Loading...
CC - Item 4C - Staff Report Receipt and Award of Bids ///.E M---F... , statte ort TO: HONORABLE MAYOR AND MEMBERS ROSEMEAD CITY COUNCIL FROM: FRANK TRIPEPI, CITY MANAGER 1 Z- DATE: SEPTEMBER 30, 1998 SUBJECT: RECEIPT AND AWARD OF BIDS FOR THE ROSEMEAD RESIDENTIAL REHABILITATION PROGRAM, DEFERRED LOAN-3856 BROOKLINE STREET On June 9, 1998, staff authorized the owner of 3856 Brookline Street to obtain bids for a project under the Community Development Block Grant (CDBG) Deferred Loan Program. At a pre-bid meeting, bid packages were given to general contractors who attended a contractor's meeting. These bid packages requested line-item bids for the work to be completed on the project, and a total for the entire rehabilitation package. Work to be completed includes the correction of code violations, such as replacement of 11 roof due to fire damage, repair of fire damaged walls and rafters on interior, kitchen, dining room and bedroom repair and repair to front porch steps that have deteriorated. III Each contractor met with the homeowner during the on-site walk-through of the property prior to submitting a bid. Each contractor explained his procedures and techniques to the homeowner during that process. Staff requested potential bidders to do this in order to ease any concerns the homeowner might have about the project. The bid due-date was June 25, 1998. Three bids were received and staff proceeded to check each bid. COUNCIL. AGENDA OCT 131998 ITEM No. 7 CI i� J A spread sheet was set up and was reviewed by staff and each homeowner was then given the opportunity for further review. In accordance with the City's approved Rehabilitation Guidelines, the property owner has the ability to select the contractor of choice as long as the bid is within 15% of the average bid or in-house estimate. The homeowner selected Nick's Remodeling. Nick's Remodeling submitted a bid in the amount of$48,775.00. In addition to this bid, a contingency amount for unforeseen items and circumstances has been added. The contingency seeks to address items that may be brought to light during the course of construction. The Bid results are as follows: Nick's Remodeling $48,775.00 Jay-Ar Construction $59,814.00 Terrones Construction $60,300.00 Average Bid $56,296.33 Because of the extensive nature of repairs due to fire damage, staff recommends that the City Council waive the $35,000.00 loan limit in order to rehabilitate this single family residential property. RECOMMENDATION 1. Accept and award contract to Nick's Remodeling, owner selected bidder for this loan program in an amount not to exceed $53,625.50. 2. Authorize staff to initiate contract with owners and contractor. Attachments 8 8__ €3 11 r 8 S Ea .`I EL'S 3 o o. 8 to 0 28 0 0 E o« cg cza „8 8 i dg so 2» 18 j69- 0▪0 0 23 C3 I 22 0▪0 oh -r] p €I a`