Bidder: Mariposa Landscapes CITY OF ROSEMEAD
JAY IMPERIAL PARK PROJECT
PROJECT No. 41354
(Addendum No. 2)
CONTRACT BID FORMS
BIDDER'. Mariposa Landscapes, Inc
CONTRACT BID FORMS
TABLETAgLE GENTS
1 - 4
SECTION 1 BID SCHEDULE
I
5
SECTION 2 BID DATA FORMS
6
2.A BID BOND 7-9
2.B LIST OF PROPOSED SUBCONTRACTORS
10 - 11
SECTION 3 NON-COLLUSION AFFIDAVIT
II
li
BIDDER Mariposa Landscapes, Inc
Ii
SECTION 1 - BID SCHEDULE
I
CBF - 1
•
•
BIDDER Mariposa Landscapes, Inc
BID SCHEDULE
SCHEDULE OF PRICES FOR
JAY IMPERIAL PARK PROJECT
PROJECT No. 41354
BASE BID SCHEDULE
j UNIT OF EST. I UNIT � ITEM
NO. ITEM DESCRIPTION MEASURE OTY_ PRICE COST
$23,308.00
1 General Conditions LS 1 23,308.00
2 Mobilization LS 1 157,567.00 j 557,567.00
3 '! Disposal of Waste Materials LS 1 17,903.00 $17,903.00
4 I Grubbing and clearing LS 1 21,010.00 $21 A10.00
5 Remove existing Fence/Gate LF 1,130 50.354 $56,90D.00
including retaining curb, footings
per plans and specifications.
6 Earthwork per Grading Plans and LS 1121,679.001$121,679.00
Specifications
7 Repair Existing Dirt Road. Remove LS ] 1 I 11
and replace 12-inches of the 1 $71,698.00
existing and scarify 8-inches below 1:71,698.00
to 90% relative compaction. % I :
(approximate 17,222 square feet) I
I
6 Adjust Utility Valves to grade EA ]' 20 644.21 $12,884 00 tI
(water, valves, etc.) �
9 Install Erosion Control per plans LS 1 $24,133.001$24,133.00
and specifications !
10 Purchase and Install all Picnic EA. 12 2,615.643 $31,388.00
Benches
11 Purchase and Install all Exercise EA 10 1,555 382 $15,554.00
Stations
12 Purchase and Install all Trash EA. 6 1,095.04 $6,570.00
Receptacles
--- - , , .
13 Purchase and Install all Benches EA. 6 1,502.923 $9 018 00
14 , Install all 1' Earth Mounds per Plans LS. 1 164,524.00 1$64,524.00
and Specifications
CBF - 2
it
BIDDER. Mariposa Landscapes, Inc
UNIT OF EST. 162 IC OT a ITEM
NO, ITEM DESCRIPTION MEASURE QTY. Tt PRICE COST
15 Install Decomposed Granite path LS. 1 �g162,214.00
and Concrete Mow strip Edging per
Plans and Specifications
16 I Install Concrete Mow strips Edging LS. 1 i 79 336.00 $79,336.00
per Plans and Specifications I 1
17 Install Decomposed Granite paving LS. 1 214,500.00 $214,500.00
pad around existing Edison Towers
18 Install Irrigation per Plans and LS, 1 202,937.001 $202,937.00
Specifications
19 Install Planting per Plans and LS. 1 181,640.00 $181,640.00
Specifications
20 Install soil prep per Plans and LS. 1 58,988.00 $58,988.00
Specifications
21 90 day maintenance period per I LS. 1 5.000.00 $5,000.00
Plans and Specifications
22 I Install all Electrical per plans and LS 1 I 181,388.0C $181,388.00
specifications. I I
23 j Furnish and Install Bollards Per EA 1 48 1 I
SCE Standard Plans, Complete H776,942 0C1$37,293.00
Place as Shown on the attached I -
detail.
24 Install Climbing Guards per SCE LS 1
n/a
specifications. Contact Randy D. n/A
Carney SCE Project Manager
(909) 374-5660—
randy.cormey@sce.com
25 1 Install water fountain as indicated EA 2 1
on the attached detail including
connection to new water meter.
Verify exact location from water I I
purveyor. Contractor to install
pressure regulator and line size 17,866.85 $15,734.00
backflow up stream of fountain and
set in box marked drinking fountain 1
All water fountain shall be grounded
per SCE Stancard,
TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$$1,551,487.00
I MILLION FIVE HUNDRED FIFTY ONE THOUSAND AND FOUR HUNDRED EIGHTY SEVEN AND 00/100 DOLLARS
Dollar amount in written form
CBF - 3 •
BIDDER: Mariposa Landscapes, Inc
ALTERNATE BID ITEM No. 1
24 Construct 6-Foot Wide Synthetic SF 16,080
Surface Pedestrian Trail, Including 738.00 $118,670.00
Excavation, Grading, Striping, •
Complete. See attached detail.
TOTAL ALTERNATE PRICE (SCHEDULE BID PRICE):$118,670.00
One hundred eighteen thousand six hundred seventy Dollars
Dollar amount in written form
TOTAL BASE BID PRICE &ALTERNATE: $1,670,157.00
one million six hundred seventy thousand one hundred fifty seven and oo
Dollar amount in written form
Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in
the schedule of bid items above, within the limits define in Section 3-2.2.1 of the Standard
Specifications, to stay within the budgeted amount of this project.
If the Bid Documents specify alternate bid items,the following Alternate Bid amounts shall
be added to or deducted from the Total Bid Price entered above.The owner can choose to
include one or more of the alternates in the Total Bid Price of the Project. If any of the
Alternate Bids are utilized by the Owner,the resulting amount shall be considered the Total
Bid Price for the Project.
The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which
cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and
after the bid opening date,or until a Contract for the Work is fully executed by the Owner and a third
party,whichever is earlier. The undersigned also agrees that if there is a discrepancy between the
written amount of the Bid Price and the numerical amount of the Bid Price,the written amount shall
govern.
Attached hereto is a certified check, a cashier's check or a bid bond in the amount of
10%of bid amount Dollars ($ )said amount being not less than ten percent(10%) of the Total
Bid Price. The undersigned agrees that said amount shall be retained by the Owner if,upon award,
we fail or refuse to execute the Contract and furnish the required bands, certificates and
endorsements of insurance and other certifications within the time provided.
If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be
prepared by the Owner for execution,within five(5)Calendar Days following the Letter of Award for
the Contract, and will deliver to the Owner within that same period the necessary original Certificates
of Insurance. Endorsements of Insurance, Performance Bond, Payment Bond and all other
documentation and certification required by the Contract.
The undersigned offers and agrees that if this bid is accepted. it will assign to the purchasing body
all rights,title, and interest in and to all causes of action it may have under Section 4 of the Clayton
CBF -4
BIDDER'. Mariposa Landscapes, Inc '..
Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the
Business and Professional Code), arising from purchases of goods, materials or services by the
Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and
become effective at the time the purchasing body tenders final payment to he Contractor. ••
Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence
satisfactory to the Owner of Bidder's California contractor's license(s)in goad standing;(2)evidence
•
that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting
therefrom', and (3) any other information and documentation, financial or otherwise, needed by
Owner to award a Contract to the lowest responsible and responsive bidder.
Bidder understands and agrees that liquidated damages shall apply to this Contract in the amounts
of five hundred dollars ($500.00) if project is not completed in ONE HUNDRED TWENTY (1201
calendar days. The Contract Time will begin to run ten (10) Working Days from the date of the
Notice of Proceed and subject to the terms and conditions described in the Contract Form and the
Contract Documents.
Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be
•
incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder
further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data
submitted herewith into a contract arising out of this Bid.
The undersigned acknowledges receipt, understanding and full consideration of the following
addenda to the Contract Documents.
Addenda Nos. 1, 2, 3
The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and
equipment or supplies necessary to complete the Work as described in the Bid Documents. If this
bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the
necessary bonds and accept the Total Bid Price as compensation in full for all Work under the
contract.
CBF - 5
BIDDER: Mariposa Landscapes, Inc
By.
I at e, Mt� 15529 Arrow Highway
Signu`� Business Street Address
Signet
Terry Noriega Irwindale, California 91706
Type or Print Name City, State and Zip Code
President (626) 960-0196
Title Telephone Number
02/15/2017
Date
Bidders/Contractor's State of Incorporation: California
Partners or Joint Venturers: N/A
Bidders License Number(s): 592268
Department Industrial Relations
Registered No.: 1000005079
NOTES:
1) By its signature on this Bid,the Bidder certifies under penalty of perjury the accuracy of the
representations made on the Contract Bid Forms.
2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address
3) If Bidder is a partnership or joint venture, give full names of all partners or joint
venturers.
As further discussed in the Instructions to Bidders,Bidder will be required
to provide evidence that the person signing on behalf of the corporation,
partnership or joint venture has the authority to do so.
CBF -6
BIDDER: Mariposa Landscapes, Inc
•
•
SECTION 2
BID DATA FORMS •
CBF -7
BIDDER:Mariposa Landscapes, Inc
Bidder shall submit is Bid data in accordance withthe format shown an each of the following Bid
Data Forms. Bidders shall prepare and use as many sheets as an necessary to adequately provide
the information required. Bidder shall ensure that every page of its Bid Data Forms are properly
identified with the Bidders name and page number.
2.A BID BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT Mariposa Landscapes, Inc. ,as
Principal, and The Ohio Casualty Insurance Company
as Surety, are held firmly bound unto the
CITY OF ROSEMEAD (hereinafter called the OWNER) in the sum of
Ten Percent of the Total Amount Bid
DOLLARS
(g 10% ), being not less than ten percent(10%)of the Total
Bid Price;for the payment of which sum will and truly to be made,we bind ourselves,
our heirs,executors,administrators,successors, and assigns,jointly and severally,
firmly by these presents.
WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work
required for the JAY IMPERIAL PARK PROJECT as set forth In the Notice Inviting
Bids and accompanying Bid Documents, dated February 22nd,2017
NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the
OWNER and, within the time and in the manner required by the above-referenced
Bid Documents, enters into the written form of Contract bound with said Bid
Documents, furnishes the required bonds (one to guaradee faithful performance
and the other to guarantee payment for labor and materials) firntshes the required
insurance certificates and endorsements, and furnishes any other certifications as
may be required by the Contract,then this obligation shall be null and void;otherwise
It shall remain In full force and effect. In the event suit is brought upon this bond by
the OWNER and judgment is recovered,said Surety shall pay all costs incurred by
the OWNER In such suit, including reasonable attorneys' fees to be fixed by the
court.
SIGNED AND SEALED,this 22nd day of February , 201
The Ohio Casualty Insurance Comp an
1r� ._. 1 )
Principal ---(SEAL - '�)
By: ec O( r0. r •. - By:
Signature L?natu ,
David B. Sandifor., • •eey-in-Fact
CBF- 8
THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND.
This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated.
Certificate No.733/430
American Fire and Casualty Company Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company West American Insurance Company i
• POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: ThatAmerican Fire 8 Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of
the State of New Hampshire,that Liberty M1lulual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts,and West American Insurance Company
is a corporation duly organized under the laws of the State of Indiana(herein collectively called the'Companies'},pursuant to and by authority herein set forth,does hereby name,constitute
and appoint, David B.Sandiford,Jeffrey H.Gryde
all of the city of Laguna Niguel stale of CA each individually if there be more than one named,its true and lawM attorney-in-fact to make,execute,seal,acknowledge
and deliver,for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surety obligations,in pursuance of these presents and shall
be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons.
IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 21m day of AprilRI
• • : , _
, 2016
American Fire and Casualty Company t
The Ohio Casualty Insurance Company
Liberty Mutual Insurance Company m
1991 �` West medcan Insurance Company
Ar
on
N
n �L L
B ' d ci
C STATE OF PENNSYLVANIA ss David M.Cerey(Asslstent Secretary m
«m COUNTY OF MONTGOMERY _ c0
d0, On this 21st day of April 2016 , before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of American Fire and ;It-
0
h-
uy Casualty Company,Liberty Mutual Insurance Company,The Ohio Casualty Insurance Company,and West American Insurance Company,and that he,as such,bong authorized so to do, ,CON
p 2 execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. : E
y > IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting.Pennsylvania,on the day and year first above wntten. 0 0
y9 aN PAa 9 COMMONWEALTH OF PENNSYLVANIA //i OR
N p °�d Notarial S
T P II N ryy Coe 9y 4
O ` Plymouth Twit tq ch 28.2q Teresa Pastella,Notary Public m
for `�4 `M CommissionExpiresMarch2e 2017 FS
4\4Fry Member Pennst vane Asmdalov of Notaries BOE
d nit
c05This Power OtAttyMey is made and executed pursuant to an by authority of the following By-laws and Authorizations of American Fire and Casualty Company,The Ohio Casualty Insurance by
Company,LibertyMutual Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows: ro
co N I P Y. Da Y9 sir;
1001ARTICLE W-OFFICERS-Section 12.Powerof denttorney Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or Ne President.and subject O c
o.E to such limitation as the Chairman or the President may prescribe.shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute seal, m
O c acknowledge and deliver as surety any and all undertakings,bonds.recognizances their and other surety obligations. Such attorneys-in-fact,subject to the limitations set forth in their respective 1p
E 6 powers of attorney,shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach(hereto the seal of the Corporation. When so m 0
Wm executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attorney-in-fact under >p
9 T the provisions of this article may be revoked at any time by the Board,the Chairman.thePresident or by the officer or officers granting such power or authority. Z<
ve?
7Nc ARTICLE%111-Execution ofConheds-SECTION 5-Surety Bonds and Undertakings.Any officerf the Company authorizedbfor that yto act in writing by the chairman or the president. E
> m and subject to such limitations as the chairman or the president may prescribe,shall appoint suchhersurysyn-beet as may be necessary to act in behalf of the Company lo make,execute, cM
Z U seal,acknowledge and deliver as surety any and all undertakings,bonds. heicsignature
recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their e m
respective powers of attorney,shall have full power to bind the Company by their siand execution of any such Instruments and to attach thereto the seal ofthe Company. When so U 0
executed such instruments shall be as binding as if signed by the president and attested by the secretary p f?
Certificate of Designation-The President of the Company,actinpursuant to the Bylaws of the Company,authorizes David M.Carey,Assistant Secretaryto appoint such attune s-in- -
9g Y P Y Y pant" Y
fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety
obligations.
Authorization-By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I,Gregory W.Davenport,the undersigned,Assistant Secretary,of American Fire and Casualty Company,The Ohio Casualty Insurance Company,Liberty Mutual Insurance Company.and
West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full,true and correct copy of the Power of Attorney executed by said
Companies,is in hill force and effect and has not been revoked.
22nd February
17
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this day of ,20 .
gpP ,, ♦
" * • :ff I9I1 By:0
r�
Gregory W.Davenport,Assistant Secretary
*
56 of 200
LMs212873 222013
CALIFORNIA ALL-PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
State of California
County of Los Angeles
On February 22, 2017 before inc. J. Cho, Notary Public
(Here insert name and title of the officer)
Personally appeared Terry Noriega, President
who proved to me on the basis of satisfactory evidence to he the person( whose name( is/are subscribed
to the within instrument and acknowledgement to me that helaL., tl.cy executed the same in his/Li/11,j,
authorized capaeity(ies), and that by his/Ir„Jtl i signature(&) on the instrument the person(* or the entity
upon behalf of which the person(cJ acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct J.CHO
! �.. Newry Public •California
)• los On las County
pal
WITNESS my hand and official seal. • an; Commits:•2179393 g
JMy Comm.trots Dec 30.2020`
�. (moTary senT)_
Signature of Notary Public
•
ADDITIONAL OPTIONAL INFORMATION
INSTRUCTIONS FOR COMPLETING THIS
FORM
Any acknowledgment completed in California must contain verbiage exactly as
DESCRIPTION OF It IE ATTACHED DOCUMENT appears above in the notary section ora separate acknowledgment form must be
properly completed and attached to that document. The only exception is if
AGREEMENT SIGNATURE PA(th document is recorded outside of California. in such instances,any alternative
(Title or description of attached document) acknowledgment verbiage as may be printed on such a document so long as the
verbiage does not require the notary to do something that is illegal for a notary in
California(i.e otifying the authorized capacity of the signer). Please check the
(Title or description of attached document continued) document.nefullyfor proper notarial wording and attach tins form if required
• State and County information must be the State and County where the
Number of Pages _ document
signer(s)personally appealed before the notary public for acknowledgment.
Document Date _ • Date of notanzation must be the date that the signer(s) personally appeared
which must also he the same dale the acknowledgment is completed.
• The notary public must print his or her name s it appears within his or her
Additional Int ormauonon followed by a comma and teny a title(notary public).
• Print the of document signer(s)who personally appear at the time of
notarization.
• Indicate the correct singular or plural forms by crossing off incorrect forms(i.e.
he/she/they,islxm)or circling the correct forms�sFailure to correctly indicate
CAPACITY CLAIMED BY THE SIGNER this information may lead to rejection of document recording.
• The notary seal impression roust be clear and photographically reproducible.
• ❑ Individuates) Impressionmust not cover text or lines. If seal impressionsmudges, seal if a
C Corporate Officer sufficint area permits.otherwise complete a different acknowledgment form.
• Signature of the notary public must match the signature on tile with the office
(Title) of the county clerk.
O Partner(s) de Additional infommtion is not required but could help to ensure this
❑ Attorney-in-Fan acknowledgment is not misused or attached to a different document.
❑ Other _ — — Indicate title or type of attached document, number of pages and
date.
en Indicate the capacity claimed by the signer. If the claimed capacity
is corporate officer,indicate the title(i.e.CEO,CFO.Secretary).
• Securely attach this document to the signed document.
CALIFORNIA ALL-PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
State of California
County of Los Angeles
On February 22, 2017 before me, J. Cho, Notary Public
(Here insert name and Jae of the officer)
Personally appeared David B. Sandiford
who proved to me on the basis of satisfactory evidence to he the person(-*) whose name(!) is/are subscribed
to the within instrument and acknowledgement to me that 1164w—they-executed the same in his/li i/tin 1i
authorized capacity(ies), and that by his/I...Alr..h signature(s) on the instrument the person(s), or the entity
upon behalf of which the person($acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct. J.CNO
J �_ Notary Public-California
WITNESS my hand and official seal. 4 a Los Angeles County z
iiiir•P;rfr Commission N 2114393
J _ ,234Comm.Ears Dec 30,2020E
Signature of Notary Public
' •
ADDITIONAL OPTIONAL INFORMATION
INSTRUCTIONS FOR COMPLETING THIS
FORM Any acknowledgment completed in California must contain verbiage exactly as
DESCRIPTION OF TIIE ATTACHED DOCUMENT appears above in the notary section or a separate acknowledgment form must be
property completed and attached to that document. The only exception
fa
AGREEMENT SIGNATURE.PAGE dui iment is recorded outside of California. In such instances,anyalternative
acknowledgment verbiage as may be pruned on such a document so long as the
(Title nm'description of(Macho)dacmncntl verbiage does not require the notary to do something that is illegal for a notary in
California fr e.ceify g the authorized capacity ofth signer). Please M1 k the
• (Title sit deEriplion of attached document continued)
document carefullyf proper rtari I wording and attach this form l required.
• State and County information must be the State and County where the
Number of Pages_ document
signer(s)personally appeared beton:the noddy public for acknowledgment,
Document Date_ • Date of notarization must be the date that the signer(s) personally appeared
which must also be the same date the acknowledgment is completed.
• The notary public Inust print his or her na
as it appearswithin his or her
Addw
Additional Information commission followed by a comma and then Yurtitle(notary public).
• Pnnt the name(s)of document signer(s)who personally appear at the time of
notanxation.
• Indicate the correct singular or plural forms by crossing ort incorrect forms(i.e.
he/die/they,is/Ere) ur circling the correct forms. Failure to correctly indicate
CAPACITY CLAIMED BY THE SIGNER this information may lead to rejection of document recording.
• The notary seal impression must be clear and photographically reproducible.
O Individual(s) • Impressionmust not cover teat or lines. If seal impression smudges,re-seal if a
- ❑ Corporate Of Feer safti en(area permits,uthenvise complete a different acknowledgmentform.
• Signature of the notary public must match the signature on file with the office
(Dee) of the county clerk.
❑ Penner(s) iR Additional information is not required but could help to ensure this
❑ Atton¢y-'in-Fact acknowledgment is not misused or attached to a different document.
❑ Other — Indicate title or type of attached document, number of pages and
date.
Indicate the capacity claimed by the signer. If the claimed capacity
is a corporate officer,indicate the title(i.e.CEO,CFO,Secretary).
• Securely attach this document to the signed document.
BIDDER: Mariposa Landscapes, Inc
LB LIST OF PROPOSED SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair Practices Act,"Sections 4100
through 4114 of the California Public Contract Code, and any amendments thereto, each •
Bidder shall provide the information requested below for each subcontractor who will
perform work, labor or render service to Bidder in or about the construction of the Work in an •
amount in excess of one-half of one percent (greater than 0.5 %) of the Bidder's Total Bid •
Price, or, in the case of bids or offers for the construction of streets or highways, including
bridges, in excess of one-half of 1 percent of the Contractor's total bid or ten thousand
dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work
which will be done by each subcontractor. Bidder shall list only one subcontractor for any
one portion of the Work.
Pursuant to Public Contract Code Section 4104,the Owner has determined that it will allow
Bidders twenty-four(24)additional hours after the deadline for submission of bids to submit
the information requested by the Owner about each subcontractor,other than the name and
location of each subcontractor.
If the Bidder fails to specify a subcontractor for any portion of the Work to be performed
under the Contract, it shall be deemed to have agreed to perform such portion itself, and
shall not be permitted to subcontract that portion of the Work except under the conditions
hereinafter set forth below.
Subletting or subcontracting of any portion of the Work in excess of one half of one percent
(greater than 0.5%)of the Total Bid Price or, in the case of bids or offers for the construction
of streets or highways, including bridges, in excess of one-half of 1 percent of the
Contractor's total bid or ten thousand dollars ($10,000),whichever is greater,for which no
subcontractor was designated in the original bid shall only be permitted in cases of public
emergency or necessity, and then only after Owner approval.
CBF -9
BIDDER: Mariposa Landscapes, Inc
2.B LIST OF PROPOSED SUBCONTRACTORS (continued)
I^napeale Next 2 Pages if needed tar listing additional subcontractors"I
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:Baker Electric Inc.
Address: 1298 Pacific Oaks Place, Escondido, CA 92029
License No.: 161756
Department of Industrial Relation Registration No. 1000000466
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name: Spectraturf
Address: 500 E Rincon Ste 100, Corona, CA 92679
License No.: 854429
Department of Industrial Relation Registration No. 1000002615
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address'.
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.'.
Department of Industrial Relation Registration No.
Name and Location Description of Work .
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
CBF- 10
BIDDER: Mariposa Landscapes, Inc
2.0 REFERENCES
The following are the names, addresses and telephone numbers for three public agencies for which BIDDER
has performed similar work within the past two(2)years:
1. Mt san Antonio College 1100 N Grand Ave. Walnut, CA 91789
Name and Address of Owner
Zakiel Gallegos (909) 274-4850
Name and telephone number of person familiar with project
Child Development centeccorrective
$508,477.00 measures site improvements 07/2016
Contract amount Type of Work Date Completed
2. SCE Hamilton Substation 21202 Brookhurst Ave. Huntington Beach, CA 92646
Name and Address of Owner
Aurora Ball (562) 491-2971
Name and telephone number of person familiar with project
Landscape Construction.Hardscape,
$216,730.00 Planting.Irrigation 01/2015
Contract amount Type of Work Date Completed
3, SCE Covina Service Center 800 W. Cienega, San Dimas, CA 91773
Name and Address of Owner
Kaly Trazos(626) 815-5607
Name and telephone number of person familiar with project
$2492.000.00 Planting, Hardscape and Irrigation 03/2015
Contract amount Type of Work Date Completed
4.
Name and Address of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
CBF - 11
BIDDER. Mariposa Landscapes, Inc
SECTION 3
NON-COLLUSION AFFIDAVIT
CBF - 12
BIDDER:Mariposa Landscapes, Inc
NON-COLLUSION AFFIDAVIT
In accordance with Public Contract Code Section 7106, the undersigned, being first duly
sworn, deposes and says that he or she holds the position listed below with the bidder,the
party making the foregoing bid,that the bid is not made in the interest of, or on behalf of,any
undisclosed person, partnership,company,association,organization,or corporation;that the
bid is genuine and not collusive or sham;that the bidder has not directly or indirectly induced
or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly
colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham
bid, or that anyone shall refrain from bidding;that the bidder has not in any manner, directly
or indirectly, sought by agreement,communication,or conference with anyone to fix the bid
price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the
bid price, or of that of any other bidder, or to secure any advantage against the public body
awarding the contract of anyone interested in the proposed contract; that all statements
contained in the bid are true; and, further, that the bidder has not, directly or indirectly,
submitted his or her bid price or any breakdown thereof, or the contents thereof,or divulged
information or data relative thereto, or paid, and will not pay, any fee to any corporation,
partnership, company association, organization, bid depository,or to any member or agent
thereof to effectuate a collusive or sham bid. `if.-' '�
Signature 6ic
Terry Noriega
Typed or Printed Name
President
Title
Mariposa Landscapes, Inc
Bidder
Subscribed and sworn before me
This 2 ay of fr6'(v A✓rj , 20 (7
U (Seal)
Notary ' blic in for J. coN
the S a- of California
SON' Notary Public -California
11jj._.
p v Los Angeles County
My Commission Expires: /t-ems—. 3°)) w a/ Commission it 2171393
M Comm.Eires Dec 30,2020
•
CBF- 13
•
h1AVOR: City of cRpsetneacI
Sneroan Aaw.vrn �
City y�/JGIIWWW
MAYON PROTP.M:
PoaN Lowjj,[] 'r 8838 E.VALLEYa00LEVARD P.O I30X 399
COUNCIL MEMBERS: ti�S�l] ROSEMEAD,CALIFORNIA 91770
WILLIAM ALAaroN TELEPHONE(626)569-3100
MARGARET CLARK FAX(626)307-9218
STEV1N LY
February 16,2017
CITY OF ROSEMEAD
ROSEMEAD, CALIFORNIA
ADDENDUM No. 3
JAY IMPERIAL PARK PROJECT
PROJECT No.41534
To All Prospective Bidders:
Please note the following revisions on the specifications for the above project:
1. The following Bid Item 24 shall be deleted from the Base Bid Schedule and not
Included in the total base bid price.
UNIT OF 1 EST. UNIT I ITEM 1
NO. ITEM DESCRIPTION MEASURE QTY. PRICE COST
•
specification Qop1aGFRandy-D:
�my@j
---r ee Man er
3745 e scgsem
The Addendum No. 3 forms a part of the Contract Documents for the above project and shall supplement or
supersede reference sections of original specifications. This Addendum No. 3 must be signed,acknowledge
on Page CBF — 5 of the Contract Bid Forms of the Specifications and submitted along with the Bidder's
Proposal.
Failure to acknowledge receipt of addendum will disqualify the Bidder.
BY ORDER OF THE CITY OF ROSEMEAD
Date: February 16,2017.
Very truly yours,
By >
afael M. Fajardo P.E.
City Engineer
Jay Imperial Park Project Page 1 of 2
1
Acknowledgement:
Company: Mariposa Landscapes, Inc
Bidder: .may
Title President_.
Date: 02/17/2017
Page 2 of 2
Jay Imperial Park Project
MAYOR: City of WpsemeaW
9Aw,xA ARMENIA
MAYOR PRO'1'N:.M:
PULLY Law -y 1, I/ 8838 C.VALLEY BOULEVARD P.O BOX 399
COUNCIL MY:.MNERS: WI/
ROSEMP.AD,CALIFORNIA 91770
WILE(AM AvpcON TELEPHONE(626)569-210
MnRUnaIi CIARX FAX(626)307-921R
STEV,w Lv
February 15,2017
CITY OF ROSEMEAD
ROSEMEAD, CALIFORNIA
ADDENDUM No. 2
JAY IMPERIAL PARK PROJECT
PROJECT No.41534
To All Prospective Bidders:
Please note the following revisions on the specifications for the above project:
1. There are only 12 Light Poles. #KCT2.10-K118-EDISON•REVA, 240V. WI 10'
DECORATIVE POLE. SEE DETAIL "NE-1"
2. On plan sheets 4.01 &4.02 for Planting,There is a Symbol called out CHI (46 EA),
which there are no description on the legend stating the Botanical name and size
of this plant. Please clarify?
Cercis occidentalis/Western Redbud-multi 24" box and this is however on
the plant legend.
3. There are a couple of Remote Control Valve Symbols on drawing 3.01 (attached)
at the south east corner of the job site with no valve size. Was this a typo error?
Please clarify.
These are extra symbols which did not get picked up. All valves seem to be
accounted for please move quick coupler from these symbols to next to
Valve A23.
4. Per Irrigation Legend the Main Line is to be a Schedule 80 PVC Pipe but don't say
anything about the fittings if we could use Schedule 40 or Schedule 80. Please
clarify.
All fittings shall match Pipe schedule.
Jay Imperial Park Project Addendum No.2 Page 1 of 2
•
5. Per specs and details Cover Mulch is to be installed after planting. Can you please tell me the
depth required? '
2" shredded redwood shavings.
6. Attached Contract Bid Forms (Addendum No.2)supersedes the previous Contract Bid
Forms.
•
The Addendum No. 2 forms a part of the Contract Documents for the above project and shall supplement or
supersede reference sections of original specifications. This Addendum No. 2 must be signed, acknowledge
on Page CBF—5 of the Contract Bid Forms of the Specifications and submitted along with the Bidder's
Proposal.
Failure to acknowledge receipt of addendum will disqualify the Bidder.
BY ORDER OF THE CITY OF ROSEMEAD
Date: February 15, 2017.
Very truly yours,
By �� •
Rafael M. Fajardo P.E.
City Engineer
Acknowledgement:
•
Company: Mariposa Landscapes, Inc. •
•
Bidder: •
Title: President ••
Date: 02/16/2017
Jay Imperial Park Project Addendum No.2 Page 2 of 2
/ty
MAYOR: Cis / of-2?V9semead
SANDRA AnMen Tn
MAYOR PRO TEM:
Pacer Low -WM, 8838 F.VALLEY BOULEVARD P.O BOX 399
COUNCIL MEMBERS: Wi ROSEMEAD,CALIFORNIA 91770
Wlwma ALmmON TELEPHONE(626)369-210
MMaMET CLARY FAX(626)307-9218
SrnTTN Lr
February 15,2017
CITY OF ROSEMEAD
ROSEMEAD, CALIFORNIA
ADDENDUM No.2
JAY IMPERIAL PARK PROJECT
PROJECT No.41534
To All Prospective Bidders:
Please note the following revisions on the specifications for the above project:
1. There are only 12 Light Poles. #KCT2-10-K118-EDISON-REVA, 240V. WI 10'
DECORATIVE POLE. SEE DETAIL"A/E-1"
2. On plan sheets 4.01 &4.02 for Planting,There is a Symbol called out CHI (46 EA),
which there are no description on the legend stating the Botanical name and size
of this plant. Please clarify?
Cercis occidentalis)Western Redbud-multi 24" box and this is however on
the plant legend.
3. There are a couple of Remote Control Valve Symbols on drawing 3.01 (attached)
at the south east corner of the job site with no valve size. Was this a typo error?
Please clarify.
These are extra symbols which did not get picked up. All valves seem to be
accounted for please move quick coupler from these symbols to next to •
Valve A23.
4. Per Irrigation Legend the Main Line is to be a Schedule 80 PVC Pipe but don't say
anything about the fittings if we could use Schedule 40 or Schedule 80. Please
clarify.
All fittings shall match Pipe schedule.
Jay Imperial Park Project Addendum No.2 Page 1 of 2
•
5. Per specs and details Cover Mulch is to be installed after planting. Can you please tell me the
depth required?
7 shredded redwood shavings.
6. Attached Contract Bid Forms (Addendum No.2)supersedes the previous Contract Bid
Farms.
The Addendum No. 2 forms a part of the Contract Documents for the above project and shall supplement or
supersede reference sections of original specifications. This Addendum No. 2 must be signed, acknowledge
on Page CBF—5 of the Contract Bid Forms of the Specifications and submitted along with the Bidders
Proposal.
Failure to acknowledge receipt of addendum will disqualify the Bidder.
BY ORDER OF THE CITY OF ROSEMEAD
Date: February 15,2017.
Very truly yours,
By
Rafael M. Fajardo P.E.
City Engineer
Acknowledgement:
Company:
Bidder:
Title:
Date:
Jay Imperial Park Project Addendum No. 2 Page 2 oft
I�f
CITY OF ROSEMEAD j
JAY IMPERIAL PARK PROJECT
PROJECT No. 41354
(Addendum No. 2)
CONTRACT BID FORMS
BIDDER:
CONTRACT BID FORMS
TABLE OF CONTENTS
SECTION 1 BID SCHEDULE 1 -4
SECTION 2 BID DATA FORMS 5
2.A RID BOND 6
2.B LIST OF PROPOSED SUBCONTRACTORS 7 - 9
SECTION 3 NON-COLLUSION AFFIDAVIT 10 - 11
BIDDER:
SECTION 1 - BID SCHEDULE
CBF - 1
BIDDER:
BID SCHEDULE
SCHEDULE OF PRICES FOR
JAY IMPERIAL PARK PROJECT
PROJECT Na 41354
BASE BID SCHEDULE
I I i
UNIT OF EST. UNIT ITEM
NO. ITEM DESCRIPTION MEASURE QTY. PRICE COST
1 General Conditions LS 1
.�-
2 Mobilization LS � 1 � I
3 Disposal of Waste Materials LS 1
4 Grubbing and clearing LS r 1
5 Remove ex'.sting Fence/Gate LF 1,130
including retaining curb, footings
per plans and specifications.
6 I Earthwork per Grading Plans and LS 1
Specifications
7 Repair Existing Dirt Road. Remove LS 1
and replace 12-inches of the
existing and scarify 8-inches below
to 90% relative compaction.
(approximate 17,222 square feet)
8 Adjust Utility Valves to grade EA 20
(water, valves, etc.)
9 I Install Erosion Control per plans LS i 1
and specifications
10 Purchase and Install all Picnic EA. 12
Benches
11 Purchase and Install all Exercise EA. 10
Stations
12 Purchase and Install all Trash EA. 6
Receptacles
13 j Purchase and Install all Benches j EA. 6
14 Install all 1' Earth Mounds per Plans I LS. 1
and Specifications
CBF-2
BIDDER:
UNIT OF EST. UNIT ITEM
NO. ITEM DESCRIPTION MEASURE QTY. PRICE COST
15 Install Decomposed Granite path LS. 1 .
and Concrete Mow strip Edging per I
Plans and Specifications
16 Install Concrete Mow strips Edging LS. 1
per Plans and Specifications
17 Install Decomposed Granite paving LS. 1
pad around existing Edison Towers
18 Install Irrigation per Plans and La 1
Specifications 1
19 Install Planting per Plans and LS. 1
Specifications
20 Install soil prep per Plans and LS. 1
Specifications
21 1 90 day maintenance period per LS. 1
I Plans and Specifications
..._._..._._.._. I
22 I Install all Electrical per plans and LS 1 •
1II specificatons.
23 Furnish and Install Bollards Per EA 48
SCE Standard Plans, Complete In
Place as Shown on the attached
11 detail. __. .......�
24 Install Climbing Guards per SCE LS 1
specificatons. Contact Randy D.
Cormey SCE Project Manager
(909) 374-5660—
randy.corm ey@sce.co m
25 ! Install water fountain as indicated EA 2
on the attached detail including
connection to new water meter.
Verify exact location from water I
purveyor. Contractor to install
pressure regulator and line size
backflow up stream of fountain and
set in box marked drinking fountain.
All water fountain shall be grounded
per SCE Standard. I
I
I I I I
I
•
TOTAL BASE BID PRICE (SCHEDULE BID PRICE):$
Dollar amount in written form
CBF- 3
BIDDER:
ALTERNATE BID ITEM No. 1
24 i Construct 6-Foot Wide Synthetic SF 16,080 '
Surface Pedestrian Trail, Including
Excavation, Grading, Striping,
Complete. See attached detail
TOTAL ALTERNATE PRICE (SCHEDULE BID PRICE):$
Dollar amount in written form
TOTAL BASE BID PRICE &ALTERNATE: $
Dollar amount in written form
Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in
the schedule of bid items above, within the limits define in Section 3-2.2.1 of the Standard
Specifications, to stay within the budgeted amount of this project.
If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall
be added to or deducted from the Total Bid Price entered above. The owner can choose to
include one or more of the alternates in the Total Bid Price of the Project If any of the
Alternate Bids are utilized by the Owner,the resulting amount shall be considered the Total
Bid Price for the Project.
The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which
cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and
after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third
party,whichever is earlier. The undersigned also agrees that if there is a discrepancy between the
written amount of the Bid Price and the numerical amount of the Bid Price,the written amount shall
govern.
Attached hereto is a certified check, a cashier's check or a bid bond in the amount of
Dollars ($ )said amount being not less than ten percent(10%)of the Total
Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award,
we fail or refuse to execute the Contract and furnish the required bonds, certificates and
endorsements of insurance and other certifications within the time provided.
If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be
prepared by the Owner for execution, within five(5)Calendar Days following the Letter of Award for
the Contract, and will deliver to the Owner within that same period the necessary original Certificates
of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other
documentation and certification required by the Contract,
The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body
all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton
CBF -4
BIDDER:
Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the
Business and Professional Code)., arising from purchases of goods, materials or services by the
Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and
become effective at the time the purchasing body tenders final payment to he Contractor.
Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence
satisfactory to the Owner of Bidder's California contractor's license(s)in good standing;(2)evidence
that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting
therefrom; and (3) any other information and documentation, financial or otherwise, needed by
Owner to award a Contract to the lowest responsible and responsive bidder.
Bidder understands and agrees that liquidated damages shall apply to this Contract in the amounts
of five hundred dollars ($500.00) if project is not completed in ONE HUNDRED TWENTY (120)
calendar days. The Contract Time will begin to run ten (10) Working Days from the date of the
Notice of Proceed and subject to the terms and conditions described in the Contract Form and the
Contract Documents.
Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be
incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder
further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data
submitted herewith into a contract arising out of this Bid.
The undersigned acknowledges receipt, understanding and full consideration of the following
addenda to the Contract Documents,
Addenda Nos.
The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and
equipment or supplies necessary to complete the Work as described in the Bid Documents. If this
bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the
necessary bonds and accept the Total Bid Price as compensation in full for all Work under the
contract.
CBF- 5
BIDDER •
By: •
Signature Business Street Address
Type or Print Name City, State and Zip Code
Title Telephone Number
Date
Bidder's/Contractor's State of Incorporation:
Partners or Joint Venturers:
Bidder's License Number(s):
Department Industrial Relations
Registered No.:
NOTES:
1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the
representations made on the Contract Bid Forms.
2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address
3) If Bidder is a partnership or joint venture, give full names of all partners or joint
venturers.
As further discussed in the Instructions to Bidders,Bidder will be required
to provide evidence that the person signing on behalf of the corporation,
partnership or joint venture has the authority to do so.
CBF - 6
BIDDER:
SECTION 2
BID DATA FORMS
CBF -7
BIDDER:
Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid
Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide
the information required. Bidder shall ensure that every page of its Bid Data Forms are properly
identified with the Bidder's name and page number.
2.A BID BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT _ as
Principal and
, as Surety, are held firmly bound unto the
CITY OF ROSEMEAD (hereinafter called the OWNER) in the sum of
DOLLARS
($ ), being not less than ten percent (10%) of the Total
Bid Price;for the payment of which sum will and truly to be made,we bind ourselves,
our heirs, executors,administrators, successors, and assigns,jointly and severally,
firmly by these presents.
WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work
required for the JAY IMPERIAL PARK PROJECT as set forth in the Notice Inviting
Bids and accompanying Bid Documents, dated
NOW, THEREFORE. if said Principal is awarded a Contract for the Work by the
OWNER and, within the time and in the manner required by the above- referenced
Bid Documents, enters into the written form of Contract bound with said Bid
Documents, furnishes the required bonds (one to guarantee faithful performance
and the other to guarantee payment for labor and materials) furnishes the required
insurance certificates and endorsements, and furnishes any other certifications as
may be required by the Contract,then this obligation shall be null and void; otherwise
it shall remain in full force and effect. In the event suit is brought upon this bond by
the OWNER and judgment is recovered, said Surety shall pay all costs incurred by
the OWNER in such suit, including reasonable attorneys' fees to be fixed by the
court.
SIGNED AND SEALED, this day of , 20_
(SEAL) (SEAL)
Principal Surety
By: By:
Signature Signature
CBF - 8
BIDDER: •
2.6 LIST OF PROPOSED SUBCONTRACTORS
In compliance with the"Subletting and Subcontracting Fair Practices Act,' Sections 4100
through 4114 of the California Public Contract Code, and any amendments thereto, each
Bidder shall provide the information requested below for each subcontractor who will
perform work, labor or render service to Bidder in or bout t ec constructionotheBddee'sWork iIn Bid
an
amount in excess of one-half of one percent(greater
Price, or. in the case of bids or offers for the construction of streets or highways, including
bridges, in excess of one-half of 1 percent of the Contractor's total bid or ten thousand
d
rther set
e Work
whichwilllbe done byl each subr is contractor. Bidder shall list only oh ne subcontracte portion of or for any
one portion of the Work.
•
Pursuant to Public Contract Code Section 4104,the Owner has determined that it will allow
Bidders twenty-four(24)additional hours after the deadline for submission of bids to submit
the information requested by the Owner about each subcontractor,other than the name and
location of each subcontractor.
If the Bidder fails to specify a subcontractor for any portion of the Work to be performed
under the Contract, it shall be deemed to have agreed to perform such portion itself, and
shall not be permitted to subcontract that portion of the Work except under the conditions
hereinafter set forth below.
Subletting or subcontracting of any portion of the Work in excess of one half of one percent
(greater than 0.5%)of the Total Bid Price or, in the case of bids or offers for the construction
of streets or highways, including bridges, in excess of one-half of 1 percent of the
Contractor's total bid or ten thousand dollars($10.000), whichever is greater,for which no
subcontractor was designated in the original bid shall only be permitted in cases of public
emergency or necessity, and then only after Owner approval.
CBF -9
•
BIDDER:
2.B LIST OF PROPOSED SUBCONTRACTORS(continued)
I"yup."tate Next 2 rages it needed tor listing additional subcontractors I
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No..
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address.
License No:
Department of Industrial Relation Registration No.
CBF- 10
BIDDER,
2.0 REFERENCES
The following are the names,addresses and telephone numbers for three public agencies for which BIDDER
has performed similar work within the past two (2)years:
1.
Name and Address of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
2.
Name and Address of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
3.
Name and Address of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
4.
Name and Address of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
II
CBF - 11
BIDDER'.
SECTION 3
NON-COLLUSION AFFIDAVIT
1
CBF - 12
BIDDER:
NON-COLLUSION AFFIDAVIT
In accordance with Public Contract Code Section 7106, the undersigned, being first duly
sworn, deposes and says that he or she holds the position listed below with the bidder, the
party making the foregoing bid, that the bid is not made in the interest of,or on behalf of,any
undisclosed person, partnership,company,association,organization,or corporation;that the
bid is genuine and not collusive or sham;that the bidder has not directly or indirectly induced
or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly
colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham
bid, or that anyone shall refrain from bidding;that the bidder has not in any manner,directly
or indirectly, sought by agreement, communication, or conference with anyone to fix the bid
price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the
bid price, or of that of any other bidder, or to secure any advantage against the public body
awarding the contract of anyone interested in the proposed contract; that all statements
contained in the bid are true; and, further, that the bidder has not, directly or indirectly,
submitted his or her bid price or any breakdown thereof,or the contents thereof,or divulged
information or data relative thereto, or paid, and will not pay, any fee to any corporation, •
•
partnership, company association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid. ••
•
•
Signature
Typed or Printed Name
Title
Bidder ••
•
Subscribed and sworn before me
This day of , 20 •
(Seal)
Notary Public in and for
the State of California
My Commission Expires:
CBF - 13
,
DJ
w Q
LTD I
J
Z 1
ZOC C0 I
< DJ w
r
e LI
LiJ w
F-
mN
a o
m ct RCf v -�
>— m 7 H
n m o LJJ 0, 7
3 W f
CC CD Ilt
} Z Q W OJ Z Q m
CC LLI
U rN> 1Y
Z Q < = z
m - � rnw CD W U) o
CC 0 0 CO m m z w ~
U
Z O Q 0 D •
- -- I- ' '' Q 11.1! w
CD J V) Z
CC Z J CO - W WW Z o a
10g o 0 Z U
U U IL
I LANS
(n
CD
1
aa
re
0 0
0
N Y 'Q s
p Z U N N K U
O O U
W Q 1- O 2 x Fqq- Q N
VI o o W N K C ip 2 fG d'
cCQO � . o co N N m = m
ccm = z z &I >E3 �` � w10 a > a XI =
U G
� Zm W Cf 4 N W 9� ' W � m � N
x 0 4J 0
H:; 1.6J col O m � al O d i N 0
U 1
¢ 2' O z F 2' (Owl O 2 CO i H K O \ Qpw = Z
O cja
1- N m z 0 d O 6 W W Z Y U 1-0 ,- CL ¢
OF z2 _i Ca w � 3zO3 KaWUn HO
w � = .l a ca _i > mI- XI0d � o < Cw i� II��r IMIr4I z
w as Z. o o z c = CC 0 0 O O z nw. w fT1-1 TI Q r1 la
� os > a OM vg ¢ aO o � Nei._ S17-S_ _ la
CC
--
b: infill,
c ° 1 nor
o
J‘ =, ,,Sia--•-- 1
Iv:
fi
i pp ii n I� � � a llN
IN
} N I
1
d A,
-1 1 ' ',,!ii i'=;Sri
},ijerM
N W' Z C
VI MOw0CC a: / N w iQn
a.
xOZO N NOUN Illino W =
z 2'
�o�^ a � 5 LtNN nOdS Ol z 3w
o NJzv0 Ewa = zip „5-,3a J - N L
LL }� O N x z y 1- / w ,-
Z I- W K x U H O K m Q / •
= o =3 w -5 , o « MG o do> of \1
o
o �- O o 0 N cm—-, „Dl-,Z+
! 0 !IN0 1; WU OW I )t.... .
w k.
0 z oV ¢ tx a x 2 z = m 1 _A00V:404:2°-.., ( Pl
C a a- ,41;;;;N:: `.!
CD C_.> i rn 0000 3 ? o JIWt dy ,n
CO CO
w �4:741:41;
w oW MOSA
wN2
oQ a . . f Yoo
O 0 4 .. 4?:fs:S 11
v 1.
¢ Z 71o
x CC cc oz o ^ _ o
O � w - � w
W d U Q _ d'
x-J CI SOI dOW 4a ® <i"
OWJN1- U' e Q 6. ..j w (VA Ii
m Z
W O 1 N Q 2 O W O C JI W
SUS Q 0 N 2 o w n N ¢>¢ a
OQ0ZO nON < 0 l�
N _ O �i < N W c U
=
< 3
__ _
0
kb ks ITEM DESCRIPTION
w AO 5" DIA. STD. GALV. PIPE, 7'-0" LONG
V (PIPE TO BE FILLED WITH CONC. ,
PRIMER SUITABLE FOR GALV. METAL
e AND PAINTED "TRAFFIC YELLOW" FOR
i OUTDOOR EXPOSURE (PIPE EXPOSED
TOP VIEW TOP PORTION ONLY)
THIMBLEYE, 2" DIA.
X 4" LONG GALV. STEEL
%r. MATERIAL FOR 3/q" BOLT �,
W (JOSLYN J-6551
11
OR EQUAL)--- -.� -
\-- 3/4"R
0.
N DIA. SQUARE
° OA HEAD BOLT (GALV. )
W/ SQUARE NUT
(INSTALL BEFORE
6 GROUND LINE -1 FILLING W/ CONCRETE)
k " .0 O
rc� ;
. .._._ 1`
a 4A
4Y. ' CONCRETE c — 3 EA. 1/2"A x 0'-41/2 0
MINIMUM .; . i "' / STUDS EQUALLY a
w
DIMENSIONS SPACES (TYP. ) w
i brit' T
CO
L-A • I
r L
a
U
" _. ___ NOTES: 1o-
=
a 1 . CONCRETE 2500 PSI @ 28 DAYS. z
1 '-6" 2. ANY DAMAGED NON-PAINTED SURFACE w
SHALL BE COATED WITH GALVANOX m
8 TYPICAL INSTALLATION TYPE 1 . w
3. PIPE SHALL BE INSTALLED PLUMB
CD X AND STRAIGHT.
Location: S'Sivn
BOLLARD PROTECTION FOR
SECONDARY LAND USE crs
kisCaOIItNCAIJEO TA
`DISONAn fill6ON INTERNATIONAL Comptny
0 SECONDARY LAND USE P.M.
No. RevTslons Made I.D.L D/L M55569—O S3
1.1-01.9-A MO 4/ee
MAYOR: City of ftsetnea
SANDRA ARRRNTA
MAYOR PRO TEM:
Pony Low
�7 i 8838 E.VALLEY BOULEVARD P.O BOX 399
l
COUNCIL MEMBERS: ROSEMEAD.CALIFORNIA 91770
WILLIAM LARGO i FAX(6 6)30(626)569-2100
MARGARET CURB FAX(626)307-9218
STEVEN Lv
February 13, 2017
CITY OF ROSEMEAD
ROSEMEAD, CALIFORNIA
ADDENDUM NO. 1
JAY IMPERIAL PARK PROJECT
PROJECT No.41534
To All Prospective Bidders:
Please note the following revisions on the specifications for the above project:
1. You are hereby informed that the Bid Opening scheduled for 11:00 a.m. on Wednesday
February 15, 2017 has been changed to February 22, 2017 at 11:00 a.m. The City of
Rosemead will receive sealed bids up to 10:30 a.m.on February 22, 2017 and will follow up
with publicly opening the bids at 11:00 a.m.
The Addendum No. 1 forms a part of the Contract Documents for the above project and shall supplement
or supersede reference sections of original specifications. This Addendum No. 1 must be signed,
acknowledge on Page CBF — 5 of the Contract Bid Forms of the Specifications and submitted along with
the Bidder's Proposal.
BY ORDER OF THE CITY OF ROSEMEAD
Date: February 13,2017 ��f", ,, {J/
o1 By: (:41 Di�"" ` Rafael 114ajardo P.E.
City Engineer
Acknowledgement:
Company: Mariposa Landscapes, Inc.
Bidder: ✓u-u etc
Title: President
Date: 02/13/2017