Loading...
RRA - Item 3A - Engineering Proposal for the Walnut Grove Bridge Retrofit at Alhambra Wash ROSEMEAD REDEVELOPMENT AGENCY R R 8838 VALLEY BLVD..ROSEMEAD,CA 91770•(818)2886671*Telecopier 8183079218 TO: HONORABLE CHAIRMAN AND MEMBERS ROSEMEAD REDEVELOPMENT AGENCY FROM: FRANK G. TRIPEPI, EXECUTIVE DIRECTOR yf� DATE: NOVEMBER 2, 1999 RE: ENGINEERING PROPOSAL FOR THE WALNUT GROVE BRIDGE RETROFIT AT ALHAMBRA WASH Attached for your consideration is an engineering proposal from Willdan Associates for engineering design, utility coordination, contract administration, and construction observation for the Walnut Grove Bridge Retrofit at Alhambra Wash. The Walnut Grove Bridge at Alhambra Wash was originally constructed (26 feet wide) by the Corp of Engineers in 1937 and later was widened to 55 feet in 1940s. The widening construction left two longitudinal joints in the bridge deck along the travel ways. These joints have become severely deteriorated to the point that it has created a hazardous driving condition for the motorists. Therefor, repairs to the deck joints are recommended by removing portion of the concrete deck and implementing a closure pour to eliminate the open joints. The total construction cost for the project is estimated to be $53,000. The proposed project is currently programmed in the fiscal year 1999-00 Redevelopment Agency budget. Construction of the project is anticipated to occur in the Spring of 2000. AGENCY AGENDA NOV - 91999 ITEM No. November 2, 1999 Page 2 The proposed fees are as follows: •Preliminary and Final Design $5,250 •Utility Coordination 1,500 •Contract Administration 1,290 •Construction Observation 3 000 Total Proposed Fixed Fee $11,040 The total fee, excluding utility coordination, is in conformance with that portion of the City's agreement with Willdan that pertains to design engineering services. RECOMMENDATION It is recommended that the Rosemead Redevelopment Agency approve the attached engineering proposal and direct staff to begin the preparation of the necessary plans and specifications. Attachment 1999rsmtl/staff rpt/rra WILLDAN ASSOCIATES ❑ ENGINEERS & i t ANNERS Professional Consulting Services Since 1964 November 1, 1999 Mr. Frank Tripepi Executive Director Rosemead Redevelopment Agency 8838 East Valley Boulevard Rosemead, CA 91770 Subject: Proposal for Professional Engineering Design, Utility Coordination, Contract Administration, and Construction Observation for the Walnut Grove Bridge Retrofit at Alhambra Wash Dear Mr. Tripepi: - As requested, Willdan Associates is pleased to be given the opportunity to submit this proposal for the above-referenced services. The Walnut Grove Bridge at Alhambra Wash was originally constructed (26 feet wide) by the Corp of Engineers in 1937 and later was widened to 55 feet in the 1940's. The • widening construction has left two longitudinal joints in the bridge deck along the travel ways. These joints have become severely deteriorated, to the point that it has created a hazardous driving condition for the motorists. Willdan will conduct a structural analysis of the bridge and/or its components as affected by the repair of the longitudinal joints and the abutment cracks. This analysis will lead us to the most economical yet sound design and repair method. Conceptually,we believe the feasible solution to repair the deck joint is to remove a portion of the concrete and implement a closure pour to eliminate the open joints. Appropriate details have to be carefully furnished in order to ensure the integrity of the closure pour slab. Evaluation of the impact of retrofit construction to the Alhambra Wash will be conducted and will include code compliance for such issues as containment of waste or hazardous materials to the Wash. 12933 CROSSROADS PARKWAY SOUTH •SUITE 200• INDUSTRY CALIFORNIA 91746-3499•(562)908-6200•FAX(562)695-2120 • November 1, 1999 Page 2 SCOPE OF SERVICES We propose to provide the following basic services for the project: Preliminary and Final Design FIELD INVESTIGATION 1. Conduct a thorough field investigation for the deck joint and other damages. 2. Assess the general conditions of the existing structure, the longitudinal joints, and the abutments. 3. Document all the deterioration and damages associated with the joints and abutments. The information obtained in this investigation will be used as the basis for the subsequent evaluations. DATA AND CODE RESEARCH Collect and review any data pertaining to the project provided by the LACDPW and other involved parties to extract any valuable information to support the engineering. PLANS AND SPECIFICATIONS 1. Prepare plans with a site plan showing the work requirements, sections, and details for all retrofitted areas, and plans for traffic control and construction staging. 2. Attend coordination meetings, as necessary, with the Agency personnel at various times during the design phase to obtain additional input and review work. 3. Obtain permits required for the retrofit construction. 4. Prepare specifications and contract documents to conform to applicable requirements of the Rosemead Redevelopment Agency. 5. Prepare final project cost estimates. Utility Coordination 1. Submit copies of plans to all affected utilities and agencies. 2. Coordinate with affected utility companies to provide for any proposed utility improvements prior to bridge retrofitting. November 1, 1999 Page 3 3. Send notification to affected utility companies, other agencies, contractor and Agency staff, and attend and coordinate the preconstruction conference. Contract Administration 1. Provide the Agency with 20 sets of final plans and specifications for bidding. 2. Assist the Agency in securing bids and awarding project. 3. Attend preconstruction conference and prepare minutes. 4. Provide contract administration for proper enforcement of the contract plans and specifications. 5. Provide engineering support, as needed. 6. Provide the necessary consulting services required to coordinate the efforts between the Agency and contractor. 7. Review and recommend approval of progress payment requests. 8. Answer inquiries and complaints for the Agency relating to the project. Construction Observation 1. Provide daily construction observation during the construction period. 2. Provide the necessary weekly, monthly, and final reports. 3. Provide copies of daily construction observation reports on a weekly basis. 4. Provide necessary coordination with other agencies toprovide final inspection ofthe project. 5. Provide report to Agency following final inspection stating that the project has been completed, and provide necessary data for Agency acceptance of the project. November 1, 1999 Page 4 Our proposed fees are as follows: • Preliminary and Final Design (Fixed Fee) $ 5,250 • Utility Coordination (Fixed Fee) $ 1,500 • Construction Observation (Fixed Fee) $ 3,000 • Contract Administration (Fixed Fee) $ 1290 Total Proposed Fee $11,040 The current estimated construction cost for the project is$53,000. The total fee, excluding utility coordination, is in conformance with that portion of the City's agreement with Willdan Associates which pertains to design engineering services. The construction contract period is estimated to be 20-working days. Compensation for weekend inspection and inspection beyond the allocated working days and hours of the construction contract will be on time-and-materials basis. If you have any questions regarding this proposal, please contact me at (562) 908-6214. Respectfully submitted, WILLDAN ASSOCIATES William C. Pagett, P.E. Senior Vice President A,mn 956109'66500-254