Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Transtech Engineers Inc. - Building and Plan Check Services
MAYOR: City of Rosemead MAYOR PRO'IEM: NI 112CARUCLARK I y RO ROSM E.VALLEY BOULEVARD RO BOX 399 �'°" COUNCIL MEMBERS: ENIEAD,CALIFORNIA 91790 SANDRA ARV1-,v'e " [626 307-921S FAX S1EA Nl.v F'AX,626U 30]-9213 Poi low February 2, 2015 Mr. Ayla Jefferson, CBO Building Department Manager/Contract Principal Transtech Engineers, Inc. 13367 Benson Avenue Chino, California 91710 Subject: City of Rosemead — Request for Proposal No. 2014-12 (Building Inspection and Plan Check Services) Dear Mr. Jefferson: As you are aware, the City of Rosemead is seeking a qualified firm to provide Consultant services to administer and operate the Building and Safety Division for the City of Rosemead. After careful review of Transtech's proposal, the City would like to invite your firm for a formal interview to be held on Wednesday, February 18, 2015 at 11:00 a.m. Please contact Pat Piatt, Senior Management Analyst, at (626) 562-2102 by Monday, February 16, 2015 to confirm your attendance. We thank you for your interest and look forward to meeting with you. Sincerely, �'���°,'y'��� Michelle G. Ramirez Community Development Director F M Submitted to: CITY OF ROSEMEAD City Clerk's Office Attn: Gloria Molleda, City Clerk � � 8838 E. Valley Boulevard Rosemead, California 91770 PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES "REQUEST FOR PROPOSAL NO. 2014-12 DO NOT OPEN WITH REGULAR MAIL" Submitted by: / TRANSTECH Engineers, Inc. TRANSTECH Contact person for this submittal: Ayla Jefferson, CBO avla.iefferson@transtech.org C: 909-851-5765 855595.2095 itoll-free) SECTION PAGE 1. Introduction 1.1- 1.3 2. Executive Summary 2.1-2 2 3. Work Plan 3.1-3.4 4. Performance Standards 4.1-4.2 5. Firm Qualifications 5.1-5.15 6. Project Team 6.1-6.12 7. References 7.1-7.14 8. Compensation 8.1-8.2 9. Insurance 9.1-9.1 10.Statement of Understanding 10.1-10.1 11. Unanticipated or Significant Deviations 11.1-11.1 PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(REP NO.2014-12) TnnrvsrrcH 1. INTRODUCTION TRANSTECII 855 595 2095(toll-free) EgralrenY 150,011 2th inl A TRANSTECII December 8, 2014 CITY OF ROSEMEAD City Clerk's Office Attn:Gloria Molleda,City Clerk 8838 E.Valley Boulevard Rosemead,California 91770 Subject: PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES REQUEST FOR PROPOSAL NO.2014-12 Transtech is pleased to submit this proposal to the City of Rosemead for the subject services. Established in 1989, Transtech is a multi-disciplinary engineering consulting firm which provides full contract municipal engineering services to local agencies. Our staff members serve local agencies in various capacities, such as City Engineer, City Traffic Engineer, CIP Program Manager, Construction Manager, Public Works Engineer, Building Official, Plan Checker, Inspector and Planner. We are accustomed to working with governmental agencies in every facet of municipal engineering. Our staff has an excellent understanding of public agency issues, procedures and policies. We also coordinate and work with regional governmental agencies, including Caltrans, County of Los Angeles, Metro, SCAG, as well as utility companies. Our service capabilities include: • Municipal Engineering Services, City Engineer, City Traffic Engineer,Capital Improvement Projects, Development Review, Plan Check • Building and Safety Services, Building Inspection, Plan Check, Building Evaluations, City Building Official, Code Enforcement • Housing/rehabilitation program management, CDBG program management, Housing/building improvement/evaluation services • Economic Development/Redevelopment Services • Program and Construction Management, Contract Administration, Construction Inspection, Labor Compliance, Design-build Services • Federally Funded Project Management and Grant applications • City Planning Services • Civil Engineering, Freeways and Interchanges, Local Streets and Roads, Sewerage, Water and Storm Drain, Pavement Management System, Grading Studies • Traffic and Transportation Planning and Engineering • Water Resources Engineering 23367 Benson Avenue I Chino CA9a7ao I T gag 5958599 I F9o95908599 I www.transtech.org 1.INTRODUCTION Page 1.2 • Surveying, Mapping,ALTA, Right-of-way Engineering • Emergency and Disaster Response, Support and Recovery Services Transtech has extensive experience in providing contract building and safety services. Currently, our firm is providing similar services to the following agencies: • City of Temple City: Building Official, Plan Check, Inspection, Permit Specialist, City Engineering, Traffic Engineering, Public Works Plan Check, Public Works Inspection Services • City of Alhambra: Building Official, Plan Check, Inspection, Permit Specialist, City Engineering, Traffic Engineering, Public Works Plan Check, Public Works Inspection Services • City of South Pasadena: Building Official, Plan Check, Inspection, Permit Specialist Services • City of Hawaiian Gardens: Building Official, Plan Check, Inspection, Permit Specialist Services • City of Huntington Park: Building Official, Plan Check, Inspection, Permit Specialist, City Engineering,Traffic Engineering Services • San Manuel Indian Reservation: Building Official, Plan Check, Inspection Services • City of Monterey Park: City Engineering, Public Works Plan Check, Public Works Inspection, Building Plan Check, Building Inspection Services • City of Commerce: City Engineering Staff Augmentation, Plan Check, Inspection, Building Permit Specialist Services • City of Cudahy: Building Plan Check Services Our key staff members have served as Building Official, Deputy Building Official, Plan Checker and Inspector for a number of agencies, and have an excellent understanding of public agency issues, procedures, and policies. Our key staff members also have extensive experience in Plan Check and Inspection of large and complex projects. We embrace a customer service attitude, and believe that services should be provided in a manner that is as applicant friendly as possible. Between various State and County agencies, and the associated bureaucracy; it has become very difficult for the average homeowner or business person to develop their own property. Meeting the needs of these individuals, through education and patient plan review and inspection is a high priority. Responsiveness is an integral part of Transtech's"customer friendly"service approach. Transtech understands the importance of being able to expedite certain projects through the plan review process. When requested, Transtech has sufficient staff and resources to expedite plan checks. In the event of a local or regional emergency or disaster, our personnel will be accessible, available, and prepared to provide Building and Safety services as directed by the City. We will strive to improve the City's reputation as a desirable community to invest and conduct business. Transtech maintains a low overhead, and provides cost effective services to its clients. Transtech has readily available staff to commence with the services upon City's authorization to proceed. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(REP NO.2014-12) �... TaansrrcM 1.INTRODUCTION Page 1.3 Thank you for the opportunity to submit this proposal. Should you have any question or should you need additional information, please contact the undersigned. Sincerely, Aye (40fregir Ayla Jefferson,CBO Building Department Manager/Contract Principal a v l a.i effe rs o n(a t ra n ste c h.o rg C: 909-851-5765 www.transtech.org .>wawwO.oMUVOUM.u1mnmE.EADBUILDING AND'Mr 5F.Wa:DUE u • lall wl.,.e,FIC6EMEAD BOWI,GANO sEnvtcs DUE„wu,o,W.Doa I PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.201432) r: TNANS,EG(I Y 2. EXECUTIVE SUMMARY TRANSTECh 2.EXECUTIVE SUMMARY Page 2.1 Our key staff members have served as Building Official, Deputy Building Official, Plan Checker and Inspector for a number of agencies, and have an excellent understanding of public agency issues, procedures, and policies. Our key staff members also have extensive experience in Plan Check and Inspection of large and complex projects. Transtech has extensive experience in providing contract building and safety services. Currently, our firm is providing similar services to the following agencies: • City of Temple City: Building Official, Plan Check, Inspection, Permit Specialist, City Engineering, Traffic Engineering, Public Works Plan Check, Public Works Inspection Services • City of Alhambra: Building Official, Plan Check, Inspection, Permit Specialist, City Engineering,Traffic Engineering, Public Works Plan Check, Public Works Inspection Services • City of South Pasadena: Building Official, Plan Check, Inspection, Permit Specialist Services • City of Hawaiian Gardens: Building Official, Plan Check, Inspection, Permit Specialist Services • City of Huntington Park: Building Official, Plan Check, Inspection, Permit Specialist, City Engineering, Traffic Engineering Services • San Manuel Indian Reservation: Building Official, Plan Check, Inspection Services • City of Monterey Park: City Engineering, Public Works Plan Check, Public Works Inspection, Building Plan Check, Building Inspection Services • City of Commerce: City Engineering Staff Augmentation, Plan Check, Inspection, Building Permit Specialist Services • City of Cudahy: Building Plan Check Services Licenses and Certification of Transtech's Building and Safety staff include: • ICC Certified Building Official • ICC Certified Building, Electrical, Mechanical and Plumbing Plans Examiner • Accessibility Plans Examiner • CalGreen-California Green Building Plan Examiner • ICC Certified Commercial Building, Electrical, Mechanical and Plumbing Inspector • Accessibility Inspector • CalGreen-California Green Building Inspector • IAPMO Certified Plumbing, Mechanical Inspector • CA Commercial and Res Plumbing Inspector • Plumbing Inspector UPC • CA Residential Mechanical Inspector • CACEO Certified Code Enforcement Official • ICC Fire Plans Examiner • Certified member of California Task Force 1 — FEMA/LA City Urban Search and Rescue - Lead Structure Specialist Our Building and Safety staff members have served and/or are currently serving on various ICC and Building Official Committees, including: • Chair; ICC Sustainability Membership Council PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) rotet TiuNsrrcX 2.EXECUTIVE SUMMARY Page 2.2 • Chair; ICC Los Angeles Basin Chapter Inspection Committee • Commissioner; ICC Codes&Standards Council • Commissioner; CALBO Green Committee • ICC Los Angeles Basin Chapter Board of Directors • ICC Building Officials Membership Governing Council • ICC Code Development Committee Vice Chair • ICC Technology/Web Advisory Group • IAS Accreditation Committee We embrace a customer service attitude, and believe that services should be provided in a manner that is as applicant friendly as possible. Between various State and County agencies, and the associated bureaucracy; it has become very difficult for the average homeowner or business person to develop their own property. Meeting the needs of these individuals,through education and patient plan review and inspection is a high priority. Responsiveness is an integral part of Transtech's"customer friendly"service approach. Transtech understands the importance of being able to expedite certain projects through the plan review process. When requested,Transtech has sufficient staff and resources to expedite plan checks. In the event of a local or regional emergency or disaster, our personnel will be accessible, available, and prepared to provide Building and Safety services as directed by the City. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP N0.2037-12) p,� 7enroTCCH / 3. WORK PLAN TRANSTECII 3.WORK PLAN Page 3.1 TRANSITION FROM CURRENT CONSULTANT We have completed several similar service transitions, and will be able to minimize any inconveniences. We do not see a need for an extensive overlapping work period with the current consultant. Our staff has done similar transitions before, and can handle any open issues left from the current consultant. The "overlapping work period" would only increase the City's cost on staff time. Our expectation is to review the project files and address status of current/open plan checks and projects and priority issues for transition. Upon this review and de-briefing from the current contractor, the Transtech team will immediately assume the positions to maintain and improve the current status of the assigned responsibilities. Plan Check Transition: If the current consultant has already started the plan check for a project, and already collected the fee for that plan check,the City would have 2 options: Option 1: Allow current consultant to complete the plan check;or Option 2: Request the current consultant to return a portion of the plan check fee proportionate to the level of plan check completion, and the new consultant completes the plan check with an hourly fee. After the review of status of current open plan checks, we will advise the City with an appropriate option accordingly. Inspection Transition: If the current consultant has already started the inspection for a project, and already collected the fee for that inspection,the City would have 2 options: Option 1: Allow current consultant to complete the inspection; or Option 2: The new consultant completes the inspection. After the review of status of current open inspections, we will advise the City with an appropriate option accordingly. In summary, we can take over all plan checks and inspections from current consultant immediately. After meeting with the current consultant and obtaining the list of open plan checks and inspections, we will advise the City the level of completion on open plan checks and inspections. The City can work out any fee issues with the current consultant for work not completed, but fees collected accordingly. SCOPE OF SERVICES Scope of Services will be provided as specified in City's RFP, Exhibit A-Scope of Services,which states: 1. General Consultant shall provide building and safety services as requested by the City. Such services shall include enforcement of the City's building laws and codes. Such enforcement shall include the duties set forth in the ordinance of the City for the Building Official and, in the performance of such work, the officials, plan reviewers and building inspectors of Consultant shall have the powers, duties and discretion of Building Official of the City. Under the California Building Code (CBC) Section 104 as amended by Los Angeles County Title 26 and adopted by the City, the Building Official is directed to perform certain tasks as described in the CBC. When acting in accordance with Section 104, the PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) r„ TRANS/ECN 3.WORK PLAN Page 3.2 Building Official is afforded certain protection from liability per section 104.2.6. As City's authorized representative, Consultant shall be deemed to have the same right to protection from liability to the maximum extent allowed by law. This section is not intended and shall not operate to in any way increase City's liability or decrease its lawful immunity from liability. 2. Building Official Duties of the Building Official shall include but not be limited to the following: The Building Official is authorized to enforce all provisions of the City Building Codes, Residential Codes, Plumbing Codes, Electrical Codes, Mechanical Codes, Green Building Standards, and Building Energy Conservation, and to make all inspections pursuant to the provisions of each code. The Building Official shall have the power to render interpretations of these codes and to adopt and enforce rules and supplemental regulations in order to clarify the application of its provisions. 3. Plan Review Consultant shall review plans prepared by or on behalf of an applicant for compliance with the Building laws of the City and State.When satisfied that the plans comply the applicable Building laws of the City and State,Consultant shall approve plans and forward to City for issuance of permit. 4. Building Inspection Consultant shall provide building observation services during the course of construction to enforce compliance with the conditions of approval, provisions of the City's Building laws and the Code requirements set forth on the approved plans for which a permit was issued. In the performance of such duties Consultant shall observe each project at the completion of the various stages of construction for compliance with the appropriate City and State code. SCHEDULE OF SERVICES Schedule of Services will be provided as specified in City's RFP, Exhibit B-Schedule of Services, which states: Public Counter Services - Consultant personnel will provide public counter services during City Hall hours of operation. Consultant personnel will provide over the counter plan review services Monday through Thursday 7:00 a.m.to 10:00 a.m. and 5:00 p.m.to 6:00 p.m. Plan Check Services - All residential and non-residential plan check would be performed by the Consultant. The Consultant will work closely with the Planner assigned to each project, including review of final plan check as Building Official. The services include plan review services of construction drawings to ensure compliance with City building codes and related Municipal Code requirements. Plan review services also include, but not be limited to, the disciplines of Building, Residential, Plumbing, Electrical, Mechanical, Green Building Standards, and Building Energy • - PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP N0.2014-12) C. TRAh31ECX 3.WORK PLAN Page 3.3 Conservation. The Building Official and Inspector(s)will work in coordination with the Planning staff on all plan checks to be sure they comply and are in accordance with the City zoning codes. Inspection Services - The Consultant will provide all inspection services for all residential and non- residential construction, and construction related activity, during City Hall hours of operation and on Fridays until 12:00 pm. Inspection services will be performed by ICC certified Building Inspector(s). Other Services- Consultant will interface with permit applicants; staff the public counter during City Hall hours of operation and provide off hour inspection services as requested; provide problem solving methods for unique or challenging plan check or code interpretation issues; report writing when necessary; policy & procedure recommendations; attend City Council meetings when necessary. Consultant will be qualified in post-disaster safety assessment, and will be available to the City to assess the safety of buildings in the event of a disaster. Consultant will also provide inspection services for special projects as determined by the City Manager. GENERAL • All residential and non-residential plan check will be performed by qualified plans examiners. Transtech staff will work closely with the Planner assigned to each project, including review of final plan check as Building Official. • The services will include plan review services of construction drawings to ensure compliance with building codes and related Municipal Code requirements. Plan review services will include, but not be limited to the disciplines of Building, Residential, Plumbing, Electrical, Mechanical, Green Building Standards, and Building Energy Conservation. The Building Official and Inspector(s) work in coordination with the Planning staff on all plan checks to be sure they comply and are in accordance with the City zoning codes. • California Building Laws - The City of Rosemead adopts the California Building Laws as amended by Los Angeles County. Once the State of California and County of Los Angeles have completed their adoption process, Transtech will provide the necessary materials (i.e. staff report, ordinances, resolutions, etc.)for the City to adopt the County Codes and will attend the City Council meeting for said items. • Inspection Services — Transtech will provide all inspection services for all residential and non- residential construction, and construction related activity, during City Hall hours of operation and on Fridays until 12:00 p.m. Inspection services will be performed by ICC certified Building Inspector(s). Upon request, inspection services will be provided before and after City Hall hours of operation and on weekends/holidays. • Other Services - Interface with permit applicants; staff the public counter during City Hall hours of operation and provide off hour inspection services as requested; provide problem solving methods for unique or challenging plan check or code interpretation issues; report writing when necessary; policy& procedure recommendations;attend City Council meetings when necessary. • Transtech staff will be available to the City to assess the safety of buildings in the event of a disaster. • Technology-As requested,Transtech staff will use the HDL system. • Transtech provides all plan check comments on electronic files. All plan check comments are ARM PROPOSAL FOR BUILDING INSPECTION AND PLAN[HECK SERVICES(RFP N0.2014-12) TRANS/ECl/ 3.WORK PLAN Page 3.4 provided on scanned pdf format electronically, as well as hard copies. Plan review corrections are written clearly, and are fully detailed to explain the Code deficiency (including all applicable code sections). To help the applicant better understand the problem, Transtech Engineers, Inc. provides as much information during plan review as possible. We believe that if the applicant has a clear understanding of the problem, he or she can take the necessary steps to correct the condition. This policy reduces the number of plan review rechecks required, allows the applicant to obtain a permit much sooner, and reduces the overall time our staff is required to spend on that particular plan. Unclear and/or cryptic corrections are never written, and all correction lists, except those written over-the-counter, are typed and printed on a laser printer. • Transtech understands the importance of being able to expedite certain projects through the plan review process. When requested, Transtech has sufficient staff and resources to expedite plan checks. • Transtech will address inquiries regarding plan check comments with applicant where clarification is requested and attend meetings as requested. • Transtech will perform inspection services for compliance with applicable Building Codes, City regulations,standards and applicable conditions of approval. • All inspection request calls will be returned within 24 hours; inspection times will be scheduled accordingly. • Upon successful completion of requested inspection service by applicant and acceptance by Transtech,the inspector will sign off on the appropriate portion of the permit. • Upon completion of all inspections and prior to final signoff Transtech will coordinate with other departments and agencies where conditions of approval must be met at time of Certificate of Occupancy. • Transtech will provide inspection services for special projects as determined by the City Manager. Emergency Services: In the event of a local or regional emergency or disaster, all on-site personnel will be accessible, available, and prepared to provide Building and Safety services as directed by the City. O PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(REP N0.2014-12) dam' ra4N3,eCx / 4. PERFORMANCE STANDARDS TRANSTECII 4.PERFORMANCE STANDARDS Page 0.1 Service Approach: • Our services are founded on the principals of Total Quality Management. We start by working with the applicant during plan review to help him or her prepare a set of plans which have all the required information clearly and logically presented. • Additionally, we never hesitate to make suggestions which help eliminate complicated details, reduce construction costs, and/or provide details which are easy to verify in the field. Experience has taught us well that inspection time and applicant frustration can both be substantially reduced, while increasing overall compliance, by producing a better set of plans during plan review process. And in the case of homeowners, this policy often demonstrates early on that the City really is here to help. • Transtech provides all plan check comments on electronic files. All plan check comments are provided on scanned pdf format electronically, as well as hard copies. Plan review corrections are written clearly, and are fully detailed to explain the Code deficiency (including all applicable code sections). • To help the applicant better understand the problem, Transtech Engineers, Inc. provides as much information during plan review as possible. We believe that if the applicant has a clear understanding of the problem, he or she can take the necessary steps to correct the condition. This policy reduces the number of plan review rechecks required, allows the applicant to obtain a permit much sooner, and reduces the overall time our staff is required to spend on that particular plan. Unclear and/or cryptic corrections are never written, and all correction lists, except those written over-the-counter,are typed and printed on a laser printer. • Transtech will perform necessary liaisons with City, and the permit applicant or applicant's designee either by telephone, mail, or meeting in the offices of Building and Safety Division, and perform necessary rechecks to achieve compliance with applicable building laws, ordinances, and regulations. • Responsiveness is an integral part of Transtech's "customer friendly"service approach. • We will strive to improve the City's reputation as a desirable community to invest and conduct business. Service Delivery Times: Service—Plan Check Average Timeframe for Delivery Residential (New Construction, Additions and Remodels) 10 to 15 business days '.. Commercial (New Construction,Additions and Remodels) 10 to 15 business days Industrial (New Construction, Additions and Remodels) 10 to 15 business days Major Development Projects such as mixed uses and complex 15 to 25 business days depending on projects typically with valuation over$5,000,000 size and complexity of the project Service-Building inspection The following working day PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) TRANSIECl/ 4.PERFORMANCE STANDARDS Page 4.2 Expedited Service Requests: Transtech has resources to expedite certain projects when requested by the City. When requested, Transtech can assign additional plans examiners to complete the projects on expedited schedule. When requested, we can dispatch additional inspectors to provide expedited inspection on same day, when requested by the City. On large development projects, if requested by the City, we can provide dedicated inspector(s) for on- going inspection on daily basis. fd PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) \'".:.^' TRANSrFC{I 5. FIRM QUALIFICATIONS TRANSTECEI 5.FIRM QUALIFICATIONS Page 5.1 Established in 1989, Transtech is a multi-disciplinary engineering consulting firm which provides full contract municipal engineering services to local agencies. Our staff members serve local agencies in various capacities, such as City Engineer, City Traffic Engineer, CIP Program Manager, Construction Manager, Public Works Engineer, Building Official, Plan Checker, Inspector and Planner. We are accustomed to working with governmental agencies in every facet of municipal engineering. Our staff has an excellent understanding of public agency issues, procedures and policies. We also coordinate and work with regional governmental agencies, including Caltrans, County of Los Angeles, Metro, SCAG, as well as utility companies. Our service capabilities include: • Municipal Engineering Services, City Engineer, City Traffic Engineer, Capital Improvement Projects, Development Review, Plan Check • Building and Safety Services, Building Inspection, Plan Check, Building Evaluations, City Building Official, Code Enforcement • Housing/rehabilitation program management, CDBG program management, Housing/building improvement/evaluation services • Economic Development/Redevelopment Services • Program and Construction Management, Contract Administration, Construction Inspection, Labor Compliance, Design-build Services • Federally Funded Project Management and Grant applications • City Planning Services • Civil Engineering, Freeways and Interchanges, Local Streets and Roads, Sewerage, Water and Storm Drain, Pavement Management System,Grading Studies • Traffic and Transportation Planning and Engineering • Water Resources Engineering • Surveying, Mapping, ALTA, Right-of-way Engineering • Emergency and Disaster Response,Support and Recovery Services • Transtech is a multi-disciplinary engineering consulting firm which provides full contract municipal engineering services to local agencies. Our staff members serve local agencies in various capacities, such as City Engineer, City Traffic Engineer, CIP Program Manager, Construction Manager, Public Works Engineer, Building Official, Plan Checker, Inspector and Planner. We are accustomed to working with governmental agencies in every facet of municipal engineering. Our staff has an excellent understanding of public agency issues, procedures and policies. We also coordinate and work with regional governmental agencies, including Caltrans, County of Los Angeles, Metro, SCAG, as well as utility companies. EXPERIENCE IN BUILDING AND SAFETY SERVICES Transtech has extensive experience in providing contract building and safety services. Currently, our firm is providing similar services to the following agencies: • City of Temple City: Building Official, Plan Check, Inspection, Permit Specialist, City Engineering, Traffic Engineering, Public Works Plan Check, Public Works Inspection Services • City of Alhambra: Building Official, Plan Check, Inspection, Permit Specialist, City Engineering,Traffic anfo PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(REP NO.2014-12) TFA,YSIECM 5.FIRM QUALIFICATIONS Page 5.2 Engineering, Public Works Plan Check, Public Works Inspection Services • City of South Pasadena: Building Official, Plan Check, Inspection, Permit Specialist Services • City of Hawaiian Gardens: Building Official, Plan Check, Inspection, Permit Specialist Services • City of Huntington Park: Building Official, Plan Check, Inspection, Permit Specialist, City Engineering, Traffic Engineering Services • San Manuel Indian Reservation: Building Official, Plan Check, Inspection Services • City of Monterey Park: City Engineering, Public Works Plan Check, Public Works Inspection, Building Plan Check, Building Inspection Services • City of Commerce: City Engineering Staff Augmentation, Plan Check, Inspection, Building Permit Specialist Services • City of Cudahy: Building Plan Check Services Licenses and Certification of Transtech's Building and Safety staff include: • ICC Certified Building Official • ICC Certified Building, Electrical, Mechanical and Plumbing Plans Examiner • Accessibility Plans Examiner • CalGreen-California Green Building Plan Examiner • ICC Certified Commercial Building, Electrical, Mechanical and Plumbing Inspector • Accessibility Inspector • CalGreen-California Green Building Inspector • IAPMO Certified Plumbing, Mechanical Inspector • CA Commercial and Res Plumbing Inspector • Plumbing Inspector UPC • CA Residential Mechanical Inspector • CACEO Certified Code Enforcement Official • ICC Fire Plans Examiner • Certified member of California Task Force 1 — FEMA/LA City Urban Search and Rescue - Lead Structure Specialist Our Building and Safety staff members have served and/or are currently serving on various ICC and Building Official Committees, including: • Chair; ICC Sustainability Membership Council • Chair; ICC Los Angeles Basin Chapter Inspection Committee • Commissioner; ICC Codes& Standards Council • Commissioner; CALBO Green Committee • ICC Los Angeles Basin Chapter Board of Directors • ICC Building Officials Membership Governing Council • ICC Code Development Committee Vice Chair • ICC Technology/Web Advisory Group • IAS Accreditation Committee PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) TFAhS1ECX 5.FIRM QUALIFICATIONS Page 5.3 Our staff members also have extensive experience in Plan Check, Inspection and Construction Management of large and complex projects,such as: • Casino Expansion for at San Manuel Indian Reservation: Transtech is currently providing plan check on $40m Casino expansion project for San Manuel India Reservation. Transtech is the reservations Building Official, Plan Checker and Inspector, and will also inspect the casino expansion. Project Value$40m. • TACC Cultural Center Development, Lanham, MD: Transtech provided plan check, inspection, construction management and owner representative services for the construction of 310,000 sf cultural center, including Olympic Swimming Pool, Indoor Full Basketball Court, Museum, Performance Center, Restaurant, Religious Center, Monastery. Project Value: $100m. • City of Alhambra Civic Library Project: Transtech provided plan check, inspection, construction management and owner representative services for the construction of 45,000 SF 2 story library with 2 levels of underground parking garage. Project Value: $30m. • City of Alhambra Renaissance Plaza Parking Structure and Entertainment Center: Construction of a 5 level, approximately 600 space parking structure, as well as a 10 plex movie theater, and 3 restaurants and retail stores. Project Value: $40m. • City of San Bernardino Historic Santa Fe Depot Renovation: Transtech provided plan check, inspection and construction management services for the renovations adoptive reuse of 60,000 sf historical Santa Fe Train Depot. Project Value:$20m. • Alhambra Redevelopment Agency Downtown Revitalization Program: Transtech provided plan check, inspection, construction management and owner representative services for the revitalization program, which involved various projects, including Fremont Plaza (modifications/reconstruction of existing buildings for lease by ToysRUs and Party City, construction of a new 30,000 SF store for PetSmart, and various other retail buildings) and Downtown Revitalization (modification/upgrade of existing buildings for Starbucks, 4 Restaurants and various retail businesses). Project Value$SOm. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) Cy/ rR.•s,ccw 5.FIRM QUALIFICATIONS Page 5.4 TRANSTECH'S OTHER SERVICE CAPABILITIES AND EXPERIENCE ENGINEERING DESIGN: Transtech staff completed numerous civil engineering design projects for local agencies in Southern California. Several projects were funded by federal funds, including management and processing as required in Caltrans Local Assistance Procedures Manual.Following are a partial listing of various projects representative of Transtech's experience: • State Route 710 Interim Improvements and Fremont Ave. Widening/Realignment: Prepared PS&E as well as provided construction management and inspection services for 3 federally funded projects in Alhambra. Improvements included street, water, sewer, storm drain, landscape, street lighting,traffic signal, and signing and striping plans. The project also involved coordination with Caltrans and encroachment permit processing/approval,as portions of the project was in Caltrans jurisdiction. These projects were all federally funded, requiring processing for E-76 through Caltrans Local Assistance. The total cost for 3 projects was$20M. • Mission Boulevard Widening: Prepared PS&E as well as provided construction management and inspection services for Mission Boulevard widening and reconstruction. Improvements included street,water,sewer,storm drain,landscape,street lighting, traffic signal, and signing and striping plans. Transtech/Mapco also provided construction management and inspection services for the project. The project involved coordination with Caltrans,and was federally funded and required processing for E-76 through Caltrans Local Assistance. Cost$3M. • City of Commerce, Washington Boulevard Overlay Project: Prepared PS&E for the rehabilitation of Washington Boulevard between the I-5 Freeway and Atlantic Boulevard in the City of Commerce. The project involved coordination with Caltrans, and was federally funded and required processing for E-76 through Caltrans Local Assistance. The total cost$1M. • City of Baldwin Park, Francisquito Avenue Overlay Project: Prepared PS&E for the rehabilitation of Francisquito Avenue between west and east city limits in the City of Baldwin Park. The project involved coordination with Caltrans, and was federally funded and required processing for E-76 through Caltrans Local Assistance. Cost$1.4M. • CSUSB (Cal State SB University) San Bernardino Campus Access Road: Prepared PS&E and provided construction administration for the project. Improvements included approximately 1 mile street, water, landscape, grading, drainage, street lighting and various other improvements. Cost$6M. • CSUSB (Cal State SB University) Perimeter Road for CSUSB Palm Desert Campus: Prepared PS&E for the project. Improvements included street, water, landscape, grading, drainage, street lighting and various other improvements. Cost $1M. • CSUSB(Cal State SB University): Campus Health Center Expansion: Prepared PS&E for the project for grading, utilities and civil engineering. Cost$8M. • University of California, Riverside - West Campus Infrastructure: Prepared West Campus Infrastructure Development Design/Study, which identified utility and surface infrastructure requirements, and how these improvements could be phased to accommodate proposed campus growth, for an area of 236.8 acres to support approximately 5 million gross square feet of academic,research,support,and student housing facilities. Cost$20M. • City of San Bernardino Campus Parkway Roadway Design: Prepared PS&E as well as provided construction management and inspection services for the project. Improvements included street, water, sewer, storm drain, landscape, street lighting, traffic signal,and signing and striping. Cost$6M. • Alameda Corridor Agency East (ACE) Rail Grade Crossing Jumpstart Improvement Project: Prepared PS&E for Federally Funded Jump Start Improvement Package 141-Rail Grade Crossing Improvements for Alameda Corridor Agency East (ACE). Project involved 6 agencies and 14 locations in Los Angeles County. Work involved roadway realignment and reconstruction, signalization, traffic control, and construction phasing as well as related improvements such as storm drain, water, sewer landscaping,underground utilities,etc. Cost$8M. • City of Commerce-Street Rehabilitation Program,Tubeway and Yates Reconstruction/Overlay: Prepared PS&E for 2 projects. The projects involved roadway rehabilitation and reconstruction, storm drain, water and sewer design. Transtech also provided construction management services for the project. Cost:50.Sm. • City of San Bernardino, Sewer upgrade project: Preparation of a project PSE for upgrade of main sewer lines at various locations per the City's Sewer Master Plan. Cost:$1.2 m • City of Commerce-Master Sewer Study Telegraph Corridor re-vitalization project: Documentation of existing system. Design capacity analysis based upon land use designations. Produced master plan study report for the project along with cost estimates. • Northpark Boulevard Sewer Extension-Half mile gravity sewer main extension for University Park Subdivision in the City of San Bernardino: Project required special structural designs and encroachment permitting for crossing 100'aqueduct right-of- way. • University Park Storm Drain Design: Design of storm drain system with pipes ranging in size from 18 to 60 inches and trapezoidal channel design for 4500 cfs. • Fremont Avenue Water, Storm Drain and Sewer: Design of water, storm drain and sewer improvements for the Fremont Avenue Widening project from Valley to Common Wealth in the City of aSS11 PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014.12) wti. rgeN,;ECx 5.FIRM QUALIFICATIONS Page 5.5 • City of San Diego Water Projects: Green Valley Water line design and construction. 5000 feet, 30" Reinforced concrete water line and pressure reducing station and details for connection to a 60-inch San Diego County Water Authority Pipeline. Structural arch and encasement designs for road crossings over various SDCWA pipelines up to 108 inches in diameter. Design and construction of Mercy Road pressure booster. • City of San Bernardino Water Projects: Design and construction management of 3500 feet of 20 to 36 inch ductile iron water transmission main in the City of San Bernardino for the development of University Park. Design of over 10,000 feet of 8 thru 12 inch DIP water main for water distribution. Structural arch design for road crossing over the Dept of Water Resources 109-inch Santa Ana pipeline. • City of Riverside Water Projects: Water distribution analysis and computer modeling for University of California Riverside West Campus expansion infrastructure project. • San Elijo Ranch Drainage, Sewer and Water Master Plan -San Marcos: 2,000 acre/3400 unit master planned community. The project included literally miles of storm drain, sewer and water lines, sedimentation areas, pump stations, booster stations,water reservoirs and force mains.Cannon Road Trunk Sewer and Pump Station-Design of 8-12 inch gravity sewer,6 and 8 inch force main,pump station and wet well.City of Carlsbad • Arrowhead Springs Master Development On San Bernardino County, in the process of annexing 600 acres into the City) Drainage,Sewer and Water Master Plan: Approximately 600 acre area for future master planned community development (1,300 residential units,lm sf commercial and office,2 hotels,golf course). CONSTRUCTION MANAGEMENT SERVICES(INFRASTRUCTURE/ROADWAY-TYPE A PROJECTS): Transtech has extensive experience in providing construction management services,and has completed a number of projects. The majority of the projects were federally funded. Transtech administered all projects through Caltrans' Local Assistance in compliance with the Local Assistance Procedures Manual (LAPM). Several of these projects also involved close coordination with Caltrans and encroachment permit processing/approval, as portions of some of the projects were in Caltrans jurisdiction. Following is a partial list of significant projects completed,including a brief scope of work and other relevant information: • Rosemead Safety and Enhancement and ADA Improvements Project (Federally Funded), City of Temple City. Provided CM/Resident Engineer, Inspector,Office Engineer Services. Project was inspected and managed in compliance with Caltrans Local Assistance Procedures Manual. Project involved reconstruction, pavement overlay, medians, landscape, curb and gutter,sidewalk,traffic signals,utilities and other misc.improvements. Cost$20m. • Nason/Cactus Roadway Improvements Project, City of Moreno Valley. Provided CM/Resident Engineer, Inspector, Office Engineer Services. Project was inspected and managed in compliance with Caltrans Local Assistance Procedures Manual. Project involved reconstruction,pavement overlay, medians,landscape,curb and gutter,sidewalk,traffic signals,utilities and other misc. improvements. Project Value: $20m (Transtech won 2013 Construction Management Association of America- CMAA, Project Award for this Project). • Rte 71/Mission 81 Grade Separation Project(Federally Funded) City of Pomona. Provided CM/Resident Engineer, Inspector, Office Engineer Services. Project was inspected and managed in compliance with Caltrans Local Assistance Procedures Manual.Project involved construction of a grade separation. Caltrans was the oversight/jurisdictional Agency. Cost$40m. • 710 Freeway Interim Improvements and Fremont Widening Project (Federally Funded), City of Alhambra. Provided CM/Resident Engineer, Inspector,Office Engineer Services. Project was inspected and managed in compliance with Caltrans Local Assistance Procedures Manual. Project involved reconstruction, pavement overlay, medians, landscape, curb and gutter,sidewalk,traffic signals, utilities and other misc.improvements. Project also involved coordination with Caltrans for work at the 710 Freeway ramps under Caltrans Encroachment Permit. Cost:$15m. • Via Duct Boulevard/2 0d Street Realignment and Metrolink Parking Facility, City of San Bernardino Project: Provided CM/Resident Engineer, Inspector,Office Engineer Services. Project was inspected and managed in compliance with Caltrans Local Assistance Procedures Manual. Project involved reconstruction, pavement overlay, medians, landscape, curb and gutter,sidewalk,traffic signals,utilities and other misc.improvements. Cost$6m. • Valley Boulevard Rehabilitation and ADA Improvements Project(Federally Funded),City of Alhambra: Provided CM/Resident Engineer, Inspector, Office Engineer Services. Project was inspected and managed in compliance with Caltrans Local Assistance Procedures Manual. Project involved reconstruction, pavement overlay, medians, landscape, curb and gutter, sidewalk,traffic signals, utilities and other misc. improvements. Project also involved coordination with Caltrans for work at the 710 Freeway ramps under Caltrans Encroachment Permit. Cost$3m. • New Avenue, from North to South City Limit Rehabilitation and ADA Improvements Project (Federally Funded), City of Alhambra: Provided CM/Resident Engineer, Inspector, Office Engineer Services. Project was inspected and managed in compliance with Caltrans Local Assistance Procedures Manual. Project involved reconstruction,pavement overlay,medians, landscape, curb and gutter, sidewalk, traffic signals, utilities and other misc. improvements. Project also involved coordination with Caltrans for work at the 1-10 Freeway ramps under Caltrans Encroachment Permit. Cost$2m. • Garfield Rehabilitation and ADA Improvements Project (Federally Funded), Alhambra: Provided CM/Resident Engineer, Inspector, Office Engineer Services. Project was inspected and managed in compliance with Caltrans Local Assistance Procedures Manual. Project involved reconstruction, pavement overlay, medians, landscape, curb and gutter, sidewalk, PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) _, TRArvSIECII 5.FIRM QUALIFICATIONS Page 5.6 traffic signals,utilities and other misc.improvements. Cost$2m. • Main Street Rehabilitation, from West to East City Limit Project, City of Alhambra: Provided CM/Resident Engineer, Inspector, Office Engineer Services. Project was inspected and managed in compliance with Caltrans Local Assistance Procedures Manual. Project involved reconstruction, pavement overlay, medians, landscape, curb and gutter, sidewalk, traffic signals,utilities and other misc.improvements. Cost$3m. Transtech also has extensive experience in managing federally funded projects. In the past few years,our staff has managed over 20 federally funded projects through Caltrans Local Assistance in compliance with Local Assistance Procedures Manual as required in federally funded projects. Services included obtaining E-76 authorization for each project phase as necessary,and prepared all necessary paper work and approval process,fund reimbursement, labor compliance and contract administration throughout the project,from PE through CE,as well as serving as Resident Engineer and Inspector during construction. Below is a listing of similar experience projects,with Federal Project Numbers(In alphabetical order by Agency Name/Project Name): • CITY OF ALHAMBRA-ALHAMBRA RD REHABILITATION, WCL TO ECL; Agency Project No: Federal Funded Project ESPL- 5130(014) • CITY OF ALHAMBRA-FREMONT OVERLAY FROM COMMONWEALTH TO NCL, MONTEZUMA TO SCL; Agency Project No: Federal Funded Project STPL-5130(012) • CITY OF ALHAMBRA-GARFIELD AVE REHABILITATION, 1-10 FWY TO MAIN ST,ALHAMBRA RD TO ATLANTIC BL;Agency Project No:Federal Funded Project STPL-5130(018) • CITY OF ALHAMBRA-JOSYLIN CENTER EECBG IMPROVEMENTS; Agency Project No: Federal Funded Project EECBG DE-FOA- 0000013 • CITY OF ALHAMBRA-MAIN ST REHABILITATION,HUNTINGTON DR TO ECL;Agency Project No:Project N2M11-68 • CITY OF ALHAMBRA-MISSION BL RECONSTRUCTION FROM GARFIELD TO ECL; Agency Project No: Federal Funded Project H P21L-5130(011) • CITY OF ALHAMBRA-NEW AVE REHABI LITATION,1-10 FWY TO NCL;Agency Project No: Federal Funded Project ESPL 5130(016) • CITY OF ALHAMBRA-POPLAR OVERLAY;Agency Project No:Federal Funded Project ESPL-5130(015) • CITY OF ALHAMBRA-SRTS SAFE ROUTE TO SCHOOL,COMMONWEALTH AVE,CURTIS AVE,ALHAMBRA RD,SECOND ST;Agency Project No:Federal Funded Project SRTSL-5130(017) • CITY OF ALHAMBRA-VALLEY BL RECONSTRUCTION, WCL TO CAMPBELL AVE; Agency Project No: Federal Funded Project HPLUL 5130(013) • CITY OF ALHAMBRA-VALLEY/FREMONT WIDENING;Agency Project No:Federal Funded Project FCRL-5130(005) • CITY OF ALHAMBRA-710 INTERIM IMPROVEMENTS, VALLEY FIBEROPTIC; Agency Project No: Federal Funded Project RPL- 5130(009),07-LA-710 PM26.5/27.5,EA.07279-187701-A • CITY OF BELL-FLORENCE AVENUE OVERLAY PROJECT;Agency Project No: Federal Funded Project STPL-5272(007) • CITY OF COMMERCE-CDBG FUNDED ADA RAMPS AT VARIOUS LOCATIONS;Agency Project No:CC NO.0201 • CITY OF COMMERCE-FLOTILLA ARRA PROJECT;Agency Project No:Federal Funded Project LAE5427 • CITY OF COMMERCE-GARFIELD AVE, TELEGRAPH RD TO MALT AVE OVERLAY; Agency Project No: Federal Funded Project LSSTPL045 • CITY OF COMMERCE-SAFE ROUTE TO SCHOOL;Agency Project No: Federal Funded Project STPLHSR-5362(009) • CITY OF COMMERCE-SLAUSON AVE OVERLAY;Agency Project No:Federal Funded Project STPL-5362(011) • CITY OF COMMERCE-5825 AND FTA BUS SHELTER CONSTRUCTION; Agency Project No: Federal Funded Project SR2SL- 5362(013) • CITY OF COMMERCE-TRAFFIC SIGNAL IMPROVEMENTS;Agency Project Noi Federal Funded Project STPLHG-5362(008) • CITY OF COMMERCE-WASHINGTON ST RECONSTRUCTION,710 FWY TO COBB ST • CITY OF COMMERCE-WASHINGTON BL OVERLAY,FIDELIA ST TO ATLANTIC BL;Agency Project No:Federal Funded Project DPI- 5362(0121 • CITY OF EL MONTE-ADA AND ST IMPROVEMENTS AT VARIOUS LOCATIONS; Agency Project No: Federal Funded Project 5210(018) • CITY OF MORENO VALLEY-CACTUS&NASON STREET IMPROVEMENTS;Agency Project No:Agreement 08-33-011-00 • CITY OF POMONA-STATE RTE 71 AND MISSION BL GRADE SEPARATION; Agency Project No: Federal Funded Project STPLN- 5070(009) • CITY OF POMONA-CONSTRUCTION AND PROJECT MANAGEMENT STAFF EXTENSION CONTRACT • RIVERSIDE COUNTY TRANSPORTATION COMMISSION-CORONA MAIN ST METROLINK TRANSPORTATION CENTER PARKING STRUCTURE;Agency Project No:08-33-011-00 • CITY OF SAN BERNARDINO-VIA DUCT BOULEVARD ALIGNMENT AND RECONSTRUCTION, METROLINK SAN BERNARDINO PARKING FACILITY;Agency Project No:Federal Funded Project CML-5033(039) • CITY OF SAN BERNARDINO-SANTA FE DEPOT HISTORIC RENOVATION; Agency Project No: Federal Funded Project 08- 4105584L PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) TRAA'swch 5.FIRM QUALIFICATIONS Page 5.7 • SAN BERNARDINO COUNTY HOUSING AUTHORITY-PROJECT AND CONSTRUCTION MANAGEMENT SERVICES;Agency Project No:U.S.Department of Housing and Urban Development Model Contract PC-662 • CITY OF TEMPLE CITY-ROSEMEAD BOULEVARD SAFETY AND ENHANCEMENT PROJECT; Agency Project No: Federal Funded Project CML 5365(007) CONSTRUCTION MANAGEMENT(BUILDING-TYPE B PROJECTS): • TACC Cultural Center Development, Lanham, MD: Construction of 31Q000 sf cultural center, including Olympic Swimming Pool,Indoor Basketball Court,Museum,Performance Center,Restaurant,Religious Center,Monastery. Project Value:$SOm. • City of Alhambra Civic Library Project:Construction of a 45,000 SF 2 story library with 2 levels of underground parking garage. Project Value:$30m. • Riverside County Transportation Commission, Corona Main Street Metrolink Parking Structure and Pedestrian Bridge: Construction of a 6 level,approximately 1,000 space parking structure,and a pedestrian bridge over rail road tracks.Project Value:$24m. • City of Alhambra Renaissance Plaza Parking Structure and Entertainment Center: Construction of a 5 level, approximately 600 space parking structure,as well as a 10 plex movie theater,and 3 restaurants and retail stores. Project Value:$40m. • City of San Bernardino Historic Santa Fe Depot Renovation:Construction of involved hazardous material abatement,building renovation, TI improvements, restaurant improvements, seismic and structural upgrade, new mechanical, electrical HVAC system and site improvements to renovate and reuse a 60000 SF existing building. Project Value:$20m. • Alhambra Redevelopment Agency Downtown Revitalization Program: Revitalization program involved various projects (modification/upgrade of existing buildings for Starbucks,Restaurants,Retail,). Project Value$10m. • San Bernardino Downtown, 3rd Street mixed-use development: Transtech developed this mixed-use project in partnership with City and Private Institutions. Project Value:$5m. • City of Alhambra Fremont Plaza(Old Sears Head Quarters Upgrade and Renovation evaluation for retail use(Transtech also served as PM/CM/Owners Representative). Project Value:$10m. • City of Monterey Park City-wide Parks(13 parks)ADA Deficiencies Assessment Study. Project Value:$2m. • City of Huntington Beach Economic Development Agency, Condition Assessment/Facility Evaluation Report for Art Center Building After initial evaluation,the building was deemed to be not suitable for the proposed use). • Riverside County Economic Development Agency, Real Estate Division, Engineering and Construction Services on various housing,real estate and infrastructure projects. • City of Temple City,Council Chambers Renovation and ADA Improvements Project: Complete reconstruction/renovation of the Council Chambers with new seating, dais, carpet, lighting, AV system, and new ADA compliant bathrooms, new ADA compliant access to the building,new emergency generator,re-design of building creating a space for Emergency Operations Center,asbestos removal,and other various improvements. Project Value:$1m. • City of Alhambra, Josylin Community Center Renovation Project: Funded by Federal Energy Efficiency and Conservation Block Grant. Complete reconstruction/renovation of the Community Center with new HVAC, windows, flooring, electrical, roof,ADA compliant bathrooms, new ADA compliant access to the building,and other various improvements. Project Value: $2m. FACILITIES NEEDS ASSESSMENT AND MASTER PLAN SERVICES: • TACC Cultural Center Development Master Plan, Lanham, MD(Transtech is also serving as PM/CM/Owners Representative). Project Value:$130m. • City of Alhambra Fremont Plaza(Old Sears Head Quarters Upgrade and Renovation evaluation for retail use(Transtech also served as PM/CM/Owners Representative). Project Value:$10m. • City of Alhambra Downtown Revitalization Program Buildings Audits and for required upgrades for compliance with current building codes and to convert existing buildings for various retail uses of approximately 20 buildings. (Transtech also served as PM/CM/Owners Representative). Project Value:$40m. • County of Los Angeles Health Center Building Evaluation for City of Alhambra for Community Center Use (After initial evaluation,the building was deemed to be not suitable for the proposed use). • City of Monterey Park, City Public Works Yard Evaluation and Needs Assessment for new Yard(City is in negotiations with a developer to exchange existing PW yard land for a new land at a different location). • City of Monterey Park City-wide Parks(13 parks)ADA Deficiencies Assessment Study(Transtech also prepared improvement plans and the project is currently going into construction phase). Project Value:$2m. • City of Huntington Beach Economic Development Agency, Condition Assessment/Facility Evaluation Report for Art Center Building After initial evaluation,the building was deemed to be not suitable for the proposed use). • City of San Bernardino Historic Santa Fe Rail Depot Upgrade and Renovation evaluation for adoptive use (Transtech also served as PM/CM/Owners Representative). Project Value:$20m. AIM PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) TannsacN 5.FIRM QUALIFICATIONS Page 5.8 • City of Temple City, City-wide ADA and sidewalk master plan, and deficiencies (Currently the City is in the process of implementing the improvements using CDBG funds. Transtech is serving as PM/CM/Owners Representative). Project Value: $2.5m. • Riverside County Economic Development Agency, Real Estate Division, Engineering and Construction Services on various housing,real estate and infrastructure projects. • University of Riverside West Campus Infrastructure Needs Assessment and Master Plan. • Arrowhead Springs Development Master Plan,San Bernardino. • Shandin Hills Planned Community Development Master Plan,San Bernardino. • Eagle Bice,Muscupiabe Land Area(Devore area in San Bernardino)Planned Community Development Master Plan. • City of Alhambra Street Lighting Master Plan. • City of San Marino Master Lighting Plan. TRAFFIC AND TRANSPORTATION ENGINEERING: Transtech serves as contract traffic engineer for a number of municipalities in Los Angeles County,and are very knowledgeable of traffic and transportation issues and trends locally and regionally. We provide technical expertise and recommendations, and conduct necessary surveys and prepare reports on traffic related issues, and present them at Commission and/or Council Meetings. We manage and coordinate with our clients signal maintenance contractors regarding signal timing and coordination,and advise when to improve the signal timing efficiency when necessary. We prepare traffic safety and calming studies,stop and signal warrants/studies,traffic impact studies, respond to City requests,citizen complaints and attend Traffic Commission meetings. We review traffic impact studies submitted by developers, provide traffic study guidelines to other consultants preparing TIA's and represent the City at planning commission and council meetings when these projects are reviewed and presented: Following are various projects representative of our experience: Project Category: Contract Cities Traffic Engineering Support Current Client Cities Brief Summary of Tasks and Duties Alhambra • Preparation of vehicle traffic safety and calming studies, reviewing citizen requests for stop Commerce and signal warrants, review of citizen requests for red curbs, on street blue curbs, yellow Huntington Park curbs, on-street parking tick marks, crossing guards and crosswalks, bus stops, residential Monterey Park speeding, request for speed bumps or additional signage. This includes providing counts, Temple City radar speed survey, measurements, pictures,a response to City staff, written responses to citizen complaints, which includes the preparation of a comprehensive report or memo, meeting and contacting the citizen on behalf of the City. • Attending Traffic Commission Meetings,presenting the reports. • When requested, attending City Council and Planning Commission Meetings where traffic related issues are reviewed,and making presentations. • As part of Traffic Engineering Support Services for the City of Huntington Park counter brochures for traffic control measures were prepared and made available to residents for information. Project Category: Traffic Safety Review and Recommendations Client Brief Summary (These tasks included counts, accident history, field measurements and observations,pictures and Level of Service analysis and preparation of a focused traffic study.) City of Commerce • Washington/Cobb Street: Identify And Evaluate The Traffic Impacts Of Eliminating The Westbound Left Turn Movement At The Intersection Of Washington Blvd And Cobb Street To Improve Traffic Flow Along Washington Boulevard. • Median Islands along Washington Blvd: Identify And Evaluate The Traffic Impacts Of Modifying The Median Islands In Front Of Mcdonalds And Costco Facilities To Improve Vehicular Safety • Washington-Fidelia to 1-5 Frwy:Update accident and collision information for review of the merits of raised medians. • Garfield at Canning:Assess striping KEEP CLEAR along Garfield and its effect on pedestrians and truck traffic. • Telegraph at Garfield: Review of the necessity for right turn on red for EB Telegraph traffic, the possible removal of restriction and how it will effect pedestrians and truck and 411M- •, PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) TaaivszecA 5.FIRM QUALIFICATIONS Page 5.9 passenger car traffic. • Ferguson at Garhardt Review of existing striping and how a lane narrowing will effect parking and the flow of through traffic along Ferguson. City of Alhambra • Review of request for an unprotected midblock crosswalk across from the Target Center as requested by Oneonta Day Care. • Review of the need for an unprotected midblock crosswalk by Almansor Park on Almansor Street. • Review and recommendation for traffic warning signs at Curve along Garvey Ave at Ramona Road. • Florentina Safety Review • Hellman Ave and Elm St: Review school request for the restriction of EB'eft turn traffic onto Elm St at the intersection. • Alhambra Rd at Marengo Ave:Removal of unwarranted unprotected crosswalk • Fremont Ave and Valley Blvd: relocation of bus stop and bench upstream to reduce congestion and potential for conflicts with NB right turning traffic at the intersection. • Fremont Ave and Renssalar Dr: Request and review for an unprotected crosswalk across Fremont Avenue. • Glendon Way:Removal of parking for increased line of sight at intersecting roadways. City of Huntington Park • Arbutus at Gage: Assessment of the removal of protected left turn phasing at the intersection to improve traffic congestion along the main corridor. • 12119 - Otis at State St review of line of sight at intersection, field review and recommendation for the removal of parking and obstructions to increase line of sight. • State Street bus stop relocation.Assessment of the relocation of an existing bus stop away from the front yards of SFDU to aid in security for the homeowner and bus patrons. City of Inglewood • Crenshaw Boulevard Between Manchester Boulevard And 791b Street:The Assessment Was Needed Due To The Horizontal Curve,The High Number Of Accidents That Occur Annually Along This Roadway. Staff Later Prepared a HSIP Funding Package for Submittal.The HSIP Funding was successful. Project Category: Traffic Calming Review and Recommendations Client Brief Summary City of Alhambra • Pine Street Cut-Thru Traffic Assessment:Part of Ongoing Efforts to Improve Safety, Reduce Accident Potential and Improve Traffic Conditions on Pine Street between Huntington Drive and Atlantic Boulevard,Studies Were Conducted and Recommendations Developed for City Council's Consideration. Project Went Thru City Council, Traffic Commission Review And Approvals As Well As Coordination With South Pasadena. • Emery Park Study: Study within a 5 mile radius of all streets in order to assess existing conditions and make recommendations to reduce the amount of cut-thru traffic currently experienced by area residents. • Fremont Ave 1-10 Freeway to Mission Rd: Review of existing conditions and determination of the amount of traffic that this corridor experiences as a result of cut-thru traffic,avoiding the congested freeways.Recommendations were presented to council. • Preparation of a report detailing the advantages and disadvantages of a speed hump program within the City of Alhambra. Recommendations were presented to City manager and staff. • Norwood PI south of Valley: Existing conditions analysis along with recommendations to discourage cut-thru traffic that is using Norwood PI traveling on Valley Blvd from the 1-710 Freeway. Recommendations were presented to City manager and staff. • Shorb St—Garfield Ave to 6vh St: Existing conditions analysis of this corridor to determine the effects of cut-thru traffic on the street segment. Recommendations were presented to the traffic commission. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) IRA/VS-1E61 5.FIRM QUALIFICATIONS Page 5.10 City of Temple City • Muscatel Ave—Las Tunas Dr to Longden Ave:Existing conditions analysis of this corridor to determine the effects of cut-thru traffic on the street segment. Recommendations were presented to the traffic commission. City of Inglewood • North City Traffic Calming : Traffic Calming Study For The Residential Area Bordered By Centinela Avenue To The South, La Cienega Blvd To The West, La area Avenue To The East And Slauson To The North.Transtech Prepared An Initial Review Of The Traffic Patterns And Volume Entering And Exiting The Above Mentioned Neighborhood. • Crenshaw/Hardy Traffic Calming Study for the residential neighborhood located to the west of Crenshaw. This included 7 day peak hour and ADT counts of traffic, accident research, observations,level of service analysis to determine the amount of cut thru traffic using the frontage road to bypass Crenshaw and Century Blvd intersection during peak commute times and presentation of findings in a focused traffic study. City of Monterey Park • Traffic Calming and Stop Sign/Signal Warrant Preparation along Floral Dr at four locations along the back side of LA City College. This involved the review of existing traffic and pedestrian patterns and safety as well as recommendations in a focused traffic study.The report was presented to residents and staff at a traffic commission hearing. Project Category: School Site Review Client Brief Summary City of Alhambra • Mark Keppel High School: Relocation of an Existing School Crosswalk In Front Of the Mark Keppel High School and the Relocation of the Crosswalk. This Project Went Thru School District And Council Review. • Fremont School: Site Assessment of Current Drop Off and Pick Up Policies As Well As Review of Existing Signage and Striping. Recommendations for New Valet Program and Signage and Striping. City of Inglewood • John Wilder Academy: Comprehensive Review of Drop-Off and Pick-Up Operations and Traffic and Pedestrian Circulation at Wilder Academy. This Project Went Thru Council Member,Academy And Council Review. Pomona Unified School • School Site Assessments and Traffic Circulation for (5) school sites; Cortez Elementary District School, Montvue Elementary, Rio Rancho Elementary, Philadelphia Elementary, Dudley Elementary. • Traffic Study along with School Site Review for New Charter School—Dudley Elementary. Whittier School District • Traffic Study along with School Site Review and Traffic Circulation Assessment for Benton Middle School. City of Huntington Park • School Site Review & Assessment of Crosswalks,Crossing Guards, Signage, parking, drop off pick up locations at various schools throughout the City including Nimitz Middle School, Hope Elementary School, San Antonio Elementary, South Region Elementary School. Presentation of recommendations to traffic authority,district council persons,parents and LA Unified School District Reps. • School Site Review with Pedestrian and Vehicle Safety Study at Lucille Royball Elementary School. This involved meeting with parent committees, school principal and reps, preparation of stop warrant,crossing guard warrants,and school signage for bus parking as well as assessment of drop-off pick up areas. Project Category: Preparation of Warrants for ALL-Way Stop, Traffic Signals, Beacons, Crosswalks and Pedestrian Devices Client Brief Summary Alhambra • Prepared Traffic Review with Existing Conditions Analysis, Observations, Counts for the Commerce Preparation of Various all-way stop, traffic signal, HAWK, flashing beacons and flashing Huntington Park pedestrian signs and signals. All warrants were conducted following CAMUTCD and CVC Monterey Park guidelines. Most of the warrant studied were presented at traffic authority or traffic Temple City commission meetings. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) •. TRAnsrecN 5.FIRM QUALIFICATIONS Page 5.11 Inglewood Project Category: Preparation of Data Required for CMP Submittal Client Brief Summary Alhambra • Preparation of CMP Data and Report to be submitted to Metro:Information Included Peak Huntington Park Hour Count,LOS Analysis and Letter Report. Temple City Inglewood Compton Project Category: Preparation of City-Wide Engineering and Speed Survey (Transtech Staff is radar certified with the Rio Hondo College Justice Center) Client Brief Summary City of Alhambra • 2013 Citywide Engineering and Speed Survey: Prepared The City-Wide Engineering And Speed Survey Which Included 80 Locations. Study Included Speed Samples,Accident Data, Existing Conditions Analysis And Recommendations Of Speed Limits. City of Inglewood • 2011 Citywide Engineering and Speed Survey: Prepared The City-Wide Engineering And Speed Survey Which Included 76 Locations. Study Included Speed Samples, Accident Data, Existing Conditions Analysis And Recommendations Of Speed Limits. Long Beach, Lynwood, • Citywide Engineering and Speed Survey: Study Included Speed Samples, Accident Data, Upland, Bell, Hacienda Existing Conditions Analysis And Recommendations Of Speed Limits. Heights, Commerce, Malibu, Santa Monica,San Marino Project Category: Peer Review of Traffic Studies Prepared by Outside Consultants submitted to Client Cities Client Preparation Of Scope for traffic study preparation as well as the review of traffic studies for proposed development projects and representation of the City at meetings and at Council review for each project City of Alhambra • Main Street Master Plan • Mandarin Baptist Church • Pannatoni Restaurant • Target Expansion • Redstone Senior Housing Development • The Alhambra Commercial Center Development • Fremont Housing Development • Chase Bank Review • Commonwealth Senior Housing Project City of Monterey Park • Garvey Hotel and Mixed Use Project City of Huntington Park • Senior Day Care Center • Arbutus and Gage Left Turn Phasing Study • Sun Light Metal Recycling Center City of Commerce • Co Development Warehouse Project • Costco Development • Citadel Expansion Project • Rolling Pin Distribution Center • Bandini Warehouse • Mace Metals Warehouse on Slauson • 6009 Malt Warehouse • 61"Warehouse Ais PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) w^, Tearvsnrcb 5.FIRM QUALIFICATIONS Page 5.12 City of Inglewood • Hollywood Park Housing Development • Imperial Partners Commercial Development Project Category: Full Traffic Impact Reports and Parking Analysis Client This task includes the preparation and submittal of full traffic impact analysis which includes existing conditions,opening year with and the horizon year all with and without related projects and the proposed project The following projects also included parking analysis studies for variances or proposed development entering existing sites. Private Developers • Restaurant Depot TIA in the City of Diamond Bar:Full Traffic Impact Analysis • Big Bear Galleria in City of Big Bear:Full Traffic Impact Analysis • Carls Junior in County Area of San Bernardino: Full Traffic Impact Analysis • Shandin Hills TIA in the City of San Bernardino:250 SFDU,Full Traffic Impact Analysis • GFR Housing in the City of San Bernardino:160 SFDU,Full Traffic Impact Analysis • East Valley Water District—Corporate Yard in the City of San Bernardino • Self Storage Facility in the City of El Segundo • Loma Linda Housing Tract in the City of Loma Linda • Arroyo Housing in the City of San Gabriel • Residential Mixed Use Project, 100 SFDU, Commercial,School in the County of LA near City of Palmdale • Queen of Angels Church Expansion—in the City of Riverside • Nippon Distribution Center in Los Angeles—7 day parking study • Apple Valley Plaza—Shared parking analysis UC Riverside • West Campus Development Project - Determine Potential Impacts on the Surrounding Circulation System with the Development of an Expanding Campus, Site and Student Enrollment. City of Industry • Industry East—Traffic study for the development of 6 million square feet of industrial use. • Grand Central Material Recycling Facility • Park and Ride Lots City of San Bernardino • City General Plan Update:Transtech prepared the Circulation Element and EIR/Traffic Study for the City's 2005 General Plan Update. The Proposed Land Use Plan And Its Impacts Were Analyzed. The Study Included Approximately 100 Intersections And 80 Street Segments. Future Traffic Condition Scenarios Were Developed Using State-Of-The-Art Transportation Planning Modeling Software. City of San Juan Capistrano • Master Plan for Downtown Area: Determine the Historic Town Center Master Plan's Potential Impacts on the City of San Juan Capistrano's Transportation System and to identify strategies for improving the Transportation System's overall effectiveness through a multimodal approach. City of Lawndale • City-Wide Parking Study:The Study Took a Comprehensive Look at the Parking Supply And Demand Issues That Explain the Parking Deficiencies in the City.The Study Conducted A City- wide Occupancy Survey Of Both On-Site And On-Street Parking And Described Options Developed To Address The Deficiencies. City of San Marcos • San Elijo Ranch Development EIR/Traffic Study: Prepared An EIR/Traffic Impact Study For A 3,200 Unit San Elijo Ranch Development Project. The Study Area Encompassed A 5 Mile Radius From The Center Of The Development. City of Lawndale • Parking assessment of entire City to determine if a residential permit district could be implemented. This involved video and GIS inventory of existing parking conditions on-street and off-street. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) Mali I ��. IRANSIECR 5.FIRM QUALIFICATIONS Page 5.13 City of Huntington Beach • Pedestrian Study:Produced this report as part of an effort by the city of Huntington Beach to evaluate the impacts of main street two block and three block street closures during weeknight surf city events and weekend events. Project Category: Safe Route to School Program Client This task includes the field review of existing signoge and striping,school drop off areas,school crosswalks, sidewalks, crossing guards and the identification of future measures that will improve school area traffic safety. City of Torrance • Safe Route to School evaluation of 32 schools and preparation of Safe Route to School Maps and identification of areas that needs additional traffic measures. City of Commerce • Safe Route to School evaluation of 4 schools and preparation of Safe Route to School Maps and identification of areas that needs additional traffic measures. City of Baldwin Park • Safe Route to School evaluation of 4 schools and preparation of Safe Route to School Maps and identification of areas that needs additional traffic measures. City of Alhambra • Safe Route to School evaluation City-Wide as needed, identification of areas that needs additional traffic measures. Project Category: Preparation of the Traffic Portion of Funding Application Packages for HSIP, SR2S, TIGER GRANTS,and CALL for Projects Client The following is a list of successful grant applications City of Alhambra • Valley Blvd Median Projects:2011 and 2013 HSIP City of Inglewood • HSIP Crenshaw 5 Curve • CALL Century Gateway Project • TIGER grant La Cienega and Century • HSIP Crenshaw at Prairie City of Commerce • Washington Blvd Median Projects HSIP 2011 • Atlantic Blvd Goods Movement 2013 • HSIP 2010 Garfield at Yates • 2010 HSIP RR Preemption City of Carson • HSIP 2010 Avalon Freeway Ramp Improvements City of Hermosa Beach • HSIP 2010 School Traffic Signal City of Bellflower • HSIP 2010 Bellflower Blvd Traffic Calming Measures City of Temple City • 2012 Safe Route to School—City Wide • 2013 HSIP Class III Bike Route Plan on Temple City Blvd,Signal Hardware improvements and pedestrian measures on Temple City Project Category: Review of Traffic Control, Detour Pons, Parking Lot Design, Signing and Striping Plans and Traffic Signal Plans for Client Cities Client Summary Alhambra • Plan Check Review and Comments on Behalf of Client Cities Plan Check Review for Huntington Park Developments, Traffic Control Plans and Detour Plans, Building Plans, Electrical, Water, South Pasadena Street,Parking Lots,Encroachment Permits,and RW Issues Commerce San Bernardino PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) r=tde `w, 7aannech 5.FIRM QUALIFICATIONS Page 5.14 GRANT WRITING: Transtech has extensive experience in grant writing and administration. Our staff works with our client cities to find potential funding sources,and to prepare competitive applications for various programs. In the past few years,The Firm has facilitated over$70 million in funds for our clients'public works projects and transportation improvements. Additionally,after funds are awarded to a client, our experienced staff provides assistance to ensure compliance with applicable funding program requirements, including preparing necessary clearance approvals (environmental, utilities, right-of-way), processing E-76 authorizations,and managing the project. Agency Grant Program Project Amount; City of Alhambra MTA Call for Projects 2012 and prey cycles Valley Boulevard,Fremont $3,000,000 Safe Routes to School Commonwealth Boulevard $250,000 Safe Routes to School Alhambra High School $320,000 Highway Safety Improvement Valley Boulevard $500,000 AQMD/CMAQ CNG Refueling $300,000 Metro Mini Call for Projects Bus Purchases $400,000 Energy CEC LED Signal Upgrade $950,000 City of Arcadia Metro Call for Projects Huntington Drive 51,010,000 City of Azusa Metro Call for Projects Azusa Transit Center $4,200000 Metro Call for Projects Azusa Avenue $800,000 City of Baldwin Park Metro Mini Call for Projects Bus Purchase $400,000 Metro Call for Projects Transit Center $4,200,000 Metro Call for Projects TDM Project $300,000 Metro Call for Projects Baldwin Bikeway $400,000 Metro Call for Projects Metrolink Overpass $1,100,000 City of Bellflower Safe Routes to School Palm/Clark $320,000 Safe Routes to School Eucalyptus $430000 City of Carson Metro Call for Projects Avalon Boulevard $6,700,000 City of Commerce MTA Call for Projects 2012 and prey cycles 1000,000 Highway Safety Improvement Garfield/Washington $503,400 Highway Safety Improvement Washington Boulevard $254,700 Metro Call for Projects Garfield/Washington $538,000 City of Hermosa Beach Highway Safety Improvement Valley School $108,360 City of Inglewood Sate Routes to School Ivy Sidewalk $230,000 Safe Routes to School La Thera Elementary School $276,000 Safe Routes to School Cable Way $239,470 Metro Call for Projects La Brea"5"Curve $6,300,000 Metro Call for Projects Century Boulevard $3,200000 Metro Call for Projects Florence Avenue $2,400000 Highway Safety Improvement Crenshaw Boulevard $245,700 Highway Safety Improvement Manchester Boulevard $180,000 Energy CEC Street Lighting $650,000 City of Inglewood TIGER Century Boulevard Multimodal $13,000,000 Corridor Project City of Inglewood TIGER La Cienega Boulevard Multimodal $1,000,000 Planning Study City of Lawndale Metro Call for Projects Inglewood/Marine $1,010,000 PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) ,... (."Li TRansrccH 5.FIRM QUALIFICATIONS Page 5.15 Highway Safety Improvement Marine/Mansel $24Q000 City of Pomona Metro Call for Projects SR 71/Mission $3,200000 TIGER, Pomona State Route "71" Complete 51,500000 Streets Corridor Improvement Plans City of Redondo Beach Metro Call for Projects Transit Center $3,200,000 B0S FTA Discretionary Bus Stop Improvements $218,000 BOS ARRA ADA Improvements $20Q000 City of Rosemead Safe Routes to School Citywide Improvements $450,000 Highway Safety Improvement Rosemead Boulevard(SR 19) $430,000 Highway Safety Improvement Garvey Boulevard $339,500 City of Temple City HSIP,Cycle 6 Safety Improvements $1,200,000 PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(REP NO.2014-12) ,®i TRANSIECII Y 6. PROJECT TEAM TRANSTECII 6.PROJECT TEAM Page 6.1 Our key staff members have served as Building Official, Deputy Building Official, Plan Checker and Inspector for a number of agencies, and have an excellent understanding of public agency issues, procedures, and policies. Our key staff members also have extensive experience in Plan Check and Inspection of large and complex projects. The following is our Project Organization Chart, followed by qualifications of our Building and Safety Department staff members who may be involved in providing services to the City: CITY OF ROSEMEAD Ayla Jefferson,CBO Contract Principal Dennis Tarango,CBO, Principal Building Official William Dorman, CBO On-site Building Official Over-the Counter Plan Check Sr. Building Inspector Lizette Vega, EIT Sr. Building Permit Technician Support Staff: Neville Pereira,CBO,PE,Sr.Plans Examiner Ed Alexanians,PE,SE, Sr. Plans Examiner(Structural) Calvin Chang,PE,Sr. Plans Examiner(MEP) Mark S. Harold,CBO,Sr. Building Inspector Jerry A.Arellano, ICC Certified Sr. Building Inspector William Reed, ICC Certified Sr.Building Inspector Mike Mendenhall,ICC Certified Sr. Building Inspector David Ragland,PE,LS,OSD,QSP,Sr. Engineer(Plan/Map Check Support) Our key staff members have served as Building Official, Deputy Building Official, Plan Checker and Inspector for a number of agencies, and have an excellent understanding of public agency issues, procedures, and policies. Our key staff members also have extensive experience in Plan Check and Inspection of large and complex projects. The following is qualifications of few of our Building and Safety Department staff members who will be involved in providing services to the City: • Ayla Jefferson, CBO, Contract Principal: : Ayla has 20 years of experience, and serves as Building Official, Deputy Building Official, Plan Checker, Code Enforcement Official, Community Improvement Coordinator, Planning Technician, and Inspector at various Transtech contract cities. She is involved in ICC organization in various positions, including ICC National Chair for ICC Sustainability Membership Council; Chair for ICC Los Angeles Basin Chapter Inspection Committee; Commissioner for ICC Codes & Standards Council and Commissioner for Callao Green Committee. In addition to her ICC certifications,she is also CACEO certified Code Enforcement Official. • Dennis Tarango, CBO, Principal Building Official: Dennis has 15 years of experience and serves as Building Official, Deputy Building Official and Nan Checker at various Transtech Contract Cities. His ICC certifications PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) vyT" 7uaNSrccX 6.PROJECT TEAM Page 5.2 include Building Official; Building Plans Examiner; Fire Plans Examiner. He is also certified as Plumbing Inspector,Mechanical Inspector and Electrical Inspector. • William Dorman,CBO,Over-the Counter Plan Check,Sr. Building Inspector:William Dorman has over 25 years of experience in Building and Safety, and has served as Senior Structural Building Inspector, Supervising Engineering Plan Check Coordinator, and Building Official/Code Administrator for the City of Pasadena. He also has extensive experience in managing construction projects, owner representative services, code consulting, forensic investigative services, expert witness and construction mediation services. He has provided Project Management services to the City of Pasadena and the Pasadena Tournament of Roses Association for the$22.5 million Rose Bowl Improvements Project;for the to the Pasadena Library Foundation and the City of Pasadena for the historical restoration of the Central Library, and provided a forensic investigation and expert witness testimony in a dispute between the Pasadena Aquatics Center and the general contractor that constructed the facility. • Lizette Vega,EIT,Sr.Building Permit Technician: Lizette has been working as building technician and inspector at various Transtech contract cities, including, Huntington Park, South Pasadena and Alhambra, Inspecting residential, commercial, and industrial buildings for compliance with the established codes. She also assists planners, plan checkers and public works engineers in plan check coordination. She designed and analyzed steel moment frames as used in residential/commercial projects where space was limited to the use of conventional wood framing methods, and utilized structural programs and excel spreadsheets to analyze the frames to determine maximum stresses on beams and columns to be in compliance with code requirements, and utilized AutoCAD to prepare structural plans and details in preparation of construction plans. Lizette is a civil engineer(Cal Poly Pomona graduate), and has EIT certification. She is in the process of obtaining her PE license. • Neville Pereira,CBO, PE,Sr. Plans Examiner: Neville has 25 years of experience,and serves as Building Official and Plan Checker at various Transtech contract cities. He previously worked for Los Angeles County, City of Los Angeles, City of Glendale, City of Pasadena and City of Santa Monica as Building/Deputy Building Official, Plan Checker and Inspector. He is involved in ICC organization in various positions; ICC LA Basin Chapter Board of Directors (2011 President), ICC Building Officials Membership Governing Council, ICC Code Development Committee Vice Chair, ICC Technology/Web Advisory Group. In addition to his ICC certifications, he is also a certified member of California Task Force 1 — FEMA/LA City Urban Search and Rescue - Lead Structure Specialist. • Ed Alexanians, PE,SE,Sr.Plans Examiner(Structural): Mr.Alexanians has over 25 years of experience. He has performed plan checks for a variety of residential and commercial projects in Cities of Alhambra, Temple City, Huntington Park, San Manuel Indian Reservation and San Bernardino. Prior to joining Transtech, he was a Sr. Plans Examiner at the County of Los Angeles. Mr. Alexanians has extensive experience in Building Codes, plan check including building, grading and NPDES plan reviews, code interpretations and resolving code related construction and plan check problems on a broad range of residential and commercial projects. He has performed plan check of complex structures,high-rise and mid-rise buildings,amusement rides and earthquake damaged buildings for the Los Angeles County Building Code compliance. He was a team member for damage assessment of several buildings after the Los Angeles riots and the 1994 Northridge Earthquake. • Calvin Chang, PE,Sr. Plans Examiner(MEP): Mr. Chang has over 25 years of experience and has been working at Transtech as Deputy Building Official,Senior Plan Examiner, On-Site over the Counter Plan Examiner. He has performed plan checks for a variety of residential and commercial projects in Cities of Alhambra, Temple City, Huntington Park, San Manuel Indian Reservation and San Bernardino. Prior to joining Transtech, he was a Sr. Plans Examiner at the City of Burbank. • Mark 5. Harold, CBO, Sr. Building Inspector: Mark has approximately 25 years experience, and serves as Building Official at various Transtech Contract Cities. He also serves as Principal Supervising Inspector on large and complex projects. Currently, he is serving as Principal Supervising Inspector on Gateway Development, Temple City ($20m commercial development). Mark was previously the Building Official at Cities of Temecula and La Quinta. • Jerry A. Arellano, ICC Certified Sr. Building Inspector: Jerry has approximately 20 years of experience. His experience includes serving as special inspector on large and complex projects,some of which include Martin n Luther King Jr. Medical Center, Harbor UCLA Medical Center, Brand Library Renovation Project, PSUSD PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(REP NO.201442) p„2/ `�. TaansrzcM 6.PROJECT TEAM Page 6.3 Elementary School #18, JPL Table Mountain Research Facility, U.S. Army Criminal Inv. Comm., Bayer Environmental Science Building, San Gorgonio High School, Lennar Homes. Currently serving City of Monterey and City of Huntington.Served as a building inspector at City of Alhambra and City of South Pasadena. • William Reed, ICC Certified Sr. Building Inspector: William has over 20 years of construction related experience. He serves as Building Inspector for various Transtech Contract Cities, including Alhambra, South Pasadena, Huntington Park and Temple City. His prior experience includes working as a contractor performing residential remodels as well as Tenant Improvement projects. • Mike Mendenhall, ICC Certified Sr. Building Inspector: Mike has approximately 15 years of experience in building inspection. He serves as Building Inspector for various Transtech Contract Cities, including Alhambra, South Pasadena, Huntington Park. In addition, he has experience in Public Works project inspections, and served as inspector on various roadway improvement projects, including federally funded projects. • David Ragland,PE,LS,QSD,QSP,Sr.Engineer(Plan/Map Check Support): David is a civil engineer and land surveyor with approximately 30 years of diverse experience and participated on numerous multi-disciplinary teams dealing with the management,design, plan check and construction of civil and transportation engineering, urban and rural development,and public works projects. He has been providing plan check to Transtech Contract Cities for the past 15 years. Full Staff Resumes are provided in the following pages. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP N0.2014-12( r'% IRA Nord; 6.PROJECT TEAM Page 6.4 AYLA JEFFERSON,CBO EDUCATION Ms. Jefferson has approximately 20 years of experience in private and • Rio Honda College,CE governmental sector. She has extensive experience in managing building and • Bospharous Univ,Turkey safety departments of different municipalities under Transtech contracts. • Athanee Royal, Belgium She has broad knowledge of municipal government operations, including CERTIFICATIONS preparation and presentation of staff reports and resolutions to city councils, • ICC Certifications:Building committees and related interaction with members of the public, other city Code Official; Building departments and other governmental agencies. Official;Accessibility Inspector;Accessibility She has extensive experience in construction codes, building and safety plan Plans Examiner; Building review and inspection, code interpretations, and resolving code related Plans Examiner construction and plan review problems on a broad range of projects. • California Building Plans Examiner She has served as Building Official, Deputy Building Official, Plan Checker, Code • CalGreen-California Green Enforcement Official,Community Improvement Coordinator, Planning Technician, Building Plan Examiner and Inspector for various municipalities. • Building Inspector CBC • Building Inspector UBC As Building Official, she provides necessary code interpretations, and coordinates • CalGreen-California Green with agency staff and departments, and applicants on building and safety related Building Inspector issues. She handles building and zoning code violations as well as working in • California Commercial coordination with the City Prosecutor to abate violations. She also provides over Plumbing Inspector the counter plan check as Deputy Building Official/Plans Examiner. • California Residential As Plans Examiner, she is responsible for examination and approval of Plumbing Inspector architectural and structural plans submitted to municipalities for a wide variety of • Plumbing Inspector UPC projects ranging from small residential additions to large, multistory commercial • California Residential and industrial facilities. Mechanical Inspector • IAPMO Certified Plumbing As Building Inspector, she has inspected a wide variety of projects ranging from Inspector, Mechanical small residential additions to large,multistory commercial and industrial facilities. Inspector • CACEO Certified Code She also served as Interim Community Improvement Coordinator at City of South Enforcement Official Pasadena and was responsible for Code Enforcement and CDBG for Home Improvements Projects. HIGHLIGHTS • Currently serving(Past She also coordinates code adoptions for Transtech contract cities. She is also Chair)on ICC Sustainability involved on various ICC boards, and has served and/or currently serving on a Membership Council number of ICC Councils, Committees and Boards, locally and nationally. She also • Currently serving(also Past served on Calbo Green Committee on State level. She was also appointed as the Chair)on ICC Los Angeles first national Chair to the ICC Sustainability Membership Council. Basin Chapter Inspection Committee Ms. Jefferson is responsible for the management of Transtech's Building and • Served on ICC LA Chapter Safety Department,and coordination with Transtech's municipal clients.With her Accessibility Committee analytical and strategic management skills, she provides strong leadership, • Served on ICC Codes& develops and collaborates with primary contacts to protect and to enhance Standards Council Transtech's position in specific proceedings; she facilitates and maintains close, • Served Calbo Green long-term working relationships with municipalities in the building and safety Committee realm. • Served on ICC CA CPS TAG ® PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) I "?&=' TxnnsrccF 6.PROJECT TEAM Page 6.5 DENNIS TARANTO,CBO EDUCATION Mr. Tarango has 15 years of experience and serves as Building Official, Deputy • Rio Hondo Community Building Official and Plan Checker at various Transtech Contract Cities. Collage—General Education His ICC certifications include Building Official; Building Plans Examiner; Fire Plans • California State University, Examiner. He is also certified as Plumbing Inspector, Mechanical Inspector and Fresno— Business Electrical Inspector. • California State Polytechnic University, Pomona — He has broad knowledge of municipal government operations, including Engineering preparation and presentation of staff reports and resolutions to city councils, committees and related interaction with members of the public, other city CERTIFICATIONS departments and other governmental agencies. • ICC Certifications: Building Official; Building Plans He has extensive experience in construction codes, building and safety plan Examiner; Fire Plans review and inspection, code interpretations, and resolving code related Examiner construction and plan review problems on a broad range of projects. • Plumbing Inspector • Mechanical Inspector As Building Official, he provides necessary code interpretations, and coordinates • Electrical Inspector with agency staff and departments, and applicants on building and safety related issues. She handles building and zoning code violations as well as working in coordination with the City Prosecutor to abate violations. He also provides over the counter plan check as Deputy Building Official/Plans Examiner. As Plans Examiner, he is responsible for examination and approval of architectural and structural plans submitted to municipalities for a wide variety of projects ranging from small residential additions to large, multistory commercial and industrial facilities. As Building Inspector, he has inspected a wide variety of projects ranging from small residential additions to large, multistory commercial and industrial facilities. She also served as Interim Community Improvement Coordinator at City of South Pasadena and was responsible for Code Enforcement and CDBG for Home Improvements Projects. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) el- TRANS rah 6.PROJECT TEAM Page 6.6 WILLIAM R.DORMAN,CBO EDUCATION Mr. Dorman has over 30 years of experience in Building and Safety. He serves as • AS degree—Architecture- Building Official/Plan Checker/Inspector at various Transtech contract cities. East Los Angeles College • BS degree—Business He has broad knowledge of municipal government operations, including Administration-University preparation and presentation of staff reports and resolutions to city councils, of La Verne committees and related interaction with members of the public, other city departments and other governmental agencies. He has extensive experience in CERTIFICATIONS construction codes, building and safety plan review and inspection, code • ICC Certified Building Official interpretations, and resolving code related construction and plan review • ICC Certified Building problems on a broad range of projects. Inspector • ICC Certified Building Plans Prior to joining Transtech, he has served in various capacities, including as Examiner Building Official/Code Administrator for the City of Pasadena, and • California General Contractor managed/supervised over 35 technical, professional and administrative employees. Building Official/Code Administrator • The administrative head of the Code Enforcement Division of the Community Development Services Department and responsible for Development Processing, Building & Safety administration, Plan Check, Building Inspection, Zoning Code Enforcement Supervising Engineering Plan Check Coordinator • Supervised plans examiners and permit technicians. • Provided fire&life safety and structural plan checks. • Provided code interpretations,division policies and procedures. • Provide plan check administration. Senior Structural Building Inspector • Responsible for supervision of specialty and combination building inspectors including office and field. • Provided complex commercial and residential building inspection. • Responsible for inspector education updates and code revisions. Mr. Dorman also has extensive experience in managing construction projects, owner representative services, code consulting, forensic investigative services, expert witness and construction mediation services. He has provided Project Management services to the City of Pasadena and the Pasadena Tournament of Roses Association for the$22.5 million Rose Bowl Improvements Project; for the to the Pasadena Library Foundation and the City of Pasadena for the historical restoration of the Central Library, and provided a forensic investigation and expert witness testimony in a dispute between the Pasadena Aquatics Center and the general contractor that constructed the facility. Ara PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) •,_ w TRANSTEEN 6.PROJECT TEAM Page 6.7 NEVILLE PEREIRA,PE,CBO EDUCATION Mr. Pereira has approximately 25 years of experience, and has worked in various • BS,Civil Engineering, capacities, such as Building Official, Deputy Building Official, Plan Checker and CalPoly, Pomona Inspector at various Public Agencies, including Los Angeles County, City of Los Angeles,City of Glendale,City of Pasadena,and City of Santa Monica. He also has CERTIFICATIONS diversified experience in Public Works and City Engineering, and has worked as • CABO Certified Building civil engineer for the County of Los Angeles Public Works Department and at Official,Council of American Parsons Engineering Company. He has broad knowledge of municipal Building Officials government operations, including preparation and presentation of staff reports • ICC Certified Plans and resolutions to city councils, committees and related interaction with Examiner; Residential members of the public,other city departments and other governmental agencies. Building Inspector; He has extensive experience in construction codes, building and safety plan Commercial Building review and inspection, code interpretations, and resolving code related Inspector construction and plan review problems on a broad range of projects. • USGBC LEED Accredited Professional Currently, he is serving as Building Official/City Engineer at various Transtech • CGBP Certified Green Contract Cities: Building Professional, Build o Building Official/City Engineer,City of Temple City(Transtech Contract City): It Green Serving as contract Building Official and City Engineer for Temple City • ICC Certified Fire Inspector I (Transtech Contract City). o Building Official, San Manuel Tribe and Casino(Transtech Contract Agency): HIGHLIGHTS Serving as contract Building Official for San Manuel Tribe and Casino • Served in various capacities, (Transtech Contract Agency). such as Deputy Building o Deputy Building Official/City Engineer, City of Huntington Park (Transtech Official, Plan Checker, Contract City): Serving as Deputy Contract Building Official and Deputy City Inspector at various Public Engineer for Huntington Park(Transtech Contract City). Agencies, Los Angeles o Deputy Building Official, City of South Pasadena (Transtech Contract City): County,City of Los Angeles, Serving as Deputy Contract Building Official for South Pasadena (Transtech City of Glendale,City of Contract City). Pasadena,City of Santa Monica His prior experience includes: • ICC Los Angeles Basin o Principal Plans Examiner/Deputy Building Official/Acting Building Official, Chapter Board of Directors City of Pasadena: Coordinate the operations of the department, act as the (2011 President) Building Official in his absence. Was also responsible for implementing the • ICC Building Officials City's enforcement of the Standard Urban Stormwater Mitigation Plan Membership Governing (SUSMP) and the Storm Water Pollution Prevention Plan (SWPPP) for Council construction projects. • ICC Code Development o Acting Deputy Building Official, City of Glendale: Coordinated the Committee Vice Chair operations of the department and administered interagency cooperation • ICC Technology/Web between Public Works, Planning, Fire,Water and Power. Advisory Group o Assistant/Acting Building Official, City of Santa Monica: Coordinated the • ICC California Pool Safety operations of the department and code enforcement, acted as the Building Technical Advisory Group Official in his absence. (CPS TAG) o Structural Engineering Associate II, City of Los Angeles, Department of Building and Safety: Performed building plan check of residential and commercial structures. o Civil Engineering, Parson's: Design engineer for railway transportation and industrial waste treatment facilities. o Civil Engineer, County of Los Angeles: Responsible for design of various highway and transportation capital improvement projects. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) r Lyra. TRANSIECB 6.PROJECT TEAM Page 6.8 ED ALEXANIANS,PE,SE HIGHLIGHTS Mr. Alexanians has over 25 years of experience. He has performed plan checks • Extensive experience in for a variety of residential and commercial projects in Cities of Alhambra,Temple Structural Plan Check City, Huntington Park, San Manuel Indian Reservation and San Bernardino. Prior to joining Transtech, he was a Sr. Plans Examiner at the County of Los Angeles. EDUCATION • M.S.in Structural Mr. Alexanians has extensive experience in Building Codes, plan check including Engineering, University of building, grading and NPDES plan reviews, code interpretations and resolving California at Los Angeles code related construction and plan check problems on a broad range of (UCLA) residential and commercial projects. He has performed plan check of complex • M.S. in Structural structures, high-rise and mid-rise buildings, amusement rides and earthquake Engineering,Tehran damaged buildings for the Los Angeles County Building Code compliance. He was University,Iran a team member for damage assessment of several buildings after the Los Angeles • B.S. in Civil Engineering riots and the 1994 Northridge Earthquake. Tehran University, Iran His selected project experience includes: REGISTRATION • Damage assessment and retrofit design for numerous condominiums, • State of California warehouses, factories and single family dwellings after the 1994 Northridge Registered Structural Earthquake. Engineer State of California • Plan check services for a five-story hotel in El Segundo, 92 unit and 15 unit Registered Civil Engineer apartment buildings, Chase Bank building and a multi-story mixed used • ICC Plans Examiner occupancy building in the City of Alhambra, and several single family residences. • Design and plan check of reinforced concrete, pre-stress and post-tensioned I beams, box girder and steel railroad bridges,traffic signal poles,retaining walls, vaults, box culverts, water reservoirs, formworks for bridge structures and shear pins for landslide stability. • Structural design of 3 four-story hotels(i.e. Holiday Inn, La Quinta Inn). • Structural design of a 60-unit and 20 unit apartment buildings with a two and one story reinforced concrete flat slab parking garage respectively and three- story wooden structures above them. • Design of a three-story steel frame office building in the City of Glendale, masonry shopping centers, auto repair shops, several single family dwellings and house additions,retaining walls, pump houses, etc. • Design refinery platforms, pipe supports, sea water inter-tank skid, horizontal and vertical pressure vessels and their foundations. Plan check vendor's shop drawings and material take-off. • Responsible for the structural design of a reinforced concrete 100-bed rehabilitation center, modification of government office buildings, design of steel frame residential buildings and a team member on the structural design of a 400-bed regional hospital. • Principal designer of two 150-bed and one 600-bed reinforced concrete hospitals. A team member on the structural design of a steel hangar (250 feet span). Design of sewage treatment units and several residential buildings including a 12 story steel frame hotel. Field supervisor for a helicopter service plant. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) .> JRANAECN 6.PROJECT TEAM Page 6.9 CALVIN CHANG,PE HIGHLIGHTS SUMMARY • Extensive experience in MEP Plan Check Mr. Chang has over 25 years of experience and has been working at Transtech as Deputy Building Official, Senior Plan Examiner, On-Site Over the Counter Plan EDUCATION Examiner. He has performed plan checks for a variety of residential and • MS,Civil Engineering commercial projects in Cities of Alhambra, Temple City, Huntington Park, San Tennessee Technological Manuel Indian Reservation and San Bernardino. Prior to joining Transtech, he University,Cookeville,TN was a Sr.Plans Examiner at the City of Burbank. • BS,Civil Engineering Chung- Yuan University,Chung-Li, Mr. Chang has extensive experience in Building Codes, code interpretations and Taiwan resolving code related construction and plan check problems on a broad range of residential and commercial projects. REGISTRATION • State of California Some of the large and complex projects he plan checked include: Registered Civil Engineer • Burbank Airport Transportation Center,4-Story,type I construction • ICC Plans Examiner • 4-story with 3-level underground parking mixed-use project,retails with 142- unit apartments above,type I/type III-one hour construction • Burbank Verdugo Park Recreation Center, 1-story assembly use, type V-B construction • 40-acre Burbank Empire Center with anchor stores, i.e. Lowes, Best Buy, Costco, Extended Stay Inn,office buildings, retails stores • Warner Bros and Disney studio campus development with office buildings and mass tenant improvement • 75-unit Marriott Courtyard hotel,4-story,type V-one hour construction • 1-story Industrial Warehouse,40,000 sf,type V-B construction • Burbank hillside 82-unit single family homes development PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2010-12) Wrack 6.PROJECT TEAM Page 6.10 MARK S. HAROLD,CBO EDUCATION Mr. Harold has over 25 years of experience,and has served as Building Official for • Indiana University the Cities of Temecula and La Quinta. He has broad knowledge of municipal government operations, including preparation and presentation of staff reports CERTIFICATIONS and resolutions to city councils, committees and related interaction with • CABO Certified Building members of the public,other city departments and other governmental agencies. Official,Council of American He has extensive experience in construction codes, building and safety plan Building Officials review and inspection, code interpretations, and resolving code related • ICC Certified Plans construction and plan review problems on a broad range of projects. Examiner; Residential Building Inspector; His professional experience includes: Commercial Building Inspector • Transtech's one of the Building Officials serving various contract Cities: • USGBC LEED Accredited • City of San Bernardino, Interim Building Official Professional • San Manuel Reservation, Deputy Building Official • CGBP Certified Green • City of Alhambra,Code Enforcement Inspections Building Professional, Build • City of Temple City,Special Projects Senior Inspector It Green • City of Monterey Park,Interim on a need Senior Inspector • ICC Certified Fire Inspector I • City of Temecula, Building Official/Director of Building and Safety, 2000 - 2009 o Oversaw 3.1 million department budget, while participating with development of jurisdictional annual operating budget of 67.3 million dollars. o Oversaw/trained staff of 20: inspectors, administrative and outside consultants. o Initiated and managed program addressing needs within building safety division. o Created Temecula Energy Efficiency Improvement Program o Development and Implementation of Building Inspection Points Program o Developed and Implemented MOM Program. This program received national recognition in the Innovations in American Government Awards Grant Competition, John F. Kennedy School of Business, and Harvard University, 2006. • City of La Quinta,Building Official/Building and Safety Manager, 1988-2000 o Led inspection and administrative staff:improved policies and procedures. o Developed,trained and implemented programs for staff. o Created City Plan Review Business Process/Development Project Types. o Developed and implemented in-house procedures and guidelines. o Performed quality control and oversight on all plan review. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) .,.> vL.? TRTNSIECII 6.PROJECT TEAM Page 6.11 JERRY ARELLANO,ICC Certified Inspector CERTIFICATIONS Mr.Arellano has approximately 20 years of experience. • (I.C.C.)Commercial Building Inspector under the CBC. His experience includes serving as special inspector on large and complex • (I.C.C.) Reinforced Concrete projects, some of which include Martin n Luther King Jr. Medical Center, Harbor Special Inspector. UCLA Medical Center, Brand Library Renovation Project, PSUSD Elementary • (I.C.C.)Structural Masonry School#18,LPL Table Mountain Research Facility, U.S.Army Criminal Inv. Comm., Special Inspector. Bayer Environmental Science Building, San Gorgonio High School, Lennar Homes. • (I.C.C.)Spray Applied Fire- Currently serving City of Monterey and City of Huntington. Served as a building Proofing Special Inspector. inspector at City of Alhambra and City of South Pasadena. • (A.C.I.)Concrete Field Tester Grade 1. • (L.A.City)Concrete Construction. • (L.A.City) Drilled-in Anchors. • (CSLB)General Contractor's License WILLIAM REED,ICC Certified Inspector Mr. Reed has over 20 years of experience. ICC CERTIFICATIONS Building Inspector He has been employed as a combination building inspector by Transtech for more than eight years, and has inspected various building permit projects in the Cities of Alhambra,South Pasadena and Monterey Park. MIKE MENDENHALL,ICC Certified Inspector Mr. Mendenhall has approximately 15 years of experience. ICC CERTIFICATIONS Building Inspector He serves as Building Inspector for various Transtech Contract Cities, including Alhambra, South Pasadena, Huntington Park. In addition, he has experience in Public Works project inspections, and served as inspector on various roadway improvement projects,including federally funded projects. ARK PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) "'�-• IRANfrtur 6.PROJECT TEAM Page 6.12 DAVID RAGLAND,PE, P1.5,QSD,QSP,Sr.Engineer EDUCATION Mr. Ragland is a civil engineer and land surveyor with approximately 30 years of • Humboldt State University, diverse experience in a wide variety of projects in civil engineering. He has CA,Bachelor of Science managed numerous multi-disciplinary teams dealing with the planning, engineering, entitlement, environmental permitting, development and REGISTRATION construction of urban and rural development, and public works projects. • Registered Civil Engineer • Licensed Land Surveyor Following are significant projects representative of Mr. Ragland's diversified experience, where he served in various capacities, such as Project HIGHLIGHTS Manager/Engineer,Design Engineer: • In the past 10 years,at • Parkway Business Centre. Design and construction of the 460 Acre industrial Transtech,has been park including South Poway Parkway for ADI Properties, Inc. Also served as working as Engineering Assessment Engineer for Communities Facilities District. Manager and providing • Campus Parkway Roadway: Design of a new roadway for a length of engineering services to approximately 2 miles, and included street, medians, landscape, lighting, traffic various Cities. signals,water,sewer,storm drain and various other utilities. • Served as Principal Project • CalState University Main Access Road. Design of a new roadway for a length of Manager for the design, approximately 1.5 miles, and include street, medians, landscape, lighting,traffic construction and signals,water,sewer,storm drain and various other utilities. management of a variety • Cannon Roadway and Sewer: Design of approximately 2 miles of roadway and of projects, including: 36 inch sewer pipe and pump station. This project required careful o Major infrastructure consideration to pipe buckling due to the extreme soils conditions of the Agua projects for public Hedionda Lagoon. Special bedding techniques were used along with special agencies(Freeway coupling of the pipes to allow for potential deflection as the bridge abutment Interchanges, Roadways, and road fill settled. Water,Storm Drain and • Lopez Canyon Roadway and Sewer: Design and construction of over 5 miles of Sewer Facilities and roadway sewer ranging up to 36 inches in diameter. Master Plans). • Arrowhead Springs Specific Plan and Development: Development of 1,916-acre o Commercial and Retail site at the foothills of San Bernardino Mountains, and includes 1,350 residential Development. units, 1,000,000 square feet of commercial and office space, 199-acre/18-hole o Master Planned public golf course, renovation and reuse of the historic Arrowhead Springs Hotel Communities. with a new 115 room annex, new 300-room hotel, a conference center, 14-acre o Residential corporate office area, and reuse and expansion of the historic Arrowhead Development. Springs spa/resort o Educational/University • San Elijo Hills Development. Development of 2000 acre master planned Infrastructure Master community including golf course and hotel. Project included preparation of Plan Studies and Specific Plan, TM, Final Map, construction plans for all necessary infrastructure, Development. environmental permits and Communities Facilities District. • Extensive experience in • Eagle Bice, Muscupiabe Land Area (Devore area in San Bernardino) Drainage, working with Caltrans and Sewer and Water Master Plan. Approximately 450 acre area for future 1,100 County of Los Angeles. unit master planned community. The project includes a major/regional storm • Extensive experience in drain system analysis, drainage, water and sewer needs and assessment for this NPDES requirements. future development. • Extensive experience in the • City of San Diego, Green Valley Water line design and construction. 5,000 feet, management and 30" Reinforced concrete water line and pressure reducing station and details for administration of federally connection to a 60-inch San Diego County Water Authority Pipeline. and state funded projects • City of San Bernardino. Design of over 10,000 feet of 8 thru 12 inch DIP water in compliance with main for water distribution. Caltrans(LAPM). • City of San Bernardino. Structural arch design for road crossing over the Dept of Water Resources 109-inch Santa Ana pipeline. � , PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) TRANS-Mal / 7. REFERENCES TRANSTECII 7.REFERENCES Page 7.1 City of Temple City Michael Forbes,Community Development Director;T: 626-285-2171 City of Cudahy Reference also includes Temple City. Former City Manager of TC, became City Manager of Cudahy Jose Pulido,City Manager(former City Manager of Temple City);T: 323-773-5143, Ext. 226 City of San Bernardino Reference also includes Temple City. Former CD Dir of TC, recently became Dev Sery Dir of SB Mark Persico, Development Services Director(former CD Director of Temple City);T: 909-384-5057 City of South Pasadena David Watkins, Director of Planning and Building/Deputy City Manager;T: 626-403-7220 City of Hawaiian Gardens Joseph Colombo, Community Development Director; T: 562-420-2641 City of Alhambra Mary Chavez, Public Works Director;T: 626-570-5062 Mary Swink, City Manager;T: 626-570-5010 City of Huntington Park Julio Morales, Interim City Manager;T: 323-584-6222 San Manuel Band of Mission Indians Robert Cantarini, Division Manager;T:909-425-3590, Ext.4315 City of Monterey Park Paul Talbot,City Manager;T:626-307-1255 Ron Bow, Public Works Director;T:626-307-1255 City of Commerce Maryam Babaki, City Engineer/PW and Community Development Director;T: 323-722-4805 Riverside County Economic Development Agency,Real Estate Division Vincent Yzaguirre, Deputy Director;T:951-955-9011 City of Moreno Valley Ahmad Ansari, PE, Public Works Director/City Engineer;T:951-413-3100 Attached are Reference Letters for the above references. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) lw raAr , 7.REFERENCES Page 7.2 w 4 eth :etwin o Nor. 9701 LAS TUNAS DRIVE I TEMPLE CITY I CALIFORNIA 1 91780-2249 1 (626)285-2171 November 12, 2014 Subject: Reference Letter Services provided to the City of Temple City by Transtech Engineers, Inc. To Whom It May Concern: Transtech Engineers, Inc. has been providing contract engineering services to the City of Temple City since 2012. Services provided by Transtech include: city engineering; traffic engineering; public works project management, plan check,and inspection;development engineering;capital improvement projects program and grant management; and as-needed professional services including planning, design, project management, construction management, and inspection. In addition, Transtech serves as City's Building Official and provides building plan check and inspection services. Transtech has assisted the City in obtaining funding and managing a number of federally funded projects, from initial funding applications through construction completion. Transtech provides high quality services in an efficient and cost effective manner. Transtech is highly responsive to any issues or problems that arise and provides excellent customer service internally to City staff and externally to the public. Their work is consistently completed in a timely and professional manner. Based on our professional experience with Transtech, we highly recommend their services. If you have any questions, please contact me at(626) 285-2171 or mforbes@templecity.us. Sincerely, U/Y Michael D. Forbes Community Development Director .®. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) ','% TRANSIECII 7.REFERENCES Page 7.3 ° CITY OF CUDAHY CALIFORNIA q. ') Incorporated November 10, 1960 (�` � P.O.Box 1007 5220 Santa Ana Street Cudahy,California 90201-6024 (323)773-5143 Fax:(323)771-2072 November 12, 2014 RE: Reference Letter for Transtech Engineers, Inc. (i.e.,Transtech) To Whom It May Concern: While I was the City Manager for Temple City, Transtech provided (i.e., and still provide) full contract services including: City Engineering; City Traffic Engineering; Public Works Engineering Management/Plan Check/Inspection; Development Engineering; Capital Improvement Projects Program & Grant Management; and "As-needed Professional Services" inclusive of planning, design, project management, construction management and inspection. Transtech also assisted Temple City in obtaining significant grant funding and managing a number of federally funded projects, from initial funding applications through construction completion. Currently, Transtech serves as Cudahy's Building and Safety Official, by providing building plan check and inspection services. Over the years, I have unequivocally found Transtech's work to be extremely professional, timely, and a tremendous value to their client cities. Should you have any questions, please don't hesitate to contact me at your earliest convenience in the office at (323) 773-5143, via cell phone at(323)868-2126 or email at jpulido @citvofcudahvca.gov Sincerely, E. Pulido City Manager PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) . lWw•' TRANSIECh 7.REFERENCES Page 7.4 COMMUNITY DEVELOPMENT DEPARTMENT A it WILDING•CODE DHPORCRMP.NT•LAND DEVaOPMPNT•PLANNING S , . 44lT 300 North"D"Street a�� San Bernardino,CA 92418-0001 S11 ',. F 110 909384.5071 Fax 909.384.5155 www.sbcity.org November 12,2014 Subject: Transtech Engineers,Inc., Reference Letter To Whom it May Concern: I'm writing to provide a reference for Transtech Engineers, Inc., a firm that I have worked with in two different jurisdictions. Transtech staff served as the City Engineer and Chief Building Official in the City of Temple City when I was the Community Development Director. Transtech staff is also providing design and engineering services to the City of San Bernardino where I currently serve as Community Development Director. In both Temple City and San Bernardino, 'franstech staff has been professional, responsive and Flexible in meeting my department's needs. The firm has proven themselves to be a great asset to the team and a reliable partner in getting projects completed. In Temple City, Transtech Engineers served as the resident engineer on the award winning $21 million Rosemead Boulevard project. Their skills and professionalism were vital in delivering the project on time and on budget. Based upon my professional experience, I would highly recommend Transtech Engineers as part of any city's team. If you have any further questions, please feel free to contact me at Persica mafrasbcitv.olg, (909)384-5357. Sincerely, • 1,1, Mark Persica,AICP Director of Community Development PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES IRFP NO.2014-12) 7Col V1-:' TRANSMEex 7.REFERENCES Page 7.5 [re iuz CITY OF SHIN PASADENA P_exn:vc .vo Hi'.1. a Ow.e'vl :u 1414 Si ■.-,a Sxe∎i. 5n:.:• PA•,r vA CA 91020 T: 626 403 7220 • 477 625 402 7221 nwvw.0 soul -PASnoren ck .. 3 November 10, 2014 SubjectReference Letter for Transtech Engineers, Inc. To Whom It May Concern: Transtech Engineers, Inc. has been providing contract Building and Safety Services, including Building Official, Permit Technician, Building Inspector, and Building Plan Check to the City of South Pasadena for nearly 17 years. The City of South Pasadena is extremely satisfied with Transtech' s services. They have always provided high quality services in an efficient and cost effective manner.They have always been very responsive and timely on all of their assignments. Based on our professional experience with Transtech, we highly recommend their services. If you have any further questions, you can contact me. Sincerely, AIL LA. / -- David ' atkins Director of Planning and Building City of South Pasadena Tel: (626) 403 7220 E-mail: PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(REP NO.2014-12) V^�•� TRANSIECI 7.REFERENCES Page 7.6 +0 Al'.N "Our Youth - Our Future" "Ii„ CITY OF - -= HAWAIIAN GARDENS Os,Ir"kM�x TO Pd November 12, 2014 Subject: Reference Letter for Transtech Engineers, Inc. To Whom It May Concern: Transtech Engineers, Inc. has been providing contract Building and Safety Services, including full time Permit Technician/Code Enforcement, Building Inspector, Building Plan Check and on a need basis Building Official services to the City of Hawaiian Garden since July 2014. The City of Hawaiian Garden is very much satisfied with Transtech's services. They have always provided high quality services in an efficient and cost effective manner. They have always been very responsive and timely on all of their assignments. Based on our professional experience with Transtech, we highly recommend their services. If you have any further questions, you can contact me at(562) 420-2641 ext. 244. Sincer , e Colombo C unity Development Director City f Hawaiian Garden Tel: (562)420 2641 E-mail:jcolomboC hacitv.orq 21815 PIONEER BOULEVARD,HAWAIIAN GARDENS.CA 90716-1237 TEL:(562)420-2641 FAX:(562)496-3708 PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(REP NO.2014-12) sy% \w. . TRANwwECil 7.REFERENCES Page 7.7 City of Alhambra Public Want D parrmen( November 10,2014 • • Subject: Reference Letter Services provided to the City of Alhambra by �Z' - - • Transtech Engineers. Inc. • To Whom It May Concerr: • Transtech Engineers, Inc. has been providing contract engineering services to rl� the City of Alhambra, including City Engineering, City Traffic Engineering. Public „,,,t r,,,,,,ren Works Engineering Management/Plan ChecWlnspection, Development uaamwa Engineering, Capital Improvement Projects Program & Grant Management, and car/""" As-needed Professional Services, inclusive of planning, design, project rroa,I °i management, construction management and inspection. Transtech also assisted the City in obtaining funding and managing a number of • federally funded projects, from initial funding applications thru construction completion. In addition, Transtech also serves as City's Building and Safety Official, provides building plan check and inspection services. City of Alhambra has worked with Transtech over 20 years. Transtech has always provided high quality services in an efficient and cost effective manner. Transtech has been very responsive and timely on all of their assignments. We have always found their work to be extremely satisfactory, and always done on a timely and professional manner. Based on our professional experience with Transtech Engineers, we highly recommend their services. If you have any further questions, you can contact me at (626) 570-5067 or mchavez @cityofalhambra.org Sincerely, City of Alhambra Mary Chavez Director of Public Works and Utilities Department • • a .'®`. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) . Vt:' TRRNSTECk 7.REFERENCES Page 7.8 -»4 Office of the City Manager $UMTINGTON Peak November 10, 2014 Francesca Tucker-Schuyler Interim City Administrator 1600 W. Beverty Blvd. Montebello, CA 90640 Subject: Reference Letter for Transtech Engineers, Inc. Dear Francesca: I am writing a letter of recommendation for Transtech Engineers,Inc.They currently serve in a number of capacities for the City, including plan check and permitting services, building inspection, and as-needed engineering services. Moreover, Transtech has been serving in a value capacity as an extension of staff since 2012. We have valued the technical expertise that Transtech has provided us.But it is not to be overlooked that perhaps the most important element that they provide a their high level of customer service. I would strongly recommend that you consider their services to either supplement or enhance your existing engineering and planning needs. Not only have we found them to be cost-effective, but exceptionally responsive. Please call me if you want to discuss this any further. Sincerely, Julio Morales 6550 Miles Avenue Huntington Perk,CA 90255 I jmor&eaahpcagov (323)584-6222 PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) TRAN51ECr/ 7.REFERENCES Page 7.9 San Manner Wands of Mission Indians Department of Manning and Development November 12,2014 Subject: Reference Letter for Transtech Engineers,Inc. To Whom It May Concern: Transtech Engineers,Inc.has been provides contract Building and Safety Services,including Building Official,Building Inspector,and Building Plan Check to the San Manuel Indian Reservation. Transtech provided full plan check services for our Casino Remodel Project and is now currently providing construction inspection services for the project.The Casino Remodel is a 50 million dollar project,scheduled to be completed next fall.The project schedule is on a 20/6 schedule,with Transtech providing on call inspection services 20 hours a day 6 days a week. The San Manuel Indian Reservation is extremely satisfied with Transtech's services.They have always provided high quality services in an efficient and cost effective manner.They have always been very responsive and timely on all of their assignments. Based on our professional experience with Transtech,we highly recommend their services. If you have any further questions,you can contact me. Sincerely, Robert Cantarini Division Manager SANMANUEL WOOF• MISSION INDIANS Dept.of Planning and Development 101 Pure Water Lane Highland,CA 92346 (909)425-3590 x 4315 office (909)862-2641 fax Rca ntarini(d sanma nuel-nsn.gov R' PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) am TRANSMFCII 7.REFERENCES Page 7.10 CITY OF MONTEREY PARK `r 320 West Hewn.*Avenue•Monterey Park•Cah ,We 9l754-286 City Council wwwmamnevoerk u Get V Peter Cron M4MaL in Hens Lane Teresa Real S•gMtlen Anthony Wong Cie,Clerk Vincent D.Chang City Treasurer Joseph Leon November 12, 2014 Subject: Services Provided to the City of Monterey Park by Transtech Engineers, Inc. To Whom It May Concern: Transtech Engineers, Inc. has been providing engineering support services to the City of Monterey Park for the past three years. Trenstech's services have included city engineering, traffic engineering, public works engineering management, plan check, development engineering, capital improvement program (CIP) & grant management; and as-needed professional services that included planning, design, project management, contract administration, construction management and inspection. Transtech is always responsive to the City's needs, providing high quality services in a timely manner. Their staff is professional and courteous, and work very well city staff. Transtech has been especially helpful during the last 18 months expediting delivery of the City's CIP projects which included numerous Parks Master Plan and ADA Improvement projects. Based on our firsthand experience working with Transtech, the City of Monterey Park highly recommends their services. If you have any questions, please feel free to contact me at 828-307-1322, or rbow©montereypark.ca.gov. Sincerely, i % , -on =• Director of Public Works/ Assistant City Manager City of Monterey Park PAOe entire Post • Pea linty Future PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP ND.2014-12) �W- IRA NSECx 7.REFERENCES Page 7.11 (q` R IA City of Commerce 3b4 a Public Works & Development Services Department November I(1, 2014 SUBJECT: Reference Letter- Services provided to the City of Commerce by Transtech Engineers, Inc. To Whom It May Concern: Transtech Engineers, Inc. has been providing various contract engineering services to the City of Corn nerce in the past 15 years_ These services included staff augmentation for Public Works Engineering/Management/Plan Check/Inspection, Development and Traffic Engineering. Transtech also provided Capital Improvement Projects Program & Grant Management, and As-needed Professional Services, inclusive of planning, design, project management, construction management and inspection. Recently. the City selected Transtech to provide construction management and inspection services tor the City's largest infrastructure project, Washington Boulevard Reconstruction, which has a total budget of$40m. Transtech is also providing building permit services to the City. The City of Commerce is extremely satisfied with Transtech's services. •franstech has always provided high quality staff and services, in an efficient and cost effective manner, and has always been very responsive and timely on all of their assignments. We highly recommend Transtech's services. It you have any further questions, you can contact me at 323-722-4805. Ext 337. or m ba bakienci.c'o rmierce.ca.us. Sincerely, Ma rya m Bahakt, tree or Public Works& Development Services Department 2515 Gnnincrre SVav-Commerce,California 9(11)1 ) 121:72211101i •FAX 32.47266211 traM.ri_mnnnrrrr.ru.u■ PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) eCer W.�� TRAN5wECA 7.REFERENCES Page 7.12 Eousrt Of RIVERSIDE ECONOMIC OEVeO?MM AGENCY November 10, 2014 Subject Transtech Engineers. Inc., Reference Letter To Whom It May Concern: This letter is to provide reference for Transtech Engineers, Inc. an experienced and capable fine who has been providing the County of Riverside an array of quality services over the past several years. Some of the services provided by Transtech include design, surveying and engineering studies for various projects and County facilities, Riverside County Economic Development Agency has turned to this firm time and time again to provide expert and sound advice on pursuing facility matters and projects. I can say unequivocally that Transtech has earned our trust based on their responsiveness,work ethic and product,their concern for us. their customer, and the quality of the staff they employ. Most recently Transtech is or has been involved in some of the following County projects: • East County Detention Center, Indio 5297M Project • Van Horn Youth Rehabilitation Facility $28M Project • Press Enterprise Building Acquisition $30M Acquisition Based on our professional experience with Transtech, we highly recommend them as a capable and experienced partner who will provide added value to any project or team. If you have any further questions please feel free to contact me directly at 951.955.4820. . Sincerely, / • yttiud� 1.i�•r ij Vincent Yzagukre Deputy Director of Real Estate www.rivcoeda.org r n��loPV + Oev-iIto< arkrn Fr tivva Deal A, em ea mnn- errant .e.; ,eIpenCe inlb^teC .ra. me,,tr!Piy)t ) raarg G'ntc C,$er,iret ']+,'+nunLe f fi• ;pc•nl d_4HopnIY v,‹ Marl arle,ry ,e,{)1!tode Ended 'p'; IP qe1:v Cu51 ,rill '•'vlru I At::1 'v r FC)ICt DeBorT2"' abi PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(REP NO.2014-12) t^" TRANSIECh 7.REFERENCES Page 7.13 Mt)(LENO VALLEY W i f I H I D R I A M S S () A I • June 3,2013 Mr.All Cuvir Transtech Engineers, Inc. 13367 Benson Avenue Chino.CA 91710 Subject: Cactus/Nason Improvement Project Dear Mr. Cavir, On behalf of the City of Moreno Valley, I would like to thank you fin the exemplary performance in the construction of the Cactus/Nason Street Improvements Project from April 2012 to May 2013. Hie project was a crucial Capital improvement Project for the City involving coordination with City Staff and Consultant Project Manager, private developers, multiple agencies including Riverside County Flood Control District and Water Conservation District (ROC & WCD), Eastern Municipal Water District (EMWD), and Riverside County Hospital and design finny including RBP, Butkos. and Arcon. Transtech was instrumental in coordinating with Southern California Edison to ensure that the removal of electric power poles on Cactus and over two miles undergrounding of high voltage utilities along Nason and Cactus were completed in an expedient and efficient manner. lranstech's experienced staff included Kurt Pegg P.E., Mike Schnepf, Senior Inspector, and Nelim Ile wham idi. Office Fog incer, who were assigned to the project full-time and stayed on- task the duration of the project. Their diligent efforts and constant communication with the City's Project Manager and City Staff served to unburden the complex project. they fostered excellent relationships with the Contractor (Sully-Miller) whose subcontractors including A.D. Wilson (Electrical), LNA (Single & Double Box Culvert) and KEG (bridge). They also coordinated with I'M WD and RCFI'I) inspectors allowing for exceptional quality assurance and quality control. 7 ranstech's staffs thorough knowledge of the Army Corps of Engineers, Fish & Wildlife. Regional Water Quality Resources Board and Air Quality Resources Board requirements and Callrans record keeping when combined with meticulous inspection records helped ensure the timely completion of the project. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.201412) TRANSTECh 7.REFERENCES Page 7.14 Cactus/Nason Improvement Project June 3,2013 Page 2 We would again like to thank you for meeting the high demands for this City Center project and helping deliver crucial improvements to the City under budget and ahead of schedule. Sincerely, /As,.;r17` Prem Kumar Deputy Public Works Director/Assistant City Engineer PK/sc PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) :- +. TRANSTEC/I 8. COMPENSATION TRANSTECII„ 8.Compensation Page 8.1 Proposed compensation is provided in the format specified in City's RFP, Exhibit C-Compensation: 1. Plan Checking 50%of City fees.This fee is based on the City's most current fee schedule. This fee will include an initial check and two (2) rechecks. Any subsequent rechecks not based on new corrections added during either initial check or recheck will be performed at Consultant's current hourly rates. 2. Building Inspection 50%of City fees. This fee is based on the City's most current fee schedule. Inspections for permits issued before the effective date of this agreement or inspections for which no City fee is collected will be performed at Consultant's current hourly rates. Following is the Compensation Table which is included in City's RFP, Page 7. Building Services 100% Plan Check Services 100% Consultant 50% Consultant 50% City 50% City 50% 3. California Building Laws There is no additional fee that will be charged to the City for the service of providing the necessary materials (i.e. staff report, ordinances, resolutions, etc.) for the City to adopt the County Codes and attend the City Council meeting for said items. 4. Other Services Other services will be performed on a time and material basis at the Consultant's current hourly rates or an agreed upon lump sum cost not to exceed basis. 5. Hourly Rate Schedule The current hourly rates for the fiscal year 2015-16 are provided below. These rates shall be reviewed and updated as necessary on an annual basis. - ` PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) q.-/ TRANSIECX 8.Compensation Page 8.2 TRANSTECH ENGINEERS, INC.STANDARD HOURLY RATES(FY 2015-16) Classification Hourly Rate Senior Engineer $155 to $175 Project Manager $140 to $170 Project Engineer $140 to $160 Staff Engineer $125 to $145 CADD Designer $100 to $125 Sr.Planner $120 to $145 Associate Planner $100 to $120 Funds and Grants Manager $130 to $150 Funds Analyst $100 to $120 Transportation Analyst $130 to $160 Plan Checker $100 to $135 Construction Manager $150 to $170 Inspector,PW $115 to $135 Building Official $125 to $145 Inspector,Building $80 to $120 Engineering Technician $65 to $75 Building Technician $65 to $75 Administrative/Clerical $60 to $65 2-Man Survey Crew $275 Reimbursable direct expenses are billed at cost plus 5%. Fees are adjusted annually based on the Consumer Price Index(CPI)for the Los Angeles area for Cost of Living Adjustment. - `. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) r/ ®' TRANSmch 9. INSURANCE TRANSTECM 9.INSURANCE Page 9.1 Transtech's will provide insurance coverage as specified in City's RFP. As required in City's RFP,the cover letter included in "Section 1. Introduction" of this proposal is signed by an authorized officer of Transtech. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) x^'/ TRANSTECII / 10. STATEMENT OF UNDERSTANDING TRANSTECII 10.STATEMENT OF UNDERSTANDING Page 10.1 As required by City's RFP,the following requested statement is included: It is understood that the Consultant's function is to be all inclusive of Building and Plan Check services for Residential and Non-Residential new construction, additions, and remodels, and within the hours of operation as noted in this RFP. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) lam TRANSrzcX / 11. UNANTICIPATED OR SIGNIFICANT DEVIATIONS TRANSTECIi 11.UNANTICIPATED OR SIGNIFICANT DEVIATIONS Page 11.1 Transtech understands the importance of being able to expedite certain projects through the plan review process. When requested, Transtech has sufficient staff and resources to expedite plan checks, and will assign necessary staff. In the event of a local or regional emergency or disaster, our personnel will be accessible,available, and prepared to provide Building and Safety services as directed by the City. PROPOSAL FOR BUILDING INSPECTION AND PLAN CHECK SERVICES(RFP NO.2014-12) rT ANS:Ech Submitted to: ®o CITY OF ROSEMEAD -° Attn: Michelle G. Ramirez Community Development Director 8838 E.Valley Boulevard Rosemead, California 91770 CITY OF ROSEMEAD - REQUEST FOR PROPOSAL NO. 2014-12 BUILDING INSPECTION AND PLAN CHECK SERVICES "RESPONSE TO RFP ADDENDUM, DATED FEBRUARY 23, 2015" a • Submitted by: / TRANSTECH Engineers, Inc. TRANSTECh Contact person for this submittal: Ayla Jefferson, CBO avla.iefferson @transtech.org C: 909-851-5765 ,n or- 855595 2495)toll-tree) March 5,2015 TRANSTEChI CITY OF ROSEMEAD Michelle G. Ramirez Community Development Director City of Rosemead 8838 E. Valley Blvd. Rosemead,CA 91770 Subject: City of Rosemead-Request for Proposal No.2014-12 (Building Inspection and Plan Check Services)—RFP ADDENDUM,dated February 23,2015 • Dear Ms. Ramirez: Transtech received the City's RFP Addendum for the subject project on February 23,2015 via e-mail. City's RFP Addendum states that any compensation proposal other than what is being requested by the City of Rosemead in this ADDENDUM will be rejected and disqualified from further consideration,and the City will only accept this updated all-inclusive percentage fee compensation form and will not accept any other form or addendum. As required by the City, we are submitting City's "Revised Compensation Proposal Form" per conditions specified in the Addendum (Attachment 1). • Following is a comparison showing our original fee and updated fee per conditions stated in Addendum: Fee submitted with the proposal dated December 2,2015 Building Services 100% Plan Check Services 100% • Consultant 50% Consultant 50% City 50% City 50% New Fee per the new conditions set in the RFP Addendum received via e-mail on February 23,2015 Building Services 100% Plan Check Services 100% • • Consultant 51% Consultant 51% City 49% City 49% d Note:Fees are based on City'current fee schedule. • As shown above,we increased our originally submitted fee with our December 8,2014 Proposal from 50% to 51%to cover the additional scope items requested by the City in Addendum, which are: • • Weekend/Holiday/After Work Hour Inspections - The Consultant will be required to provide • 13367 Benson Avenue I Chino CA 91710 I T 9095958599 I F 9095908599 I www.transtech.org March 5,2015 CITY OF ROSEMEAD Michelle G. Ramirez Subject: City of Rosemead-Request for Proposal No.2014-12 (Building Inspection and Plan Check Services)—REP ADDENDUM,dated February 23,2015 Page 3 occasional weekend, holiday, and after work hour inspections as requested by the City Manager or designee. • No Fee/City Projects - The Consultant will be required to process and inspect no fee and City projects at no additional cost to the City or the applicant. • Disaster Safety Assessment - The Consultant will be required to provide disaster safety assessment of all buildings in the event of a disaster as requested by the City Manager or designee. In addition,the Consultant will be required to provide emergency inspections, as needed, due to natural or manmade disasters (i.e.fire,auto accident,etc.). • Other Services - The Consultant will attend City Council meetings as requested by the City Manager or designee. The increase in the originally submitted fee with our December 8, 2014 Proposal from 50% to 51% is assumed to cover the above listed additional scope items per Addendum 1, for which the level of effort cannot be estimated or calculated accurately, as the level of effort for these items will depend on the City's discretion, or the number of accidents/incidents and/or any other disasters that may or may not happen in the future. Thank you for the opportunity to submit this proposal. Should you have any question or should you need additional information,please contact the undersigned. Sincerely, Ayla Jefferson,CBO Building Department Manager/Contract Principal Ayla.lefferson@transtech.org C: 909-851-5765 www.transtech.org ATTACHMENTS: ATTACHMENT 1:City's Revised Compensation Proposal Form issued with February 23,2015 Addendum • ATTACHMENT 2:Addendum received from City via e-mail on February 23, 2015 aDR BDX TRAHM.ENG FE ASJ\ PasMS1c14\P_a4 1D7 RD MEAD BL;LDI NG AND WEn SE VICE S DLJt a®,,:LAW R O:awDSEMEAD ELSSERVIa,.ADDENDUM I FEE SUBMITTAL 3 5 L5 514+1 DOG( • • Submitted by:Transtech Engineers,Inc. tRA.:r<rx ATTACHMENT 1: City's Revised Compensation Proposal Form issued with February 23, 2015 REP Addendum February 23, 2015 Page 5 REVISED COMPENSATION PROPOSAL FORM 1. The Consultant understands and agrees to nil of the Scope of Services listed in the Request for Proposal No. 2014.12 (Building Inspection and Plan Check Services) -ADDENDUM dated February 23, 2015. 2. The Consultant understands that the City of Rosemead is requesting an updated proposal based on an all-Inclusive percentage fee compensation only, based on all of the Scope of Services listed in the Request for Proposal No. 2014-12 (Building Inspection and Plan Check Services) -ADDENDUM dated February 23, 2015 and that the City of Rosemead will not accept any hourly rates or additional charges. 3. The Consultant understands that any compensation proposal other than what is being requested by the City of Rosemead in this ADDENDUM will be rejected and disqualified from further consideration. 4. Revised Alt-Inclusive Percentage Fee Compensation _Building Services _ 100% Plan Check Services __ 100%_ _ Consultant ' - 51% Consultant r -- _ 51 % Cly. 49%b City Note:Fees are based on City'current fee schedule. Ayla Jefferson,CBO Building Department Manager/Contract Principal Printed Name Title e < Ica-- March 5,2015 Signature Date This form must be returned to the City of Rosemead. Community Development Director, Michelle Ramirez, by 5:00 am. on Thursday, March 5. 2015. The City of Rosemead will only accept this updated all-inclusive percentage fee compensation form and will not accept any other form or addendum. Consultants that do not return this Revised Compensation Proposal by the listed date and time will be disqualified and no longer considered a candidate for the administration and operation of the Building and Safety Division for the City of Rosernoad. • RETURN COMPLETED FORM BY 5:00 P.M.,MARCH 5, 2015 • Transkei'Fnginears Submitted by:Transtech Engineers,Inc. TLINSTECil ATTACHMENT 2:Addendum received from City via e-mail on February 23, 2015 • yT�/' prry p/r//` Ct 7 O�ROS4�meat MATORIIIOTEM. , Shrrimaar tun /In Ol . '-' I Il"Y lr btOX1)X In C 4V1 MENIPXF X )IN IN c* , .A 11u {arq,l vxu PAX iM12m ti:ii^rin !tit rli,w February 2, 2015 Ms. Ayla Jefferson,CBO Building Department Manager/Contract Principal Transtech Engineers, Inc. 13367 Benson Avenue Chino, California 91710 Subject: City of Rosemead-Request for Proposal No.2014-12(Building Inspection and Plan Check Services)-ADDENDUM Dear Ms. Jefferson: As you are aware, the City of Rosemead is seeking a qualified firm to provide Consultant services to administer and operate the Building and Safety Division for the City of Rosemead. On February 18,2015, the City held interviews with four(4)firms. Based on these interviews, clarification is needed on the City's fee schedule. The City currently charges 1.5 times the County of Los Angeles fee schedule for initial plan submittals only. Other than this. there are no additional fees collected from applicants regardless of the number of submittals for the same project. Also, there are no additional fees for a valid open building permit regardless of the number of inspections conducted. The City is requesting an updated proposal based on a percentage fee compensation only be submitted based on the following scope of services(no hourly rates aradditional charges will be acceoled)- SCOPE OF SERVICES Full-Time Dedicated Stall - The full-time dedicated staff shown below is the minimum number that must be assigned to the City. • Building Official • Building Inspector • Permit Technician In addition, the Consultant will be required to provide additional staff, as needed.to meet the demands of an increase in workload. • Counter Coverage-The Consultant wilt be required to provide counter coverage Monday - Thursday 7:00 a.m. to 6:00 p.m. In addition, over the counter plan check review • services must be provided at a minimum Monday-Thursday 7:00 a.m. to 10:00 a,m.and • 5:00 p.m.to 6:00 p.m., and as requested from the public by appointment. • • • ATTACHMENT 2:Addendum received from City via e-mail on February 23,2015 RFP Addendum February 23.2015 Page 2 Plan Check Services - All plan checks will be performed by the Consultant. The Consultant is expected to work closely with the Planner and Engineer assigned to each project,including review of final plan check as Building Official. The services must include plan review of construction drawings to ensure compliance with building codes and related Municipal Code requirements. Plan check services must include, but not be limited to,the disciplines of Building,Residential, Plumbing, Electrical,Mechanical.Green Building Standards, and Building Energy Conservation. Additionally, geotechnical, seismic, and any other disciplines necessary for plan checks are to be included as part of the consultant's percentage fee. The Building Official and Inspector(s) work in coordination with the Planning and Engineering staff to ensure lull compliance with all Federal, State, and local codes. California Building aws-The City of Rosemead adopts the California Budding Laws as amended by County of Los Angeles. Once the State of California and County of Los • Angeles have completed their adoption process,the Consultant will bo required to provide the necessary materials (i.e. staff report, ordinances, resolutions, etc.) for the City to • adopt the County Codes and will be required to attend the City Council meeting(s) for said items. Inspection Services - The Consultant will provide all inspection services for all construction,and construction related activity Monday-Thursday 7:00 a.m. to 6:00 p.m. and on Fridays from 7:00 a.m. to 12:00 p.m. Inspection services must be performed by ICC certified Building Inspector(s). Inspection services will not be expected on the following days unless otherwise requested by the City Manager or designee as noted under the section called"Weekend/Holiday/After Work Hour Inspections". • New Year's Day • Martin Luther King, Jr. Day • President's Day, Memorial Day • Independence Day • Memorial Day • Labor Day • Veteran's Day • Thanksgiving Day • Chnstmas Day Weekond/Holidav/After Work Hour Insoectinns - The Consultant will be required to provide occasional weekend, holiday, and after work hour inspections as requested by the City Manager or designee. • No Fee/City Protects-The Consultant will be required to process and inspect no fee and City projects at no additional cost to the City or the applicant. • • • Translech Engineers ATTACHMENT 2:Addendum received from City via e-mail on February 23, 2015 RFP Addendum February 23, 2015 Page 3 Technology--Permits are input into the HDL system at the same time the permit is issued or plan check fees are collected. The Consultant will be expected to know and use the HDL system as well as updating the increase in fees in the system annually. Transportation of Plans— The consultant will be required to provide daily transportation of all plans for projects that exceed the capability of the onsite staff to properly provide plan check services In a timely manner from and to City Hall. Disaster Safely Assessment—The Consultant will be required to provide disaster safety assessment of all buildings in the event of a disaster as requested by the City Manager or designee. In addition, the Consultant will be required to provide emergency inspections, as needed, due to natural or manmade disasters (i.e. fire, auto accident, etc.). Reports—The Consultant will be required to produce: • the Building Division Activity report and a summary of plan checks, permits, and Inspections to the City on a monthly basis- • the Strong Motion Instrumentation Program (SMIP) report and the Green Fee report and Cover Letter on a quarterly basis or as otherwise required by the State of California; and • • the Congestion Management Program report to the City on an annual basis. Invoice -- The Consultant will be required to submit the monthly Building Division report and Permit Activity report along with the monthly invoice based on the approved all- , inclusive percentage tee split. Charges in addition to the all-inclusive percentage fee will not be accepted or approved by the City of Rosemead. Other Services -, The Consultant will be responsible for all correspondence related to activities of the Building and Safety Division. In addition, The Consultant will be required to respond to complaints. perform investigations, provide problem solving methods for unique or challenging plan check or code interpretation Issues,provide report writing and policy&procedure recommendations, and attend City Council meetings as requested by the City Manager or designee. COMPENSATION The City is requesting the submittal of an updated all-Inclusive percentage fee compensation only, based on all of the above-noted services that will be required as • part of the percentage fee(no hourly rates or additional charges will be accented). To continue to be considered in this process, the attached compensation proposal form • must be completed and returned to me by 5:00 o.m. on Thursday, Mgrch 5 2Qt5. • Transtertt Engineers ATTACHMENT 2:Addendum received from City via e-mail on February 23,2015 RFP Addendum February 23,2015 Page 4 Consultants that do not return the attached compensation proposal form by this date and time will be disqualified and no longer considered a candidate for the administration and operation of the Building and Safety Division for the City of Rosemead. We thank you for your interest and look forward to an updated compensation proposal. If you have any questions, please do not hesitate to contact me at(626) 569-2158 or by email at mramlrez @cltyofrosemead.org. Sincerely, r ( Litt .�lx' (, ( ,tuy Michelle G. Ramirez Community Development Director Attachment-Revised Compensation Proposal Form Transtech Engineers ATTACHMENT 2:Addendum received from City via e-mail on February 23,2015 RFP Addendum February 23,2015 Page 5 REVISED COMPENSATION PROPOSAL FORM 1. The Consultant understands and agrees to WI of the Scope of Services listed in the Request for Proposal No. 2014-12 (Building Inspection and Plan Chock Services)-ADDENDUM dated February 23, 2015. 2. The Consultant understands that the City of Rosemead is requesting an updated proposal based on an all-inclusive percentage fee compensation only, based on all of the Scope of Services listed in the Request for Proposal No. 2014-12 (Building Inspection and Plan Check Services) -ADDENDUM dated February 23, 2015 and that the City of Rosemead will not accept any hourly rates or additional charges. 3. The Consultant understands that any compensation proposal other than what is being requested by the City of Rosemead in this ADDENDUM will be rejected and disqualified from further consideration. 4. Revised All-Inclusive Percentage Fee Compensation Building Services 100% Plan Check Sew es 100% Consultant i Consultant -•o City r City Printed Name Title Signature Date This form must be returned to the City of Rosemead, Community Development Director, Michelle Ramirez, by 5,,Q0 o m on Thursday March 5 2015. The City of Rosemead will only accept this updated all-Inclusive percentage fee compensation form and will not accept any other form or addendum. Consultants that do not return this Revised Compensation Proposal by the listed date and time will be disqualified and no longer considered a candidate for the administration and operation of the Building and Safety Division for the City of Rosemead. RETURN COMPLETED FORM BY 5:00 P.M.. MARCH 5,2015 Translech Ergksers