SECTION 1 BID SCHEDULE I - 4
SECTION 2 BID DATA FORMS 5
2.A BID BOND 6
2.B LIST OF PROPOSED SUBCONTRACTORS 7 -9
SECTION 3 NON-COLLUSION AFFIDAVIT 10 - 11
BIDDER: Ins AngnIns Fnginnartrlg Inr
SECTION 1 - BID SCHEDULE
•
CBF - 1
BIDDER: Los Angeles Engineering, Inc.
BID SCHEDULE
SCHEDULE OF PRICES FOR
JAY IMPERIAL PARK PROJECT
PROJECT No. 41354
BASE BID SCHEDULE
1 UNIT OF EST. UNIT ll ITEM
NO. I ITEM DESCRIPTION MEASURE QTY. I PRICE COST
1 General Conditions LS 1 j;25060— 1 ajOCO
2 Mobilization LS 1 IOSOc0— IeSCicY_") —
3 Disposal of Waste Materials LS 1 31 -! Asir-
-.._. i 9----__-'--_.---._I-__.._._.._._..._.....__-'-/a3srol....LOOI -
4 Grubband and clearing LS 1
5 Remove existing Fence/Gate LF 1,130
including retaining curb, footings
per plans and specifications. 9- ) o i (n 0-
6 Earthwork per Grading Plans and I LS 1
Specifications ---____.__...__J_._.._._.... IBD,0001 (50, CCY7
7 Repair Existing Dirt Road. Remove LS j 1
and replace 12-inches of the
existing and scarify 8-inches below 1/0 f
(approximate 17,222 square feet) 1
8 Adjust Utility Valves to grade EA 20 _
(water, valves, etc.) 400_ (6r COO
9 Install Erosion Control per plans I LS 1
and specifications �C ClIf
3S COO I
10 Purchase and Install all Picnic EA. 12
Benches 2,500- 30fDW
11 Purchase and Install all Exercise EA. 10
Stations 2 � — 25f poo—
1 '...
12 Purchase and Install all Trash EA. 6 '.
Receptacles I, (p0— br(45)00_
13 Purchase and Install all Benches EA.
I - 6 tIO _O—I 9f(aC0_
14 Install all 1' Earth Mounds per Plans 1 LS. 1
and Specifications '15,DOD i 5f7
CBF -2
BIDDER: Los Angeles Engineering. Inc.
UNIT OF EST. UNIT ITEM
NO. ITEM DESCRIPTION MEASURE QTY. PRICE COST
15 Install Decomposed Granite path LS. 1 I
and Concrete Mow strip Edging per p ow 130 ow-
Plans and Specifications r
16 Install Concrete Mow strips Edging LS. 1 _
per Plans and Specifications - 35'000 35,COD
17 Install Decomposed Granite paving LS, 1
pad around existing Edison Towers $Or 000 90rpOp—
i
18 Install Irrigation per Plans and LS. j 1 1 -�
Specifications 1100 CCC o20C boo
19 Install Planting per Plans and LS. 1
Specifications 1301000_ 1 30,000—
20 Install soil prep per Plans and LS. 1
Specifications 90,000" yo,oro
21 1 90 day maintenance period per LS. 1
Plans and Specifications 1q,co0 qr�I '
22 I Install all Electrical per plans and LS 1 I — I
specifications. I)QqD00l )9o, COb
23 Furnish and Install Bollards Per I EA 48
SCE Standard Plans, Complete In
Place as Shown on the attached I �1�' 3j,7c0 •
detail.
24 incr-in CH-12,-g-Cbards-per SCE LC 'I :
D.
mer
;ter ce.eemeDeLe V tD t"'ER f\ UE NOUN it 3
25 i Install water fountain as indicated EAi 2
on the attached detail including I I Stoop- )a, 000
connection to new water meter.
Verify exact location from water
1 purveyor. Contractor to install
1 pressure regulator and line size 11
1 backflow up stream of fountain and
set in box marked drinking fountain.
i AU water fountain shall be grounded
per SCE Standard.
• '
TOTAL BASE BID PRICE/1 (SCHEDULE BID PRICE):$ 11LiLigii,)
076
Dill. MV ��I'Cm) Iro+r N.A. ut.1r 0•11nC.13 btia- ' 5wweie s qe L cLiIc i i,4.2 eaN .
Dollar amount in written form c.e4,15
CBF - 3
BIDDER: I os Angeles Fngineerina Inc
ALTERNATE BID ITEM No. 1
24 Construct 6-Foot Wide Synthetic SF . 16,080
Surface Pedestrian Trail, Including a5
Excavation, Grading, Striping, )
Complete, See attached detail.
TOTAL ALTERNATE PRICE (SCHEDULE BID PRICE):$ ( IOFt fsgG
Dollar amount in written f J `_r-r'{s
•
TOTAL BASE BID PRICE &ALTERNATE: $ I i Gio c&10 •
car Qr , waQ
1Ft six cQ �
iec9 5,x —fN4Ua.acY Lei,Ic-4 kinirsb
Dollar amount in written form •
etiwc 22i1a c z.,f5
Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in
the schedule of bid items above, within the limits define in Section 3-2.2.1 of the Standard
Specifications, to stay within the budgeted amount of this project.
If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall
be added to or deducted from the Total Bid Price entered above.The owner can choose to
include one or more of the alternates in the Total Bid Price of the Project If any of the
Alternate Bids are utilized by the Owner,the resulting amount shall be considered the Total
Bid Price for the Project.
The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which
cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and
after the bid opening date,or until a Contract for the Work is fully executed by the Owner and a third
party,whichever is earlier. The undersigned also agrees that if there is a discrepancy between the
written amount of the Bid Price and the numerical amount of the Bid Price,the written amount shall
govern.
Attached hereto is a certified check, a cashier's check or a bid bond in the amount of
Ten Percent Bid Bond Dollars($ 10% )said amount being not less than ten percent(10%)of the Total
Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award,
we fail or refuse to execute the Contract and furnish the required bonds, certificates and
endorsements of insurance and other certifications within the time provided.
If awarded a Contract, the undersigned agrees to execute the formal Contract which will be
prepared by the Owner for execution,within five(5)Calendar Days following the Letter of Award for
the Contract,and will deliver to the Owner within that same period the necessary original Certificates
of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other
documentation and certification required by the Contract.
The undersigned offers and agrees that if this bid is accepted, it will assign to the purchasing body
all rights,title, and interest in and to all causes of action it may have under Section 4 of the Clayton
CBF -4
BIDDER: Los Angeles Engineering, Inc.
Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 of Part 2 of Division 7 of the
Business and Professional Code), arising from purchases of goods, materials or services by the
Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and
become effective at the time the purchasing body tenders final payment to he Contractor.
Bidder understands and agrees that, when requested by Owner, he shall provide: (1) evidence
satisfactory to the Owner of Bidders California contractors license(s)in good standing;(2)evidence
that the person signing this Bid is authorized to bind Bidder to this Bid and to a contract resulting
therefrom; and (3) any other information and documentation, financial or otherwise, needed by
Owner to award a Contract to the lowest responsible and responsive bidder. i
Bidder understands and agrees that liquidated damages shall apply to this Contract in the amounts
of five hundred dollars ($500.00) if project is not completed in ONE HUNDRED TWENTY (1201
calendar days. The Contract Time will begin to run ten (10) Working Days from the date of the •
Notice of Proceed and subject to the terms and conditions described in the Contract Form and the •
Contract Documents.
•
Bidder acknowledges that data submitted with its Contract Bid Forms which it requires to be
incorporated into a Contract arising out of this Submittal has been so identified by Bidder. Bidder
further acknowledges that the Owner may, at its discretion, incorporate any of the remaining data •
submitted herewith into a contract arising out of this Bid.
The undersigned acknowledges receipt, understanding and full consideration of the following
addenda to the Contract Documents.
Addenda Nos. t,2,3
The Bidder understands and agrees that the Total Bid Price is inclusive of all labor, materials, and
equipment or supplies necessary to complete the Work as described in the Bid Documents. If this
bid is accepted, the undersigned Bidder agrees to enter into and execute the Contract with the
necessary bonds and accept the Total Bid Price as compensation in full for all Work under the
contract.
•
CBF-5
BIDDER: Los Angeles Engineering, Inc.
By: 633 N. Barranca Ave, Covina,CA 91723
Signature iii Business Street Address
Aaron O'Brien Covina, CA 91723
Type or Print Name City, State and Zip Code
Secretary 626-454-5222
Title Telephone Number
02/22/2017
Date
Bidder's/Contractor's State of Incorporation: California Corporation
•
Partners or Joint Venturers: Angus O'Brien-President/Treasurer
Aaron O'Brien-Secretary
Bidder's License Number(s): 591176
•
Department Industrial Relations
Registered No.: 1000002848
NOTES:
1) By its signature on this Bid, the Bidder certifies under penalty of perjury the accuracy of the
representations made on the Contract Bid Forms.
2) If Bidder is a corporation, enter State of Incorporation in addition to Business Address
3) If Bidder is a partnership or joint venture, give full names of all partners or joint
venturers.
As further discussed in the Instructions to Bidders,Bidder will be required •
to provide evidence that the person signing on behalf of the corporation,
partnership or joint venture has the authority to do so.
•
•
CBF-6
MINUTES OF SPECIAL MEETING OF THE
BOARD OF DIRECTORS OF
LOS ANGELES ENGINEERING, INC.
A California Corporation
The Directors of LOS ANGELES ENGINEERING, INC. , A
California Corporation, held the special Meeting of the Board of
Directors at 633 N. Barranca, Covina, California, on March 27, 2015
at the hour of 2 : 00 p.m. for the purpose of passing on any
business which might be brought before the meeting.
There were present at said meeting the following Directors,
constituting a quorum of the full Board:
ANGUS O'BRIEN AND AARON O'BRIEN
ANGUS O'BRIEN acted as Chairman of the meeting and AARON
O'BRIEN acted as Secretary of the meeting .
RESOLVED - Beth Ballard as Chief Financial Officer is
authorized and directed to sign all bid documents and contracts
concerning the corporation business and thereby bind the
corporation to the contract and is authorized to do all things
necessary and properly to carry out negotiations and execution of
contracts with a public agency.
RESOLVED - The following persons are confirmed as the duly
elected officers, serving in their said capacity until their
successors are elected and qualified:
Angus O' Brien President
Aaron O'Brien Secretary
Aaron O' Brien Chief Estimator
Beth Ballard Chief Financial Officer
There being no further business to come before the meeting and
upon motion duly made, seconded and unanimously carried, the
meeting was adjourned.
AARON O'BRIEN, Secretary
ATTEST: This Corporate lteylution is ip force.
I/,-`—} Signed this 090n day of Fehvvtct&/ 2017
1.
ANGUS O'BRIEN, Chairman and /
President Aaron O'Brien, Secretary
BIDDER: Los Angeles Engineering, Inc.
SECTION 2
BID DATA FORMS
CBF - 7
BIDDER: Los Angeles Engineering, Inc.
Bidder shall submit its Bid data in accordance with the format shown on each of the following Bid
Data Forms. Bidders shall prepare and use as many sheets as are necessary to adequately provide
the information required. Bidder shall ensure that every page of its Bid Data Forms are properly
identified with the Bidder's name and page number.
2.A BID BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT Los Angeles Engineering, Inc. ,as
Principal, and Liberty Mutual Insurance Company
, as Surety, are held firmly bound unto the
CITY OF ROSEMEAD (hereinafter called the OWNER) in the sum of
Ten Percent of Amount Bid
DOLLARS
($ 10% ), being not less than ten percent (10%) of the Total
Bid Price;for the payment of which sum will and truly to be made,we bind ourselves,
our heirs. executors, administrators, successors, and assigns,jointly and severally,
firmly by these presents.
WHEREAS, said Principal has submitted a bid to the OWNER to perform all Work
required for the JAY IMPERIAL PARK PROJECT as set forth in the Notice Inviting
Bids and accompanying Bid Documents,dated February 22, 2017
NOW, THEREFORE, if said Principal is awarded a Contract for the Work by the
OWNER and, within the time and in the manner required by the above- referenced
Bid Documents, enters into the written form of Contract bound with said Bid
Documents, furnishes the required bonds (one to guarantee faithful performance
and the other to guarantee payment for labor and materials) furnishes the required
insurance certificates and endorsements, and furnishes any other certifications as
may be required by the Contract,then this obligation shall be null and void;otherwise
it shall remain in full force and effect. In the event suit is brought upon this bond by
the OWNER and judgment is recovered, said Surety shall pay all costs incurred by
the OWNER in such suit, including reasonable attorneys' fees to be fixed by the
court.
SIGNED AND SEALED, this 21st day of February 20 17 Company
Los Angeles Engineering, Inc. (SEAL) Liberty Mutual Issuance (SEAL)
Principal Sbrety� 11
By; By:
Signature Acv„ J 'Hrlrn 6, Signature
(j Maria Pena,Attorney-in-Fact
CBF-8
•
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
County
State
of Californial
Los Angeles )
On 02/22/2017 before me, Joseph Haygood, Notary Public
(insert name and title of the officer)
personally appeared Aaron O'Brien ,
who proved to me on the basis of satisfactory evidence to be the person(s)—whose name(sj is/arg
subscribed to the within instrument and acknowledged to me that he/sJastitheY executed the same in
his/hefitheif authorized capacity(iesj, and that by hisibef/thersignature(aj"on the instrument the
personjs)'or the entity upon behalf of which the personjcted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
JOSEPH HAY000D I
WITNESS my hand and official seal.
ST:-. Commission No.2151432
(. :: ,`' NOTARY PUBLICLALIFORNN
Cl ' LOS ANGELES COUNTY
1\/\ 11 I / M'Cann Expires APRIL]l.3020
Signature /jig -i -r-aLv) (Seal)
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT Civil Code § 1189
A notary public or other officer completing this certificate verifies only the identity of the
individual who signed the document to which this certificate is attached, and not the
truthfulness, accuracy or validity of that document.
State of California )
) ss
County of Los Angeles )
FES z _ LUil
On before me, Lisa L. Thornton, Notary Public, personally
appeared Maria Pena, who proved to me on the basis of satisfactory evidence to be the
persons} whose name(4 is/are subscribed to the within instrument and acknowledged to me
that he{she/they executed the same in lais{her{tkeir authorized capacity(Jes}, and that by
kis,her/tkeir signatures} on the instrument the person(s3, or the entity upon behalf of which
the person(s4 acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Sig azure I4, ,
(Seal) Lis L. horntrn, Nbtary, ublic
LISA L. fHORNTON
Commission # 2118370 (
z ?:o'. .r. Notary Punic -California
Los Angeles County n
jI Cy Comm. &ones Jul5 2019
THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND.
This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated.
Cerlifcale No. 7541984
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS.That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts. and West American Insurance Company is a corporation duly
organized under the laws of the Slate of Indiana therein collectively called the Companies'),pursuant to and by authority herein set forth,does hereby name,constitute and appoint.
C.K. Nakamura;E S.Albrecht,Jr_Jeffrey Strassner;Jessica L. Rosser,Lisa L.Thornton;Maria Pena:Natalie K.Trofimoff;Noemi Ouiroz;Patricia S-
AranaTim M.Tomko
all of the city of Los Angeles ,state of CA each individually if there be more than one named,its true and lawful attorney-in-fact to make,execute,seal,acknowledge
and deliver,for and on its behalf as surely and as its act and deed any and all undertakings,bonds,recognizances and other surety obligations,in pursuance of these presents and shall
be as binding upon the Companies as II they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons.
IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 10th day of November , 2016 . >
ne
D
� The OhM toCasualty Insurance parry m
r z Liberty O Mutual Insurance Company e
ca
West American Insurance Company m
eSTATE OF PENNSYLVANIA ss David M.Care Assistant Secretary C
_m COUNTY OF MONTGOMERY
m _ c
1 C On this 10th dayof November 201eO
m before me personally appearedmpny, and th M.Carey,such,acknowledgedbegauthorized himself to Pe the Assistant Secretary of Mutual Insurance U H
O m Company,The Ohio Casually Company,and West American Insurance Company, and that he,as being so to do,execute the foregoing instrument for theerican In41)
ON therein contained by signing on behalf of the corporations by himself as a duly authorized officer. `
a3 > IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia,Pennsylvania,on the day and year first abovenwritten. O O.
=ja q8f COMMONWEALTH OF PENNSYLVANIA /V. Oa
cos ev Notarial s l • /. . /y
Teresa1 NotaryPublic By: �.I�QN
co a ( I UpperMerion Twp Montgomery CwnN Teresa Pasfella,Notary Public C
O y MyC miss Expires march 2P.2011 CU
.M. `o \4(ry PSP Member.PennSyli,aniwn�.ation ci Notanes 0- cd
v 10
CA This Power of Attorney is made and executedpursuant to and by authority of the following By-laws and Authorizations of The Ohio Casually Insurance company, Liberty Mutual en p
y"„ Insurance Company,and West American Insurance Company which resolutions are now in lull force and effect reading as follows. G
titiN
c: ARTICLE IV-OFFICERS-Section It Power of Attorney.Any officer or other official of the Corporation autbonzed for mat purpose in writing by the Chairman or the Presitlent,and subject O c
co Nto such limitation as the Chairman or the President may prescribe,shall appoint such attomeys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal, 41
N
C acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attorneysinfact,subject to the limitations set forth in their respective 5
E ti powers of attorney,shall have full power to bind the Corporation by their signature and execution of any such iinstruments and to attach thereto the seal of the CorporatlOn. When so q w
C N executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attorney-in-fact under >a
9 T the provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority. .Z0vt
ucr
_7th a ARTICLE XIII-Execution of Contracts-SECTION 5.Surety Bonds and Undertakings.Any officer of the Company authorizedfor that purpose in wilting by the chairman or the president, E00
> 22 and subject to such limitations as the chairman or the president may prescribe,shallappoint such attorneysin-fact as may be necessary to act in behalf of the Company to make,execute, ye pi,
O E seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attomeysindact subject to the limitations set forth iin their u G
Z U respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so
executed such instruments shall be as binding as if signed by the president and attested by the secretary. tO
O
Certificate of Designation-The President of the Company,acting pursuant to the Bylaws of the Company,authorizes David M.Carey,Assistant Secretary to appoint such attorneys-in- I—`I
I fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety
obligations.
Authorization-By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surely bonds,shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn the undersigned. Assistant Secretary. The Ohio Casualty Insurance Company. Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the onginal power of attorney of which the foregoing is a fun,true and correct copy of the Power of Attorney executed by said Companies,is in full force and effect and
1
has not been revoked i :6
11t
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this day of 20
p >> 1a1z By:
Vf IReneeCL latent Secretary
* F *
I I
150 of 5001.
LMS_12873082016
BIDDER. Los Angeles Engineering, Inc.
2.B LIST OF PROPOSED SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair Practices Act," Sections 4100
through 4114 of the California Public Contract Code, and any amendments thereto, each
Bidder shall provide the information requested below for each subcontractor who will
perform work,labor or render service to Bidder in or about the construction of the Work in an
amount in excess of one-half of one percent (greater than 0.5%) of the Bidder's Total Bid
Price, or, in the case of bids or offers for the construction of streets or highways. including
bridges, in excess of one-half of 1 percent of the Contractor's total bid or ten thousand '
dollars ($10,000), whichever is greater, and shall further set forth the portion of the Work
which will be done by each subcontractor. Bidder shall list only one subcontractor for any
one portion of the Work.
Pursuant to Public Contract Code Section 4104,the Owner has determined that it will allow
Bidders twenty-four(24)additional hours after the deadline for submission of bids to submit
the information requested by the Owner about each subcontractor,other than the name and
location of each subcontractor.
If the Bidder fails to specify a subcontractor for any portion of the Work to be performed
under the Contract, it shall be deemed to have agreed to perform such portion itself, and
shall not be permitted to subcontract that portion of the Work except under the conditions
hereinafter set forth below.
Subletting or subcontracting of any portion of the Work in excess of one half of one percent
(greater than 0.5%)of the Total Bid Price or, in the case of bids or offers for the construction
of streets or highways, including bridges, in excess of one-half of 1 percent of the
Contractor's total bid or ten thousand dollars ($10,000), whichever is greater,for which no
subcontractor was designated in the original bid shall only be permitted in cases of public '..
emergency or necessity, and then only after Owner approval.
CBF-9
BIDDER: Los Angeles Engineering Inc.
2.B LIST OF PROPOSED SUBCONTRACTORS(continued)
["Duplicate Next 2 Pages if needed for listing additional subcontractors."]
Name and Location Description of Work /
of Subcontractor to be Subcontracted
Name: ))[ert—z- Dsee,6
Address: 147' /�. • 31 57! tii r'n9134?. •
License No.: 9R i-3O7
Department of Industrial Relation Registration No. /tCt20/T7`0L'
Name and Location Description of Work CC iL 5 IA [4r�
of Subcontractor to be Subcontracted j V N
•
���� L�1� ( P
< :,,hu)
Name: ru-" °l t�"
Address: '/S SS /1 fl. -f.�. lyses/ 3 tt-d"ua, e, 'j Lis T`I
License No.: S•C-S-I'-13,9
Department of Industrial Relation Registration No. idtt'OU (2015
Name and Location Description of Work i
i
of Subcontractor to be Subcontracted l-Z ✓ \
[
Name: Orh50n tav' '"'r W.
��-
Address: .LAfl15 .ow+ .t Rd. /aw u t A,)ien( t'H CJL4277
License No.: 9-rill-I,
Department of Industrial Relation Registration No. /vat) ail'a 8"
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No. •
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address: !�
License No.:
Department of Industrial Relation Registration No.
CBF- 10
BIDDER: Los Angeles Engineering, Inc.
2.6 LIST OF PROPOSED SUBCONTRACTORS (continued)
I^oupllcate Next 2 Pages if needed for listing additional subconvactors i
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
•
License No: •
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address: _ t
License No.
Department of Industrial Relation Registration No.
CBF- 10
BIDDER: Los Angeles Engineering. Inc.
2.B LIST OF PROPOSED SUBCONTRACTORS(continued)
I^oupumte Next 2 Pages if needed for listing additional subcontractors^I
Name and Location Description of Work
of Subcontractor to be Subcontracted •
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
•
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No. •
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No:
Department of Industrial Relation Registration No.
•
CBF- 10
BIDDER: Los Angeles Engineering, Inc.
2.B LIST OF PROPOSED SUBCONTRACTORS(continued)
I"nup-cale Next 2 Pages II needed 0r listing additional subcontractors^I
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address: •
License No.:
Department of Industrial Relation Registration No.
•
Name and Location Description of Work •
of Subcontractor to be Subcontracted
•
Name:
Address: I
License No.: •
Department of Industrial Relation Registration No.
Name and Location Description of Work •
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No. •
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.
Department of Industrial Relation Registration No.
•
•
CBF- 10
BIDDER: Los Angeles Engineering. Inc.
2.B LIST OF PROPOSED SUBCONTRACTORS (continued)
[-Duplicate Next 2 Pages if needed for listing additional subconlraclors-1
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.:
Department of Industrial Relation Registration No.
Name and Location Description of Work
of Subcontractor to be Subcontracted
Name:
Address:
License No.'.
Department of Industrial Relation Registration No.
CBF- 10
BIDDER: Los Angeles Engineering, Inc.
2.0 REFERENCES
The following are the names,addresses and telephone numbers for three public agencies for which BIDDER
has performed similar work within the past two(2)years:
1 See Attached References
Name and Address of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
2.
Name and Address of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
3.
Name and Address of Owner
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
4.
Name and Address of Owner
•
Name and telephone number of person familiar with project
Contract amount Type of Work Date Completed
CBF - 11
it
os ANOece
v 0,C
PROJECT NUMBER: 1468
PROJECT INFORMATION: CONTRACT INFORMATION:
PROJECT NAME. Lindsey Academy-All Weather Field CONTRACT AMOUNT: 51,154,168.00
PROJECT ADDRESS: 5075 Daisy Avenue,Long Beach,CA 90S05 CONTRACT NUMBER:
PROJECT MGR/PHONE: Mitch Ward CONTRACT TYPE. Lump Sum
SUPERINTENDENT/PHONE: Armando Bernal DURATION: 150 Calendar Days
COMPLETION DATE: Dec-16
OWNER INFORMATION: ARCHITECT INFORMATION:
OWNER NAME: Long Beach Unified School District ARCHITECT NAME: HMC Architects
OWNER ADDRESS: 1425 Webster Ave,Long Beach,CA 90810 ARCHITECT ADDRESS'. 3546 Concours Street,Ontario,CA 92614
OWNER PHONE: 562-997-7550 ARCHITECT PHONE: 909-898-9979
OWNER FAX: 562-595-8644 ARCHITECT FAX:
OWNER-CONTACT: Allen Paul ARCHITECT CONTACT: JR Richardson
CM INFORMATION:
CM NAME: Long Beach Unified School District %toDate Complete: 100%
CM ADDRESS'. 2425 Webster Ave Long Beach,CA 90810 %of Work By LAE:
CM PHONE: 562-997-7550 Actual Completion Date: Apr-16
CM FAX: 562-595-8644 Actual Contract Amount:
CM CONTACT: Allen Paul Original Start Date: Jul-16
SCOPE OF WORK: Removal of existing grass turf,Installation of drainage system,Irrigation,Permeable base,Nailer curb.
'An Employee-Owned Company'
OcsFF`�+ANNOOEce
vil
PROJECT NUMBER: 1461
PROJECT INFORMATION: CONTRACT INFORMATION:
PROJECT NAME: Vincent Park Tud Install CONTRACT AMOUNT: $2,511,839.00
PROJECT ADDRESS'. E.Redondo Blvd.&E.Florence Avenue CONTRACT NUMBER:
PROJECT MGR/PHONE: Jessica Geer CONTRACT TYPE: Unit Price
SUPERINTENDENT/PHONE: Lab Guttierrez DURATION: 120 Working Days
COMPLETION DATE: Nov-16
OWNER INFORMATION: ARCHITECT INFORMATION:
OWNER NAME: City of Inglewood ARCHITECT NAME: Lloyd Civil&Sports Engineering
OWNER ADDRESS. One Manchester Blvd,Inglewood,CA 90401 ARCHITECT ADDRESS: 7349 N.Via Paseo Del Sur,Site 515-324,Scottsdale,AZ
OWNER PHONE: 310-412-5333 ARCHITECT PHONE: 602-635-4226
OWNER FAX: 310-412-5552 ARCHITECT FAX: 602-997-3148
OWNER-CONTACT: Boytrese Osias ARCHITECT CONTACT:
CM INFORMATION:
CM NAME'. City of Inglewood %to Date Complete: 100%
CM ADDRESS. One Manchester Blvd,Inglewood,CA 90401 %of Work By LAE'.
CM PHONE: 310-412-5333 Actual Completion Date: Apr-16
CM FAX: 310-412-5552 Actual Contract Amount 2,511,83900
CM CONTACT. Boytrese Osias
SCOPE OF WORK: Demo,Grading,oncrete Retaining Walls,Drainage,Permeable Base,Quick Coupler System,Synthetic Turf.
'An Employee-Owned Company.
COg ANG&
S
PROJECT NUMBER: 1459
PROJECT INFORMATION: CONTRACT INFORMATION:
PROJECT NAME: La Palma Recharge Basin CONTRACT AMOUNT: $7,134,56330
PROJECT ADDRESS: La Palma Avenue&Kraemer Blvd.,Anaheim,CA CONTRACT NUMBER'. LPRB-2015-1
PROJECT MGR/PHONE: John Risch CONTRACT TYPE: Unit Price
SUPERINTENDENT/PHONE: John Kay DURATION: 10 Months
COMPLETION DATE'. Aug-16
OWNER INFORMATION: ARCHITECT INFORMATION:
OWNER NAME'. Orange County Water District ARCHITECT NAME: Startec
OWNER ADDRESS: 18700 Ward St.,Fountain Valley,CA 92708 ARCHITECT ADDRESS'. 38 Technology Drive,Ste 100,Irvine,CA 92618
OWNER PHONE. 714 378 3200 ARCHITECT PHONE: 949-923-6000
OWNER FAX: 714-378 3373 ARCHITECT FAX'.
OWNER-CONTACT: Benjamin Smith ARCHITECT CONTACT:
CM INFORMATION:
CM NAME: Orange County Water District %to Date Complete_ 40%
CM ADDRESS- 18700 Ward St.Fountain Valley,CA 92708 %of Work By LAE:
CM PHONE: 714-3783200 Actual Completion Date'. August 20161 Work Still In Progress)
CM FAX: 714-378-3373 Actual Contract Amount: 7,134,563.30
CM CONTACT: Benjamin Smith
SCOPE OF WORK: Earthwork,Steel Piping,Mechanical,Pump Station.Structural Concrete,Masonry Building,Electrical,
Instrumentation,Landscape&Irrigation.
"An Employee-Owned Company"
,ANOE�
L S
~G/NE.,,,_
PROJECT NUMBER: 1458
PROJECT INFORMATION: CONTRACT INFORMATION:
PROJECT NAME: Media Creek Restoration CONTRACT AMOUNT: $1,407,435.00
PROJECT ADDRESS: Rock Tree Drive&Medea Valley Drive,Agoura Hills CONTRACT NUMBER: NIB 15-03
PROJECT MGR/PHONE'. elf Bird CONTRACT TYPE: Creek Restoration
SUPERINTENDENT/PHONE: Armando Bernal DURATION: 100 Working Days
COMPLETION DATE. Nov-15
OWNER INFORMATION: ARCHITECT INFORMATION:
OWNER NAME: City of Agoura Hills ARCHITECT NAME: Questa
OWNER ADDRESS: 30001 Ladyface Court,Aguora Hills CA 91301 ARCHITECT ADDRESS: 1220 Brickyard Cover Road,Point Richmond,CA 94807
OWNER PHONE: 818597-7335 ARCHITECT PHONE: 510-235-6114
OWNER FAX: 818-597-7352 ARCHITECT FAX: 510-236-2423
OWNER-CONTACT: Kelly Fisher ARCHITECT CONTACT: Syd Temple
mnzipm o v_ Us a..
CM INFORMATION:
CM NAME: Questa %to Date Complete: 100%
CM ADDRESS' 1220 Brickyard Cover Road,Point Richmond.CA 94807 %of Work By LAE:
CM PHONE: 510-236:6114 Actual Completion Date: Apr-16
CM FAX: 510-236-2423 Actual Contract Amount: 1,407,435 00
CM CONTACT' Syd Temple
SCOPE OF WORK: Removal of existing concrete trap channel,existing 66"RCP headwall,clear&gru bb. The installation of a
concrete stairway w/handrail,installation of 370 linear feet of a keystone retaining wall,a new prefab steel bridge,a asphalt pavement ADA trail
and a OG walkway,a ri prap environmental friendly channel,hydroseeding and irrigation and planting.
"An Employee-owned Company"
OS ANGFCF
v [ I s
.GJwEE\ "
PROJECT NUMBER: 1450
PROJECT INFORMATION: CONTRACT INFORMATION:
PROJECT NAME: El Camino Real Widening CONTRACT AMOUNT: $8,930590.00
PROJECT ADDRESS: El Camino Road from Tamarack to Chestnut Ave. CONTRACT NUMBER: 3957,3643,6302,6303
PROJECT MGR/PHONE: John Risch CONTRACT TYPE: Road Widening
SUPERINTENDENT/PHONE: Todd Petersen DURATION: 300 Working Days
COMPLETION DATE'. Nov15
OWNER INFORMATION: ARCHITECT INFORMATION:
OWNER NAME: City of Carlsbad ARCHITECT NAME'.
OWNER ADDRESS'. 1635 Faraday Ave,Carlsbad,CA 92008 ARCHITECT ADDRESS:
OWNER PHONE: 760-602-6477 ARCHITECT PHONE:
OWNER FAX: 760-602-8562 ARCHITECT FAX:
OWNER-CONTACT: ARCHITECT CONTACT:
CM INFORMATION:
CM NAME: Kleinfelder _ %to Date Complete. 75%
CM ADDRESS: %of Work By LAE:
CM PHONE: 858-705-0755 Actual Completion Date: August 2016(Work Still In Progress
CM FAX: Actual Contract Amount: 8,930,59000
CM CONTACT: Dave Carlin
SCOPE OF WORK: Demolition,Earthwork,Storm Drains,Dry Utilities,Electrical,Soldier Pile Retaining Walls,Curb,Gutter,
Sidewalks,AC Paving,Landscape&Irrigation.
"An Employee-Owned Company"
Os ANOet,
v S
Uv
%NEERN
PROJECT NUMBER: 1446
PROJECT INFORMATION: CONTRACT INFORMATION:
PROJECT NAME: Temecula Valley/Chaparral HS Field improv. CONTRACT AMOUNT. 51,891,000.00
PROJECT ADDRESS: Multiple Locations.Temecula,CA CONTRACT NUMBER: 2013-14-105
PROJECT MGR/PHONE: Jeff Bird CONTRACT TYPE Synthetic Turf Field
SUPERINTENDENT/PHONE: Todd Petersen DURATION: 300 Calendar Days
COMPLETION DATE: Jun-15
OWNER INFORMATION: ARCHITECT INFORMATION:
OWNER NAME: Temecula Valley Unified School District ARCHITECT NAME'. DC Architects
OWNER ADDRESS: 31350 Rancho Vista Rd,Temecula,CA 92592 ARCHITECT ADDRESS. 820 N.Mountain Ave,Ste 200,Upland,CA 91786
OWNER PHONE: 951-676-2661 ARCHITECT PHONE: 909-985-6939
OWNER FAX: ARCHITECT FAX: 909-985-0864
OWNER-CONTACT: ARCHITECT CONTACT:
CM INFORMATION:
CM NAME'. Neff Construction FINAL CONTRACT AMNT: $1,874,96500
CM ADDRESS: 17015.eon View Ave,Ontario,CA 91761 ORIGINAL COMPLETION: Apr-15
CM PHONE: 909-947-3768 BLDG SEISMIC RETROFIT: No
CM FAX: 909.947-3823 %ol Work By LAE'. 73%
CM CONTACT: Ron Kuehl Project Square Footage. 210,000
SCOPE OF WORK: Construction of Synthetic Track and Field,sub base,drainage,concrete curbs and sports equipment
"An Employee-Owned Company"
Og ANGE4FiIr
t.
«'t'GJCNEEB
N"•
PROJECT NUMBER: 1445
PROJECT INFORMATION: CONTRACT INFORMATION:
PROJECT NAME: PCH/Del Prado Streetscape CONTRACT AMOUNT: $6,472,946.80
PROJECT ADDRESS: PCH&Del Prado,Dana Point CONTRACT NUMBER:
PROJECT MGR/PHONE: John Risch CONTRACT TYPE: Street
SUPERINTENDENT/PHONE: Jack Tognen DURATION: 160 working days
COMPLETION DATE:
OWNER INFORMATION: ARCHITECT INFORMATION:
OWNER NAME: City of Dana Point ARCHITECT NAME: Roma Urban Design&Landscape Architects
OWNER ADDRESS. 33282 Golden La me rn,Dana Point,CA 92629 ARCHITECT ADDRESS. 1527 Stockton St,San Francisco,CA 94133
OWNER PHONE: 949-248-3500 ARCHITECT PHONE: 415-616-9900
OWNER FAX: 949-248-9970 ARCHITECT FAX:
OWNER-CONTACT: Matt Sinacori ARCHITECT CONTACT: Annlsa Voyiatzes
CM INFORMATION:
CM NAME: N/A %to Date Complete: 100%
CM ADDRESS: %of Work By LAE: 59%
CM PHONE. Actual Completion Date- May-15
CM FAX: Actual Contract Amount $ 6,774,629.00
CM CONTACT:
SCOPE OF WORK:
demolition,storm drain,grading,curb and gutter,sidewalks,spandrals.wheel chair ramps,traffic signals,
retaining wall,relocate palm trees,street lighting,landscape lighting,landscape and irrigation,site furnishings,asphalt paving.
"An Employee-Owned Company"
CAANJO\F(FSNEEp`NGr
PROJECT NUMBER: 1402
PROJECT INFORMATION: CONTRACT INFORMATION:
PROJECT NAME: Lindero Canyon Road Bridge Widening CONTRACT AMOUNT: $5798.090.00
PROJECT ADDRESS'. Westlake Village,CA CONTRACT NUMBER. P08-1107.31.12
PROJECT MGR/PHONE. Brad Holmes CONTRACT TYPE: Street
SUPERINTENDENT/PHONE. John Kay DURATION. 242 Working Days
COMPLETION DATE: Sep-10
OWNER INFORMATION: ARCHITECT INFORMATION:
OWNER NAME: City of Westlake Village ARCHITECT NAME. Willdan
OWNER ADDRESS: 31200 Oak Crest Drive,Westlake Village,CA ARCHITECT ADDRESS:
OWNER PHONE: 818-706-1613 ARCHITECT PHONE. 710-978-8206
OWNER FAX: 818-706-1391 ARCHITECT FAX:
OWNER-CONTACT: John Knipe ARCHITECT CONTACT: Ken Taylor
CM INFORMATION:
CM NAME: %to Cate Complete: 100%
CM ADDRESS: %of Work By LAE: 56%
CM PHONE' Actual Completion Date. 12/16/2015
CM FAX- Actual Contract Amount: $6.650,46100
CM CONTACT:
SCOPE OF WORK:
Project consists of the widening of Lindero Canyon Road over the 101 Freeway,adding lanes,paving,concrete,drains,etc.
"An Employee-Owned Company"
CAN96.4
� S
EER v"
PROJECT NUMBER: 1440
PROJECT INFORMATION: CONTRACT INFORMATION:
PROJECT NAME: Rosemead Blvd Beautification CONTRACT AMOUNT: 515,773,914 50
PROJECT ADDRESS: Rosemead Blvd,Temple City,CA CONTRACT NUMBER: P08-11-07.31.12
PROJECT MGR/PHONE: Jeff Bird CONTRACT TYPE: Street
SUPERINTENDENT/PHONE: Jack Togneri DURATION'. 16 months
COMPLETION DATE: Sep-14
OWNER INFORMATION: ARCHITECT INFORMATION:
OWNER NAME: City of Temple City ARCHITECT NAME. Gruen&Associates
OWNER ADDRESS: 9701 Las Tunas Drive,Temple City,CA 91780 ARCHITECT ADDRESS: 6330 Sa Vicente Blvd,Ste 200,Los Angeles,CA 90048
OWNER PHONE: 714-883-8677 ARCHITECT PHONE: 323-937-4270
OWNER FAX: 626-285-8192 ARCHITECT FAX: 323-937-6001
OWNER-CONTACT: All Cayir ARCHITECT CONTACT: Amy Sheldon
CM INFORMATION:
CM NAME: Transtech FINAL CONTRACT AMNT. 515,537,122.00
CM ADDRESS: 9701 Las Tunas Drive,Temple City,CA 91)80 ORIGINAL COMPLETION'. Mar-14
CM PHONE: 714-883-8677 BLDG SEISMIC RETROFIT: No
CM FAX: %af Work By LAE: 57%
CM CONTACT. All Cayir Protect Square Footage: 344,000
SCOPE OF WORK:
Demolition,grading,site utilities,site concrete,decorative Concrete,ac paving,monument signs,traffic signals,pedestrian lighting,decorative seating
nodes,bus shelters,landscape&irrigation.This is a beautification project that spans across 2 miles of Rosemead Blvd.
Aaron O'Brien,Chief Estimator
"An Employee-Owned Company"
BIDDER. Los Angeles Engineering, Inc.
SECTION 3
NON-COLLUSION AFFIDAVIT
CBF - 12
BIDDER'. Los Angeles Engineering, Inc
NON-COLLUSION AFFIDAVIT
In accordance with Public Contract Code Section 7106, the undersigned, being first duly
sworn, deposes and says that he or she holds the position listed below with the bidder, the
party making the foregoing bid,that the bid is not made in the interest of,or on behalf of,any
undisclosed person, partnership,company,association,organization,or corporation;that the
bid is genuine and not collusive or sham;that the bidder has not directly or indirectly induced
or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly
colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham
bid,or that anyone shall refrain from bidding; that the bidder has not in any manner, directly
or indirectly,sought by agreement, communication, or conference with anyone to fix the bid
price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the
bid price, or of that of any other bidder, or to secure any advantage against the public body
awarding the contract of anyone interested in the proposed contract; that all statements
contained in the bid are true; and, further, that the bidder has not, directly or indirectly,
submitted his or her bid price or any breakdown thereof,or the contents thereof,or divulged
information or data relative thereto, or paid, and will not pay, any fee to any corporation,
partnership, company association, organization,bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid.
Signature
Aaron O'Brien
Typed or Printed Name •
Secretary
Title
Los Angeles Engineering, Inc.
Bidder
Subscribed and sworn before me SII,
This_day of , 20
(Seal)
See Attached Notary Acknowledgement
Notary Public in and for '..
the State of California
My Commission Expires: •
CBF- 13
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of Los Angeles
On 02/22/2017 before me, Joseph Haygood, Notary Public
(insert name and title of the officer)
personally appeared Aaron O'Brien
who proved to me on the basis of satisfactory evidence to be the personlsrwhose name($is/arm
subscribed to the within instrument and acknowledged to me that he/skr€/they executed the same in
his/her/their-authorized capacity(iesrand that by hisffiefithffirsignatureW on the instrument the
person(e% or the entity upon behalf of which the person,($acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
Win, JOSEPH HAYGON�
WITNESS my hand and official s-al. • commission No.21y1432
-
i PUBLIC-CALIFORNIA
PUBLICLIFORNIA
/ \ LOS ANGELES COUNTY 1
41MYcomm.EspiesW A xi 2030
Signature Z_�! __yn•s (Seal)
0150011:0E61 A , City of Wpsetnea
MAYOR PRO I IOU
POI IX Low
583311 VA1ILt BOULEVARD P()BOX 199
10I l(11 MEMBERS: + ItOSENIEA0 CALIFORNIA 91770
WILT I AMN_m(nv '1E1 EH IONI (626)569-2100
Al
51166111-1 CI AO. FAX 1E26)107-9218
SI RVEN Lr
February 13, 2017
CITY OF ROSEMEAD
ROSEMEAD, CALIFORNIA
ADDENDUM NO. 1
JAY IMPERIAL PARK PROJECT
PROJECT No.41534
To All Prospective Bidders:
Please note the following revisions on the specifications for the above project:
1. You are hereby informed that the Bid Opening scheduled for 11:OD a.m. on Wednesday
February 15, 2017 has been changed to February 22, 2017 at 11:00 a.m. The City of
Rosemead will receive sealed bids up to 10:30 a.m. on February 22, 2017 and will follow up
with publicly opening the bids at 11:00 a.m.
The Addendum No. 1 forms a part of the Contract Documents for the above project and shall supplement
or supersede reference sections of original specifications. This Addendum No. 1 must be signed,
acknowledge on Page CBF — 5 of the Contract Bid Forms of the Specifications and submitted along with
the Bidder's Proposal.
BY ORDER OF THE CITY OF ROSEMEAD
Date: February 13,2017 •
1 Y.
e:L ))
Rafael IYFajardo P.E.
City Engineer
Acknowledgement:
Company: LossA etas Enaineerina Inc.
Bidder: I Title: Aaron O'Brien, Secretary
Date: 02/14/2017
MAYOR: City of psemeai
SANDRA AAMENTA
MAYOR PRO TEM:
Porky Low j;J I 8838 E.VALLEY BOULEVARD P.O BOX 399
COUNCIL MEMBERS: il ROSEMEAD,CALIFORNIA 91770 •
WILLIMIAIAFCON �.. TELEPHONE(626)569-2100
MARGARET CLARK FAX(626)307-9218
STEVEN LY
February 15,2017 '..
CITY OF ROSEMEAD
ROSEMEAD,CALIFORNIA
ADDENDUM No.2
JAY IMPERIAL PARK PROJECT
PROJECT No.41534
To All Prospective Bidders:
Please note the following revisions on the specifications for the above project:
1. There are only 12 Light Poles. #KCT2-10-K118-EDISON-REVA, 240V. WI 10'
DECORATIVE POLE. SEE DETAIL"NE-1"
2. On plan sheets 4.01 &4.02 for Planting,There is a Symbol called out CHI(46 EA),
which there are no description on the legend stating the Botanical name and size
of this plant. Please clarify?
Cercis occidentalis!Western Redbud-multi 24" box and this is however on
the plant legend.
3. There are a couple of Remote Control Valve Symbols on drawing 3.01 (attached)
at the south east corner of the job site with no valve size. Was this a typo error?
Please clarify.
These are extra symbols which did not get picked up. All valves seem to be
accounted for please move quick coupler from these symbols to next to
Valve A23.
4. Per Irrigation Legend the Main Line is to be a Schedule 80 PVC Pipe but don't say
anything about the fittings if we could use Schedule 40 or Schedule 80. Please
clarify.
All fittings shall match Pipe schedule.
lay Imperial Park Project Addendum No.2 Page 1 of 2
5. Per specs and details Cover Mulch is to be installed after planting. Can you please tell me the
depth required?
2"shredded redwood shavings.
6. Attached Contract Bid Forms (Addendum No.2)supersedes the previous Contract Bid
Forms.
The Addendum No. 2 forms a part of the Contract Documents for the above project and shall supplement or
supersede reference sections of original specifications.This Addendum No. 2 must be signed, acknowledge
on Page CBF—5 of the Contract Bid Forms of the Specifications and submitted along with the Bidder's
Proposal.
Failure to acknowledge receipt of addendum will disqualify the Bidder.
BY ORDER OF THE CITY OF ROSEMEAD '..•
Date: February 15, 2017.
Very truly yours,
/ C
Rafael M. Fajardo P.E.
City Engineer •
Acknowledgement:
Company: Los Angeles Engineering, Inc.
Bidder: V 1
Title: Aaron O'Brien, Secretary
Date: 02/17/2017
•
•
Jay Imperial Park Project Addendum No.2 Page 2 oft
MAYOR: Cityof j�/(lA ��
J
SANDRA.ARMEMA
MAYOR PRO TEM:
Pony LAW
_, 8838 E VALCA BOULEVARD P.O BOX 399
roFNCII.MEMBERS: ��- TEOLEPHONE,CALIFORNIA 91770
TELMARu ALARCON " FAX ONE(626)569-2100
MARENRLT CLARK (626)307-9218FAX
STEVEN Y
February 16,2017
CITY OF ROSEMEAD
ROSEMEAD, CALIFORNIA
ADDENDUM No. 3
JAY IMPERIAL PARK PROJECT
PROJECT No.41534
•
•
To All Prospective Bidders: •
Please note the following revisions on the specifications for the above project:
1. The following Bid Item 24 shall be deleted from the Base Bid Schedule and not
Included in the total base bid price.
•
UNIT OF i EST. UNIT
NO.
. ITEM DESCRIPTION III MEASURE l ITEM
QTY. PRICE
1 COST
- 1
The Addendum No.3 forms a part of the Contract Documents for the above project and shall supplement or
supersede reference sections of original specifications. This Addendum No. 3 must be signed, acknowledge
on Page CBF —5 of the Contract Bid Forms of the Specifications and submitted along with the Bidder's
Proposal
•
•
Failure to acknowledge receipt of addendum will disqualify the Bidder.
BY ORDER OF THE CITY OF ROSEMEAD
Date: February 16,2017.
Very truly yours,
By >
afael M.Fajardo P.E.
City Engineer
Jay Imperial Park Project Page 1 of 2
Acknowledgement:
Company: Los Angeles Engineering, Inc.
Bidder:
Title: Aaron O'Brien,Secretary