Loading...
CC - Item 5B - Sidewalk Gap Closure Project - Award of Contract fro Design Engineering - Delta Ave from Mission Drive to Wells StreetROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: GLORIA MOLLEDA, CITY MANAGER ey� DATE: JUNE 19, 2018 SUBJECT: SIDEWALK GAP CLOSURE PROJECT (DELTA AVENUE FROM MISSION DRIVE TO WELLS STREET) - AWARD CONTRACT FOR DESIGN ENGINEERING SUMMARY As part of the City's Fiscal Year 2018-19 Capital Improvement Program, the City Council approved a project entitled "Safe Routes to School (SR2S) Sidewalk Gap Closure — Delta Avenue" which consists of public improvements to the City's local streets and public right-of- way areas. In compliance with the American with Disabilities Act (ADA) guidelines, this project consists of adding and retrofitting concrete sidewalk including the installation of parkway trees and appurtenances. The proposed work will take place on Delta Avenue between Mission Drive and Wells Street. This project is not only going to beautify the area; but also, it will create a continuous sidewalk on both sides of Delta Avenue. These improvements will help pedestrians and school children that sometimes walk on the street due to the lack of continuous sidewalk on these streets. STAFF RECOMMENDATION It is recommended that the City Council authorize the City Manager to enter into a contract with CEJ Engineers, Inc. in the amount of $38,380 for design engineering services. In addition, authorize an amount of $4,000 (approximately 10%) as a contingency to cover the cost of unforeseen expenses. During Fiscal Year 2017-18, the City Council approved the "Sidewalk Installation Project/Earle Avenue and Wells Street" from Mission Drive to Wells Street. The project consisted of the installation of sidewalk, parkway trees, and appurtenances. The project was received throughout the community as a success for both the aesthetic appearance as well as safety improvements for pedestrians walking to Shuey Elementary School. It has been proposed to complete a similar project at Delta Avenue from Mission Drive to Wells Street, which would also serve as a route for pedestrians walking to Shuey Elementary School. ITEM NO. 5-11 City Council Meeting June 19, 2018 Page 2 of 3 The City staff applied for a SR2S grant for Sidewalk Gap Closure on Delta Avenue and was successfully awarded a grant in the amount of $1.1 million for the construction of the project. The project consists of the installation of sidewalk at Delta Avenue from Mission Drive to Wells Street, similar to Earle Avenue Sidewalk Installation Project. This will be the final gap closure around Shuey Elementary; and would allow students to walk safely utilizing the sidewalk rather than the roadway when traveling to the school. In response to a Request for Proposal, eight (8) sealed bids were received in the Office of the City Clerk by May 30th, 2018. The City Clerk opened the sealed bids with the following results: RANK CONSULTANT LOCATION BID AMOUNT 1 CEJ Engineers, Inc. Irwindale, CA $38,380.00 2 PK Construction Pasadena, CA $39,290.00 3 Onward Engineering Anaheim, CA $51,610.00 4 EC + Associates Engineering Downey, CA $54,250.00 5 Kreuzer Consulting Group Seal Beach, CA $59,455.00 6 CWE Buena Park, CA $61,502.00 7 Tait & Associates, Inc. Santa Ana, CA $61,800.00 8 KOA Corporation Monterey Park, CA $69,642.00 Staff reviewed the proposal documents as well as the consultants' background and recent projects for competency. Staff determined that CEJ Engineers, Inc. was the lowest responsible bidder to perform the design consulting services. FISCAL IMPACT A funding amount of $75,000 (Measure R) for this project was approved by the City Council as part of the City's FY 2018-19 Capital Improvement Program. ENVIRONMENTAL REVIEW The project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (a) of the CEQA Implementation Guidelines. STRATEGIC PLAN IMPACT Strategy 3: Beautification and Infrastructure PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. City Council Meeting June 19, 2018 Page 3 of 3 Prepared By�'� ""Rafael M. Fajardo, P.E., City Engineer Submitted By: Miche e G. Ramirez, Director of Public Works Attachment A: CEJ Engineers, Inc. Proposal CEJ Engineering, Inc. Proposal �0_ - May 30, 2018 _.,,... CITY OF ROSEMEAD Rafael Fajardo, RE City Engineer 8838 E. Valley Boulevard Rosemead, CA 91770 Dear lvlr.. Fajardo, CEJ Engineers is pleased to have the opportunity to submit this proposal for professional engineering services related to the City's project. CEJ Engineers specializes in street design and street improvement projects. Our staff has extensive experience in preparing street construction plans, drainage studies, utility coordination, master plans, and preparing PS&E for various projects in accordance with local and regional standards and policies. Our key personnel has more than 40 years of experience in working and communicating with a wide spectrum of relevant public agencies throughout Orange County and the Los Angeles County. CEPS personnel have provided professional consulting services to cities, special districts, and other governmental agencies within Southern California and Caltrans. CEJ is dedicated to professional quality and technical excellence through a proactive QA/QC program. The CEJ team will provide services for the aspects required for this project as per the scope of work. The following Exhibits are enclosed: 11 Exhibit A — Scope of work ❑ Exhibit B —Proposed Fee We believe the CEJ Team provides the right combination of experienced staff, Project understanding, and local knowledge to successfully assist the City of Rosemead with Engineering Services. Please feel free to contact us to discuss any aspects of this proposal or to arrange for an interview at (626) 667-8675 or at jeervautes@cej-eng.com. Respectfully Submitted, Joaquin Cervantes, P.E. Principal CEJ Engineers, Inc. 18800 Amar Rd., Suite B13 Walnut CA 91789 Engineers C, Surveyors , Planners 18800 Aimir Rd, Suite B 13, Walnut CA„ 91799/626-66743675 SR2" Sd Jl 4,Vf;_b.F, GAP t:,€.� ,C1,''-tG i`�(4E?d�e�9".�`,Gi�`s3' d,"t`r� AR1C,�lJJ.` pr op,? at!;?6i.".5'fy i-��dglr" (Pn& 1?Pr7. 2l)A ° `) Table of Contents FirmIntroduction....................:.............................:...................................................................................... 3 Qualifications of Project Team.................................................................................................................... 3 ScopeOf Work ................................... ................... .......................................... .............................................. 5 ProjectManagement....................................................................................................................................5 ProjectUnderstanding..................................................................................................................................6 Plans, Specifications & Estimates.................................................................................................................. 6 ProjectSubmittals..................................................................................................... ProposedFee.......................................................................................................... Engineers s Sw veyors m Pioneers uw�. SSE 14£300 Awar Rd ,uIle J113 Walmi ICA 91789/62'6667467 I ........ ...... I..... 9 ................. I ... I... 9 SR25 Siad&'i( AL I( r,!^ `;a",05,,1ARE 2pyOIECTTDO' FA AVki r€ LN?aid{' aldi ^aiP:`tAd DRIVE TO WrUS STHFI- ' I'RF '' AiO. 0118-1115) INNFROTWOrt CEJ is a privately -owned engineering corporation that provides a full range of professional civil engineering dedicated to serving public agencies. CEJ is a certified Small Business Enterprise (SBE) and Disadvantaged Business Enterprise (DBE) that has met the special needs of cities, counties, special districts, as well as state and federal agencies. We offer a full complement of Civil Engineering, Traffic Engineering and Surveying capabilities. CEJ is highly capable and qualified to perform the tasks outlined in the RFP. We are confident that our qualifications listed throughout this proposal will further illustrate our ability to meet the City's expectations for responsiveness, quality, level of service, expertise and commitment. A successful partnership for the type of services being requested by the City of Rosemead involves choosing the appropriate Project Manager and team with diverse capabilities. Team members need the experience and knowledge to quickly resolve design challenges and field issues, but they also need excellent communication skills to interact with the various parties that become involved. l [ 1 CEJ offers a qualified team of professionals with the technical qualifications and diverse capabilities necessary to undertake the design for the City's project. The following briefly outlines the responsibilities and qualifications of each of our team members, These individuals are committed to this project for its duration. Key Personnel Joaquin Cervantes, CEJ's proposed Project Manager for this project will remain in this Position and as the key point of contact. Mr. Joaquin Cervantes, P.E., has over 20 years of experience. Mr. Cervantes will be assigned as our Project Manager for this project and as Principal of CEJ Engineers; he will have the authority to negotiate on behalf of the Company, He has extensive experience with various city capital improvement projects including several storm drain and flood control projects. He will be the primary point of contact with the City and will be supported by the staff resources of the firm. He has over eighteen years of civil engineering experience. Mr. Cervantes has assisted in the design and preparation of plans and specifications for street improvements, hydraulics, drainage, engineering planning, flood control, storm drain, sanitary sewer, highway interchange projects for numerous public agencies in Southern California. zBe. 5 SWE:Vl,`iE. f GLiP CLOS1?AF P[10A-0 , Y DELr,4 AVOJUh FROW1 A4154Nkk:tF'! 3.^F?'Vf -'f'a # V Ef S ,?I_'EEY" u Education: 1998 B.S, Civil Engineering California State Polytechnic University, Pomona, Registration: California No. C70635, Civil Mr. Miguel Esparza, E.I.T, QSD, will serve as the lead civil staff design engineer and is a Senior Engineer with CEJ Engineers, Inc. He has over 20 years of experience in civil engineering specifically in highway, street improvement, and traffic engineering projects. His experience also includes highway/street design, alternative studies, utility coordination, Storm water Pollution Control Plans (SWPPP) cost estimating, grading, railroad grade separations, stage construction/traffic handling, and detour plans. Education: 1998 B.S, Civil Engineering California State Polytechnic University, Pomona 2001 M.S. Civil Engineering California State University, Long Beach Registration: California E.I.T Mr. Carlos Urena, P.L.S., will serve as the lead surveyor, his qualifications include over 18 years of professional work as a Land Surveyor. Mr. Urena has direct exposure to management of office staff and field staff, sales, client relations, cost estimating and proposal generation, commercial ALTA surveys, control surveys including GPS, Boundary, Topographic, Extensive Construction Calculations, survey research for utility mapping and coordination and project management coordination and implementation. Mr. Urena will be responsible for the design of cross-sectional survey, and topography. and the preparation of right-of-way documents as necessary. Education: 2000 B.S, Civil Engineering, California State Polytechnic University, Pomona Registration: Licensed Land Surveyor (PLS), California, License No. 8234 Staffing Availability CEJ recognizes that the key to successful project execution is dependent Upon the key personnel and how they will manage their time to participate in the project. CEJ will dedicate the appropriate staff on the projects and insure that the staff has the required schedules to be able to properly execute the project. Below is a table indicating the staff availability. Key Personnel Role Availability Carlos Alvarado, P.E QA/QC 10 % to 25°%0 Joaquin Cervantes, P.E Project manager 60% to 80% Miguel Esparza, E.LT Design, Engineer 60% to 80% Carlos Urena, PLS Land surveyor 50% As demonstrated in the above descriptions of our key personnel, CEJ is proposing experienced personnel that will provide best practices to every task. Our key personnel, backed by experienced support personnel, are assigned lead roles to ensure continuity across all services. The following tasks will give a detailed description of the professional services included in this Scope of Work and our Project Approach. The team management and close coordination with all parties involved in the project is critical to the successful completion of any project. CEJ takes pride in the high level of service we provide to our clients. Three key elements to successful project management include a Project Kick-off Meeting, and Project meetings. Project Kick-off Meeting A Project Kick-off Meeting will be scheduled to include the decision makers and policy enforcement staff from the governing agencies and utility companies associated with this project (Project Team). Project Meetings CEJ will attend project meetings as required. We anticipate we will need to attend a total of 3 meetings (kick-off and 2 design meetings). Quality Control Approach The primary and most important fundamental aspects to the execution of any construction contract is the adherence to an established Quality Assurance/Quality Control (QA/QC) plan. CEJ proposes Carlos Alvarado as QA/QC manager for all task orders. He has over 40 years of experience in management and oversight of public agency projects. These QA/QC procedures are implemented from initial scoping through agency review and approval. As the QA/QC manager, Carlos Alvarado's responsibilities will include the following: Review project scope, schedule, and budget after the kick-off meetings, ➢ Review progress at critical stages of the project, ➢ Make technical suggestions, ➢ Provide management recommendations, ➢ Review deliverables prior to submission R0 3§C1EVJALX GAPCb'.s,SURT Nr J e "AT DYFLFIi dy'!=aJal Rsoall'w'; 3t`opiD`"WL:T(;i, wiratssrf?e i (,NFP 1,40. 2018-15) ➢ Review the overall project to make certain the projects standards are being achieved CEJ conducted a field review of the subject street within the Project limits. The project is located at Delta Avenue from Mission drive to Wells street. The Improvements include grading, removals and installation of new sidewalk, retaining curbs, driveways and curb gutter reconstruction, tree planting and appurtenant improvements. The following describes the scope of work: Delta Avenue— (Mission Drive to Wells Street.) Delta Avenue is a two lane road, classified as Residential Street. It is 40 feet wide with a total distance of approximately 1,700 LF. Existing Conditions.- There onditions: There is currently no sidewalk on both sides of the street except for a few locations and large sections of damaged driveways and curb and gutter. Proposed Scope Our assessment is to construct new sidewalk on both sides on the street and remove and replace large sections from curb to curb at locations where severe cracking is observed. The City's constructionbudget will determine the extent of the repairs, sidewalk and curb and gutter replacement. CEJ will prepare conceptual design for the proposed hardscape and landscape improvements as well a preliminary construction cost estimates to adequately assess the extent of the construction improvements as shown on the RFP. Structural calculations In addition, Structural Calculations will be prepared for the proposed retaining wall along this segment of homes. Structural calculations will be prepared and submitted to the City for review and approval. Plans, Specifications & Estimates Task 1- Field Condition Assessment/Topographic Survey 1.1 Prepare afield survey to assess the physical conditions and utilities within the project area. 1.2 Meet with City staff to define and clarify the work plan and project elements and obtain all project data from the City. We will review all City -supplied information and neighborhood concerns. 1.3 We will coordinate with all utility companies to determine underground, surface, and overhead facilities. CEJ Comply with the City -adopted "Utility Coordination Procedures." Determine where FR25SIDE WALK SIP(.r_sASU`;EPROJECT Ae' DEVI A/9VENUE .t<E'%a rt',y .37ehlOtVIr_ ICA ifraas SSD? E interfaces with existing facilities will occur as a result of the future of this project. In addition, we will consult with affected utility companies and resolve any conflicts. We will prepare a utility log and include findings in our biweekly status reports 1.4 Perform topographic surveys at the necessary locations as necessary to design the intended improvements. CEJ will establish horizontal and vertical ground control necessary to produce a 1"=40' scale digital topographic map within the street right-of-way and beyond the street right-of- way where required. 1.5 CEJ will establish existing and proposed controls including centerline, street geometrics, and right- of-way throughout the project limits. Elevations will be based on the Los Angeles County Department of Public Works (LACDPW). 1.6 We will provide a topographic map showing detailed survey at 1"=40' scale using AutoCAD on 24" X 36" sheets. The map will show all existing conditions, will identify all features include BCR, ECR, flow -lines, centerlines, angle points, top of curb, spandrels, pavement striping, utilities, structures, walls, trees and.landscape, underground and surface utilities, poles, hydrants, catch basins, signs, valves, manholes. Task 2- Construction Plans The Plans. Specifications, and Estimates will conform to the City of Rosemead's standards and practices. 2.1 CEJ will provide clear, concise, and complete drawings with Latest version of AutoCAD and Civil3D software. The design will be plotted using permanent drafting ink on mylar, and drafted on twenty- four inch by thirty-six inch (24"x36") mylar sheets. The plans will be prepared under the supervision of a Civil Engineer registered in the state of California who will sign the final plans. The original drawings and the electronic data of these drawings will be submitted to the City, along with a CD in AutoCAD format upon completion. 2.2 CEJ will conduct all necessary research to establish precise location of all utilities and utility easements for each project. CEJ will provide the utility with a preliminary notification/request for current information letter and up to three relocation notices via certified mail CEJ will consult with affected utility companies requiring relocations, and resolve any conflicts, keeping City staff informed in writing, including the possibility of undergrounding utilities presently on poles along the project area. Comply with Caltrans' "Manual on High and Low Risk Underground Facilities within Highway Rights -of -Way. Construction plans will include telephone numbers of utilities and other affected agencies; power poles; driveway approaches; edge of pavement; water service relocation and/or installation if necessary; sewer manhole cover and water valve cover adjustment if necessary; and other utility's that are of benefit to the design of the project. e'2S ,`TH9LWVAiU; . r?2SSddsEVIMidPGAP'00SUR PROJECT T kTA, A4P'x€iU H?0M MPt SS:ION 0R'Ib1C rr VY 9F P a Wr r'i'iiriz The final plans will be submitted in three (3) submittals and will consist of the following submittals and materials. The 60% submittal materials will include the following: 60% Improvement Plans • Title Sheet with vicinity map, General Notes, Signature Blocks, Legend, Sheet Index, Utility Contact Information. • Utility Plans • Sidewalk Plans, Profiles, Sections, Details, and Construction Notes • Construction Plans with base mapping including survey and utility locations. The 85% submittal materials will include the following: • 85% Improvement Plans • 85% Specifications • 85% Engineers Estimate— Including Quantity Calculations and Cost Data. 100% Final Submittal Material will include'the following item: Y 100% Improvement Plans —On mylar and stamped bythe Engineer • 100% Specifications —Stamped by the Engineer • 100% Engineers Estimate- Including Quantity Calculations and Cost Data. Final plans, specifications, and estimates will be provided on "D" size mylar, three sets of copy's and in electronic format to the City on a CD and PDF version. CEJ will also prepare AS -Built Plans Proposed fee is enclosed in a separate document. See exhibit "B" attached May 29, 2018 CITY OF ROSEMEAD Rafael Fajardo City Engineer, P.E 8838 E. Valley Boulevard Rosemead, CA 91770 PROPOSAL O. SR2S SIDEWALK GAP CLOSURE PROJECT AT DELTA AVENUE FROM • DRIVE TO - •2018-16) Dear Mr. Fajardo, CEJ Engineers is pleased to have the opportunity to submit this FEE proposal for professional engineering services related to the City's project. 1 Our proposed fee is based on the proposal required format and is not to exceed lump sum fee amount of $38,380 based on established hourly rates. Respectfully Submitted, Joaquin Cervantes, P.E. Principal CEJ Engineers, Inc. CEJ 18800 Amar Rd., Suite B13 Walnut CA 91789 (626) 667 -8675 -office (626) 893-9266—Cell [ENT: City of Rosemead CEJ Engineers Inc OJ: SR2S Sidewalk Gap Closure Project -Delta Ave. e No: SUMMARY PROPOSAL FEE TE: 05/29/18 Page 1 of 1 :•-Task 1 TOPOGRAPHIC I; ass PositiordName Hours Rate. Subtotal A Two - Man Survey Crew 16 $180 $2,880 B Survey Analyst 10 $120 $1,200 C CADD Designer/ Technician 20 $85 $1,700 LABOR; $6,780 A Street Plans SeniorEngineer 40 $140 $5,600 B Rei Wall _ Engineer l Senior Designer _. __ 20 _ $120 "-"-`00 2,400 C --- CADD Desic,�ner/Technician-� _ --- - 80 $9p - $7,200 D StrucCalcs SructuralEngmeer -_ _ 20 $140 _ ,. $2,800 D .._.,.._ _ Smng_andEn __�..�...._..,_.w..� ineer/Senior Desi ner - __�__._ _____---.__. 18. _------ $140$2,520 —'� -- - Striping ®. __ ., __ $20,520 ;lass _.- -- PosdionlNama _ . __ Hours Rate Subtotal _ _ _Semor Engineer -_ 8 _ $1,200 B ---_. Techni cian..__ _.. _ _. _.... .- -" 32 .,,^$150 $85 .......$2;720'-- .. _ LA80R: ....._.__.._. -F $3,920 - TE lass PositionlName Hours Rate .Subtotal _._En neer/fie....m... o_r.D,.esic ner --. 20 -._—_��-- $120 '-- LABOR: R: $2,400 lass Position/Name Hours Rate Subtotal A Pre-bid meeting ---_ 4 .0 _ .--_--.Yv —_,_...� $480 A ..-_. Review Shop Drawings/RFI'S _._._$120 24 ._......._ _._.... $2,880_„_- A _ ___ Prepare Record Drawings - ,.___..$120 16 $90 $1.440 Total Labor at Billing Rates $37,4: Reimbursable Expenses $960 Proposal BY/ Project Manager Joaquin Cervantes RE i CEJ ENGINEERS, INC. Effective July 1, 2016 to June 30, 2017 Hourly Rate Schedule ENGINEERING DIVISION Principal Engineer.....................................150.00 Project Manager ....................................... 140.00 Senior Project Engineer ........................... 130.00 Senior Engineer ...................................... 115.00 Associate Engineer .................................. 105,00 Design Engineer ...................................... 100.00 Designer/CADD Drafter ............................ 95.00 Clerical/Technical Aide .....:........................ 65.00 LANDSCAPE ARCHITECTURE Senior Landscape Architect, ..................... 11o.00 Associate Landscape Architect-- ........... 100.00 REIMBURSABLE EXPENSES Reproduction .................................... Cost SURVEYING DIVISION Senior Surveyor........................................150.00 190.00 Senior Survey Analyst..............................135.00 Survey Analyst II ......................................120.00 ...... ........,110.00 Survey Analyst I .......................................100.00 Survey Party Chief ...................................105.00 Field Party (Three)., ............ 190.00 Field Party (Two)......................................180.00 Field Party (One) .... .......... ..... ...... ........,110.00 CONSTRUCTION MANAGEMENT/ INSPECTION Operations Manager.................................110.00 Supervising Public Works Observer ......... 105.00 Senior Public Works Observer ...................95:00 Public Works Observer...............................90.00 Construction Manager..............................110.00 Construction Engineer................................85.00 Subconsultant Services, .................... Cost plus 10% Automobile Transportation ......... ...... ... Current rate Delivery, Freight, Courier .....................Cost Agency Fees.. ................... .... ... Cost Commercial Travel / Subsistence......... Cost Additional billing classifioaUms maybe added to the above listing during the year as ne, positions are created. The above schedule Isfor straight time. Bluepdnling, reproduction, messenger services, and printing Will be invoiced at cost plus ten percent (16%). A subconsultant management fee often percent (1 B%) will be added to the direct cost of all subconsuitant senlces to provide for the cost of administration, consultation. and coordination. Valid July 1, 2016 thru June 3q 2617, thereafter, the roles may be raised once par year to the value OF change of the Consumer pdce Index for the Los Angeles/Orange County area, but not mwo than Me percentperyear.