000 1 and 206 -1. 12 Adjust Water Valve /Gas Valve to Grade. EA 4 , Loo `Z 13 Install Landscape per Plans and LS 1 Specifications Complete as 10" ow 1/0 600) indicated on Sheet No. 3 to 7. 14 Install Irrigation per Plans and LS 1 Specifications Complete as t g`� ,000 5 00o indicated on Sheet No. 8 to 11. 15 Install Survey Well Monument EA 3 per City of Rosemead Std. Plan S08 -001. See Section 2 -9 ' / 2 �� SI �� Surveying of the General Provision -7 per details (Cover, Sleeve & Dome will be provided by the City at no cost). 16 Install Traffic Striping, Traffic LS 1 Signal Loops and Pavement Markers per the Striping Plans ZO D 2 $ oOC7 and Specifications Complete. 17 Remove Existing and Install SF 4,896 50/50 Mix of Yosemite and Arizona Cobble River Rock 6" 12 �� 7 �rZ Dia. Min. to 12" Dia. Max as Indicated on Plans and Specifications Complete. TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$ a -- ' Dollar amount in written Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in the schedule of bid items above, within the limits define in Section 3 -2.2.1 of the Standard Specifications, to stay within the budgeted amount of this project. If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall be added to or deducted from the Total Bid Price entered above. The owner can choose to include one or more of the alternates in the Total Bid Price of the Project. If any of the Alternate Bids are utilized by the Owner, the resulting amount shall be considered the Total Bid Price for the Project. &l0. -S, CBF -2 BIDDER: Y X5A WV�&'{itlt�lDUt The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern. Attached hereto is a certified check, a cashier's check or bid bon in the amount of I c> '/. Dollars ($ ) said amount being not less than ten percent (10 %) of the Total Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award, we fail or refuse to execute the Contract and furnish the required bonds, certificates and endorsements of insurance and other certifications within the time provided. If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be prepared by the Owner for execution, within five (5) Calendar Days following the Letter of Award for the Contract, and will deliver to the Owner within that same period the necessary original Certificates of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other documentation and certification required by the Contract. The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the Business and Professional Code), arising from purchases of goods, materials or services by the Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to he Contractor. Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence satisfactory to the Owner of Bidder's California contractor's license(s) in good standing; (2) evidence that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting therefrom; and (3) any other information and documentation, financial or otherwise, needed by Owner to award a Contract to the lowest responsible and responsive bidder. The undersigned acknowledges receipt, understanding and full consideration of the following addenda to the Contract Documents. Addenda Nos. +soA The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and equipment or supplies necessary to complete the Work as described in the Bid Documents. If this bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the necessary bonds and accept the Total Bid Price as compensation in full for all Work under the contract. CBF -3 Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data submitted herewith into a contract arising out of this Bid. BIDDER: =nc By_ Signature 0 �..} � Gt�ln� Y Type or Print Name 1�s, Title t sk'A?) C �, ieffA &A'14CA L OK e Business Street Address C- iO b. CA vt l71 D City, State and Zip Code O(DgpyS7- 826e) Telephone Number Bidder's /Contractor's State of Incorporation: LAI , I �001(G Partners or Joint Venturers: Bidder's License Number(s): q 2 "7 5 kA4 — A 3 C -10 L -2, Department of Industrial Relations Registered No. 1 ®0600(0013 NOTES: 1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the representations made on the Contract Bid Forms. 2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address 3) If Bidder is a partnership or joint venture, give full names of all partners or joint venturers. As further discussed in the Instructions to Bidders, Bidder will be required to provide evidence that the person signing on behalf of the corporation, partnership or joint venture has the authority to do so CBF -4 CERTIFICATE OF CORPORATE RESOLUTION Of KASA CONSTRUCTION INC. I, DIANA KASBAR President of KASA CONSTRUCTION INC. organized and existing under the laws of the State of California and having its principal place of business at _ 15148 Siena Bonita Lane, Chino, CA 91710 , hereby certify that the following is a true copy of a resolution adopted by the Board of Directors of the Corporation at a meeting convened and held on NOVEMBER 09, 2014, at which a quorum was present and voting throughout and that such resolution is now in full force and effect and is in accordance with the provisions of the charter and by -laws of the Corporation. RESOLVED: That the DIRECTORS are hereby authorized and directed to certify to any interested party that this resolution has been duly adopted, is in full force and effect, and is in accordance with the provisions of the charter and by -laws of the Corporation. FURTHER RESOLVED, none at this time. I further certify that this Corporation is duly organized and existing, and has the power to take the action called for by the foregoing resolution. DIRECTORS DIANA KASBAR e Z_ 11 -09 -14 President Date SAM KASBAR 11 -09 -14 Vice President / Date SAM K ASB 11 -09 -14 Secretary Date DIANA KASBAR 11 -09 -14 Treasurer Date Witness my hand seal of this Corporation on this 9' day of November , 2014 . BIDDER: VISA b 5661;vn ,a�K SECTION 2 BID DATA FORMS CBF -5 BIDDER: Kasa Construction, Inc. Bond No.: KASCO -486 Bidder shall submit its Bid data in: accordance with the format shown on each of the following Bid Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide the information required. Bidder shall ensure that every page of its Bid Data Forms are properly identified with the Bidder's name and page number. 2.A BID BOND KNOW ALL MEN BY THESE PRESENTS: THAT Kasa Construction, Inc, as Principal, and The Ohio Casualty Insurance Company . as Surety, are held firmly bound unto the CrrY OF ROSEMEAD (hereinafter celled the OWNER) in the sum of Ten Percent of the Total Amount of the Bid 10% our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work required for the Montebello BNdJTowne Center Drive Resurfacing Median and Landscape Enhancement Project as set forth in the Notice Inviting Bids and accompanying Bid Documents, dated February 4, 2015 NOW; THEREFORE, if said Principal is awarded a Contract for the Work by the OWNER and, within the time and in the manner required by the above- referenced Bid Documents, enters into the written form of Contract bound with said Bid Documents, furnishes the required bonds (one to guarantee faithful performance and the other to guarantee payment for labor and materials) furnishes the requited In :court SIGNED AND SEALED, this 2 day o f February 20 15 - - The Ohio Casualty -- Kasa Construction, Inc. (SEAL) Principal By; 74 sy ignsture THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. :This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. CertFlcate NO. 6506435 American Fire and - Casualty Company -- Liberty Mutual Insurance Company The Ohio Casualty` Insurance Company -- West American Insurance Company - I j POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That American Fine & Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts,: and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the 'Companies'), puisuantto and by authority herein set forth, does hereby name constitute and appoint, Matthew R Dobvns Randv :Soohn all ofthe atyof Santa Ana - state of CA each individually ifthere be more than one named, its We and lawful attomey- in- factto make, execute, seal acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds;: recognizances and other surety obligations, in pursuance of these presents and shall be' as binding upon the Companies:asif they have been duly signed by the president and attested . by the secretary of the Companies in their own proper persons.-' IN WITNESS WHEREOF this Power ofAttomey has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this gist dayof March" 2014 } American Fire and Casualty Company _ a The Ohio Casualty Insurance Company a - = Liberty Mutual Insurance Company aa), .West merican Insurance Company � ! N ✓ir_,- K - "- .«.,. syr STATE OF PENNSYLVANIA - ss David M. Care ,Assistant Secretary >1 , COUNTY OF MONTGOMERY La W ar Onthis 31st dayof March 2014 , - before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary : of American Fire and — O v F v d Casually Company,, Liberty Mutual Insurance Company, The Ohio Casualty Insurance Company, and WestAmerican Insurance Company, and that he, as such, tieing authorized so to do, W O m execute the foregoing instrument for the purposes therein centamedby signing on behalf ofthe corporations by himself as a duly authorized officer!. : U L N > IN WITNESS WHEREOF, I have hereunto subscnbed and affixed my notarial seal at Plymouth Meeting Pennsylvania, on t day and year first abovewritten. O C. N T C ` By. Teresa Pastella, Notary Public - F -- l.3 L L�. ai o -T a° E d cia This Power of Attorney is made and executedparai�a ftdandby'ittithbrltyofthe following Bylaws and Authorizations ofAmencan Fire and Casualty Company, The Ohio Casually Insurance rep.; m Company, Liberty Mutual Insurance Company. and'WsitA*Acan Insurance Company which resolutions are now in full force and effect reading as follows:a°t y CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of CALIFORNIA County of ORANGE On j before me ERIKA GUIDO, NOTARY PUBLIC, personally appeared RANDY SPOHN ® who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is /are subscribed to the within instrument and acknowledged to me that he /she /they executed the same in his /her /their authorized capacity (ies), and that by his /her/ signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. RIKAGUIDO � g COMM. #2022671 Y WITNESS m nd and official seal. NOTARY PUBLIC CALIFORNIA �66 3 M comm. expires M Y 5, 2017 A 'l-._ - -y �1� Vltr\ Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER ❑ PARTNER(S) ❑ LIMITED ® ATTORNEY -IN -FACT ❑ TRUSTEE(S) ❑ GUARDIAN /CONSERVATOR ❑ OTHER: DESCRIPTION OF ATTACHED DOCUMENT SIGNER IS REPRESENTING: NAME OF PERSON(S) OR ENTITY(IES) CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 - - - - A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ) County of ` '�Ay "arc -,AC) ) On 2�� {2015 beforeme,_ Yt2car ZaJa�� ��T��tv QJ�tiG Date Here Insert Name and Title of the Officer personally appeared r ar"y"l V-CS\6etV Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is /are subscribed to the within instrument and acknowledged to me that he /she /they executed the same in his /her /their authorized capacity(ies), and that by his /her /their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. FIECTORrZAVALA Commission P 2006622 Notary Public - CelOornie Itan Bernardino County 14 COMM. Ex0ifiluVOC1128, 2017 I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my seal. of Notary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Docume(�t ( Title or Type of Document: 1 9 Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator I Other: Signer Is Representing: Signer Is Representing: 02014 National Notary Association • www.Nationa[Notary.org • 1- 800 -US NOTARY (1 -800- 876 -6827) Item #5907 2.B LIST OF PROPOSED SUBCONTRACTORS In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100 through 4114 of the California Public Contract Code, and any amendments thereto, each Bidder shall provide the information requested below for each subcontractor who will perform work, labor or render service to Bidder in or about the construction of the Work in an amount in excess of one -half of one percent (greater than 0.5 %) of the Bidder's Total Bid Price, or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one -half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work which will be done by each subcontractor. Bidder shall list only one subcontractor for any one portion of the Work. Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow Bidders twenty -four (24) additional hours after the deadline for submission of bids to submit the information requested by the Owner about each subcontractor, otherthan the name and location of each subcontractor. If the Bidder fails to specify a subcontractor for any portion of the Work to be performed under the Contract, it shall be deemed to have agreed to perform such portion itself, and shall not be permitted to subcontract that portion of the Work except under the conditions hereinafter set forth below. Subletting or subcontracting of any portion of the Work in excess of one half of one percent (greater than 0.5 %) of the Total Bid Price or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one -half of 1 percent of the Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, for which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after Owner approval. CBF -7 BIDDER: K "A L.UVr6�i1/C f t Zrtc, 2.13 LIST OF PROPOSED SUBCONTRACTORS (continued) t` *Duplicate Next 2 Pages If needed for listing additional subcontractors. -I Name and Location Description of Work of Subcontractor to be Subcontracted Name: � �a rt ri lJ avr ,v foAnj . Address: License No.: Department of industrial Relation Registration No. / AU UO 55 , $ Name and Location Description of Work of Subcontractor / to be Subcontracted 1' a Name: YC C' �5 Address �i�i�i7 923�� License No.: p Department of Industrial elation Registration No. 1 �JOCJ oO 9 �� Name and Location Description of Work of Subcontractor to be Subcontracted i LI 2 i (/qV Q n J Name: & A5 q Address: 2 <' , !S ,Met CR 2 276 License No.: Department of Industrial Relation Registration No. / r7C10 ®c7 / 7 y9 Name and Location Description of Work of Subcontractor to be Subcontracted -S+yi � �� Mccr key . 11 Name: Its -s4y,' lt�� Address ASP o n ✓a ran Iz� n "o Cq 917 t License No.: "Z Department of Industrial Relation Registration No. ®6v /z Name and Location of Subcontractor Description of Work to be Subcontracted l ew d e .c +o "'s . Name: l ood, mcig -' @YS Address: I ZZ f5ay - - ) Fir / /et7 o Gt 928 3 1 License No.: Department of ndustrial Relation Registration No eo �� Gg Aletme n /A G"L OJJY -v-ss 1 y zO W , zs LI-sct tic a 3 9y�71 P (f �>r- Yt)"tj-.1 -F bv/ r p Car9GYL"�'2- 2.0 REFERENCES J The following are the names, addresses and telephone numbers for three public agencies for which BIDDER has performed similar work within the past two (2) years: tt A 1"�',`�L N. lea w �Teir 4 re. 1. L QIN i4 O¢Ca ltlf'l cD krp ") e�gv �At Name and Address of Owhbr E b �-eAr 9 C ° t °�`1I -- 7s Name and telephone n mber of person familiar with project j 3 �S escw Para- 2. 'Contract amount Type of Work L340o - PnrtfS - t01 e1,� 5�. (�zr(IS r Ge 1 a2S70 Nam6 and Address of Owner c t5 - 1 -i69f— b-700 Name and telephone number of person familiar with project , gL1 o C) rC 7 � n cmt QRt Contract amount Type of Work 3. (Cd5Sor G� a 2-"k Name and Address of O ner 62..6 -33 Name an telephone number of person f Contract amount 4. L jAh SoLq cdl F ati 2 Name nd Address of Owner �ac e r Liltr� - b61- Z`d( Name and telephone number of person Lk of t4 s. 65 C}fko'tk Date Completed ZSSSV �ftCKpdRpl� 0 i i projecr w05 Typ of with amount Type of Completed aA 913S3 LU CBF -9 SECTION 3 NON - COLLUSION AFFIDAVIT CBF -10 NON - COLLUSION AFFIDAVIT In accordance with Public Contract Code Section 7106, the undersigned, being first duly sworn, deposes and says that he or she holds the position listed below with the bidder, the party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. l � S ignature �iuyw ��.GiS�GIY Typed or Printed Name �P.es s Title t � Subscribed and sworn before me This Q-V� day of 20 f No ry ublic in and for th State of California My Commission Expires: I Z11 ZO►: (Seal) Commiaaion / 2046622 Notary Pub k - California r. 614 6arnardino County CBF - 11 KASA Construction 316 North Corona Ave. Ontario, CA 91764 Subject: Letter of Recommendation;Taft Ave. Median Project and Lemon Street Trail and Median Project To Whom It May Concern: KASA Construction has completed the subject projects in the City of Villa Park. KASA completed the projects in a most satisfactory way. The work was done in the time frame allowed even thought we experienced rain delays. The staff from KASA was very responsive,replying to our requests on a same day basis. The field team was great to work with and kept the job sites in a very clean and safe condition. I am pleased with the final proect results and we have received many compliments from residents in the community.I would certainly recommend KASA for future projects. Very truly yours r {�� n fa Joe O'Neil P.E. City Engineer City of Villa Park W. WHARi? W M[ER, Mayor k BRAD RE SE,, Mayor Pro Tom ROBERTFAUTEUX, Councllmeintm = W. BILL WCALO NE°Y. Coond lmeenkxr : DEBORAH PAU 1.1', Co incllmember LewMa QperatiLaq Corp..' 1156 N. Mountain Avenue (91786) / Post Office Box 670 Upland, CA 91785 -0670 Office —(909) 949 -6789 / Facsimile (909) 931 -5595 January 21, 2015 RE: Letter of Recommendation for KASA Construction To Whom It May Concern: In September of 2014, KASA Construction was selected and began construction of certain CFD improvements in our Park Place master planned community in Ontario, CA (a joint ventcue project by Lewis Community Developers and Stratham Communities). Park Place showcases homes by industry leading homebuilders, KB Horne, TRI Pointe Homes, Ryland Homes and Woodside Homes. The CFD improvements completed by KASA Construction included Celebration Park (a 6 acre public park) and Merrill Avenue landscape improvementsmith total costs in excess of $5,000,000. KASA Construction was aggressive in their bidding for Celebration Park and were approximately 14% lower than the second place bid. The Park Place Grand Opening took place on November 8, 2014 and over 4,000 people attended the opening celebration which included the viewing of 18 beautifully appointed model homes and a tour of the Parkhouse (a spectacular 14,500SF recreation center). The Grand Opening also included live entertainment and food service in Celebration Park. The date of the Grand Opening; however, was not con until after KASA Construction had commenced its work. KASA Construction rose to the challenge and completed over $5,000,000 of construction in half the time granted by our agreement. A significant portion of the work had to be completed within a more 20 working days from commencement of construction. Six months of construction were accelerated and successfully completed within a total of 60 working days — all while coordinating construction activities with various contractors of other trades concurrently performing work within Park Place. KASA's exemplary performance exceeded our expectations. It is with great pleasure that we have been afforded the opportunity to collaborate with KASA's experienced, dedicated and driven staff. KASA's professional managerial skills, from the top down, alongside their relentless "get the job done" attitude and approach in the administration and implementation of construction truly made the difference in the successful and accelerated completion of Celebration Park which allowed us to meet our November 8 Grand Opening date. I look forward to working with the KASA Construction team on many more projects in the future. Sincerely, Randall Lewis u Executive Vice President q y� t � 5 > (v ' <� ... t.. ,. . ^ } Y� StW yIF\� City of SANTA CLARITA 23920 Valencia Boulevard • Suite 300 • Santa C'arna, California 91355 -2196 Pho= (661) 259 -2489 - FAX, (661) 259 -8125 wwwsanta- daritaxom January 4, 2011 KASA Construction 316 North Corona Avenue Ontario, CA 91764 Subject: Letter of Recommendation; Valencia Industrial Center Median Improvements, Project B 1008 To Whom It May Concern: On behalf of the City of Santa Clarita we would like to thank KASA Construction for their exemplary performance in completing the Valencia Industrial Center Median Improvements, Project B 1008, located on Avenue Stanford and Avenue Scott. KASA Construction completed this project with 'diligence and commitment, maintaining the highest level of professionalism, attention to detail, and work ethic. The project management team always kept the City's best interests in mind and if a problem or issue were to arise, KASA Construction always resolved it in a quick and efficient manner. KASA Construction's scheduling and coordination was extremely smooth, which was further perpetuated by their closely- monitored traffic control and safety precautions. They maintained an excellent relationship with the City inspection team, and kept the job running in a compliant and organized fashion. In many instances, KASA Construction went beyond the City's expectations in order to assure that the project was delivered at the highest standard possible. The City could not be more pleased with the final project result. It has been a pleasure working with KASA Construction and we would not hesitate to recommend their outstanding services. We would like to express our gratitude for a job well done and look forward to working together again soon. Sincerely, ) F rancisco J. L,ujan Project Manager FJL:dp 5 \Pt\�NG- CINV'rwbXasa mtcmm<nda� ion hr doc cc: Curtis L. Nay, Assistant City Engineer Harry Corder, Senior Engineer w � DSA LCC3 Construction Service, Inc & Inspection o LC.I3.0 Testing & Inspection < Bnviromuentat Services Construction Management October 6, 2010 Mr. Sam Kasbar Kasa Construction 316 N. Corona Ave. Ontario, Ca 91764 Dear Mr. Kasbar, It is with great pleasure that I write this testimonial for Kasa Construction. As Vice President of Construction for LCC3 Construction Services, Inc, I have been afforded the opportunity to benefit firsthand from the talents of the Kasa Construction project team. This testimonial is best exemplified in the following example. In June of 2010 Kasa Construction started a project for the Pomona Unified School District which was being managed by me as owner's agent. This project consisted of reconstructing a hill slope which had started to fail and was causing damage to one of the district's elementary school campuses. The project was scheduled to complete under a tight time line and reduced budget. Larry Edwards, Project Superintendent, and his support team's relentless commitment to cost containment; schedule recovery and customer satisfaction truly made the difference in the successful completion of the above mentioned project. I am pleased to share that not only did the project complete under budget, but do to Mr. Edward's commitment to the success of the project it came in on schedule with no disruption to any school programs. Kasa Construction's project team always searched for the best solution whenever possible and kept the goal of the project in sight. I found the project team to be professional, courteous, and very organized. I have added Kasa Construction to our contractor list and I look forward to. working with the Kasa Construction team in the near future. Sincerely, i WWI Brian Watt Vice President, Construction LCC3 Construction Services, Inc Cc: File 4295 711ivpa Street # 203 Ontario, Ca 9 [761 Office: (909) 390 -0500 e Fax (800) 420 -3407 PAUL K. TANAKA, Mayor TASHA CERDA, Mayor Pro Tom DAN MEDINA, Councilmember RONALD K IKEJIRI, Coundimember RACHEL C. JOHNSON, Counclimetrabor 1700WEST 162` STREET / GARDENA, CALIFORNIA 90247 1 (310) 217-9600 / FAX 010)217-6119 City of Gardena MARIA E. MARQUEZ-BROOKES, City Clerk J. INGRID TSUKIYAMA, City Treasurer MITCHELL G. LANSDELL, City Manager PETER L. WALLIN, City Attorney August 19, 2010 KASA Construction Inc. 316 N. Corona Ave. Ontario, CA 91764 Project : Arthur- Johnson Park — Restroo in Facility, JN 819 1200 W. 170th Street Subject: Letter of Recommendation To Whom It May Concern: The City of Gardena would like to thank your company, KASA Construction Inc., for the job well done and successfully completing the Arthur Johnson Park Restroom Facility project located at 1.200 W. 170 St., Gardena, CA 90247. Within the 112 calendar (lays allocated for the project, your company has shown due diligence and dedication to finish the work 36 Days ahead of schedule, which greatly benefited the community. The City of Gardena also acknowledged that the project was complex due to the electrical, mechanical and other utility retrofits required for functionality, however, your attention to the specifics of the construction in detail as well as proper scheduling has been very remarkable, resulting to a jot) well done. In addition to the high level of professional and quality workmanship in the field, KASA have proven to maintain the same high level of service on the Project Management and Administrative portions of the project. Again, I won Id like to express my gratitude in providing your 120 %s in completing this much needed project for the City of Gardena. We would not hesitate to refer KASA Construction Inc. to other organizations who are also in need of quality services from such a dedicated and hard working company. Sincerely, Engineer Public Works Department DEPARTMENT OF PUBLIC WORKS July 24, 2012 To Whom It May Concerm Kasa Construction In July 2012, Kasa Construction completed work on the Improvements of Oak Grove Drive from Footbill Boulevard to Berkshire place in the Cities of La Canada Flintridge and Pasadena Ca. This was an $252,000 project that included both major street rehabilitation, and landscaping betterments. The project is on the frontage of the La Canada Flintridge High School, and the street serves as the primary access for Jet Propulsion Laboratory, which has around 20,000 employees. Kasa's perfortnance on this project was excellent and the project looks great. Kasa's staff was responsive and flexible. Kasa worked hard to keep the project on schedule and to mitigate the impact on the school and on JPL. In addition, Kasa's experienced staff was helpful in resolving typical construction problems such as changed conditions and interpretation and implementation of the Plans. Kasa Construction and the City of Pasadena were able to work out contract problems, such as changes in scope of work in an open; fair, and expeditious manner. The City of Pasadena would be happy to work with Kasa Construction on any future project. Please feel free to call me at for verbal confirmation of reference. Robert Gardner Resident Engineer Department of Public Works Cily of Pasadena Ph. 626 -744 -4643 Fax. 626- 744 -3823 bgardner@ci. pase dena.ca. us 100 North Garfield Avenue • P.O. Box 7115 • Pasadena CA 91109721$ C626) 7444191 September 13, 2010 KASA Construction Inc. 316 N. Corona Avenue Ontario, CA 91764 Project: Citrus College Campus Safety Landscape Project To Whom It May Concern: CITRUS COMMUNITY COLLEGE DISTRICT BOARD OF TRUSTEES Mss. Susan M. Keith, President Gl;immo-dAzusa/La Veme /Pomona Represenrarivc Dr. Gary L. Woods, Vice President Azusa /Covina /Glendr ra/Irwindale Reprewnrarive Dr. Parricia Rasmussen, Clerk /Seoe mly t;teodara /Azusa /San Dimas Represereative Mrs..]oaaneMontgomery, Me,,ber Moncgvia /BeadburylDua rte P�eptesentaiive Dr. Edward C. Orr411, Member Dumw /Arcadia /Azusa /rMonrovia Repres°nrarive Ms. Karine Ponce, ,student Represeumtilm Dr, Geraldine. M. Perri, SarperurtendenrlPrzsidoxt I am writing this letter of referral to thank your company, KASA Construction Inc., for the due diligence and dedication in successfully completing the Campus Safety Landscape Project located at Citrus Community College, 1000 West Foothill Boulevard, Glendora, CA 91741. KASA Construction worked well within an active campus setting and construction activity. Product deliveries were coordinated in a manner which was supportive of ongoing campus business. I have also been pleased with your approach which constantly recognizes the College's best interest. KASA Construction provided a safe and clean environment when working on campus and when students were present. The project was completed on time. We would not hesitate to refer KASA Construction to other agencies. Your team has remained positive and pro - active throughout our association in this project administratively and in the field. It has been a pleasure to work with your team on this project and we look forward in working with KASA in the future. Sincerely, Rotrt B dshaw Construction Program Manager Citrus College RJB:la a000 West Foothill 1louleverd Glendora, CA yi74s -iB9 j TEL: 626.963.03z3 www.cirruscollege.edu CITY 01T MURR 1 .[A September 12, 2011 KASA Construction 316 North Corona Avenue Ontario, CA 91764 Subject: Letter of Recommendation; Torrey Pines Park Project 10- 40109GP7343 To Whom It May Concern; On behalf of the City of Murrieta, we would like to thank KASA Construction for their exemplary performance in completing the Torrey Pines Park Project, #10- 40109GP7343. KASA Construction completed this project with diligence and commitment, maintaining the highest ievvi of professionalism, attention to detail, and work ethic. The project management team always kept the City's best interest in mind and if a problem or issue arose, KASA Construction always resolved it in a quick and efficient manner. KASA Construction's scheduling and coordination was extremely smooth. They maintained an excellent relationship with the City inspection team and kept the job running in a compliant and organized fashion. In many instances, KASA Construction went beyond the City's expectations in order to assure that the project was delivered at the highest standard possible. The City of Murrieta could not be more pleased with the final project result! it has been a pleasure working with KASA Construction and we would not hesitate to recommend their outstanding seTvIces. We would like to express our gratitude for a job well done and look forward to working together again in the future. Sinter T /Af Cad Project Manager JC:mw 1 Town S uaic, 24601 Jefferson avenue • Murrieta, California 92562 pbone: 951.304.CITY (2489) • fax: 951.698.-4509 wch: murrieta.org Cit of £dfaadi June 20. 2011 KASA Construction 316 North Corona Avenue Ontario, CA 91764 Subject: Letter of Recommendation; Terrace Park Improvements Project. To Whom It May Concern: On Behalf of the City of Redlands, we would like to thank KASA Construction for their exemplary performance in completing the Terrace Park Improvements project. KASA Construction completed this project with diligence and commitment, maintaining the highest level of professionalism, attention to detail and work ethic. The project management team always kept the City's best interest in mind and if a problem or issue were to arise, KASA always resolved it in a quick and efficient manner. The City could not be more pleased with the final project results. It has been a pleasure working with KASA and we would not hesitate to recommend their outstanding services to others. We would like to express our gratitude for a job well done and look forward to working together again. Sincerely, Bassani Alzammar Construction Manager "Preserving the Past, Protecting the Future" P.O. BOX 3005 REDLANDS, GA 92373 '; :'