CC - Item 4B - Approval for Engineering Services for Slurry Seal Project • %Ec,,41--F-- 't / o'I stafteport TO: HONORABLE MAYOR AND MEMBERS ROSEMEAD CITY COUNCIL FROM: RANK G. TRIPEPI, CITY MANAGER J DATE: FEBRUARY 3, 1999 RE: APPROVAL OF ENGINEERING PROPOSAL TO PROVIDE ENGINEERING SERVICES FOR THE FY 1998-99 SLURRY SEAL PROJECT ON VARIOUS STREETS Attached for your consideration is an engineering proposal from Willdan Associates for engineering design (preliminary and final), construction observation and contract administration, and utility coordination for slurry seal of pavement on those streets identified as Exhibit A. The total construction cost for this project is estimated to be $113,000. The City's share is estimated at $50,000 and the Agency's estimated at$63,000. The proposed project is currently programmed in both the 1998-99 City and Redevelopment Agency budgets. The City budget utilizes State Gas Tax funds. Construction of the project is anticipated to begin in the Spring of 1999. The streets were selected based upon the recommendations of the City's Pavement Management program. COUNCIL. AGENDA FEB 091999 ITEM No. CG- i CWro osaliEn r Proposal-9899 SlurrySeal w d \ / February 3, 1999 Slurry Seal Page 2 The proposed fees are as follows: Preliminary and Final Design $ 6,800 Utility Coordination $ 2,000 Construction Observation $ 10,300 Contract Administration $ 2,900 Total Proposed Fee $22,000 The total fee, excluding utility coordination, is in conformance with that portion of the City's agreement with Willdan Associates which pertaims to design engineering services. RECOMMENDATIONS It is recommended that the Rosemead City Council: 1. Approve the attached engineering proposal. 2. Direct staff to begin the preparation of the necessary plans and specifications. Attachment C\ProposaREngrg Proposal-9899 Slurry Seal wpd A WILLDAN ASSOCIATES ❑ ENGINEERS &PLA[ FNERS Professional Consulting Services Since 1964 February 3, 1999 Mr. Frank G. Tripepi City Manager City of Rosemead 8838 E. Valley Boulevard Rosemead, CA 91770 Subject: Proposal for Professional Engineering Design, Construction Observation, Contract Administration, and Utility Coordination for the 1998-1999 Slurry Seal Program on Various Streets Dear Mr. Tripepi: As requested, we are pleased to be given the opportunity to submit this proposal for the above-referenced services. Generally,this project includes a slurry seal coat for the streets throughout and serving the City of Rosemead and the Rosemead Red evelopmentAgency area as listed in Exhibit"A." The streets selected conform to priorities shown in the updated Pavement Management System report SCOPE OF SERVICES We propose to provide the following basic services for the project: Preliminary and Final Design 1. Confer with City staff to review, in full detail,the requirements for the project. Review available information and data assembled by City staff. 2. Prepare plans identifying the streets to be slurried, the trash pickup schedule, and street sweeping schedule. 3. Attend coordination meetings, as necessary, with City personnel EX various times during the design phase to obtain additional input and revie:v work. 4. Prepare specifications and contract documents to conform to applicable requirements of the City of Rosemead. 5. Prepare final project cost estimates. 12900 CROSSROADS PARKWAY SOUTH•SUITE 200•INDUSTRY, CALIFORNIA 91746-3499•(552)908-620! •FAX(562)695-2120 February 3, 1999 Page 2 Utility Coordination 1. Submit copies of plans to all affected utilities and agencies. 2. Coordinate with affected utility companies to provide for any proposed utility improvements prior to pavement construction: 3. Coordinate with water company to implement an upgrade of fire hydrants, as needed, within the project. 4. Send notification to affected utility companies,other agencies,contrator and City staff, and attend and coordinate the preconstruction conference. Contract Administration 1. Provide the City with 20 sets of final plans and specifications for bit!ding. 2. Assist the City in securing bids and awarding project. 3. Attend preconstruction conference and prepare minutes. 4. Provide contract administration for proper enforcement of the contract plans and specifications. 5. Provide engineering support,as needed. 6. Provide the necessary consulting services required to coordinate the efforts between the City and contractor. 7. Review and recommend approval of progress payment requests. 8. Answer inquiries and complaints for the City relating to the project Construction Observation 1. Provide daily construction observation during the construction penod. 2. Provide the necessary weekly, monthly, and final reports. 3. Provide copies of daily construction observation reports on a weekly basis. 4. Provide necessary coordination with other agencies to provide final inspection of the project. February 3, 1999 Page 3 5. Provide report to City following final inspection stating that the project has been completed, and provide necessary data for City acceptance of the project. Our proposed fees are as follows: • Preliminary and Final Design (Fixed Fee) $ 6,800 • Utility Coordination (Fixed Fee) $ 2,000 • Construction Observation (Fixed Fee) $10,300 • Contract Administration (Fixed Fee) $ 2900 Total Proposed Fee $22,OD0 The current estimated construction cost for the project is $113,000. The total fee, excluding utility coordination, is in conformance with that portion of the City's agreement with Willden Associates which pertains to design engineering services. The construction contract period is estimated to be 15-working days. Compensation for weekend inspection and inspection beyond the allocated working d,3ys and hours of the construction contract will be on time-and-materials basis. If you have any questions regarding this proposal, please contact Mr. Ken R ukav Ina at (562) 908-6228. Respectfully submitted, WILLDAN ASSOCIATES Richard L. Kopecky, P.E. Senior Vice President Enclosure AF:swk 956109%6650lp9-31 EXHIBIT "A" 1998-99 SLURRY SEAL PROGRAM City of Rosemead Abilene Bartlett/Walnut Grove Brookline Guess/Guess Brookline GuessNalley Claudia Mission/Rose Claudia Marshall/End Damon Mead/Darlow Earle Marshall/Norwood Ellis Marshall/Ralph Glendon Ivar/Muscatel Grand Rosemead/Walnut Grove Greendale Marshall End Guess Hart/Rosemead Guess Muscatel/End Guess Rio Hondo/Hart Lashbrook Olney/End Linda Lee Glendon Way/City End Livia Lower Azusa/Evansport Marybeth Olney/Marshall Mead Damon/Blair Muscatel Valley/Mission Nevada Muscatel/End Olney Ivar/City End Olney Temple City/Rio Hondo Rockhold Wells/End Steele Hart/Rosemead City Hall Parking Lot Page 1 of 2 EXHIBIT "A" 1998-99 SLURRY SEAL PROGRAM Rosemead Redevelopment Agency Alley N/Emerson Evelyn/Del Mar Alley N/Garvey Jackson/Isabel Brighton Gravalia/Garvey Chariette Hellman/Anson Charlotte Dorothy/Hellman Charlotte Hellman/Artson Columbia Jackson/City End Columbia City End/Jackson Delta Dorothy/Hellman Delta Hellman/Artson Delta Fern/Garvey Dorothy San Gabriel/Gladys Dorothy Gladys/Charlotte Earle Klingerman/Fern Earle Fem/Garvey Emerson Del Mar/Evelyn Falling Leaf Emerson/North End Falling Leaf Graves/Newmark Falling Leaf Newmark/Garvey Fern Earle/Delta Graves Del Mar/Stevens Jackson Hellman/Columbia La Merced W/of San Gabriel/200' W/of San Gabriel Muscatel Garvey/Ramona Park Gladys/San Gabriel Pine Graves/Newmark Rush W/ of San Gabriel/460' E/of San Gabriel Rush Walnut Grove/San Gabriel Willard Fern/Garvey Wilson Way End/Whitmore Page 2 of 2