Geotechnical Report_City of Rosemead_Walnut Grove Ave Valley Blvd Inters_121317
LIMITED PAVEMENT/GEOTECHNICAL INVESTIGATION
REPORT
PROJECT:
PAVEMENT DISTRESS STUDY AT THE INTERSECTION OF
WALNUT GROVE AVENUE AND VALLEY BOULEVARD
ROSEMEAD, CA 91770
FOR:
CITY OF ROSEMEAD
8838 EAST VALLEY BOULEVARD
ROSEMEAD, CA 91770
PREPARED BY:
GEO-ADVANTEC, INC.
457 W. ALLEN AVENUE, SUITE 113
SAN DIMAS, CALIFORNIA 91773
PROJECT NO. 17-1188
DECEMBER 13, 2017
Table of Contents
Subject Page
1. INTRODUCTION ......................................................................................................... 1
2. SITE CONDITIONS AND PAVEMENT DISTRESSES ............................................. 2
3. SCOPE OF SERVICES ................................................................................................. 2
4. FIELD EXPLORATORY WORKS .............................................................................. 3
5. SUBSURFACE CONDITIONS .................................................................................... 4
6. LABORATORY TESTING........................................................................................... 4
7. GROUNDWATER ........................................................................................................ 5
8. COLLAPSE POTENTIAL ............................................................................................ 5
9. CONCLUSIONS AND RECOMMENDATIONS ........................................................ 5
9.1. Discussion ............................................................................................................... 5
9.2. Recommended Rehabilitation ................................................................................. 6
9.2.1. Full Depth Removal and Reconstruction (FDRR) ........................................... 7
9.3. Utility Trench Backfilling ....................................................................................... 8
9.4. Temporary Excavations........................................................................................... 9
10. OBSERVATION AND TESTING ........................................................................... 10
11. CLOSURE ................................................................................................................ 10
457 West Allen Avenue, Suite 113. San Dimas, California 91773. Phone: (909) 305 – 0400. WWW.GeoAdvantec.com
Mr. Rafael Fajardo, P.E. December 13, 2017
Public Works Director Project No. 17-1188
City of Rosemead
8838 East Valley Boulevard
Rosemead, CA 91770
Subject: Limited Pavement/Geotechnical Investigation Report
Pavement Distress Study at the Intersection of
Walnut Grove Avenue and Valley Boulevard
Rosemead, CA 91770
1. INTRODUCTION
This report presents the results of a Limited Pavement/Geotechnical Investigation performed by
Geo-Advantec Inc. (GAI) for the Pavement Distress Study at the intersection of Walnut Grove
Avenue and Valley Boulevard, located within the City of Rosemead, California. This investigation
was performed to provide geotechnical and pavement information at the site, and to determine the
causes for distresses observed at the site, as described in the forthcoming sections of this report.
The report also includes our recommendations for the rehabilitation of the distresses from a
pavement/geotechnical standpoint.
The recommendations provided within this submittal are based on the results of our field
exploration, laboratory testing, engineering analyses and our experience from similar projects. Our
services were performed in general accordance with our Proposal No. 17-1188, dated August 30,
2017.
A vicinity map is presented as Figure A-1 within Appendix A. An aerial photo of the site has been
used as the base map to depict the approximate locations of the pavement distresses and the borings
performed, and is presented as Figure A-2 within Appendix A.
Our professional services have been performed using the degree of care and skill ordinarily
exercised, under similar circumstances, by reputable geotechnical consultants practicing in this or
similar localities. No other warranty, expressed or implied, is made as to the professional advice
included in this report. This report has been prepared for City of Rosemead (“the City”) and their
design consultant for the subject project. The report has not been prepared for use by other parties,
and may not contain sufficient information for the purposes of other parties or other uses. The
Geotechnical Engineer of Record should be allowed to review the plans for the proposed
Project No. 17-1188 Geo-Advantec, Inc. Page 2 of 11
December 13, 2017
development and perform such additional geotechnical analyses as may be required to confirm the
applicability of the recommendations contained in this report to the final design.
2. SITE CONDITIONS AND PAVEMENT DISTRESSES
The pavement distresses are located at the intersection of Walnut Grove Avenue and Valley
Boulevard, located in the City of Rosemead, California. The streets are in a medium traffic volume
area surrounded by commercial businesses on all side and is along a bus route in the west-east
direction. The main pavement distresses observed are as follows:
1. Depression – a localized low spot on the pavement surface. These spots are most
noticeable after a rain, when the depression is filled with water.
2. Shoving – plastic movement in the asphalt concrete that creates a localized bulging on
the surface
3. Rutting – the displacement of asphalt concrete that creates channels in the wheel path
on the surface.
Approximate locations of the observed depression and shoving distresses described are depicted
on Figure A-2 within Appendix A, and the photographs are shown in Appendix P. There are two
depressions observed at the intersection. The first one is a moderate sized depression located on
the southeast corner of the intersection (“corner depression”) as seen in Photo 1 within Appendix
P, and the second one is a large sized depression located in the center of the intersection on the
slow eastbound lane (“center depression”) as seen in Photos 3 and 4. Shoving was observed just
past the concrete bus pad on the eastbound lane as seen in Photo 5. There were also excess asphalt
spilling over into the concrete gutter at the same location. Moderate to high intensity rutting were
observed on all lanes on the eastbound and westbound directions.
The site is relatively flat with an approximate elevation of 320 feet Above Mean Sea Level
(AMSL). More detailed information about the location of the subject project is presented on
Figures A-1 and A-2 within Appendix A of this report.
3. SCOPE OF SERVICES
Our scope of services for this project included the followings:
Project No. 17-1188 Geo-Advantec, Inc. Page 3 of 11
December 13, 2017
x Performing a site reconnaissance, evaluating the general site conditions, and marking the
proposed boring locations for the purpose of underground utility clearance;
x Conducting four exploratory borings at the proposed locations within vicinity of the project
limits using asphalt concrete coring machine and hand auger, and sampling periodically;
x Measuring the existing asphalt concrete and base sections thicknesses;
x Performing laboratory testing on selected soil samples obtained from our exploratory
borings;
x Reviewing the field data and the laboratory test results, performing engineering analyses,
and preparing a final geotechnical evaluation report for the site which includes our findings
and recommendations for the design and rehabilitation of the distresses from the
geotechnical point of view.
4. FIELD EXPLORATORY WORKS
The field exploration program took place on November 7, 2017 and it consisted of performing a
total of four 6-inch diameter exploratory borings. Figure A-2 presents approximate locations of
the conducted borings plotted on the aerial photo of the intersection along with the pavement
distresses limits. Borings B-1 and B-2 were placed near the shoving/rutting areas, Boring B-3 near
the corner depression, and Boring B-4 near the center depression.
The borings were conducted using an asphalt concrete coring machine and hand auger, were drilled
down to the planned depth. Modified California Sampler samples were taken periodically for the
deeper borings. Borings B-1 and B-2 were drilled down to approximately 2 feet below the ground
surface (bgs), while Boring B-3 and B-4 were drilled down to approximately 6 feet and 7 feet bgs,
respectively. The thicknesses of the asphalt concrete (AC) and underlaying base layer were
measured. The following table presents the results of our measurements on the existing pavement
sections along with classification of base and subgrade material.
Project No. 17-1188 Geo-Advantec, Inc. Page 4 of 11
December 13, 2017
Table 1 – Field Measurement of Asphalt Concrete and Base Layer Thicknesses
SAMPLE
LOCATION
LAYER THICKNESSES (IN) MATERIAL CLASSIFICATION
ASPHALT
CONCRETE BASE BASE(1) SUBGRADE(2)
B-1 7.5 9.5 Crushed Aggregate Base Silty Sand
B-2 7.0 11.0 Crushed Aggregate Base Silty Sand
B-3 6.0 9.0 Crushed Aggregate Base Silty Sand
B-4 10.0 6.5 Crushed Aggregate Base Silty Sand
Notes:
(1) Base classification was based on visual observation, and was not tested for its conformity to
specification defined the Standard Specifications for Public Works Construction (“Greenbook”).
(2) Subgrade classification was based on visual classification method with the aids of laboratory lab
tests.
5. SUBSURFACE CONDITIONS
The soil encountered in our exploratory work was predominantly silty sands with varying amounts
of gravel. The silty sand layers in Boring B-3 is medium dense throughout, whereas in Boring B-
4 is in very loose to loose in the upper 6 feet below the ground surface (bgs) and becoming medium
dense below 6 feet bgs. The encountered soils in Boring B-3 were generally slightly moist to moist,
whereas Boring B-4 were moist to very moist in the upper 5 feet bgs and slightly moist to moist
below 5 feet bgs. It should also be noted that the material in Boring B-1 had a black appearance
whereas the other three borings had a brown appearance.
Variations in the soil layer conditions, as well as more detailed information, are indicated on the
attached Boring Logs in Appendix B. Approximate locations of the borings are shown on the
boring locations plan, Figure A-2. The soil conditions described in this report are based on the
soils observed in the test borings drilled for this investigation and the laboratory test results. It is
possible that soil conditions could vary in areas other than the boring locations.
6. LABORATORY TESTING
Laboratory testing, including moisture content, unit weight, gradation, and plasticity index
(Atterberg limits) tests were performed on selected soil samples obtained from the site
investigation to aid in the classification of the encountered layers and to evaluate their engineering
properties. Consolidation tests been conducted on selected soil samples to determine their collapse
Project No. 17-1188 Geo-Advantec, Inc. Page 5 of 11
December 13, 2017
potential. Also, bitumen extraction and sieve analyses have been conducted on the upper asphalt
concrete section for one of the asphalt concrete cores obtained. The results of our laboratory tests
are presented on the boring logs in Appendix B, as well as within Appendix C.
7. GROUNDWATER
As mentioned above, the subject site has an approximate elevation of about 320 feet Above Mean
Sea Level (AMSL). We have reviewed the historically highest groundwater contour map shown
in “Seismic Hazard Zone Report for the El Monte 7.5-Minute Quadrangle, Seismic Hazard Zone
Report 024” published by “Department of Conservation, California Division of Mine and
Geology", shown in Figure D-1 within Appendix D. Historically highest groundwater depth is at
approximately 35 feet bgs. Also, groundwater was not encountered to a maximum depth of 7.4
feet bgs during our exploratory works (Appendix B). Based on the site topography, historically
highest groundwater contour map, and data obtained from the exploratory borings conducted at
the site, it is unlikely that the groundwater would contribute to the pavement distresses observed.
8. COLLAPSE POTENTIAL
To study the hydro-consolidation (“collapse”) characteristics of the site’s underlaying soil, we
have performed three consolidation tests on selected samples where inundation occurred at vertical
stresses close to their corresponding in-situ stresses. The silty sand in Boring B-3 at 24 inches bgs
settled approximately 5.0 percent upon inundation at a vertical stress of about 400 psf. The silty
sand in Boring B-4 at 24 inches and 65 inches had negligible settlement upon inundation. Due to
the moderate collapse potential for slightly moist sample, care shall be taken to ensure all backfill
are moisture-condition above their optimum moisture content.
9. CONCLUSIONS AND RECOMMENDATIONS
9.1. Discussion
Based on the manholes observed at the site and the provided utility plans, there is a sewer line at
approximately 8 to 10 feet below the ground surface (bgs). The center depression is located
between two manholes, i.e. right above the sewer line. However, based on the trend of change in
Project No. 17-1188 Geo-Advantec, Inc. Page 6 of 11
December 13, 2017
moisture content in Boring B-4, it cannot be concluded that any leak or a broken sewer line was
the cause of the center depression. The excess moisture in the upper 5 feet indicates that it could
be a surface runoff issue that contributed to the initial softening of the subgrade soil, or that the
center depression has caused excess water to accumulate in that area and infiltrate into the subgrade
soil. It is noted that the soils in the upper 6 feet adjacent to the center depression was in very loose
to loose state, thus contributing to the settlements seen.
The soils adjacent to the corner depression was medium dense throughout with a slight increase in
moisture with increasing depth. It is not clear what is the cause for the corner depression since it
does not have a loose soil layer nor excess moisture content. However, it is noted that the
depression is right above a conduit for telecom cables (Photo 2) and further investigation should
be performed by the responsible telecom company.
The effect of hydro-consolidation (“collapse”) as mentioned in Section 8 should also be
considered. Surface runoff with poor drainage could infiltrate through the pavement section and
into the subgrade soils, causing a trigger of collapse. The high moisture content seen in Boring B-
4 could indicate that collapse had already been triggered and resulted in the center depression.
Shoving at the edge of the concrete bus pad indicates that there could be too much asphalt binder,
too much fine aggregate, rounded aggregate, etc. Also, various mechanical parts and tools were
observed to be pressed into the asphalt near Boring B-1 (Photo 6). These clues help reinforce that
the asphalt mix could be an issue. However, the scope of our investigative works cannot determine
the existence of such problem.
9.2. Recommended Rehabilitation
The cause of the center and corner depression is most likely from lack of adequate compaction on
backfilled materials placed in the trenches during construction of the existing utility lines. Also,
volume change in the soils due to intrusion of water from any source (e.g. runoff) and existence of
collapsible materials could have exacerbated the situation. To mitigate the depression and prevent
future progress of settlement, the area should be rehabilitated by Full Depth Removal and
Reconstruction (FDRR). The FDRR should be either performed along the entire length of the sewer
line and telecom trench within the intersection, or within the locality of the distressed.
If localized repair is intended, the limit of excavation and removal of the soils shall extend laterally a
distance equal to the diameter of the depression on all sides (i.e. if the average diameter of the
Project No. 17-1188 Geo-Advantec, Inc. Page 7 of 11
December 13, 2017
depression is 3 feet, the FDRR area should be approximately 9 feet by 9 feet). After the entire
backfilled materials are excavated, the removed soils shall be placed back in layers not exceeding 8
inches in thickness when placed loose, and shall be moisture-conditioned to a moisture content
between the optimum and 3 percent above the optimum moisture content, and compacted to at
least 90 percent of the maximum dry density obtained per ASTM D1557. Prior to placement of
backfill, the bottom of removal shall be observed and confirmed to be competent by the
Geotechnical Engineer of Record.
Also, as discussed, the asphalt pavement at the intersection has demonstrated significant deformations
of shoving and rutting types. It is our recommendation that the asphalt pavement within the
intersection and at least 150 feet before the intersection from each side, be demolished and replaced
with a new pavement section/FDRR. The recommended sections for FDRR of the pavement section
are provided in the following section 9.2.1.
Samples of the subgrade soils were obtained from our exploratory works and assumed R-Value was
chosen based on the subgrade soil classification. The pavement section recommendations provided in
Table 2 below are based on the R-Values assumed. The pavement section recommendations are for
Traffic Index (TI) values of 9, 10 and 11. We would be pleased to provide additional pavement section
recommendations for different TI values upon request.
9.2.1. Full Depth Removal and Reconstruction (FDRR)
The Full Depth Removal and Reconstruction (FDRR) alternative includes removal of the entire
asphalt concrete and base layer, reworking and compacting of the subgrade soils, and placing back
well-compacted layers of base and asphalt concrete.
This alternative consists of constructing the pavement section by placing layers of hot Asphalt
Concrete Mix (ACM) over the compacted base materials. The base layer should be underlain by
compacted subgrade soils. It is recommended that the upper 12 inches of the subgrade soils below the
base layer be scarified, moisture-conditioned, and compacted. The subgrade soils shall be moisture-
conditioned to moisture content between the optimum and 2 percent above the optimum moisture
content, and compacted to at least 95 percent of the maximum dry density obtained per ASTM D1557.
For the rehabilitation within the center depression area, it is recommended that the additional subgrade
soils be reworked up to 5 feet below the ground surface.
Project No. 17-1188 Geo-Advantec, Inc. Page 8 of 11
December 13, 2017
Asphalt thickness for different TI values are provided in Table 2. It is recommended that the first
layer of ACM over the base material should be a dense/leveling course of about 2 inches thick,
overlaid by placing of layer(s) of ACM with maximum thickness of 4 inches each layer.
Table 2 – Recommended Full Depth Removal and Reconstruction
R-Values TRAFFIC INDEX
MINIMUM COURSE THICKNESS (IN)
HOT MIXED
ASPHALT, tAC AGGREGATE BASE, tB
40
9 6.0 9.0
10 6.5 10.5
11 7.0 12.0
Base course material should consist of Crushed Aggregate Base (CAB) as defined by Section 200-
2.2 of the Standard Specifications for Public Works Construction (“Greenbook”). In lieu of CAB
materials, Crushed Miscellaneous Base (CMB) materials as defined by Section 200-2.4 of the
Greenbook may be used. Base course should be compacted to at least 95 percent of the maximum dry
density of that material. The assumed R-value in design of the above provided preliminary sections
for CAB material is 78.
Base course material should be purchased from a supplier who will certify the base course will meet
or exceed the specifications in the Greenbook as indicated. We could, at your request, perform sieve
analysis and sand equivalency tests on material delivered to the site which appears suspect.
Additional tests could be performed, upon request, to determine if the material is in compliance with
the specifications.
9.3. Utility Trench Backfilling
If utility trenches are encountered during reworking of the deep subgrade for the center depression
or corner depression, recommendation shall be as followed. A minimum of 4 inches of bedding
material shall be first placed below the bottom of the utility line, on a firm and unyielding subgrade.
Bedding material shall also be placed immediately around a utility line extending to a point 12
inches above the top of the line. The bedding material should consist of sand, fine-grained gravel,
or cement slurry to support the line and protect it. The bedding material should meet the
specification given in the latest edition of the Greenbook. Sand or gravel should be compacted in
accordance with Greenbook specifications.
Project No. 17-1188 Geo-Advantec, Inc. Page 9 of 11
December 13, 2017
Above the bedding material and up to the finished ground surface, utility trench backfills may
consist of low-expansive material (EI less than 35), and should be mechanically compacted to at
least 90 percent of the maximum dry density of the soils, except below pavements or within the
areas with a higher relative compaction such as building pads. A minimum relative compaction of
95 percent will be required in the upper 1 foot of the backfill underneath the pavement areas and
the minimum required relative compaction for the upper 2 feet within the building pads shall be
as set forth for the building pads. Prior to backfilling, the gradation and expansivity of the backfill
material shall be tested, reviewed, and approved by the soils engineer. The bedding materials and
backfilling should be placed in accordance with Sections 306-1.2.1 and 306-1.3 of the Greenbook.
When adjacent to any footings, utility trenches and pipes should be located above an imaginary
line measured at a gradient of 1:1 (horizontal: vertical) projected down from the bottom edges of
any footings. Otherwise the pipe should be designed to accept the lateral effect from the footing
load, or the footing bottom should be deepened as needed to comply with this requirement, into
competent materials.
For bedding and backfilling of trenches and upon approval of the soils engineer, slurry mix
(CLSM) may be used. The slurry mix shall comply with the requirements of Section 201-6 of the
Greenbook. The backfill material shall be observed, tested and approved by the Geotechnical
Engineer.
9.4. Temporary Excavations
Based on the grading recommendations provided, it is expected that the excavation for reworking
the subgrade be as deep as about 5 feet bgs. The shallow soils at the site are expected to be
temporarily stable when excavated at a gradient of 1.5:1 (H:V) for excavations that are less than 5
feet in height. The top of slopes should be barricaded to prevent vehicles and storage loads within
7 feet of the tops of the slopes. A greater setback may be necessary when considering heavy
vehicles (e.g. concrete trucks and cranes) and we should be advised of such heavy vehicle loadings
so that specific setback requirements can be established. When excavating adjacent to footings of
existing buildings, proper means should be employed to prevent any possible damage to the
existing structures. Adjacent to existing buildings, un-shored excavations should not extend below
a 1:1 (H:V) plane extending downward from the lower edge of adjacent footings. All regulations
of State or Federal OSHA should be followed.
Project No. 17-1188 Geo-Advantec, Inc. Page 10 of 11
December 13, 2017
Temporary excavations are assumed to be those that will remain un-shored for a period of time
not exceeding 10 days. In dry weather, the excavation slopes should be kept slightly moist, but not
saturated. If excavations are made during the rainy season (normally from November through
April), particular care should be taken to protect slopes against erosion. Mitigative measures, such
as installation of berms, plastic sheeting, or other devices, may be warranted to prevent surface
water from flowing over or ponding at the top of excavations.
10. OBSERVATION AND TESTING
This final report has been prepared assuming that GEO-ADVANTEC, INC. will perform all
geotechnical-related field observations and testing. If the recommendations presented in this report
are utilized, and observation of the geotechnical work is performed by others, the party performing
the observations must review this report and assume responsibility for recommendations contained
herein. That party would then assume the title “Geotechnical Consultant of Record”.
A representative of the Geotechnical Consultant should be present to observe all grading
operations as well as all footing excavations. Upon the client’s request, a report or final verification
letter presenting the results of these observations and related testing should be issued upon
completion of the grading operations.
11. CLOSURE
The findings and recommendations presented in this final report were based on the results of our
field and laboratory investigations, combined with professional engineering experience and
judgment. The report was prepared in accordance with generally accepted engineering principles
and practice. We make no other warranty, either expressed or implied.
The soils encountered in the boreholes are believed to be representative of the total under
consideration area for the subject proposed developments; however, soil characteristics can vary
throughout the site. GAI should be notified if subsurface conditions are encountered which differ
from those described in this report.
Project No. 17-1188 Geo-Advantec, Inc. Page 11 of 11
December 13, 2017
Samples secured for this investigation will be retained in our laboratory for a period of 45 days
from the date of this report and will be disposed after this period unless other arrangements are
made.
Should you have any questions concerning this submittal, or the recommendations contained
herewith, please do not hesitate to call our office.
Respectfully submitted,
GEO-ADVANTEC, INC.
Giang (Jack) Lee, P.E. Shawn Ariannia, Ph.D., P.E., G.E.
Senior Project Engineer Principal Geotechnical Engineer
Distribution:
1. Addressee (2 wet stamped copy + pdf copy via e-mail)
2. File
19
APPENDICES
Appendix A: Maps and Plans and Figures
Figure A-1: Vicinity Map
Figure A-2: Boring Locations Plan
Appendix B: Field Exploratory Logs
Keys to Logs
Borings B-1 to B-4
Appendix C: Laboratory Test Results
Sieve Analysis
Percent Finer than No. 200
Consolidation Test
Asphalt Binder/Extraction Test
Appendix D: Quadrangle Maps
Figure D-1: Historically Highest Groundwater Map
Appendix P: Site Photographs
APPENDICES
APPENDIX A
MAPS, PLANS AND FIGURES
352-(&76,7(
),*85(
352-(&712
*HR$GYDQWHF,QF
'$7(
9,&,1,7<0$3
$
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
%
%
%
%
6&$/()7/(*(1'%25,1*/2&$7,211$0('(37+1%
),*85($352-(&712*HR$GYDQWHF,QF'$7(%25,1*/2&$7,2163/$13DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
APPENDIX B
FIELD EXPLORATORY BORING LOGS
86&6
6<0%2/
*:
*3
*0
*&
6:
63
60
6&
0/
&/
2/
0+
&+
2+
37
.(<72/2*6
*5$3+,&
/2*
62,/6&/$66,),&$7,21
025(7+$1
2)0$7(5,$/,6
/$5*(57+$112
6,(9(6,=(
*5$9(/6
025(7+$1
2)&2$56(
)5$&7,21,6
/$5*(57+$112
6,(9(
6$1'6
6,/76$1'&/$<6
/,48,'/,0,7,625025(
25025(2)
&2$56(
)5$&7,21,6
60$//(57+$1
126,(9(025(7+$1
),1(6
&/$<(<*5$9(/6*5$9(/6$1'&/$<0,;785(6
:(//*5$'('6$1'6*5$9(//<6$1'6/,77/(2512
),1(6
3225/<*5$'('6$1'6*5$9(//<6$1'6/,77/(25
12),1(6
6,/7<6$1'66$1'6,/70,;785(6
&/$<(<6$1'66$1'&/$<0,;785(6
,125*$1,&6,/76$1'9(5<),1(6$1'652&.)/285
6,/7<25&/$<(<),1(6$1'625&/$<(<6,/76:,7+
6/,*+73/$67,&,7<
,125*$1,&&/$<62)/2:720(',803/$67,&,7<
*5$9(//<&/$<66$1'<&/$<66,/7<&/$<6/($1
&/$<6
25*$1,&6,/76$1'25*$1,&6,/7<&/$<62)/2:
3/$67,&,7<
,125*$1,&&/$<62)+,*+3/$67,&,7<)$7&/$<6
25*$1,&&/$<62)0(',8072+,*+3/$67,&,7<
25*$1,&6,/76
3($7$1'27+(5+,*+/<25*$1,&62,/6
7<3,&$/1$0(6
:(//*5$'('*5$9(/6*5$9(/6$1'0,;785(6
/,77/(2512),1(6
3225/<*5$'('*5$9(/6*5$9(/6$1'0,;785(6
/,77/(2512),1(6
6,/7<*5$9(/6*5$9(/6$1'6,/70,;785(6
,125*$1,&6,/760,&$&(28625',$720$&(286),1(
6$1'<25*5$9(//<(/$67,&6,/76
),1(
*5$,1('
62,/6
6,/76$1'&/$<6
/,48,'/,0,7,6/(667+$1
0$-25',9,6,216
&/($1
*5$9(/6
/(667+$1
),1(6
*5$9(/6
:,7+),1(6
025(7+$1
),1(6
&/($1
6$1'6
/(667+$1
),1(6
6$1'6:,7+
),1(6
&2$56(
*5$,1('
62,/6
+,*+/<25*$1,&62,/6
25025(2)
0$7(5,$/,6
60$//(57+$1
126,(9(6,=(
),1( ),1( &2$56(6,(9(6,=(6
6$1'
*5$,16,=(6
&2$56(
*5$9(/&2%%/(6 %28/'(566,/7$1'&/$<0(',80
%XON%DJ6DPSOH
6WDQGDUG3HQHWUDWLRQ7HVW637
&DOLIRUQLD0RGL¿HG6DPSOHU
&KDQJHLQPDWHULDOREVHUYHGLQVDPSOHRU
FRUHV
&KDQJHLQPDWHULDOFDQQRWEHDFFXUDWHO\
ORFDWHGGXHWROLPLWDWLRQVLQWKH
GULOOLQJVDPSOLQJPHWKRGVXVHG
:DWHU/HYHODW(QGRI
'ULOOLQJ
:DWHU/HYHODW7LPH
'ULOOLQJ
:DWHU/HYHO$IWHU
6SHFL¿HG+RXUV
SPT CD (2) SPT CD (1) CD (2)
0-4 0-8 0-4 0-8 0-20
5-8 9-16 5-10 9-18 21-50
9-15 17-45 11-30 19-54 51-150
16-30 46-195 31-50 55-90 151-250
over 30 over 195 over 50 over 90 over 250
SOME
GRANULAR SOILS
(SANDS, GRAVELS, etc.)
*THE FOLLOWING "DESCRIPTIVE TERMINOLOGY/ RANGES OF MOISTURE CONTENTS" HAVE BEEN USED FOR MOISTURE
CLASSIFICATION IN THE LOGS.
DESCRIPTION
AND
20-35%
DESCRIPTIVE ADJECTIVE VS. PERCENTAGE
DESCRIPTIVE ADJECTIVE
TRACE
LITTLE
PERCENTAGE REQUIREMENT
1 - 10%
10-20%
VERY DENSEHARD over 39
* CONVERSION BETWEEN CALIFORNIA DRIVE SAMPLERS (CD) AND STANDARD PENETRATION TEST (SPT) BLOW COUNT
HAS BEEN CALCULATED USING "FOUNDATION ENGINEERING HAND BOOK" BY H.Y. FANG. (VALUES GIVEN AS CD (1) ARE
FOR 140 Lbs HAMMER WEIGHT AND 30 INCHES DROP ONLY. VALUES GIVEN AS CD (2) ARE FOR HAND AUGERING WITH 35
Lbs HAMMER WEIGHT AND 18 INCHES FREE DROP/FALL. )
LOOSE
MEDIUM DENSE
DENSEVERY STIFF 19-39
FIRM 5-9
STIFF 10-18
0-4 VERY LOOSE
CONSISTENCY
GRANULAR SOILS (SANDS, GRAVELS, etc.)
RELATIVE DENSITY *BLOWS/FOOT
FINE-GRAINED SOILS (SILTS, CLAYS, etc.)
*BLOWS/FOOT
KEY TO LOGS
MOIST 10-13
MOISTURE CONTENT (%)
DRY 2 - 4
SLIGHTLY MOIST
<10
15-24
24-28
35-50%
FINE-GRAINED SOILS
(SILTS, CLAYS, etc.)
SPT/CD BLOW COUNTS VS. CONSISTENCY/DENSITY
CD (1)
SOFT
Almost saturated; visible free
water
APPROXIMATE MOISTURE CONTENT DEFINITION
Dry to the touch; no observable
moisture
Some moisture but still a dry
appearance
Damp, but no visible water
Enough moisture to wet the hands
WET 20-25
VERY MOIST 15-20
6-8
DEFINITION
30-38
>40
!
"# "$
%
$
&
'&
()
***
***
***
&&++&
,
!#
-* .
"/ 00 1
!2
!-
)#+/
3.
443535-)//4
6
/ 76
))8! )!
9:
:;# <
96-3&=<&
5
! &*&&>>
!
;
!-..?2
. 6
./.#
!
5
"
"
#$%&"'('
&&
1 -
. !
"#
."# "$1
$
&
()
***
***
***
&&++&
,
!#
-* .
"/ 00 1
!2
!-
)#+/
3.
443535-)//4
6
/ 76
))8! )!
9:
:;# <
96-3&=<&
)
5
! &*&&>>
!
;
!-..?2
. 6
./.#
!
5
"
"
#$%&"'('
D0*'>
>
@E*'
E
@>
E
!
"
#
."# "$1
!
$
E&
E
&&
&0E&
&&0E
>
'@
@&
@E
()
***
***
***
&&++&
,
!#
-* .
"/ 00
@
0 1
!2
!-
)#+/
3.
443535-)//4
6
/ 76
))8! )!
9:
:;# <
96-3&=<&
*
5
! &*&&>>
!
;
!-..?2
. 6
./.#
!
5
"
"
#$%&"'('
*&&
&>
*&E
@'
@*&DD
@@
&
&0
E
!
"
#
."."$1
#
"#
.".
".". 1
1
$#
.
#$$! E "#
#
" ! "#
$
D
&E&
&'
>
&
@
&0@
&
D
''
@
&D
()
***
***
***
&&++&
,
!#
-* .
"/ 00
@
0 1
!2
!-
)#+/
3.
443535-)//4
6
/ 76
))8! )!
9:
:;# <
96-3&=<&
+
5
! &*&&>>
!
;
!-..?2
. 6
./.#
!
5
"
"
#$%&"'('
APPENDIX C
LABORATORY TEST RESULTS
3URMHFW 3DYHPHQW'LVWUHVVHVDW:DOQXW*URYH$YH 9DOOH\%OYG 3URMHFW1R
6LWH 5RVHPHDG&$'DWH
7HFK 0$1
6DPSOH %# 7HVW6SHFL¿FDWLRQ $670'
0DWHULDO 6LOW\6$1'60
0HVK 3HUFHQW
6LHYH 2SHQLQJ 3DVVLQJ
PP
LQ
LQ
LQ
LQ
1R
1R
1R
1R
1R
1R
3$57,&/(6,=(',675,%87,215(3257
3(5&(17),1(5*5$,16,=(PP
6,/7 &/$<
*5$9(/ 6$1'
&RDUVH )LQH&RDUVH0HGLXP)LQH&2%%/(
),*85(
352-(&712
*HR$GYDQWHF,QF
'$7(
6,(9($1$/<6,6
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
3URMHFW 3DYHPHQW'LVWUHVVHVDW:DOQXW*URYH$YH 9DOOH\%OYG 3URMHFW1R
6LWH 5RVHPHDG&$'DWH
7HFK 0$1
6DPSOH %# 7HVW6SHFL¿FDWLRQ $670'
0DWHULDO 6LOW\6$1'60
0HVK 3HUFHQW
6LHYH 2SHQLQJ 3DVVLQJ
PP
LQ
LQ
LQ
LQ
1R
1R
1R
1R
1R
1R
3$57,&/(6,=(',675,%87,215(3257
3(5&(17),1(5*5$,16,=(PP
6,/7 &/$<
*5$9(/ 6$1'
&RDUVH )LQH&RDUVH0HGLXP)LQH&2%%/(
),*85(
352-(&712
*HR$GYDQWHF,QF
'$7(
6,(9($1$/<6,6
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
3URMHFW 3DYHPHQW'LVWUHVVHVDW:DOQXW*URYH$YH 9DOOH\%OYG 3URMHFW1R
6LWH 5RVHPHDG&$'DWH
7HFK 0$1
6DPSOH %# 7HVW6SHFL¿FDWLRQ $670'
0DWHULDO 6LOW\6$1'60
0HVK 3HUFHQW
6LHYH 2SHQLQJ 3DVVLQJ
PP
LQ
LQ
LQ
LQ
1R
1R
1R
1R
1R
1R
3$57,&/(6,=(',675,%87,215(3257
3(5&(17),1(5*5$,16,=(PP
6,/7 &/$<
*5$9(/ 6$1'
&RDUVH )LQH&RDUVH0HGLXP)LQH&2%%/(
),*85(
352-(&712
*HR$GYDQWHF,QF
'$7(
6,(9($1$/<6,6
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
% 60
% 60
% 60
% 60
% 60
% 60
35(:$6+
'5<:(,*+7
JP
$)7(5:$6+
'5<:(,*+7
JP
62,/7<3(
6,(9($1$/<6,662,/3$66,1*$670'
%RULQJ 'HSWKLQ
),*85(
352-(&712
*HR$GYDQWHF,QF
'$7(
3(5&(17),1(57+$1126,(9(
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
3URMHFW 3URMHFW1R 'DWH7HVWHG
6LWH/RFDWLRQ 7HVWHGE\
%RULQJ1R 6DPSOH1R 'HSWK )UDPH1R 6DPSOH7\SH
6RLO'HVFULSWLRQ :DWHUDGGHG
,QLWLDO0RLVWXUH&RQWHQW )LQDO0RLVWXUH&RQWHQW
,QLWLDO'U\8QLW:HLJKWSFI )LQDO'U\8QLW:HLJKWSFI
,QLWLDO9RLG5DWLR )LQDO9RLG5DWLR
,QLWLDO'HJUHHRI6DWXUDWLRQ )LQDO'HJUHHRI6DWXUDWLRQ
$VVXPHG6SHFL¿F*UDYLW\
5HPDUNV
&2162/,'$7,217(67&RQVROLGDWLRQ&XUYH
3DYHPHQW'LVWUHVVHVDW:DOQXW*URYH$YH 9DOOH\%OYG
5RVHPHDG&$ /7
% ,QWDFW&'
6LOW\6DQG60 SVI
6HWWOHPHQW XSRQLQXQGDWLRQ
&2162/,'$7,21RI6DPSOH7KLFNQHVV9(57,&$/675(66SVI
&2162/,'$7,21&859(
$W)LHOG0RLVWXUH $IWHU6DWXUDWLRQ
),*85(
352-(&712
*HR$GYDQWHF,QF
'$7(
21(',0(16,21$/&2162/,'$7,217(67
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
3URMHFW 3URMHFW1R 'DWH7HVWHG
6LWH/RFDWLRQ 7HVWHGE\
%RULQJ1R 6DPSOH1R 'HSWK )UDPH1R 6DPSOH7\SH
6RLO'HVFULSWLRQ :DWHUDGGHG
,QLWLDO0RLVWXUH&RQWHQW )LQDO0RLVWXUH&RQWHQW
,QLWLDO'U\8QLW:HLJKWSFI )LQDO'U\8QLW:HLJKWSFI
,QLWLDO9RLG5DWLR )LQDO9RLG5DWLR
,QLWLDO'HJUHHRI6DWXUDWLRQ )LQDO'HJUHHRI6DWXUDWLRQ
$VVXPHG6SHFL¿F*UDYLW\
5HPDUNV
6HWWOHPHQW XSRQLQXQGDWLRQ
% ,QWDFW&'
6LOW\6DQG60 SVI
&2162/,'$7,217(67&RQVROLGDWLRQ&XUYH
3DYHPHQW'LVWUHVVHVDW:DOQXW*URYH$YH 9DOOH\%OYG
5RVHPHDG&$ /7
&2162/,'$7,21RI6DPSOH7KLFNQHVV9(57,&$/675(66SVI
&2162/,'$7,21&859(
$W)LHOG0RLVWXUH $IWHU6DWXUDWLRQ
),*85(
352-(&712
*HR$GYDQWHF,QF
'$7(
21(',0(16,21$/&2162/,'$7,217(67
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
3URMHFW 3URMHFW1R 'DWH7HVWHG
6LWH/RFDWLRQ 7HVWHGE\
%RULQJ1R 6DPSOH1R 'HSWK )UDPH1R 6DPSOH7\SH
6RLO'HVFULSWLRQ :DWHUDGGHG
,QLWLDO0RLVWXUH&RQWHQW )LQDO0RLVWXUH&RQWHQW
,QLWLDO'U\8QLW:HLJKWSFI )LQDO'U\8QLW:HLJKWSFI
,QLWLDO9RLG5DWLR )LQDO9RLG5DWLR
,QLWLDO'HJUHHRI6DWXUDWLRQ )LQDO'HJUHHRI6DWXUDWLRQ
$VVXPHG6SHFL¿F*UDYLW\
5HPDUNV
6HWWOHPHQW XSRQLQXQGDWLRQ
% ,QWDFW&'
6LOW\6DQG60 SVI
&2162/,'$7,217(67&RQVROLGDWLRQ&XUYH
3DYHPHQW'LVWUHVVHVDW:DOQXW*URYH$YH 9DOOH\%OYG
5RVHPHDG&$ /7
&2162/,'$7,21RI6DPSOH7KLFNQHVV9(57,&$/675(66SVI
&2162/,'$7,21&859(
$W)LHOG0RLVWXUH $IWHU6DWXUDWLRQ
),*85(
352-(&712
*HR$GYDQWHF,QF
'$7(
21(',0(16,21$/&2162/,'$7,217(67
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
APPENDIX D
QUADRANGLE MAP
352-(&76,7(
),*85(
'352-(&712
*HR$GYDQWHF,QF
'$7(
+,6725,&$//<+,*+(67*5281':$7(50$3
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
APPENDIX P
SITE PHOTOGRAPHS
3KRWR'HSUHVVLRQDWVRXWKHDVWFRUQHU
3KRWR'HSUHVVLRQDWVRXWKHDVWFRUQHUZLWKXQGHUJURXQGXWLOLWLHVPDUNHG
),*85(
352-(&712
6,7(3+272*5$3+6*HR$GYDQWHF,QF
'$7(
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
3KRWR0HDVXUHPHQWRIFHQWHUGHSUHVVLRQ
3KRWR0HDVXUHPHQWRIFHQWHUGHSUHVVLRQ
),*85(
352-(&712
6,7(3+272*5$3+6*HR$GYDQWHF,QF
'$7(
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$
3KRWR6KRYLQJDGMDFHQWWRFRQFUHWHEXVSDG
3KRWR9DULRXVREMHFWVSUHVVHGLQWRWKHDVSKDOW
),*85(
352-(&712
6,7(3+272*5$3+6*HR$GYDQWHF,QF
'$7(
3DYHPHQW'LVWUHVV6WXG\DW,QWHUVHFWLRQRI
:DOQXW*URYH$YHQXH 9DOOH\%RXOHYDUG5RVHPHDG&$