Loading...
RRA – Item 2 – Change orders No. 5 and No. 6; Authorization to file completion; Garvey Park Clubhouse/Sheriff Sub-station ROSEMEAD REDEVELOPMENT AGENCY R 8838 VALLEY BLVD..ROSEMEAD,CA 91770•(818)288-6671•Telecopier 8183079218 TO: FRANK G. TRIPEPI,EXECUTIVE DIRECTOR FROM: MICHAEL D. BURBANK, DIRECTOR OF PARKS AND RECREATION DATE: JULY 7, 1999 RE: APPROVAL OF CHANGE ORDERS NO. 5 AND NO. 6 AND AUTHORIZATION TO FJI F THE NOTICE OF COMPLETION AND ACCEPT THE GARVEY PARK CLUBHOUSE/SHERIFF'S SUB-STATION Attached for consideration are two change orders from the Contractor for the Garvey Park Clubhouse/Sheriffs Sub-Station (Oceanstate Development) and a request from the Architect for additional Construction Administrative Services. Change Order No. 5 was for providing and installing a roof access ladder and security door, in the amount of$ 2,128.00. Change Order No. 6 for $ 841.00 was for installing an additional Gate Valve and Pressure Regulator on the buildings 2" water line. Both of these items were required by the Building Department. The final item is a request from the Architect,B.O.A_ in the amount of$ 3,000.00 for additional Construction Administrative Services that were required as a result of the six (6) change orders. The Contractor for the Garvey Park Clubhouse has completed the project. The total construction cost was S 419,604.00 (see Exhibit 1) RECOMMENDATION: It is recommended that the Rosemead Redevelopment Agency approve Change Orders No. 5 and No. 6, along with the request for additional Architect services, execute the Certificate of Substantial Completion and authorize staff to file the Notice of Completion. attachments 07-n-66s dodsb AC,,Ei`v'v - JUL 131999 ITEM No. o?- CHANGE OWNER K ORDER ARCHCONTRACTOR TECT X PIT ❑ • AM DOCUMENT 6701 OTHER r�❑, G PROJECT: 4'Rt'( (' dS oa ?,G IK-E rtrr �. IANGE ORDER NUMBER:gQ',J (name, address) �/J?�(o�i��,.J FL. DATE: [- / ! 7 TO CONTRACTOR: � � 1M17' GA 91770 ARCHITECT'S PROJECT NO: 97' ��7/ (name, address) X A 1 r CONTRACT DATE: 2 m-gq W. (161.4.41M.1 kg CONTRACT FOR: -q�,, %fl go 00 AL.(Pal P3RA, GA `118D3 The Contract is changed as follows: Att GNAAQ, flz 9` , favi al WJE k& WVet-oryle&I1 BATED - 7 - 99. GRA nVir DiCi 1Zofk� -I: �✓ Zy 128.oa Not valid until signed by the Owner, Architect and Contractor. p,p, �q The original(Contract Sum)(�)was . ... . . . . . . . . _ . . . . �y S we . ao Net change by previously authorized Change Orders S Z9 ii5• ao The(Contract Sum)( hiletiT,am;C::.j prior to this Change Order was S 4/7, I/6,CI The(Contract Sum)(^ a - - )will he(increased)(decreased) (uaq chagc& Ze aby this Change Order in the amount of $ /-, / .a The new(Contract Sum)( )including this Change Order will he _1 �� /pZ¢3. 00 / The Contract Time will be(inc-csaretA4).4.cisef eased)(unchanged)-hr $[.h4J E IT)e Mar hH'I4/GADif ( O )dans. NOIF. This summary lowriot rellec-t changes in the Contract Mum.C.cintrAct Time ur Guarantercl Maximum Price wNch lave been.tUvrzeil bF (imxwruon Change Directive. Park A .4-Et1 6 J 5:1441-47g .a Go ()MY ,91 r.74-10,42 AHC,IIITm CONTRACTOR 1 J. 11N �� 1OWNE W. Neat hnlR✓E- Pry t < ✓AY � VO Addrns Atldrea Address ,9• f s,_i tp , / 'k.r • i• .. 'i 3t 4,1 /! 77D --7 riraigkii/knrW< N BY Y d uv !Al/7' _/qi . . In DDATE ��9 DATE 5-- /cf.- ? (O s" DATE AIACAUTION: You should sign an original AIA document which has this caution printed in red. !� An original assures that changes will not be obscured as may occur when documents are reproduced. AIA DOCUMENT 6701 • CHANGE. OKI ER • 19F' FUITIOS • AIA° • a19a% • THE AMERICAN INSTITUTE OF ARCHITECTS. 1-35 NEW YORE MT, N . U ASHINGTON. IJC. LatKb 6701-1987 WARNING:Unlicensed photocopying violates as.copyright laws and is subject to legal prosecution. Jun-09-99 02 : 27P 626/ 588-2782 P . 01 :Itrl OSD Construction, Inc dba i J OCEANSTATE DEVELOPMENT COMPANY LICENSE NO.597028 2409W HELLMAN AVENUE ALHAMBRI,Cl 91803 PO BOX 7227-91801 CHANGE ORDER NO. 5 • June 9, 1999 Anthony Wu BOA Architects 279 West Seventh Street San Pedro, CA 90731 Project: Garvey Park Community Center & Sheriff Substation Owner: City of Rosemead - 88378 E. Valley Blvd., Rosemead 91770 Project Mgr: Mike Burbank Provide labor and material necessary to complete the following work: 1. Install roof access ladder and security door, required by Building & Safety. To be built and installed as per city code. Material and labor $1 ,850.00 Administrative cost $278.00 Total Change Order $ 2,128.00 PHONE 626-588-2795 FAX 626-588-2782 CHANGE OWNER ORDER C" NTIRACTOR FIELD J AIA 1)OC1'.11ENT 6701 ��t� OTHER�,u PROJECT: aA l Tf K 4t6T14✓N IFf RANGE ORDER NUMBER: 40 , (name, address) 7?” criegi fl- Al - DATE: 6'-1 -Pcf1 Kr-APISCA TO CONTRACTOR: t/ ? I ( 710 ARCHITECT'S PROJECT NO: 17- 1577 (name, address) flet' 157A-t wveteNE �. �n CONTRACT DATE: /�, Mg/ W. l{(LLMAf`1 A1V'G�,�f L(/ CONTRACT FOR: %�e OOOi00 ALf MS Ci al , Gh 91803 The Contract is changed as follows: f A-(1k2 t%A GHgoJiSre--,)Wee. ?1Z114 1%KOM GZMI 4Xl /a0PHeAYr caw JUNE IS I qql . ct+416t orvet< MatrzAl-- = 484/ aeo Not valid until signed by the Owner, Architect and Contractor. ¢p The original(Contract Sum)(FioaramMa'n eedu Pricc)was f 388, g9]0. co Net change by previously authorized Change Orders S 3/, Z9 /. r/!/ The(Contract Sum)(prior to this Change Order was $ AO Z43. 0The(Contract Sum)( - : ed .. ,will be(increased)(cleErea eel) I ��1 Q0 (mlehewgecgbc this Change Order in the amount of S (p/,0 The new(Contract Sum)(" - cdM mu-^=cw)including this Change Order will be S 4Z0, 4 00 •(/ The Contract Time will be(m .c-rcet �ra_aeeHundlanged)be" 'ai1�Jt`' (TIS AWL /oA0If, ( 0 )days_ N OTE This summary doc•not reficct el' g n tilir CiPillialil Sum.iiiiiltratil Time or Guaranteed Maximum Price which lent Bern utalicriced be l(instruction CCange Directive. P'ITA A,Nrrg&TuRE ,(1aCbkre Ko, try or % • )+1V 77N5T. t4CIrIR l ✓N/I div A (» r03,e E. ✓aLLer p._Vt? Adtire.. Ad�ddr s Aches. r r, En'!r73 ftG ' i GA ' 893 ICirlAAMPt CA 81770 ____ II / BY / ii//li.� /uR1g NT / Sad.1 _ Hl DATE ib--� 7 DATE. 6 — l6 - ( q —. DATE AIACAUTION: You should sign an original AIA document which has this caution printed in red. M An original assures that changes will not be obscured as may occur when documents are reproduced. AIA DOCUMENT 0701 • CHANGE ORDER • 198' EDITION • AD, • ¢,1981 • THE AMERICAN INSTITUTE OF ARCHITECTS, I3S NEW YORK AVE, N U.. WASHIMil ON. DC. _'IN{x G701-1887 WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. Jun- 14-99 04 : 08P 626/ 588-2782 P - 02 OSD Construction, Inc. dba OCEANSTATE DEVELOPMENT COMPANY LICENSE NO 597028 2409 W.HELLMAN AVENUE ALHAMBRI,CA 91803 PO BOX 711 7-918 01 CHANGE ORDER NO. 6 June 15, 1999 Anthony Wu BOA Architects 279 West Seventh Street San Pedro, CA 90731 Project: Garvey Park Community Center & Sheriff Substation Owner: City of Rosemead - 88378 E. Valley Blvd., Rosemead 91770 Project Mgr: Mike Burbank Provide labor and material necessary to complete the following work: 1. Per inspector's request, install additional gate valve and pressure regulator on main 2" water line. Labor and material $732.00 Administrative cost $109.80 Total Change Order $ 841.80 PHONE 626-588-2795 FAX 626-588-1782 PROFESSIONAL SERVICES SUPPLEMENTAL AUTHORIZATION AIA DOCUMENT C604 (Instructions on reverse side) In accordance with the written Agreement dated as of between the parties designated below for NOVEMBER 25, 1997 THE PROJECT: CITY OF ROSEMEAD GARVEY PARK COMMUNITY CENTER & SHERIFF SUBSTATION The CITY OF ROSEMEAD hereby authorizes the BOA ARCHITECTURE to: I Proceed with Additional Services 0 Proceed with revised scope of services ❑ Incur Reimbursable Expenses 0 as follows: PROVIDE ADDITIONAL CONSTRUCTION ADMINISTRATION SERVICES ON APPROVED CHANGE ORDERS. Compensation shall be adjusted as follows: (Here msert provisions in accordance wi lM1 the Afire men!.or as otherwise agreed by the parties.) COMPENSATION TO BE 107. OF THE APPROVED CHANGE ORDERS (APPROXIMATELY $3,000 FOR COMPENSATION) Time for performance shall be adjusted as follows: Were insert provisions covering lime of commencemenl and completion of authorized services as applicable TO BE ADJUSTED ACCORDINGLY TO COMPLETE THE PROJECT. Upon return of a fully executed authorization, this service shall become a part of the Agreement identified above. ,.Al - APPROVED BY: APPROVES :Y: ;I NAME NAME ati� '' aga BY CITY OF ROSEMEAD BY BOA ARCH : ECTURE TITLE TITLE DIRECTOR OF ARCHITECTURE DATE DATE JUNE 9, 1999 MA DOCUMENT 6604 • PROFESSIONAL SERVICES SUPPLEMENTAL AUTHORIZATION • MARCH 1979 EDITION • AIA® 01979 • THE AMERICAN INSTITUTE OF ARCHITECTS, 17] NEW YORK AVENUE, NM.. WASHINGTON, D.C. 10.006 G604-1979 CERTIFICATE OF ovcsl_I: X SUBSTANTIAL COMPLETION1991 ' X .TR,vtlloN X A I,. DO(.:I .\lliVl (iDiiI'll-1.It - Ilnatrurnu on Rvnue adel (1111,: PROTECT'. Garvey Park PROJECT NO.: 97-1577 '9","9'(-0'91'9-Community Center & Sheriff Substation 7933 Emerson Place CONTRACT FOR: Rosemead, CA 91770 CONTRACT DATE: TO OWNER. TO CONTRACTOR. ""•rm'"-f/'"""'City of Rosemead ^v' '""9"(919%" Oceanstate Development 8838 E. Valley Blvd. 2409 W. Hellman Avenue Rosemead, CA 91770 Alhambra, CA 91803 DATE OF ISSUANCE. June 7, 1999 PROIFCT OR DESIGNATED PORTION SHALL INCLUDE ***ENTIRE FACILITY - COMMUNITY CENTER & SHERIFF SUBSTATION*** The Work performed under this Contract h:es been rcx Erwad.and found to the V chjtrars best know-ledge. int, mation :md bchel. to he substantiate complete. Substantial Completion the.stage i in the progress of the Wink when the Work or di:cign:ucd portion thereof is suffciently complete in :ccord:mee with the Contract Document:.so die Owner can occupy or tat lac the Work lot us intended use. Thr dm( of substantial Completion of the Project or pi nion thereof dcaignmed ahoyc is hereby c-stuhlished as June 7, 1999 whir h Ls also the date of conmmn¢mem of applicable warranties required by rhe Contract Documents. except as stated below: ***NONE*** A let ol items to he completed or curter led is attached hereto etThe failure to include Acid ' Esuch list dors not alter the respon- nibil ty oil the Contractor to complete all Work in cce rd-a ce vv il the C ntya Do( • f iI rCI Poi Ll — _ ART II I I el IiJ... yyyy. / UATIy. the Contractor complete or correct the\brh on the let of items tarhod Kurt' with' t 3 (thirty) clays from h uc. o thu vc c: f Substantial Completion . /J Oceanstate �eloPmont �. � /Hl/�, G� �- r9 CONTRACTOR B - IDI E The De nci .tarpts the Work or designated portion thereof issubstanuale din-Dike and vy ll -sun)e full pl,sess nr the-roI tat 12:00 Noon wpm) nn June 7, 1999 fdawl 05511LN - -� BY DATE The iesponstolities tat the Owner and the Conte aur for recurit,'. ninten:ma hen- wilitIIcs. daimge tO die AC rk 'Ind lusumme shall he as fallow nor ()Hui r cud r y en 1,1d legal WO au nuc oust rl.i :9d(kg< y mirl r CHICHIC(Oki ee,1 yr age CAUTION: You should use an original AIA document which has this caution printed in red. AIA An original assures that changes will not be obscured as may occur when documents are reproduced. e AIA DOCUMENT G704 • ITU 111 RAIL I t AVI AI < till l IO dill. ] - : 199i I l It VlPmltAA IA Intl f1 AlllIII Il l 1 IA V!INF} VAA A LIII 1 - - WARNING:Unlicensed photocopying violates Us.copyright laws and will subject the violator to legal prosecution. G704-1992 EXHIBIT "1" CONSTRUCTION AND ADMINISTRATIVE COST A. Original Construction Contract $ 388,000.001 ) B. Change Order No. 1 (approved January 26, 1999) $ 5,710.00 C. Change Order No. 2 (approved January 26, 1999) $ 19,870.00 D. Change Order No. 3 (approved March 23, 1999) $ 1,855.00 E. Change Order No. 4 (approved March 23, 1999) $ 1,200.00 F. Change Order No. 5 $ 2,128.00 G. Change Order No. 6 $ 84].00 Construction Cost Total $ 419,604.00 Extra Architect's Administrative Services $ 3 000.00 Total Project Cost $ 422,604.00 (1) Second Lome Bid $439,45100 07-n-b6sdoc/sb