MNR Construction Inc.� • ��,
,- ..�
..� �, �;,
BIDDER: LicA o5
SECTION1 BID SCHEDULE ......................................................................... ..............................1
SECTION2 BID DATA FORMS ..................................................................... ..............................5
2.A BID BOND .................................................................................. ..............................6
2.6 LIST OF PROPOSED SUBCONTRACTORS ............................ ..............................7
SECTION 3 NON- COLLUSION AFFIDAVIT ................................................. .............................10
CBF -1
BID SCHED
SCHE DULE OF •,
PRO • 21845 _
•
4
Traffic Control Plans prepared by a
LS 1
EST.
UNIT
ITEM
NO.
ITEM DESCRIPTION
UNIT
CITY.
PRICE
COST
1
Clearing & Grubbing per Plans and
LS
1
per Plans and Specifications Complete.
7
Specifications. See Technical Provisions
LF 2,600
��.
Pages TP -2 & TP -3 per Details.
$ 20 ' 57x y am ,
per Plans and Specifications Complete.
2
Disposal of Waste Materials.
LS
1
ffit,�,.
�
3 Prepare a Storm Water Pollution LS 1
support per SPPWC Std. Plan 224 -2,�
Prevention Plan (SWPPP).
4
Traffic Control Plans prepared by a
LS 1
Registered Traffic Engineer.
%.5; i
5
Unclassified Excavation.
CY 100
�i C-C"
6
Remove and Dispose existing manhole
EA 3
including bedding, backfilling and Paving
S> fib• g 7 pC Pj
per Plans and Specifications Complete.
7
Construct Extra Strength 15 -Inch
LF 2,600
diameter Vitrified Clay Pipe (VCP)
including bedding, backfilling and Paving
$ 20 ' 57x y am ,
per Plans and Specifications Complete.
8
Construct 15 -Inch diameter Ductile Iron
LF 81
(DI) Sewer Pipe including pipe structure
support per SPPWC Std. Plan 224 -2,�
•� d
bedding, backfilling and paving per Plans
and Specifications Complete
9
Remove and Dispose existing 8" Vitrified
LF 330
Clay Pipe (VCP) sewer including pipe
1
plugs, bedding, backfilling and Paving
L{pAt (fir 2�
per Plans and Specifications Complete.
10
Construct extra strength 8 -Inch diameter
Vitrified Clay Pipe (VCP) including
bedding, backfilling and Paving per
Plans and Specifications Complete.
J EA
11
Construct Reinforced Precast Concrete
;76
Manhole per LACDPW Std. Plan 2003 -2.
- 7 1 F00* '
�
CBF -2
• • ' 9
TOTAL BASE BID PRICE $ 9
amount in written form
CBF -3
EST.
UNIT
ITEM
NO.
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
12
Construct Drop Manhole per CSD Std.
EA
1
Plan S- a- 205.f2+
c'6 <� +�,•°®
13
Install House Connection Remodeling
EA
41
including pavement per SPPWC Std.
Plan 223- 2
14
House Lateral Replacement per SPPWC
EA
10
Std. Plan 222 -2. *(approx. 25% of 6 +O,a2
6 Jet ��•
existing laterals)
15
Construct Wye per LACDPW Std. Plan
EA
50
2024 -1.
16
Construct 72" Manhole Type "E" (case II)
LS
1
per CSD Std. Plan S -a -205. And detail
D1
't �"
s 1q ,6 ob
ffi /q,`Jbt�'
on sheet
17
Remodel and plug existing sewer
LS
1
manhole per detail 'Won sheet D1
{ •�E
I
18
Remove existing and Construct 18"
LS
1
diameter RCP (2000 -D), including
concrete collars per SPPWC Std. Plan.
380-4, complete as shown on the plans
+
19
Sewer Flow Bypassing at all locations as
LS
1
shown on the plans.
10, Bco ca
to, oc �
20
Construct Terminal Cleanout Structure
EA
1
per SPPWC Std. Plan 204 -2
q�Sy Doo °—'
g p •�
21
Abandon Existing Sewer. Fill with low
LF
830
density cellular concrete (LDCC) or
controlled low strength material (CLSM)
with min. compressive strength of
o�
3000PSI @ 28day and plug ends
22
Provide temporary and permanent
EA
1
support for the 36" RCP Sewer per CSD
Std. Plan S -a -222 and S- a- 217.x
C3 �'
Complete in place.
TOTAL BASE BID PRICE $ 9
amount in written form
CBF -3
$
� r l
Uollar amount in written form ( f `7
U CBF -4
UNIT
EST.
UNIT
ITEM
NO.
ITEM DESCRIPTION
QTY.
PRICE
COST
1
Cold mill 2.0- inches thick existing
SF
91,562
pavement.
2
Construct 2.0 inches thick pavement
TONS
1,170
overlay ARHM -GG -C (PG 64 -16) as
indicated
on the plans.
3
Remove Existing, Dispose and
SF.
1,200
Construct 4- inches thick PCC Sidewalk
SPPWC Std. Plan
per 113 -1.
4
Remove Existing, Dispose and
EA
4
Con b
- per
$ k
Std. Plan 1
5
Remove Existing and Construct 6-
SF
200
Inches Thick Driveway Approach per
SPPWC Std. Plan 110 -2
6
Adjust Sewer Manhole to Grade per
EA
13
SPPWC Std. Plan 205 -1 and 206 -1.
�(TLjD
�,lS
7
Install Survey Well Monument per City
EA
8
of Rosemead Std. Plan S08 -001. See
Section 2 -9 Surveying of the General
Provision -7 per details (Cover, Sleeve
co
& Dome will be provided by the City at
no cost).
8
Install Traffic Striping, Traffic Signal
LS
1
Loops and Pavement Markers per the
Striping Plans and Specifications
• as
Complete.
9
Install 36 -Inch Box Parkway Tree Crape
EA
20
Myrtle "Muskogee" including 90 -days
maintenance period and tree wells per
as
�D
SPPWC Std. Plan 520-4.
$
� r l
Uollar amount in written form ( f `7
U CBF -4
Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in
the schedule of bid items above, within the limits define in Section 3 -2.2.1 of the Standard
Specifications, to stay within the budgeted amount of this project.
If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall
be added to or deducted from the Total Bid Price entered above. The owner can choose to
include one or more of the alternates in the Total Bid Price of the Project. If any of the
Alternate Bids are utilized by the Owner, the resulting amount shall be considered the Total
Bid Price for the Project.
The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which
cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and
after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third
party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the
written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall
govern.
a 1 he to is a certified check, a cashier's check or a bid bond in the amount of
G ) Dollars ($ 1O% ) said amount being not less than ten percent (10 %) of the Total
Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award,
we fail or refuse to execute the Contract and furnish the required bonds, certificates and
endorsements of insurance and other certifications within the time provided.
If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be
prepared by the Owner for execution, within five (5) Calendar Days following the Letter of Award for
the Contract, and will deliver to the Owner within that same period the necessary original Certificates
of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other
documentation and certification required by the Contract.
The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body
all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton
Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the
Business and Professional Code), arising from purchases of goods, materials or services by the
Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and
become effective at the time the purchasing body tenders final payment to he Contractor.
Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence
satisfactory to the Owner of Bidder's California contractor's license(s) in good standing; (2) evidence
that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting
therefrom; and (3) any other information and documentation, financial or otherwise, needed by
Owner to award a Contract to the lowest responsible and responsive bidder.
CBF -5
Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be
incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder
further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data
submitted herewith into a contract arising out of this Bid.
The undersigned acknowledges receipt, understanding and full consideration of the following
addenda to the Contract Documents.
Addenda Nos.
The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and
equipment or supplies necessary to complete the Work as described in the Bid Documents. If this
bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the
necessary bonds and accept the Total Bid Price as compensation in full for all Work under the
contract.
CBF -6
IDI - * i
r +`
Signature
Type or Print Name
Title
Business Street Address
C")4 91
City, State and Zip Code
G 5 - ; ;QLL
Telephone Number
Bidder's /Contractor's State of Incorporation:
Partners or Joint Venturers:
Bidder's License Number(s): 'e912RF
Department Industrial Relations
Registered No. IDDL 7U E�
Ti
1)
2)
3)
By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the
representations made on the Contract Bid Forms.
If Bidder is a corporation, enter State of Incorporation in addition to Business Address
If Bidder is a partnership or joint venture, give full names of all partners or joint
venturers.
As further discussed in the Instructions to Bidders, Bidder will be required
to provide evidence that the person signing on behalf of the corporation,
partnership or joint venture has the authority to do so.
MUM
09 412570
State of California
Secretary of State
STATEMENT OF INFORMATION
(Domestic Stock and Agricultural Cooperative Corporations)
FEES (Filing and Disclosure): $25.00. If amendment, see instructions.
IMPORTANT —READ INSTRUCTIONS BEFORE COMPLETING THIS FORM
ENDORSED - FILED
In the office of the Secretary of state
Of the State of Ca6fOmla
SEP 3 0 2009
This Space For Filing Use Only
1. CORPORATE NAME (Please do not alter if name is preprinted,)
S
MNR Construction, Inc.
DUE DATE:
COMPLETE ADDRESSES FOR THE FOLLOWING (Do not abbreviate the name of the city. Items 2 and 3 cannot be P.O. Boxes.)
2. STREET ADDRESS OF PRINCIPAL EXECUTIVE OFFICE CITY
STATE ZIP CODE
1051 Calle Ortega San Dimas
CA 91773
3. STREET ADDRESS OF PRINCIPAL BUSINESS OFFICE IN CALIFORNIA, IF ANY CITY
STATE ZIP CODE
1051 Calls Ortega San Dimas
CA 91773
4. MAILING ADDRESS OF THE CORPORATION, IF DIFFERENT THAN ITEM 2 CITY
STATE ZIP CODE
1"' 4'a Ortega San Dimas
CA 91773
NAMES AND COMPLETE ADDRESSES OF THE FOLLOWING OFFICERS (The corporation must have these three officers. A comparable title
)r the specific officer may be added; however, the preprinted titles on this form must not be altered.)
5. CHIEF EXECUTIVE OFFICER/ ADDRESS CITY
STATE ZIP CODE
Robert Vasilj 1051 Calle Oretga San Dimas
CA 91773
6. SECRETARY/ ADDRESS CITY
STATE ZIP CODE
Marica Vasilj 1051 Calls Ortega San Dimas
CA 91773
T. CHIEF FINANCIAL OFACERI ADDRESS CITY
STATE ZIP CODE
Robert Vasilj 1051 Calls Ortega San Dimas
CA 91773
NAMES AND COMPLETE ADDRESSES OF ALL DIRECTORS, INCLUDING DIRECTORS WHO ARE ALSO OFFICERS (The corporation
must have at least one director. Attach additional pages, if necessa
8. NAME ADDRESS CITY
STATE ZIP CODE
Robert Vasilj 1051 Calle Ortega San Diams
CA 91773
9. NAME ADDRESS CITY
STATE ZIP CODE
Marica Vasilj 1051 Calle Ortega San Dimas
CA 91773
10. NAME ADDRESS CITY
STATE ZIP CODE
11. NUMBER OF VACANCIES ON THE BOARD OF DIRECTORS, IF ANY: N/A
AGENT FOR SERVICE OF PROCESS (If the agent is an individual, the agent must reside in California and Item 13 must be completed with a California
street address (a P.O. Box address is not acceptable). If the agent is another corporation, the agent must have
on file with the California Secretary of State a
certificate pursuant to Corporations Code section 1505 and Item 13 must be left blank.)
12. NAME OF AGENT FOR SERVICE OF PROCESS
Marica Vasilj
13. STREET ADDRESS OF AGENT FOR SERVICE OF PROCESS IN CALIFORNIA, IF AN INDIVIDUAL CITY
STATE ZIP CODE
1051 Calle Ortega San Dimas
CA 91773
TYPE OF BUSINESS
14. DESCRIBE THE TYPE OF BUSINESS OF THE CORPORATION
t General Engineerin Contractor
5. BY SUBMITTING THIS STATEMENT OF INFORMATION TO THE CALIFORNIA SECRETARY OF STATE, THE CORPORATIO CERTIFIES THE I FORMATION
CONTAINED HEREIN, INCLUDING ANY ATTACHMENTS, IS TRUE AND CORRECT.
9 -28 -2009 Marica Vasilj Vice President
DATE TYPEIPRINT NAME OF PERSON COMPLETING FORM TITLE
SIGNATURE
8I -200 C (REV 01 12008)
APPROVED BY SECRETARY OF STATE
r
i
i
BID DATA SECTI
F OR MS
: D
In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100
through 4114 of the California Public Contract Code, and any amendments thereto, each
Bidder shall provide the information requested below for each subcontractor who will
perform work, labor or render service to Bidder in or about the construction of the Work in an
amount in excess of one -half of one percent (greater than 0.5 %) of the Bidder's Total Bid
Price, or, in the case of bids or offers for the construction of streets or highways, including
bridges, in excess of one -half of 1 percent of the Contractor's total bid or ten thousand
dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work
which will be done by each subcontractor. Bidder shall list only one subcontractor for any
one portion of the Work.
Pursuant to Public Contract Code Section 4104, the Owner has determined that it will allow
Bidders twenty -four (24) additional hours after the deadline for submission of bids to submit
the information requested by the Owner about each subcontractor, other than the name and
location of each subcontractor.
If the Bidder fails to specify a subcontractor for any portion of the Work to be performed
under the Contract, it shall be deemed to have agreed to perform such portion itself, and
shall not be permitted to subcontract that portion of the Work except under the conditions
hereinafter set forth below.
Subletting or subcontracting of any portion of the Work in excess of one half of one percent
(greater than 0.5 %) of the Total Bid Price or, in the case of bids or offers for the construction
of streets or highways, including bridges, in excess of one -half of 1 percent of the
Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, for which no
subcontractor was designated in the original bid shall only be permitted in cases of public
emergency or necessity, and then only after Owner approval.
CBF -10
DD
23 LIST OF PROPOSED SUBCONTRACTORS (continued)
( Next 2 Pages if needed for listing additional subcontractors. "]
Name and Location Description of Work
of Subcontractor to be Subcontracted
License No.:
Department
Registration
Name and Location
of Subcontractor
Description of Work
to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location
of Subcontractor
Description of Work
to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location
of Subcontractor
Description of Work
to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No
CBF - 11
BIDDER: llt;�[AC' vYl
2.0 REFERENCES
The following are the names, addresses and
telephone numbers for three public agencies for which BIDDER
has performed similar work within the past two (2) years:
1. (: �au r,4 Z k�,
FYI
Lam .
Na and Address of OwneV
a oL
413 -- (-36.-, �
Name and telephone number off person>�rwith
project
1 42
fse�
Contract a mo
Type of Work
Date Completed
2.
l�
Name,aJd Address of Owner
Loy) 4-'MYNA' - . m"'
q-� (Ib1a�')2 ° giG19 3
Na Me and telephone number of person
miliar wi project
Contract amount
Type of Work
Da Completed
/�
3. l
% 6i!Ar11 RL
Z13Zc,
Na a nd Address of Owner
)wrl� 110 — 26�) �811 2 -,526q
( - �YJvA;1eJ
Flame and telephone number of p
fa r iarrltl with project
S 1) 34 2t4 �L
zlf� 5C0 --U-
Contract amount
Type of Work
Date Completed
a. CI nF t= eat
r) 5k
1
Name q0 Address of Owne
Cyi C4 ?Hraski
5WQ- -2 3&0
Name and telephone number of person familiar with project
6 1 b52,22� ® � s
- ? - (r::, �ewQT
Contract amount
Tvpe of Work
Date Completed
CBF -12
BIDDER: � ccyniYuci Cy'1 =,oc
SECTI
N
CBF -13
BIDDER: MNL f J5y6il(AC :j_-0c,
NON - COLLUSION AFFIDAVIT
In accordance with Public Contract Code Section 7106, the undersigned, being first duly
sworn, deposes and says that he or she holds the position listed below with the bidder, the
party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any
undisclosed person, partnership, company, association, organization, or corporation; that the
bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced
or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly
colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham
bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly
or indirectly, sought by agreement, communication, or conference with anyone to fix the bid
price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the
bid price, or of that of any other bidder, or to secure any advantage against the public body
awarding the contract of anyone interested in the proposed contract; that all statements
contained in the bid are true; and, further, that the bidder has not, directly or indirectly,
submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged
information or data relative thereto, or paid, and will not pay, any fee to any corporation,
partnership, company association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid.
Signature 1
Typed or Printed Na
Title
Subscribed and s orn before me
This —� n d ay of 20
A JAJ I- 11 4 -A
NotaWlyublic in tl for
th tate of Cali rnia
My Commission Expires: NA ay j t L, t (�
(Seal)
Commission# 1972172
Notary Public - California
Los Angeles County
Comm. Expires 16. 20
CBF -14
BIDDER: MNR Construction Inc.
Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid
Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide
the information required. Bidder shall ensure that every page of its Bid Data Forms are properly
identified with the Bidder's name and page number.
KNOW ALL MEN BY THESE PRESENTS.
THAT MNR Construction
Principal, and Fidelity & deposit C
as
, as Surety, are held firmly bound unto the
CITY OF ROSEMEAD (hereinafter called the OWNER) in the sum of
Ten Percent of Amount Bid UULI-Amb
($ of amount bid ) , being not less than ten percent (10 %) of the Total
Bid Price; for the payment of which sum will and truly to be made, we bind ourselves,
our heirs, executors, administrators, successors, and assigns, jointly and severally,
firmly by these presents.
WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work
required forthe GARVEY AVENUE SEWER RELIEF LINE PROJECT as setforth in
the Notice Inviting Bids and accompanying Bid Documents, dated
July 8 2015
NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the
OWNER and, within the time and in the manner required by the above- refefenced
Bid Documents, enters into the written form of Contract bound with said Bid
Documents, furnishes the required bonds (one to guarantee faithful performance
and the other to guarantee payment for labor and materials) furnishes the required
insurance certificates and endorsements, and furnishes any other certifications as
may be required by the Contract, then this obligation shall be null and void; otherwise
it shall remain in full force and effect. In the event suit is brought upon this bond by
the OWNER and judgment is recovered, said Surety shall pay all costs incurred by
the OWNER in such suit, Including reasonable attorneys' fees to be fixed by the
court.
SIGNED AND SEALED, this 6th day of July , 2015 .
MNR Construction, Inc. (SEAL) Fi delity& Deposit Company of Maryland (SEAL)
Principal Surety
By: BY
Signature Robert Vasilj Signature Frank Morones, Attorney -in -Fact
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New
York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Maryland, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies "), by
THOMAS O. MCCLELLAN, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said
Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby
nominate, constitute, and appoint Frank MORONES, of Brea, California, its true and lawful agent and Attorney -in -Fact, to make,
execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of
such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and
purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE
COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND
SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT
COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of
the By -Laws of said Companies, and is now in force.
IN WITNESS WHEREOF, the said Vice - President has hereunto subscribed his /her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 16th day of July, A.D. 2013.
ATTLST:
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
NiiN "s"
r/,9t�, Fr o owofp a so.......... 0
SEAL 3 F A t 3 — . — ° 'oc
u W 2'b s 78Ba ♦ br3
i
Assistant Secretary
Gerald F. Haley
Vice President
Thomas O. McClellan
State of Maryland
City of Baltimore
On this 16th day of July, A.D. 2013, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, THOMAS O.
MCCLELLAN, Vice President, and GERALD F. HALEY, Assistant Secretary, of the Companies, to me personally known to be the individuals and
effects described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith,
that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and
that the said Corporate Seals and the signature as such officer were duly aff and subscribed to the said instrument by the authority and direction of the said
Corporations.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seat the day and year fast above written.
+' ...........
° + M '' lays .. .
l lli11111 1 \ \'`+
Constance A. Dunn, Notary Public
My Commission Expires: July 14, 2015
POA -F 012 -0114B
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 118-9
1, sYm:�:stV'�t
I
A notary public or other officer completing this certificate, verifies only the identity of the Individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy.. or validity of that document.
''state of California
Oour+ty of „ _ Orange }
Or - �°� - -- before roe, L.
Date
k , Notary Public -- _-.._-..._-..__.. .........__..._._......__._.__.
Here Insert Name and Title of the Officer
personally appeared Frank M orone s
Names) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(;) whose narrie(a) W
subscribed to the within instrument and acknowledged to me that he / tea executed the name In
his / ftet authorized capaolty(ies), and that by hls signatures) or) the instrunnent the person(s),
or the entity upon behalf of which the porson(f9) acted, axecuted the instrument.
I certify under PENALTY OF PERJURY tinder the laws
of the State of California that the foregoing paragraph
is trite and conent.
L. CLARK WITNESS nay hand and official seat.
z 'ssn # 1996834 z
Cmm
ael Not Publ - California al
Angeles County v _..
Signature--.— My Comm. Expires Nov 78, 2016 " """"" - "" ' . " " "
Srrnature of No #y t�ubfic
Place Notary Seat Alcove
OPTIONAL
Though this section is optional, completing this information can deter alteration of the docurnent or
fraudufent roottarhme nt of this fora? to an unintended document.
Description of Attached Document
Title or Type of Docurnent: Document Date:
Num0er of Pages. __— Signer's) Other Than Named Above:
Capaoity(ies) Claimed by Signer(s)
Signer's ner's Name; __... ____
-i
Got porate Officer 1Rie(s) ,.__` ------- ..__. ._
Partner - -- ::_l Limited 1- i General
'Individual XI Attorney in Fact
E.; Trt.fs4ee (_1 Guardian or Conservator
s Other
Signer Is Representing:.,,,,,,
Signer's Nrarne; .. _ _ _
C!Corporate Officer -•- I itle(s ). _ ..............
f Partner - Limited -_' Genearal
i...::i Individual 1 Attorney in Fact
''l Trustee f = Guardian or Conservator
- i Other-
Signer Is Representing: ___ _ ._ .. .....-_ —_ . _........
02014 National Notary Association - www.NrationaiNotary.ru g . I.800-US NOTARY (1- 800 -876 -6827) Itern #5907
CALIFORNIA ALL PURPOSE ACKNOWLEDGMENT
otary public or other officer completing this certificate verifies only the identity of the individual who signed
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that
ATE OF CALIFORNIA J
Lcl
UNTY OF ( / 1$ I
before me, �
Date
appeared
(here insert name and title of the officer)
10 proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is /are
bscribed to the within instrument and acknowledged to me that he /she /they executed the same
his/her /their authorized capacity(ies), and that by his/her /their signature(s) on the instrument
e person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
certify under PENALTY OF PERJURY under the laws of the State of California that the
paragraph is true and correct.
my hand and official seal. .., vE6NA PERK
.d'` Commission # 1972172
Notary Public • California z
z :r•
Los Angeles County >
My Comm. Expires Mar 16, 2016
Signature
Description of Attached Document
Title or Type of Document:
Document Date:
Other:
Number of Pages:
engineering Contract
N IVINR o„
Construction, .
License No. 891298 -A
STATEMENT OF QUALIFICATIONS
Contract Fulfillment —
MNR Construction, Inc. has the workforce, competence, and experience to perform the proposed contract in a timely, qualified and
acceptable manner, including — but not limited to — having available and committed performance of the contract such as:
A. Satisfactory financial resources
B. Necessary licenses, organization, experience, accounting and operational ability
C. Sufficient personnel with the essential expertise and technical skills
D. Requisite production, construction, and technical equipment
E. Contracts or other binding arrangements with responsible subcontractors to perform all aspects of the contract not covered by the
prime contractor.
History of Contract Performance —
MNR Construction has a well -known reputation and history of virtuous performance on contracts for the life of the firm, and by our officers
and key personnel including — but not limited to — the following:
A. No suspension or revocation of any relevant professional license, significant fines, penalties or failure to comply with licensing
requirements.
B. No termination for default of any contract, nor significant failure to perform timely or in accordance with the proposal, plans
and /or specifications.
C. No premeditated failure to comply with labor laws and regulations including —but not limited to — laws pertaining to timely
payment of wages, payment of prevailing wages and /or signatory (union) wages, sexual harassment, child labor and timely
payment of all obligations to subcontractors, vendors, suppliers and truckers.
D. No intentional disregard for the personal safety of employees, other personnel on construction sites, or the public (repeated or
multiple failures to comply with safety rules, regulations, or requirements can be considered as significant)
E. No violation of Workers' Compensation laws
F. No failure to comply with laws and regulations prohibiting discrimination or promoting equal employment opportunity and
G. No significant violation of local, state or federal environmental protection laws, rules, regulations or requirement including those
related to the unauthorized or unpermitted discharge of pollutants, including wastewater.
Record of Ethics and Business Practice —
MNR Construction, Inc. has a notable record of integrity and business ethics for the life of the firm and by their officers including— but not
limited to the following—
A. No conviction of a crime involving bidding upon or performance of a local, state or federal government contract
B. No conviction of a crime involving serious moral turpitude, a fundamental lack of integrity, or the knowing disregard of the law
Subcontractor Relations —
MNR Construction has a proven record of appropriate business ethics toward subcontractors, including— but not limited to —the following:
A. Demonstrated knowledge of and compliance with federal, state and all local and applicable including City of Los Angeles laws and
regulations pertaining to utilization of subcontractors and business practices toward subcontractors
engineering Co ht� cr
MNR a
o„
Construct .
License No. 891298 -A
B. Demonstrated commitment to practices of good faith, and fair dealing toward subcontractors.
C. Demonstrated record of intended performance of contractual obligations owing to subcontractors, including timely payment.
D. Demonstrated loyalty to union contractors with an emphasis on minority subcontractors.
E. Demonstrated knowledge and understanding of Project Labor Agreements, Davis Bacon requirements and general Federal and
State funding payroll compliance
Bonding and Insurance —
MNR Construction, Inc., has fully achieved all requirements having to do with the submission of all required bonds and insurance
certificates /documents upon notifications of award of the contract by the said awarding agency. To date, MNR Construction has had no
issues with bonding whatsoever, and has never had a bonding company take over a job. Additionally, MNR has shown progressive growth
with each fiscal year; our bonding capacity has increased significantly since the beginning of operation. Currently, MNR holds a pre -
approved aggregate limit of $20.0 Million.
Bidding History —
MNR Construction, Inc., has not failed to submit any requested additional information by the date and time specified by said agency after
receipt of bids or proposals but prior to the award of the contract. A copy of awarded contracts has been attached to this proposal.
`engineering co
nP~db "_
MNR Construction, Inc.
License No. 899298 -A
MNR Construction, Inc., CompanV History
MNR Construction, Inc., began work in 2007 under its present organization. The company was derived by Mr. Robert Vasilj, the eldest son of Ivan
Vasilj, President of Vasilj Construction where Robert formally served as Vice President, and Responsible Managing Officer (RMO) for 19 years. With
the blessing of his father, he went into business for himself and has been quite successful in making a name for the company with agencies and
counties in and around the Los Angeles area.
MNR Construction, Inc., has worked hard to earn the respect of peers and agencies alike becoming a member of the Engineering Contractors
Association along with being signatory to both the Operating Engineers Local 12 and the Laborers International Union, Local 300. Additionally,
MNR Construction, Inc., has been previously qualified and currently serves on the "On -Call Emergency List' for the City of Los Angeles, City of
Glendale and City of Anaheim. With a combined total of nearly 50 years of experience, MNR Construction, Inc., is confident in its abilities and
proud of its accomplishments thus far.
Key Personnel:
Robert Vasilj was the Senior Foreman, Responsible Managing Officer, and Vice President at Vasilj Incorporated for nearly 19 years. His duties
included both the supervision of his own crew, and the daily operations needed in accordance with the project. His projects over the years of
working with Vasilj Incorporated ranged from $60,000.00 to $6.1 Million totaling approximately $25 million in work over the course of his time at
Vasilj Incorporated. Robert opened MNR Construction, Inc,. in 2007 and was awarded his first contract that July in the amount of $680,00.00 and
has since been awarded contracts totaling $18 Million over four years. His skills include all competent training, confined space, CPR /First Aid,
OSHA, Class A drivers license, and is the current license holder of the MNR Construction.
Elizabeth Torrez worked as the assistant to Mr. Vasilj at Vasilj Incorporated working with partnering charters, time and material tickets, submittals,
and preparation of bid proposals. Elizabeth currently serves as the Director of Operations for MNR Construction. She has been both the on -site
and corporate headquarters contact assisting and coordinating project management, submittals, loss control, human resources, and project
development predominately working with the City of Los Angeles and serves as a member of the Ad -Hoc Working Group for the City of Los Angeles
Bureau of Engineering and the Engineering Contractors Association. Elizabeth is second in command to Mr. Vasilj.
Nicholas Gregorovic currently serves as a Project Estimator and Waterline Specialist for MNR Construction. His experience ranges in basic field
work, operating of heavy equipment to the supervision of various large sewer, waterline, and storm drain projects. He now uses the
aforementioned expertise as a competitive project estimator for MNR.
Kreso "Chris" Grbavac currently serves as a Foreman for MNR Construction handling predominantly City of Los Angeles sewer projects but has also
served several other agencies in the Los Angeles and Orange counties. Chris has been both a Foreman and a Corporate Officer of pipeline working
in the sewer field for over 10 years bringing knowledge, dedication and expertise as an Operator Foreman.
Steve Brkic serves as a Senior Foreman for MNR Construction dealing specifically with Project Management and Supervision from the field working
hand -in -hand with the MNR corporate headquarters to assure all projects are well managed and effective communication is in place from start to
finish of the project.
Scott Barnett serves as a Project and Safety manager for MNR Construction handling all safety related issues and compliance with State and
Federal standards. Working in the area of construction management for nearly 7 years, Scott brings an added element of development to MNR in
relation to scheduling, correspondence, project documentation and overall communication between the respective agency and our company.
ea ,E.ngineenng C,,,,
X 01 MNR Construction, .
License No. 891298 -A
ELIZABETH TORREZ, Chief Operating Officer
Education
California State University San Marcos, San Marcos, Co
Bachelor of Arts, Communication, 2007
Work Experience
Chief Operating Officer November 2014 - Present
Responsible for managing day -to -day activities of company headquarters with a heavy focus on business development, overall process
improvements, and implementing strategic financial goals.
Provide exceptional business relationship management for company; establish and cultivate positive relationships with
customers, design consultants, sub - contractors, and suppliers. Actively participate in industry - related events and forums, and
belong to professional associations to further enhance positive company image.
• Act as head decision -maker for company's bonding and insurance carrier determination; consistently monitor rates and analyze
best needs for a $18M policy.
• Oversee employee safety issues; revise safety manual when company incidents or regulatory changes have occurred. Ensure
continual compliance with local, state, and federal agencies such as EDD, OSHA, and DIR.
• Assist HR with 401k- related decisions, union issues or interactions, and ensuring employee terminations are valid and within
legal guidelines.
• Advise on topics related to company asset protection; participate in contract negotiations and make any appropriate change
recommendations to Owner.
MNR CONSTRUCTION. INC - DIRECTOR OF OPERATIONS March 2009 - Present
Responsible for managing day -to -day activities of company headquarters with a heavy focus on strategic, tactical, and short-term financial
goals for business. Work closely with President and act as second in command overseeing and providing direct supervision for multiple
departments and positions including Project and Safety Management, Accounting, Fleet Manager, Office Manager, and Human Resources.
• Successfully handle multi -site crew management; oversee and manage 12 -16 active projects at a time.
• Assist with pulling permits and bid submissions. Handle subcontractor and field meeting scheduling tasks.
• Work cooperatively with Public Agencies in good faith, utilizing excellent negotiation skills under urgent deadlines. Continually
monitor and enforce subcontractor regulatory agreements assuring jobsite insurance requirements are fulfilled.
• Research best venue pricing options; present most cost and quality effective options to owners.
Utilize Union connections to locate and place employees; execute employee reviews and monitor 90 -day probation periods.
• Excel at providing seamless support and assistance to superiors, allowing President and Managers to align with business
objectives and meet specific goals.
• Demonstrate an ownership attitude by completing tasks not specifically outlined but necessary for successful company
operations.
OFFICE MANAGER August 2007 - March 2009
Managed and coordinated all main office activities and acted as liaison between senior management, employees, and clients.
Established and nurtured relationships with vendors and subcontractors assisting with company growth; spearheaded all work
scheduling.
• Developed documents and procedures for tracking daily work flow dynamics such as logged hours for payroll, equipment
and materials used, and overall description and tracking of days' work. Forms have proven invaluable in multiple ways
including establishing a timeline of work performed and documenting signatures for arbitration purposes.
VASIU. INCORPORATED - ADMINISTRATIVE ASSISTANT June 2004 — July 2006
Acted as Administrative Assistant to company Vice President. Responsible for screening all phones and incoming mail; scheduled
meetings, created and maintained all company files.
• Acted as professional liaison between VP, Project Managers, general contractors, and vendors.
• Excelled in Project Management tasks such as generating competitive proposals and tracking submittals and overall project progress.
• Communicated with general contractors, tracked submittals and project status, generated proposals, tracked submittals and
assisted with various projects as directed.
Alliance Affiliations
Engineering Contractors Association (ECA)
Board of Directors, 2013 - Present
• Public Agencies Committee Chair, 2013 - Present
Government Affairs Committee, August 2014 - Present
Women Construction Owners and Executives (WCOE) - Member
engineering CO �
N MNR o�
Construct .
License No. 891298 -A
ROBERT VASILJ, President /Foreman /Operator
Licenses and Certifications
CPR/First Aid Certification
Confined Space Entry
OSHA Competent Person
Heat and Illness Prevention
Work Experience
MNR CONSTRUCTION, INC. - President /Superintendent /Foreman
January 2007 — Present
• Responsible for managing overall company tasks and projects and safety procedures and developments
• Supervise all construction projects: pipeline —sewer and water, storm drain, sub drain for over 50 different Clients from
counties to cities, water agencies and private developers.
• Oversees and supervises project crew, scheduling (time, materials, and supplies), daily jobsite tasks, all field operations.
• Communicates with field inspectors, and project engineers.
• Chief Estimator - prepares estimates for underground sewer, water and storm drain projects by calculating various
statistical data such as quantity take -offs, material price lists, labor costs per man -hour, equipment costs and applying to
complete scope of work quantified take -offs.
• Performs project management tasks during the planning phase of new projects consisting of material and equipment
preparation. Methodology of project completion and development.
• Understanding and interpreting the drawings and specifications, developing Request for Information (RFIs)
Vasil *. Inc. dba Ivanko -Vice President /Superintendent
January 1990 - January 2007
Supervised various construction projects in excess of $6.0 million: pipeline —sewer and water, storm drain, sub drain for
most agencies located within Southern California including but not limited to Schools, Counties, Cities, Airports, Gas
Stations, Foothill Transit, Private Developers and Water Departments.
Oversaw and supervised project crew, scheduling (time, materials, supplies), daily jobsite tasks, all field operation.
• Communicated with field inspectors, and project engineers.
Alliance Affiliations
International Union of Operating Engineers of Southern California
Engineering Contractors Association
ece\ Engineering Cohfr e�
a
o�
Construction IVINR Inc.
License No. 891298 -A
NICHOLAS "DUBI" GREGOROVIC, Foreman /Operator
Licenses and Certifications
CPR /First Aid Certification
Confined Space Entry
OSHA Competent Person
Heat and Illness Prevention
Work Experience
November 2011 - Present
Project Estimator and Operator Foreman, MNR Construction, Inc., Baldwin Park, Ca
• Responsibilities include project management, estimating, engineering and general management of field operations. Also
utilizes operating and Foreman skills when needed on on -going projects.
November 2011 - 2009
Project Estimator, Mike Bubalo Construction Co., Inc., Baldwin Park, Ca
• Responsibilities include project management, estimating, engineering and general management of main office and field
operations.
2007 -2009
Operator /Foreman, MNR Construction, Inc., Baldwin Park, Ca
• Supervised various projects up to $1.5 Million (sewer, water and storm drains)
• Managed field personnel, job scheduling, testing and acceptance.
• Procured necessary and specialized tools, materials and services.
• Acted as intermediary between public agencies, local and city officials, private property owners, suppliers and
subcontractors to resolve various issues during construction.
2006 -2007
Operator /Foreman, J. DeSigio Construction, Inc. - Monrovia, Ca
• Managed /supervised underground construction, field personnel and communicated with project Engineers and Inspectors.
• Attended pre -job, pre- construction and project meetings. Called -in /managed Underground Service Alerts.
• Negotiated price changes and extra work.
2006 -1994
Operator /Foreman, Engineering Plumbing, Inc., Baldwin Park, Ca
• Managed /supervised underground construction, field personnel and communicated with project Engineers and Inspectors.
Negotiated price changes and extra work.
Engineering Cont�d 10
Construct IVINR .
License No. 891298 -A
SCOTT BARNETT, Project and Safety Manager
Education
University of California, Riverside
Bachelor of Science, Business Administration, 2006
California State Polytechnic University, Pomona, Ca 2008
Construction Management Certification
Mount San Antonio College
Water Treatment Certificate, 2012 and Water Distribution Certificate, 2012
Licenses and Certificates
30 Hour Occupation Safety and Health Administration Certification
Work Experience
• 6+ Years of Public Works Infrastructure /K -12 Education Construction Management Experience. 2+ Years in a Supervisory
Capacity.
• Managed the installation of 100,000+ LF of infrastructure improvements with a cumulative construction value of approx.
$20M.
• Managed new K -12 school construction, modernization, and renovation projects with a cumulative construction value of
approx. $64M.
• State, federal, and bond funding experience. (State Revolving Fund, ARRA, etc.)
• Typical supervisory role consisted of 2 immediate employees. In addition, project teams consisted of 15 -25 members.
• Highly motivated professional with a proven track record to communicate effectively and establish strong working
relationships with all organizations.
• Proven ability in understanding and implementing contractual requirements.
• Excellent multitasking, strategic planning and negotiating skills.
• Exceptional schedule management skills.
• Knowledge of requirements related to Low Bid Project Delivery Method, Deferred Maintenance, Purchase Orders, Certified
Payroll, DBE, WBE, PCC, LEED, local, state, and federal building codes.
• Strong analytic skills in recognizing problems, developing solutions, and implementing /evaluating solutions.
Project Management Experience
• City of El Segundo, Sanitary Sewer System Rehabilitation Project Manager, project value: $1.1Mil
• Inland Empire Utilities Agency, 930 Zone Recycled Water Pipeline Project Manager, project value: $6.1 Mil
• City of Azusa, Sewer Master Improvements, Project Manager, project value: $1.2 Mil
• Upper San Gabriel Valley Municipal Water District, City of Industry Recycled Water Pipeline Construction Manager,
project value: $13 Mil
• Upper San Gabriel Valley Municipal Water District, Rosemead Extension Recycled Water Project Phase I & II, Project
Manager /IOR, project value: $4.5 Mil
• Upper San Gabriel Valley Municipal Water District, Whittier Narrows Golf Course Recycled Water Infrastructure
Project, Construction Manager /IOR, project value: $450K
�e�ee,N Engineering Co.,, to
e
.
License No. 891298 -A
STEVE BRKIC, Senior Foreman
Licenses and Certificates
CPR /First Aid Certification
Confined Space Entry
OSHA Competent Person
Heat and Illness Prevention
Work Experience
• 9+ Years of Public Works Infrastructure, 3+ Years in a Supervisory Capacity.
• Highly motivated professional with a proven track record to communicate effectively and establish strong working
relationships with all organizations.
• Proven ability in understanding and implementing contractual requirements and installation of pipelines.
• Excellent multitasking, and strategic planning for constrained deadlines and requirements.
• Exceptional schedule management skills.
• Strong analytic skills in recognizing problems, developing solutions, and implementing /evaluating solutions.
Senior Foreman Experience
• City of El Segundo, Sanitary Sewer System Rehabilitation Senior Foreman, project value: $1.1Mil
• City of Azusa, Sewer Master Improvements, Senior Foreman, project value: $1.2 Mil
• City of Los Angeles, Secondary Sewer Renewal Program, Senior Foreman for several projects with a combined total
of $10.0+ Mil
• City of Los Angeles, Contract Emergency Sewer and Storm Drain Repairs, Field Liaison and Senior Foreman for
2011 - Present, project value: (strictly time and material basis)
• City of Los Angeles, Department of Recreation and Parks, Sewer Tie Repairs, Retrofit and /or New Installation
Project, Contract Liaison /Senior Foreman, project value: Varies ($33 -K - $500K +)