Loading...
CC - 2019-21 - Adopting Projects for Fiscal Year 2019-20 Funded by SB 1 RESOLUTION NO. 2019-21 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROSEMEAD, CALIFORNIA, ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2019-20 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017)was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS,the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account(RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS,the City,will receive an estimated$914,800 in RMRA funding in Fiscal Year 2019-20 from SB 1; and WHEREAS, this is the third year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City has undergone a robust public process to ensure public input into our community's transportation priorities/the project list; and WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment; and WHEREAS,the funding from SB 1 will help the City maintain and rehabilitate its streets and add active transportation infrastructure throughout the City this year and many of similar projects into the future; and WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City's streets are in an "good" condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a "very good" condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide. NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City Council of the City of Rosemead, State of California, as follows: 1. The foregoing recitals are true and correct. 2. The following list of proposed projects will be funded in-part or solely with fiscal year 2019-20 Road Maintenance and Rehabilitation Account revenues: Valley Boulevard Resurfacing, Phase II. The project involves the rehabilitation of the street pavement on Valley Boulevard from Rosemead Boulevard to the east City limit. The scope of work will include cold milling the existing asphalt concrete pavement; constructing a rubberized asphalt concrete overlay; adjusting utility manholes and vaults to the final grade; and restoring the traffic striping and pavement markings. The project will provide a useful pavement life of 15-20 years. The anticipated schedule is to complete design drawings and bid specifications in the Fall 2019, and complete construction in the Spring 2020. 3. The following previously proposed and adopted projects may utilize fiscal year 2019-20 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues: Walnut Grove Avenue Resurfacing Project and Walnut Grove Avenue Colored Concrete Crosswalk Installation Project. These projects were combined as one project involving the rehabilitation of the street pavement on Walnut Grove Avenue from Marshall Street to the north City limit, and installation of colored concrete crosswalks at various intersections within the same limits. The project was previously designated to be funded with RMRA revenues in fiscal years 2017-18 and 2018-19,and will be utilizing fiscal year 2019-20 RMRA revenues as well. The project will provide a useful pavement life of 15- 20 years, and the concrete crosswalks will provide a useful life of 30-40 years. While design drawings and bid specifications are nearly complete, construction is anticipated in the Spring 2020 to allow for the scheduled undergrounding of overhead utilities in Walnut Grove Avenue. PASSED AND ADOPTED by the City Council of the City of Rosemead, State of California this 23rd day of April 2019,by the following vote: Margare lark, Mayor APPROVED AS TO FORM: ATTEST: r/a-4/ Rachel Richman, City Attorney Ericka ernandez, City Clerk _ . . . _ _ _ _ . ..• - , - _ • _ . • _ . . -v. _ • STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) § CITY OF ROSEMEAD ) I,Ericka Hernandez,City Clerk of the City Council of the City of Rosemead,California,do hereby certify that the foregoing City Council Resolution, No. 2019-21, was duly adopted by the City Council of the City of Rosemead, California, at a regular meeting thereof held on the 23`d day of April, 2019,by the following vote,to wit: AYES: ARMENTA, CLARK, DANG, LOW, LY NOES: NONE ABSENT: NONE ABSTAIN: NONE Ericka Hernandez, City Clerk