Loading...
RRA – Item 2 – Acceptance of Bids and Awards of Contract – FY 1997/98 Asphalt Concrete Overlay and / R RIA ROSEMEAD REDEVELOPMENT AGENCY 8838 VALLEY BLVD.ROSEMEAD,CA 91770•(818)288-6671•Telecopier 8183079218 TO: FRANK G. TRIPEPI, EXECUTIVE DIRECTOR� FROM: KEN RUKAVINA, CITY ENGINEER I�/'— J DATE: JUNE 2, 1998 RE: ACCEPTANCE OF BIDS AND AWARD OF CONTRACT — FY 1997/98 ASPHALT CONCRETE OVERLAY AND STREET LIGHTING IMPROVEMENTS The following bids were received for the subject project on Thursday, May 21, 1998: 1. Sully-Miller Contracting Co. $653,520.75 2. Excel Paving Company $683,250.00 3. Silvia Construction Inc. $683,409.90 Attached are copies of the three low bids, a bid analysis, and Dun and Bradstreet reports for the three low bids. The low bid was received from Sully-Miller Contracting Co., a responsible contractor, in the amount of $653,520.75 which is approximately 3 percent below the Engineer's estimate of$677,200. The average bid was $673,393.55. There was an irregularity in the low bid submitted by Sully-Miller Contracting Co. The contractor performed a mathematical error wherein the extension amount for Bid Item No.18 was incorrectly entered as $7,260.00; the correct extended amount is $32,340.00. The total bid for Sully-Miller Contracting Co. stated above reflects the correction of this error. Attached are Exhibits "A" and "B" listing the streets included in this project. AGENCY AGENDA JUN 091998 • ITEM No. June 2, 1998 Page 2 RECOMMENDATION 1. Waive the irregularity in the bid submitted by Sully-Miller Contracting Co. 2. Accept the bids and award the project to Sully-Miller Contracting Co., in the amount of $653,520.75. 3. Declare the project Categorically Exempt under CEQA. 4. Authorize the Chairman to sign the contract on behalf of the Agency. Attachments KJR:kr 1998/staff reportslrra EXHIBIT "A" ASPHALT CONCRETE OVERLAY ON VARIOUS STREETS FISCAL YEAR 1997-98 • Baruch Street (San Gabriel Boulevard to 320' West of San Gabriel Boulevard) • Constance Street (San Gabriel Boulevard to Pine Street) • El Camino Drive (Roseglen Avenue to East End) • Emerson Place (San Gabriel Boulevard to Del Mar Avenue) • Garvalia Avenue (Brighton Street to Del Mar Avenue) • Garvalia Avenue (Daroca Avenue to Jackson Avenue) • Garvalia Avenue (San Gabriel Boulevard Pine Street) • Gladys Avenue (Klingerman Street to North End) • Graves Avenue (San Gabriel Boulevard to Angelus Avenue) • Klingerman Street (San Gabriel Boulevard to Angelus Avenue) • Oakmill Avenue (Arroyo Drive to East End) • Pueblo Drive (Roseglen Avenue to East End) • Rush Street (Walnut Grove Avenue to 450' East of Walnut Grove Avenue) • Villa Park (Roseglen Avenue to East End) • Walnut Grove Avenue (San Gabriel Boulevard to Rush Street) EXHIBIT "B" STREET LIGHTING IMPROVEMENTS ON VARIOUS STREETS FISCAL YEAR 1997-98 • Baruch Street (San Gabriel Boulevard to 320' West of San Gabriel Boulevard) • Constance Street (San Gabriel Boulevard to Pine Street) • Emerson Place (San Gabriel Boulevard to Del Mar Avenue) • Garvalia Avenue (Brighton Street to Del Mar Avenue) • Garvalia Avenue (Daroca Avenue to Jackson Avenue) • Garvalia Avenue (San Gabriel Boulevard to Pine Street) • Gladys Avenue (Klingerman Street to North End) • Graves Avenue (San Gabriel Boulevard to Angelus Avenue) • Klingerman Street (San Gabriel Boulevard to Angelus Avenue)