Loading...
OB - Item 3B - Rosemead Skate Plaza ProjectTO: THE HONORABLE CHAIR AND BOARD MEMBERS FROM: CURTIS CANNON, SPECIAL PROJECTS MANAGER �& DATE: APRIL 18, 2016. SUBJECT: ROSEMEAD SKATE PLAZA PROJECT— PROJECT No. 41009 SUMMARY Included in the July 2010 bond issuance by the former Redevelopment Agency (RDA) was a project to complete a number of improvements and upgrades to facilities at Rosemead Park, including basketball courts, turf and landscape, and a skate plaza. The action recommended for this agenda item will provide funding to construct a skate plaza facility at Rosemead Park. On March 22, 2016, the City Council awarded the construction contract to PK Construction for the Rosemead Skate Plaza Project for $381,999, plus 15% contingencies of $57,301, for a total of $439,300. Staff Recommendation It is recommended that the Oversight Board: 1. Approve Resolution 2016 -004 confirming the contracts and expenditures related to the Rosemead Skate Plaza Project — Project No. 41009. On November 10, 2014, the City Council directed staff to proceed with developing a skate plaza adjacent to the Aquatic Center, within Rosemead Park. On April 28, 2015, the City Council approved a contract with Spohn Ranch Skate Parks, for conducting public workshops and preparing design plans. On June 17, 2015 and July 22, 2015, the City conducted public workshops, and subsequently incorporated community inputs into the skate plaza design concept. The Rosemead Skate Plaza is approximately 10,000 square feet in size, located immediately to the east of the Aquatic Center in Rosemead Park. The design capitalizes on the existing natural topography at the site to minimize major earthwork, and includes a variety of street features: steps, handrails, benches, ramps, etc. Exhibits "A" and "B" illustrates the location and the design concept of the Project. ITEM NO. 3.6 Oversight Board Meeting April 18, 2016. Page 2 of 3 In December 2015, the City completed the bid documents, and subsequently advertised the Project for construction bids. On February 24, 2016, the City publicly received and opened six (6) bids, as summarized below. RANK CONTRACTOR LOCATION Total Bid 1 PK Construction Altadena, CA $381,999 2 Spohn Ranch Inc. Los Angeles, CA $508,609 3 Y. Ko Construction Co. Inc. Woodland Hills, CA $512,000 4 Monet Construction Inc. Glendale, CA $513,942 5 Minco Construction Gardena, CA $557,200 6 E C Construction S. El Monte, CA $606,580 Notes: (1) Bid price of $514,942 was adjusted to $513,942, to correct arithmetic error. The apparent low bidder was PK Construction ( "PK ") of Altadena California, with a bid of $318,999; that is approximately $126,610 lower than the next lowest bid. The bid price also includes an alternate bid item for wrought iron fencing for $2,475. Construction management and inspection services for this project will be completed utilizing City staff and existing on -call contractors as follows: ITEM CONTRACTOR DESCRIPTION AMOUNT (Not to exceed) 1 Spohn Ranch Inc. Special Inspection $13 2 Willdan Soil Testing $8,520 SCB Inspection Inspection $30,000 r 4 3 City Staff Miscellaneous $7 Total $59,493 Oversight Board Meeting April 18, 2016. Page 3 of 3 FINANCIAL REVIEW Funding for the construction of the Rosemead Skate Plaza Project is included in the bond proceeds from the former RDA. The total appropriation of bond proceeds necessary to award this project is approximately $498,493 as describe below: PK Construction $381,999 Contingencies (15 %) $57,301 Soil Testing $8,520 Spohn Ranch $13,500 Inspection $30,000 Miscellaneous $7,473 Total $498,793 PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Submitted by: Curtis Cannon Special Projects Manager Attachments: (1) Resolution 2016 -17 (2) Bid Analysis RESOLUTION NO. 2016-004 A RESOLUTION OF THE OVERSIGHT BOARD FOR THE SUCCESSOR AGENCY TO THE ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION CONFIRMING THE CONTRACTS AND EXPENDITURES RELATED TO THE ROSEMEAD SKATE PLAZA PROJECT. WHEREAS, the Rosemead Successor Agency received the Finding of Completion on April 18, 2013 from the Department of Finance; and WHEREAS, the Finding of Completion states that the Rosemead Successor Agency may utilize proceeds derived from bonds issued prior to January 1, 2011 in a manner consistent with the original bond covenants per Health and Safety Code Section 34191.4 (c); and WHEREAS, the Rosemead Successor Agency is holding approximately $7.1 million in bond proceeds derived from bonds issued prior to January 1, 2011 for Capital Improvement Projects identified in the bond covenants; and WHEREAS, the Rosemead Successor Agency will be required to provide oversight of the completion of the Capital Improvement Projects to ensure compliance with the bond covenants; and WHEREAS, the approved Capital Improvement Projects have been included on each Recognized Obligation Payment Schedule filed by the Rosemead Successor Agency; NOW, THEREFORE, THE OVERSIGHT BOARD FOR THE SUCCESSOR AGENCY TO THE ROSEMEAD COMMUNITY DEVELOPMENT COMMISSION HEREBY RESOLVES: SECTION 1 . The Rosemead Successor Agency Oversight Board confirms that the vendors and professional firms listed below are qualified and capable to provide materials and construction services necessary to complete the Rosemead Skate Plaza Project. SECTION 2. That the contract with the following firms shall not exceed the amounts listed in the table below. If any contract amendments are required, all such changes shall be brought back to the Oversight Board for review and approval. TRADE FIRM TOTAL BUDGET Construction PK Construction $ 439,300.00 Special Inspection Sohn Ranch, Inc. $13,500.00 Soil Testing Willdan $ 8,520.00 Project Inspection SCB Inspection $ 30,000.00 Project Administration /Staff Time N/A $ 7,473.00 TOTAL COST: $ 498,793.00 SECTION 3. Successor Agency staff is directed to submit documents to the Department of Finance as necessary, including an amended Recognized Obligation Payment Schedule. SECTION 4. Successor Agency staff is directed to provide a copy of this Resolution to the County Auditor Controller, the State Controller's Office and the State Department of Finance. PASSED, APPROVED AND ADOPTED THIS DAY OF ' 2016 ATTEST: Pat Wallach Chair Carol Cowley City Clerk APPROVE AS TO FORM: Rachel H. Richman City Attorney PUBLIC WORKS SERVICE DEPARTMENTIENGINEERING DIVISION ROSEMEAD SKATE PARK PROJECT PROJECT No. 41009 BID ANALYSIS BID OPENING: FEBRUARY 24.2016 AT 11:00 AM PK Construction BASE BID PRICE #1 1 v ICLEA AND GRUBBING. 1.00 LS $ 45000.00 $ 12,360.00 $ _ 45,000.00 2 DISPOSAL OF WASTE MATERIALS. 1.00 LS $ 12,360.00 _ 3 CONSTRUCT ROSEMEAD SKATE PARK PER PLANS AND SPECIFICATIONS 1.00 LS $ 322,164.00 $ 322,164.00 $ 4,384.00 _C OMPLETE. _ TOTAL BASE BID PRICE DISP OSAL OF WASTE MATERIALS. 1.00 LS $ 379,524.00 ALTERNATE BID ITEM No. t 4 INSTALL G UARD RAIL AS INDICATED ON THE P LANS C>{xvr�, „� U,N17,UN{7PH {E v�, 2,475.00 4 TOTAL ALTERNATE BID PRICE lW00 1 LF 1 $ 125.00 Is 2,475.00 TOTAL BASE & ALTERNATE BID PRICE Spohn Ranch, Inc. BASE BID PRICE $ 381,999.00 #2 ALTERNATE BID ITEM No. 1 17EM'IDE6$i'B1pT54,,, 7 7 -- �,..,rr,.,r.... .r.,.., :: .1.,,. C>{xvr�, „� U,N17,UN{7PH {E v�, .T074's „`# 4 INSTALL GUARD RAIL AS INDICATED ON THE PLANS lW00 1 LF 1 $ 125.00 1 $ 18,750.00 1 CLEARIN AND GRUBBING. 1.00 LS $ 4,384.00 $ 4,384.00 2 DISP OSAL OF WASTE MATERIALS. 1.00 LS $ 7,000.00 $ 7,000.00 CONSTRUCT ROSEMEAD SKATE PARK PER PLANS AND 3 SPECIFICATIONS COMPLETE. 1_.00 LS $ 478,475.00 $ 478,475.00 TOTAL BASE BID CE PRI __ � � $ 489,859.00 ALTERNATE BID ITEM No. 1 17EM'IDE6$i'B1pT54,,, 7 7 -- �,..,rr,.,r.... .r.,.., :: .1.,,. C>{xvr�, „� U,N17,UN{7PH {E v�, .T074's „`# 4 INSTALL GUARD RAIL AS INDICATED ON THE PLANS lW00 1 LF 1 $ 125.00 1 $ 18,750.00 3 TOTAL ALTERNATE BID PRICE _ _1.00 1.00 LS $ 479,000.00 $ 18,750.00 TOTAL BASE & ALTERNATE BID PRICE Y.Ko. Construction Co. BASE BID PRICE $ 508,609.00 #3 1 CLEARING AND GRUBBING. 1 1.00_ LS $ 9,000.00 $ 9,000.00 2 DISPOSAL OF WASTE MA TERIALS. .1.00 LS $ 10,000.00 $ 3 CONSTRUCT ROSEMEAD SKATE PARK PER PLANS AND SPEC IFICATIONS COMPLETE. _ _1.00 1.00 LS $ 479,000.00 _1 479,000.00 — TOTAL BASE BID PRICE i _$ . $ 498,000.00 ALTERNATE BID ITEM No. 1 4 INSTA GUARD RAIL AS INDICATED ON TH 150.00 1 LF $ 93.34 $ 14,001.00 2 _PLANS TOTALALTERNATE BID PRICE .1.00 LS $ 10,000.00 $ 14,001.00 TOTAL BASE & ALTERNATE BID PRICE Monet Construction, Inc. BAS BID PRICE 512,001.00 #4 1 ICLEARING AND GRUBBING. 1 NITj LS $ 4,200.00 $ 4,200.00 2 1 DISPOSAL OF WASTE MATERIALS. .1.00 LS $ 10,000.00 $ 10,00000 3 CONSTRUCT ROSEMEAD SKATE PARK PER PLANS AND SPECIFICATIONS COMPLETE. 1.00 LS $ 483,242.00 $ 483,242.00 TOTAL BASE BID PRICE i $ 497,442.00 ALTERNATE BID ITEM No. 1 PAGE 1 4 IN STALL GUARD RAIL AS INDICATED ON TH PLANS 150.00 1 LF 1 $ 110.00 $ 16,500.00 TOTAL ALTERNATE BID PRICE i $ 16,500.00 PAGE 1 PUBLIC WORKS SERVICE DEPARTMENT /ENGINEERING DIVISION TOTAL BASE & ALTERNATE BID PRICE Minako America Corp DBA Minco Corportation BASE BID PRICE 513,942.00 #5 kf♦EM.a p�1i1RT1O�1 fic' „r�, __ ,,,..,,. . ,.,, �,,, ,...' � ,. ��, .`... _�. QTY; .CTJIIT ..,,, ..NIT„RR1CJ;?;,,, ai .,.,,.TAYtaL i,,,,.,... 'n 1 CLEARING AND GRUBBING. 1.00 LS $ 7,000.00 $ 7,000.00 2 DISPOSAL OF WASTE MATERIALS. 1.00 LS $ 3,000.00 $ 3,000.00 3 CONSTRUCT ROSEMEAD SKATE PARK PER PLANS AND SPECIFICATIONS COMPLETE. 1.00 LS $ 527,700.00 $ 527,700.00 $ 537,700.00 TOTAL BASE BID PRICE ALTERNATE BID ITEM No. 1 ITEi41'= bESCRIPTION 4 INSTALL GUARDRAIL AS INDICATED ON THE PLANS 1 150.00 1 LF 1 $ 130.00 $ 19,500.00 1.00 TOTAL ALTERNATE BID PRICE I I I $ 19,500.00 TOTAL BASE & ALTERNATE BID PRICE EC Construction BASE BID PRICE 557,200.00 #6 ALTERNATE BID ITEM No. 1 . - O'�f”; "? 4 INSTALL GUARDRAIL AS INDICATED O THE P LAN S 1 CLEARING AND GRUBBING. 1.00 LS $ 13,600.00 $ 13,600.00 2 DISPOSAL OF WASTE MATERIALS. 1.00 LS LS $ 10,355.00 $ 568,420.00 $ 10,355.00 $ 568,420.00 3 CONSTRUCT ROSEMEAD SKATE PARK PER PLANS AND SPECIFICATIONS COMPLETE. 1.00 TOTAL BASE BID PRICE 1 $ 592,375.00 ALTERNATE BID ITEM No. 1 . - O'�f”; "? 4 INSTALL GUARDRAIL AS INDICATED O THE P LAN S 150.00 LF $ 94.70 $ 10.,205.00 TOTAL ALTERNATE BID PRICE I I I $ 14,205.00 k fell CAN J.&I4. l lkl le \11=111:3 11300 1014 606,560.00 PAGE2