CC - Item 6D - Walnut Grove Resurfacing Project - Award of Contract for Design Services (--E. U711 :}4 ROSEMEAD CITY COUNCIL STAFF REPORT ittpAPoRAwo'e TO: THE HONORABLE MAYOR AND CITY COUNCIL11 I2�FROM: GLORIA MOLLEDA, CITY MANAGE .N`. DATE: FEBRUARY 27,2018 SUBJECT: WALNUT GROVE AVENUE RESURFACING PROJECT—AWARD OF CONTRACT FOR DESIGN SERVICES SUMMARY On April 28, 2017, California Senate Bill I (the Road Repair and Accountability Act of 2017) was signed into law to address basic road maintenance, rehabilitation, and critical safety needs on both the state highway and local streets road system. A percentage of this new Road Maintenance and Rehabilitation Account (RMRA) funding will be apportioned by formula to eligible cities and counties for projects that meet the RMRA requirements. On October 24, 2017, the City Council adopted Resolution No. 2017-57. approving funding under the RMRA for the Walnut Grove Avenue Resurfacing Project from Marshall Avenue to the northerly City limit. Staff has now completed a Request for Proposal (RFP) for the design engineering services of this project and will be recommending that the City Council enter into a contract with the lowest reasonable bidder. DISCUSSION SB I established the RMRA to address deferred maintenance on the state highway and local street road systems. This bill provides funding for projects that include, but are not limited to, the following: • Road Maintenance and Rehabilitation • Safety Projects • Railroad Grade Separation • Traffic Control Devices Based on the RMRA requirements, the resurfacing of Walnut Grove Avenue from the northerly City limit to Marshall Avenue would be a good candidate for this funding. According to the City of Rosemead's Pavement Management Program report from 2015, Walnut Grove Avenue has an average Pavement Condition Index (PCI) of 60. The Pavement Management Program identifies� IIFM NI IMR6FR: 1 City Council Meeting February 27, 2018 Page 2 of 3 and evaluates pavement conditions and determines the causes of deterioration, rating the pavement conditions from 0 to 100. According to this report, the aforementioned portion of Walnut Grove Avenue requires resurfacing. In addition, staff is currently working in coordination with Southern California Edison (SCE) for Rule 20A Utility Underground District, between Marshall Avenue and Valley Boulevard, along Walnut Grove Avenue. According to SCE, tentative construction will start in October 2018, and be completed at the beginning of next year (2019). As soon the Utility Underground District is completed, the street resurfacing will take place. The proposed project includes the construction of a 2.5-inch overlay of rubberized pavement, miscellaneous concrete work and appurtenances. A RFP was prepared for design engineering services and issued to a number of companies, as well as posted on the City's Website. On February 8. 2018, staff received eight (8) proposals with the following results: Rank Bidder Location Total Base Bid Amount I EC+Associates Engineering Downey $ 44,900 2 Transtech Engineers, Inc Chino $ 50,000 3 '.. NV5 Irvine $ 58,505 4 KOA Monterey Park $ 77,065 5 Tait& Associates Santa Ana $ 79,335 6 Onward Engineering Anaheim $ 84,110 7 Infrastructure Engineers Brea $ 97,904 8 Quantum Quality Consulting, Inc. Torrance $ 98,615 L 9 CEJ En_ineers, Inc. Walnut $ 116,800 Staff has reviewed the proposal documents for completeness, and investigated the consultant's background and recent projects for competency. Staff has concluded that EC + Associates Engineering is the lowest responsible bidder to perform the design of project. STAFF RECOMMENDATION It is recommended that the City Council authorize the City Manager to enter into a contract with EC + Associates Engineering for design engineering services of the Walnut Grove Avenue Resurfacing Project in the amount of$ 44,900. FISCAL IMPACT Funding for this project was approved by the City Council as part of the City's Fiscal Year 2017- 2018 Capital Improvement Project from Measure R Local Return funding. City Council Meeting February 27,2018 Page 3 of 3 STRATEGIC PLAN IMPACT Engineering Strategy 3: Continue efforts to enhance the condition and general appearance of the City's public infrastructure and the public right-of-way. ENVIRONMENTAL REVIEW The project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (a) of the CEQA Implementing Guidelines. PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Prepared by. --_ Submitted by: 47 fael M. Fajardo, P.E. City Engineer Michelle Ramire ., Dirfie-eb of Public Works Attachment A: Bid Proposal of EC + Associates Engineering Attachment B: City Council Staff Report, October 24, 2017 Attachment C: Resolution No. 2017-57 45110E M E C FR OE %AOR OgLiED 1959 Attachment A Bid Proposal of EC + Associates Engineering EC + Associates n February 8.2_018 Mr. Rafael Fajardo. P.E. City Engineer City of Rosemead 8838 E. Valley Boulevard Rosemead.CA 91770 Subject: Proposal for Professional lIngineering Services Walnut Growe :\wcnue Resurfacing Project from Northly City I 'mit to Marshall Avenue Dear Mr. Fajardo: EC t Associates I.ngineering can provide the City of Rosemead with the technical expertise required to successfully complete the Walnut Grove Avenue Resurfacing Project. We will also provide services for aspects required ti,r this project as described in the Scope of N ork. 1 he follow ing Exhibits are enclosed: • Appendix A - Scope of work • Appendix B— Schedule of I lourly Rates I'.0'Associates I'ngineering is excited about this opportunity to use our team's skills and expertise to assist the city of Rosemead with this important project. Please do not hesitate to contact us to discuss an) aspect of this proposal. Respectfully. i Emigdiu Carrillo Jr.. P.I1. Vice- President P: 562 708 3580 ww w weecacng incering.com ._L. Assoc EC +Associates Engineering www ecaengweenng cow 8207 Brookg.ern Hoax Downey CA 90240 P 562 708 3586 EC + Associates e r Appendix A Scope of Work Project Understanding The project consists in the construction of a road resurfacing, striping and appurtenances. Walnut Grove Avenue Resurfacing Project is a state funded project through S81 from RMRA, EC+Associates design services include the preparation of a topographic survey, incorporation of the the Geotechnical Investigation Report to the design, prepare construction plans and specifications and prepare a quantity calculations and construction cost estimate. Project Team Management Project Manager- EC+Associates' Project Manager, under the general direction of the City Engineer, will be responsible for overseeing the aspects of project development and coordination. The project management and constant monitoring of the schedule with all parties involved in this project is critical to the successful completion of the project. Schedules- Constant contact with the City will be maintained to ensure issues are being resolved in a timely manner to allow the design to stay on schedule. EC+Associates will be proactive by continuously looking at the overall project and make recommendations to the City to provide a high-quality project. EC+Associates will provide budget planning and monitoring to ensure that the project is designed and constructed within the City's budget. This shall include establishing and maintaining cost controls by tracking forecasted costs. project budget, and actual costs. Project Coordination- EC+Associates will coordinate efforts with the City and City subconsultants. public. private utilities, and other agencies to obtain the necessary technical and operational information for completion of the work. Record Keeping- EC+Associates will maintain comprehensive records that track all incoming and outgoing correspondence, submittals, request for information, contract documents, invoices, and all other project related documents. All records shall be considered the property of the City and as such the City shall have access to any records QA/QC- The primary mission of our Quality Assurance/Quality Control plan is to provide staff with the technical and managerial expertise to plan. organize, implement. and control the overall quality effort, thereby providing a complete quality project that conforms with the City standards and within the time and budget established. EC+Associates will provide quality control measures throughout the duration of the project City of Rosemead Proposal for Walnut Grove Avenue Resurfacing Project EC + Associates Scope of Work 1. Field Investigation and Topographic Survey Data Collection - EC+Associates will provide written requests to the City to obtain available as-built drawings. reports, studies. and utility contact information. EC+Associates will prepare and send utility notifications to the utility companies and other agencies providing services within the City. We will request copies of available maps. plans and records of any existing facilities within the project limits that may be affected by the proposed Improvements. Field Survey and Mapping - EC+Associates will perform a review of the project site to familiarize design staff with project constraints and observe the general site conditions and perform a complete topographic survey, including the following; a) Portion of the public street abutting the frontages of the properties such as sidewalk, top of curb, flow line, existing grade elevation of asphalt, edge of gutter, grade breaks elevations. b) Location and description of the existing, lighting, walls, landscape and trees. c) Elevations will be based on County datum using bench mark provided by City of Rosemead. 2. Right of Way Engineering EC+Associates will perform right of way engineering including appraisal, descriptions and right of way maps as necessary. We will identify all right way acquisition required for the construction of the project and prepare documents if necessary 3. Construction Plans EC+Associates will prepare construction plans for project design. EC+Associates will submit five sets of plans, specifications, and estimate (PS&E) to the City for review and comment in 70%. 90%, and 100% stages prepared on 11" x 17" plans. EC+Associates shah address the City's comments and incorporate the comments into the plans, specifications. and estimate. The Final submittal shall include one set of wet- signed hard copy plans on mylar sheets, 22" x 34", one reproducible set of specifications, a final engineer's estimate, and one CD ROM of the full set of AutoCAD plan sheets, specificationsand estimate. The review submittals will be submitted on half size(11" x 17"). five copies and an electronic copy(PDF format). The submittals will include the following plan components; Plan Construction list of sheets. •Title Sheet and Location Map •Traffic Control Plans • Utility Plans • Erosion Control Plans City of Rosemead Proposal for Walnut Grove Avenue Resurfacing Project EC + Associates ;l ; e t • Roadway Plans • Profiles • Sections and Details •Traffic Signal Plans • Striping Plans 4. Specifications - EC+Associates with prepare the specifications using boiler plate specifications and general technical provisions and amendments. F('+Associates will be responsible for preparing the technical specifications and compiling the project specifications, signed by a civil engineer registered in the State of California, which are complete and ready for bidding purposes. 5. Engineer's Estimate - EC+Associates will prepare a detailed engineers estimate in Microsoft Excel spreadsheet format that includes the bid items described within the contract specifications. The estimate will be based upon recent bid prices for similar projects as maintained by EC+Associates. Backup quantity calculations will be provided showing detailed computations for accuracy of the quantities upon request. 6. Permits/Environmental Assessment- EC+Associates will attend any necessary meetings and prepare all applicable application as required for permit approval. Plan checking and Encroachment fees will be paid by the City. 7. Construction Support- EC+Associates will coordinate and attend meetings including the preconstruction meeting with the City. EC+Associates will provide support services during the bid solicitation period. EC+Associates will be available to answer questions regarding the technical provisions of the contract special provisions, the design drawings or design issues brought up during the bidding process. RFI's will be responded within two (2) working days. Cost for this task will be considered as part of the preparation of the PSE documents at no additional cost to the City. As-Builts will be prepared at the end of the project. City of Rosemead Proposal for Walnut Grove Avenue Resurfacing Project EC + Associates eir ! rrerill City Responsibilities 1. Provide copies of City files, record drawings. existing geotechnical data. and other information for the project 2. Provide potholing data if required 3. Provide City base sheet for improvement plans in AutoCAD format Assumptions 1. FL-Associates will attend a maximum of six meetings 2. Construction inspections services are not included in this scope of work. Deliverables 1. Project Schedule 2. 70% Plans, Specifications, and Estimate (PS&E) 3. 90% Plans, Specifications, and Estimate (PS&E) 4. 100% Plans. Specifications, and Estimate(PS&E) Exclusions: Geotechnical Investigation and recommendations are not included in our scope of work. The City will provide a geotechnical report, boring logs, and recommendations required for this project. A copy of the geotechnical report will be included in the project plans and specifications. SWPPP- SWPPP is not included in our scope of work. Since the project area of disturbance appears to be less than an acre, no SWPPP is required. If SWPPP is required, 1.(- Associates will prepare one at a negotiated fee. Hydrology and Hydraulics Report- A hydrology analysis and report are not included in our scope of work. If a Hydrology/Hydraulics Report is required, EC t Associates will prepare one at a negotiated fee. PROPOSED FEE Our proposed fee is based on the proposal required format and is not to exceed lump sum fee amount of$44,900. City of Rosemead Proposal for Walnut Grove Avenue Resurfacing Project EC + Associates r1 (; I Il 8 ! I rl Appendix B Hourly Rate Schedule ENGINEERING DIVISION Principal Engineer 140.00 Project Manager 125.00 Senior Project Engineer 115.00 Senior Engineer 105.00 Associate Engineer 100.00 Design Engineer 95.00 Designer/CADD Drafter 85.00 Clerical Technical Aide 65.00 LANDSCAPE ARCHITECTURE Senior Landscape Architect 105.00 Associate Landscape Architect 95.00 REIMBURSABLE EXPENSES Reproduction Cost Subconsultant Services Cost plus 10% Automobile Transportation Current rate Delivery, Freight,Courier Cost Agency Fees Cost Commercial Travel/Subsistence Cost SURVEYING DIVISION Senior Surveyor 140.00 Senior Survey Analyst 130.00 Survey Analyst II 115.00 Survey Analyst I 100.00 Survey Party Chief 105.00 Field Party (Three) 190.00 Field Party (Two) 175.00 Field Party (One) 110.00 CONSTRUCTION MANAGEMENT/INSPECTION Operations Manager 110.00 Supervising Public Works Observer 100.00 Construction Manager 110.00 Construction Engineer 90.00 City of Rosemead Proposal for Walnut Grove Avenue Resurfacing Project E M �Y('�'e\ O O CIVIC PP 0E At}evco, oiJ Attachment B City Council Staff Report, October 24, 2017 E M e �` , £ �° ROSEMEAD CITY COUNCIL sr STAFF REPORT 1w[i�,1 OfyforoytO;121 TO: THE HONORABLE MAYOR AND CITY COUNCIL sir‘ i FROM: BILL R. MANIS, CITY MANAGER le DATE: OCTOBER 24,2017 SUBJECT: RESOLUTION NO. 2017-57, APPROVING THE WALNUT GROVE AVENUE RESURFACING PROJECT FUNDED BY THE ROAD REPAIR AND ACCOUNTABILITY ACT SUMMARY On April 28,2017,the Governor signed a Senate Bill (SB) 1,which is known as the Road Repair and Accountability Act of 2017 (RMRA); to address basic road maintenance, rehabilitation and critical safety needs on both the state highway and local streets road system. In order to receive RMRA funds, the City must meet a "Maintenance of Effort" requirement to ensure that these new road funds do not supplant existing levels of general revenue spending on streets and roads. DISCUSSION SBI, formally known as the Road Repair and Accountability Act(RMRA)of 2017,received the required two-thirds majority from the California Legislature and was signed into law by Governor Brown on April 28, 2017. SB 1 establishes the Road Maintenance and Rehabilitation Program (RMRP) to address deferred maintenance on the state highway and local street road systems. The bill provides that funds shall be used for projects that include, but are not limited to,the following: • Road Maintenance and Rehabilitation • Safety Projects • Railroad Grade Separation • Traffic Control Devices Beginning November I, 2017, the State Controller will deposit various portions of this new funding into the newly created Road Maintenance and Rehabilitation Account (RMRA). A percentage of this new RMRA funding will be apportioned by formula to eligible cities and counties pursuant to Streets and Highways Code(SHC) Section 2032 (h) for basic maintenance, rehabilitation and critical safety projects on the local streets and roads system. ITEM NUMBER:j2 J{... City Council Meeting October 24.2017 Page 2 of 3 City of Rosemead currently receives $1,226,200 in gas tax revenues annually. With the passage of SB I, the amount is expected to increase by $318,500 for a total of$1,544,700 for FY 2017- 18. A larger increase in gas tax revenues is expected for FY 2018-19. due to the phasing in of new nixes. In order to receive RMRA funds, the Cit' must meet a "Maintenance of Eflbrt" (MOE) requirement to ensure that these new road funds do not supplant existing levels of general revenue spending on streets and roads. The City's MOE for FY 2017-18 is $57,000. Staff is requesting the City Council to appropriate funds from the General Fund for sidewalk installation projects. STAFF RECOMMENDATION It is recommended that the City Council: I. Adopt Resolution No. 2017-57,approving the Walnut Grove Avenue Resurfacing Project from Marshall Avenue to Northerly City limit funded by the Road Repair and Accountability Act—Senate Rill SB 1. 2. Approve a budget appropriation of $57,000 from the General Fund unassigned fund balance to meet the MOE requirements. FISCAL IMPACT This is an expenditure plan to spend the City's SR 1 Fiscal Year 2017-I8, The City's Ski I fund projected revenue balance is $1,267,200, of which $318.500 is from the FY 2017-18 distributions and $948,700 is from FY 2018-19 distributions. The total project cost estimate is approximately$1,100,000.00. ENVIRONMENTAL REVIEW The project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (a)of the CEQA Implementing Guidelines. STRATEGIC PLAN IMPACT - None PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Prepared by: Submitted hy: Rafael M. Fajardo. P.E. City Engineer Pearl Lieu, Finance Director City Council Meeting October 24,2017 Page 3 of 3 Attachment A: Resolution No.2017-57 Attachment B:Spreadsheet RMRA F Attachment A Resolution No. 2017-57 RESOLUTION NO.2017-57 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROSEMEAD, CALIFORNIA, TO APPROVE THE LIST OF PROJECTS TO BE FUNDED BY SB 1 THE ROAD AND REPAIR AND ACCOUNTABILITY ACT WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017; and, WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year;and WHEREAS,the City must include a list of all projects proposed to receive nding f from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, approvedby the City Council, which includes description and location of each proposed project, a proposed schedule for the project's completion,and the estimated useful life of the improvement;and, WHEREAS,the City, will receive an estimated S318,500 in FY 2017-18 and $948,700 in FY 2018-19 from RMRA funding from SB l;and, WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate streets/roads and add active transportation infrastructure throughout the City this year and many similar projects into the future;and, WHEREAS,the City reviewed the Pavement Management System and indicates that the City's streets are in good conditions and this revenue will help us to increase the overall quality of our road system and over the next decade will bring our streets and roads into a "excellent" conditions;and, WHEREAS, without revenue from SB 1, the City, would have otherwise been delaying projects throughout the community;and, WHEREAS, if the legislature and Governor failed to act, City streets and county roads would have continued to deteriorate, having many and varied negative impacts on our community; and, WHEREAS, cities and counties own and operate more than 81 percent of the streets and roads in Califomia, and from the moment we open our front door to drive to work, bike to school, or walk to the bus station,people are dependent upon a safe,reliable local transportation network; and. WHEREAS, modernizing the local street and road system provides well- paying construction jobs and boots local economies;and, • WHEREAS, police, fire and emergency vehicles all need safe reliable roads to react quickly to emergency calls and few minutes of delay can be a matter of life and death;and. WHEREAS, maintaining and preserving the local street and road system in good condition will reduce drive times and traffic congestion, improve bicycle safety, and make the pedestrian experience safer and more appealing which leads to reduce gas emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals; and, WHEREAS, restoring roads before they fail also reduces construction time which results in less Mr pollution from heavy equipment and less water pollution from site nm-off;and, WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenanceand material ty, investing in nll complete significant sircets infrastructure, and using cutting-edge technology, practices, positive co-benefits statewide. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ROSEMEAD. DOES HEREBY RESOLVE,DECLARE, DETERMINE, AND ORDER AS FOLLOWS: SECTION I.The City approves the Walnut Grove Avenue Resurfacing Project planned to he funded with Road Maintenance and Rehabilitation Account revenues. SECTION 2.The City Clerk shall certify to the adoption of this resolution and hereafter the same shall be in full force and effect. PASSED, APPROVED,AND ADOPTED this 24th day of October,2017. Polly Low, Mayor • • APPROVED AS TO FORM: ATTEST: Rachel Iticlvnan,City Attorney Marc Donohue, City Clerk STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES) § CITY OF ROSEMEAD I, Marc Donohue, City Clerk of the City Council of the City of Rosemead, California, do hereby certify that the foregoing City Council Resolution, No. 2017-57, was duly adopted by the City Council of the City of Rosemead, California, at a regular meeting thereof held on the 24th day of October,2017,by the following vote.to wit: AYES: NOES: ABSENT: ABSTAIN; Marc Donohue,City Clerk Alw~ E um[ 0 �OkCga AiEU[� Attachment B Spreadsheet RMRA I I1 i1Iijg ' i ' I � j , , , II oris iir �. it ;, - s- , Ili " SII#. IYII-' „ , 1 1- III , l �lo ' 1- I� pII III I� I• ,� , . I I ! �_ ll fUIf; �„ II, I, „� i I II11I ”' i1 Millar IiIIINIu� �" miiumai' fa __ � IINII 11 II �IN.limo I "iIi'P! !%II I I I I. � �1 : , II, I ! i - H1 � I ; 1 r 1 ' i f` I , I 1 : 1 Liii H i I , 1 ISill IIt !1IIIIIII _II 1 , i fI -r i EEE00CCECCCCCECCCCE CCC = Ili i EEEEEEEEEEEEEEBEESSEEEESEEEEEEBSMIII M O Q O CIV C PR�.DC ttt 4"CoAPOg4iEJ X059 Attachment C Resolution No. 2017-57 RESOLUTION NO. 2017.57 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROSEMEAD, CALIFORNIA, TO APPROVE THE LIST OF PROJECTS TO BE FUNDED BY SB I THE ROAD AND REPAIR AND ACCOUNTABILITY ACT WHEREAS, Senate Bill 1 (S$ I), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017;and, WHEREAS,SB 1 includes accountability and transparency provisions that will ensure thc residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year;and WHEREAS, the City must include a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB I, approved by the City Council, which includes description and location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and, WHEREAS, the City, will receive all estimated $318,500 in FY 2017-18 and $948,700 in FY 201849 from RMRA funding from SB 1;and, WHEREAS, the funding from SB I will help the City maintain and rehabilitate streets/roads and add active transportation infrastructure throughout the City this year and many similar projects into the future;and, WHEREAS, the City reviewed the Pavement Management System and indicates that the City's streets are in good conditions and this revenue will help us to increase the overall quality of our road system and over the next decade will bring our streets and roads into a "excellent" conditions; and, WHEREAS, without revenue from SB 1, the City, would have otherwise been delaying projects throughout the community; and, WHEREAS, if the legislature and Governor failed to act, City streets and county roads would have continued to deteriorate,having many and varied negative impacts on our community; and, WHEREAS, cities and counties own and operate more than 81 percent of the streets and roads in California,and from the moment we open our front door to drive to work, bike to school, or walk to thc bus station, people are dependent upon a safe, reliable local transportation network; and, WHEREAS, modernizing the local street and road system provides well- paying construction jobs and boots local economies; and, WHEREAS, police, fire and emergency vehicles all need safe reliable roads to react quickly to emergency calls and few minutes of delay can be a matter of life and death; and, WHEREAS, maintaining and preserving the local street and road system in good condition will reduce drive times and traffic congestion, improve bicycle safety, and make the • pedestrian experience safer and more appealing which leads to reduce gas omissions helping the Stare achieve its air quality and greenhouse gas emissions reductions goals; and, WHEREAS, restoring roads before they fail also reduces construction time which results in less air pollution from heavy equipment and less water pollution from site run-off;and, WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, material and practices, will have significant positive co-benefits statewide. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ROSEMEAD, DOES HEREBY RESOLVE,DECLARE,DETERMINE,AND ORDER AS FOLLOWS: SECTION 1. The City approves the Walnut Grove Avenue Resurfacing Project plarmed to be funded with Road Maintenance and Rehabilitation Account revenues. SECTION 2.The City Clerk shall certify to the adoption of this resolution and hereafter the same shall be in full force and effect. PASSED, APPROVED,AND ADOPTED this 24'day of October, 2017. Polly Low,Mayor API)2OVED AS TO FORM: ATTEST: {jam ///:Al achel Richman,City Attorney Marc Donohue,City Clerk STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) § CITY OF ROSEMEAD I, Marc Donohue, City Clerk of the City Council of the City of Rosemead, California, do hereby certify that the foregoing City Council Resolution. No. 2017-57, was duly adopted by the City Council of the City of Rosemead, California,at a regular meeting thereof held on the 24i11 day of October,2017,by the following vote,to wit: AYES: ARMENTA,CLARK, LY,LOW NOES: NONE ABSENT: ALARCON ABSTAIN: NONE Marc Donohue, City Clerk