TO: THE HONORABLE MAYOR AND CITY COUNCIL
FROM: BRAD MCKINNEY, ACTING CITY MANAGED
DATE: JANUARY 9, 2018
SUBJECT: REQUEST TO INSTALL RED CURB—5012 WALNUT GROVE AVENUE
SUMMARY
The Traffic Commission received a request from Talal Trabolsi of Jacobs Engineering Group,the
lead construction management company for the Alameda Corridor Extension (ACE) Trench
Project for the Walnut Grove Avenue Crossing, for the extension of the existing 20-feet red curb
at 5012 Walnut Grove Avenue all the way to the rail road crossing, which is approximately 100
additional feet. According to Mr. Trabolsi's request, this is needed due to the installation of new
striping as part of the ACE Trench Project,which will no longer accommodate parking in this area.
DISCUSSION
A request was received from Jacobs Engineering Group, who is currently working on the ACE
Project, to extend the existing red curb along the north bound of Walnut Grove Avenue at 5012
Walnut Grove Avenue approaching the railroad crossing. According to the request, the new
striping does not accommodate parking along this location.
Walnut Grove Avenue is a north-south arterial street that is approximately 60-feet wide and allows
for two-way traffic and restricted parking on both sides of the street (see Attachment 2). The
posted speed limit is 45 miles per hour. Traffic volume in this location is moderate to heavy at
times due in part to it being an arterial street, as well as its proximity to major corporate centers,
commercial areas, and the State Route 10 Freeway.
Staff has reviewed the site and determined that extending the red curb by approximately 100-feet
is within the recommended distance to be clear of obstructions and provide a clear path to vehicles
driving north bound on Walnut Grove Avenue.
STAFF RECOMMENDATION
It is recommended that the City Council approve the Traffic Commission's recommendation to
extend the existing 20-feet of red curbing at 5012 Walnut Grove Avenue to the rail road crossing,
approximately 100 additional feet.
ITEM NUMBER: 5C
4
City Council Meeting
January 9,2018
Page 2 of 5
FISCAL IMPACT
Funding for this type of roadway improvement is included in the Annual Maintenance and
Operations Budget for Fiscal Year 2017-18 under the Public Works Department, Field Services
Division.
STRATEGIC PLAN IMPACT—None
ENVIRONMENTAL REVIEW
This project is categorically exempt from the California Environmental Quality Act (CEQA)
pursuant to Section 15301 (C)of the CEQA Implementing Guidelines.
PUBLIC NOTICE PROCESS
This item has been noticed through the regular agenda notification process.
Prepared By: Submitted By:
L,A;
afael M. Fajardo, P.E., City Engineer Michelle G. Ramirez, Dire)
ire or of Public Works
Attachment A: Vicinity Map Showing Existing Curb Markings
Attachment B: Proposed Red Curb
Attachment C: Traffic Commission Staff Report (December 7, 2017)
ro"'"i M F
di / 0
PIM 7
ilii'
___00,,,..)
Attachment A
Vicinity Map Showing Existing Curb Markings
City Council Meeting
January 9,2018
Page 3 of 5
ATTACHMENT A
VICINITY MAP SHOWING EXISTING CURB MARKINGS
-
�rA '
F` -:-.,_
. .9s,rr .r r cam • ` I _�"
4.. . i .fir r'..C+1 .�:?.4 O L �( _ - `. '
'111T1 f! `' L�
` I Y. I r r 11 � �. ` , .i r ...,..- ♦ y
et. •v.,
• �. . Y 1.* L ' S lit.
. ,.., ..,,, ,,.. f ' ' ,,,,,41,- ',.: 1,, i' ` , - '. L. ., _ -.•'•' ., ._ -,.,.,: ,: r. III ‘..L "_.• IN?
. .- , \
r 1.;•,... .,. e - ..., ,-,\....'t!. e. . ,f$. lk —. ,. .
. 1. - • '11111\ t" .I
? Ali
i i,L 1 ,. •' r r l - -' - 1
1
Y
N
5 M
O
ar �1
o
lit4M$7
110111a--ofP
Attachment B
Proposed Red Curb
w
City Council Meeting
January 9,2018
Page4of5
ATTACHMENT B
PROPOSED RED CURB
i'''.e,-- l• I. -. • - • ' ,i tom„.. � �i ; ;� •�{
yr
'tea • .1). --•
A. h •""11111•11.
r r rn FFP - �. � _
. 'r r r r v.sr: r __
. \ , , • ' .• a,rill;",.
elFif4ii "°‘. ':‘\A ..r‘: t : • t ' \ \. ' ' -'-
'. it.:.....c...:„.1,01. • ' rr s • .. \ -:u.'' a:i1•11°.°°1:-.:" 1 . r %
M. r,„,.,.,,,,� ley i :. * y
Itt•
1•� r f •r r, i s t, ` 'q a, !• _ ` i A' ;ll: ,
. , r r 1-_ ,a''r , 6 r)~ Vie, 1 ,. A_. - `:,
.1:.- .-tet Tr, i11-i..i w. _ J,� �^r 1 • i" 15....
N
CM.
S E M F
Civic PRIDE
.CCMPORATEO 194
Attachment C
Traffic Commission Staff Report (December 7, 2017)
IMMIk
City Council Meeting
January 9,2018
Page 5 of 5
ATTACHMENT C
TRAFFIC COMMISSION STAFF REPORT
(December 7,2017)
E M F
S i
O i 9
! ROSEMEAD TRAFFIC COMMISSION
c,v,c PRIDE STAFF REPORT
AtoRPORAT£O X04
TO: TRAFFIC COMMISSION
FROM: MICHELLE G. RAMIREZ, DIRECTOR OF PUBLIC WORKS
DATE: DECEMBER 7, 2017
SUBJECT: INSTALLATION OF RED CURB — 5012 WALNUT GROVE AVENUE
SUMMARY
On September 25, 2017, City staff received a request from Talal Trabolsi of Jacobs
Engineering Group, the lead construction management company for the ACE Trench
Project for the Walnut Grove Avenue Crossing, for the extension of the existing 20-feet
red curb at 5012 Walnut Grove Avenue all the way to the rail road crossing, which is
approximately 100 additional feet. According to Mr. Trabolsi's request, this is needed due
to the installation of new striping as part of the ACE Trench Project, which will no longer
accommodate parking in this area (see Attachment 1).
STAFF RECOMMENDATION
It is recommended that the Traffic Commission propose that the City Council extend the
existing 20-feet of red curbing at 5012 Walnut Grove Avenue to the rail road crossing,
approximately 100 additional feet.
ANALYSIS
A request was received from Jacobs Engineering Group, who is currently working on
Alameda Corridor Extension Project, to extend the existing red curb along the north bound
of Walnut Grove Avenue at 5012 Walnut Grove Avenue approaching the rail road
crossing. According to the request, the new striping does not accommodate parking
along this location.
Walnut Grove Avenue is a north-south arterial street that is approximately 60-feet wide
and allows for two-way traffic and restricted parking on both sides of the street (see
Attachment 2). The posted speed limit is 45 miles per hour. Traffic volume in this location
is moderate to heavy at times due in part to it being an arterial street, as well as its
proximity to major corporate centers, commercial areas, and the State Route 10 Freeway.
Staff has reviewed the site and determined that extending the red curb by approximately
100-feet is within the recommended distance to be clear of obstructions and provide a
clear path to vehicles driving north bound on Walnut Grove Avenue.
4
Traffic Commission Meeting
December 7, 2017
Page 2 of 6
PUBLIC NOTICE PROCESS
This item has been noticed through the regular agenda notification process, which
includes a 300-foot radius notice to 45 property owners and postings of the notice at the
six public locations (see Attachment 4).
Prepared By: Submitted By:
4/0-011"a/IAL?5--
Rafael M. Fajardo, P.E. Michelle G. Ramirez
City Engineer Director of Public Works
Attachments:
1. Jacobs Engineering's Request
2. Vicinity Map Showing Existing Curb Markings
3. Proposed Recommendation
4. Public Notification
I
•
Traffic Commission Meeting
December 7, 2017
Page 3 of 6
Attachment 1
Jacobs Engineering's Request
Hi Rafael,
I work with Jacobs on the ACE Trench Project and we had the below two items for the Walnut
Grove Ave Crossing we were hoping to get input from the City of Rosemead. I spoke with your
inspector last Thursday to discuss and he felt it would be best to reach out to you.
1 - We will be installing 8" bollards to protect signal arms at the Walnut Grove crossing with the
railroad tracks. Our question is whether the City prefers any specific color or a sleeve to be
installed on the bollards.
2- We would like to extend out the red curb along NB Walnut Grove Ave (see attached picture)
approaching the crossing. The new striping does not accommodate parking along the street
and we have placed temporary no parking signs until we have authorization from City of
Rosemead to move forward with the red curb.
Please advise.
Talal Trabolsi, P.E.
JACOBS I San Gabriel Trench Project 1714.325.1222 mobile I talal.trabolsi ajacohs.com
•
N-,.
•
Traffic Commission Meeting
December 7, 2017
( Page 4 of 6
t Attachment 2
Vicinity Map Showing Existing Curb Markings
e. a0 0'•7:1(+u • c. r r, • ` rJ \
rr i� •
•'�\ •,F, 'IC ,••• � �r,yp ,
_
r r r r r r i rr• �. '+
♦f •r r r r r'r 4
'' ( �014C ~ 1'�-•, rte '_ M_
I (� f r(y f r r r r r ( ♦
,,.. . , , ,.. ttr, .
.. . ..., ,r '
ii
• i 1r r (' _),) V „,„..or Ir i AL
r • n0. 0000 .
( 1 v •. �t�.
_ .
.r , ..-
1
1,.. _ lkr(1 r ,lk •• Yo 1 --.
.s ,,A,k , 114:
, r o 61 18 t ' ; A\ • . . 1 t <A.'.'
•
I,r ,, � .,, r— L
.T i
N
Traffic Commission Meeting
December 7, 2017
Page 5 of 6
l
Attachment 3
Proposed Recommendation
t .i,..,‘'1 N+ , .• • i
•
![f,• .• ‘
rr
r f. .=` •' ,A - ? C < r r r r .'r• : \'•.. 1* .'tom '- .
dii,
A ,..sr' r , ' s • \ ` ' \ • • -: _ - .- , -`.,.%;
, '1 . .( I. Ili ..* ' e ' 1 • ,
r Ill1• r I 1 • r ,y y r 1 1 4 ,� 1
. i ,(k•
iw.✓.-- , , , ,`r• C ,., + - �t • y,t•r• .t ,11 '•.t • • t , i
. ) . •••• - i,. t ;r t • ." . t. r kit .-- . . :
•
r r ,I r r '� � f •e . ` t
ra
r r �f • \
rj. \
r n' iA r i • \tk \
,'. * • k9
. i iki afifIllit 444.1-r•
16
c r. ' 14A\ ' ..‘ ‘Mi . j• - ' iii021 4 it'-'", '
•F. ;. -Ea- .•i ' 16ce hr C w•, r p• +'•
A
N
r
Traffic Commission Meeting
December 7, 2017
( Page 6 of 6
Attachment 4
City of Rosemead
Public Notification
NOTICE IS HEREBY GIVEN that on Thursday, December 7, 2017, at the hour of 7:00 p.m., or soon
thereafter as the matter may be heard, the Rosemead Traffic Commission will hold a public meeting in the
Council Chambers at City Hall, 8838 E. Valley Boulevard, Rosemead, California 91770, for the purpose of
reviewing the possible extension of the existing 20-feet red curb at 5012 Walnut Grove Avenue to the rail
road crossing, which is approximately 100 additional feet. The request was submitted by Talal Trabolsi of
Jacobs Engineering Group, the lead construction management company for the ACE Trench Project for
the Walnut Grove Avenue Crossing, and is needed due to the installation of new striping as part of the ACE
Trench Project, which will no longer accommodate parking in this area.
You are being notified of this meeting because your property is within close proximity to the location.
Citizens'wishing to comment may do so by either attending the Traffic Commission meeting, or by sending
a comment letter by 5:00 p.m. on Thursday, December 7, 2017. Written comments must be addressed to:
City of Rosemead
Public Works Department
8838 E. Valley Boulevard
Rosemead, California 91770
Attention: Mrs. Michelle Ramirez, Director of Public Works
Written comments may be mailed to the above address, emailed to mramirez(c�citvofrosemead.orq, or
faxed to(626) 307-9218. Again, only letters received by 5:00 p.m. on Thursday, December 7, 2017, will be
accepted. Should you have any questions regarding this letter, please contact the City Engineer, Rafael
( Fajardo, at (626) 569-2151.
For information please call:
Para obtener más informacion, favor de Ilamar al:
De biet them chi tiet, xin gpi:
626-569-2150
Proposed Recommendations
5012 Walnut Grove Avenue, Rosemead
3 i - -_• C f"•�
ti ,. � , 1 1 ,r3.
fir. ..1.,rk;. _ ,'1 • . -
ti;A I 1 ~, A`` I"