Loading...
RRA - Item 3A - Engineering Proposoal for Traffic Signal Improvement on Hellman/Jackson at Entrance of Senior Housing R 1 R to ROSEMEAD REDEVELOPMENT AGENCY 0038 VALLEY BLVD ROSEMEAD,CA 91770•(818)283-6671 •Telecooier 8183079210 TO: HONORABLE CHAIRMAN AND MEMBERS ROSEMEAD REDEVELOPMENT AGENCY FROM: FRANK G. TRIPEPI, EXECUTIVE DIRECTO DATE: APRIL 6, 1999 SUBJECT: ENGINEERING PROPOSAL FOR TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF HELLMAN/ JACKSON AVENUES AND AT THE ENTRANCE TO THE GARVEY SENIOR HOUSING PROJECT Attached for your consideration is an engineering proposal from Wilidan Associates for engineering design, design survey, utility coordination, construction survey, contract administration, and construction observation for the installation of two new traffic signals at the intersection of Hellman Avenue and Jackson Avenue and at the entrance to the Garvey Senior Housing project. The traffic signal improvements will include installation of new traffic signals, signal controllers, new intersection lighting, crosswalks, street name signs, and the removal of conflicting signs and pavement markings. The project also includes construction of a separate right-turn on Garvey Avenue at the entrance of the Garvey Senior Housing as well as installation of handicap access ramps to comply with the Americans with Disabilities Act. !,C_EL;' 1' A r4ENDA APR i 31999 April 6, 1999 Page 2 We have included the traffic signal at the entrance to the Garvey Senior Housing project for several reasons. First, BVH Architects is in the process of performing the onsite engineering for the project, and the City needs to perform the design of the offsite improvements in Garvey Avenue in order that both onsite and offsite improvements are aligned and coordinated. Secondly, constructing this signal with the one at Hellman/Jackson Avenues allows for economy of scale thereby providing a more competitive bid process. Lastly, if the traffic signal is constructed prior to construction of the buildings and other onsite improvements, construction vehicles and trucks will have safe ingress and egress onto Garvey Avenue. The total construction cost for this project is estimated to be $240,000; $140,000 for the Garvey Senior Housing improvements and $100,000 for the Hellman/Jackson Avenues traffic signal. The estimated construction contract period is 30 working days. Construction is anticipated to begin in Fall 1999. The proposed fees are as follows: • Design Survey (Fixed Fee) $ 1,500 • Preliminary and Final Design (Fixed Fee) 20,500 • Utility Coordination (Fixed Fee) 3,000 • Construction Survey(Fixed Fee) 1,500 • Contract Administration (Fixed Fee) 3,500 • Construction Observation (Fixed Fee) 16200 Total Proposed Fee $46,200 The total fee, excluding utility coordination, is in conformance with that portion of the City's agreement with Willdan Associates which pertains to design engineering services. The current Fiscal Year 1998-99 Redevelopment Agency budget does not include funding for the subject project. Therefore, appropriation of unappropriated Redevelopment Agency reserve funds in the amount of$25,000 ($15,000 for the Garvey Senior Housing Project and $12,000 for the traffic signal improvements at the intersection of Hellman Avenue and Jackson Avenue) will be required to cover the design costs to be incurred during the current fiscal year. The remaining project costs will be included in the proposed Fiscal Year 1999-2000 Redevelopment Agency budget. April 6, 1999 Page 3 RECOMMENDATION It is recommended that the Rosemead Redevelopment Agency: 1. Approve the attached engineering proposal. 2. Appropriate $25,000 ($15,000 for the Garvey Senior Housing Project and $12,000 for the traffic signal improvements at the intersection of Hellman Avenue and Jackson Avenue)from unappropriated Redevelopment Agency reserve funds. 3. Direct staff to begin the preparation of the necessary plans and specifications for the subject project. KJR swk 1999rsmtl/staff rpUrra • A WILLDAN ASSOCIATES ❑ ENGINEERS & cLANINFR.c. Professional Consulting Services Since 1964 April 8, 1999 Mr. Frank G. Tripepi Executive Director Rosemead Redevelopment Agency 8838 E. Valley Boulevard Rosemead, CA 91770 Subject: Proposal for Professional Engineering Design, Design Survey, Utility Coordination, Construction Survey, Contract Administration, and Construction Observation for Traffic Signal Improvements at the Intersection of Hellman/Jackson Avenues and at the Entrance to the Garvey Senior Housing Project Dear Mr. Tripepi: Willdan Associates is pleased to submit this proposal for your consideration for the installation of two new traffic signals at Garvey Avenue and the new entrance to the Garvey Senior Housing, and at the intersection of Hellman Avenue and Jackson Avenue. The traffic signal improvements will include installation of new traffic signals, signal controllers, new intersection safety lighting, crosswalks, street name signs, and the removal of conflicting signs and pavement markings. The project also includes construction of a separate right-turn on Garvey Avenue at the entrance of the Garvey Senior Housing as well as installation of handicap access ramps to comply with the Americans with Disabilities Act. SCOPE OF SERVICES We propose to provide the following basic services for the project: Design Survey 1. Perform research at Los Angeles County and the City of Rosemead for survey information. 2. Establish record centerline along the proposed construction zone on Garvey Avenue. 3. Obtain locations of topographic features within construction limits. 4. Obtain cross sections on 25-foot intervals. 12900 CROSSROADS PARKWAY SOUTH•SUITE 200• INDUSTRY CALIFORNIA 91746-3499•(562)908-6200•FAX(562)695-2120 April 8, 1999 Page 2 Preliminary Design 1. Confer with Agency staff to review, in full detail, the requirements for the project. Review available information and data assembled by Agency staff. 2. Develop base drawings, including collecting and plotting of field data, and the identification and plotting of substructures and utilities. 3. Develop street improvement plan to include the right-turn on Garvey Avenue at the Garvey Senior Housing. 4. Prepare traffic signal plans for the intersection of Garvey Avenue and the new entrance to the Garvey Senior Housing, and the intersection of Hellman Avenue and Jackson Avenue. 5. Prepare signing and striping plans for each signal. 6. Submit preliminary traffic signal plans to the Rosemead Redevelopment Agency for review and comments. 7. Develop preliminary project cost estimates. Final Design Phase 1. Based on comments received form the Rosemead Redevelopment Agency and utility companies. revise plans. 2. Prepare detailed final plans and attend coordination meetings, as necessary, with Agency personnel at various times during the design phase to obtain additional input and review work. 3. Prepare specifications and contract documents to conform to applicable requirements of the Rosemead Redevelopment Agency. 4. Prepare final project cost estimates. Utility Coordination 1. Submit copies of plans to all affected utilities and agencies. 2. Coordinate with affected utility companies to provide for any utility relocations to accommodate new traffic signal pole and foundation installation. 3. Send notification to affected utility companies,other agencies,contractor,and Agency staff, and attend and coordinate the preconstruction conference. April 8, 1999 Page 3 Construction Survey 1. Tie out centerline intersection monuments in the construction area. 2. Set curb reference C-nails on 25-foot intervals at a uniform offset. 3. Reset centerline intersection monuments and file corner records with Los Angeles County Surveyor. Contract Administration 1. Assist the Agency in securing bids and awarding project. 2. Attend preconstruction conference and prepare minutes. 3. Provide contract administration for proper enforcement of the contract plans and specifications. 4. Provide engineering support, as needed, to make as-built revisions to the original plans. 5. Provide the necessary consulting services required to coordinate the efforts between the Agency and contractor. 6. Review and approve progress payment requests. 7. Answer inquiries and complaints for the Agency relating to the project. Construction Observation 1. Provide daily construction observation during the construction period. 2. Provide the necessary weekly, monthly, and final reports as needed_ 3. Provide copies of daily construction observation reports on a weekly basis, if requested. 4. Provide necessary coordination with other agencies to provide final inspection of the project. 5. Perform as-built corrections on original drawings. 6. Provide report to Agency following final inspection stating that the project has been completed, and provide necessary data for Agency acceptance of the project. April 8, 1999 Page 4 Our proposed fees are as follows: • Design Survey (Fixed Fee) $ 1,500 • Preliminary and Final Design (Fixed Fee) 20,500 • Utility Coordination (Fixed Fee) 3,000 • Construction Survey(Fixed Fee) 1,500 • Contract Administration (Fixed Fee) 3,500 • Construction Observation (Fixed Fee) 16200 Total Proposed Fee $46,200 The current estimated construction cost for the total project is $240,000; $140,000 for the improvements at Garvey Avenue and the Garvey Senior Housing, and $100,000 for the traffic signal improvements at the intersection of Hellman Avenue and Jackson Avenue. The design fee is based on the fee curve schedule from the American Society of Civil Engineers. The total fee, excluding utility coordination, is in conformance with that portion of the City's agreement with Willdan Associates which pertains to design engineering services. The constructioncontract period is estimated to be 30 working days. Compensation for weekend inspection and inspection beyond the allocated working days and hours will be on a time-and-materials basis. If you have any questions regarding this proposal, please contact me at (562) 908-6210. Respectfully submitted, WILLDAN ASSOCIATES Kf / 'ichard L. Kopecky, P.'. Senior Vice President AF meC 956109\666D\P9-96